  • Additional Agenda for 93rd Meeting of PCSC scheduled to be held on2nd December 2020 (online through WebEx) Page1/4

    Southern Regional Power Committee Bengaluru

    Additional Agenda for 93rdmeeting of

    Protection Coordination Sub-Committee(PCSC) of SRPC

    to be held on 2nd December, 2020 online through WebEx

    1. Frequent tripping of 400kV KKNPP – Tirunelveli line-2

    a. A special meeting was held on 4thNovember 2020 to discuss the frequent tripping of

    400kV KKNPP – Tirunelveli line-2 and prolonged outage of 400kV KKNPP – Tirunelveli

    line-1 (since July 2020). The instances of tripping are given below:

    Sl.

    No.

    Event Description Elements tripped

    1 Multiple tripping in 400kV Kudankulam SS

    at 05:48 Hr. on 26-07-2020.

    i. 400kV Kudankulam - Tirunelveli line-2

    ii. 400kV Kudankulam - Tuticorin PS-2

    2 Multiple Tripping in 230kV/110kV TTN Auto

    SS of TANTRANSCO and 400kV/230kV

    Kudankulam Nuclear Power Plant (KKNPP)

    of NPCIL at 22:10Hr. on 08-10-2020.

    i. 230kV TTN Auto- TTPS line-1 and 2.

    ii. 230kV TTN Auto- Kayathar line-1

    iii. 230kV/110kV Transformer-1 and 2 at TTN

    Auto SS

    iv. 400kV KKNPP - Tirunelveli line-2

    v. 230kV KKNPP - TTPS

    vi. 230kV KKNPP - SR Pudur

    3 Multiple Tripping in 230kV/110kV TTPS of

    TANGEDCO and 400kV/230kV KKNPP of

    NPCIL at 17:38 Hr. on 30-10-2020.

    i. 230kV TTN Auto- Kayathar line-1

    ii. 400kV KKNPP - Tirunelveli line-2

    iii. 230kV KKNPP - TTPS

    4 Multiple Trippingin 400kV/230kV

    Kudankulam Nuclear Power Plant(KKNPP)

    of NPCIL at 17:58 Hr. on 02-11-2020.

    i. 400kV KKNPP - Tirunelveli line-2

    ii. 230kV KKNPP - TTPS

    iii. 230kV KKNPP - SR Pudur

    b. NPCIL- KKNPP and TANTRANSCO may update on the status of action taken on the

    recommendations during the special meeting.

    2. Confirmation Status of insulator replacement in following lines:

    i. 400kV Hassan – Nelamangala

    ii. 400kV Nelamangala – Talaguppa.

    a. During September - October 2019, as per information from KPTCL, the above lines

    were kept in non-auto mode due to insulator replacement works. However, it has

    been observed that during the recent trippings of 400kV Nelamangala – Talaguppa

    lines, auto reclose function in the line is in disabled condition.

    b. KPTCL may update status.

  • Additional Agenda for 93rd Meeting of PCSC scheduled to be held on2nd December 2020 (online through WebEx) Page2/4

    3. Review of Distribution of Loads and Signal Paths of Raichur – Sholapur SPS, Talcher-

    Kolar SPS, and Kundankulam (Unit-I & II) SPS – Status Update

    a. A meeting was held on 10th September 2020 to finalise SPS DS matrix for Raichur –

    Sholapur SPS, Talcher-Kolar SPS and Kudankulam (Unit-I & II) SPS and the finalized

    matrix was communicated to all constituents for taking up any pending works.

    b. During the recent HVDC Talcher-Kolar Pole trippings, it has been observed that signal

    has not got extended to some of the load points in Tamil Nadu, Andhra Pradesh.

    PGCIL / constituents shall update status on the pending works.

    c. Further, during tripping of HVDC Talcher-Kolar Pole-1 SPS Trip signal-1 had operated

    on 23rdOctober 2020 at 21:33 Hr. However,the trip signal was not received at

    Andhra Pradesh.There was no load relief in Andhra Pradesh.

    d. Andhra Pradesh and PGCIL may apprise.

    4. Tripping Frequent tripping of 220kV Ambewadi – Ponda(Xeldem) line-1

    a. There had been frequent tripping of 220kV Ambewadi – Xeldem line on single line to

    ground fault. Instances of tripping during August to October 2020 is given below:

    S.NO. ELEMENT NAME TRIPPING

    DATE TRIPPING

    TIME OWNER (SEND)

    OWNER (REND)

    REMARKS

    1 220kV Ambewadi - Xeldem 01-Aug-20 17:47 KPTCL GOA R-N Fault

    2 220kV Ambewadi - Xeldem 04-Aug-20 14:36 KPTCL GOA R-N Fault

    3 220kV Ambewadi - Xeldem 26-Aug-20 13:53 KPTCL GOA Y-B Fault

    4 220kV Ambewadi - Xeldem 30-Aug-20 16:15 KPTCL GOA Y-B Fault

    5 220kV Ambewadi - Xeldem 31-Aug-20 13:01 KPTCL GOA Y-B Fault

    6 220kV Ambewadi - Xeldem 31-Aug-20 14:15 KPTCL GOA B-N Fault

    7 220kV Ambewadi - Xeldem 05-Sep-20 14:01 KPTCL GOA B-N fault

    8 220kV Ambewadi - Xeldem 15-Sep-20 11:20 KPTCL GOA B-N fault

    9 220kV Ambewadi - Xeldem 20-Sep-20 11:15 KPTCL GOA B-N fault

    10 220kV Ambewadi - Xeldem 23-Sep-20 14:07 KPTCL GOA B-N fault

    11 220kV Ambewadi - Xeldem 28-Sep-20 12:31 KPTCL GOA B-N fault

    12 220kV Ambewadi - Xeldem 01-Oct-20 08:30 KPTCL GOA B-N fault

    13 220kV Ambewadi - Xeldem 07-Oct-20 14:00 KPTCL GOA B-N fault

    14 220kV Ambewadi - Xeldem 19-Oct-20 23:53 KPTCL GOA Y-N Fault

    15 220kV Ambewadi - Xeldem 23-Oct-20 11:07 KPTCL GOA B-N fault

    16 220kV Ambewadi - Xeldem 26-Oct-20 12:14 KPTCL GOA B-N fault

    17 220kV Ambewadi - Xeldem 26-Oct-20 13:25 KPTCL GOA B-N fault

    18 220kV Ambewadi - Xeldem 26-Oct-20 20:07 KPTCL GOA

    Line did not trip at Ambewadi

    end.

    19 220kV Ambewadi - Xeldem 27-Oct-20 13:10 KPTCL GOA Y-B Fault

    20 220kV Ambewadi - Xeldem 29-Oct-20 14:28 KPTCL GOA B-N fault

    21 220kV Ambewadi - Xeldem 30-Oct-20 10:57 KPTCL GOA B-N fault

    b. KPTCL may apprise.

  • Additional Agenda for 93rd Meeting of PCSC scheduled to be held on2nd December 2020 (online through WebEx) Page3/4

    5. Frequent tripping of 220kV Asupaka-Lower Sileru line

    a. The issue of frequent tripping of 220kV Asupaka – Lower Sileru line was discussed in

    PCSC-92 held on 29th September 2020. It was informed in the meeting that frequent

    faults were occurring in the line due to vegetation along the length of the line.

    b. It was also informed that the auto reclose in the line is in disabled condition.

    TSTRANSCO had informed that auto reclosure at Asupaka end was disabled since AR

    was not in service at Lower Sileru end. APGENCO had informed that Auto Reclosure

    at Lower Sileru end would be enabled within a week’s time.

    c. Instances of tripping of the line during August – October 2020 are given below:

    S.NO. ELEMENT NAME TRIPPING

    DATE TRIPPING

    TIME OWNER (SEND)

    OWNER (REND)

    REMARKS

    1 220kV Asupaka – Lower Sileru

    01-Aug-20 11:01 TSTRANSCO APGENCO B-N Fault

    2 220kV Asupaka – Lower Sileru

    18-Aug-20 19:19 TSTRANSCO APGENCO Y-N Fault

    3 220kV Asupaka – Lower Sileru

    22-Aug-20 13:01 TSTRANSCO APGENCO Y-N Fault

    4 220kV Asupaka – Lower Sileru

    29-Aug-20 10:33 TSTRANSCO APGENCO R-N Fault

    5 220kV Asupaka – Lower Sileru

    01-Sep-20 10:48 TSTRANSCO APGENCO B-N Fault

    6 220kV Asupaka – Lower Sileru

    05-Sep-20 10:41 TSTRANSCO APGENCO Y-N Fault

    7 220kV Asupaka – Lower Sileru

    07-Sep-20 12:39 TSTRANSCO APGENCO Y-N Fault

    8 220kV Asupaka – Lower Sileru

    08-Sep-20 14:35 TSTRANSCO APGENCO R-N Fault

    9 220kV Asupaka – Lower Sileru

    18-Sep-20 12:05 TSTRANSCO APGENCO Y-N Fault

    10 220kV Asupaka – Lower Sileru

    19-Sep-20 12:18 TSTRANSCO APGENCO Y-N Fault

    11 220kV Asupaka – Lower Sileru

    24-Sep-20 13:32 TSTRANSCO APGENCO R-N Fault

    12 220kV Asupaka – Lower Sileru

    28-Sep-20 12:56 TSTRANSCO APGENCO Y-N Fault

    13 220kV Asupaka – Lower Sileru

    02-Oct-20 12:07 TSTRANSCO APGENCO Y-N Fault

    14 220kV Asupaka – Lower Sileru

    03-Oct-20 20:53 TSTRANSCO APGENCO R-N Fault

    15 220kV Asupaka – Lower Sileru

    08-Oct-20 10:10 TSTRANSCO APGENCO B-N Fault

    16 220kV Asupaka – Lower Sileru

    09-Oct-20 14:53 TSTRANSCO APGENCO Y-N Fault

    17 220kV Asupaka – Lower Sileru

    09-Oct-20 10:59 TSTRANSCO APGENCO Y-N Fault

    18 220kV Asupaka – Lower Sileru

    09-Oct-20 12:25 TSTRANSCO APGENCO Y-N Fault

    19 220kV Asupaka – Lower Sileru

    13-Oct-20 10:15 TSTRANSCO APGENCO B-N Fault

  • Additional Agenda for 93rd Meeting of PCSC scheduled to be held on2nd December 2020 (online through WebEx) Page4/4

    20 220kV Asupaka – Lower Sileru

    13-Oct-20 11:51 TSTRANSCO APGENCO R-N Fault

    21 220kV Asupaka – Lower Sileru

    16-Oct-20 13:43 TSTRANSCO APGENCO Y-N Fault

    22 220kV Asupaka – Lower Sileru

    16-Oct-20 15:21 TSTRANSCO APGENCO Y-N Fault

    23 220kV Asupaka – Lower Sileru

    17-Oct-20 12:01 TSTRANSCO APGENCO Y-N Fault

    24 220kV Asupaka – Lower Sileru

    24-Oct-20 12:08 TSTRANSCO APGENCO R-N Fault

    25 220kV Asupaka – Lower Sileru

    30-Oct-20 11:01 TSTRANSCO APGENCO Y-N Fault

    26 220kV Asupaka – Lower Sileru

    31-Oct-20 12:37 TSTRANSCO APGENCO R-N Fault

    d. APGENCO vide email dated 19.11.2020 had informed that for the subject line A/R at Lower Sileru end has been enabled since 02.11.2020

    e. TSTRANSCO / APGENCO may update status of implementation of the decision taken in PCSC-92 meeting.

    6. Review of Protection audit recommendation – Power swing block

    a. TANTRANSCO, vide email dated 22.09.2020, had informed that, the following recommendation regarding power swing was made during the Protection audit of 400kV Manali and 230kV NCTPS SS conducted in 2019:

    i. Zone 1 Trip, Higher Zones block for a delay of unblocking time delay (2sec) and then trip.

    ii. Block all zones with out-of-step tripping enabled at electrical zero locations by carrying out required system studies.

    b. TANTRANSCO had adopted block all zones with unblocking time of 2 sec. If any line fault is detected, unblock immediately and initiate tripping. TANTRANSCO stated that with this philosophy no unwarranted tripping have been encountered.

    c. They also stated that with reference to audit recommendation and to trip the breaker in Zone-1 during recoverable swing condition, the probability of damage to breaker is high (as stated in the Ramakrishna Committee recommendation). The electrical zero locations of grid during power swing may vary according to the grid conditions. (major contribution is from RE source).

    d. TANTRANSCO has requested to drop the above protection audit point and to continue with their existing philosophy of “block all zones with unblocking time of 2 sec. If any line fault is detected, unblock immediately and initiate tripping”.

    e. The issue may be discussed in meeting.

    *****