22 January 2004 VP
ESE Section Status
PersonnelWe are still three people down from April last year. I will be hiring soon but there will not be resource improvement for several months.
Ex-support projects CDF DAQ and silicon tracker support is very low level, but spiky. Still
some issues with radiation damage and speeding up the readoutD0 DAQ support is capably handled by ESD along with CDF DAQ.D0 Trigger distribution system needed a four week repair and test cycle for
a noticeable quantity of boards.D0 Mixer system support is very low level, but spiky. Diagnostics requests
mostly.D0 L2 trigger processor (Alpha/Betas) support quiet and assumed to be
done.Beams Recycler BPM Upgrade is working well but not commissioned. CD
support is capably handled by ESD.CDF Silicon and DAQ RunIIb upgrades are wrapping up assembly and
testing of individual ‘wedges’. Minimal effort from ESE.
Total effort between 1 and 2 FTE for the previous 12 months.
22 January 2004 VP
CDF Area
22 January 2004 VP
ESE Project: D0 VRB Controller debugging
Abstract and GoalsESE asked to get VRB Controller modules into serviceable condition. The ESE evaluation phase was restarted after the VRB controllers meet their original specification. There are two versions of the module.
Leader(s) : Don Lincoln, Ted Zmuda
Stakeholder Orgs: D0, CEPA/ESE
Participants and Effort: Ted Zmuda, Mark Bowden, Thinh Pham
Timeline & Schedule: Start May 2003, Ongoing, Run2a D0
Deliverables: Error free operation of both versions of the module. Overhaul of VRB Controller modules not likely.
Plans: Current firmware under test and may be satisfactory
Comment: There were two VRBC layouts which complicated the debugging. One design has been patched to match the other. ESE is not planning to support this module beyond patching the firmware to fix bugs.
WBS: 50.02.04.02
22 January 2004 VP
VRBC Test Stand
22 January 2004 VP
ESE Project: D0 Detector Luminosity Monitor Firmware
Abstract and GoalsD0 designed a board to be used in both the Trigger Luminosity Input and the DAQ Luminosity Monitor. D0 asked ESE to write the firmware for the Trigger version.
Leader(s) : Rich Partridge, Brendan Casey, Rick Kwarciany
Stakeholder Orgs: D0, CEPA/ESE
Participants and Effort: Rick Kwarciany
Timeline & Schedule: Start April 2003, Ongoing, Run2a/b D0
Deliverables: Firmware, Support User Requests
Plans: Iterate testing and debugging until the requirements are met.
Comment: Rick has completed firmware that accomplishesthe first requirements. Testing is waiting for TDC work.
WBS: 50.02.04.02
22 January 2004 VP
Luminosity Test Stand
22 January 2004 VP
ESE Project: Tevatron Ionization Monitor.
Abstract and Goals: Produce DAQ buffer card for new Ionization Profile Monitor in the Tevatron. Design, Prototype, production and support of module. Major firmware development effort.
Leader(s) : Adreas Jansson, Hogan Nguyen, Mark Bowden, Rick Kwarciany.
Stakeholder Orgs: AD, CEPA/ESE
Participants and Effort: ESE DAQ Team
Timeline & Schedule: Prototype buffer testing date April.
Deliverables: Operational boards in DAQ system 2004
Plans: Prototype schematic begun, layout next. Firmware being designed.
Comment: Utilizing development done for level 1 buffer for BTeV DAQ to quickly produce a version for AD.
WBS: 50.01.13
22 January 2004 VP
12 channel (X 2.5 Gbps)Optical Receiver
FPGA
DDR Memory (3 GBytes)
IPM/BTeV L1 Buffer Prototype
22 January 2004 VP
ESE Project: Tevatron BPM DAQ
Abstract and GoalsDesign DAQ for replacement Tevatron Beam Position Monitor System.
Leader(s) : Steve Wolbers, Bob Webber, Vince Pavlicek
Stakeholder Orgs: Beams, CEPA/ESE, CEPA/APS
Participants and Effort: Vince Pavlicek, Mark Bowden
Timeline & Schedule: Prototype in summer, install in Fall.
Deliverables: DAQ hardware, purchase or design and construct.
Plans: See http://wwwserver2.fnal.gov/tevbpm/index.html.
Comment:
WBS: 50.01.13
Page 9June 25, 2003
22 January 2004 VP
ESE Project: D0 L1 Calorimeter Test
Waveform GeneratorAbstract and Goals
Design, fabricate & commission a Waveform Generator module that will assist testing of the D0 Level 1 Calorimeter front-end board.
Leader(s) : Hal Evens (Nevis), Stefano Rapisarda
Stakeholder Orgs: D0, CEPA/ESE
Participants and Effort: Stefano Rapisarda, Gustavo Cancelo
Timeline & Schedule: Start Jan 2003. Prototype tested, production specifications underway. Run2b D0
Deliverables: 4-20 Production modules Summer 2004
Plans: Prototype successfully tested with Saclay prototype ADF, Michigan State will complete ADF production. Timing enhancements & SCL interface being added.
Comment:
WBS: 50.02.04.02
Page 10June 25, 2003
22 January 2004 VP
ESE Possible Project: SVX DAQ Run IIb
upgradeAbstract and Goals: SVX DAQ upgrade, including FTM
board and modifications to other modules as needed.
Leader(s) : Peter Maksimovic (Johns Hopkins) , Guilherme Cardoso
Stakeholder Orgs: CDF/SVX, CEPA/ESE
Participants and Effort: Guilherme Cardoso, Jim Franzen
Timeline & Schedule: Being defined
Deliverables: FTM design and production including firmware,Support User Requests
Plans: Waiting for CDF collaboration decision.
Comment: Includes consultation on the new SRC being designed at John’s Hopkins.
Page 11June 25, 2003
22 January 2004 VP
ESE Effort: Pixel R&D Test Beam
Support.Abstract and Goals: BTeV test beam support
Leader(s) : Simon Kwan, Marcos Turqueti.
Stakeholder Orgs: BTeV, PPD, CEPA/ESE
Participants and Effort: Marcos Turqueti & Lorenzo Uplegger
Timeline & Schedule: Current, Ongoing, BTeV
Deliverables: Test Beam FPIX1 FPIX2 telescope planes. Operational support during Test Beams.
Plans: First 6 FPix1 planes delivered and working at MTest,Additional pre-FPix2 planes in process.Waiting for Beam.
Comment: Inserted here because of the primarily support nature of this effort
Page 12June 25, 2003
22 January 2004 VP
Possible ESE Project: D0 SCL Diagnostic
Board.Abstract and Goals: Modify the Serial Command Link
(SCL) receiver firmware such that a test stand can be safely connected to the running detector SCL system to allow debugging noise issues in the detector that are not reproducible on isolated test stands.
Leader(s) : Marv Johnson, Ted Zmuda
Stakeholder Orgs: D0, CEPA/ESE
Participants and Effort: Ted Zmuda, Thinh Pham
Timeline & Schedule: TBD, awaiting specification meeting
Deliverables: Modified firmware
Plans:
Comment: Ron Rechenmacher asked Ted for a similar change, which has become popular. Now we need to define what exactly D0 wants and needs for this diagnostic task. D0 really wants this but it needs to get pop up on their stack.
Page 13June 25, 2003
22 January 2004 VP
Possible ESE Project: Level 1 Calorimeter
daughter cardAbstract and Goals: D0 designed the card and did the
schematic. ESE will provide the PCB layout and production but no testing or support.
Leader(s) : Dan Edmonds, Stefano Rapisarda
Stakeholder Orgs: D0, CEPA/ESE
Participants and Effort: Stefano Rapisarda, Jim Franzen
Timeline & Schedule: Waiting for information and decisions.
Deliverables: Layout and modules from PCB’s & Parts.
Plans:
Comment: Proposed in 2002, then repeatedly back-burnered
Page 14June 25, 2003
22 January 2004 VP
ESE Effort: Lattice Gauge Links
Abstract and Goals: High Speed Link design, prototype and production. Was a project now being down graded.
Leader(s) : Don Holmgren, Bill Haynes
Stakeholder Orgs: Lattice Gauge, CCF/FTP, CEPA/ESE
Participants and Effort: Bill Haynes, Greg Deuerling
Timeline & Schedule: Prototype testing FY04
Deliverables: Prototype Links
Plans: Given working prototypes, build production units.
Comment: A prototype enabler for the ongoing section R&D effort in high speed links.
WBS: 50.02.04.03
Page 15June 25, 2003
22 January 2004 VP
This is a picture of the 8-channel serial-link card that is capable of a data rates up to 3.5 Gbs per channel
Link Prototype
22 January 2004 VP
End