Description:
22 January 2004 VP ESE Project: D0 VRB Controller debugging Abstract and Goals ESE asked to get VRB Controller modules into serviceable condition. The ESE evaluation phase was restarted after the VRB controllers meet their original specification. There are two versions of the module. Leader(s) : Don Lincoln, Ted Zmuda Stakeholder Orgs: D0, CEPA/ESE Participants and Effort: Ted Zmuda, Mark Bowden, Thinh Pham Timeline & Schedule: Start May 2003, Ongoing, Run2a D0 Deliverables: Error free operation of both versions of the module. Overhaul of VRB Controller modules not likely. Plans: Current firmware under test and may be satisfactory Comment: There were two VRBC layouts which complicated the debugging. One design has been patched to match the other. ESE is not planning to support this module beyond patching the firmware to fix bugs. WBS:
17
22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource improvement for several months. Ex-support projects CDF DAQ and silicon tracker support is very low level, but spiky. Still some issues with radiation damage and speeding up the readout D0 DAQ support is capably handled by ESD along with CDF DAQ. D0 Trigger distribution system needed a four week repair and test cycle for a noticeable quantity of boards. D0 Mixer system support is very low level, but spiky. Diagnostics requests mostly. D0 L2 trigger processor (Alpha/Betas) support quiet and assumed to be done. Beams Recycler BPM Upgrade is working well but not commissioned. CD support is capably handled by ESD. CDF Silicon and DAQ RunIIb upgrades are wrapping up assembly and testing of individual ‘wedges’. Minimal effort from ESE. Total effort between 1 and 2 FTE for the previous 12 months.
Transcript
Page 1: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Section Status

PersonnelWe are still three people down from April last year. I will be hiring soon but there will not be resource improvement for several months.

Ex-support projects CDF DAQ and silicon tracker support is very low level, but spiky. Still

some issues with radiation damage and speeding up the readoutD0 DAQ support is capably handled by ESD along with CDF DAQ.D0 Trigger distribution system needed a four week repair and test cycle for

a noticeable quantity of boards.D0 Mixer system support is very low level, but spiky. Diagnostics requests

mostly.D0 L2 trigger processor (Alpha/Betas) support quiet and assumed to be

done.Beams Recycler BPM Upgrade is working well but not commissioned. CD

support is capably handled by ESD.CDF Silicon and DAQ RunIIb upgrades are wrapping up assembly and

testing of individual ‘wedges’. Minimal effort from ESE.

Total effort between 1 and 2 FTE for the previous 12 months.

Page 2: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

CDF Area

Page 3: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Project: D0 VRB Controller debugging

Abstract and GoalsESE asked to get VRB Controller modules into serviceable condition. The ESE evaluation phase was restarted after the VRB controllers meet their original specification. There are two versions of the module.

Leader(s) : Don Lincoln, Ted Zmuda

Stakeholder Orgs: D0, CEPA/ESE

Participants and Effort: Ted Zmuda, Mark Bowden, Thinh Pham

Timeline & Schedule: Start May 2003, Ongoing, Run2a D0

Deliverables: Error free operation of both versions of the module. Overhaul of VRB Controller modules not likely.

Plans: Current firmware under test and may be satisfactory

Comment: There were two VRBC layouts which complicated the debugging. One design has been patched to match the other. ESE is not planning to support this module beyond patching the firmware to fix bugs.

WBS: 50.02.04.02

Page 4: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

VRBC Test Stand

Page 5: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Project: D0 Detector Luminosity Monitor Firmware

Abstract and GoalsD0 designed a board to be used in both the Trigger Luminosity Input and the DAQ Luminosity Monitor. D0 asked ESE to write the firmware for the Trigger version.

Leader(s) : Rich Partridge, Brendan Casey, Rick Kwarciany

Stakeholder Orgs: D0, CEPA/ESE

Participants and Effort: Rick Kwarciany

Timeline & Schedule: Start April 2003, Ongoing, Run2a/b D0

Deliverables: Firmware, Support User Requests

Plans: Iterate testing and debugging until the requirements are met.

Comment: Rick has completed firmware that accomplishesthe first requirements. Testing is waiting for TDC work.

WBS: 50.02.04.02

Page 6: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

Luminosity Test Stand

Page 7: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Project: Tevatron Ionization Monitor.

Abstract and Goals: Produce DAQ buffer card for new Ionization Profile Monitor in the Tevatron. Design, Prototype, production and support of module. Major firmware development effort.

Leader(s) : Adreas Jansson, Hogan Nguyen, Mark Bowden, Rick Kwarciany.

Stakeholder Orgs: AD, CEPA/ESE

Participants and Effort: ESE DAQ Team

Timeline & Schedule: Prototype buffer testing date April.

Deliverables: Operational boards in DAQ system 2004

Plans: Prototype schematic begun, layout next. Firmware being designed.

Comment: Utilizing development done for level 1 buffer for BTeV DAQ to quickly produce a version for AD.

WBS: 50.01.13

Page 8: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

12 channel (X 2.5 Gbps)Optical Receiver

FPGA

DDR Memory (3 GBytes)

IPM/BTeV L1 Buffer Prototype

Page 9: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Project: Tevatron BPM DAQ

Abstract and GoalsDesign DAQ for replacement Tevatron Beam Position Monitor System.

Leader(s) : Steve Wolbers, Bob Webber, Vince Pavlicek

Stakeholder Orgs: Beams, CEPA/ESE, CEPA/APS

Participants and Effort: Vince Pavlicek, Mark Bowden

Timeline & Schedule: Prototype in summer, install in Fall.

Deliverables: DAQ hardware, purchase or design and construct.

Plans: See http://wwwserver2.fnal.gov/tevbpm/index.html.

Comment:

WBS: 50.01.13

Page 9June 25, 2003

Page 10: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Project: D0 L1 Calorimeter Test

Waveform GeneratorAbstract and Goals

Design, fabricate & commission a Waveform Generator module that will assist testing of the D0 Level 1 Calorimeter front-end board.

Leader(s) : Hal Evens (Nevis), Stefano Rapisarda

Stakeholder Orgs: D0, CEPA/ESE

Participants and Effort: Stefano Rapisarda, Gustavo Cancelo

Timeline & Schedule: Start Jan 2003. Prototype tested, production specifications underway. Run2b D0

Deliverables: 4-20 Production modules Summer 2004

Plans: Prototype successfully tested with Saclay prototype ADF, Michigan State will complete ADF production. Timing enhancements & SCL interface being added.

Comment:

WBS: 50.02.04.02

Page 10June 25, 2003

Page 11: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Possible Project: SVX DAQ Run IIb

upgradeAbstract and Goals: SVX DAQ upgrade, including FTM

board and modifications to other modules as needed.

Leader(s) : Peter Maksimovic (Johns Hopkins) , Guilherme Cardoso

Stakeholder Orgs: CDF/SVX, CEPA/ESE

Participants and Effort: Guilherme Cardoso, Jim Franzen

Timeline & Schedule: Being defined

Deliverables: FTM design and production including firmware,Support User Requests

Plans: Waiting for CDF collaboration decision.

Comment: Includes consultation on the new SRC being designed at John’s Hopkins.

Page 11June 25, 2003

Page 12: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Effort: Pixel R&D Test Beam

Support.Abstract and Goals: BTeV test beam support

Leader(s) : Simon Kwan, Marcos Turqueti.

Stakeholder Orgs: BTeV, PPD, CEPA/ESE

Participants and Effort: Marcos Turqueti & Lorenzo Uplegger

Timeline & Schedule: Current, Ongoing, BTeV

Deliverables: Test Beam FPIX1 FPIX2 telescope planes. Operational support during Test Beams.

Plans: First 6 FPix1 planes delivered and working at MTest,Additional pre-FPix2 planes in process.Waiting for Beam.

Comment: Inserted here because of the primarily support nature of this effort

Page 12June 25, 2003

Page 13: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

Possible ESE Project: D0 SCL Diagnostic

Board.Abstract and Goals: Modify the Serial Command Link

(SCL) receiver firmware such that a test stand can be safely connected to the running detector SCL system to allow debugging noise issues in the detector that are not reproducible on isolated test stands.

Leader(s) : Marv Johnson, Ted Zmuda

Stakeholder Orgs: D0, CEPA/ESE

Participants and Effort: Ted Zmuda, Thinh Pham

Timeline & Schedule: TBD, awaiting specification meeting

Deliverables: Modified firmware

Plans:

Comment: Ron Rechenmacher asked Ted for a similar change, which has become popular. Now we need to define what exactly D0 wants and needs for this diagnostic task. D0 really wants this but it needs to get pop up on their stack.

Page 13June 25, 2003

Page 14: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

Possible ESE Project: Level 1 Calorimeter

daughter cardAbstract and Goals: D0 designed the card and did the

schematic. ESE will provide the PCB layout and production but no testing or support.

Leader(s) : Dan Edmonds, Stefano Rapisarda

Stakeholder Orgs: D0, CEPA/ESE

Participants and Effort: Stefano Rapisarda, Jim Franzen

Timeline & Schedule: Waiting for information and decisions.

Deliverables: Layout and modules from PCB’s & Parts.

Plans:

Comment: Proposed in 2002, then repeatedly back-burnered

Page 14June 25, 2003

Page 15: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

ESE Effort: Lattice Gauge Links

Abstract and Goals: High Speed Link design, prototype and production. Was a project now being down graded.

Leader(s) : Don Holmgren, Bill Haynes

Stakeholder Orgs: Lattice Gauge, CCF/FTP, CEPA/ESE

Participants and Effort: Bill Haynes, Greg Deuerling

Timeline & Schedule: Prototype testing FY04

Deliverables: Prototype Links

Plans: Given working prototypes, build production units.

Comment: A prototype enabler for the ongoing section R&D effort in high speed links.

WBS: 50.02.04.03

Page 15June 25, 2003

Page 16: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP

This is a picture of the 8-channel serial-link card that is capable of a data rates up to 3.5 Gbs per channel

Link Prototype

Page 17: 22 January 2004 VP ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource.

22 January 2004 VP