4/13/2020 2020 Pipeline Safety Conference April 14, 2020 JON WOLFGRAM, CHIEF ENGINEER –MINNESOTA OFFICE OF PIPELINE SAFETY OUR GOALS FOR TODAY! Stay connected! Stay focused! Talk processes! 1
Transcript
Page 1: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

2020 Pipeline Safety Conference

April 14, 2020

JON WOLFGRAM, CHIEF ENGINEER – MINNESOTA OFFICE OF PIPELINE SAFETY

OUR GOALS FOR TODAY!

• Stay connected!

• Stay focused!

• Talk processes!

1

Page 2: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

OUR AGENDA FOR TODAY

• MNOPS Update

• 2020 Inspections

• COVID-19

• Minnehaha Academy Incident

• Silver Springs Maryland Incident

• Your Questions.

MNOPS

• 19 Staff Total

• 14 Inspectors

• (3) Field Offices

• Pipeline Safety Inspection & Investigations

• Damage Prevention Education and

Enforcement

2

Page 3: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

SINCE THE LAST TIME:

LOTS OF INSPECTIONS

CENTURYLINK LOCATE ISSUES

NEW DIRECTOR – JIM SMITH

MS216D MEETINGS

(2) INSPECTOR OPENINGS

COVID-19

2019 INSPECTION PERSON DAYS

Inspection Types Natural Gas Hazardous Liquid

Grand Total

Standard Inspections 495 82 578

Design and Construction 295 3 298

Operator Training 13 0 13

Integrity Management 36 5 41

Operator Qualification 27 1 29

Accident/Incident Investigation 141 13 155

Damage Prevention Inspection and Investigations

120 6 126

Compliance Follow up 60 5 65

Grand Total 1187 116 1304

  

 

 

   

 

 

 

 

       

 

 

3

Page 4: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

4

Page 5: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

     

     

4/13/2020

Total Incidents 2009‐2019 (National)

0

100

200

300

400

500

600

700

800

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Total Incidents 2010‐2019 (MN)

0

2

4

6

8

10

12

14

16

18

20

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

5

Page 6: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

   

 

 

 

   

     

         

   

 

 

 

   

     

       

4/13/2020

Total Incidents By Cause 2010‐2019 (National)

ALL OTHER CAUSES 4%

CORROSION 16%

NATURAL FORCE DAMAGE 6%

OTHER OUTSIDE FORCE DAMAGE 8%

EXCAVATION DAMAGE 10%

INCORRECT OPERATION 12%

MATERIAL/WELD/EQUIP FAILURE 44%

Incidents By Cause 2010‐2018 (MN) ALL OTHER CAUSES

3%

CORROSION 5%

EXCAVATION DAMAGE 8%

INCORRECT OPERATION 17%

MATERIAL/WELD/EQUIP FAILURE 41%

NATURAL FORCE DAMAGE 20%

OTHER OUTSIDE FORCE DAMAGE 6%

6

Page 7: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

         

       

           

10

4/13/2020

Total Incidents By Cause 2010‐2019 (MN)

0

1

2

3

4

5

6

7

8

9

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

ALL OTHER CAUSES CORROSION EXCAVATION DAMAGE INCORRECT OPERATION

MATERIAL/WELD/EQUIP FAILURE NATURAL FORCE DAMAGE OTHER OUTSIDE FORCE DAMAGE

7

Page 8: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

INSPECTIONS: 2019

(116) Pipeline Safety Issues Cited

Top 5

1. 192.605(a) – O&M – Procedures & Review

2. 191.11- Distribution Annual Reports

3. 192.605(b)(8) – O&M – Effectiveness Review for Procedures

4. 192.1007(a)(2) – DIMP Knowledge: Info. from design, ops and maintenance

5. 192.1007(a)(3) – DIMP Knowledge: Identification of needed information.

DAMAGE PREVENTION: 2019

(193) Damage Prevention Safety Issues Cited

Top 5

1. Not located by start time on ticket / mis-locate.

2. No ticket.

3. Failure to notify of no marks by start time.

4. Failure to find precise location of facility.

5. Failure to maintain clearance with equipment.

8

Page 9: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

2019 Annual Report

Looking ahead!

1. Work together through challenges!

2. Complete 2020 inspections.

3. Operator RSI

4. Continue to refine the new MNOPS Database.

5. Work to build an operator portal.

6. Hire new staff.

7. Get back to normal!!

https://dps.mn.gov/divisions/ops/about/Pages/default.aspx

9

Page 10: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Operator RSI

Due July 1, 2020 https://www.cognitoforms.com/MNOPS1/MNOPSRSIAllOperators

1. Request for Plans and Procedures

2. PHMSA Advisory Bulletins

3. NTSB Recommendations

4. Low Pressure Distribution Systems

5. Pipeline Safety Management Systems

6. Environmentally Sensitive Areas

Statute Changes

1. MS216D

2. Pipeline Civil Penalty Amounts

3. Continue to provide feedback

4. Legislature Focus – COVID19

5. Back in session Today.

     

       

   

 

     

     

   

10

Page 11: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

2020 Inspections

1. Inspections as planned for 2020

2. Aim for “Virtual” Inspections

3. Inspectors will “Prep” by reviewing plans

4. Solo Field Inspections

5. Construction Inspections – Social Distancing

6. Investigations – Social Distancing

Stay-of-Enforcement & Waivers

PHMSA Stay – OQ, D&A, & CRM

MNOPS will consider for intrastate upon request

Notify MNOPS of potential Issues

MNOPS will respond in writing

Items outside of the PHMSA Stay will require a waiver

Reference 190.341 & Minnesota Statute 299F.57 Subdivision 5.

https://www.phmsa.dot.gov/news/phmsa‐stay‐enforcement‐covid‐19

11

Page 12: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

NTSB Recommendations:

SILVER SPRINGS, MARYLAND INCIDENT

INFORMATION PROVIDED BY PHMSA

https://www.ntsb.gov/investigations/AccidentReports/Pages/par1901.aspx

Silver Springs, Maryland Incident

An explosion and fire occurred on August 10,2016 at an apartment complex.

14 units in the apartment building partially collapsed.

7 residents died

65 resident were transported to the hospital

3 firefighters were transported and released from the hospital

12

Page 13: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

                        

                               

           

4/13/2020

Incident Cause

The failure of an indoor mercury service regulator with an unconnected vent line that allowed natural gas into the meter room where it accumulated and ignited from an unknown ignition source.

Incident Cause

The actual photo of the unthreaded union:

13

Page 14: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

NTSB Recommendations:

Require that all new service regulators be installed outside occupied structures. (P‐19‐001)

Require existing interior service regulators be relocated outside occupied structures whenever the gas service line, meter, or regulator is replaced. In addition, multifamily structures should be prioritized over single‐family dwellings. (P‐19‐002)

192 Enforcement Implications:

Subpart H – Customer Meters, Service Regulators, and Service Lines (192.353, 192.355, 192.357, etc.)

Requirements for Corrosion Control (192.481)

Subpart L – Operations (192.615)

Subpart M – Maintenance (192.723)

Subpart P – Distribution Integrity Management Plan (DIMP)

                    

                          

                          

   

14

Page 15: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

DIMP

192.1007(a) – Knowledge: Do you know the location, type, maintenance, and leak call history of ALL your system’s inside meter sets? Can you demonstrate this to an inspector?

192.1007(b) – Identify Threats: “An operator must consider reasonably available information to identify existing and potential threats. Sources of data may include, but are not limited to, incident and leak history, corrosion control records, continuing surveillance records, patrolling records, maintenance history…”

NRC 1155909 (Silver Springs) has put the entire gas distribution industry on notice with respect to indoor meter sets as a system integrity risk.

DIMP

192.1007(d) – Identify and Implement Measures to Address Risks:

1. Address the possible need for specific measures to address sub‐categories of inside meter set risks, e.g., meter types, multi‐unit buildings, special venting issues, etc.

2. Special/Accelerated AC & Continuing Surveillance Patrols Vent testing/Replacement/Move out Programs

3. “Red tag” and shut‐in as an explicitly considered option to remove risk

4. Others?

192.1007(f) – Periodic Evaluation and Improvement: “An operator must re‐evaluate threats and risks…”. If you haven’t re‐evaluated your DIM program with respect to Silver Springs and other incidents – Why Not?

                                                 

                                    

                                      

                                            

             

                                  

                      

                      

 

                                                    

15

Page 16: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations: 192.199

(e) Have discharge stacks, vents, or outlet ports designed to prevent accumulation of water, ice, or snow, located where gas can be discharged into the atmosphere without undue hazard;

(f) Be designed and installed so that the size of the openings, pipe, and fittings located between the system to be protected and the pressure relieving device, and the size of the vent line, are adequate to prevent hammering of the valve and to prevent impairment of relief capacity;

Inside Regulator Considerations: 192.355 (b)

(b) Requiring service regulators to terminate outdoors

16

Page 17: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations: 192.355 (b)(1)

(b)(1) Must be rain and insect resistant

Inside Regulator Considerations: 192.355 (b)(2)

(b)(2) Be located at a place where gas from the vent can escape freely into the atmosphere and away from any opening into the building

17

Page 18: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations: 192.355 (b)(2)

Inside Regulator Considerations:

Recommendation: Install service regulators away from an ignition source

18

Page 19: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations: 192.357 (d)

Requires regulators that might release gas to be vented to the outside atmosphere

Inside Regulator Considerations: 192.353(a)(b)(c)

• Requires each service regulator to be located in a readily accessible location, and that if service regulators are installed in a building they must be located as near as practical to the service line entrance to the building.

• Gas service regulators must be installed in readily accessible location.

• Each meter installed within a building must be located in a ventilated place.

• Inside meter must be not less than 3 feet from any source of ignition.

19

Page 20: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations: 192.723

• The following leakage surveys are required for inside and outside piping up to the outlet of the gas meter.

• Business districts at intervals not exceeding 15 months, but at least once each calendar year.

• Outside business districts as frequently as necessary, but at least once every five calendar years at intervals not exceeding 63 months for plastic and cathodically protected lines; cathodically unprotected distribution lines every 3 calendar years at intervals not exceeding 39 months.

Inside Regulator Considerations: 192.481

• Perform Every 3 years, Not To Exceed 39 months for inside and outside piping up to the outlet of the meter.

20

Page 21: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Inside Regulator Considerations:

Ensure vent line is not corroded:

21

Page 22: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Ensure vent line is properly sized:

Ensure vent line is properly sized:

22

Page 23: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Additional Considerations:

Vents must use metallic pipe, not PVC

PVC can create static electricity

Metallic piping will create structural integrity

Perform Visual Inspection and Observations on inside piping.

Make sure all piping is connected

The best practice is to relocate service regulators and gas meters outside.

Minnehaha Academy Explosion

https://www.ntsb.gov/investigations/AccidentReports/Pages/PAB1903.aspx

23

Page 24: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Minnehaha Academy Explosion

August 2, 2017

Building Explosion

(2) Fatalities

(9) Injuries

Meter-move-out work

Mechanical Contractor working on Jurisdictional Piping

Valve open

LOCKOUT-TAG-OUT

24

Page 25: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

25

Page 26: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

26

Page 27: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

27

Page 28: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

28

Page 29: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

29

Page 30: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Minnehaha Academy Explosion: Takeaways

Ensure only qualified personnel work on your system.

Awareness to Mechanical Contractors regarding.

jurisdictional components.

Ensure proper purging of all piping.

Perform pre-project walk-troughs and design reviews.

Identify all required valves and ensure they work.

MNOPS Alert Notice February 2, 2018

Incidents Can Share Similarities:

Review work prior to starting it.

Look for the loose ends in the field or in procedures.

Ensure adherence to procedures.

Don’t make assumptions.

Identify shut-down plans prior to beginning work.

Find the valves you might need.

Find a backup valve.

Make sure they work.

Does LOTO (Lock out / Tag out) apply?

https://www.osha.gov/SLTC/controlhazardousenergy/

30

Page 31: 2020 Pipeline Safety Conference€¦ · 4/13/2020. INSPECTIONS: 2019 (116) Pipeline Safety Issues Cited . Top 5 . 1. 192.605(a) – O&M – Procedures & Review 2. 191.11- Distribution

4/13/2020

Questions?

THANK YOU!

PIPELINE SAFETY TAKES ALL OF US!

THANK YOU FOR WHAT YOU DO!

STAY SAFE!