2020 – 2024 FINANCIAL PLAN LIQUID WASTE SERVICES Peter Navratil GENERAL MANAGER, LIQUID WASTE SERVICES Liquid Waste Committee Meeting – October 17, 2019 5.1 33101686 Liquid Waste Committee
Transcript
Page 1: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

2020 – 2024 FINANCIAL PLANLIQUID WASTE SERVICESPeter NavratilGENERAL MANAGER, LIQUID WASTE SERVICES

Liquid Waste Committee Meeting – October 17, 2019

5.1

33101686 Liquid Waste Committee

Page 2: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

2

L IQUID WASTE SERVICES OVERVIEW

The total Liquid Waste Services Budget for 2020 is $328.3 Million

Liquid Waste Services provides the following services:• Liquid waste collection and treatment for 17 municipalities and Electoral Area A• Operate and maintain 5 treatment plants, 33 pump stations and over 530 km of

trunk sewers• Convey and treat an average of 1.2 billion litres of wastewater per day• Five operational functions support Liquid Waste Services:

• Policy, Planning and Analysis• Project Delivery• Operations and Maintenance• Environmental Management and Quality Control• Management Systems and Utility Services

Liquid Waste Committee

Page 3: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

3

Customer Level of Service Objective KPI Metric

Past 3 year (2016-2018)

Avg. Performance

Expected Performance

by 2029

Eliminate Discharges from the Sewer

System

Sanitary Sewage Overflow (SSO) events (#) 34

CSO volume (ML) 34,744

Facilities unable to meet basic service (%) 95%

Minimize Impacts on Public Health and the Environment from Authorized WWTP Discharges

Compliance with operational certificates & WSER (% of Flow) 99.96%

Recreational water quality (% of tests not meeting criteria) 0.9%

Improve Environmental Stewardship

Biosolids beneficially used (%) 92.9%

Total energy use (kWh/ML Treated) 220

Odour complaints (#) 15

Minimize Timeline to Recover from a

Major Event

Targeted assets resilient to power outage event (%) 80%

Targeted assets resilient to seismic event (%) New metric

Targeted assets resilient to climate change event (%) New metric

L IQUID WASTE – SERVICE LEVELS

Liquid Waste Committee

Page 4: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

4

L IQUID WASTE SERVICES OVERVIEW

• Amendment to the Cost Apportionment Bylaw in 2019 allows for direct application of DCCs to fund growth capital

• 2020-2024 Financial Plan includes the direct application of DCCs to fund growth capital

• Resulted in debt service savings compared to prior year financial plan

• 2020-2024 Financial Plan includes contribution to capital adjustments in line with Financial Management Policy

Liquid Waste Committee

Page 5: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

5

$ millions 2019 2020 $ Change % Change

Sewer Levy $255.8 $274.2 $18.4 7.2%

ExternalRevenues

$14.0 $14.3 $0.3 2.3%

DCCs $31.7 $34.2 $2.5 7.9%

Reserves $9.4 $5.6 ($3.8) (40.9%)

Total Revenues $310.9 $328.3 $17.4 5.6%

2020 L IQUID WASTE SERVICES REVENUES

Sewer Levy84%

External Revenues

4%

DCC's10%

Reserves2%

• Increasing application of DCCs due to growth capital program

Liquid Waste Committee

Page 6: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

6

$ millions 2019 2020$

Change%

Change

Operations $177.9 $184.3 $6.4 3.6%

Debt Service $54.3 $57.2 $2.9 5.3%

Contribution to Capital

$78.7 $86.8 $8.1 10.4%

Total Expenditures

$310.9 $328.3 $17.4 5.6%

2020 L IQUID WASTE EXPENDITURES

Operations56%

Debt Service17%

Contribution to Capital

27%

• Increasing Debt Service due to expanding capital program

• Increasing Contribution to Capital a planned strategy to reduce future impact of debt servicing

Liquid Waste Committee

Page 7: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

Sewerage Area ($ Millions) 2019 2020$

Change%

Change

Vancouver Sewerage Area $79.6 $85.5 $5.9 7.4%

North Shore Sewerage Area $23.0 $26.0 $3.0 13.0%

Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1%

Fraser Sewerage Area $129.5 $135.9 $6.4 4.9%

Drainage $2.2 $2.1 ($0.1) (2.5%)

TOTAL $255.8 $274.2 $18.4 7.2%

7

2020 L IQUID WASTE SEWER LEVY

Liquid Waste Committee

Page 8: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

8

2 0 2 0 L I Q U I D WA S T E E X P E N D I T U R E S H I G H L I G H T S

Budget Highlights/Key Actions Include:• Identify options and strategies to cost effectively eliminate combined sewer overflows• Complete the project definition for Iona Island WWTP secondary upgrade• Complete construction of Lions Gate / First Narrows Pump Station• Continue ground improvements for Northwest Langley WWTP• Implement Asset Management condition assessment programs across all facilities• Complete ecological and human health risk assessment for 12 CSO locations• Identify and analyze alternate models for single sewerage area allocation

Proposed Staffing Changes:• 2 Project Engineers• 1 Clerk Stenographer III• 1 Maintenance Engineer• 1 WWTP Operations Engineer• 1 Asset Management Engineer• 1 Engineering Technician• 1 Trades Foreman for the Seymour-Capilano Filtration PlantLiquid Waste Committee

Page 9: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

9

2 0 2 0 L I Q U I D WA S T E S E RV I C E S C A P I TA L P R O G R A M

2020 Capital Program - $883.4 Million

2020 Major Capital Projects• Construction of North Shore WWTP• Annacis Island WWTP Stage 5 construction• Annacis Island WWTP Outfall construction• Sapperton Pump Station construction• Northwest Langley WWTP ground improvements• Gilbert/Brighouse Trunk Pressure Sewer• Burnaby Lake North Interceptor construction• Highbury Interceptor Air Management construction

Growth33%

Opportunity1%

Resilience3%

Maintenance17%

Secondary Treatment

40%

Upgrade6%

Liquid Waste Committee

Page 10: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

10

2020-2024 “WHAT ’S HAPPENING” SUMMARY

• 2020: Indicative design for Iona Island WWTPAdvance construction of the North Shore WWTPProduction of Green Biomethane at Lulu Island WWTPCommission Sapperton Pump StationComplete Highbury Interceptor Air Management Facility

• 2021: Complete the update of the Integrated Liquid Waste and Resource Management PlanHydrothermal Processing Pilot Facility completeIona Island WWTP digester sludge dewateringComplete First Narrows Pump Station and North Shore Conveyance project

Liquid Waste Committee

Page 11: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

11

2020-2024 “WHAT ’S HAPPENING” SUMMARY

• 2022: Removal of all biosolids stockpiles from Iona Island WWTP completeComplete Golden Ears Pump Station and SSO tankGilbert Trunk Sewer twinning complete

• 2023: First release of construction tenders for Iona Island WWTP UpgradeComplete refurbishment of the Annacis Island WWTP Trickling FiltersComplete construction of Golden Ears Forcemain and river crossing

• 2024: Annacis Island WWTP Outfall System and Stage 5 commissioningComplete ground improvements and detailed design for Northwest Langley WWTP

Liquid Waste Committee

Page 12: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

12

2 0 2 0 t o 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L S U M M A RY

2019 2020 2021 2022 2023 2024

Revenues $310.9 M $328.3 M $371.3 M $425.3 M $475.8 M $518.4 M

Expenditures

Operating Programs $150.3 M $154.3 M $164.8 M $170.1 M $177.5 M $169.4 M

Admin/Support $2.1 M $2.3 M $2.3 M $2.4 M $2.4 M $2.4 M

Communications $0.4 M $0.5 M $0.5 M $0.5 M $0.5 M $0.5 M

ERE $1.9 M $2.0 M $2.1 M $2.1 M $2.2 M $2.2 M

Centralized Support $23.2 M $25.2 M $25.9 M $27.4 M $28.5 M $29.9 M

Debt Service $54.3 M $57.2 M $81.6 M $117.8 M $149.4 M $185.3 M

Contribution to Capital $78.7 M $86.8 M $94.1 M $105.0 M $115.3 M $128.7 M

Total Expenditures $310.9 M $328.3 M $371.3 M $425.3 M $475.8 M $518.4 MLiquid Waste Committee

Page 13: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

2019 2020 2021 2022 2023 2024

Total Expenditures ($ Millions)

$310.9 $328.3 $371.3 $425.3 $475.8 $518.4

% Change 5.6% 13.1% 14.6% 11.9% 9.0%

Liquid Waste Levy ($ Millions) $255.8 $274.2 $306.8 $347.6 $386.5 $416.3

Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 ($7.6) ($8.8) ($6.1) $10.4 N/A

Total Capital Expenditures ($ Millions)

$564.9 $883.4 $759.9 $529.5 $617.8 $634.1

Average Household Impact ($) $250 $264 $290 $322 $352 $372

% Change 5.6% 9.8% 11.3% 9.2% 5.8%

Household Impact Change from Prior Cycle ($)

($7) ($8) ($6) $9 N/A

2 0 2 0 - 2 0 24 L I Q U I D WA ST E F I NA N C IAL P L A N

Liquid Waste Committee

Page 14: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

14

2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - V S A

2019 2020 2021 2022 2023 2024

Total Expenditures ($ Millions)

$92.3 $98.4 $106.8 $113.0 $119.8 $123.4

% Change 6.6% 8.5% 5.9% 6.0% 3.0%

VSA Liquid Waste Levy ($ Millions) $79.6 $85.5 $92.6 $99.8 $106.5 $111.4

VSA Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 $1.1 $5.4 $8.2 $12.8 N/A

Total Capital Expenditures ($ Millions)

$64.9 $89.5 $41.8 $69.5 $104.7 $155.7

Household Impact ($) $293 $310 $331 $353 $371 $384

% Change 5.6% 7.0% 6.5% 5.2% 3.6%

Household Impact Change from Prior Cycle ($)

$3 $17 $28 $42 N/ALiquid Waste Committee

Page 15: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

15

2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - N S S A

2019 2020 2021 2022 2023 2024

Total Expenditures ($ Millions)

$25.9 $28.5 $31.7 $37.6 $42.2 $48.1

% Change 10.1% 11.4% 18.4% 12.4% 14.1%

NSSA Liquid Waste Levy ($ Millions) $23.0 $26.0 $29.2 $34.5 $39.1 $44.6

NSSA Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 ($2.0) ($6.4) ($10.1) ($8.7) N/A

Total Capital Expenditures ($ Millions)

$177.9 $347.3 $216.0 $81.9 $81.3 $17.6

Household Impact ($) $304 $340 $376 $440 $493 $558

% Change 11.8% 10.6% 17.1% 12.1% 13.1%

Household Impact Change from Prior Cycle ($)

($26) ($84) ($131) ($112) N/ALiquid Waste Committee

Page 16: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

16

2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - L I W S A

2019 2020 2021 2022 2023 2024

Total Expenditures ($ Millions)

$23.1 $27.3 $30.6 $35.5 $39.0 $42.7

% Change 17.7% 12.2% 15.9% 10.1% 9.2%

LIWSA Liquid Waste Levy ($ Millions) $21.5 $24.7 $28.1 $32.2 $35.8 $38.7

LIWSA Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 ($0.7) ($2.4) ($2.3) ($0.2) N/A

Total Capital Expenditures ($ Millions)

$43.0 $37.7 $55.3 $29.1 $2.0 $4.3

Household Impact ($) $214 $239 $269 $300 $329 $347

% Change 11.8% 12.2% 11.6% 9.8% 5.5%

Household Impact Change from Prior Cycle ($)

($10) ($24) ($26) ($4) N/ALiquid Waste Committee

Page 17: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

17

2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - FS A

2019 2020 2021 2022 2023 2024

Total Expenditures($ Millions)

$166.6 $171.9 $200.1 $237.1 $272.6 $302.0

% Change 3.2% 16.4% 18.5% 15.0% 10.8%

FSA Liquid Waste Levy ($ Millions) $129.5 $135.9 $154.8 $179.0 $203.0 $219.4

FSA Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 ($5.6) ($4.9) ($1.4) $7.0 N/A

Total Capital Expenditures ($ Millions)

$279.1 $408.9 $446.8 $349.0 $429.8 $456.5

Household Impact ($) $226 $234 $260 $294 $326 $344

% Change 3.2% 11.1% 13.1% 10.9% 5.7%

Household Impact Change from Prior Cycle ($)

($9) ($8) ($2) $11 N/ALiquid Waste Committee

Page 18: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

18

2 0 2 0 - 2 0 2 4 L I Q U I D WA S T E F I N A N C I A L P L A N - D R A I N A G E

2019 2020 2021 2022 2023 2024

Total Expenditures ($ Millions)

$3.0 $2.2 $2.1 $2.1 $2.2 $2.2

% Change (25.3%) (5.7%) 0.3% 2.7% 1.3%

Drainage Liquid Waste Levy ($ Millions)

$2.2 $2.1 $2.1 $2.1 $2.1 $2.2

Drainage Liquid Waste Levy Change from Prior Cycle ($ Millions)

$0 ($0.4) ($0.5) ($0.5) ($0.5) N/A

Liquid Waste Committee

Page 19: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

Sewerage Area 2019 2020 2021 2022 2023 2024

Vancouver Sewerage Area $293 $310 $331 $353 $371 $384

North Shore Sewerage Area $304 $340 $376 $440 $493 $558

Lulu Island Sewerage Area $214 $239 $269 $300 $329 $347

Fraser Sewerage Area $226 $234 $260 $294 $326 $344

REGIONAL AVERAGE $250 $264 $290 $322 $352 $372

19

2020-2024 L IQUID WASTE HOUSEHOLD IMPACT

Liquid Waste Committee

Page 20: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

20

L I Q U I D WA S T E H O U S E H O L D I M PA C T – C O M PA R I S O N W I T H OT H E R J U R I S D I C T I O N S

NACWA = National Association of Clean Water Agencies

Region / Jurisdiction 2016 2017 2018

GVS&DD Household Impact (HHI) $207 $218 $231

Regional Average(Annual MV + Municipality Total Sewer Service Charge)

$525 $551 $583

NACWA - US Average (CAD)(Annual Charge for Single Family Residence)

$632 $661 $665

NACWA - Region 10 Average (CAD)(US Pacific Northwest)

$731 $784 $825

Liquid Waste Committee

Page 21: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

Questions?Liquid Waste Committee

Page 22: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

Liquid Waste Services Capital Program Expenditure UpdateAS AT AUGUST 31, 2019

Bryan ShojiDIRECTOR, PROJECT DELIVERYLIQUID WASTE SERVICES

Liquid Waste Committee – October 17, 201933105049

5.3

Liquid Waste Committee

Page 23: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• Second of a series of three reports for 2019.

• Current capital program consists of 145 distinct projects valued at over $7.3 billion, with many involving multiple contracts spanning several budget years.

• Attachment 1, Table 1: Projecting to be within 0.5% of budget ($37.9 million) of overall budget through the life of these projects.

• Attachment 2: Detailed project list.2

Capital Expenditure Progress to August 31, 2019

Liquid Waste Committee

Page 24: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• 2019 Capital Program budget = $565 million

• Attachment 1, Table 2: $163 million of $377 million prorated budget spent.

• Year end expenditure projection = $384 million (68% of budget)

3

2019 Capital Expenditure Progress

Liquid Waste Committee

Page 25: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• Attachment 3: Project Status Information

• Albert Street Trunk Sewer – Port Moody

• Gilbert Trunk Sewer – Richmond

• Sapperton Pump Station – New Westminster

• Golden Ears Sanitary Overflow Tank – Maple Ridge

• AIWWTP Secondary Clarifier Rehabilitation – Delta

4

Selected Project Updates

Liquid Waste Committee

Page 26: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

5

Albert Street Trunk SewerPort Moody Liquid Waste Committee

Page 27: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

6

Gilbert Trunk SewerRichmond

Liquid Waste Committee

Page 28: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

7

Sapperton Pump StationNew Westminster

Liquid Waste Committee

Page 29: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

8

Golden Ears Sanitary Sewer Overflow TankMaple Ridge Liquid Waste Committee

Page 30: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

9

AIWWTP Secondary Clarifier RehabilitationDelta Liquid Waste Committee

Page 31: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

Thank you

Liquid Waste Committee

Page 32: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

IONA ISLAND WASTEWATER TREATMENT PLANT

COMMUNITY ENGAGEMENT & PROJECT DEFINITION UPDATE

TOM SADLEIRPROGRAM MANAGER, COMMUNITY ENGAGEMENTLIQUID WASTE SERVICES

FRED NENNINGERDIRECTOR, POLICY, PLANNING AND ANALYSISLIQUID WASTE SERVICES

Liquid Waste Committee – October 17, 201932480576 1

5.4 / 5.5

Liquid Waste Committee

Page 33: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

2

COMMUNITY ENGAGEMENT

• GVS&DD Board (LWC, Regional Parks)

• VSA members• Residents and

Businesses• Stakeholder Groups • Musqueam Indian

Band Technical Workshop 4, Musqueam Indian Band, July 24, 2019

Liquid Waste Committee

Page 34: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• Reduce odour• Increase treatment level• Reduce plant lighting • Maintain access to park• Replace and create new

habitat• Coordinate removal of existing

lagoons with new habitat• Maintain Musqueam views

3

WHAT WE’VE HEARD TO DATE

Public Workshop 1, January 9, 2019, Richmond

Liquid Waste Committee

Page 35: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

4

ENGAGEMENT ACTIVITIES (2019 / 2020)

Timeline Activity

October 17November 1

Present preliminary design concepts to Liquid Waste Committee and GVS&DD Board

November 2019 -February 2020

Present preliminary design concepts to:

• VSA municipal councils / committees• Musqueam Chief and Council• Regional Parks Committee• Public Workshop #2 (Richmond)• Community associations / environmental groups• Musqueam Community Meeting #2

Ongoing Monthly meetings with VSA municipal staffMeetings with Musqueam staffStakeholder meetingsLiquid Waste Committee

Page 36: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

5

ENGAGEMENT ACTIVITIES (2020)

Timeline Activity

March Special Meeting of the Liquid Waste Committee to workshop design concepts and recommended designPresent design concepts and recommended design to GVS&DD Board

April to September Present recommended design to:• VSA municipal councils / committees• Musqueam Chief and Council (TBC)• Regional Parks Committee• Public Workshop #3 • Community associations / environmental groups• Musqueam Community Meeting #3 (TBC)

November Project Definition Report and Indicative Design to Liquid Waste Committee and GVS&DD Board

Liquid Waste Committee

Page 37: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

That the GVS&DD Board authorize staff to complete the community engagement process, as presented in the report dated October 1, 2019, titled “Iona Island Wastewater Treatment Plant Project – Community Engagement Process”.

6

RECOMMENDATION (5.4)

Liquid Waste Committee

Page 38: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

PROJECT GOALS

Secondary Wastewater Treatment

Resource Recovery

Community and Park Integration

Liquid Waste Committee

Page 39: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• Plan for plant to 2100• Compare liquid treatment options• Compare solids treatment options• Develop an indicative design for 2030 build• Integrate new plant with park• Business case resource recovery opportunities

8

PROJECT DEFINITION PHASE

Liquid Waste Committee

Page 40: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

PROJECT DEFINITION PROCESS

wo

rksh

op

PROJECT SCOPE DEFINITION

PLANT CONCEPT DEFINTION

TREATMENT, ARCHITECTURAL, ECOLOGICAL & COMMUNITY CONCEPTS INTEGRATION

PLANT CONCEPT DEVELOPMENT DEVELOP 3 PLANT CONCEPTS

1 2 3

PLANT CONCEPT REFINEMENT REFINE 3 CONCEPTS

1 2 3

SELECTED PLANT DESIGN SELECTED CONCEPT

FURTHER REFINEMENT

Workshop 2

WE ARE HERE

PROJECT TEAM ALIGNMENT

PROJECT DEFINITION REPORT

Workshop 1

Workshop 3

Workshop 4

Workshop 5

Workshop 6

Workshop 7 & 8

LIQUID TREATMENT

SOLIDS TREATMENT

ARCHITECTURAL, ECOLOGICAL & COMMUNITY THEMES

OBJECTIVES

TREATMENT TECHNOLOGIES

INTEGRATED RESOURCE RECOVERY OPPORTUNITIES

ARCHITECTURAL FEATURES

ECOLOGICAL FEATURES

COMMUNITYOPPORTUNITIES

REQUIREMENTS

PURPOSE GOALS PROCESS

INDICATIVE PLANT DESIGN

Liquid Waste Committee

Page 41: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

10

WASTEWATER TREATMENT MATRIXPlant Build Scenarios

Secondary Plant Tertiary Plant (Filtration) Tertiary Plant (MBR)

Primary Treatment Options

SecondaryTreatment Options

Tertiary Treatment Options

Solids TreatmentOptions

ACTIVATED SLUDGE

ANAEROBIC DIGESTION

BIOSOLIDS

MANAGEMENT

PROGRAM

BIOLOGICALLY ENHANCED CLARIFICATION

ACTIVATED SLUDGE

THERMAL HYDROLYSIS + ANAEROBIC

DIGESTION + BIOSOLIDS DRYING

INCLINED PLATE CLARIFIERS + CHEMICALSINCLINED PLATE CLARIFIERS

MEMBRANE BIOREACTOR

SLUDGE WASTE-TO-ENERGY

TERTIARY FILTRATION

MEMBRANE BIOREACTOR

Liquid Waste Committee

Page 42: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

11

ADVANCED TREATMENT PILOT PLANT

Ozone Treatment

Biological Activated Carbon

Granular Activated Carbon

• Example process train for micropollutant removal

TertiaryInfluent

Liquid Waste Committee

Page 43: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

12

IONA ISLAND

Iona Island Wastewater Treatment Plant

Liquid Waste Committee

Page 44: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

13

SECONDARY PLANT

Liquid Waste Committee

Page 45: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

14

TERTIARY PLANT (FILTRATION)

Liquid Waste Committee

Page 46: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

15

TERTIARY PLANT (MBR)

Liquid Waste Committee

Page 47: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

• Solid stream – biofuels, biosolids, nutrients

• Liquid stream – reclaimed water • Gas stream – biogas• Energy – thermal energy from

wastewater effluent, waste-to-energy heat recovery and biofuels

Potential Inputs Potential Products

VSA Wastewater

RESOURCE RECOVERY OPPORTUNITIES

Liquid Waste Committee

Page 48: 2020 –2024 FINANCIAL PLAN - Metro Vancouver · Lulu Island Sewerage Area $21.5 $24.7 $3.2 15.1% Fraser Sewerage Area $129.5 $135.9 $6.4 4.9% Drainage $2.2 $2.1 ($0.1) (2.5%) TOTAL

QUESTIONS?