Substation automationusing iec 61850
nternal Guide :. ( ) ,Nalini Lecturer EEE department.r MGR University ,By:
PrasoonKumar E06BEE1066
PratyushKumar E06BEE1067
Ratnesh Kumar Verma E06BEE1080
RuchikaE06BEE1087
8/3/2019 21058813 Substation Automation
2/25
A conventional substation
8/3/2019 21058813 Substation Automation
3/25
what is substation
AUTOMATION?
8/3/2019 21058813 Substation Automation
4/25
Intelligent substation
8/3/2019 21058813 Substation Automation
5/25
Substation automation function
8/3/2019 21058813 Substation Automation
6/25
History of substation
AUTOMATION
8/3/2019 21058813 Substation Automation
7/25
100 years of relay protection bertillundquist
8/3/2019 21058813 Substation Automation
8/25
Remote terminal units(RTU)1984,joachim
8/3/2019 21058813 Substation Automation
9/25
Plc -scada based sasystem1987,tom
wilson
8/3/2019 21058813 Substation Automation
10/25
Optimizing sa by using ied1994, gerrit
dogger
8/3/2019 21058813 Substation Automation
11/25
Predictable assembly of SA system 1998,technicalreport
8/3/2019 21058813 Substation Automation
12/25
Real time simulator of SA 2000, huang shu, liang xiao, gao xin-hua, dai shi-yong
8/3/2019 21058813 Substation Automation
13/25
Iedoperation, protection and maintenance2003, b.m.cuka
8/3/2019 21058813 Substation Automation
14/25
Multi protocol upgraded sa2004, ken
cooley
8/3/2019 21058813 Substation Automation
15/25
SUBSTATION BASED ONIEC 61850
8/3/2019 21058813 Substation Automation
16/25
A conceptual substation
8/3/2019 21058813 Substation Automation
17/25
Process level
8/3/2019 21058813 Substation Automation
18/25
Bay level
8/3/2019 21058813 Substation Automation
19/25
Station level
8/3/2019 21058813 Substation Automation
20/25
Why iec 61850?
8/3/2019 21058813 Substation Automation
21/25
Communication between levels
8/3/2019 21058813 Substation Automation
22/25
Abbreviation:
SA: Substation Automation CB: Circuit Breaker PLC: Programmable Logic Controller SCADA: Supervisory Control And Data
Acquisition System GOOSE: Generic Object Oriented Substation Equipment HMI: Human Machine Interface
COMU: Communication Unit
.
8/3/2019 21058813 Substation Automation
23/25
Reference:
100 tears of relay protection BetriLundqvist.
PLC based SA and SCADA system Tom Wilson
Optimizing SA by using IED GerritDogger
Predictable assembly of SAS TechnicalReport
Design and realization of realtime
simulator for SAS
IED data utilization for operation, B.M. Cuka
protection and maintenance
Multi protocol upgrade strategy Ken Cooley
.
8/3/2019 21058813 Substation Automation
24/25
queries?
8/3/2019 21058813 Substation Automation
25/25
THANK
YOU!