2020 – 2024 FINANCIAL PLANLIQUID WASTE SERVICESPeter NavratilGENERAL MANAGER, LIQUID WASTE SERVICES
Liquid Waste Committee Meeting – October 17, 2019
5.1
33101686 Liquid Waste Committee
2
L IQUID WASTE SERVICES OVERVIEW
The total Liquid Waste Services Budget for 2020 is $328.3 Million
Liquid Waste Services provides the following services:• Liquid waste collection and treatment for 17 municipalities and Electoral Area A• Operate and maintain 5 treatment plants, 33 pump stations and over 530 km of
trunk sewers• Convey and treat an average of 1.2 billion litres of wastewater per day• Five operational functions support Liquid Waste Services:
• Policy, Planning and Analysis• Project Delivery• Operations and Maintenance• Environmental Management and Quality Control• Management Systems and Utility Services
Liquid Waste Committee
3
Customer Level of Service Objective KPI Metric
Past 3 year (2016-2018)
Avg. Performance
Expected Performance
by 2029
Eliminate Discharges from the Sewer
System
Sanitary Sewage Overflow (SSO) events (#) 34
CSO volume (ML) 34,744
Facilities unable to meet basic service (%) 95%
Minimize Impacts on Public Health and the Environment from Authorized WWTP Discharges
Compliance with operational certificates & WSER (% of Flow) 99.96%
Recreational water quality (% of tests not meeting criteria) 0.9%
Improve Environmental Stewardship
Biosolids beneficially used (%) 92.9%
Total energy use (kWh/ML Treated) 220
Odour complaints (#) 15
Minimize Timeline to Recover from a
Major Event
Targeted assets resilient to power outage event (%) 80%
Targeted assets resilient to seismic event (%) New metric
Targeted assets resilient to climate change event (%) New metric
L IQUID WASTE – SERVICE LEVELS
Liquid Waste Committee
4
L IQUID WASTE SERVICES OVERVIEW
• Amendment to the Cost Apportionment Bylaw in 2019 allows for direct application of DCCs to fund growth capital
• 2020-2024 Financial Plan includes the direct application of DCCs to fund growth capital
• Resulted in debt service savings compared to prior year financial plan
• 2020-2024 Financial Plan includes contribution to capital adjustments in line with Financial Management Policy
Liquid Waste Committee
5
$ millions 2019 2020 $ Change % Change
Sewer Levy $255.8 $274.2 $18.4 7.2%
ExternalRevenues
$14.0 $14.3 $0.3 2.3%
DCCs $31.7 $34.2 $2.5 7.9%
Reserves $9.4 $5.6 ($3.8) (40.9%)
Total Revenues $310.9 $328.3 $17.4 5.6%
2020 L IQUID WASTE SERVICES REVENUES
Sewer Levy84%
External Revenues
4%
DCC's10%
Reserves2%
• Increasing application of DCCs due to growth capital program
Liquid Waste Committee
6
$ millions 2019 2020$
Change%
Change
Operations $177.9 $184.3 $6.4 3.6%
Debt Service $54.3 $57.2 $2.9 5.3%
Contribution to Capital
$78.7 $86.8 $8.1 10.4%
Total Expenditures
$310.9 $328.3 $17.4 5.6%
2020 L IQUID WASTE EXPENDITURES
Operations56%
Debt Service17%
Contribution to Capital
27%
• Increasing Debt Service due to expanding capital program
• Increasing Contribution to Capital a planned strategy to reduce future impact of debt servicing
Liquid Waste Committee
Sewerage Area ($ Millions) 2019 2020$
Change%
Change
Vancouver Sewerage Area $79.6 $85.5 $5.9 7.4%
North Shore Sewerage Area $23.0 $26.0 $3.0 13.0%
Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1%
Fraser Sewerage Area $129.5 $135.9 $6.4 4.9%
Drainage $2.2 $2.1 ($0.1) (2.5%)
TOTAL $255.8 $274.2 $18.4 7.2%
7
2020 L IQUID WASTE SEWER LEVY
Liquid Waste Committee
8
2 0 2 0 L I Q U I D WA S T E E X P E N D I T U R E S H I G H L I G H T S
Budget Highlights/Key Actions Include:• Identify options and strategies to cost effectively eliminate combined sewer overflows• Complete the project definition for Iona Island WWTP secondary upgrade• Complete construction of Lions Gate / First Narrows Pump Station• Continue ground improvements for Northwest Langley WWTP• Implement Asset Management condition assessment programs across all facilities• Complete ecological and human health risk assessment for 12 CSO locations• Identify and analyze alternate models for single sewerage area allocation
Proposed Staffing Changes:• 2 Project Engineers• 1 Clerk Stenographer III• 1 Maintenance Engineer• 1 WWTP Operations Engineer• 1 Asset Management Engineer• 1 Engineering Technician• 1 Trades Foreman for the Seymour-Capilano Filtration PlantLiquid Waste Committee
9
2 0 2 0 L I Q U I D WA S T E S E RV I C E S C A P I TA L P R O G R A M
2020 Capital Program - $883.4 Million
2020 Major Capital Projects• Construction of North Shore WWTP• Annacis Island WWTP Stage 5 construction• Annacis Island WWTP Outfall construction• Sapperton Pump Station construction• Northwest Langley WWTP ground improvements• Gilbert/Brighouse Trunk Pressure Sewer• Burnaby Lake North Interceptor construction• Highbury Interceptor Air Management construction
Growth33%
Opportunity1%
Resilience3%
Maintenance17%
Secondary Treatment
40%
Upgrade6%
Liquid Waste Committee
10
2020-2024 “WHAT ’S HAPPENING” SUMMARY
• 2020: Indicative design for Iona Island WWTPAdvance construction of the North Shore WWTPProduction of Green Biomethane at Lulu Island WWTPCommission Sapperton Pump StationComplete Highbury Interceptor Air Management Facility
• 2021: Complete the update of the Integrated Liquid Waste and Resource Management PlanHydrothermal Processing Pilot Facility completeIona Island WWTP digester sludge dewateringComplete First Narrows Pump Station and North Shore Conveyance project
Liquid Waste Committee
11
2020-2024 “WHAT ’S HAPPENING” SUMMARY
• 2022: Removal of all biosolids stockpiles from Iona Island WWTP completeComplete Golden Ears Pump Station and SSO tankGilbert Trunk Sewer twinning complete
• 2023: First release of construction tenders for Iona Island WWTP UpgradeComplete refurbishment of the Annacis Island WWTP Trickling FiltersComplete construction of Golden Ears Forcemain and river crossing
• 2024: Annacis Island WWTP Outfall System and Stage 5 commissioningComplete ground improvements and detailed design for Northwest Langley WWTP
Liquid Waste Committee
12
2 0 2 0 t o 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L S U M M A RY
2019 2020 2021 2022 2023 2024
Revenues $310.9 M $328.3 M $371.3 M $425.3 M $475.8 M $518.4 M
Expenditures
Operating Programs $150.3 M $154.3 M $164.8 M $170.1 M $177.5 M $169.4 M
Admin/Support $2.1 M $2.3 M $2.3 M $2.4 M $2.4 M $2.4 M
Communications $0.4 M $0.5 M $0.5 M $0.5 M $0.5 M $0.5 M
ERE $1.9 M $2.0 M $2.1 M $2.1 M $2.2 M $2.2 M
Centralized Support $23.2 M $25.2 M $25.9 M $27.4 M $28.5 M $29.9 M
Debt Service $54.3 M $57.2 M $81.6 M $117.8 M $149.4 M $185.3 M
Contribution to Capital $78.7 M $86.8 M $94.1 M $105.0 M $115.3 M $128.7 M
Total Expenditures $310.9 M $328.3 M $371.3 M $425.3 M $475.8 M $518.4 MLiquid Waste Committee
2019 2020 2021 2022 2023 2024
Total Expenditures ($ Millions)
$310.9 $328.3 $371.3 $425.3 $475.8 $518.4
% Change 5.6% 13.1% 14.6% 11.9% 9.0%
Liquid Waste Levy ($ Millions) $255.8 $274.2 $306.8 $347.6 $386.5 $416.3
Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 ($7.6) ($8.8) ($6.1) $10.4 N/A
Total Capital Expenditures ($ Millions)
$564.9 $883.4 $759.9 $529.5 $617.8 $634.1
Average Household Impact ($) $250 $264 $290 $322 $352 $372
% Change 5.6% 9.8% 11.3% 9.2% 5.8%
Household Impact Change from Prior Cycle ($)
($7) ($8) ($6) $9 N/A
2 0 2 0 - 2 0 24 L I Q U I D WA ST E F I NA N C IAL P L A N
Liquid Waste Committee
14
2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - V S A
2019 2020 2021 2022 2023 2024
Total Expenditures ($ Millions)
$92.3 $98.4 $106.8 $113.0 $119.8 $123.4
% Change 6.6% 8.5% 5.9% 6.0% 3.0%
VSA Liquid Waste Levy ($ Millions) $79.6 $85.5 $92.6 $99.8 $106.5 $111.4
VSA Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 $1.1 $5.4 $8.2 $12.8 N/A
Total Capital Expenditures ($ Millions)
$64.9 $89.5 $41.8 $69.5 $104.7 $155.7
Household Impact ($) $293 $310 $331 $353 $371 $384
% Change 5.6% 7.0% 6.5% 5.2% 3.6%
Household Impact Change from Prior Cycle ($)
$3 $17 $28 $42 N/ALiquid Waste Committee
15
2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - N S S A
2019 2020 2021 2022 2023 2024
Total Expenditures ($ Millions)
$25.9 $28.5 $31.7 $37.6 $42.2 $48.1
% Change 10.1% 11.4% 18.4% 12.4% 14.1%
NSSA Liquid Waste Levy ($ Millions) $23.0 $26.0 $29.2 $34.5 $39.1 $44.6
NSSA Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 ($2.0) ($6.4) ($10.1) ($8.7) N/A
Total Capital Expenditures ($ Millions)
$177.9 $347.3 $216.0 $81.9 $81.3 $17.6
Household Impact ($) $304 $340 $376 $440 $493 $558
% Change 11.8% 10.6% 17.1% 12.1% 13.1%
Household Impact Change from Prior Cycle ($)
($26) ($84) ($131) ($112) N/ALiquid Waste Committee
16
2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - L I W S A
2019 2020 2021 2022 2023 2024
Total Expenditures ($ Millions)
$23.1 $27.3 $30.6 $35.5 $39.0 $42.7
% Change 17.7% 12.2% 15.9% 10.1% 9.2%
LIWSA Liquid Waste Levy ($ Millions) $21.5 $24.7 $28.1 $32.2 $35.8 $38.7
LIWSA Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 ($0.7) ($2.4) ($2.3) ($0.2) N/A
Total Capital Expenditures ($ Millions)
$43.0 $37.7 $55.3 $29.1 $2.0 $4.3
Household Impact ($) $214 $239 $269 $300 $329 $347
% Change 11.8% 12.2% 11.6% 9.8% 5.5%
Household Impact Change from Prior Cycle ($)
($10) ($24) ($26) ($4) N/ALiquid Waste Committee
17
2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - FS A
2019 2020 2021 2022 2023 2024
Total Expenditures($ Millions)
$166.6 $171.9 $200.1 $237.1 $272.6 $302.0
% Change 3.2% 16.4% 18.5% 15.0% 10.8%
FSA Liquid Waste Levy ($ Millions) $129.5 $135.9 $154.8 $179.0 $203.0 $219.4
FSA Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 ($5.6) ($4.9) ($1.4) $7.0 N/A
Total Capital Expenditures ($ Millions)
$279.1 $408.9 $446.8 $349.0 $429.8 $456.5
Household Impact ($) $226 $234 $260 $294 $326 $344
% Change 3.2% 11.1% 13.1% 10.9% 5.7%
Household Impact Change from Prior Cycle ($)
($9) ($8) ($2) $11 N/ALiquid Waste Committee
18
2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - D R A I N A G E
2019 2020 2021 2022 2023 2024
Total Expenditures ($ Millions)
$3.0 $2.2 $2.1 $2.1 $2.2 $2.2
% Change (25.3%) (5.7%) 0.3% 2.7% 1.3%
Drainage Liquid Waste Levy ($ Millions)
$2.2 $2.1 $2.1 $2.1 $2.1 $2.2
Drainage Liquid Waste Levy Change from Prior Cycle ($ Millions)
$0 ($0.4) ($0.5) ($0.5) ($0.5) N/A
Liquid Waste Committee
Sewerage Area 2019 2020 2021 2022 2023 2024
Vancouver Sewerage Area $293 $310 $331 $353 $371 $384
North Shore Sewerage Area $304 $340 $376 $440 $493 $558
Lulu Island Sewerage Area $214 $239 $269 $300 $329 $347
Fraser Sewerage Area $226 $234 $260 $294 $326 $344
REGIONAL AVERAGE $250 $264 $290 $322 $352 $372
19
2020-2024 L IQUID WASTE HOUSEHOLD IMPACT
Liquid Waste Committee
20
L I Q U I D WA S T E H O U S E H O L D I M PA C T – C O M PA R I S O N W I T H OT H E R J U R I S D I C T I O N S
NACWA = National Association of Clean Water Agencies
Region / Jurisdiction 2016 2017 2018
GVS&DD Household Impact (HHI) $207 $218 $231
Regional Average(Annual MV + Municipality Total Sewer Service Charge)
$525 $551 $583
NACWA - US Average (CAD)(Annual Charge for Single Family Residence)
$632 $661 $665
NACWA - Region 10 Average (CAD)(US Pacific Northwest)
$731 $784 $825
Liquid Waste Committee
Questions?Liquid Waste Committee
Liquid Waste Services Capital Program Expenditure UpdateAS AT AUGUST 31, 2019
Bryan ShojiDIRECTOR, PROJECT DELIVERYLIQUID WASTE SERVICES
Liquid Waste Committee – October 17, 201933105049
5.3
Liquid Waste Committee
• Second of a series of three reports for 2019.
• Current capital program consists of 145 distinct projects valued at over $7.3 billion, with many involving multiple contracts spanning several budget years.
• Attachment 1, Table 1: Projecting to be within 0.5% of budget ($37.9 million) of overall budget through the life of these projects.
• Attachment 2: Detailed project list.2
Capital Expenditure Progress to August 31, 2019
Liquid Waste Committee
• 2019 Capital Program budget = $565 million
• Attachment 1, Table 2: $163 million of $377 million prorated budget spent.
• Year end expenditure projection = $384 million (68% of budget)
3
2019 Capital Expenditure Progress
Liquid Waste Committee
• Attachment 3: Project Status Information
• Albert Street Trunk Sewer – Port Moody
• Gilbert Trunk Sewer – Richmond
• Sapperton Pump Station – New Westminster
• Golden Ears Sanitary Overflow Tank – Maple Ridge
• AIWWTP Secondary Clarifier Rehabilitation – Delta
4
Selected Project Updates
Liquid Waste Committee
5
Albert Street Trunk SewerPort Moody Liquid Waste Committee
6
Gilbert Trunk SewerRichmond
Liquid Waste Committee
7
Sapperton Pump StationNew Westminster
Liquid Waste Committee
8
Golden Ears Sanitary Sewer Overflow TankMaple Ridge Liquid Waste Committee
9
AIWWTP Secondary Clarifier RehabilitationDelta Liquid Waste Committee
Thank you
Liquid Waste Committee
IONA ISLAND WASTEWATER TREATMENT PLANT
COMMUNITY ENGAGEMENT & PROJECT DEFINITION UPDATE
TOM SADLEIRPROGRAM MANAGER, COMMUNITY ENGAGEMENTLIQUID WASTE SERVICES
FRED NENNINGERDIRECTOR, POLICY, PLANNING AND ANALYSISLIQUID WASTE SERVICES
Liquid Waste Committee – October 17, 201932480576 1
5.4 / 5.5
Liquid Waste Committee
2
COMMUNITY ENGAGEMENT
• GVS&DD Board (LWC, Regional Parks)
• VSA members• Residents and
Businesses• Stakeholder Groups • Musqueam Indian
Band Technical Workshop 4, Musqueam Indian Band, July 24, 2019
Liquid Waste Committee
• Reduce odour• Increase treatment level• Reduce plant lighting • Maintain access to park• Replace and create new
habitat• Coordinate removal of existing
lagoons with new habitat• Maintain Musqueam views
3
WHAT WE’VE HEARD TO DATE
Public Workshop 1, January 9, 2019, Richmond
Liquid Waste Committee
4
ENGAGEMENT ACTIVITIES (2019 / 2020)
Timeline Activity
October 17November 1
Present preliminary design concepts to Liquid Waste Committee and GVS&DD Board
November 2019 -February 2020
Present preliminary design concepts to:
• VSA municipal councils / committees• Musqueam Chief and Council• Regional Parks Committee• Public Workshop #2 (Richmond)• Community associations / environmental groups• Musqueam Community Meeting #2
Ongoing Monthly meetings with VSA municipal staffMeetings with Musqueam staffStakeholder meetingsLiquid Waste Committee
5
ENGAGEMENT ACTIVITIES (2020)
Timeline Activity
March Special Meeting of the Liquid Waste Committee to workshop design concepts and recommended designPresent design concepts and recommended design to GVS&DD Board
April to September Present recommended design to:• VSA municipal councils / committees• Musqueam Chief and Council (TBC)• Regional Parks Committee• Public Workshop #3 • Community associations / environmental groups• Musqueam Community Meeting #3 (TBC)
November Project Definition Report and Indicative Design to Liquid Waste Committee and GVS&DD Board
Liquid Waste Committee
That the GVS&DD Board authorize staff to complete the community engagement process, as presented in the report dated October 1, 2019, titled “Iona Island Wastewater Treatment Plant Project – Community Engagement Process”.
6
RECOMMENDATION (5.4)
Liquid Waste Committee
PROJECT GOALS
Secondary Wastewater Treatment
Resource Recovery
Community and Park Integration
Liquid Waste Committee
• Plan for plant to 2100• Compare liquid treatment options• Compare solids treatment options• Develop an indicative design for 2030 build• Integrate new plant with park• Business case resource recovery opportunities
8
PROJECT DEFINITION PHASE
Liquid Waste Committee
PROJECT DEFINITION PROCESS
wo
rksh
op
PROJECT SCOPE DEFINITION
PLANT CONCEPT DEFINTION
TREATMENT, ARCHITECTURAL, ECOLOGICAL & COMMUNITY CONCEPTS INTEGRATION
PLANT CONCEPT DEVELOPMENT DEVELOP 3 PLANT CONCEPTS
1 2 3
PLANT CONCEPT REFINEMENT REFINE 3 CONCEPTS
1 2 3
SELECTED PLANT DESIGN SELECTED CONCEPT
FURTHER REFINEMENT
Workshop 2
WE ARE HERE
PROJECT TEAM ALIGNMENT
PROJECT DEFINITION REPORT
Workshop 1
Workshop 3
Workshop 4
Workshop 5
Workshop 6
Workshop 7 & 8
LIQUID TREATMENT
SOLIDS TREATMENT
ARCHITECTURAL, ECOLOGICAL & COMMUNITY THEMES
OBJECTIVES
TREATMENT TECHNOLOGIES
INTEGRATED RESOURCE RECOVERY OPPORTUNITIES
ARCHITECTURAL FEATURES
ECOLOGICAL FEATURES
COMMUNITYOPPORTUNITIES
REQUIREMENTS
PURPOSE GOALS PROCESS
INDICATIVE PLANT DESIGN
Liquid Waste Committee
10
WASTEWATER TREATMENT MATRIXPlant Build Scenarios
Secondary Plant Tertiary Plant (Filtration) Tertiary Plant (MBR)
Primary Treatment Options
SecondaryTreatment Options
Tertiary Treatment Options
Solids TreatmentOptions
ACTIVATED SLUDGE
ANAEROBIC DIGESTION
BIOSOLIDS
MANAGEMENT
PROGRAM
BIOLOGICALLY ENHANCED CLARIFICATION
ACTIVATED SLUDGE
THERMAL HYDROLYSIS + ANAEROBIC
DIGESTION + BIOSOLIDS DRYING
INCLINED PLATE CLARIFIERS + CHEMICALSINCLINED PLATE CLARIFIERS
MEMBRANE BIOREACTOR
SLUDGE WASTE-TO-ENERGY
TERTIARY FILTRATION
MEMBRANE BIOREACTOR
Liquid Waste Committee
11
ADVANCED TREATMENT PILOT PLANT
Ozone Treatment
Biological Activated Carbon
Granular Activated Carbon
• Example process train for micropollutant removal
TertiaryInfluent
Liquid Waste Committee
12
IONA ISLAND
Iona Island Wastewater Treatment Plant
Liquid Waste Committee
13
SECONDARY PLANT
Liquid Waste Committee
14
TERTIARY PLANT (FILTRATION)
Liquid Waste Committee
15
TERTIARY PLANT (MBR)
Liquid Waste Committee
• Solid stream – biofuels, biosolids, nutrients
• Liquid stream – reclaimed water • Gas stream – biogas• Energy – thermal energy from
wastewater effluent, waste-to-energy heat recovery and biofuels
Potential Inputs Potential Products
VSA Wastewater
RESOURCE RECOVERY OPPORTUNITIES