2020ECO-VC Activity
Proposal and Application Guidelines
January, 2020
ECO-VC AdministrationGlobal Procurement Company
Panasonic Corporation
Contents Item Page
1. Overview (1) About ECO-VC Activity P4
(2) Concept of ECO-VC Activity P5
(3) ECO-VC Activity Coverage Area P6
(4) Key Points of ECO-VC Activity P7
(5) Achievements of ECO-VC Activity (Effects / Application Results) P8, P9
2. Schedule Annual Schedule (Planned for FY2020) P11
3. Application
GuidelinesNote) Refer to the Attached File: 2020 ECO-VC Activity Application Guidelines
4. Screening Meeting (1) Screening Overview P13
(2) Evaluation Criteria for Screening P14
(3) Screening Process P15
5. Others(1) Registration and Release of the Environment Technology Database P17
(2) Issuance of the Certificate of Registration P18
Reference Information Activities for Achieving the Environment Vision 2050 P20-P24
Attachment; Access Map (Screening Venue) For inquiries: [email protected]
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
1. Overview
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
1. (1) About ECO-VC Activity
4
ECO-VC (ECO Value Creation) Activity• Panasonic's procurement operations aim to achieve both reduced greenhouse gases with
recycling-oriented manufacturing and reduced costs through environmentally-aware activities: energy savings in our products and suppliers, reduced resource usage with lighter and more compact products with a lower number of parts, use of recycled materials, and shifting to fossil fuel-free materials.VC means an abbreviation of Value Creation
• We gather ideas from our suppliers worldwide to introduce the most outstanding examples at the ECO-VC Activity award ceremony and networking event. Ideas shared with our suppliers in this way are spread throughout the entire Panasonic Group.This activity began in fiscal 2009.
Reduce
greenhouse gases
AND
Recycling-
oriented
manufacturing
Reduce costs
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
1. (2) Concept of ECO-VC Activity
5
Reduce CO2 Emissions
Utilize Recycled Resource Used
Reduce inTotal Resources Used
Function
Value = ーーーーーーーーーー
Cost
Maximizing ValueDegree of satisfaction
FunctionObtained effects
CostPaid costs
Mate
rial C
ost
Rati
on
alizati
on
Minimize Environmental Loads
Strengthening Product
Competitiveness
ECO-VC Administration, Global Procurement Company, Panasonic Corporation 6
All aspects of the supply chain are involved: manufacturing, sales, distribution, and corporate activities
1. (3) ECO-VC Activity Coverage Area
PanasonicBusinessPartners
CustomersLogistics Logistics
・Lightweight and
Downsizing
・Energy saving
・Optimized packaging
・Standardizations
・Reduce number of parts
・Substitution of Materials
・Utilize recycled materials
・Material inventory
reductions
・Streamlining of the
shipping process
・Modal shift
・Improved packaging
・Efficiently of utilizing
warehouse
・Energy saving facilities
・High-efficiency air-
conditioning system
・Zero waste
・Streamlining of the
shipping process
・Modal shift
・Improved packaging
・ Efficiently of utilizing
warehouse
・Cross-industrial joint
shipping
・Energy saving products
・Outstanding eco friendly
products
・Energy-saving / energy
storage / energy-
creating products
・Ecology solutions for
the entire house
・Promote eco-navi
products
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
1. (4) Key Points of ECO-VC Activity
7
Key Words Examples of Initiatives and AchievementsEnergy saving of products - Developed a power supply unit whose switching supply efficiency is 15% higher than the previous model.
- Reduced power consumption of the product during standby mode to less than 0.1 W by developing a
special microcomputer.
Energy saving in the manufacturing (factory) - Reduced the power consumption by 20 % in the process for producing the register of micro chips with the energy saving
activities to implementing an insulation in hearing furnace, and etc.
Implementation of renewable energy - Exchange from the current power generation to solar power (renewable energy) in the manufacturing process of motor
Development of smaller size
and lighter weight products
- Reduce and shrink LSI package
- Shrink chip size.
Part standardization and common use - Reduce to create new die (mold tool) by commoditized existing cover and case
Resource conservation - Reduction in Total Resources Used. Utilize 100% recycled materials.
- Reduce packing materials by utilizing reusable and returnable container.
Recycled materials - Utilize recycled resins (plastics)
Alternative materials and single material - Significantly reduced product prices achieved cost rationalization by changing the copper tube to iron tube
Use new materials - Adopted a new material with outstanding thermal conductivity for the radiator plate and reduced the
internal temperature by 15°celsius. As a result, made cost rationalization by eliminated cooling fan,
and enabled to replace heat-resistant capacitor with a standard capacitor.
Less parts - Enabled the integration of components by improving die (mold tool) and pressing processes.
As a result, significantly reduced the number of parts.
- Reduced 25% of circuit components per unit.
Transportation efficiency - Improvement in a loading rate, joint transportation and consolidated service
Direct transportation
/ round transportation
- Implementing direct transportation to the warehouse and utilize return track
Improve packaging - Optimized size for transportation and storage, downsizing by minimum packaging,
review type of materials
Modal shift - Change type of transportation such as from truck to rail lord, or vessel
Use Eco-friendly (low emission) vehicle - Introducing and utilize eco-track, and promote eco-conscious drive
Biofuel - Use biofuel proactively
Effective use of warehouse space - Improve storage efficiency, consolidate warehouse locations, and eliminate defect inventory
Development of new transportation route - Reduce air freight transportation, contribute to reduce lead time
Others - Reduced VOC and CO2 emissions by eliminating the housing coating through the development
of a weldless molding method.
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
1. (5) Achievements of ECO-VC Activity - 1 (Effects / Application Results)
8
Reductions
Number of Proposals
CO2Reduction
RecycledResource Use
Reduction inTotal Resource
Used
CostRationalization
Accumulated total Cost Rationalization amount 194.4 billion JPYNumber of Proposal Received 8,959
To improve efforts and qualityUse ever more effective VE techniques
for efficient and proactive proposals
Unit: Billion JPY Unit: K tons
Unit: K tons Unit: K tons
09 10 11 12 13 14 15 16 17 18 19
92
154213
235250255
176153
116122178
09 10 11 12 13 14 15 16 17 18 19
3 6
3241
48 51 48
25
6 3
28
09 10 11 12 13 14 15 16 17 18 19
0.6
1.2
1.7 1.71.9
2.11.9 1.8
0.30.01
0.01
09 10 11 12 13 14 15 16 17 18 19
0.1
1.21.6 1.8
2.12.4
2.1 2
0.1 0.3
1.99
09 10 11 12 13 14 15 16 17 18 19
512
668
890 866
1077
1445
933
622
354
820 772
部品点数削減
薄肉化
軽量化
生産性向上
商品力向上
Reduction of the number of components
Thinning walls
Weight reductions
Productivity improvement
Improve
Product competitiveness
Unit:Number of Applications
ECO-VC Administration, Global Procurement Company, Panasonic Corporation 9
*Before FY 2017 onward, actual figures are recorded for Company cases
1. (5) Achievements of ECO-VC Activity - 2 (Application Results)
Company 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Central Contract Center - - - - - ※ ※ ※ ※ 180 69
AP 58 192 241 294 706 1,142 703 447 217 428 341
LS
LC 5 14 12
33 64 50 46 26 26 27 55PES 28 2 15
PEW 13 4 50
PH 9 63 28 15 22 14 26 30 31 45 46
CNS
AVC 223 174 178 189 83
93 30 30 17 12 20PMC 7 14 98 7
PSN 15 12 10
PSFS 13 35 27 30 32 53 62 48 31 50 53
AMINFO 5 13 18 22 20 13 9 18 11 11 19
Energy 29 22 23 39 30 18 19 5 6 18 79
IS23 46 39
62 508 6
18 15 29 6213 14 47 21 13
PHC 3 4 4 3 1 - - - - - -
SANYO 0 16 67 0 0 0 - - - - -
MRO 0 3 0 0 - - - - - 10 20
PRC Material 39 19 56 34 - - - - - - -
Raw Material TC 18 0 17 17 0 0 - - - - 8
Global Logistics Division 11 21 60 57 - - - - - - -
Overseas Manufacturing
Company- - - 63 62 33 19 - - 10 -
Total 512 668 901 866 1,077 1,445 933 622 354 820 772
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
2. Schedule
ECO-VC Administration, Global Procurement Company, Panasonic Corporation 11
2. Annual Schedule (Planned for FY2020)
Company
Contribution
Technology & Development
Cost Improvement
Quality Performance
Supply Chain Management
ECO-VC
Processed Parts
General
Early July
(plan)
Fin
al
Sc
ree
nin
g
May 29
(plan)
Te
ch
no
log
yE
xh
ibit
ion
TypeYear 2020
Month 1 2 3 4 5 6 7 8 9 10 11 12
Dec. (Plan)
FY2019・Provide Registration Cert Issuance
・Sharing Successful Results and Proposals
Pri
mary
S
cre
en
ing
Late Jan.
Online announcement of activity outline / application guidelines
From Late Jan.
Briefing session
Dec. 2018 – Jan. 2019FY2018• Provide Registration Cert
Issuance
• Sharing Successful Results
and Proposals
Late Nov.
(plan)
Application PeriodScreening at each Company
Application Period
Sc
ree
nin
g
16:00, Thursday, April 23Deadline (→Secretariat)
*PEPM:Panasonic Excellent Partners Meeting
Application
Deadline
(Company)
*PE
PM
16:00, Thursday, June 18
Deadline
* Integration being considered
* ECO-VC Final Screening and Company Contribution Screening held on same day
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
4. Screening Meeting
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
Item Content Remarks
Schedule Primary screening: Panasonic Shoshin Hall, late May (plan)
Final screening: Panasonic Shoshin Hall, early Jul. (plan)
* Details will be advised separately.
* Refer to Access Maps
Presentation method
Screening method
Screening groups
Screening will be conducted in several groups
Each group will contain 4-5 people (3 judges per group)
Presentation format: presentation-style
Allotted time
• Presentation time: 10 minutes
• Q&A session: 10 minutes (total of 20 minutes)
Screening method
Scored out of 100 / Total of judges x number of people (in groups)
* Subject to change depending on the
number of themes screened and operations
on the day.
4. (1) Screening Overview
13
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
4. (2) Evaluation Criteria for Screening
14
Items Evaluation PointsResults
Weight Pts
Activity
&
Effort
Innovation
・Prioritized and innovative (eg: industry and world first)
・Own technology, not duplicate or copy from others
・Introduce to Panasonic first besides others20
35
Difficulty・Tough to achieve, high difficulty rate
・Defeat common sense of industry efforts15
Contributed
to
Panasonic
Group
of
Company/
Future
Prospects
Environmental
Contribution
・Reduce CO2 emissions (amount & rate)
・Reduce amount of resources used,
utilize recycled resources (amount & rate)20
65
Rationalization・Evaluated by Profit and Loss point of view(Cost reduction amount & rate, Material Inventory Reductions,
reduce days of supply and material delivery lead time)20
Strengthening Product
Competitiveness
・Evaluated by supplier contributions made to Panasonic
in terms of product competitiveness / future prospects(eg: energy saving, improve productivity, improve branding)
10
Possibility
/ Feasibility
・Further product development and possibility
・Evaluated by feasibility of expansion to other Panasonic
Group of companies and products10
Others・Add points based on level of overall presentation,
easy to understand format, and attitude5
Total 100
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
15
All entries
Final screening
The top 2 places in each group proceed to the final screening
Initial screening
• Innovation Promotion Department
• Quality & Environment Division
• Company Procurement• Global Procurement
Company
Judges
• Innovation Promotion Department
• Quality & Environment Division
• Global Procurement Company
Judges
Processed parts/general
50 cases (*if there are 5 groups)
Each No. 3 / No. 4 (Honorable Mention Awards)
A maximum of 50 of the most outstanding will be nominated
Gold awards: 2
Silver awards: 3
Decision on gold, silver, and bronze awards
* If there are 10 proceeding
Bronze awards: 5
*The ranking is the total scores by groups
Each No. 1 / No. 2 (proceeding to the final screening)
4. (3) Screening Process *may be altered depending on the number of applications
15
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
5. Others
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
5. (1) Registration and Release of the Environment Technology Database
17
All successful results and proposals will be registered on the Panasonic Environment
Technology Database System and made available to all Panasonic employees. * Results and proposals will not be released outside Panasonic.
ECO-VC Administration, Global Procurement Company, Panasonic Corporation 18
5. (2) Issuance of the Certificate of Registration
★ Certificates of Registration will be issued to all themes submitted.
ECO-VC Administration, Global Procurement Company, Panasonic Corporation
Reference Information
Activities for Achieving the Environment Vision 2050
・In FY 20 ECO-VC activities, energy initiatives were evaluated in the framework of CO2 reduction as before.・The conversion method for renewable energy has been added to the outline and application guidelines since FY 19.
GP2021 :Targets and action plans to be achieved in fiscal 2021
Category 2021 targets
Ma
teri
al Is
su
es Energy
Increase the ratio of total energy created to
total energy usedTotal energy created : total energy used = 1 : 8.5
Products
&
Services
Increase amount of energy created Amount of energy created: 30,000 GWh or more
Increase the size of contribution toward
energy savings through products and
services
Size of contribution toward energy savings through products and
services:
Direct: 25,000 GWh or more
Indirect: 2,000 GWh or more
Expand energy creation businesses
Expand energy efficient products and services business, focusing on products and services utilizing IoT/AI
Factories
Promote zero-CO2 model factories
- Establish model factory using advanced hydrogen technology
- Establish at least one zero-CO2 model factory in each region
Increase the use of renewable energy through the generation
of renewable energy on-site and procurement of renewable
energy
Renewable energy generated on our sites:
40,000 MWh or more
Promote energy efficiency in production
- Reduce energy loss through IoT
- Improve productivity through manufacturing innovation
Resources
Create circular economy business modelsAnalysis of the development of circular economy options for existing
businesses: 100%
Reduce resource consumption and increase the use of
sustainable materialsRecycled resin usage: 42,000 tons or more (2019 to 2021 total)
Achieve Zero Waste Emissions from factories globally Factory waste recycling rate: 99 % or more
Oth
er
en
vir
on
me
nta
l
su
sta
ina
bilit
y g
oa
ls Water Reduce water consumption in production activities
Chemical
substancesMinimize the environmental impact of chemical substances usage in production activities and products
Biodiversity Promote procurement of sustainable materials
Local
communitiesPromote environmental initiatives to contribute to local communities and educate the next generation
Compliance Ensure compliance with environmental laws and regulations
ECO-VC Administration, Global Procurement Company, Panasonic Corporation 22
Location1-19 Nakamachi, Kadoma City, Osaka PrefectureTEL: +81-6-6907-4812 FAX: +81-6-6907-4813
TransportationPlease come via public transportation1. From Osaka On the Osaka Metro Midosuji Line, go from Umeda Station to
Yodoyabashi Station (change trains)On the Keihan Line, go from Yodoyabashi Station to Kadomashi Station, followed by a 5-minute walk
2. From Kyoto On the Keihan Line, go from Sanjo Station to Kadomashi Station,
followed by a 5-minute walk On the Kintetsu Line, go from Kyoto Station to Tambabashi Station
(change trains)On the Keihan Line, go from Tambabashi Station to Kadomashi Station, followed by a 5-minute walk
3. From Osaka International Airport On the Osaka Monorail, go from Osaka-Airport Station
to Kadoma-shi Station, followed by a 5-minute walk
Access Map: Panasonic Shoshin Hall
To Itami Airport
Hachijima
Intersection
Dainichi
Intersection
Moriguchi
N
Dainichi
Panasonic
LS
Company
Moriguchi
Nishisanso
Kadomashi
Panasonic
IS
Company
To Osaka
Yodoyabashi
Route 163
Panasonic
CNS Company
Panasonic
CNS CompanyKadoma
City hall
Kadoma
Fire Department
Panasonic
Museum
●●
●●
● ●
●
●
Panasonic
Shoshin Hall
To Kyoto
Demachiyanagi
Osaka Metro(Subway)
Tanimachi Line
Panasonic Corporation
Osaka Metro(Subway)
Tanimachi Line
For inquiries: [email protected]