CITIZEN’S CHARTER2021 (1st edition)
I. Mandate
The Development Academy of the Philippines is a Government-Owned or-ControlledCorporation established in 1973 with an original charter created by Presidential Decree205, amended by Presidential Decree 1061 and further amended by Executive Order288.
To foster and support the development forces at work in the nation’s economy throughselective human resources development programs, research, data collection, andinformation services, to the end that optimization of wealth may be achieved in amanner congruent with the maximization of public security and welfare;
To promote, carry on and conduct scientific, inter-disciplinary and policy-orientedresearch education, training, consultancy, and publication in the broad fields ofeconomics, public administration, and the political and social sciences, generally,involving the study, determination, interpretation, and publication of economic, political,and social facts and principles bearing upon development problems of local, national,or international significance; and,
To discharge a regional role in initiating and catalyzing exchange of ideas and expertiseon development activities in the region of Asia and the Pacific.
II. Mission
DAP fosters synergy and supports the development forces at work towards sustainableand inclusive growth. Specifically commits to:
1. Generate policy and action through research and strategic studies that addressdevelopment issues and emerging challenges;
2. Promote excellence in leadership and organizations through training, education, andconsultancy; and,
3. Catalyze the exchange of ideas and expertise in productivity and development in theregion of Asia and the Pacific
1
III. Vision
DAP is the leading knowledge organization providing innovative, effective, andresponsive solutions to the country’s development challenges. \
IV. Core Values
The officers and personnel live up to the following core values:
Dangal (Honor and Integrity)Galing (Smart and Innovative)Tatag (Stable and Future-ready)
V. Quality Policy
In transforming people and organizations, we are committed to:
Deliver the highest quality of service to our stakeholders;
Adhere to regulatory (legal) requirements and established professional and ethicalstandards;
Provide responsive interventions to advance national development through goodgovernance and productivity
To achieve this, we commit to continually improve the effectiveness of our qualitymanagement system.
Serbisyo namin at malasakit ay para sa inyo.Kalidad namin at pagbabago ay dahil sa inyo.
Sa patuloy naming pag-unlad ay kaisa kayo.
2
VI. List of Services
External ServicesApplication for Admission and Enrollment to Master’s Degree (Public Offering) 9
Application to PMDP Senior Executives Class, Middle Managers Class, and PhroneticLeadership Class
13
Availment of GSPDM Academic Programs 19
Enrollment in Public Courses 25
Processing of APO Scholarship Training Program 29
Queries on DAP’s Program and Services 32
Request for Appointment with the DAP President by External Clients 33
Request for Certification, Authentication, and Verification (CAV) 36
Request for Certification/s 38
Request for Certified True Copy 40
Request for Concept Paper 42
Request for Copy of Student Credentials 45
Request for Customized Training Services 47
Request for eCopy of the Full Capstone Project Report/Capstone Paper Manuscript 51
Request for ID Replacement 54
Request for Payment of Consultancy Services/Honoraria(On-line through Document Tracking System (DTS)
56
Request for PMDP Non-Academic Records and Certifications 60
Request for Project Proposal 61
Request for Technical Assistance/Consultancy/Research Services 65
Request for the Use of the Conference Center Facility - Pasig 69
Request for the Use of the Conference Center Facility - Tagaytay 72
Response to Written Communication (Emails and Snail Mail) 75
3
Internal Services
Administrative Department
Request for Banquet Service by Internal Clients 78
Request for the Use of Engineering Services Office Space by InternalCustomers
81
Central Documentation and Records Division (CDRD)
Issuance of the Certification of Consultant/Resource Person Output Clearancefor Honoraria Payment
83
Preparation of Documented Information Feedback Form (DFF) 85
Preparation, Review, Finalization, And Dissemination of Policy Issuances -Memorandum Circular (MC), Office Order (OO), and Special Order (SO)
87
Re-Issuance of Training Certificates or Issuance of Certified True Copy ofTraining Certificate
90
Request for Issuance of Training Certificates or Issuance of Certified True Copyof Training Certificate
92
Corporate Operations and Strategy Management - Management InformationSystems (COSM-MIS)
Issuance of ICT Clearance for Purchase Request 94
Issuance of ICT Diagnosis Report 95
Management of DAP E-mail account 97
Technical Support Assistance of Simple ICT Request 99
Technical Support Assistance of Complex ICT Request 100
Video Conference Assistance 101
Uploading of Bids and Awards Notices in the DAP Website 103
Uploading of Training/Course Invitation in the DAP Website 104
Corporate Operations and Strategy Management (COSM)
Creation of Project Management Information System (PMIS) Account 105
Issuance of Project Special Order 107
Issuance of Revised Project Special Order 110
Request for Corporate-level Documents (Documents Requiring Signature ofCompliance Officer and DAP President)
112
4
Request for Corporate-level Documents (Internal Use) 115
Council of Fellows
Request for Technical Expert 118
Finance Department (Accounting & Treasury Divisions)
Request for Billing and Collection(On-line through Document Tracking System (DTS)
120
Request for Billing and Collection(On site through Document Tracking and Monitoring System (DTMS)
123
Finance Department (Budget, Accounting & Treasury Division)
Request for Cash Advance for Local and Foreign Travel(On-line through Document Tracking System (DTS)
125
Request for Cash Advance with a Specific Purpose(On-line through Document Tracking System (DTS)
129
General Services Division (GSD)
Engineering Services 133
Motor Vehicles Pool (MVPool) Services 134
Human Resource Development Division (HRD)
Approval of Internal Learning and Development (L&D) Interventions 135
Approval of Requests for External Learning and Development (L&D)Interventions
137
Preparing Travel Documents and Payment for External Training 139
Human Resource Management - Recruitment, Selection, and Placement(HRM-RSP)
Endorsement of Candidates 141
HR Assessment Process 143
Processing of Service Agreement (SA) 145
Human Resource Management Division (HRMD) - HRMDD
Issuance of Certificate of Employment/Engagement and Service Record 148
Process of Classifying Consultants and Resource Persons (C/RP) 150
Process of Reviewing and Approving Letters of Invitation (LOI) for Consultants 153
5
and Resource Persons (C/Rp)
Request for Monetization of Leave Credits 155
Institutional Marketing Center
Management of DAP Booth 157
Partnership & Linkages 159
Review and Approval of Website Content & Social Media Assets 161
Request for IMC Tokens/Collaterals 163
Request for Newspaper Features 165
Request for Press Conference and Media Guesting 167
Request for Review and Approval of Briefer, AVP Script and Final Review ofAVP
169
Request for Review and Approval of Marketing Collaterals Design 170
Study Visits/Request for Institutional Briefing 172
Legal Office
Final Contract Review 173
Initial Contract Review 175
Request for Legal Opinion 177
Logistics DivisionIssuance of BAC Resolutions for Academic, Scholarly or Artistic Work,Exclusive Technology and Media Services (Sec. 53.6) or Highly TechnicalConsultants (Sec. 53.7)
178
Lease of Venue 179
Procurement of Goods and Services through Shopping and Small ValueProcurement
184
Procurement through Competitive Bidding (Goods and Services, InfrastructureProjects, and Consulting Services)
188
Requisition and Issuance of Supplies in Stock 191
Return of Property 192
Transfer of Property 194
Office of the Board Secretary
6
Request for Board Resolutions 196
Request for Secretary’s Certification 199
Office of the President
Request for Appointment with the DAP President by Internal Clients 201
Review and Approval of the DAP President (Online Processing) 203
Review and Approval of the DAP President (Physical Documents) 211
Office of the Senior Vice President for Services (OSVP-S)
Request for Investigation 218
Request for Security Augmentation 221
Research Support Services Division (RSSD) - Library
Interlibrary Research 223
Research and Reference Service 224
7
EXTERNAL SERVICES
8
APPLICATION FOR ADMISSION AND ENROLLMENT TO MASTER’SDEGREE (PUBLIC OFFERING)Enrollment and Admission process for Master in Public Management (Public Offering).
Office or Division: Office of the Academy Registrar (OAR)
Classification: Complex
Type of Transaction: G2C - Government to Citizen
Who may avail: Qualified individuals who want to pursue higher education.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
DAP-OAR Form 09 for DAP GS AdmissionRequirements
Office of the Academy Registrar (OAR)
1. Student Information Form, 1 ,Original/Photocopy
Office of the Academy Registrar (OAR)
2. Previous School Diploma (Certified TrueCopy) , 1, Photocopy
Applicant’s School of Origin
3. Transcript of Records (Transfer of Credentialfrom last school attended)
Applicant’s School of Origin
4. Agency Nomination / Letter ofRecommendation/Special Order(forGovernment Employees), 1 , Original
Originating Agency
5. Letter of Undertaking, 1 ,Original/Photocopy
Applicant
6. Birth Certificate PSA*, 1 , Photocopy PSA
7. Marriage Certificate from PSA.* (if married)(For foreign students, license must have English
translation) , 1 , Photocopy
PSA
8. Curriculum Vitae/PDS, 1 ,Original/Photocopy
Applicant
9. Two Passport Size Photographs Applicant
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
9
1. Submitaccomplishedapplication formtogether with thecomplete admissionrequirements. (SoftCopies)
1. Receive dulyaccomplishedapplication form andcheck completenessof documents.
None 10 Minutes
ADMISSIONOFFICER
2. Pay EntranceExam Fee at TreasuryOffice andsecure OfficialReceipt (OR). (BankTransfer/Deposit)
2. Receive paymentand issue OfficialReceipt (OR).
P600.00 10 Minutes CASHIER, 3rdFloor, DAP Bldg,Pasig City
3. Present/submitproof of payment totake EntranceExamination.
3. Encode the ORand advise the clientto take EntranceExamination.
None 10 Minutes OAR
ADMISSIONOFFICER
4. Wait for the emaillink from OAR andAssessment Analytics(Personality andEssay)
4. Send link toapplicants to takeEssay andPersonality Test
None 2 hours OAR/TestingPartner
ADMISSIONOFFICER
4.1 Consolidateresults of exam andinterview
None 3 workingdays
OAR
ADMISSIONOFFICER
4.2 Advise client ofthe admission examresult and interviewschedule.
None OAR
ADMISSIONOFFICER
Total PhP600.00
3 days, 2 hrs.and 30
minutes
INTERVIEW
10
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Issue notice ofInterview Schedule.
5 Minutes DAP GraduateSchool
PROGRAMMANAGER
1. Submit self forinterview.
2. Interview client tovalidate applicationdetails andaccomplishedassessment form.
1 hours DAP GraduateSchool
PROGRAMMANAGER/ADMISSION
OFFICER
3. Consolidateresults of exam andinterview
3 working days DAP GraduateSchool
PROGRAMMANAGER
4. Inform the applicantof the result of theapplication.
DAP GraduateSchool
PROGRAMMANAGER
Total 0 3 workingdays, 1 hrsand 5minutes
ENROLLMENT
CLIENT STEPS AGENCY ACTIONSFEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1.Pay Matriculation Feethru Bank Transfer orDeposit
1. Receive paymentand issue OfficialReceipt.
P198,500(MonthlyORQuarterly)
15 Minutes TREASURYDIVISION
CASHIER
11
2. Send proof ofpayment to OAR andGSPDM.
2. Receive andvalidate payment
10mins OAR and GSPDM
3. Encode students’record into theRegistrar InformationSystem
30mins OAR
3. Wait for the advice ofGSPDM regardingProgram’s schedule
4. Advice the studenton the Schedule ofthe Program.
10mins GSPDM
Total P198,000(Online)
1 Hour and 5minutes
12
APPLICATION TO THE PUBLIC MANAGEMENT DEVELOPMENTPROGRAM (PMDP)
The Development Academy of the Philippines (DAP) implements a governmentscholarship under the Public Management Development Program, the erstwhileNational Government’s Career Executive Service Development Program (NGCESDP).The PMDP implements three training programs, namely:
1) Phronetic Leadership Class (PLC) for selected high-level officials(Undersecretaries, Assistant Secretaries, and equivalent positions)
2) Senior Executives Class (SEC) for senior career executives in the third level(Directors and equivalent positions)
3) Middle Managers Class (MMC) for the high performing-high potential divisionchiefs, section chiefs, and/or technical staffs being fast-tracked for managerialpositions.
To avail of the privilege of joining the Program, heads of agencies shall nominate theirqualified personnel to the PMDP Program Management Office (PMO). Applicants will besubjected to the PMDP screening process. The NGCESDP Steering Committee makesthe final decision on the selection and admission to the PMDP.
The following matrices provide vital information on the Program, including contactdetails, admission processes, and requirements:
Office or Division: PMDP PMOClassification: Under Special Law – Inter Agency Steering CommitteeType ofTransaction:
Government to Government
Who may avail: Qualified individuals from National GovernmentAgencies, Legislative and the Judiciary Branches,Constitutional Offices, State Universities and Colleges,and Government-Owned and Controlled Corporations
CHECKLIST OF REQUIREMENTS WHERE TO SECUREPLC Admission
● PMDP Nomination Form 1-A● Critical Essay Form 1-B for PLC● Declaration of Medical Illnesses Form (D)● Government’s Physician Certification Form (E)
Downloadable onlinehttps://pmdp.dap.edu.ph/forms-requirements/
● Updated Personal Data Sheet – CSC Form 212 Downloadable onlinehttp://www.csc.gov.ph
13
● Certified true copy of CSC Form 33(Appointment papers)
Agency Human ResourceDepartment of thenominee
● Certified true copy of Official Passport Nominee
SEC / MMC Admission
● PMDP Nomination Form (A)● Immediate Supervisor’s Assessment Form (B)● Agency Screening Certification Form (C)● Declaration of Medical Illnesses Form (D)● Government’s Physician Certification Form (E)
Downloadable onlinehttps://pmdp.dap.edu.ph/forms-requirements/
● Updated Personal Data Sheet – CSC Form 212 Downloadable onlinehttp://www.csc.gov.ph
● Certified true copy of CSC Form 33(appointment papers)
Agency Human ResourceDepartment of thenominee
● Certified true copy of Designation Order (ifapplicable)
● Certified true copy of IPCR for the past two years
● Organizational Chart of the Agency
● Certificate of no pending administrative case
● Original/Certified true copy of Transcript of Records School where thenominee graduated
● Certified true copy of birth certificate PSA
● Certified true copy of Official Passport (applicable toSEC applicants only as a requirement for theForeign Study Mission)
Nominee
● Certification/confirmation of the nomination from theCentral Office (for nominations made by RegionalDirectors or other Officers)
Central Office
● Laboratory Results such as: CBC (Complete BloodCount); Urinalysis; Fecalysis; Physical assessment;Chest X-ray
Government hospital(other than the agency’shospital/clinic)
14
APPLICATION PROCEDURE
FOR PLC:
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSON /SRESPONSIBL
E
1. Submitaccomplishedapplication forms,Critical EssayForm 1-B, andother requireddocuments toPMDP, DAP, PasigCity or via email:[email protected]
Perform the followingtasks:
a. Check for thecompleteness of thesubmitted documents
None 2 days PMDPRecruitment
andAdmissions
Team
b. Assess the qualificationsand the essay response ofthe nominee using theapproved scoring system ofthe Program
None 1 day PMDPRecruitment
andAdmissions
c. Deliberate on theapplicant
None 1 day PMDPAdmissionsCommittee
d. Submit shortlistedapplicants to theNGCESDP SteeringCommittee for vetting &confirmation ofacceptance to theProgram.
None 5-10 days PMDPRecruitment
andAdmissions
Team
e. Inform each applicantvia email of his/herinclusion in the shortlistfor confirmation byNGCESDP SteeringCommittee.
None 1 day PMDPRecruitment
andAdmissions
Team
15
2. Receivenotification ofacceptance and/ornon-acceptance.
Notify each applicant onthe result of one’sapplication via email andSMS. Subsequently, issueeach applicant the officialletter of acceptance /non-acceptance to theProgram.
None 2 days PMDPRecruitment
andAdmissions
Team
Total 12-17 days
FOR SEC AND MMC:
CLIENT STEPS AGENCY ACTIONSFEES TO
BE PAID
PROCESSING
TIME
PERSON /S
RESPONSIBLE
1. Submitaccomplishedapplication formand otherrequireddocuments toPMDP, DAP,Pasig City or viathe onlinesubmission form:
For MMC:https://bit.ly/PMDPMMCForms
For SEC:bit.ly/PMDPSECForms
Check for the completenessof the submitted documents.Subsequently, invite theapplicant for an examinationand interview through e-mailand SMS.
None 2 days PMDPRecruitment
andAdmissions
Team
2. Upon receipt ofthe invitation forexam andinterview,acknowledge andconfirm ifschedule isacceptable.
Schedule the written examwith the third-party providerand the interviewers.
For the online processing ofapplications: The examswill be scheduled a daybefore the online interview.
None 1 day PMDPRecruitment
andAdmissions
Team
16
3. Undertake thefollowingexaminations:
a. Cognitive Testb. Occupational
PersonalityQuestionnaire
c. Essay Writing
4. Prepare for thescheduledinterview.
Administer the exams.Promptly generate resultsof exams and collate foruse of the interviewers.
Orient the applicant aboutthe PMDP prior to theconduct of the interview.
None 1 day PMDPRecruitment
andAdmissionsOfficer and
thethird-partyprovider
(Assessment Analytics,
Inc.)
5. Undertake thebehavioral -based interview.
Evaluate the applicant, withcalibration by twointerviewers.
None 1 day PMDPRecruitment
andAdmissions
ProgramManager,
Invited DAPOfficers, andPMDP Class
Managers
6. Wait for updateson the progressof his/herapplication
a. Inform the applicant thats/he will be notified viaSMS and email regardingthe progress of his/herapplication after thedeliberations of thePMDP AdmissionsCommittee.
None 1 day PMDPRecruitment
andAdmissions
Team
b. Deliberate on theapplicants.
None 1 day PMDPAdmissionsCommittee
c. Submit shortlistedapplicants to the
None 5-10 days PMDPRecruitment
17
NGCESDP SteeringCommittee for vettingand confirmation ofacceptance to theProgram.
andAdmissions
Team
d. Inform each applicant viaemail of his/her inclusionin the shortlist forconfirmation byNGCESDP SteeringCommittee.
None 1 day PMDPRecruitment
andAdmissions
Team
7.Receivenotification ofacceptanceand/ornon-acceptance.
Notify each applicant on theresult of one’s applicationvia email and SMS.Subsequently, issue eachapplicant the official letter ofacceptance /non-acceptance to theProgram.
None 2 days PMDPRecruitment
andAdmissions
Team
Total None 15-20 days
18
AVAILMENT OF GRADUATE SCHOOL OF PUBLIC ANDDEVELOPMENT MANAGEMENT ACADEMIC PROGRAMS
The Graduate School of Public and Development Management (GSPDM) is theacademic arm of the DAP that offers short courses and graduate degree programs inthe fields of public management and productivity and quality management for the publicand private sectors. Programs are offered in a ladderized mode and can be customizedto suit the needs of an agency.
GSPDM’s academic programs are categorized as follows:
A. Regular Academic Programs1. Doctorate Degree2. Master’s Degree3. Executive Course4. Certificate Course
B. Customized Academic Programs1. Doctorate Degree2. Master’s Degree3. Executive Course4. Certificate Course
The regular academic programs are open to the public for enrolment while thecustomized academic programs are tailored-fit to the needs of the client and may bejointly conducted by GSPDM and the client.
Office or Division: GSPDMClassification: 1. Regular Academic Programs: Simple
2. Customized Academic Programs: Multi-Stage: Highly TechnicalType of Transaction: G2G - Government to Government
G2C - Government to CitizenG2B - Government to Business Entity
Who may avail: Government Agencies, Private SectorTuition Fee: 1. Regular Academic Programs
Doctorate Degree1
Master’s Degree
a. Face to Face Php 250,000.00
b. Online Php 198,500.00
1 Rate is undetermined yet as curriculum development is ongoing.
19
Executive Course
a. Face to Face Php 25,000.00
b. Online Php 22,000.00
Certificate Course
a. Face to Face Php 15,000.00
b. Online Php 12,500.00
2. Customized Academic Programs2
Doctorate Degree3
Master’s Degree
a. Face to Face Price is subject to negotiation with client
b. Blended Price is subject to negotiation with client
c. Online Price is subject to negotiation with client
Executive Course
a. Face to Face Price is subject to negotiation with client.
b. Online Price is subject to negotiation with client.
Certificate Course
3 Rate is undetermined yet as curriculum development is ongoing.
2 Provided are baseline rates only as the final rate is subject to negotiation with clients based on their needs, e.g.requirement for logistics, and budgetary capacity.
20
a. Face to Face Price is subject to negotiation with client.
b. Online Price is subject to negotiation with client.
CHECKLIST OF REQUIREMENTS
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Memorandum of Understanding (MOU)/
Memorandum of Agreement (MOA)/ Letter ofConforme (LOC)
Template: RDAP DocumentManagement SystemReview and Endorsement: DAPLegal Office
3. REGULAR ACADEMIC PROGRAMS
CLIENT STEPS AGENCY ACTIONS FEESTO BEPAID
WORKINGDAYS
PERSONRESPONSIBLE
INQUIRY1. Check programs offeredby DAP-GSPDM at theDAP website or by calling(02) 8-631-2167.
1.1Provide basicinformation on theprograms offeredby DAP-GSPDM.
None 10 minutes GSPDM Staff
1.2Refer to the Officeof the AcademyRegistrar foradmissioninquiries.
None 10 minutes Admission Officer
GSPDM
Total 0 20 minutes
2. CUSTOMIZED ACADEMIC PROGRAMS
CLIENT STEPS AGENCY ACTIONS FEESTO BEPAID
WORKINGDAYS
PERSONRESPONSIBLE
INQUIRY1. Check programs offeredby DAP-GSPDM at theDAP website or by calling(02) 8-631-2119.
1. Provide basicinformation on theprograms offered byDAP-GSPDM.
None 10 minutes GSPDM Staff
GSPDM
21
1.1 Letter of Intent -Inform the client tosend a letter oremail containingthe details of theinquiry and intentto have anexploratorymeeting forGSPDM toformally acceptand address thesame.
None 10 minutes GSPDM Staff
GSPDM
1.2 Take note of theinquiry and notifyresponsibleLearningManagementTeam (LMT).
None 5 minutes GSPDM Staff
GSPDM
2. Submit Letter of Intentaddressed to the Deanregarding the customizedprogram and request foran exploratory meeting
2. Schedule andprepare forexploratorymeeting.
None 10 minutes GSPDM Staff
GSPDM
Total 0 35 minutes
EXPLORATORYMEETING3 . Discuss agency
requirements and otherpertinent details on thepartnership.
3.1Provide brieforientation on DAP,the GraduateSchool, and itscurrent programofferings.
None 30 minutes Dean
GSPDM
3.2Discuss possibleterms of reference.
None 30 minutes Program Manager(PM)
GSPDM
Total 0 1 hour
PREPARATION OFINITIAL PROPOSAL
4. Draft and submittechnical and financialproposals based on
None 3 days forexistingprograms;
PM
GSPDM
22
4. Receive proposal forinitial review andprovide feedback.
agreements during theexploratory meeting.
7 days for newprograms
4.1Revise the proposalbased on the client’sinitial comments.
None 1 day PM
GSPDM
4.2Set the schedule of
meeting to present
the final proposal.
None10 minutes
PM
GSPDM
Total 0 4 days, 10minutes for
regularprograms
8 days, 10minutes for
new programsPRESENTATION OFFINAL PROPOSAL5 Attend the meeting and
provide feedback onthe final proposal, ifany.
5. Present the finalproposal.
None 30 minutes PM
5.1Take note of theclient’s comments.Negotiate termsthat are amenableto both parties.
None 30 minutes Dean/PM
GSPDM
Total 0 1 hour
PREPARATION OFINCEPTION REPORT6. Accept Inception
Report.
6.Prepare InceptionReport based onagreements duringthe final proposalpresentation.
None 1 day Dean/PM
GSPDM
Total 0 1 working day
MOU/MOA/LOC SIGNING7. Review draftMOU/MOA/LOC.
7.1DraftMOU/MOA/LOCand supportingdocuments andendorse to DAPFinance and LegalOffices for initialreview.
None 3 days LMTFinance OfficerLegal Officer
GSPDM
23
7.2Send copy of thedraftMOU/MOA/LOC toclient for review.
None 10 minutes LMT
GSPDM
8. Provide comment orfeedback, if any.
8.1Incorporate in thedraftMOA/MOU/LOCthe proposedrevisions by DAPLegal Officer andclient, and revertto both parties forfinal review.
None 5 days forDAP; 5 days
for client
LMT
GSPDM
8.2Once approved byboth parties,proceed withMOU/MOA/LOCsigning (9 copiesfor MOU/MOA andat least 3 copiesfor LOC).
None 3 days forDAP; 3 days
for client
LMT and VariousCenters
9. Return all signedMOU/MOA/LOC to theLMT.
9. Notarize 9 copies ofMOU/MOA andprovide client with 2copies. LOC need notbe notarized.
None 3 days LMT
GSPDM
9.1 Inform the Officeof the AcademyRegistrar of thenecessary enrolmentarrangements.
None 10 minutes LMT
GSPDM
Total 0 14 days and20 minutes for
DAP;
8 days forclient
24
ENROLLMENT IN PUBLIC COURSESThe Development Academy of the Philippines (DAP) offers to the public trainingprograms that are usually announced on the DAP website/brochures and through lettersof invitation. These are implemented by the following technical excellence and resourcecenters: Productivity and Development Center, Center for Governance, SustainableHuman Development Program, Center for Organizational Development, and DAP saMindanao. Interested individuals and organizations may enroll in these public offerings.
Office or Division: Center for Governance, Center for OrganizationalDevelopment, DAP sa Mindanao, Productivity andDevelopment Center, or , Sustainable Human DevelopmentProgram, ,
Classification: Complex
Type of Transaction: G2C-Government to Citizen
Who may avail: National line agencies, local government units, governmentcorporations, international organizations, funding institutions,private sector including small- and medium-scale enterprises(SMEs) and non-government organizations (NGOs), theacademe, and interested individuals and organizations.
Qualification requirements for participants (if any) arespecified in the letter of invitation/brochure.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Duly accomplished enrollment form oronline registration and nominationform.
DAP website(https://www.dap.edu.ph/service-charter/) orDAP to email enrollment form.
CLIENT STEPS AGENCYACTIONS
FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Downloadenrollment andnominationforms orregister online.
None 5 minutes ImplementingOffice/Unit/AssignedProject Staff
2. Submitduly-accomplished enrolment
2. Receive dulyaccomplishedform.
None 1 working day ImplementingOffice/Unit/
25
and nominationforms, throughe-mail or fax atleast threeweeks beforethe date of thetraining.
Acknowledgereceipt ofenrollmentandnominationforms.
AssignedProject Staff
3. Secure thenotice ofacceptance/admission(NOAA)
3. Issue theNOAA andadvisepayment oftraining fee 10working daysbefore theactual conductof the training.
None2 working days Assigned
ProjectManager/AssignedProject Staff
4. If payment is tobe made viabank, e-mail/faxvalidateddeposittransaction slipto the emailaddressprovided in thebrochure/letterof invitation.
Note: Paymentsshould be madeahead of trainingschedule anddeposited at theDAP Landbankaccount.
4. Acknowledgereceipt andissue officialreceipt (OR).
Total feedepends onthe typeandduration oftraining.
A 15%cancellationfee will becharged forno-showparticipantsand forreservationswithdrawnfive daysbefore thetrainingdate.
1 working day ProjectManager/Cashier’sOffice Staff
26
5. Present theNOAA and ORuponregistration onthe first day oftraining.
5. Requestclient to signtheattendancesheet.
None 5 minutes AssignedProjectManager
TotalTotal feedependson the typeandduration oftraining.
4 days, 10minutes
Note:
* Should the number of enrollees be less than the viable target, the DAP reserves theright to cancel or postpone the conduct of training. Received NOAA confirms theschedule of training.
* Walk-in participants may be entertained only if there are available or unfilled slots.Interested parties are advised to contact the implementing center to confirm availability.
Address and Contact Information:
Center for GovernanceMs. Imelda C. CaluenManaging Director4th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos. (02) 8631-2135 / 8631-0921, local 166Email Address: [email protected]
Center for Organizational DevelopmentMr. Immanuel A. MagalitActing Managing Director5th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTelefax No.: 8631-2121 / 8621-2133; Trunkline: (632) 8631-0921 to 30, local 116/120Email Address: [email protected] / [email protected]
DAP sa MindanaoMs. Jo-ann Emilene A. De BelenManaging DirectorDoor 2, K7 Strip Building, KM7, Lanang, Davao City
27
Telephone No.: (082) 232-8082; Fax No.: (082) 224-5685Email Address: [email protected]
Productivity and Development CenterMr. Arnel D. AbantoManaging Director5th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (632) 8631-2137 / (632) 8631-0921 to 30, local 171Email Address: [email protected]
Sustainable Human Development ProgramMs. Dorothea Boy-NavarroDirector4th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (02) 8631-2131 / (02) 8631-2169Email Address [email protected]
28
APPLICATION FOR APO SCHOLARSHIP TRAINING PROGRAMAs the country’s National Productivity Organization (NPO), the DAP coordinates theprojects of the Asian Productivity Organization (APO) through its APO/DAP Secretariat(APO/DAP Sec). APO projects feature scholarship trainings on productivity-relatedtechnologies through a combination of lectures by experts, field visits for observation ofactual applications, country reports by participants for the sharing of experiences, andother modalities.
The APO/DAP Sec accepts all scholarship training applications from the country, whichare then endorsed to the APO Secretariat in Japan. The APO Secretariat makes thefinal deliberations on the applications. Successful applicants are notified by theAPO/DAP Sec and they are advised to make the necessary preparations for theirparticipation in the training, such as arrangements for their travel (e.g., country paper,travel documents, visa, insurance, attendance to pre-departure briefing, etc.) if theproject will be implemented in a foreign country.
Office or Division: APO/DAP Secretariat
Classification: Simple
Type of Transaction: G2G – Government to GovernmentG2C – Government to Citizen
Who may avail: Endorsed nominees of agencies or organizations, public or private;Professionals who wish to apply in their own capacity
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Agency or organization-endorsed applicants1. Official Endorsement/Nomination
Form, 1Office of the endorsing agency or organization(public or private) or their HR department
2. Candidates Biodata Form (CBF), 1 APO/DAP Secretariat (via email or online)
3. 1 Copy of Valid passport (if availableand if needed)
DFA
Self-nominated applicants
1. Letter of Intent, 1, original, signed APO/DAP Sec (template via through email oronline)
2. Candidates Biodata Form (CBF), 1 APO/DAP Secretariat (via email or online)
3. 1 Copy of Valid passport (if availableand if needed)
DFA
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
29
STAGE 1: Submission and Review of Requirements
1. Email all therequirements tothe APO/DAPSecretariat beforethe deadline
1.Check ifsubmitteddocuments arecomplete andsendacknowledgementemail. Ifincomplete,inform the client.
None 5 minutes ProgramCoordinator
APO/DAPSecretariat
2. If needed, complywith missingrequirements andrepeat step 1.
2. Repeat step 1 None 5 minutes ProgramCoordinator
APO/DAPSecretariat
2.1 Pre-screennominees
None 1 working day ProgramCoordinator;APO Liaison
Officer
APO/DAPSecretariat
2.2 Endorsepre-screened CBFsand supportingdocuments to APOSecretariat in Japanon or beforedeadline
None 5 hours 5minutes
ProgramCoordinator;APO Liaison
Officer
APO/DAPSecretariat
Screening anddeliberations byAPO Secretariat inJapan
APO Secretariat(Japan)
Release ofdeliberationresults to NPOswithin one (1)month prior totraining (undernormalcircumstances)
APO Secretariat(Japan)
30
STAGE 2: Result of Applications
3. Prepare officialDAP notice toapplicants withthe result ofAPO Secretariatdeliberations
None 1 working day ProgramCoordinator;APO Liaison
Officer
APO/DAPSecretariat
3.1 Issue notice toall applicants thruemail
None 2 hours Programcoordinator
APO/DAPSecretariat
TOTAL None 2 workingdays, 7
hours and 15minutes
31
QUERIES ON DAP’S PROGRAMS AND SERVICESThe DAP ensures that queries about the DAP’s programs and services are quicklyanswered and addressed according to its standards and service pledges. All queriesare initially acted upon by the Institutional Marketing Center, which also acts as theAcademy’s Public Affairs Desk (PAD), the unit that is in charge of all hotlines, text lines,emergency lines, etc., in compliance with RA 11032 (Ease of Doing Business).
Office or Division: INSTITUTIONAL MARKETING CENTER – PUBLIC AFFAIRS DESK(PAD)
Classification: SIMPLE
Type of Transaction: G2G – Government to GovernmentG2C – Government to CitizenG2B – Government to Business
Who may avail: ALL
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1 original Client Contact Report Form (CCRForm)
DAP Public Affairs Desk – Ground Floor
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Request thru theCCR forminformation on DAPtraining, courses,public offerings andfacilities via PADOffice or e-mail [email protected]
1. Provideinformation andmaterials requested.
None 30 minutes
INSTITUTIONALMARKETINGCENTER –
PUBLIC AFFAIRSDESK
Public AffairsOfficer
2. Accomplish the ClientFeedback Form.
2. Provide theClient FeedbackForm.
None
Total None 30 minutes
32
REQUEST FOR APPOINTMENT WITH THE DAP PRESIDENT BYEXTERNAL CLIENTSRequests for appointment with the DAP President are confirmed through the staff of the Officeof the President, after careful review and internal consultation.
Office orDivision:
Office of the President (OP)
Classification: Simple
Type ofTransaction:
G2G - Government to GovernmentG2C – Government to Citizen
Who may avail: All Government Agencies, LGUs, GOCCs, other GovernmentInstrumentalities and Private Sectors
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
For external clients (either/or):1. Official letters, 1, original, signed2. Official email
Requesting client from all governmentagencies, LGUs, GOCCs, other governmentinstrumentalities and private sectors
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Convey officialinvitation orrequest forappointmentwith DAPPresidentthrough emailor snail mail.
1. Receive officialinvitation orrequest forappointment andprovideacknowledgement, if sent viaemail.
None 3 Minutes
Office of thePresident
Clerk(Front Desk)
1.1 Print invitation,(if sent throughemail)
None
3 Minutes
Office of thePresident
Project Assistant(Receiving
Officer)
1.2. Recordinvitations/request in theData Tracking
NoneOffice of the
President
Project Assistant
33
ManagementSystem (DTMS)and forward tothe technicalstaff forschedulemanagement
(ReceivingOfficer)
Project Officer
1.3.Classifyinvitationaccording toappropriatenessand availabilityof the DAPPresident.
a. If appropriatefor the DAPPresident, itwill be plottedon thePresident’sofficialcalendar forconsiderationand approval.
b. If theinvitation isnotappropriatefor DAPPresident, itwill beforwardedand endorsedto theappropriatecenter/unit.
1.4. Send invitation,program/ agenda, andother meetingmaterials to the DAP
None 1 working day Office of thePresident
Project Officer(Technical Staff)
34
President and HEA &CoS
1.5 Approveinvitation/ request forappointment.
None 2 workingDays
President andCEO of DAP
2. Receivefeedback/response fromDAP Office ofthe President
2. Send feedback/status of requestto the requestorthrough email None
3 Minutes Office of thePresident
Project Officer(Technical Staff)
Total None3 days, 9minutes
35
REQUEST FOR CERTIFICATION, AUTHENTICATION ANDVERIFICATION (CAV) FOR:
● Commission on Higher Education (CHED/CAV)● DFA/CAV - Apostille/Red Ribbon (Fresh grad w/o diploma)
(TOR+Cert of Grade+Cert of Non SO+Cert of English Medium of Instruction)
Office or Division: Office of the Academy Registrar (OAR)
Classification: Highly Technical
Type of Transaction: G2C-Government to Citizen
Who may avail: All GSPDM and PMDP Students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Student Request Form(DAP-OAR-F11,Rev.0), 1 , original
Office of the Academy Registrar (OAR)
2. Customer Experience Survey Form
(DAP-OAR-F25,Rev.0), 1, original
Office of the Academy Registrar (OAR)
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. AccomplishStudent RequestForm and submit toOAR
1. Receive dulyStudent RequestForm and checkcompleteness ofdocuments.
None 10 Minutes Records Officer
1.2 Issue PaymentRequest Form.
None
2. Pay the documentfee at Treasury Officeand secure OfficialReceipt (OR).
2. Receive paymentand issue OfficialReceipt (OR).
Php350/set 10 Minutes Cashier, 3rd Flr,DAP Bldg
2.1 Advise client toproceed to Office ofthe AcademyRegistrar (OAR).
None
3. Present OR toOAR
3. Acknowledgereceipt of therequested documentand advise the client
None 10 Minutes Records Office
36
to pick up thedocument after 7working days
4.Upon receipt of therequested document,accomplish theCustomer ExperienceSurvey Form(DAP-OAR-F25,Rev.0)
4. Releasedocument/s andrequest the client toforward thedocuments to CHEDor DFA.Let the client signthe transactionlogbook
None 10 minutes Records Office
4.1 Release ofcertification
7 workingdays
Records Office
Total PhP 350per set
7 workingdays, 40minutes
37
REQUEST FOR CERTIFICATION/SThis process covers the requests to the Office of the Academy Registrar for thefollowing certifications:
1) Certifications of Units Earned2) Certification of Enrolment/Attendance3) Certification of Scholastic Standing4) Certification of Enrolment for Residency5) Certification of General Weighted Average (GW6) Certification of English as a Medium of Instruction7) Certification of Good Moral Character8) Certification of Candidacy for Graduation9) Certificate of Authentication and Verification10) Certification of Completion of Academic Requirements11) Certification of Enrolled Subjects with number of units12) Certification of Remaining Units13) Certification of Training Equivalent14) Certification of No Objection15) Certification of Grades16) Certification of Graduation17) Certification of Transfer of Credential/Honorable Dismissal18) Certification of Course Description19) Non Issuance of Special Order (SO)20) Certification of Exemption from Special Order
Office or Division: Office of the Academy Registrar (OAR)
Classification: Simple
Type of Transaction: G2C-Government to Citizen
Who may avail: All GSPDM and PMDP Students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Student Request Form(DAP-OAR-F11,Rev.0), 1, original
Office of the Academy Registrar (OAR)
2. Customer Experience Survey Form
(DAP-OAR-F25,Rev.0), ), 1, original
Office of the Academy Registrar (OAR)
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
38
1. AccomplishStudent RequestForm and submit toOAR
1. Receive dulyaccomplishedStudent RequestForm and checkcompleteness ofdocuments.
None 10 Minutes Records Office
1.2 Issue PaymentRequest Form.
None
2. Pay the documentfee at Treasury Officeand secure OfficialReceipt (OR).
2. Receive paymentand issue OfficialReceipt (OR).
Php50/page 10 Minutes DAP Cashier,3rd Flr, DAP
Bldg
2.1 Advise client toproceed to Office ofthe AcademyRegistrar (OAR).
3. Present OR toOAR
3. Acknowledgereceipt of therequested documentand advise the clientto pick up thedocument after 2-3working days
10 Minutes Records Office
4.Upon receipt of therequested document,accomplish theCustomer ExperienceSurvey Form(DAP-OAR-F25,Rev.0)
4. Preparation ofdocument/srequested andrequest the client tosign the transactionlogbook
10 Minutes Records Office
4.1 Release ofcertification
3 workingdays
Records Office
Total PhP 50.00per page
3 workingdays, 40minutes
39
REQUEST FOR CERTIFIED TRUE COPYTo provide certified true copy copy for the following student credentials:
● Certified True Copy of TOR/Diploma/Certificate● Certified True Copy of Document on File
Office or Division: Office of the Academy Registrar
Classification: Simple
Type of Transaction: G2C-Government to Citizen
Who may avail: All GSPDM and PMDP Students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Student Request Form(DAP-OAR-F11,Rev.0), original, 1,copy
Office of the Academy Registrar (OAR)
2. Customer Experience Survey Form(DAP-OAR-F25,Rev.0), original, 1copy
Office of the Academy Registrar (OAR)
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. AccomplishStudent RequestForm and submit toOAR
1. Receive dulyaccomplishedStudent RequestForm and checkcompleteness ofdocuments.
None 10 Minutes Records Officer
1.2 Issue PaymentRequest Form.
2. Pay the documentfee at Treasury Officeand secure OfficialReceipt (OR).
2. Receive paymentand issue OfficialReceipt (OR).
Php50/page 10 Minutes Cashier, 3rd Flr,DAP Bldg
2.1 Advise client toproceed to Office ofthe AcademyRegistrar (OAR).
40
3. Present OR toOAR
3. Acknowledgereceipt of therequested documentand advise the clientto wait for 20-30minutes for thedocumentsrequested to bereleased
None 10 Minutes Records Officer
4.Upon receipt of therequested document,accomplish theCustomer ExperienceSurvey Form(DAP-OAR-F25,Rev.0)
4. Releasedocument/srequested andrequest the client tosign the transactionlogbook
None 10 minutes Records Officer
Total PhP50.00/page
40 minutes
41
REQUEST FOR CONCEPT PAPERRequest to conceptualize new, innovative, value-adding, creative ideas, concepts,plans, programs and/or interventions from the Academy or any of its business groups
Office or Division: Council of Fellows (COF)Office of the President (OP)
Classification: Complex
Type of Transaction: G2G - Government to GovernmentG2C - Government to CitizenG2B - Government to Business Entity
Who may avail: 1. Academy’s Internal Centers/Offices2. National Line Agencies3. Non-Government Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Original, signed, request letter or formalemail with the following details:
Type of expert/assistance needed✔ Title of activity/ies✔ Duration
Contact Details of Client✔ Name of client✔ Email address✔ Contact/Mobile number✔ Group/center name
Requesting Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit a requestthrough letter oremail to COF
1.1 Take note of theinquiry andprovide basicinformation onthe services andtechnicalassistanceoffered by theCOF
None 15 minutes COFSecretariat
2. Inquire on possibleexploratorymeeting with COF
2.1 Inform theSeniorExecutiveFellow (SEF) of
None 15 minutes COFSecretariat
42
regardingassistance needed
the concern andask permissionto proceed withthe ExploratoryMeeting
3. Confirm scheduleof the ExploratoryMeeting and itsarrangements
3.1 ScheduleExploratoryMeeting
None 2 hours COFSecretariat
3.2 Inform the SEFof the feedbackand neededrequirements
None
3.3 Prepare for theExploratoryMeeting
None
4. Discuss agencyrequirements andother pertinentdetails on theassistance needed
5. Take note of theagencyrequirements andinform agency ofthe programmanagementparticulars
None 2 hours COFSEF/Secretariat
6. Request for theconcept paper orproposal withacceptableadjustment tocontent,methodology andcost ending andschedule nextmeeting forfinalization
5. Take note of therequests andadjustments andprepare conceptpaper/proposalfor submission toclient
None 2 workingdays
COFSEF/Secretariat
6. Review theconcept paper orproposalpresented by theCOF
6. Considerscomments andnegotiate terms, ifpossible
None 3 workingdays
COF
SEF/Secretariat
7. Accept finalagreements
7. Endorse theproject anddocumentation tothe appropriatecenter in the
None 1 workingday
COFSenior
ExecutiveFellow
43
Academy forcontracting andimplementation
END OF TRANSACTIONTotal None 6 working
days, 4hours, 30
mins
44
REQUEST FOR COPY OF STUDENT CREDENTIALSThis charter describes the process for providing a copy or copies of the followingstudent credentials to students of the DAP’s Graduate School of Public andDevelopment Management (GSPDM) and the Public Management DevelopmentProgram (PMDP):
● Transcript of Records for further studies, PRC board exam or for references● Transfer of Credentials/Honorable Dismissal● Copy/Replacement of Diploma
Office or Division: Office of the Academy Registrar
Classification: Complex
Type of Transaction: G2C-Government to Citizen
Who may avail: All GSPDM and PMDP Students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Student Request Form(DAP-OAR-F11,Rev.0), 1 , original
Office of the Academy Registrar (OAR)
2. Customer Experience Survey Form(DAP-OAR-F25,Rev.0) , 1 , original
Office of the Academy Registrar (OAR)
3. Affidavit of Loss for ReplacementCopy
Hall of Justice or Notary Public
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. AccomplishStudent RequestForm and submit toOAR
1. Receive dulyaccomplishedStudent RequestForm and checkcompleteness ofdocuments.
None 10 Minutes RecordsOfficer
1.2 Issue PaymentRequest Form.
None RecordsOfficer
2. Pay the documentfee at Treasury Officeand secure OfficialReceipt (OR).
2. Receive paymentand issue OfficialReceipt (OR).
Php250 10 Minutes DAP Cashier,3rd Flr, DAP
Bldg
45
2.1 Advise client toproceed to Office ofthe AcademyRegistrar (OAR).
None
3. Present OR toOAR
3. Acknowledgereceipt of therequested documentand advise the clientto pick up thedocument after 5working days
None 10 Minutes RecordsOfficer
4.On the date of pickup, acknowledgereceipt of therequested documentand accomplish theCustomer ExperienceSurvey Form(DAP-OAR-F25,Rev.0)
4. Process andRelease document/srequested andrequest the client tosign the transactionlogbook
None 5 workingdays
RecordsOfficer
Total PhP250.00
5 workingdays, 30minutes
46
REQUEST FOR CUSTOMIZED TRAINING SERVICESThe Development Academy of the Philippines (DAP) offers to the public training programsthat are customized to suit the needs and requirements of its clients. The trainingprograms could include training needs analysis, training design development, trainingmanagement, and training evaluation. These are implemented by the following technicalexcellence and resource centers: Center for Governance, Center for OrganizationalDevelopment, DAP sa Mindanao Productivity and Development Center, and SustainableHuman Development Program.
Office or Division: Center for Governance, Center for OrganizationalDevelopment, DAP sa Mindanao, Productivity andDevelopment Center, or Sustainable Human DevelopmentProgram.
Classification: Training program of 7 days duration or shorter – ComplexTraining program of longer than 7 days duration – HighlyTechnical
Type of Transaction: G2G-Government to GovernmentG2B-Government to Business Entity
Who may avail: National line agencies, local government units, governmentcorporations, international organizations, funding institutions,the private sector including SMEs and NGOs, and theacademe.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Formal letter of request and terms ofreference (TOR) indicating thefollowing:- Type of training- Training needs to be addressed- Number and profile of targetparticipants- Preferred venue- Proposed schedule- Name of agency, address, contactnumber- Name and position of contact /focalperson
Requesting business entity or governmentinstitution
CLIENT STEPS AGENCYACTIONS
FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
47
1. Submit letter ofrequest andTOR to theOffice of theSenior VicePresident forPrograms viacourier, fax, oremail.
1. Acknowledgereceipt ofletter.
Review andendorse letterof request andTOR to theDirector/Officer inCharge of theoffice/unitconcerned.
None 2 workingdays
Office of theSenior VicePresident forProgramsStaff
2. Provideadditionalinformationrequested
2. Contact theclient/focalperson andclarify detailsin the letter ofrequest andTOR (anexploratorymeeting maybe scheduledas necessary).
None 1 working day AssignedOffice/UnitStaff
2.1 Draft technicaland financialproposal.
None 12 workingdays
SupervisingFellow/ProjectManager/Technical Staff
2.2 Review andapprove technicaland financialproposal
None 5 workingdays
Director/Officer-in-Charge, ManagingDirector,and/or SeniorVice Presidentfor Programs
3. Acknowledgereceipt ofproposal.
Request forproposalpresentation (ifneeded)
3. Submitproposal toclient
Present proposaland verifyassumptions
None 4 hoursProjectManager/Project Staff
48
3.1 Finalizeproposal (ifnecessary)
None 2 workingdays
SupervisingFellow/ProjectManager/Technical Staff
4. Issue notice ofacceptance ofproposal
4. Receive noticeletter ofacceptance.
Variesaccordingto topic,class size,duration,and venueof thetraining
1 working day SupervisingFellow/ProjectManager/Technical Staff
Total Variesaccordingto topic,class size,duration,and venueof thetraining
23 days, 4hours
Note:
* Contracting comes right after the approval of the submitted proposal. For projectsamounting to less than PHP 500,000.00, a Letter of Conforme (LOC) shall serve as abinding contract while for projects amounting to PHP 500,000.00 and higher, aMemorandum of Agreement (MOA) shall be prepared. For projects not involvingfinancial obligations, a Memorandum of Understanding (MOU) shall be prepared.
Address and Contact Information:
Office of the Senior Vice President for ProgramsMs. Magdalena L. MendozaSenior Vice President for Programs4th Floor A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City PhilippinesTel. Nos. (02) 8631-2157/ 8631-0921 local 150Email Address: [email protected]
Center for GovernanceMs. Imelda C. CaluenManaging Director4th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, Philippines
49
Tel. Nos. (02) 8631-2135 / 8631-0921, local 166Email Address: [email protected]
Center for Organizational DevelopmentMr. Immanuel A. MagalitActing Managing Director5th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTelefax No.: 8631-2121 / 8621-2133; Trunkline: (632) 8631-0921 to 30, local 116/120Email Address: [email protected] / [email protected]
DAP sa MindanaoMs. Jo-ann Emilene A. De BelenManaging DirectorDoor 2, K7 Strip Building, KM7, Lanang, Davao CityTelephone No.: (082) 232-8082; Fax No.: (082) 224-5685Email Address: [email protected]
Productivity and Development CenterMr. Arnel D. AbantoManaging Director5th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (632) 8631-2137 / (632) 8631-0921 to 30, local 171Email Address: [email protected]
Sustainable Human Development ProgramMs. Dorothea Boy-NavarroDirector4th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (02) 8631-2131 / (02) 8631-2169Email Address [email protected]
50
REQUEST FOR ECOPY OF THE FULL CAPSTONE PROJECTREPORT/ CAPSTONE PAPER MANUSCRIPTIn support of academic research development studies, the PMDP facilitates therequest for full ecopy of the Capstone Project Report and Capstone Papermanuscript. The process adopted is in compliance to DAP’s internal copyrightpolicy as approved by the Academic Council on February 2020 which states:
This paper is an official document of the Development Academy of thePhilippines. Reproduction and distribution of the paper or parts thereof isprohibited except with permission from the copyright owners-the author,Development Academy of the Philippines, and the author’s agency.
The author and publisher make no representation or warranties withrespect to the accuracy, applicability, fitness, or completeness of thecontents of this publication. The information contained in this report isstrictly for educational purposes.
Proper acknowledgement and citation should be accorded to informationobtained from this material
For PMDP, DAP is represented by the Senior Vice President for Programs andthus, has the authority to grant such requests as co-owner of the report.
Office or Division: PMDP PMO
Classification: Under Special Law – Inter Agency Steering Committee
Type of Transaction:
Who may avail: On-going scholars, Alumni, Faculty Members,External Researchers
APPLICATION PROCEDURE
Note: Only papers classified as not confidential can be accessed.CLIENT STEPS AGENCY ACTIONS FEES TO
BE PAIDPROCES
SINGTIME
PERSON /SRESPONSI
BLE
Register formalrequest at
1. Acknowledgereceipt of request.
None 1 day Jay MartinSherylReyes
51
pmdp.records@dap. edu.ph
h
2. Check PMDPdatabase for
classification of paper.
None 0.5 day Jay Martin
3. Endorse request tothe Office of theManaging
Director for certificationthat the requestedpaper is notconfidential in nature
None 0.5 day Jay MartinSherylReyes
4. Forward endorsementletter SVP Magdalena L.
Mendoza for approval
None 0.5 day MD NanetteC.Caparros
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSON /SRESPONSI
BLE
5. Review and signendorsement lettersignifying grant ofpermission to accessthe requested paper
None 1 day SVPMagdalena L.Mendoza
Receive a copyof theEndorsementLetteraddressed tothe PMDPAlumni
6. Transmit signedendorsement letter toPMDP alumni asauthor of therequested paper with acopy furnished to therequestor who will dosubsequent follow ups
None 0.25 day Jay Martin
7. Inform the requestorthat the request has
beenforwarded to the PMDP
alumni and that s/hemay directly followup status of requestto the alumni
0.25 day
52
Total None 4 days
Follow up grantof permissiondirectly formPMDP Alumni asauthor and fromthe Alumni’sagency asco-author
Request alumni tofurnish PMDP a copyof his/her
response for informationand filing
Receive copy ofthe requestedpaperfrom the PMDPAlumni
Receive a copy of thepaper released by thePMDP alumni and fileappropriately.
53
REQUEST FOR ID REPLACEMENTThis describes the process of providing DAP Graduate School students with areplacement Identification Card due to lost ID.
Office or Division: Office of the Academy Registrar (OAR)
Classification: Simple
Type of Transaction: G2C-Government to Citizen
Who may avail: All GSPDM and PMDP Students
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Student Request Form(DAP-OAR-F11,Rev.0), 1 , original
Office of the Academy Registrar (OAR)
2. Customer Experience Survey Form(DAP-OAR-F25,Rev.0) , 1 , original
Office of the Academy Registrar (OAR)
3. Affidavit of Loss for Replacement,signed, 1 , original
Hall of Justice or Notary Public
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. AccomplishStudent RequestForm and submit toOAR
1. Receive dulyaccomplishedStudent RequestForm and checkcompleteness ofdocuments.
None 10 Minutes Records Officer
1.1 Issue PaymentRequest Form.
None
2. Pay the documentfee at Treasury Officeand secure OfficialReceipt (OR).
2. Receive paymentand issue OfficialReceipt (OR).
Php250 10 Minutes DAP Cashier,3rd Flr, DAP
Bldg
2.1 Advise client toproceed to Office ofthe AcademyRegistrar (OAR).
None
3. Present OR toOAR
3. Acknowledgereceipt of therequested documentand
None 10 Minutes Records Officer
54
4. Proceed toRegistrar InformationSystem Unit (RIS)
4. Process therequest and print thereplacement ID.
None 10 minutes IT Officer
4.1 Advice the clientto wait for 10-15minutes for therelease of StudentIdentification Card
None
5. Upon receipt of therequestedreplacement ID Card,accomplish theCustomer ExperienceSurvey Form(DAP-OAR-F25,Rev.0)
5. Release thereplacement StudentID and request theclient to sign thetransaction logbook
None 10 minutes IT Officer
Total P250.00 50 minutes
55
REQUEST FOR PAYMENT OF CONSULTANCY SERVICES/HONORARIA(On-line through Document Tracking System (DTS)
All DAP Offices may file the request for payment of consultancy services/honoraria forConsultants, Resource Persons, Facilitators and Non-Plantilla Personnel (NPP) engagedby the Academy for completed and uploaded outputs through On-Line Document TrackingSystem (DTS).
Office or Division: Finance Department (Budget, Accounting &Treasury Division)
Classification: Simple
Type of Transaction: G2C - Government to CitizenG2B - Government to Business EntityG2G - Government to Government
Who may avail: Resource Persons / ConsultantsOfficers and Staff of the Academy
CHECKLIST OF REQUIREMENTS(Uploaded to On-line DTS and all originalsupporting documents should besubmitted to the Finance Department)
WHERE TO SECURE
1. Approved Letter of Invitation (LOI) Originating Center
2. Accomplished Consultant’s EvaluationForm
DAP Document Management System(DMS)
3. Certificate of Output Submitted andServices Rendered
Originating Center
4. Accomplished DAP Transaction Form Originating Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E
1. Uploadpaymentrequest withapproved DAPDocumentTransactionForm (DTF)and supporting
1. AssignProcessingControlNumber (PCN)and forward alldocuments tothe Finance-Pre-Audit
None Two (2) minutes AdministrativeDepartment(AD), Front
Desk ServicesStaff
56
documents toDTS.
1.2Evaluateonline thepaymentrequestdocumentsbased on therequirementsand forwardthe same tothe BudgetDivision (BD)
None Thirty (30)minutes for
simpletransactions
FinanceDepartment
(FD) -Accounting
Division (AD),Pre-Audit Staff
1.3Allocatebudget ,issues theBudgetUtilization Slip(BUS) andforwards to theAccountingDivision (AD)
None Fifteen (15)minutes per
regulartransaction
FinanceDepartment
(FD) – BudgetDivision (BD)
Staff
1.4Prepare theDisbursementVoucher (DV)and JournalEntry Voucher(JEV) on-line.
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
1.5Received theDV/JEVthroughon-line DTS
None Two (2) minutes FinanceDepartment
(FD) –Treasury
Division (TD)Staff
1.6On siteprinting of DV,JEV and TaxCreditCertificates(TCC)
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
57
1.7On siteprinting ofChecks
None Ten (10)minutes
FinanceDepartment
(FD) –Treasury
Division (TD)Staff
1.8Sign DV /JEVand TCC
None Fifteen (15)minutes
FinanceDepartment
(FD) andAccounting
Division (AD)– ManagingDirector and
Acting Directorand other
designatedsignatoriesoutside FD
1.9Printing ofChecks andfor signatureWith Signatory#1 andSignatory #2
None Fifteen (15)minutes
If per Batch,240 minutes
per signatory. Ifper Piece, 15minutes persignatory.
Designatedsignatories
fromPrograms and
ServicesGroups
1.10 Updaterecords in theDTMS.
Inform ROwhen check isavailable.
None Ten (10)minutes
On informingRO, there is
MonthlyOutstanding
Checks Reportsent regularly to
CenterHeads/FO
FinanceDepartment
(FD) -Treasury
Division (TD)Staff
58
1.11 Issue checkand/or deposit toLandbankaccounts of thepayee. (If all theoriginalsupportingdocuments aresubmitted to theServices FrontDesk (SFD)).
Note: Release ofcheck is subjectto the submissionof the originalsupportingdocuments to theSFD.
P50.oo ifP10,000
.oobelowand
P100.ooif
P10,000.oo
abovefor
depositsoutsideMetroManila
One HundredTwenty (120)
Minutes or Two(2) hours
FinanceDepartment
(FD) -Treasury
Division (TD)Staff
Total None Forsimple/regulartransactions:
4 hours and 9minutes
59
REQUEST FOR PMDP NON-ACADEMIC RECORDS ANDCERTIFICATIONSThe PMDP facilitates requests for non-academic records of scholars such as Certificate ofAttendance, Certificate of Participation, Certificate of Completion and other certificationswhich the scholars or their agencies and sometimes faculty members may need.
Office or Division: PMDP PMOClassification: Under Special Law – Inter Agency Steering CommitteeType of Transaction: Government to GovernmentWho may avail: On-going scholars, Alumni, Faculty Members
APPLICATION PROCEDURE
CLIENT STEPS AGENCY ACTIONSFEES TO
BE PAID
PROCESSING
TIME
PERSON /S
RESPONSIBLE
Register [email protected] or [email protected]
1. Acknowledge receipt ofrequest.
None 1 day Jay Martin
2. Check PMDP databasefor information needed tobe included in thecertification
None 0.5 day Jay Martin
3. Endorse document to theOffice of the ManagingDirector for review/approval
None 0.5 day Jay MartinSheryl Reyes
4. Signing of the requesteddocument
None 0.5 day MD Nanette C.Caparros
Receivenotification on theavailability ofrequesteddocument
5. Inform requestor of theavailability of the signeddocument forpickup/release
None 0.5 day Jay Martin
Coordinate mannerand date ofclaiming therequesteddocument
6. Release the documentas requested. None
Jay Martin
Total: 3 days
60
REQUEST FOR PROJECT PROPOSALSThe DAP ensures that queries about the DAP’s programs and services are quicklyanswered and addressed according to its standards and service pledges. All queries areinitially acted upon by the Institutional Marketing Center, which also acts as the Academy’sPublic Affairs Desk (PAD), the unit that is in charge of all hotlines, text lines, emergencylines, etc., in compliance with RA 11032 (Ease of Doing Business).
Office or Division: INSTITUTIONAL MARKETING CENTER – PUBLIC AFFAIRS DESK (PAD)
Classification: Simple
Type of Transaction: G2G – Government to GovernmentG2C – Government to CitizenG2B – Government to Business
Who may avail: ALL
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Letter Requesting for Project Proposal Client’s Agency
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit formal letterrequesting for theproject proposal [email protected]
1. Assess if therequest states allthe needed detailsand information.
None 30 minutes INSTITUTIONALMARKETING
CENTER – PUBLICAFFAIRS DESK
Public Affairs Officer
1.1 Acknowledgereceipt and endorsethe letter thru theClient ContactReport to theappropriatecenter/office.
The Center ActionOfficer is reminded ofthe turnaround timeexpected for them torespond to the client.
1.2 Act on Client’sConcern.
None 15 minutes INSTITUTIONALMARKETING
CENTER – PUBLICAFFAIRS DESK
Public Affairs Officer
61
Center’s ActionOfficer
1.3 Return the ClientContact Reportand a copy oftransmittalconfirmation orcommunicationbetween the clientand the center (forverificationpurposes) to thePAD
Center’s ActionOfficer
2. PAD receives theClient ContactReport with thetransmittalconfirmation fromthe Center ActionOfficer and recordsthe closure of thetransaction.
None 10 minutes INSTITUTIONALMARKETING
CENTER – PUBLICAFFAIRS DESK
Public Affairs Officer
2. Accomplish the ClientFeedback Form.
Provide the ClientFeedback Form.
Total None 55 minutes
62
FEEDBACK AND COMPLAINTS MECHANISMHow to send feedback a. Accomplish the Client Contact Form at the
Public Affairs Desk for walk-in clientsb. Send feedback thru email at
publicaffairsdesk@ dap.edu.ph or leave amessage via the DAP website athttps://www.dap.edu.ph/contact- us/ or youmay call us at telephone number8-6310921 local 100 or 8-6312171
How feedbacks are processed a. The Public Affairs Officer compilesfeedback via the Client Feedback Formand checks email on daily basis andencodes it in the feedback registry
b. Feedback requiring answers will beendorsed to the appropriate center oroffice.
c. Concerned center/office will sendresponse to the client and furnishes acopy of such to the Public Affairs Desk
d. For follow-ups, clients may contact thePublic Affairs Desk at telephone number8-6310921 local 100 or 8-6312171
How to file a complaint a. Accomplish the Public Affairs DeskComplaint Form at PAD for walk-in clients
b. Complaints can also be filed via thefollowing: [email protected] or leave amessage via the DAP website athttps://www. dap.edu.ph/contact-us/ or callus at telephone number 8-6310921 local100 or 8-6312171
How complaints are processed a. Public Affairs Officer provides complainantwith a copy of his/her complaint indicatingthe date of the receipt of initial feedbackfrom the concerned Action Officer.
b. Public Affairs Officer endorses thecomplaint to the concerned Action Officerwithin 1 working day or 24 hours fromreceipt.
63
FEEDBACK AND COMPLAINTS MECHANISMc. Action Officer reviews and acts on the
complaint.d. Action Officer informs complainant in
writing the status/final resolution of thecomplaint, copy furnished the PublicAffairs Desk. (Within 5 working days forinternally-filed complaints; 10 workingdays for externally-filed complaints).
e. If the Action Officer cannot act on thecomplaint at his/her level, the case shall beendorsed to the DAP President who willorder the Standing Committee onDiscipline to conduct a formal investigationand submit the report to the DAPPresident.
f. The President renders decision.g. The Committee on Discipline informs the
complainant of the decision.h. Complainant receives a copy of the
resolution.(Source: MC 2010 – 007 Attached)
Contacts Information of CCB, PCC, andARTA
• 8888 – Presidential Complaints Center• 0908 8816565 – CSC Contact Center ng
Bayan• 478-5093 – Anti-Red Tape Authority
64
REQUEST FOR TECHNICAL ASSISTANCE/ CONSULTANCY/RESEARCH SERVICESThe Development Academy of the Philippines (DAP) provides services by way of technicalassistance, management advisory, and policy and action-oriented research in the fields ofproductivity, governance, organizational development, and sustainable humandevelopment. These are implemented by the following technical excellence and resourcecenters: Center for Governance, Center for Organizational Development, DAP saMindanao, Productivity and Development Center, and Sustainable Human DevelopmentProgram. Interested individuals and organizations may avail themselves of these services.
Office or Division: Center for Governance, , Center for OrganizationalDevelopment, DAP sa Mindanao, Productivity andDevelopment Center, , or Sustainable Human DevelopmentProgram.
Classification: Highly Technical
Type of Transaction: Government to GovernmentGovernment to Business Entity
Who may avail: National line agencies, local government units, governmentcorporations, international organizations, funding institutions,the private sector including SMEs and NGOs, and theacademe.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
- Official letter of request addressedto the Senior Vice President forPrograms- Terms of Reference (TOR)
Requesting business entity or governmentinstitution
CLIENT STEPS AGENCYACTIONS
FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit letterof requestand TOR tothe Office ofthe SeniorVicePresident forPrograms viacourier, fax,or email.
1. Acknowledgereceipt ofletter.
Review andendorse letterof request andTOR to theDirector/Officer in Charge ofthe office/unitconcerned.
None 2 workingdays
Office of theSenior VicePresident forProgramsStaff
65
2. Provideadditionalinformationrequested.
2. Contactclient/focalperson andclarify detailsin the letter ofrequest.
None 1 working day ImplementingCenter/AssignedTechnical Staff
2.1 Draft technicaland financialproposal.
None 12 workingdays
SupervisingFellow/ProjectManager/Technical Staff
2.2 Review andapprove oftechnical andfinancial proposal
None 5 workingdays
Director/Officer-in-Charge,ManagingDirector,and/or SeniorVice Presidentfor Programs
3. Acknowledgereceipt ofproposal.
Request forproposalpresentation (ifneeded).
3. Submitproposal toclient
Present proposaland verifyassumptions.
None 2 workingdays
.
SupervisingFellow/ProjectManager/Technical Staff
3.1 Finalizeproposal (ifnecessary).
None 5 workingdays uponreceipt ofcomments/feedback fromtherequestingagency
SupervisingFellow/ProjectManager/Technical Staff
4. Issue noticeofacceptanceof proposal.
4. Receive noticeletter ofacceptance.
DAPconsultancyfees aredeterminedbased on thenature,duration,
1 working day SupervisingFellow/ProjectManager/Technical Staff
66
expectedoutputs/deliverables, andspecificconditions ofengagement.
TotalDAPconsultancyfees aredeterminedbased on thenature,duration,expectedoutputs/deliverables, andspecificconditionsofengagement.
28 days
Note:
* Contracting comes right after the approval of the submitted proposal. For projectsamounting to less than PHP 500,000.00, a Letter of Conforme (LOC) shall serve as abinding contract while for projects amounting to PHP 500,000.00 and higher, aMemorandum of Agreement (MOA) shall be prepared. For projects not involvingfinancial obligations, a Memorandum of Understanding (MOU) shall be prepared.
Address and Contact Information:
Office of the Senior Vice President for ProgramsMs. Magdalena L. MendozaSenior Vice President for Programs4th Floor A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City PhilippinesTel. Nos. (02) 8631-2157/ 8631-0921 local 150Email Address: [email protected]
Center for GovernanceMs. Imelda C. CaluenManaging Director4th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos. (02) 8631-2135 / 8631-0921, local 166
67
Email Address: [email protected]
Center for Organizational DevelopmentMr. Immanuel A. MagalitActing Managing Director5th Floor-A, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTelefax No.: 8631-2121 / 8621-2133; Trunkline: (632) 8631-0921 to 30, local 116/120Email Address: [email protected] / [email protected]
DAP sa MindanaoMs. Jo-ann Emilene A. De BelenManaging DirectorDoor 2, K7 Strip Building, KM7, Lanang, Davao CityTelephone No.: (082) 232-8082; Fax No.: (082) 224-5685Email Address: [email protected]
Productivity and Development CenterMr. Arnel D. AbantoManaging Director5th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (632) 8631-2137 / (632) 8631-0921 to 30, local 171Email Address: [email protected]
Sustainable Human Development ProgramMs. Dorothea Boy-NavarroDirector4th Floor-B, DAP Bldg., San Miguel Avenue, Ortigas Center, Pasig City, PhilippinesTel. Nos.: (02) 8631-2131 / (02) 8631-2169Email Address [email protected]
68
REQUEST FOR THE USE OF CONFERENCE CENTER FACILITY - PASIGThe DAP, through the Conference and Office Facilities Services (COFS) in Pasig, providesservices and facilities for non-residential trainings, meetings, conferences and specialevents activities. Its services include provision of learning facilities, food and beverage, andbusiness services unit for both group and individual walk-in customers.
Office or Division: Administrative Department
Classification: Simple
Type ofTransaction:
G2G - Government to GovernmentG2C - Government to CitizenG2B - Government to Business Entity
Who may avail: Government and private institutions, individual guests and otherinterested parties.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
None None
CLIENT STEPS AGENCYACTIONS
FEES TO BEPAID
PROCESSING TIME PERSON RESPONSIBLE
1. Inquire throughemail:
[email protected] [email protected]
Inquire through calls:
Pasig: (02)8631-2144 or (02)8631- 0921 loc. 115
Visit DAP Pasig:DAP Bldg., SanMiguel Ave., OrtigasCenter 1600 PasigCity
1.Receiveinquiry throughcalls or emailsor personalvisit fromcustomers forrequest forquotation orbooking.
None 30Minutes
Customer RelationsOfficer (CRO)
Conference and OfficeFacilities Services
(COFS)
1.1 Tour thecustomer aroundthe facility forpersonal visits.
None30
minutes Customer RelationsOfficer (CRO)
69
For inquiriesthrough calls oremail, recordrequirement andcontact details ofclient.
Conference and OfficeFacilities Services
(COFS)
1.2 Checkavailability ofconferencefacilitiesinquired.
None 15Minutes
Customer RelationsOfficer (CRO)
2. Receive andreview copy ofproposal throughemail or in person.
2. Prepare andsend proposal tocustomerthrough email orin person.
None 1 hour Customer RelationsOfficer (CRO)
2.1 Tentativelybook reserveddate.
None 15minutes
Customer RelationsOfficer (CRO)
3. Confirmreservation throughcall, email orpersonal visit.
3. PrepareReservationSheet/Contract.
None 10minutes
Customer RelationsOfficer (CRO)
3.1 SendRS/Contract tocustomer forsignature.Change bookingstatus to“confirmed”.
None 10minutes
Customer RelationsOfficer (CRO)
4. Pay required downpayment fee at thecashier’s office ordeposit cash/chequepayment or onlinebank transfer in theaccount name of:DevelopmentAcademy of thePhilippines,Landbank of thePhilippines, Pasig
4. Issue officialreceipt
At least50% deposit
of thecontracted
price isrequired
uponconfirmationfor externalcustomers.
10minutes
Customer RelationsOfficer (CRO)
70
Capitol BranchSavings Account No:0671-010-540
Forgovernment
accountssubmission
of Certificateof
Availabilityof Funds
(CAF)
Total 50% of thecontract
price
3 hours
71
REQUEST FOR THE USE OF CONFERENCE CENTER FACILITY -TAGAYTAYThe DAP, through its DAP Conference Center in Tagaytay, provides services and facilitiesfor both residential and non-residential trainings, conferences, and team-building activities.Its services include recreational facilities, lodging, food and beverage, and businessservices unit for both group and individual walk-in clients.
Office or Division: DAP Conference Center Tagaytay – Facilities Marketing andSales Office (FMSO)
Classification: Simple
Type ofTransaction:
G2G - Government to GovernmentG2C - Government to CitizenG2B - Government to Business Entity
Who may avail: Government and private institutions, individual guests and otherinterested parties
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
None None
None None
CLIENT STEPS AGENCYACTIONS
FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Inquire throughemail:
[email protected] [email protected]
Inquire through calls:
Tagaytay: (046)483-2643 or (046)483-1291 or4831292 loc. 222and 369
Visit the DAPConference CenterTagaytay: Brgy.
1.Receiveinquiry throughcalls or emailsor personalvisit fromclients forrequest forquotation orbooking.
None 30 Minutes AccountExecutive (AE)
DAPCCTagaytay
Facilities andMarketing SalesOffice (FMSO)
72
Sungay East,Tagaytay City
1.1 Tour theclient around thefacility forpersonal visits.For inquiriesthrough calls oremail, recordrequirement andcontact details ofclient.
None30 minutes DAPCC Tagaytay
- FMSO AE
1.2 Checkavailability ofconferencefacilitiesinquired.
None 15 Minutes DAPCC Tagaytay- FMSO AE and
ReservationOfficer (RO)
2. Receive andreview copy ofproposal throughemail or in person.
2. Prepare andsend proposal toclient throughemail or inperson.
None 1 hour DAPCC Tagaytay- FMSO AE and
RO
2.1 Tentativelybook reserveddate.
None 15 minutesDAPCC Tagaytay
- FMSO RO
3. Confirmreservation throughcall, email orpersonal visit.
3. PrepareReservationSheet/Contract.
None 10 minutes DAPCC Tagaytay- FMSO AE and
RO
3.1 SendRS/Contract toclient forsignature.Change bookingstatus to“confirmed”.
None 10 minutes DAPCC Tagaytay- FMSO AE
4. Pay required downpayment fee at thecashier’s office or
4. Issue officialreceipt
At least50%
deposit of
10 minutes TagaytayCashier
73
deposit cash/chequepayment or onlinebank transfer in theaccount name of:DevelopmentAcademy of thePhilippines,Landbank of thePhilippines, PasigCapitol BranchSavings Account No:0671-010-540
thecontracted
price isrequired
uponconfirmatio
n.
ForGovernment Accountssubmission
ofCertificate
ofAvailabilityof Funds
DAPCC Tagaytay- FMSO AE
Total 50% of thecontract
price
3 hours
74
RESPONSE TO WRITTEN COMMUNICATIONS (emails and snail mail)Internal and external written communications received at the Office of the President and Internaland external emails received through the Official Academy and OPCOS email accounts will bepromptly acknowledged and replied thereto.
Office or Division: Office of the President
Classification: Simple and Complex depending on type of document
Type of Transaction: G2G - Government to GovernmentG2C – Government to Citizens
Who may avail: All Government Agencies, LGUs, GOCCs, other GovernmentInstrumentalities and Private Sectors
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
A. For external clients:1. Official letters2. Official email
Requesting client from all government agencies,LGUs, GOCCs, other governmentinstrumentalities and private sectors
B. For internal clients1. Memorandum2. Official letter3. Official email
Requesting DAP centers/ units
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
For external andinternal clients:
1. Convey writtencommunicationthrough email or snailmail.
1. Receive writtencommunicationand provide
acknowledgement, ifsent via email.
None 3 Minutes Office of thePresident
Technical Staff
1.1 Print writtencommunication
None 5 Minutes
Office of thePresident
Project Assistant
1.2 Record writtencommunicationin the DataTrackingManagementSystem (DTMS)and forward it
75
for furtherinstruction andendorsement
1.3 Reviewdocuments forendorsement toDAP President
a. If appropriate forthe DAPPresident, it willbe endorsed tothe Presidentand forinstruction/approval.
b. If the writtencommunicationis notappropriate forDAP President,it will beforwarded andendorsed to theappropriatecenter/unit
None 10 Minutes Office of thePresident
Head ExecutiveAssistant
(Chief of Staff)
1.4 Approve/Signwrittencommunications
None 2 workingdays
President and CEOof DAP
2.Receive feedback/response from DAPOffice of thePresident
Send approvedwrittencommunication tothe requestorthrough email None
5 Minutes Office of thePresident
Project Officer
(Technical Staff)
Total0
2 workingday, 23minutes
76
INTERNAL SERVICES
77
REQUEST FOR BANQUET SERVICE BY INTERNAL CLIENTSAs part of its mandate, the Conference and Office Facilities Services provides banquetservices (food and beverages) to its internal customers for activities such as meetings,planning and other project related events.
Office or Division: Administrative Department
Classification: Complex
Type of Transaction: G2G - Government to Government
Who may avail: All centers and offices from the different groups of the Academy.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Reservation Slip Food and Beverage Services
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
Before and Duringthe Event/Activity
1. Inquire about foodand beverage(banquetrequirements) formeetings
1.1 Receiveinquiriesthrough phoneand/or walk-incustomers
None
30 minutes
Food ServiceSupervisor
Conference andOffice Facilities
Services
1.2 Providecustomers withlist of set menuand/oravailable menu
For same dayrequests,customers aregiven availablechoices fromthe counter;
For advancedreservation (atleast 3 days
None
78
beforeevent/activity),customer maychoose from aset menu;
1.3 Discuss withAdminCoordinatormeal choicesand changesfrom the setmenu
None 30 minutes
Food ServiceSupervisor
Conference andOffice Facilities
Services
2. Reserve thepreferred menu andfill-up reservationslip
2. Receive andreviewcustomer’sfinal menuchoice thenconfirmreservation
None 45 minutes
Food ServiceSupervisor
Conference andOffice Facilities
Services
2.1 Serve the foodat the agreedschedule andvenue None 5 working
days
HeadWaiter/Waiter
Conference andOffice Facilities
Services
Post-Event
3. ReceiveAcknowledgementReceipt (AR)
3. Prepare theAR of thecustomer
None
Food ServiceSupervisor
Conference andOffice Facilities
Services
79
3.1 Issue AR anddistribute it tothe customerfor theirappropriateprojectcharging
None 1 working day
Food ServiceSupervisor
Conference andOffice Facilities
Services
Total None 6 workingdays, 1 hour,45 minutes
80
REQUEST FOR THE USE OF ENGINEERING SERVICES OFFICESPACES BY INTERNAL CUSTOMERSIn support to the Academy’s core business, the Engineering Services provides neededfacilities in terms of office space for its various programs.Office or Division: Administrative Department
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: All centers and offices from the different groups of the Academy.
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Memo request Group or Center Head
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Inquire fromEngineering Servicesif there is availableoffice space.
1. Receiverequest andcheck foravailability
None
1 day
General ServicesDivision (GSD)
Staff
Office of theDirector, GSD
1.1 Give feedbackto inquiringclient onavailability/non availabilityof office space
None
2. Receive informationon the availabilityand prepares memorequest addressed tothe DAP Presidentfor approval
None
3. Forward approvedmemo to GSD
3. Receiveapprovedmemo andinstructhousekeeping
None 1 dayGeneral ServicesDivision (GSD)
Staff
81
services toprepareavailablespace
Office of theDirector, GSD
3.1 Give feedbackto client thatspace is readyfor occupancy
None 10 minutes
General ServicesDivision (GSD)
Staff
Office of theDirector, GSD
Total None 2 days, 10minutes
82
ISSUANCE OF THE CERTIFICATION OF CONSULTANT/RESOURCEPERSONS OUTPUT CLEARANCE FOR HONORARIA PAYMENTConsultants and Resource Persons are being engaged to render expert services inconjunction with the Academy's internal operating and support systems or withprograms/projects which the Academy undertakes. The Certificate of Clearance forHonoraria Payment is issued when a consultant/resource person has completedengagement and delivered specific outputs as defined with the agreed TOR in the LOIor Contract of Service as one of the requirement to facilitate the request for payment ofhonoraria.
Office or Division: Central Documentation and Records Division (CDRD)
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: Resource Persons / Consultants, Officers and Staff of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Consultant’s/RP’s Certification of OutputClearance for Honoraria Payment Form,1, completed
Document Management System (DMS)
1. C/RP’s Output (Hard Copy/Soft Copy) Requesting Center/Office/ProjectManager/Project Staff
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Prepares andprovides initialattestation for theC/RP Certification ofOutput Clearance forHonoraria PaymentForm and the C/RP’sOutput
Note: The requestingCenter/Office shall submitthe output in the DMS
1. Initiallyreviews thesubmitteddocuments forcompletenessbeforeendorsing toimmediatesuperior forfinalattestation
Note: Incompletesubmissions arereturned to requestingCenter/Office
None 4 hours CDRD Staff
83
1.1 Confirmsoutputsubmission,assigns anoutput code tosuch, updatesthe RPdatabase
1.2 Provides finalattestation forthe submittedclearance andoutput
None CDRD ActingManager
1.3 Uploadssigned CDRDdocumentsinto DMS androuted to thenext processorthru DMS andDTMS-RCAsystem
None CDRD Staff
1.4 Forward thesigneddocuments tothe HRMDDfor furtherprocessing
None CDRD Staff
TOTAL None 4 hours
84
PREPARATION OF DOCUMENTED INFORMATION FEEDBACK FORM(DFF)
The Documented Information Feedback Form (DFF) is the form used to suggest thecreation of or revision to an existing documented information i.e. Quality ManagementSystem-related documented information, the DAP Quality Manual, Procedures andWork Instructions, template/form, etc.
Office or Division: Central Documentation and Records Division (CDRD)
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: DAP Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Filled-up/signed DocumentedInformation Feedback Form 1 copy
Document Management System (DMS)
2. Proposed draft Originator/Process Owner
3. Original form/document for revision only,1 copy
Originator/Process Owner
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. The Originator(Center/Office/Staff) sendsthe dulyaccomplished DFF
1.1 Receives andreviews thesubmission forcompletenessand returns tothe originatoras needed.
None
2 hours
CDRD Staff
1.2 Forward therequest and itsattachments tothe processowner, forreview andapproval
None CDRD Staff
1.3 Endorses thereviewed DFFandattachments tothe President
None 1 hour CDRD Staff
85
& CEO forfurtheraffirmance.
1.4 Registers theapproveddocumentedinformation,disseminates/email blast to allconcerned viaofficial dapwebmail andupload ontothe DMS
None 1 hour CDRD Staff
Total None 4 hours
86
PREPARATION, REVIEW, FINALIZATION AND DISSEMINATION OFPOLICY ISSUANCES - MEMORANDUM CIRCULAR (MC), OFFICEORDER (OO), AND SPECIAL ORDER (SO)
This process refers to the standard process of formulation, review, approval, anddissemination of policy issuances. Through this standard process, proposed policies willbe thoroughly reviewed in terms of compliance to existing government rules andregulations and consistency with existing internal policies of the Academy. This processwould also ensure that proposed policy goes through the appropriate vertical andhorizontal channels for completed staff work before finalization, approval anddissemination.
Office or Division: Central Documentation and Records Division (CDRD)
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: DAP Center/ Office
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Signed Policy for Review and ApprovalMemorandum, 1 copy (hard copy)
Document Management System (DMS)
2. Proposed draft policy, 1 copy (soft andhard copy)
Originating Office/Proponent
CLIENT STEPS AGENCYACTIONS
FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. The proponent/originator submitsdraft proposed policyi.e. MemorandumCircular (MC) andOffice Order (OO)with attachedreferences, asneeded
1.1 Reviews thefinal draft ofthe proposedMC /OO
None 4 hours Acting Manager,CDRD-
CDRD staff
1.2 If needed,preparesappropriateform/templateas supportingdocument
None 1 hour CDRD Staff
87
1.3 Finalizesproposedpolicyissuance,organize instandardformat/template. Providesnumber anddate andadditionalreferences asneeded.
None 2 hours CDRD Staff
1.4 Endorses tothe ActingManager ofCDRD forfinal review.
None
1.5 Endorses tothe GroupHead of theoriginator/proponent forreview andapproval.
None
1.6 Send to theOffice of thePresident &CEO forsignature andapproval
None
1.7 Disseminates/email blaststhe approvedPolicyIssuance thruDAP webmailand uploadonto theDocumentManagement
None 1 hour CDRD staff
88
System(DMS)
2. The proponent /originator submitsdraft proposedSpecial Order (SO)re: Designation ofOICs, SDO,Creation ofCommittee/TaskForce, etc.
2.1 Reviews thefinal draft ofthe SO andfinalizes usinga standard/template,providesnumber, date.
None 1 hour CDRD Staff
2.2 Endorses tothe Office ofthe President& CEO forsignature andapproval
None CDRD Staff
2.3 Disseminates/email blaststhe approvedSO thru DAPwebmail andupload ontothe DocumentManagementSystem(DMS)
None 1 hour CDRD Staff
Total None 10 hours
89
REQUEST FOR RE-ISSUANCE OF TRAINING CERTIFICATES ORISSUANCE OF CERTIFIED TRUE COPY OF TRAINING CERTIFICATE
Training participants may request for reissuance of e-certificate/s or for printed certifiedtrue copy of certificate/s from the Public Affairs Desk (PAD) through a letter of request oremail. The processing fee is One Hundred Pesos (Php100.00) per certificate. The PADshall forward the request and proof of payment to CDRD which shall send the requestedcertificate/s or certified true copies of certificate/s to PAD for release to the requestingparty.
Office or Division: Central Documentation and Records Division
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: Training participants
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter of request from the requestingparticipant thru Public Affairs Desk
Requesting Participant
2. Official receipt of P100.00 Treasury Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. PAD endorses theletter of request forthe re-issuance oftraining certificate
1. Verifies detailsof trainingcertificaterequested i.e.name, date,implementingcenter, etc.
None 1 hour PAD Staff
1.1 Prepares thecertificationand certificateof requestingparticipant
P100.00 2 hours CDRD Staff
1.2 Signs thecertification forthe certificate
1 hour CDRD ActingManager
90
1.3 Releases thecertificate torequestingparticipant thruPAD
1 hour CDRD Staff
Total P100.00 5 hours
91
REQUEST FOR ISSUANCE OF TRAINING CERTIFICATES/CITATIONS
This process rationalize and integrate the procedures and forms on the preparation,issuance, control and recording of certificates, whether in printed or digital form, fortraining and non-training programs being implemented by the different units of theAcademy including citations to individuals and institutions,
Office or Division: Central Documentation and Records Division (CDRD)
Classification: Simple
Type of Transaction: G2G - Government to Government
Who may avail: Training participants
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Memorandum request for issuance ofCertificates/citations
DMS
2. List of participants to awarded withCertificates
Controlled template List of Participants to beawarded of Certificates - DMS
3. List of individuals/institutions to beawarded with Certificate of Appreciation
Controlled template List ofindividuals/institutions to be awarded withCertificate of Appreciation - DMS
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Concerned ProjectManager submitsthe Memo and Listof Participants/Individual/ Institutionto be awarded withCertificates/ Citation
Note: The Memo shallspecify whether thecertificate being requested isin printed or digital form orboth.
1.1 Review detailsof submittedtrainingcertificate/citationsrequested i.e.name, date,implementingcenter, etc.
None 2 hours CDRD Staff
Note: The CDRD shallgenerate the certificatesand/or e-certificates withinformation taken verbatimfrom the submitted List of
1.2 Preparescertificate andsubmits theP/CEOe-signature
None 6 hours CDRD Staff
92
Participants to be Awardedwith Certificates/Citations
request formand Memoand List ofParticipants/Individual/Institution tobe awardedwithCertificates/Citation to theOffice of thePresident forsignature/approval
1.3 The Office ofthe President/CEO reviewsand approvesthe submitteddocuments
None 8 hours OP HEA/COS
1.4 Releases therequestedcertificates tothe concernedPM/centerand/or to theBusiness Unitfor Printingthrough theDMS
P10.00
(e-cert)
P50.00(printed)
2 hours CDRD Staff
Total P60.00 18 hours
93
ISSUANCE OF ICT CLEARANCE FOR PURCHASE REQUESTThe ICT clearance is a pre-requisite prior to the purchase of IT materials, equipmentand appliances. The ICT clearance should be attached to a Purchase Request.
Office or Division: COSM-MIS
Classification: Simple
Type of Transaction: G2G – Government to Government
Who may avail: All DAP Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Purchase Request (detailed itemspecifications)
Document Management System (DMS)
2. ICT Clearance Form Document Management System (DMS)
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit PurchaseRequest viaDocumentTracking System(DTS) withcomplete details ofthe item beingrequested
1. Check forcompleteness ofthe submitteddocuments
None 10 mins
COSM-MIS
MIS staff
1.2 Prepares ICTClearanceForm
None 10 mins COSM-MIS
MIS staff1.3 Endorse to
COSM-MISDirector forsignature
None 1 min COSM-MIS
Director
1.4 Approval ofCOSM Director
None 5 mins Director
1.5 ForwardServices FrontDesk (SFD)the PR withICT clearancefor processing
None 3 mins
COSM-MIS
MIS staff
Total None 29 minutes
94
ISSUANCE OF ICT DIAGNOSIS REPORTThe ICT Diagnosis report is a document issued by MIS to report the defects found uponinspection of IT material or equipment.
Office or Division: COSM-MIS
Classification: Simple
Type of Transaction: G2G – Government to Government
Who may avail: All DAP Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Request through ticket via ITSupport Ticketing System
IT Support Ticketing System (ISTS)
ticketing.dap-systems.net
2. ICT Diagnosis Form Document Management System (DMS)
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Create a ticket viaIT SupportTicketing Systemto report ITproblemencountered
1. Acknowledgereceipt of theticket bychanging thestatus fromOpen toon-going
None 1 minute COSM-MIS
MIS staff
1.1 Check thereportedtechnicalproblem
None 20 minutes COSM-MIS
MIS staff
1.2 Preparediagnosisreport
None 10 minutes COSM-MIS
MIS staff
1.3 Endorse toCOSM Directorfor signature
None 1 minute COSM-MIS
Director
1.4 Approval ofCOSM Director
None 5 minutes Director
1.4 Forward toRequestingCenter the ICT
None 1 minute COSM-MIS
95
DiagnosisReport
MIS staff
Total None 38 minutes
96
MANAGEMENT OF DAP EMAIL ACCOUNTThe service aims to document the request for creation of DAP email account for newlyhired employees and the deactivation of email accounts of employees who have beenseparated from the service of the Academy.
Office or Division: COSM-MISClassification: SimpleType of Transaction: G2G – Government to GovernmentWho may avail: HRMD Staff, Program Centers
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. For new hires: Detailed information (Full
Name, HRIS Number, Designation,Office/Center) , 1 copy, original
HRMD
2. For separatees: Clearance Form, 1copy, original
HRMD
3. For external clients: Email registrationForm
E-mail registration form (http://bit.ly/dap-email)
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
CREATION OF EMAIL1. Forward request
for creation ofDAP emailaccount
1. Sent reply emailto acknowledgereceipt ofrequest
None 1 minute COSM-MIS
MIS staff
1.1 Create emailaccount
None 3 minutes COSM-MIS
MIS staff1.2 Endorse email
credentials toHR thru email
None 1 minute COSM-MIS
MIS staffTotal 0 5 minutesSUSPENSION OF EMAIL1. Submit Clearance
form toCOSM-MIS
1. Receive formfrom therequestingparty.
None 1 minute COSM-MIS
InformationSystem Analyst
1.1 Suspend emailand clearedemployee in theform
None 5 minutes COSM-MIS
InformationSystem Analyst
97
1.2 Endorse toCOSM Directorfor approvalandendorsement toHR
None 10 minutes COSM-MIS
InformationSystem Analyst
Total 0 16 minutes
CREATION OF EMAIL FOR EXTERNAL CLIENTS/PARTICIPANTSSubmit Email RequestForm and list ofparticipants toCOSM-MIS
Sent reply email toacknowledgereceipt of request
None 1 minute COSM-MIS
MIS staff
1.1 Endorse therequest toCOSMDirector forApproval
None 1 minute COSM-MIS
MIS staff
1.2 Approval ofCOSMDirector
None 5 minutes
1.2 Create emailaccount (note:processingtime isdependent onvolume ofusers)
None 10 minutes COSM-MIS
MIS staff
1.3 Endorse emailcredentials torequestingclient thruemail
None 1 minute COSM-MIS
MIS staff
Total None 18 minutes
98
TECHNICAL SUPPORT ASSISTANCE OF SIMPLE ICT REQUESTSThe IT Support Ticketing System (ISTS) is established to improve service delivery of ITsupport services to its clients. The application provides a standard and streamlinedmechanism that will document the entire process of IT requests from the time therequest is made up to the resolution of the problem and the provision of client feedback.
Office or Division: COSM-MIS
Classification: Simple /
Type of Transaction: G2G – Government to Government
Who may avail: All DAP Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Request through ticket via IT SupportTicketing System
IT Support Ticketing System (ISTS)ticketing.dap-systems.net
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Create a ticket viaIT SupportTicketing Systemto report ITproblemencountered
1. Acknowledgereceipt of theticket bychanging thestatus fromOpen toon-going
None 30 seconds COSM-MIS
MIS staff
1.1 Check/assessthe reportedtechnicalproblem
None 10 mins COSM-MIS
MIS staff
1.2 Resolve thereportedproblem
None 15 mins COSM-MIS
MIS staff1.3 Close the ticket None 30 seconds COSM-MIS
MIS staff2. Rate service 2. Receive and log
ratingNone COSM-MIS
MIS staffTotal None 26 minutes
99
TECHNICAL SUPPORT ASSISTANCE OF COMPLEX ICT REQUESTSThe IT Support Ticketing System (ISTS) is established to improve service delivery of ITsupport services to its clients. The application provides a standard and streamlinedmechanism that will document the entire process of IT requests from the time therequest is made up to the resolution of the problem and the provision of client feedback.
Office or Division: COSM-MIS
Classification: Simple /
Type of Transaction: G2G – Government to Government
Who may avail: All DAP Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Request through ticket via IT SupportTicketing System
IT Support Ticketing System (ISTS)ticketing.dap-systems.net
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Create a ticketvia IT SupportTicketing Systemto report ITproblemencountered
1. Acknowledgereceipt of theticket bychanging thestatus fromOpen toon-going
None 30 secs COSM-MIS
MIS staff
1.1 Check/assessthe reportedtechnicalproblem
None 30 mins COSM-MIS
MIS staff
1.2 Troubleshoot thereportedproblem
None3 days
COSM-MIS
MIS staff
1.3 Close the ticket None 30 secs COSM-MIS
MIS staff
2. Rate service 2. Receives andlogs rating
None COSM-MIS
MIS staff
Total None 3 days, 36minutes
100
VIDEO CONFERENCE ASSISTANCEThe service aims to provide technical assistance when it comes to video conferencingsetup for international training.
Office or Division: COSM-MISClassification: SIMPLEType of Transaction: G2G – Government to GovernmentWho may avail: All DAP personnel
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. 1 original, signed memo of Center Head
addressed to Director of COSMrequesting for the service from the enduser
Requesting Center/Office
2. 1 copy of training date and venue Requesting Center/Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Forward thesigned memorequesting forVideoconassistance to theOffice of theDirector of COSM
1. Acknowledgereceipt of memo
None 1 minute COSM
AdminCoordinator
1.1 Endorse therequest to MIS
None 1 minute COSM-AdminCoordinator
1.2 Coordinate withthe requestingparty for testingof equipmentand connectivity(note: wait timeis dependent onrequestingparty)
None 15 minutes COSM-MIS
InformationSystem Analyst
2. Requestingparty informsMIS aboutavailable
2. Test Videoconequipment andinternetconnectivity
None 1 hour (withinDAP)
COSM-MIS
InformationSystem Analyst
101
schedule fortesting
1 day beforeevent (forexternalvenues)
Total None
1 hour, 17minutes (if
venue is withinDAP)
1 working day,17 minutes (if
venue isexternal)
102
UPLOADING OF BIDS AND AWARDS NOTICES TO THE DAP WEBSITEThis service is to post bids and awards/request for quotation on the website to informpossible supplier for the Academy’s purchasing requirement/bidding:
Office or Division: COSM-MIS
Classification: Simple
Type of Transaction: G2G – Government to Government
Who may avail: BACSec & Procurement
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Information to be posted BACSec & Procurement
2. File/s to be attached on the post(biddingdocuments)
BACSec
3. File/s to be attached on thepost(request for quotation)
Procurement
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send an emailrequest withattacheddocument toCOSM-MIS
1. Acknowledgereceipt of email
None 1 minute COSM-MIS
MIS staff
1.1 Post invitationto bid/ requestfor quotation inthe website
None 20 minutes COSM-MIS
MIS staff
1.2 Notify therequestingCenter / Officethat theinformation isalready postedon the website
None 3 minute
COSM-MIS
MIS staff
Total None 24 minutes
103
UPLOADING OF TRAINING/COURSE INVITATIONS TO THE DAPWEBSITEThe training invitations posted in the Academy website aids the Centers in promotingthe latest available course offerings of the Academy.
Office or Division: COSM-MIS
Classification: SIMPLE
Type of Transaction: G2G
Who may avail: All DAP personnel
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Memo from the RequestingCenter, 1, original, signed
Requesting Center
2. Specific official files to be uploaded(jpeg or pdf format)
Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. IMC to submit viaemail theapprovedmaterialsfor posting in theAcademy website
1. Acknowledgereceipt of email
None 1 minute COSM-MIS
MIS staff
1.1 COSM-MIS willupload theinformation ontothe website
None 30 minutes COSM-MIS
MIS staff
1.2 Notify therequestingCenter viaemail that theinformation isalready postedon the website
None 3 minutes COSM-MIS
MIS staff
Total None 35 minutes
104
CREATION OF PROJECT MANAGEMENT INFORMATION SYSTEM(PMIS) ACCOUNTThe PMIS is a tool used by the project managers to facilitate the preparation of variousproject documents. Project managers with Permanent and Co-Terminous employmentstatus holding positions of APO 1 and above were given automatic access whileNon-regular staff were given probationary access after authorization from Center Headto the PMIS.
Office or Division: Corporate Operations and Strategy Management Office (COSM)
Classification: Simple
Type of Transaction: G2G-Government to Government
Who may avail: Non-Plantilla Personnel (NPP) staff with APO 1 and above position;Plantilla personnel with APO 1 appointment and above
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Memo: Authorizing Access of PMIS, 1original, signed
Director of Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Request to createPMIS account:a. For NPP:
Submit memoto COSMauthorizingaccess ofNPP staff
b. For PlantillaPersonnel:Send emailrequest toCOSM
1. Check if thepersonnel isqualified to gainaccess
None 35 minutes COSM staff
1.1Create anaccount in thesystem forqualifiedrequestor
None 5 minutes COSM staff
1.2 Send email toproject managerregarding
None 25 minutes COSM staff
105
his/her systemcredentials.
Total None 105 minutes
106
ISSUANCE OF PROJECT SPECIAL ORDERThe project Special Order is the document that defines the composition of project teammembers and their roles and functions in the implementation of the project. It alsoprovides information on the project duration, cost and the client being assisted. Theproject special order serves as an evidence of the legitimacy of the project contractedas well as reference for succeeding project activities.
Office or Division: Corporate Operations and Strategy Management Office (COSM)
Classification: Simple
Type of Transaction: G2G-Government to Government
Who may avail: Project Managers (PM), Project Team members
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Document Tracking Sheet,1, original Document Management System
2. Memo: Designation of Project Team andsubmission of PIP,1, original, signed
Document Management System
3. Draft Special Order,1, original, signed Project Management Information System
4. Project Profile,1, copy, Project Management Information System
5. Project Logframe,1, copy, Project Management Information System
6. Project Implementation Plan,1, original,signed
Project Management Information System
7. Project Evaluation Sheet signed,1,original, signed
Project Management InformationSystemFinance Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit allrequired projectdocuments toCOSM viaDocument
1. Check forcompleteness ofthe submitteddocuments
None 1 hour
530 minutes
COSM staff
107
Tracking System(DTS)
2. PM to endorseonline (throughPMIS) all requiredproject documents
2. Check if projectis properlyendorsed
None 5 minutes COSM staff
3. Project’sSupervisingFellow to endorseproject to Financefor project coding
3. Monitor if projectis properlyendorsed
None 5 minutes COSM staff
3.1 Coordinate withFinance in theissuance ofproject code
Printing of Final SO
None 30 minutes
1 hour
COSM staff
3.2 Endorsement ofFinal SO to OPfor approval
None 5 minutes COSM staff
3.3 Endorsement ofFinal SO to VPCCC for hissignature andendorsement toOP
None 5 minutes COSM staff
3.4 Upon receipt ofsigned SO,scan finalforwardapproved SOand send to PMvia emailDTS
None 30 minutes515 minutes
COSM staff
108
3.5 Send copy toDocumentTrackingManagementSystem (DTMS)
None
Total None50 minutes, 2
hours, 45minutes 2
hours
109
ISSUANCE OF REVISED PROJECT SPECIAL ORDERThe project Special Order is the document that defines the composition of project teammembers and their roles and functions in the implementation of the project. It serves asevidence of the legitimacy of the project contracted as well as reference for succeedingproject activities. When the project details are revised for some reason that are agreedwith the client, such as change in duration, or cost, or if there are changes in the projectteam, the project SO is likewise revised to reflect these changes.
Office or Division: Corporate Operations and Strategy Management Office (COSM)
Classification: Simple
Type of Transaction: G2G-Government to Government
Who may avail: Project Managers, Project Team members
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Document Tracking Sheet Document Management System
2. Memo: Designation of Project Team andsubmission of Project ImplementationPlan (PIP), 1, original, signed
Document Management System
3. Draft Special Order (SO) ), 1, original,signed
Project Manager
4. Letter of extension duly signed by bothparties), 1, photocopy, signed
Project Manager
5. Amended MOA (if applicable), 1,photocopy, signed
Project Manager , Finance Officer
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit to COSMvia DocumentTracking System(DTS) allrequired projectdocuments
1. Check forcompletenessof thesubmitteddocuments
None 1030 mins COSM staff
110
1.1 Acknowledgereceipt in thelog book
None
1.2 Revise SOonline in ProjectManagementInformationSystem (PMIS)
None
2. Finalization ofrevised Specialorder
2. Printing of FinalSO
None 1030 mins COSM staff
2.1 Endorsement ofFinal SO toCenter
3. Prepare revisedPIP and PES forendorsement toProgram Directorand Center Head
3. Check if PIP isrevised
None 3 hours
5 mins
COSM staff
4. Print revised PIPProject EvaluationSheet (PES), andendorse finalproject documentsto VP CCC forPresident’ssignature
4. Scan final SOand send to PMvia email
None 510 minutes COSM staff
4.1 Send copy toDMS
None COSM staff
Total None 4 hours, 1030minutes
111
REQUEST FOR CORPORATE-LEVEL DOCUMENTS (DOCUMENTSREQUIRING SIGNATURE OF COMPLIANCE OFFICER AND DAPPRESIDENT)The Corporate Operations and Strategy Management (COSM) is the steward of allcompliance and management-level documentation for the DAP. Requests forcorporate-level documents may be made from COSM for the purpose of complying withthe said executive information related to the Academy-level scorecard, GCGcorrespondence for DAP, GCG memorandums for all GOCCs, Memorandum Circularspertinent to DAP’s oversight agency compliance, results of the annual CustomerSatisfaction Survey and official documentation of Management Committee meetings.
Office or Division: Corporate Operations and Strategy Management (COSM)
Classification: Complex
Type of Transaction: G2G-Government to Government
Who may avail: DAP Groups, Centers, Offices/UnitsDAP Management Committee members
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. An approved memorandum or a formalbusiness email to request for corporatelevel documents, 1 original or photocopy,signed
DAP Group Head or Center Head Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Crafts a memorequest and sendthrough thefollowing options:
● physicalrouting;
● business email;or
● DocumentTracking System(DTS)
1. Acknowledgesthe receipt ofmemo request forcorporate-leveldocumentsthrough:
● physicaldocument/s;
● businessemail; or
● DocumentTrackingSystem (DTS)
None 1 hour COSM
Technical Staff
112
1.1Endorses therequest forcorporate-leveldocuments to theCOSM Director
None 10 minutesCOSM
Technical Staff
1.2COSM Directorreviews andapproves therequest toprovide thedocuments
None 4 hours COSM Director
1.3 Endorses therequest forcorporate-leveldocuments to theComplianceOfficer
None 10 minutes
COSM Director
1.4The ComplianceOfficer reviewsand providesattestation for therequest
None 1 day DAP ComplianceOfficer
1.5The ComplianceOfficer endorsesthe request to theDAP Presidentfor review andapproval
None DAP ComplianceOfficer
1.6Review, approvaland signing ofrequest by theDAP President
None 2 days DAP President
113
1.7Receives thefully-approvedrequest andprovides anupdate to theclient
None 1 hour COSM
Technical Staff
2. Receives therequestedtechnicaldocumentation
2. Documents thesuccessfulfulfillment of therequest throughthe trackingsheet, businessemail or theDocumentTracking System(DTS)
None 10 minutes COSM
Technical Staff
2.1 Informs theCOSM Director ofrequest fulfillment
None COSM
Technical Staff
Total None 3 days, 6hours and 20
minutes
114
REQUEST FOR CORPORATE-LEVEL DOCUMENTS (INTERNAL USE)The Corporate Operations and Strategy Management (COSM) is the steward of allcompliance and management-level documentation for the DAP. Groups/Centers/Officesrequest from COSM the said executive information related to the Academy-levelscorecard, GCG correspondence for DAP, GCG memorandums for all GOCCs,Memorandum Circulars pertinent to DAP’s oversight agency compliance, results of theannual Customer Satisfaction Survey and official documentation of ManagementCommittee meetings.
Office or Division: Corporate Operations and Strategy Management (COSM)
Classification: Simple
Type of Transaction: G2G-Government to Government
Who may avail: DAP Groups, Centers, Offices/UnitsDAP Management Committee members
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. An approved memorandum or a formalbusiness email to request for corporatelevel documents, 1 original or photocopy,signed
DAP Group Head or Center Head Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Crafts a memorequest and sendthrough thefollowing options:
● physicalrouting;
● business email;or
● DocumentTracking System(DTS)
1. Acknowledgesthe receipt ofmemo request forcorporate-leveldocumentsthrough:
● physicaldocument/s;
● businessemail; or
● DocumentTrackingSystem (DTS)
None 1 hour COSM
Technical Staff
115
1.1Endorses therequest forcorporate-leveldocuments to theCOSM Director
None 10 minutes COSM
Technical Staff
1.2COSM Directorreviews andapproves therequest toprovide thedocuments
None 4 hours COSM Director
1.3 Endorses therequest forcorporate-leveldocuments to theComplianceOfficer
None 10 minutes COSM Director
1.4The ComplianceOfficer reviewsand providesattestation for therequest
None 1 day DAP ComplianceOfficer
1.5Receives thefully-approvedrequest andprovides anupdate to theclient
None 1 hour COSM
Technical Staff
116
2. Receives therequestedtechnicaldocumentation
2. Documents thesuccessfulfulfillment of therequest throughthe trackingsheet, businessemail or theDocumentTracking System(DTS)
None 10 minutes COSM
Technical Staff
2.1 Informs theCOSM Directorof requestfulfillment
None COSM
Technical Staff
Total None 1 day, 6 hoursand 20
minutes
117
REQUEST FOR TECHNICAL EXPERTThis pertains to requests for Technical Expert Services (e.g., Panelist, Faculty Adviser,Resource Person, Subject Matter Expert, etc.) for DAP projects.
Office or Division: Council of Fellows (COF)Office of the President (OP)
Classification: SimpleType of Transaction: G2G-Government to GovernmentWho may avail: Academy’s Internal Centers/Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1 Original, Signed, Request letter or formalemail. Requesting Office
2. Fully-accomplished COF TechnicalAssistance/Engagement Request Form COF- Secretariat
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Fill up and submitthe request formor make a call,text or email toCOF
1.1 Receive therequest formand endorsesuch to the SEF
None 5 minutes SecretariatCOF
1.2 Inform theclient/requesting party toexpect thefeedbackthrough call,text or email
None 5 minutes SecretariatCOF
1.3 Review therequest, identifythe propertechnicalexpert, andcoordinate/discuss with thetechnical expertthe neededservices.
None 2 hours SEF
118
1.4 Approve andendorse therequest to theassignedtechnical staff.
None 15 minutes SEF
2. Receive theapproved requestform.
2.1 Relay to therequestingparty/client thefinal decisionthrough text, callor email
None 5 minutes SecretariatCOF
END OF TRANSACTION
Total None 2 hours, 40minutes
119
REQUEST FOR BILLING AND COLLECTION(On-line through Document Tracking System (DTS))
When an output for a certain project of the Academy is completed, a request for a BillingStatement (BS) is forwarded to the Finance Department-Accounting Division.
The BS is the basis for recording the Accounts Receivable (AR) in the books ofaccounts.
Collections of ARs are supported by BS.
Office or Division: Finance Department (Accounting & TreasuryDivisions)
Classification: SimpleType of Transaction: G2C - Government to Citizen
G2B - Government to Business EntityG2G - Government to Government
Who may avail: All Centers of the AcademyCHECKLIST OF REQUIREMENTS(Uploaded to On-line DTS and alloriginal supporting documents shouldbe submitted to the FinanceDepartment)
WHERE TO SECURE
1. Accomplished Billing Request Form Originating Center2. Approved Memorandum of
Agreement (MOA)Originating Center
3. Approved Letter of Conforme Originating Center4. Certificate of Acceptance of Project
DeliverableOriginating Center
CLIENT STEPS AGENCYACTIONS
FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Upload BillingRequest (BR) withsupportingdocuments to theDTS.
1. AssignProcessingControl Number(PCN) andforward alldocuments tothe Finance–AccountingDivision
None Two (2)minutes
AdministrativeDepartment,
Front Desk Staff
120
1.1 Validates theon-line requestand preparesthe BillingStatement (BS).Printing ofBillingStatement (BS)is on site.
None Ten (10)minutes
FinanceDepartment
(FD)-AccountingDivision (AD)
1.2 Updatesrecords in theFinancialManagementInformationSystem (FMIS)and issues theBS to the TD
None Ten (10)minutes
FinanceDepartment
(FD)-AccountingDivision (AD)
2. The external clientaccepts the BillingRequest fromDAP throughemail.
1.3 Sends ScannedBillingStatement (BS)and supportingdocuments tothe clientthrough email.
.
None Sixty (60)minutes
FinanceDepartment
(FD)-TreasuryDivision (TD)
Staff
2.1 Delivers theoriginal BS tothe client
None Four HundredEighty (480)minutes due
to travelconstraint
FinanceDepartment
(FD)-TreasuryDivision (TD)
Staff
3. Treasury Divisionfollows up theclient for payment
3. Follows-up dateof paymentfrom client
None Ten (10)minutes
FinanceDepartment
(FD)-TreasuryDivision (TD)
Staff
4. The Externalclient delivers thecheck to DAP
4. Collects andissues OfficialReceipt
None Fifteen (15)minutes
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
121
5. Treasury Divisionto pick up thecheck payment ofclient
5. Collects andissues OfficialReceipt
None Two HundredForty (240)
minutes dueto travel
constraints
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
6. Treasury feedbackthe ProjectManager as to thestatus of collection
6. Updates theconcerned DAPoffice on statusof collection
None Fifteen (15)minutes
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
Total None 14 hours and2 minutes
122
REQUEST FOR BILLING AND COLLECTION(On site through Document Tracking and Monitoring System (DTMS))
When an output for a certain project of the Academy is completed, a request for a BillingStatement (BS) is forwarded to the Finance Department-Accounting Division.
The BS is the basis for recording the Accounts Receivable (AR) in the books ofaccounts.
Collections of ARs are supported by BS.
Office or Division: Finance Department (Accounting & TreasuryDivisions)
Classification: SimpleType of Transaction: G2C - Government to Citizen
G2B - Government to Business EntityG2G - Government to Government
Who may avail: All Centers of the AcademyCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Accomplished Billing Request Form,1
Originating Center
2. Approved Memorandum ofAgreement (MOA), 1, original
Originating Center
3. Approved Letter of Conforme, 1,original
Originating Center
4. Certificate of Acceptance of ProjectDeliverable, 1, copy
Originating Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Prepares andsubmits BillingRequest (BR) withsupportingdocuments to theServices
1. Records,assigns aProcessingControl Number(PCN) andforwards BRand supportingdocuments tothe AD
None Two (2)minutes
AdministrativeDepartment,
Front Desk Staff
1.1 Validatesrequest andprepares the
None Ten (10)minutes
FinanceDepartment
123
BillingStatement (BS)
(FD)-AccountingDivision (AD)
1.2 Updatesrecords in theFinancialManagementInformationSystem (FMIS)and issues theBS to the TD
None Ten (10)minutes
FinanceDepartment
(FD)-AccountingDivision (AD)
2. The TreasuryDivision deliversthe BillingRequest to theclient
2. Sends/ DeliversBillingStatement (BS)to the client
None Four HundredEighty (480)
minutes
FinanceDepartment
(FD)-TreasuryDivision (TD)
Staff
3. Treasury Divisionfollows up theclient for payment
3. Follows-up dateof paymentfrom client
None Ten (10)minutes
FinanceDepartment
(FD)-TreasuryDivision (TD)
Staff
4. The Externalclient delivers thecheck to DAP
4. Collects andissues OfficialReceipt
None Fifteen (15)minutes
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
5. Treasury Divisionto pick up thecheck payment ofclient
5. Collects andissues OfficialReceipt
None Two HundredForty (240)
minutes dueto travel
constraints
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
6. Treasuryfeedback theProjectManager asto the statusof collection
6. Updates theconcerned DAPoffice on statusof collection
None Fifteen (15)minutes
FinanceDepartment (FD)
-TreasuryDivision (TD)
Staff
Total None 13 hours and2 minutes
124
REQUEST FOR CASH ADVANCE FOR LOCAL AND FOREIGN TRAVEL(On-line through Document Tracking System (DTS))
All regular employees, Non-Plantilla Personnel (NPP), and external resource persons,with no outstanding Cash Advances (CAs), may request for CAs on authorized localand foreign travels.
All CAs shall be subject to liquidation.
Office or Division: Finance Department (Budget, Accounting &Treasury Divisions)
Classification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: A. LOCAL TRAVEL
✔ Permanent and Co-TerminousOfficers/ Staff
✔ Non-Plantilla Personnel (NPP)and External Resource Personsof the Academy
B. FOREIGN TRAVEL✔ Permanent and Co-Terminous
Officers/ Staff✔ Non-Plantilla Personnel (NPP) of
the AcademyCHECKLIST OF REQUIREMENTS(Uploaded to On-line DTS and alloriginal supporting documents shouldbe submitted to the FinanceDepartment)
WHERE TO SECURE
A. Local Travel1. Approved Service Agreement (SA)
for NPP and LOI for ExternalResource Persons of the Academy,1,
Originating Center
2. Accomplished DAP Transaction Slip(DTF), 1
Originating Center
3. Approved Itinerary of Travel, 1, Originating Center4. Approved Travel Order, 1, Originating CenterB. Foreign Travel1. Accomplished DAP Transaction Slip
(DTF)Originating Center
125
2. Approved Itinerary of Travel Originating Center3. Approved Travel Order Originating Center4. Malacañang approval, if Agency
Head will travelMalacañang
5. DAP Management Authorization Office of the President of the Academy6. Letter of Invitation Host/ sponsoring country/ organization7. Letter of Acceptance Originating Center
CLIENT STEPS AGENCYACTIONS
FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Upload paymentrequest withapproved DAPDocumentTransaction Form(DTF) andsupportingdocuments toDTS.
1.1 AssignProcessingControl Number(PCN) andforward alldocuments tothe Finance-Pre-Audit
None Two (2)minutes
AdministrativeDepartment(AD), Front
Desk ServicesStaff
1.2 Evaluate onlinethe paymentrequestdocumentsbased on therequirementsand forward thesame to theBudget Division(BD)
None Thirty (30)minutes for
simpletransactions
FinanceDepartment
(FD) -Accounting
Division (AD),Pre-Audit Staff
1.3 Allocate budget, issues theBudgetUtilization Slip(BUS) andforwards to theAccountingDivision (AD)
None Fifteen (15)minutes per
regulartransaction
FinanceDepartment
(FD) – BudgetDivision (BD)
Staff
1.4 Prepare theDisbursementVoucher (DV)and JournalEntry Voucher(JEV) on-line.
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
126
1.5 Received theDV/JEVthrough on-lineDTS
None Two (2)minutes
FinanceDepartment
(FD) – TreasuryDivision (TD)
Staff
1.6 On site printingof DV, JEV andTax CreditCertificates(TCC)
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
1.7 On site printingof Checks
None Ten (10)minutes
FinanceDepartment
(FD) – TreasuryDivision (TD)
Staff
1.8 Sign DV /JEVand TCC
None Fifteen (15)minutes
FinanceDepartment
(FD) andAccounting
Division (AD) –Managing
Director andActing Director
and otherdesignatedsignatoriesoutside FD
1.9 Printing ofChecks and forsignature withSignatory #1and Signatory#2
None Fifteen (15)minutes
If per Batch,240 minutesper signatory.If per Piece,15 minutes
per signatory.
Designatedsignatories fromPrograms and
Services Groups
1.10 Updaterecords in theDTMS. InformRO when checkis available.
None Ten (10)minutes
On informingRO, there is
FinanceDepartment
(FD) - TreasuryDivision (TD)
Staff
127
MonthlyOutstanding
ChecksReport sentregularly to
CenterHeads/FO
1.11 Issue checkand/or depositto Landbankaccounts of thepayee. (If allthe originalsupportingdocuments aresubmitted tothe ServicesFront Desk(SFD)).
Note: Release ofcheck is subjectto thesubmission ofthe originalsupportingdocuments tothe SFD.
P50.00 ifP10,000.0
0 belowand
P100.00 ifP10,000.00 above
fordepositsoutsideMetroManila
One HundredTwenty (120)
Minutes orTwo (2) hours
FinanceDepartment
(FD) - TreasuryDivision (TD)
Staff
Total None For simple/regular
transactions:4 hours and9 minutes
128
REQUEST FOR CASH ADVANCE WITH A SPECIFIC PURPOSE(On-line through Document Tracking System (DTS))
A Cash Advance (CA) is granted for emergency purposes only.
A regular employee and a duly designated Disbursing Officer (DO), with no outstandingCash Advance (CA), may request for a CA with a specific and authorized purpose.
Likewise, the DO requesting for a specific CA amounting to P 5,000 and above shall bebonded.
All CAs shall be subject to liquidation.
Office or Division: Finance Department (Budget, Accounting &Treasury Division)
Classification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: Officers and Staff of the Academy
● Bonded Permanent and Co-TerminousOfficers/ Staff for P5,000.00 andabove, with no outstanding CAs;
● Unbonded Permanent andCo-Terminous Officers/ Staff foramounts below P5,000.00, with nooutstanding CAs
CHECKLIST OF REQUIREMENTS(Uploaded to On-line DTS and all originalsupporting documents should besubmitted to the Finance Department)
WHERE TO SECURE
1. Accomplished Specific CashAdvance Form
Originating Center
2. Accomplished DAP Transaction Slip(DTF)
Originating Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Upload paymentrequest withapproved DAPDocumentTransaction Form(DTF) and
1. AssignProcessingControl Number(PCN) andforward alldocuments to
None Two (2)minutes
AdministrativeDepartment(AD), Front
Desk ServicesStaff
129
supportingdocuments toDTS.
the Finance-Pre-Audit
1.2 Evaluate onlinethe paymentrequestdocumentsbased on therequirementsand forward thesame to theBudget Division(BD)
None Thirty (30)minutes for
simpletransactions
FinanceDepartment
(FD) -Accounting
Division (AD),Pre-Audit Staff
1.3 Allocate budget, issues theBudgetUtilization Slip(BUS) andforwards to theAccountingDivision (AD)
None Fifteen (15)minutes per
regulartransaction
FinanceDepartment
(FD) – BudgetDivision (BD)
Staff
1.4 Prepare theDisbursementVoucher (DV)and JournalEntry Voucher(JEV) on-line.
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
1.5 Received theDV/JEV throughon-line DTS
None Two (2)minutes
FinanceDepartment
(FD) – TreasuryDivision (TD)
Staff
1.6 On site printingof DV, JEV andTax CreditCertificates(TCC)
None Fifteen (15)minutes
FinanceDepartment
(FD) –Accounting
Division (AD)Staff
1.7 On site printingof Checks
None Ten (10)minutes
FinanceDepartment
(FD) – Treasury
130
Division (TD)Staff
1.8 Sign DV /JEVand TCC
None Fifteen (15)minutes
FinanceDepartment
(FD) andAccounting
Division (AD) –Managing
Director andActing Director
and otherdesignatedsignatoriesoutside FD
1.9 Printing ofChecks and forsignature withSignatory #1and Signatory#2
None Fifteen (15)minutes
If per Batch,240 minutesper signatory.If per Piece,15 minutes
per signatory.
Designatedsignatories fromPrograms and
ServicesGroups
1.10 Updaterecords in theDTMS.
Inform RO whencheck is available.
None Ten (10)minutes
On informingRO, there is
MonthlyOutstanding
ChecksReport sentregularly to
CenterHeads/FO
FinanceDepartment
(FD) - TreasuryDivision (TD)
Staff
1.11 Issue checkand/or depositto Landbankaccounts of thepayee. (If all theoriginalsupportingdocuments aresubmitted to the
P50.00 ifP10,000.0
0 belowand
P100.00 ifP10,000.00 above
fordepositsoutside
One HundredTwenty (120)
Minutes orTwo (2) hours
FinanceDepartment
(FD) - TreasuryDivision (TD)
Staff
131
Services FrontDesk (SFD)).
Note: Release ofcheck is subjectto thesubmission ofthe originalsupportingdocuments tothe SFD.
MetroManila
Total None Forsimple/regul
artransactions:4 hours and9 minutes
132
ENGINEERING SERVICES
This process refers to the administration, management, operation and maintenance ofbuilding-engineered systems, to include but not limited to structural system, air-conditioningsystem, water distribution system, sanitary & plumbing system, fire alarm system, PABX ortelephone system, elevator system, lighting, power & electrical system, generator system,etc.
Office or Division: General Services DivisionClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: Center/Department/Office/Unit Designated Coordinators
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Request Slip for minor engineering
repairs; or Phone Call, Text or EmailRequest
GSD-OD / Engineering Office, Basement
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Submit a requestthrough call, textor email toGSD-Engineering
1. Receive and logthe request andassignengineeringpersonnel to dorepair works
None Equal to orless thanthree (3)
hours fromthe time of
requestsubmission
BuildingEngineer orDesignatedEngineeringPersonnel
133
MOTOR VEHICLE POOL (MV POOL) SERVICES
This process describes the administration, management and operation of all motorvehicles of the Academy. Motor Vehicle Services, under the General Services Division(GSD) provides land transportation service for DAP in Pasig City, DAP ConferenceCenter in Tagaytay City and DAP sa Mindanao (Davao-based) operations.
Office orDivision:
General Services Division
Classification: SimpleType ofTransaction:
G2G - Government to Government
Who may avail: Center/Department/Office/Unit Designated CoordinatorsCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Reservation Slip*, 1, signed byrequesting party or by theCenter/Office Head
GSD-MVPool Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Submit areservation slipor emailrequest toGSD-MVPoolat least 5 daysprior to date ofuse
1. Approve ordisapproverequest, andinform requestingparty of the resultof their request
None Equal or lessthan one (1)working dayfrom the time
of requestsubmission
MVPoolDispatcher orhis designatedrepresentative
134
INTERNAL LEARNING AND DEVELOPMENT (L&D) INTERVENTIONS
This pertains to interventions that are organized and conducted by the HRMDD for the Academy.
Office or Division: Staff Development UnitClassification: Highly TechnicalType of Transaction: G2GWho may avail: All Plantilla and Non-Plantilla-based personnel of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Memo Request approved by Center
HeadRequesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Center Headsends a memorequesting toconduct a specifictraining to beimplemented bythe HRDD as partof its internalcapabilityprograms.
1. HRD evaluatestraining requestagainst CB-HRand givesrecommendationto the ActingManager of HRD.
None 1 day HRM Officer IIHuman
ResourceDevelopment
1.1 Acting Managerof HRD reviewsthe evaluationand endorses therecommendationif in order foraction of the MD,HRMDD
None 1 day Acting Manager,HRD
1.2MD HRMDDevaluates therecommendationand approves ordisapproves therequest based onthe assessment.
None 2 days MD, HRMDD
135
1.3Once approved,HRD attends topre-trainingrequirements.
None 16 days HRM Officer II
TOTAL None 20 days
136
EXTERNAL LEARNING AND DEVELOPMENT (L&D) INTERVENTIONS
These interventions aim to further equip staff with the required competencies for their positions.
Office or Division: Human Resource Development Division (HRD)Classification: Highly TechnicalType of Transaction: G2G – Government to GovernmentWho may avail: All Plantilla and Non-Plantilla-based personnel of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Invitation and/or Program for the Training Organizing Agency/Party2. Memo Endorsement Concerned Center/Group Head, DAP
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBLE
1. Center Headendorses througha Memo thetargetedparticipant/s tolocal training toHRMDD forapproval.
1. Human ResourcesDevelopment(HRD) to evaluatethe endorsedMemo /participant/s(using CB HRMFramework) forrelevancy,completeness,and followspertinentregulations.
None 4 hours HRM Officer IIHuman
ResourceDevelopment
1.1 Acting Managerof HRD reviewsthe evaluationand recommendsappropriateaction on thetraining requestto MD, HRMDD
None 1 day Acting Manager,HRD
1.2 HRMDDManaging Directorevaluates therecommendationand endorses toSVP-Services forapproval.
None 2 days HRMDDManagingDirector
137
1.3 If approved, HRDto inform theCenter Head andparticipant/s ofthe decision.
None 4 hours HRM Officer II
1.4 HRD to registerparticipant/s,processpayment, andcoordinates withthe participant/son his/herattendance.
None 1 day HRM Officer II
Total None 5 days
138
PROCESS OF PREPARING TRAVEL DOCUMENTS AND PAYMENTFOR EXTERNAL TRAINING
This pertains to the preparation of the pre-travel documents and the requirements afterparticipation in approved external training.
Office or Division: Human Resource Development Division (HRD)
Classification: Complex
Type ofTransaction:
G2G – Government to Government
Who may avail: All Plantilla and Non-Plantilla-based personnel of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Training Report Participant
2. Certified Copy of Certificate Participant
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. From theapproved client’srequest fortraining
1. HRD prepares PRfor hotelaccommodationand landtransportation orflight booking (ifapplicable),payment fortraining, traveldocuments, travelallowances andencodes thetraining in theHRIS.
None 4 days HRM Officer II
139
1.1. Acting Managerof HRD checksthe documentsprepared.
1 day Acting Manager,HRD
2. Participantsubmits trainingreport andphotocopy oftrainingcertificate/s toHRD.
2. HRD receivestraining report andcopy of trainingcertificate.
None 5 minutes HRM Officer II
2.1 HRD registerstraining certificatein the employee’s201 file.
None 5 minutes HRM Officer II
2.2 Uploads trainingreport inDocumentManagementSystem (DMS)
None 10 minutes HRM Officer II
Total None 5 days and20 minutes
140
ENDORSEMENT OF CANDIDATES
This describes the procedure undertaken by the Human Resource ManagementDivision when endorsing candidates.
Office or Division: Human Resource Management - Recruitment, Selection, andPlacement (HRM-RSP)
Classification: ComplexType of Transaction: G2G – Government to GovernmentWho may avail: All DAP Group/Center Heads
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Approved Personnel Requisition
Form (PRF)HRMDD or HRIS
2. Functional BEI FormHRMDD3. Cover or Endorsement Memo
4. Candidate’s Profile FolderCLIENT STEPS AGENCY ACTIONS FEES TO
BE PAIDPROCESSING
TIMEPERSON
RESPONSIBLE1. Submits to
HRMDD approvedPRF
1.1. Preparescandidate’sprofile folder(exam result,interviewevaluation, QSassessmentresult)
None 1 hour HRPsychometrician
(HRM – RSP)
1.2. Prepares cover/endorsementMemo
None 15 minutes HRPsychometrician
(HRM – RSP)
1.3. Endorsescandidate profilefolders withcover/endorsementmemo to theDirector forreview andclearance
None 5 minutes HRPsychometrician
(HRM – RSP)
141
1.4. HRM DivisionDirectorreviews, clearsand signscandidate profilefolders, QSAssessment,and cover/endorsementmemo (e-copythrough email orphysical copy)
None 1 workingday
HRM DivisionDirector
1.5. Routesendorsementwith attachedFunctionalInterview Formto RequestingCenter/Officethrough email
None 15 minutes HRPsychometrician
(HRM – RSP)
2. RequestingCenter/Officereceives thecandidates’profiles
2. Awaits feedbackfrom requestingCenter/Office
None 7 calendardays
HRPsychometrician
(HRM – RSP)
Total None8 Days
1 hour and 30minutes
142
HR ASSESSMENT PROCESS
This describes the procedure undertaken by the Human Resource ManagementDivision in assessing applicants to be included in the roster of pre-assessed candidates.
Office or Division: Human Resource Management - Recruitment, Selection, andPlacement (HRM-RSP)
Classification: SimpleType of Transaction: G2C – Government to CitizenWho may avail: All Applicants
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. An application letter or The applicant2. Curriculum Vitae
3. Accomplished EPDS and DAP Essay(Original or Electronic Copy)
HRMDD Staff/Psychometrician
4. Set of Psychological Battery Test Philippine Psychological Corporation
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. For scheduledinterviews andexams, confirmavailability andattendancethrough emailand sendaccomplishedrequired forms
2. Email HRAssessmentschedule andthe EmploymentPersonal DataSheet and DAPEssay Form
None 30 mins HRPsychometrician
(HRM – RSP)
2. Show up for theHR Assessmentand submitphysical copy ofaccomplishedrequired forms
2.1. Conduct batteryof tests (writteninitialassessment)
None 3 hours HRPsychometrician
(HRM – RSP)
2.2. Schedule initialinterview (HRlevel)face-to-face oronline
None 10 mins HRPsychometrician
(HRM – RSP)
143
3. Show up for HRinitial interview
3.1. Conducts initialinterview
None 45 mins HRPsychometrician
(HRM – RSP)3.2. Dismisses the
applicant for theday
None 5 mins HRPsychometrician
(HRM – RSP)3.3. Encodes the
applicant’sinformationprofile andexaminationresults in theHRIS to formpart of the activefile
30 mins HRPsychometrician
(HRM – RSP)
3.4. Evaluates theraw scores ortest results ofapplicants andencodes in theHRIS
None 30 mins HRPsychometrician
(HRM – RSP)
3.5. Assess profile ofapplicant andprepares the QSAssessment
None 30 mins HRPsychometrician
(HRM – RSP)
Total None 6 Hours
144
PROCESSING OF SERVICE AGREEMENT (SA)
Below are the steps undertaken in the processing of a Service Agreement andon-boarding of selected candidates.
Office or Division: Human Resource Management - Recruitment, Selection, andPlacement (HRM-RSP)
Classification: SimpleType of Transaction: G2G – Government to GovernmentWho may avail: All Center/Group Head
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Approved Personnel Requisition Form
(PRF), 1HRMDD
2. Completed Service Agreement Form(SAF)
Originating Center/Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submits draftServiceAgreement Form(SAF)signed andendorsed by theCenter Head
1. Review of SA’sAlignment toTOR
If not aligned, returnto requestingCenter.
None 10 minutes HRM Staff/Officer(HRM – RSP)
1.1 Returnsreviewed SA toCenter Head forsignature.
None 10 minutes HRM Staff/Officer(HRM – RSP)
2. Center Headsigns SA andforwards to HRM–RSP.
2. Invite Candidatefor Formal JobOffer
None 10 minutes HRM Staff/Officer(HRM – RSP)
3. Candidateresponds to offer.
3. HRM – RSPconductsonboardingsession.
None 30 minutes HRM Staff/Officer(HRM – RSP)
3.1 Uponacceptance ofJob Offer,Encoding ofSAF in HRIS
None 5 minutes HRM Staff/Officer(HRM – RSP)
145
3.2. Endorses theSA to BudgetDivision forBudgetUtilization Slip(BUS)
None 5 minutes HRM Staff/Officer(HRM – RSP)
3.2 Once returnedby the BudgetDivision,endorse to theOffice of thePresident forapproval of thePCEO
None 1 working day HRMDD ActingManagingDirector
3.3 Once returnedby the Office ofthe Presidentand CEO,attestation ofServiceAgreementForm (SAF) byHRMDD
None 1 working day HRMDD ActingManagingDirector.
By the HRMDDirector forServices Group
3.4 Coordinatesreportingschedule of thenewly hired staffto therequestingCenter/Office
None 15 minutes HRM Staff/Officer(HRM – RSP)
3.5 Facilitatescontract signingand endorsesnew hire toCenter/Office
None 5 minutes HRM Staff/Officer(HRM – RSP)
4. Endorsement toSFD For closingof PCN andtransmittal toCenter/Office
None 5 minutes RequestingCenter/Office
146
Total None 2 days, 1hour and 35
minutes
147
ISSUANCE OF CERTIFICATE OF EMPLOYMENT / ENGAGEMENT ANDSERVICE RECORD
The certificate of employment / engagement and Service Record contain information onthe current position, office assignment, salary or honoraria as the case may be, statusof employment and length of service in the Academy. This is issued for whatever legalpurpose it may serve the employee.
Office or Division: Human Resource Management Division (HRMD) - HRMDDClassification: SimpleType of Transaction: G2C - Government to Citizen
G2G - Government to GovernmentWho may avail: Plantilla and Non-Plantilla Personnel (former and incumbent)
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. HRMDD Request Form for
CertificationsHRMDD
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Secure and submitduly accomplishedrequest form (canbe as attachmentto email; if no formattached, mentionspecifics in theemail request)
1. Receive therequest form (orvia email)
None 5 minutes Clerk
HR Officer
HRMD
1.1 Review therequest andclarify details ofrequest ifnecessary
None 10 minutes HR OfficerHRMD
1.2 Prepare therequestedcertificate ofemployment/engagementand /or ServiceRecord (SR)
10 minutes HR OfficerHRMD
148
1.3 Review and signthe certificate /SR (e-signatureif request viaemail; originalsignature if hardcopyrequested)
1 day Clerk
HRM DirectorHRMD
2. Claims requestedcertificate / SR andrates the servicevia the same form(if hard copy;receives soft copyvia email)
2. Releasecertificate / SRafter therequestor hadrated the service(no customerfeedback formfor soft copy)
5 minutes Clerk
HRMD
Total None 1 day, 30minutes
149
PROCESS OF CLASSIFYING CONSULTANTS AND RESOURCEPERSONS (C/RP)
The DAP engages consultants and resource persons who are experts in their fields ofstudy in order to fulfill project requirements. Classifying consultants ensures that thecorrect rate is applied for services they render.
Office or Division: Human Resource Management Division (HRMD) - HRMDDClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: Officers and Staff of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Completed and signed Engagement
Request & Classification Form (ERCF)and CV Highlights Form
Document Management System (DMS)
2. Curriculum Vitae of Consultant/ResourcePerson (C/RP), 1 copy
Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Complete andforwards thefollowing toHRMDD:Curriculum Vitae(CV), EngagementRequest andClassificationForm (ERCF)signed by theProject Manager(PM) and CVHighlights Formsigned by theC/RP
1. Receive and logsthe documentsfrom the client viaSFD
(this step comeslater as we doadvanceprocessing viaDTS)
None 5 minutes HR Officer
HRMD
1.1 If the C/RP’sengagement isconsidered HighlyTechnical, theCenter is advisedto coordinate withthe Bids andAwardsCommittee (BAC)Secretariat forprocessing
None Note:non-applicable
End-userdirects action
to BAC(MC on this –to be finalized/
Approved)
Note:non-applicable
End-user directsaction to BAC
(MC on this – tobe finalized/Approved)
150
1.2 Provide C/RPclassificationwhile validatingclassificationprovided by therequesting Center(indicates this inthe Notes in theDTS)
None 2 workingdays
HR Officer
HRMD
1.3 If classificationdiffers from theone provided bythe requestingCenter, returndocuments toCenter via DTS
None 5 minutes HR Officer
HRMD
2. Providejustification forthe classificationof the C/RP if notin agreementwith classificationof HRMDD; if inagreement, notesthis on theDocumentTracking Sheet
2. Discuss withrequesting Centerto ensureagreement ofclassification(discussion herewould pertain toexchange ofNotes in the DTS)
None 15 minutes HR Officer
HRMD
2.1 Provideattestation for thefinal classificationof the C/RP
None HR Officer
HRMD
2.2 Encode the finalclassification inthe HRIS androute thedocuments backto therequestingCenter/Officethru SFD viaDTS) andforwards thecompleted
None 15 minutes HR Officer
HRMD
151
documents tothe requestingCenter throughSFD (theforwarding toSFD will comelater as this willpertain to hardcopies of thedocuments)
Total None 2 workingdays, 40minutes
152
PROCESS OF REVIEWING AND APPROVING LETTERS OFINVITATION (LOI) FOR CONSULTANTS AND RESOURCE PERSONS(C/RP)
Letters of Invitation (LOI) for Consultants and Resource Persons (C/RP) are reviewedthrough their form and content to ensure that DAP Management, the implementingGroup/Center/Office and the C/RP are completely in agreement with the terms of theengagement.
Office or Division: Human Resource Management Division (HRMD) - HRMDD
Classification: Simple
Type of Transaction: G2G
Who may avail: Resource Persons / Consultants Officers and Staff of the Academy
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Letter of Invitation (LOI) for C/RP signed byGroup Head, 1 original
Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit draft LOIvia DTS
1.1. Review the draftLOI andprovidesfeedback to therequestingCenter through
None 2 workingdays
HR Officer
HRMD
1.2. Return to theoriginatingCenter via DTSif LOI is notaccording to MC2014-007 andmemo datedSept. 23, 2020on RevisedClassification
153
and Rates forCRPs
2. Amendportions of the LOIas necessary
None
3. Forward themended LOI toHRMDD via DTS
3. Receive andreview LOI ifchanges doneare in order andencode thedetails of theLOI in the HRIS
None 15 minutes HR Officer
HRMD
3.1 Affix C/RP’sclassificationlevel (in theRemarks portionin the DTS) andinitials (this stepis for hard copylater)informationprovided
None HR Officer
HRMD
3.2 Forward theLOI to FinanceDepartment forbudgetpurposes (viaDTS)
None 1 minute HR Officer
HRMD
Total None 2 workingdays, 16minutes
154
REQUEST FOR MONETIZATION OF LEAVE CREDITS
Monetization of leave credits aims to provide necessary additional funds to finance theeducation, health or other expenses of the employees.
Office or Division Human Resource Management Division (HRMD) - HRMDDClassification SimpleType of Transaction G2G – Government to GovernmentWho may avail Eligible/qualified Plantilla Based Personnel of the Academy
CHECK LIST OF REQUIREMENTS WHERE TO SECURE1. Application for Leave of Absence (ALA), 1
copy, original, signed by the immediatesuperior
HRMDD
2. Memorandum, signed, from the requestor(if request will monetize 50% or more)
Requestor
CLIENT STEPS AGENCY ACTION FEESTO BEPAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Submit a dulyaccomplishedALA form (forminimum of10 tomaximum of30 vacationleave/VLcredits)
If request formonetization is50% or more ofSL and VLcredits, attachmemorandumwith validreason, to besigned by theHead of Agency
1. Validates VLbalance ofrequestor andreflects the newVL balance in theALA
None 30 minutes HR Officer
HRMD
155
1.1 Prepares Memo,to be signed bythe Director ofHRM Division,addressed to theHead of Agencythrough theFinance Dept.Head
Attachments: include:Service Recordand Leave card
None2 days HR Officer
HRMD
1.2 HRM DivisionDirector reviewsand approves therequest
None HRM DivisionDirector
HRMD
1.3 HRM DivisionDirectorendorses toFinance forbudgetcertification
None HRM DivisionDirector
Finance Dept.
1.4 Routes thememo to theHead of Agency
None 10 minutes Admin Officer
1.5 HR receivesapproved/signedmonetizationrequest andendorsesdocuments/request toServices FrontDesk (SFD) forlogging.
None 10 minutes HR Officer
Total None 2 days, 50minutes
156
MANAGEMENT OF THE DAP BOOTH
DAP ensures the veracity and compliance of its information and communicationmaterials such as booths for conferences and events to the institution’s standards byhaving it reviewed and approved by the DAP IMC.
Office or Division: Institutional Marketing Center (IMC)
Classification: ComplexType ofTransaction: G2G - Government to Government
Who may avail:Government departments, offices, and agencies; private companies;educational institutions; international organizations; DAP Centers,Units and Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy of the Memorandumof request if internal Center/Unit or Letterof request if external request
Requesting Center/Unit
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send a formalmemorandum orletter of requestvia e-mail [email protected]
1. Receive thememorandum withthe attachments
None Five (5)minutes
IMC Staff
1.1 Ask for theManagingDirector’srecommendation& approval.
None Five (5)minutes
ManagingDirector, IMC
1.2 Calendar the eventdate and assign aperson to bein-charged of theBooth
None Two (2) hours ManagingDirector, IMC
1.3 Prepare thestandard designfor the Booth
None Five (5) days IMC Staff
1.4 Send backcomments/recommendationsto the requestingCenter/Unit
None Ten (10)minutes
IMC Staff
157
Total None 5 workingdays, 2
hours, 20minutes
158
PARTNERSHIPS & LINKAGES
DAP forges and sustains linkages and partnerships with training, educational, research,and consulting organizations through its groups and centers.
Office or Division: Institutional Marketing Center (IMC)
Classification: ComplexType ofTransaction:
G2B - Government to Business EntityG2G - Government to Government
Who may avail: Government departments, offices and agencies; private companies;educational institutions ; international organizations
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy of Formal Letter ofRequest/Intent by the Agency
Requesting Agency
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send a formalletter ofrequest/intent forpartnership viaemail [email protected]
1. Review documentsand set a meetingwith the client
None Five (5) days IMCPartnerships
Staff
2. Initialcollaborationmeeting
- Provideinformation onthe assistancethey need fromDAP
- Accomplishnecessary formsprovided by IMC,if needed
2. Initialcollaborationmeeting
- Assess the needsor requests of theclients andendorse them tothe potentialCenter or programin the Academythat can assistthem
None Three (3)hours
IMC ManagingDirector andPartnerships
Staff
3. Confirm if thediscussion willprogress toprojectingcontracting
3. Receive andacknowledgeconfirmation fromclient/potentialpartner
None Fifteen (15)minutes
IMCPartnerships
Staff
159
3.1 Endorse thepotentialpartnership to theappropriateGroup/Center.
None Two (2) hours IMC ManagingDirector
Total None5 working
days, 5hours, 15minutes
160
REVIEW AND APPROVAL OF WEBSITE CONTENT & SOCIAL MEDIAASSETS
DAP ensures the veracity and compliance of its information and communicationmaterials posted online such as social media captions, press releases, online videos,images, web banners, institutional announcements, job postings, and other social mediacontent to the institution’s standards by having them reviewed and approved by DAPIMC.
Office or Division: Institutional Marketing Center (IMC)
Classification: SimpleType ofTransaction: G2G - Government to Government
Who may avail: DAP Centers, Units, and Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy Memorandum ofrequest by the Center/Unit
Requesting Center/Unit
2. One (1) softcopy of Layout Requesting Center/Unit
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send a formalmemorandum ofrequest with theattachedproposedcontent anddesign via [email protected]
(Include thesoftcopy of thecollateral/designlayout)
1. Receive andreview thememorandum andthe attachmentsfor completeness
None Five (5)minutes
IMC Staff
1.1 Review, commentand revise contentif needed
None Two (2) days IMC Staff andManaging
Director IMC
161
1.2 Approve thecontent foruploading
None Thirty (30)minutes
ManagingDirector IMC
1.3 Post content onthe DAP websiteor other socialmedia platforms
None Two (2) hours IMC Staff
Total None 2 workingdays, 2
hours, 35minutes
162
REQUEST FOR IMC TOKENS/COLLATERALS
DAP to further promote its events, programs, and services, provides tokens to its guestsand partners, and produces marketing collaterals for distribution. To ensure complianceto the institution’s standards when it comes to tokens and marketing collaterals, groupsand centers are asked to have proposals for tokens and collaterals reviewed andapproved by DAP IMC.
Office or Division: Institutional Marketing Center (IMC)
Classification: SimpleType ofTransaction: G2G - Government to Government
Who may avail: DAP Centers, Units, and Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy Memorandum ofrequest by the Center/Unit stating thespecific token needed
Requesting Center/Unit
2. One (1) original copy Order slip IMC
3. One (1) original copy Memo fund transfer Requesting Center/Unit
4. Customer satisfaction rating Requesting Center/Unit
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send a formalmemorandum(approved by theManagingDirector of therequestingCenter) with theattacheddocuments forreview via [email protected]
1. Acknowledgereceipt of thememorandum
None Five (5)minutes
IMC Staff
1.1 Send back to therequesting
None Three (3)hours
ManagingDirector, IMC
163
Center/Party andgive some list ofmaterialsavailable withinthe Center
2. Center/Party willfill up the OrderSlip and send aMemo for fundtransfer to IMCfor the requestedmaterials withtheir ManagingDirectorsapproval
2. Receive the OrderSlip of therequested tokenand prepare theavailablecollaterals
None Two (2)working days
IMC Staff
3. Get thetoken/collateralsto the IMC Officeand fill up thecustomersatisfaction rating
3. Receive customersatisfaction form
None Two (2) hours RequestingCenter
Total None 2 workingdays, 5hours, 5minutes
164
REQUEST FOR NEWSPAPER FEATURES
DAP publishes its stories and announcements in print media in order to keep its targetpublics up-to-date with the institution’s programs and offerings. DAP IMC providesassistance to groups and centers that would like to get their stories featured in printmedia.
Office or Division: Institutional Marketing Center (IMC)
Classification: SimpleType ofTransaction: G2B - Government to Business Entity
Who may avail: Public and private organizations
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy Memorandum requestby the Center or Unit
Requesting Center
2. One (1) softcopy of News Article Content Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Sendmemorandumrequest anddocumentsneeded for NewsFeature viae-mail [email protected]
1. Acknowledgereceipt of thememorandum
None Five (5)minutes
IMC Staff
1.1 Providerecommendation& approval
None Thirty (30)minutes
ManagingDirector, IMC
1.2 Review andproofread thearticle
None Six (6) hours IMC Staff
165
1.3 Send Letter ofRequest to Mediaregarding NewsFeature togetherwith the Newsarticle that will beposted
None Two (2)working days
IMC Staff
Total None 2 workingdays, 6
hours, 35minutes
166
REQUEST FOR PRESS CONFERENCE AND MEDIA GUESTING
DAP conducts press conferences in order to disseminate pertinent information about itsprograms and offerings to its target publics. For press conferences and events, DAPIMC provides assistance in facilitating the invitation of guests from media outlets
Office or Division: Institutional Marketing Center (IMC)
Classification: ComplexType ofTransaction: G2G - Government to Government
Who may avail: Public and private organizations
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy Memorandumrequest by the Center or Party
Requesting Center
2. One (1) original and softcopy of the Letterto Media to be invited
Requesting Center
3. One (1) softcopy of News Article Content Requesting Center
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Sendmemorandumrequesting for aschedule ofPressConference andGuestingvia e-mail [email protected]
1. Acknowledgereceipt of thememorandum
None Five (5)minutes
IMC Staff
1.1 Providerecommendationandrecommendation& approval
None Thirty (30)minutes
ManagingDirector, IMC
1.2 Check the dataand availableMedia partner’sschedule ofavailability
None Two (2)working days
IMC Staff
167
1.3 Send Letter ofRequest to theidentified Mediaoutlet regardingthe PressConference &Guesting
None Two (2)working days
IMC Staff
1.4 Send reply slip orletter from MediaPartners to theCenter
None Two (2)working days
IMC Staff
Total None 6 workingdays,
35minutes
168
REQUEST FOR REVIEW AND APPROVAL OF BRIEFER, AVP SCRIPT,AND FINAL REVIEW OF AVP
DAP ensures the veracity and compliance of its information and communicationmaterials such as briefers, audio-visual presentation scripts, and audio-visualpresentations to the institution’s standards by having them reviewed and approved bythe DAP IMCOffice or Division: Institutional Marketing Center (IMC)
Classification: SimpleType ofTransaction: G2G - Government to Government
Who may avail: DAP Centers, Units, and Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy of Memorandum ofrequest if internal Center/Unit
Requesting Center/Unit
2. One (1) photocopy of AVP Script Requesting Center/Unit
3. One (1) copy of the AVP Requesting Center/Unit
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E
1. Send a formalmemorandum orletter of requestvia e-mail [email protected]
1. Receive thememorandumwith theattachments
None Five (5)minutes
IMC Staff
1.1 Review andcomment on theAVP Script/AVP
None Two (2) days IMC ManagingDirector
1.2 Send backcomments/recommendationsto the requestingCenter/Unit
None Ten (10)minutes
IMC Staff
Total None 2 days, 15minutes
169
REQUEST FOR REVIEW AND APPROVAL OF MARKETINGCOLLATERALS DESIGN
DAP ensures the veracity and compliance of its information and communicationmaterials such as brochures, posters, tarpaulins, flyers, invitations, and tokens to theinstitution’s standards by having it reviewed and approved by the DAP IMC.
Office or Division: Institutional Marketing Center (IMC)
Classification: SimpleType ofTransaction: G2G - Government to Government
Who may avail: DAP Centers, Units, and Offices
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy of theMemorandum of request by theCenter/Unit with the attachedsupporting documents (softcopy of thecollateral design/layout)
Requesting Center/Unit
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send a formalmemorandum ofrequest with theattachedproposedcontent anddesign via [email protected]
(Include thesoftcopy of thecollateraldesign/layout)
1. Receive thememorandum withthe attachments
None Five (5)minutes
IMC Staff
1.1 Review andcomment on thecollaterals
None Two (2) days IMC ManagingDirector
1.2 Send backcomments/recommendations
None Ten (10)minutes
IMC Staff
170
to the requestingCenter/Unit
Total None2 workingdays, 15minutes
171
STUDY VISITS / REQUEST FOR INSTITUTIONAL BRIEFING
DAP makes its mandate, programs, and services known to local and internationalorganizations by conducting institutional briefings.
Office or Division: Institutional Marketing Center (IMC)
Classification: Complex
Type ofTransaction:
G2C - Government to CitizenG2B - Government to Business EntityG2G - Government to Government
Who may avail: Public and private organizations
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. One (1) original copy of Formal Letter ofRequest stating the objectives for thebriefing, schedule of the visit, and thenumber and position levels of participantsaddressed to The DAP President, 6/FDAP Building, San Miguel Avenue,Ortigas Center, Pasig City
Requesting Agency
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Send Letter ofRequest/Intentaddressed to theDAP President atleast 10 workingdays before theintended visit viae-mail [email protected]
1. IMC will confirmthe schedule andcomplete thenecessarypreparations
None Six (6)working days
IMC Staff
2. Visit the DAPpremises for thebriefing/tour
2. Give the briefing tothe requestingagency
None Seven (7)hours
ActingManaging
Director, IMC3. Fill-up the
evaluation form3. Provide the
evaluation formNone One (1) hour IMC Staff
Total None6 working
days, 8hours
172
FINAL CONTRACT REVIEW
The final contract review process ensures that all revisions and agreements are formallyacknowledged by all the involved parties. The final contract is printed in seven (7) original copies,reviewed and signed by the DAP Center Head, Group Head, Finance Head, Legal Officer andPresident.
Office or Division: Legal OfficeClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: Development Academy of the Philippines (DAP) Centers and Units
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Memo to President Caronan re: Final
Review of said Contract, 1 copy,original (signed by Group Head,Center Head, Project Manager)
Concerned Center/Office
2. Project Information, 1 copy, original Concerned Center/Office3. Contract Review Routing Form
(CRRF), 1 copy, original (signed byCenter Head, Group Head, Finance,Legal)
Concerned Center/Office
4. Final Contract, 7 copies, original Concerned Center/Office5. Project/Training Proposal, 1 copy,
originalConcerned Center/Office
6. Project Implementation Plan (PIP), 1copy, original
Concerned Center/Office
7. Project Logical Framework, 1 copy,original
Concerned Center/Office
8. Certificate of Availability of Funds(CAF), 1 copy, original
Concerned Center/Office
9. Notice of Award (NOA), 1 copy,original
Concerned Center/Office
10.Notice to Proceed (NTP), 1 copy,original
Concerned Center/Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. ConcernedCenter/ Officeforwards(physically/ orthru email)revised Contractand attachmentsto Legal
1. Acknowledgesreceipt andchecks forwardeddocs
Incompletedocumentation will bereturned to theoriginating Center.
None 15 minutes Legal Staff
173
1.1 Legal Officerreviewsdocuments tocheck ifcorrections and/orcomments wereincorporated
Affixes thesignature/e-sig in theMemo for FinalReview.
None 2 days & 4hours
Chief LegalCounsel
1.2 Forwards docs tothe Office of thePresident (OP) forendorsement
None 15 minutes Legal Staff
Total None 2 days, 4hours and 30
minutes
174
INITIAL CONTRACT REVIEW
The DAP Legal Services reviews contracts with clients, consultants, third party service providers andother parties such as Memorandum of Agreement, Service Agreement, Letter of Conforme, etc.
Upon the formal confirmation of a client to proceed with a project, DAP initiates the crafting andreview of a contract to ensure that all expectations and commitments from all the involved partiesare well documented. The project contract is initially reviewed internally by the project team, CenterHead, Group Head, Finance Head and Legal Officer.
Office or Division: Legal OfficeClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: Development Academy of the Philippines (DAP) Centers and Units
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Document Tracking Sheet (DTS), 1
copy, original Concerned Center/Office2. Contract Review Routing Form
(CRRF), 1 copy, original (signed byCenter Head, Group Head, Finance)
Concerned Center/Office
3. Draft Contract (MOA, MOU, Contractof Service, Contract for ServiceProviders), 1 copy (softcopy andhardcopy)
Concerned Center/Office
4. Project/Training Proposal, 1 copy(softcopy and hardcopy)
Concerned Center/Office
5. Project Implementation Plan (PIP), 1copy, original
Concerned Center/Office
6. Summary of PIP, 1 copy, original Finance Office7. Project Logical Framework, 1 copy,
originalConcerned Center/Office
175
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. ConcernedCenter/ Officeforwards(physically/orthru email or theonline DTS)Contract andattachments toLegal (InitialReview)
1. Acknowledgesreceipt andcheckscompleteness ofthe forwardeddocuments forreview
Incompletedocumentation will bereturned to theoriginating Center.
None 15 minutes Legal Staff
1.1 Legal Officerprovidescomments andrevisions on theContract.
Affixes thesignature/e-sig in theCRRF.
None 2 days & 4hours Chief Legal
Counsel
1.2 Returns docs toConcernedCenter/Office toincorporatecorrections and/orcomments of theLegal Officer
None15 minutes Legal Staff
Total None 2 days, 4hours and 30
minutes
176
REQUEST FOR LEGAL OPINION
The DAP Legal Services provides legal advice and opinion to concerned Center/Offices of theAcademy, upon request.
Office or Division: Legal Office
Classification: ComplexType of Transaction: G2G - Government to GovernmentWho may avail: Development Academy of the Philippines (DAP) Centers and Units
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Document Tracking Sheet (DTS), 1
copy, originalConcerned Center/Office
2. Memo/Email re: Request for LegalOpinion, 1 copy, original
Concerned Center/Office
3. Other pertinent documents such ascontracts, TORs, receipts, posting,and other documents relevant to theinquiry for reference, 1 copy, original
Concerned Center/Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. ConcernedCenter/ Officeforwards(physically/orthru email)Memo andpertinentdocuments toLegal
1. Acknowledgesreceipt of Memo/Email and otherpertinentdocuments
None 15 minutes Legal Staff
1.1 Legal Officerprovides/writesopinion
None 6 days & 4hours
Chief LegalCounsel
1.2 Returns docs/emails opinion toConcernedCenter/Office
None 15 minutes Legal Staff
Total None 6 days, 4 hrsand 30
minutes
177
ISSUANCE OF BAC RESOLUTIONS FOR ACADEMIC, SCHOLARLY ORARTISTIC WORK, EXCLUSIVE TECHNOLOGY AND MEDIA SERVICES(SEC. 53.6) OR HIGHLY TECHNICAL CONSULTANTS (SEC. 53.7)
This process described the procurement of Consulting Services following the conditionsof Annex H of the 2016 Revised Implementing Rules and Regulations of RA 9184.
Office or Division: Logistics DivisionClassification: Highly TechnicalType ofTransaction:
G2G - Government to Government
Who may avail: DAP EmployeesCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter of Invitation (endorsed by HR,as determined and classified as“Consultant” as per RA 9184)
DAP Document Management System (DMS)
2. Documentary Requirements, whetherSec. 53.6 or 53.7, as attached to theendorsed LOI by HR.
Refer to Annex H of the 2016 Revised IRR of RA9184.
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. HR staff toendorse to theBAC Secretariatthe evaluatedand determinedLOI from theEnd User,whether underSec. 53.6 or53.7, withcompletedocumentaryrequirements.
1. Receive completedocuments
None 5 minutes HR staff
2. Drafting of BACResolution
2. Draft BACResolution forreview of End Userand BAC Members
None 3 days BACSecretariat,
End User, andBAC members
3. Finalization ofBAC Resolution
3. Finalize the BACResolution for thesignature of BACmembers
None 7 days BAC Membersand BAC
Secretariat
Total None 10 days and5 minutes
178
LEASE OF VENUE
Refers to training centers, convention halls, hotels, and similar establishments catering totrainings, seminars, conferences, conventions, symposia and similar gatherings requiring theofficial participation of government officials and employees. This may include meals andaccommodation.
Office or Division: Logistics Division
Classification: Complex
Type ofTransaction:
G2G - Government to Government
Who may avail: DAP Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Purchase Request (PR) End-user / RequestorPurchase Request form: DAP DocumentManagement System (DMS)
2. Justification (If Privately owned venue orthere is an available publicly ownedvenue that complies with therequirements) that privately owned venueis more efficient and economical to thegovernment.
End-user / Requestor
3. Copy of Pre-market survey conducted. End-user / Requestor
CLIENT STEPS AGENCY ACTIONS FEES TO BEPAID
PROCESSINGTIME
PERSONRESPON
SIBLE
1. Submission ofApprovedPurchaseRequest
1.1 Receipt of BudgetedPurchase Requestand processesthe transaction in theDocument TrackingManagementSystem (DTMS) None
15 minutes pertransaction
LogisticsDivision/Property
ManagementStaff
LogisticsDivision/Property
ManagementSection
179
1.2 Evaluates thecompleteness of PR(specifications,authorizedsignatories,presence ofjustification) andreflects feedback inthe DTMS None
30 minutes pertransaction
LogisticsDivision/Property
ManagementStaff
LogisticsDivision/Property
ManagementSection
1.3 Encodes thetransaction togenerate/assign PRnumber in theProcurementManagementSystem (PMS) None 15 minutes per
transaction
LogisticsDivision/Property
ManagementStaff
LogisticsDivision/Property
ManagementSection
1.4 Prepares Request forQuotation (RFQ),includingspecifications/ termsof reference/scopeof work None 45 mins. per
transaction
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
180
1.5 Disseminates RFQto at least three (3)Suppliers.
If catering servicesoutside the lease ofvenue, please referto Procurement ofGoods and Servicesthrough Shoppingand Small ValueProcurement.
None45 mins. pertransaction
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
1.6 Secure RFQ’s
The deadline forsubmission may beextended thrice, ifno quotationreceived.
Endorse PR toEnd-user if noquotation from thethird posting wasreceive forevaluation/updating of PR.
None
Refer to 2016Revised
ImplementingRules and
Regulationsof RA 9184,Annex “H”.
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
2. Receive andreview copy ofproposal/quotations andconfirms venuechoice
2.1 Prepares andendorses tosignatories Abstractof Quotation (AOQ),including theevaluated contractterms & conditions None 45 minutes per
transaction
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
181
2.2 Request and securefor Certificate ofAvailability of Funds(CAF) fromAccounting Division
None 1 day
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
2.3 Send CAF tosupplier forcontracting
None 10 minutes
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
2.4 Secure and Evaluatepropose contract.
None 60 minutes
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
2.5 Process contract forsignature ofauthorizedsignatories None 2 days
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
182
Canvassingand
ProcurementSection
2.6 Provide End-user /Requestor copy ofsigned contract.
None 10 minutes
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
Total 0 7 days, 5hrs.if proposal/s
is/arereceived on
the firstdissemination
of RFQ.
15 days, 5hrs.if proposal/s
is/arereceived on
the thirddissemination
of RFQ.
183
PROCUREMENT OF GOODS AND SERVICES THROUGH SHOPPINGAND SMALL VALUE PROCUREMENT
This process described the acquisition of Goods and Services amounting to P1 millionand below.
Office or Division: Logistics DivisionClassification: ComplexType ofTransaction:
G2G - Government to Government
Who may avail: DAP EmployeesCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Purchase Request (PR) End-user / RequestorPurchase Request form: DAP DocumentManagement System (DMS)
2. Approved ICT Clearance for I.T.Equipment, 1, original
COSM
3. Approved Furniture Clearance forFurniture, 1, original
GSD
4. Approved Fixtures Clearance forFixtures, 1, original
GSD
5. Approved Library Clearance forBooks, 1 original
Library
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSING TIME
PERSONRESPONSIBL
E1. Submission of
ApprovedPurchaseRequest
1. Receipt ofBudgetedPurchaseRequest andprocesses thetransaction in theDocumentTrackingManagementSystem (DTMS)
None 15 minutesper
transaction
LogisticsDivision/Property
ManagementStaff
LogisticsDivision/Property
ManagementSection
1.1 Evaluates thecompleteness ofPR(specifications,clearance,authorized
None
30 minutesper
transaction
LogisticsDivision/Property
ManagementStaff
184
signatories,availability ofitem) and reflectsfeedback in theDTMS
LogisticsDivision/Property
ManagementSection
1.2 Encodes thetransaction togenerate/assignPR number in theProcurementManagementSystem (PMS)
None 15 minutesper
transaction
LogisticsDivision/Property
ManagementStaff
LogisticsDivision/Property
ManagementSection
1.3 PreparesRequest forQuotation (RFQ),includingspecifications/terms ofreference/scopeof work
None 45 minutesper
transaction
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
1.4 DisseminatesRFQ to at leastthree (3)Suppliers for PRwith totalestimated cost of50K below.
None Refer to 2016Revised
ImplementingRules and
Regulations ofRA 9184,
Annex “H”.
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
185
1.5 Post RFQ toPhilGEPS websitefor PR with totalestimated cost of50K above butdoes not exceed1M
None Refer to 2016Revised
ImplementingRules and
Regulations ofRA 9184,
Annex “H”.
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
1.6 Secure RFQ’s (atleast 3 pricequotations mustbe obtain forshopping or 1price quotationmay suffice forSmall ValueProcurement.
The deadline forsubmission maybe extendedthrice, if none orless than therequired numberof quotations arereceived.
Endorse PR toEnd-user if noquotation from thethird posting wasreceive forevaluation/updating of PR.
None Refer to 2016Revised
ImplementingRules and
Regulations ofRA 9184,
Annex “H”.
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
1.7 Prepares andendorses tosignatoriesAbstract ofQuotation (AOQ),including theevaluated contract
None 45 minutesper
transaction
LogisticsDivision/
Canvassingand
ProcurementStaff
186
terms &conditions
LogisticsDivision/
Canvassingand
ProcurementSection
1.8 Prepares andendorses tosignatories thePurchase Order(PO), includingthe evaluatedcontract terms &conditions
None 45 minutesper
transaction
LogisticsDivision/
Canvassingand
ProcurementStaff
LogisticsDivision/
Canvassingand
ProcurementSection
Total None
Procurement through Alternative Methods of Procurement is covered under Republic ActNo. 9184 or the Government Procurement Reform Act.
187
PROCUREMENT THROUGH COMPETITIVE BIDDING (GOODS ANDSERVICES, INFRASTRUCTURE PROJECTS, AND CONSULTINGSERVICES)The Procurement through Competitive Bidding as prescribed by Republic Act No. 9184,entitled “An Act Providing for the Modernization, Standardization and Regulation of theProcurement Activities of the Government and for other Purposes”, otherwise knownGovernment Procurement Reform Act, refers to a method of procurement which is opento participation by any interested party and which consists of the following processes:advertisement, pre-bid conference, eligibility screening of prospective bidders, receiptand opening of bids, evaluation of bids, post-qualification, and award of contract.
Office or Division: Logistics DivisionClassification: Highly TechnicalType ofTransaction:
G2G - Government to Government
Who may avail: DAP EmployeesCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Purchase Request End-user / RequestorPurchase Request form: DAP DocumentManagement System (DMS)
2. Official Bidding Documents (OBD)as indicated in 2016 RevisedImplementing Rules and Regulations ofRA 9184
GPPB Website
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E1. Submit duly
approved andbudgetedPurchaseRequest withattached draftOfficial BiddingDocuments andProposedTechnicalWorking Group(TWG)Members.
1. Receive completedocuments
None 5 minutes BACSecretariat
Staff
1.1 Draft a ProposedBAC Schedule andBAC Resolutioncreating TWG.
3 days BACSecretariat
Staff
188
1.2 Provideadministrative
support to the BACand TWG. (i.e. BAC
Approval of BACSchedule and BACResolution creating
TWG,Pre-Procurement
Conference,Advertisement,
Pre-Bid Conference,Receipt and
Opening of Bids, BidEvaluation,
Post-Qualification,Approval of
Resolution/Issuanceof Notice of
Award/Notice ofDisqualification)
None Goods andServices: 26
calendar days(minimum
calendar daysrecommended
for activity)and 136
calendar days(maximum
calendar daysrecommended
for activity);Infrastructure
Works: 26calendar days
(minimumcalendar daysrecommended
for activity)and 141 or
156 calendardays
(maximumcalendar daysrecommended
for activity);Consulting
Services: 36calendar days
(minimumcalendar daysrecommended
for activity)and 180
calendar days(maximum
calendar daysrecommended
for activity);Refer to 2016
RevisedImplementing
Rules andRegulations of
BACSecretariat
Staff
189
RA 9184,Annex “C”.
Total NoneProcurement through Competitive Bidding (Goods and Services, Infrastructure Projects, andConsulting Services) is covered under Republic Act No. 9184 or the GovernmentProcurement Reform Act.
Appendix 8 of the 2016 Revised IRR of RA 9184 or the Guidelines on the Sale ofBidding Documents:
Approved Budget for the Contract Maximum Cost of Bidding Documents(in Philippine Peso)
500,000 and below 500.00More than 500,000 up to 1 Million 1,000.00More than 1 Million up to 5 Million 5,000.00More than 5 Million up to 10 Million 10,000.00More than 10 Million up to 50 Million 25,000.00More than 50 Million up to 500 Million 50,000.00More than 500 Million 75,000.00
190
REQUISITION AND ISSUANCE OF SUPPLIES IN STOCK
This process describes the withdrawal of items held in stock, from the Central StockRoom.
Office or Division: Logistics DivisionClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: DAP Employee
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Requisition and Issuance of Stock
Form, 1Downloadable to DAP DocumentManagement System (DMS)
2. Approved Budget Utilization Slip,original
Budget Office 3rd/F
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E1. Forward signed
RIS Form toServices FrontDesk (SFD)
Note:This form shall beprepared in threecopies
1. Receive ofBudgeted RIS
None 5 minutes LogisticsDivision -Property
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.2 Issue the Stockindicated in theRIS
None 50 minutesper
transaction
LogisticsDivision -Property
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
Total None 55 minutes
191
RETURN OF PROPERTY
This process covers the return of DAP property from one Accountable Person to theLogistics Division’s - Property & Supply Management Section.
Office or Division: Logistics DivisionClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: DAP Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Copy of Property AcknowledgementReceipt (PAR) and/ or Inventory CustodianSlip or Summary of Accountability
Summary of Accountability
Current Property Owner
Logistics Division - Property & SupplyManagement Section
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Endorses /ReturnsProperty
1. ReceivesProperty
None 5 minutes peritem
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.1 Prepares InvoiceReceipt forProperty (IRP)
None 30 minutesper item
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
192
1.2 Endorses IRP toPropertyCustodian forSignature
None 15 minutesper
transaction
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.3 Sign the IRP None 15 minutesper
transaction
Director,LogisticsDivision
1.4 AdvisesaccountablePerson throughemail to receiveIRP from Property& SupplyManagementSection
None 15 minutesper
transaction
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.5 Issues signed IRPto accountableperson
None 15 minutesper
transaction
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
Total None 1 hour, 35minutes
193
TRANSFER OF PROPERTY
This process covers the transfer of DAP property from one Accountable Person toanother Accountable Person, through the Logistics Division’s - Property & SupplyManagement Section.
Office or Division: Logistics DivisionClassification: SimpleType of Transaction: G2G - Government to GovernmentWho may avail: DAP Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Copy of Property Acknowledgement
Receipt (PAR) and/ or InventoryCustodian SlipOrSummary of Accountability
Current Property Owner
Logistics Division - Property & SupplyManagement Section
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Endorse / ReturnProperty
1. Receive Property None 5 minutes peritem
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.1 Prepare InvoiceReceipt forProperty (IRP)and PropertyAcknowledgement Receipt/
Inventory CustodianSlip (PAR/ICS)
None 30 minutesper item
LogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
194
1.2 Endorse IRP andPAR/ICS toPropertyCustodian forSignature
None 15 minutesper
transaction
LogisticsDivision
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.3 AdviseaccountablePerson throughemail to receiveIRP and PAR/ICSfrom PropertyManagement Unit
None 15 minutesper
transaction
LogisticsDivision -Property
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
1.4 Issue item toAccountablePerson (User)with PAR/ICS
None20 minutes
per itemLogisticsDivision -
Property &Supply
ManagementStaff
LogisticsDivision -
Property &Supply
ManagementSection
Total None 1 hour, 25minutes
195
REQUEST FOR BOARD RESOLUTIONS
Board Resolutions may be crafted and issued upon request of Management for theBoard’s decision on matters concerning the organization.
Office or Division: OFFICE OF THE BOARD SECRETARYClassification: Highly TechnicalType of Transaction: G2G-Government to GovernmentWho may avail: Board of Trustees, DAP Officers
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Fully filled out Request Form, 1 ,
originalOnline Document Management System(DMS) DAP Controlled forms V.1.
2. Cover Letter, 1, original, signed Requesting Office3. Completed Staff Work (CSW)
supporting the Approval of BoardResolution.
Requesting Office
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E1. Sends completed
request form andattachments
1. Reviewscompleteness ofrequirements.
For incompleterequirements, thedocuments are sentback to the requesterwith comments.
None 5 minutes Office of theBoard
Secretary
BoardSecretary Staff
1.1 Makes a draftBoard Resolutionendorsed by themanagement tothe Office of theCorporateSecretary withcover letter andsupportingdocuments.
None 1 hour
This is usuallyprepared three
(3) workingdays beforethe intendedsigning and
approval of theOriginal, for
BOTcomments orsuggestion.
Office of theBoard
Secretary
BoardSecretary Staff
196
1.2 Sends advancedcopy marked as“DRAFT” to besent to allmembers of theBOT with theirsecretaries copyfurnished.
None 10 minutes Office of theBoard
Secretary
BoardSecretary Staff
1.3 Reviews andprovidescomments for thedraft BoardResolution
None 7 days
PD No. 1061identifies allmembers of
the DAP BOTwho must beapprised ofany pendingresolutions.
Members of theDAP Board of
Trustees
1.4 IncorporatesComments andinputs from theBoard to beincorporated indraft and theresolutionfinalized.
None
1 hourOffice of the
BoardSecretary
BoardSecretary Staff
1.5 Coordinates withall BOTsecretaries (viaphone, email orsite visit) toinquire about theavailability of theBoard to sign andapprove theresolution.
None
1 day
Office of theBoard
Secretary
BoardSecretary Staff
1.6 Informs therequestor that theresolution hasbeen signed;furnish copy torequestor.
NoneOffice of the
BoardSecretary
BoardSecretary Staff
197
All original copies ofthe Resolutions will bekept by the OCS.Original copies mustbe scanned forrecords purposes.
Total None 8 days, 2hours and 15
minutes
198
REQUEST FOR SECRETARY’S CERTIFICATION
The Secretary’s Certification is issued upon the request of the Management, membersof the Board, banks, and other oversight agencies to certify corporate acts and records.
Office or Division: OFFICE OF THE BOARD SECRETARYClassification: COMPLEXType of Transaction: G2G-Government to GovernmentWho may avail: BOARD OF TRUSTEES, DAP OFFICERS, BANKS, AND
OVERSIGHT AGENCIESCHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Fully filled out Request Form, 1,original
Online Document Management System(DMS) DAP Controlled forms V.1.
2. Cover Letter, 1, original, signed Requesting Office3. Documents for Certification Requesting Office or the OCS
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Fill out arequest formsigned andapproved by theImmediateSupervisor.
1. Reviewscompleteness ofrequirements andinforms therequestor when toexpect therequesteddocument.For incompleterequirements, thedocuments are sentback to therequester withcomments.
None 5 minutes Office of theBoard
Secretary
BoardSecretary Staff
1.1 Preparedocuments.
None 1 hour Office of theBoard
Secretary
BoardSecretary Staff
199
1.2 ProvideCertification andinforms therequestor ofavailability of thedocument.
In case requestcannot be granted,the Secretariatinforms therequestor of thereason why therequest cannot begranted.
None 7 workingdays
PD No. 1061identifies allmembers of
the DAP BOTwho must beapprised ofany pendingresolutions.
Members of theDAP Board of
Trustees
1.3 Inform therequestor ofavailability of thedocument.
In case requestcannot be granted,the Secretariatinforms therequestor of thereason why therequest cannot begranted.
None 5 minutes Office of theBoard
Secretary
BoardSecretary Staff
Total None 7 days, 1hour and 10
minutes
200
REQUEST FOR APPOINTMENT WITH THE DAP PRESIDENT BYINTERNAL CLIENTS
Requests for appointment with the DAP President are confirmed through the staff of theOffice of the President, after careful review and internal consultation.
Office or Division: Office of the President (OP)Classification: SimpleType ofTransaction:
G2G - Government to GovernmentG2C – Government to Citizen
Who may avail: Development Academy of the Philippines (DAP) Centers and UnitsCHECKLIST OF REQUIREMENTS WHERE TO SECURE
For internal clients (either/or):1. Memoranda, 1, original, signed2. Official letter, 1, original, signed3. Official email
Requesting DAP centers/ units
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBL
E
1. Requestconfirmationand attendanceof the DAPPresident oncertainevents/activities.
1. Receive officialinvitation or requestfor appointment andprovideacknowledgement, ifsent via email.
None 3 Minutes
Office of thePresident
Clerk(Front Desk)
1.1 Print invitation, ifsent through email,record invitations/request forappointment to theData TrackingManagementSystem (DTMS).and forward to thetechnical staff forschedulemanagement
None 3 Minutes
Office of thePresident
ProjectAssistant
(ReceivingOfficer)
Project Officer(Technical
Staff)
1.2 Classify invitationaccording toappropriateness
None 1 working dayOffice of the
President
Project Officer
201
and availability ofthe DAP President.
a. If appropriate forthe DAPPresident, it willbe plotted on thePresident’s officialcalendar forconsideration andapproval.
b. If the invitation isnot appropriate forthe DAPPresident, it willbe forwarded andendorsed to theappropriatecenter/unit
(TechnicalStaff)
1.3 Send invitation,program/ agenda,and other meetingmaterials includingmeeting links (forvirtual meetings) tothe DAP Presidentand HEA & CoS
1.4 Approve invitation/request forappointment.
None 2 workingdays
President andCEO of DAP
Total None 3 days, 6minutes
202
REVIEW AND APPROVAL OF THE DAP PRESIDENT (ONLINEPROCESSING)
For shifting to online processing, administrative, technical, operational and functionalsupervision and control over all groups and units of the Academy is still exercised. Allcompleted documents that need approval and signature of DAP President shall besubmitted either via email or through the Data Tracking System (DTS) and processed atthe Office of the President.
Office or Division: Office of the PresidentClassification: Simple, Complex or Highly Technical depending on type of documentType ofTransaction:
G2G - Government to Government
Who may avail: Development Academy of the Philippines (DAP) Centers and UnitsCHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Documents that need approval
and electronic signature of thePresident of the Academy, 1,original signed (scanned copy) ordigital signed documents
a. (see specified documents,per process classification)
DAP Centers and Units
2. Document Tracking Sheet (DTS),(including Daily Time Recordsubmission), 1, original
DAP Centers and Units
3. E-signature Request Form DAP Centers and Units4. Covering memo (except for Daily
Time Record), withapproval/disapproval/remarks box
DAP Centers and Units
5. Endorsement from Legal forComplex and Highly Technicaldocuments (e.g. MOA, BACrelated documents such as BoardResolutions)
DAP Centers and Units
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
A. Simple1. Request forapproval andsignature of thefollowingdocuments:
a. TravelDocuments
1. Receive thedocuments forsignature ofDAP President,either via emailor Data TrackingSystem (DTS).
None 5 Minutes Office of thePresident
Project Assistant(Receiving Officer)
203
b. Travelrequestform forpersonaland officialtravel
c. TravelOrder/TravelItinerary
d. TravelAuthority
e. Daily TimeRecords
f. Letter ofInvitation(LOI)
g. Request forMonetization of VL/SL
h. Payrolli. Special
Ordersj. Memo on
Notices/announcements
k. PurchaseRequest
l. ServiceAgreements(Non-PlantillaPersonnel)
m. Approval ofScholarshipGrant
1.1 Check thecompleteness ofthe documents.
Incompletedocuments willbe returned to
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
204
the requestor forcompletion.
1.2. Recorddocuments inthe DataTrackingManagementSystem (DTMS).
Simultaneouslyuploading ofdocuments toOP’s database(google drive)
Forward emailrequest to theTechnical Officerand HEA andCoS for review.Tag priorityconcerns as“URGENT” inthe forwardedemail.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
Project Officer(Technical Staff)
1.3. Reviewdocuments andprovidecompleted staffwork prior toendorsement toDAP Presidentfor approval.
None
30 Minutes
Office of thePresident
Project Officer(Technical Staff)/Head Executive
Assistant(Chief of Staff)
1.4. Approval ofdocuments None 2 working
daysPresident and CEO
of DAP
1.5. Processdocuments byplacing/ affixingDAP President’selectronic
None 5 minutes perdocument
Project Officer(Technical Staff)
205
signature onappropriatedocuments.
2. Transmittal ofsigned andapproveddocuments
2. Update status ofdocuments inDTMS
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
2.1. Reverting ofsigneddocuments torespective units/
Centers via email orData TrackingSystem (DTS)
None 5 Minutes Office of thePresident
Project Officer(Technical Staff)Project Assistant
(Receiving Officer)
B. Complex1. Request for
approval andsignature ofthe of thefollowingdocuments:
a. Appointment ofPlantillaPersonnel
b. Contracts(e.g.MOA,MOUs,VAS)
c. FinancialDocuments
d. (e.g.budget,financialreports,etc.)
e. DAPPoliciesand
2. Receive thedocuments forsignature ofDAP President,either via emailor Data TrackingSystem (DTS).
None 5 Minutes Office of thePresident
Project Assistant(Receiving Officer)
206
Issuances(e.g.MemorandumCirculars,OfficeOrders)
2.1. Check thecompleteness ofthe documents.
Incompletedocuments will bereturned to therequestor forcompletion.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
2.2. Recorddocuments inthe DataTrackingManagementSystem (DTMS).
Forward emailrequest to theTechnical Officerand HEA and CoSfor review. Tagpriority concerns as“URGENT” in theforwarded email.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
2.3. Reviewdocuments andprovidecompleted staffwork prior toendorsement toDAP Presidentfor approval.
None
30 Minutes
Office of thePresident
Project Officer(Technical Staff)Head Executive
Assistant(Chief of Staff)
2.4. Approval ofdocuments None 5 working
daysPresident and CEO
of DAP
207
2.5. Processdocuments byplacing DAPPresident’selectronicsignature onappropriatedocuments.
None 10 minutes perdocument
Project Officer(Technical Staff)
2. Transmittal ofsignedand approveddocuments viaemail or DTS
3. Update status ofdocuments in
DTMSNone 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
3.1. Reverting ofsigneddocuments torespective units/
Centers via email orData TrackingSystem (DTS)
None 5 Minutes Office of thePresident
Project Officer(Technical Staff)Project Assistant
(Receiving Officer)
C. Highly Technical1. Request for
approval andsignature of theof the followingdocuments:
a. BACDocuments
b. BoardResolutions
1. Receive thedocuments forsignature ofDAP President,either via emailor Data TrackingSystem (DTS).
None 5 Minutes Office of thePresident
Project Assistant(Receiving Officer)
1.1. Check thecompleteness ofthe documents.
Incompletedocuments will bereturned to therequestor forcompletion.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
208
1.2. Recorddocuments inthe DataTrackingManagementSystem (DTMS).
Forward emailrequest to theTechnical Officerand HEA and CoSfor review. Tagpriority concerns as“URGENT” in theforwarded email.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
1. 3. Reviewdocuments andprovidecompleted staffwork prior toendorsement tothe DAPPresident forapproval.
None
3 Hours
Office of thePresident
Project Officer(Technical Staff)Head Executive
Assistant(Chief of Staff)
1.4. Approval ofdocuments None 10 working
DaysPresident and CEO
of DAP
1.5. Processdocuments byplacing DAPPresident’selectronicsignature onappropriatedocuments.
None 7 minutes perdocument
Project Officer(Technical Staff)
2. Transmittal ofsigned andapproveddocuments viaemail or DTS
2. Update status ofdocuments inDTMS
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
209
2.1. Reverting ofsigneddocuments torespective units/
Centers via email orData TrackingSystem (DTS)
None 5 Minutes Office of thePresident
Project Officer(Technical Staff)Project Assistant
(Receiving Officer)
Total None Simple: 2days, 58minutes
Complex: 5days, 68minutes
HighlyTechnical:10days, 3 hrs
and 30minutes
210
REVIEW AND APPROVAL OF THE DAP PRESIDENT (PHYSICALDOCUMENTS)
Exercising administrative, technical, operational and functional supervision and controlover all groups and units of the Academy, all completed documents that need approvaland signature of DAP President shall be submitted and processed at the Office of thePresident.
Office or Division: Office of the PresidentClassification: Simple, Complex or Highly Technical depending on type of documentType ofTransaction:
G2G - Government to Government
Who may avail: Development Academy of the Philippines (DAP) Centers and UnitsCHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Documents that need approval
and signature of the President ofthe Academy, 1, original, signed(see specified documents, perprocess classification)
DAP Centers and Units
2. Document Tracking Sheet (DTS),(including Daily Time Recordsubmission), 1, original
DAP Centers and Units
3. Covering Memo (except for DailyTime Record), 1, original, signed
DAP Centers and Units
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
A. Simple1. Request for
approval andsignature ofthe followingdocuments:a. Travel
Documentsb. Travel
requestform forpersonaland officialtravel
c. TravelOrder/TravelItinerary
1. Receive thedocuments forsignature of DAPPresident.
None 3 Minutes Office of thePresident
Clerk(Front Desk)
211
d. TravelAuthority
e. Daily TimeRecords
f. Letter ofInvitation(LOI)
g. Request forMonetization of VL/SL
h. Payrolli. Special
Ordersj. Memo on
Notices/announcements
k. PurchaseRequest
l. ServiceAgreements(Non-PlantillaPersonnel)
m. Approval ofScholarship Grant
1.1 Classifydocumentsaccording tourgency andchecks itscompleteness
Incompletedocuments will bereturned to therequestor forcompletion.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
1.2 Recorddocuments inthe DataTracking
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
212
ManagementSystem (DTMS)
1.3 Reviewdocuments andprovidecompleted staffwork prior toendorsement toDAP President
None
30 Minutes
Office of thePresident
Project Officer(Technical Staff)
Head ExecutiveAssistant
(Chief of Staff)
1.4 Approve andsign documents None 2 working
daysPresident and CEO
of DAP
2. Receivesignedand approveddocuments
2. Check thecompleteness ofthe neededsignature andupdate status ofdocuments inDTMS
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
2.1 Release anddeliver of signeddocuments torespectiveunits/centers
None 10 Minutes Office of thePresident
Clerk(Front Desk)
B. Complex1. Request for
approval andsignature ofthe of thefollowingdocuments:
a. Appointment ofPlantillaPersonnel
b. Contracts(e.g.MOA, MOUs,VAS)
1. Receive thedocuments forsignature of DAPPresident.
None 3 Minutes Office of thePresident
Clerk(Front Desk)
213
c. FinancialDocuments
d. (e.g.budget,financialreports,etc.)
e. DAPPoliciesandIssuances (e.g.MemorandumCirculars,OfficeOrders)
1.1 Classifydocumentsaccording tourgency andcheck itscompleteness
For incompletedocuments, itwill be returnedto the client forcompletion.
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
1.2 Recorddocuments tothe DataTrackingManagementSystem (DTMS)
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
1.3 Reviewdocuments andprovidecompleted staffwork prior to
None 4 Hours
Office of thePresident
Project Officer(Technical Staff)
214
endorsement toDAP President
Head ExecutiveAssistant
(Chief of Staff)
1.4 Approve andsignsdocuments None 6 working
DaysPresident and CEO
of DAP
2. Receivessignedand approveddocuments
2. Check thecompleteness ofthe neededsignature.Update status ofdocuments in
DTMS
None 10 Minutes
Office of thePresident
Project Officer(Technical Staff)
Project Assistant(Receiving Officer)
2.1 Release anddeliver of signeddocuments torespectiveunits/centers
None 10 Minutes Office of thePresident
AdministrativeOfficer
(Front Desk)
C. Highly Technical1. Request for
approval andsignature ofthe of thefollowingdocuments:a. BAC
Documents
b. BoardResolutions
1. Receives thedocuments forsignature ofDAP President.
None 3 Minutes Office of thePresident
Clerk(Front Desk)
1.1 Classifydocumentsaccording tourgency andchecks itscompleteness
For incompletedocuments, it
None 5 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
215
will be returnedto the client forcompletion.
1.2 Recorddocuments tothe DataTrackingManagementSystem (DTMS)
None 3 Minutes
Office of thePresident
Project Assistant(Receiving Officer)
1.3 Reviewdocuments andprovide thecompleted staffwork prior toendorsement toDAP President
None
3 Hours
Office of thePresident
Project Officer(Technical Staff)Head Executive
Assistant(Chief of Staff)
1.4 Approve andsign documents None 10 working
DaysPresident and CEO
of DAP
2. Receivessigned andapproveddocuments
2. Check thecompleteness ofthe neededsignature.Update status ofdocuments inDTMS
None 3 Minutes
Office of thePresident
Project Officer(Technical Staff)
Project Assistant(Receiving Officer)
2.1 Release anddeliver signeddocuments torespectiveunits/centers
None 10 Minutes Office of thePresident
Clerk(Front Desk)
Total None Simple: 2days, 54minutes
Complex: 6days, 4 hrs
and 31minutes
216
HighlyTechnical:10days, 3 hrs
and 24minutes
217
REQUEST FOR INVESTIGATION
These are requests made by DAP employees to investigate cases of missing supplies,equipment or altercations.
Office or Division: Office of the Senior Vice President for Services (OSVP-S)Classification: ComplexType of Transaction: G2G-Government to GovernmentWho may avail: DAP employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Memo from client, 1 original,
signed Center or Office concerned
2. List of people involved, 1 copy Center or Office concerned3. Copy of Purchase Request of
missing equipment, 1 copy, signed Logistics/Center or Office concerned
4. Copy of Requisition and IssuanceSlip of missing supplies, 1 copy,signed
Property/Center or Office concerned
5. Logbook of inventories of supplies Center or Office concerned6. Records of equipment use if
applicable Center or Office concerned
7. 1 Copy of Gate Pass Center or Office concerned/Security8. Logbook of Security Guards Security9. CCTV footages Security10.Other documents/evidences that
may be identified during the courseof the investigation
Offended party/ Logistics/Property/ Security
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Furnish memorequest forinvestigation*Waiting time of 40- 55 minutes)
1. Receive memo
None 1 minute
Offendedparty/Chief
Operating SecurityOfficer (COSO)
1.1 Review memo None 30 minutes COSO1.2 Identify person/s
to be interviewed None 15 minutes COSO
1.3 Identify otherrequirementsnecessary
None 10 minutes COSO
218
2. Providenecessaryrequirements*Waiting timedepends on howmany andavailability ofpersons to beinterviewed
2. Receiverequirements None 10 minutes
Offended party/Logistics/Property/
Security
2.1 Start interview None
5 hours for 10individuals atan average of30 minutes per
interview(Should theinvestigationrequire more people to beinterviewed,
then theAcademy's
Civil SecurityOffice shallinform the
client of theadditional time
needed tocomplete theinterview and
theinvestigation.)
COSO
3. Waiting time(Maximum of 4-5
days)
3. Review guards’logbook
None 30 minutes COSO
3.1 Review CCTVfootages None 1 working day COSO
3.2 Consolidation ofinformation/preparation ofInvestigationReport
None 2 workingdays COSO
219
3.3 Submission ofreport to theCESO for reviewand comments
None 1 hourCOSO/Chief
Executive SecurityOfficer (CESO)
3.4 Finalization ofreport None 30 minutes COSO
3.5 Report forapproval andendorsement ofCESO
None 15 minutes CESO
4. Receive reportof investigationfrom COSO
4. Presentation ofreport to client None 1 minute COSO
Total None3 work days,8 hours, 22
minutes
220
REQUEST FOR SECURITY AUGMENTATION
These are requests for additional security personnel made by DAP employees duringspecial events or functions.
Office or Division: Office of the Senior Vice President for Services (OSVP-S)Classification: SimpleType ofTransaction:
G2G - Government to Government
Who may avail: DAP Group or Center HeadsCHECKLIST OF REQUIREMENTS WHERE TO SECURE1. Memo from client Requesting Office/Center or Office concerned2. Copy of Request for Additional
Security Personnel Chief Operating Security Officer (COSO)
3. Contract with Security ServicesProvider COSO
CLIENT STEPS AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Furnish memorequest forsecurityaugmentation
1. Receive memo None 1 minute Requesting party/(COSO)
1.1 Review memo todeterminesecurityheadcount
None 30 minutes COSO
1.2 Confirm numberof additionalsecuritypersonnelneeded
None 15 minutes COSO
2. Receiveproposal
2. Submit proposalto client for theirapproval
None 10 minutes COSO
2.1 Submit requestletter to securityservices providerfor additionalsecuritypersonnel
None 1 day COSO
2.2 Deployment ofadditionalsecuritypersonnel
None 1 day COSO/Securityservices provider
221
Total None 2 days, 55minutes
222
INTERLIBRARY RESEARCHSUSPENDED UNTIL FURTHER NOTICE FROM C19RT
This process describes the issuance of Endorsement/Referral Letter by the DAP Libraryto those who would like to conduct research in other libraries. An endorsement letterfrom a professor/staff of the researcher’s originating institution is required for any privateor public individual to conduct research in any library around the country.
Office/Division Research Support Services Division (RSSD)-Library
Classification Simple
Type ofTransaction
G2C - Government to Citizen
Who May Avail DAP Students, Faculty Members, Administrative Personnel
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Accomplished Library Request forReferral Form, 1
DAP Library
CLIENTSTEPS
AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
1. Present theAccomplishedRequest forReferral Form
1. Receive theform from client
None 1 minute Librarian
DAP Library
2. Wait for therequest to beprocessed
2. Encode thedetails to theEndorsementLetter Template.Print and signthe letter.
None 5 minutes Librarian
DAP Library
3. Receives theletter from theLibrarian
None 5 minutes Librarian
DAP Library
Total None 11 minutes
223
RESEARCH AND REFERENCE SERVICE
This process responds to research needs and reference queries of library patrons(students, faculty members, DAP personnel and outside researchers).
Office/Division Research Support Services Division-Library
Classification Simple
Type ofTransaction
G2C - Government to Citizen
Who May Avail DAP Students, Faculty Members, Administrative Personnel, OutsideResearchers
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
For Internal Clients1. Valid DAP
Student/Faculty/Personnel/AlumniIdentification Card
Identification Card issued by HRMDD for DAPFaculty and Personnel
Identification Card issued by the Office of theRegistrar for officially enrolled students andalumni
For External Clients1. Referral/Endorsement Letter
Endorsement letter secured from the Librarian ofthe clients’ company or school
2. Valid Identification Card(Government-Issued IDs, CompanyID, School ID)
CLIENTSTEPS
AGENCY ACTIONS FEES TOBE PAID
PROCESSINGTIME
PERSONRESPONSIBLE
For Internal Clients (Face-to-Face Transaction) SUSPENDED UNTIL FURTHER NOTICE FROM C19RT
1. State researchand/orreference query
1. Receive queryfrom client andverify in thedatabase if theresourcesneeded areavailable
None 1 minute DAP Librarian
2. Wait for thequery to beprocessed and
2. Select and pullout from theshelves the
None 5 minutes DAP Librarian
224
informationsourcedetermined
materialsneeded by theclient
3. Select what isrelevant in theresources givenby the Librarian
3. Check out thematerials to beborrowed inthe LibrarySystem
None 5 minutes DAP Librarian
4. Sign theborrower’sreceipt
4. Receive thesigned copy ofborrower’sreceipt forfilling
None 1 minute DAP Librarian
Total None 12 minutes
For Internal Clients (Online Transaction)
1. Send aresearch and/orreference queryto the DAPLibrary Webmail
1. Receive thequery emailedby the clientand verify in thedatabase if theresourcesneeded areavailable
None 1 minute DAP Librarian
2. Wait for anemailconfirmationfrom the DAPLibrary
2. Review andevaluate therelevance ofelectronicresources thatis related to thequery and sendthose to theclient
None 1 hour DAP Librarian
3. Receive theresources fromDAP Librarian
3. Receive aconfirmationfrom the clientthat theresources werereceived
None 10 minutes
Total None 1 hour, 11
225
minutes
For External Clients (Outside Researchers) SUSPENDED UNTIL FURTHER NOTICE FROM C19RT
1. Present theEndorsement/Referral Letterand register inthe LoggedSheet
1. Receives theEndorsement/Referral Letterand Issue apayment slip
Php100 1 minute DAP Librarian
2. Proceed to theCashDepartment andpresent thepayment slip forthe payment ofresearch fee
None 15 minutes
3. Return to theLibrary andpresent thesigned paymentslip
3. Receive thepayment slip forfilling
None 5 minutes DAP Librarian
4. State researchand/orreference query
4. Receive queryfrom client andverify in thedatabase if theresourcesneeded isavailable
None 1 minute DAP Librarian
5. Wait for thequery to beprocessed andinformationsourcedetermined
5. Select and pullout from theshelves thematerialsneeded by theclient (Note: ForExternalClients, allmaterials arefor Room-UseOnly)
None 5 minutes DAP Librarian
6. Receive thematerials from
6. Log thematerials in the
None 5 minutes DAP Librarian
226
the Librarian system
7. Return thematerials to theLibrarian
7. Issue a readingreceipt
None 1 minute DAP Librarian
8. Sign the receipt 8. Receive thereading receiptfor filling
None 1 minute DAP Librarian
Total None 34 minutes
227