23 - HMI - Page 1SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
HMI Status at SDO PSR-1January 21-22, 2009
GSFC
– HMI Present Status
– Changes Since SDO PER• Hardware
• Software
– Blank Image Resolution
– Results of Test Program• Environmental
• Functionals & CPTs
• Trend Data
– Test Verification & Waivers
– Verification Matrix
– PFR Status
– HMI Remaining Work
– Readiness to Ship
23 - HMI - Page 2SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
HMI Instrument on SDO
• Helioseismic and Magnetic Imager (HMI) studies the interior and magnetic activity of the Sun
• HMI Instrument– HMI Optics Package (HOP)
– HMI Electronics Box (HEB)
– Intra Instrument Harness
– Flight Software
X
Z
Y
EVE
AIA
X
Y
Z
HOP HEB
HMI
SDO
23 - HMI - Page 3SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
HMI Integration
HOPHOP
HarnessHarness
HEBHEB
AIAAIAEVEEVE
HMIHMI
23 - HMI - Page 4SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
HMI Status
• HMI is ready for the Observatory to be shipped– Environmental tests successfully accomplished
– CPTs successfully performed• Optical performance is stable and meets requirements
• Alignments and co-alignments meet requirements
– Present flight software will be flown• Tested patch prevents blank images when HEB is hot; patch loaded at instrument turn on
• Minor constraints recognized and documented
– Flight blankets have been installed• Minor blanket close out on primary alignment cube required after final CPT
– HMI is currently in flight configuration with the following planned exceptions• CCD & CEB Radiator covers
• Blanketing for spacewire cable
• Mission simulations will fine tune the operational plans and procedures
• HMI test bed at LMSAL has been, and will continue to be, quite useful– Test flight observing sequences
– Develop and test flight operations procedures
– Trouble shoot anomalies
– Develop and qualify potential flight software patches or updates
23 - HMI - Page 5SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Changes Since SDO PER (March 2008)
• Hardware changes– Minor thermal blanket adjustments to address solar entrapment concerns
• HMI Software changes– FSW was delivered with known issues and software update planned after observatory integration
– Developed a list of software updates with SDO Project to address the following• Incorporate fixes to selected known discrepancies based on HMI DAIs
• Incorporate corrections based on IV&V findings
• Integrate high speed bus (HSB) resynchronization protocols
– Software was updated prior to TVac and subsequent CPTs & Functionals• Kernel acceptance testing performed at LMSAL in May 2008
• Kernel 2.34 and FSW 10.10 loaded on 8 June 2008
• Final FSW acceptance testing performed 10-12 June 2008 on the flight instrument
– Developed and Tested Onboard Scripts for responding to FDCs and INCs• Camera Header Errors Recovery
• Camera gain and offset reset Recovery
• Observatory Software changes – TSM/RTS developed and tested
• Decontamination Heater Operations
• Camera Link Detection & Recovery
• Camera Header Errors Detection & Recovery
• Camera gain and offset reset Detection & Recovery
23 - HMI - Page 6SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Environmental Tests
• HMI passed all environmental tests as part of the Observatory test program
– EMI/EMC (April 2008)• Radiated susceptibility exceeded requirements in one preamp of one camera at 200-300 MHz
o No instrument susceptibility detected during Observatory level self compatibility test.
o Large margin between observatory radiated emissions and instrument susceptibility
• Radiated Emission exceedence as seen at instrument-level EMC (see Waivers)
– Mechanical (acoustic, shock, vibration) (May/June 2008)• Baseline performance reconfirmed
– Thermal Balance (July 2008)• Thermal control system, including survival heaters, meet requirements
• Thermal math model refined based on Thermal Balance data, and reviewed with project
• Blank Image Anomaly observed during the first hot plateau (see following chart)
– Thermal Vacuum (July/August 2008)• Successful qualification of the flight hardware
• Instrument meets requirements at all temperatures
• Camera intensity ratio changed with time in vacuum (see later chart re PFR-452)
o Initial on-orbit bake-out/warm-up expected to eliminate this effect
o Full Level-1 science achievable with bake-outs/warm-ups every 6 months even if effect is experienced on-orbit
Instrument now qualified for flight
23 - HMI - Page 7SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Blank Image Anomaly Resolution
• Observed during HMI Instrument Thermal Vacuum testing at LMSAL– HEB hot operations caused some images to have values of all “0”s
– Presumed caused identified as CIF memory Mode Register Set (MRS) command
– Updated flight software was developed but was not thoroughly tested before delivery
• Blank images were observed again during the first hot plateau in the Observatory level thermal balance test.
– Troubleshooting identified a means for clearing the blank image anomaly
– A software patch was developed to remove the mode reset command
• The MRS patch was extensively exercised during observatory thermal vacuum testing
• Testing on the HMI test bed and subsequent FPGA analysis was able to identify the root cause.
– Root cause has been determined as incorrect SDRAM address bits due to the FPGA timing skew across two clock domains
• Hardware will be used as is with software patch that removes the MRS command – FSW patch used as part of every instrument turn on since Mid-August 2008
• Patch disables the built-in SEFI recovery function in the CIF– SEFI ground recovery procedure developed and tested
– SEFI Rate – once per SDRAM every eight years in background environment, once per 30 days in flare
– Three way voting logic requires two SEFIs to occur in the same bank without ground intervention before impacting science
23 - HMI - Page 8SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
CPT Performance Status
• Instrument performance fully characterized
• HMI has performed 7 CPTs to date (three at observatory level)
• Post Environmental CPT results
– Analysis has been completed and is consistent with the established baseline
• All CPT PFRs successfully resolved
• Instrument Sequencer Operational statistics # of Images Runtime
– Since delivery (Dec 2007 – Dec 2008): 876,276 486.8 hours
– Since software update (June 2008 – Dec 2008): 660,020 366.7 hours
– Since software patch (Sept 2008 – Dec 2008): 115,328 64.1 hours
• Longest uninterrupted sequencer run since software update: 48.5 hours
– All expected images received and were complete
Level 1 science performance requirements met
23 - HMI - Page 9SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Trending
• Instrument performance trended, examples below
• Mechanical/Non Optical Performance (All meet requirements)
– Spin times for Cal/Focus wheels, shutters, and Hollow Core Motors
– Mechanism delay time ranges (an internal parameter)
– Voltages (primary and secondary) and currents
– Boresight Alignment
• Optical Performance (All meet requirements)• Best focus
• Field curvature
• Distortion
• MTF
• CCD alignment
• Flat Field stability
• Particulate contamination
• Scattered light performance
• All trends nominal; will continue trending through I&T and on orbit
23 - HMI - Page 10SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Mechanism Trending Summary
1.02
1.03
1.04
1.05
1.06
1.07
Cal/F
ocu
s W
heel
Sp
in P
eri
od
(s)
CF1
CF2
Lockheed Martin GSFC
0.104
0.106
0.108
0.110
0.112
0.114
Sh
utt
er
Sp
in P
eri
od
(s)
SH1
SH2
0.600
0.800
1.000
1.200
1.400
Pre-V
cal
Pre-V
ibe
TB AT 1
TB AT 3
Post-V
ibe
TV AT 2
.1
TV CPT 2
TV FT 2
TV AT 4
TV FT 4
TV FT 6
TV AT 6
TV FT 8
TV CPT 3
TV AT 7
HEB Pre
-Vibe
HEB Pos
t-Vib
e
SC Inte
gratio
n
Stand
alone
Pre-E
MI
Pre-V
ibe
TV Hot
1
TV Hot
2
TV Hot
3
TV Cold
3
Post-E
nv
Ho
llow
Co
re M
oto
r S
pin
Per
iod
(s)
WT1
WT2
WT3
WT4
PS1
PS2
PS3
All mechanisms meet requirements, variations due to temperature
Cold
Hot
23 - HMI - Page 11SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Test & Verification
• Testing since Observatory PER
– EMI/EMC – Waiver SDO-CCR-0982, SDO-CCR-1002
– Vibe/Acoustics/shock – No issues
– CPT #2 – No issues
– Post-environmental Instrument CPT and Observatory Functional –No Issues
• HMI Verification Matrix status
– All functional and performance requirements are met, with the exception of Waivers listed below and items shown on the following verification matrix slides
• Waivers since PER:
CCR Type Title Status Comments
SDO-CCR-0982 WaiverHMI EMI/EMC Test Radiated Susceptibility Exceeded
ApprovedRS exceeded requirements in one preamp of one camera at 200 MHz by 3-4 DN
SDO-CCR-1002 Waiver Observatory Radiated Emissions Exceedance ApprovedThere is sufficient margin between emissions and susceptibilities
SDO-CCR-1003 WaiverHMI HSB Electrical Requirement - Inner Shield Length
ApprovedThe data rate is met with the 0.1 inch extra length
SDO-CCR-1020 Waiver HMI Performance during 1.0V Ripple Voltage In Review Freq. 1-29 Hz not tested in EMI/EMC
SDO-CCR-1022 WaiverHMI Electronics Box (HEB) Stress Analysis not Completed at the Instrument Level
In ReviewBridge board stress analysis performedLoads test performed successfully
23 - HMI - Page 12SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Requirements Verification Status
Verification Activity No. Req. Verified Open Status
Comprehensive Performance Test 21 21 0 As Run Test procedure in closure
EMI/EMC/GND 28 27 1 GND shop order number to be linked
Science Performance Analysis 35 34 1 Camera Gain Stability Report in progress
Image Motion waiver in progress
Software Acceptance 138 138 0 Document update
Optical Requirements 10 10 0 STOP analysis complete
Report in release
Timing 3 3 0 Report being completed
Thermal 19 19 0 As Run Test procedure in closure
Electrical Design Inspection 43 42 1 Verify the single link data rate
TOTAL 297 294 3
• 169 Closed
• 294 Verified / 3 Open
• Verified = Analysis complete, Data certified, Reports in completion
23 - HMI - Page 13SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Verification Close-out
• Single Link Data Rate Verification
– Level 1 science data rate has not been demonstrated with a single HSB data link
– A test has been defined to measure the date rate threshold
– Maximum data rate with a single link will be determined during instrument testing, scheduled for the last week of January
• Image Motion Waiver
– Image motion resulting from tuning waveplate rotation exceeds a requirement detailed in the Instrument Performance Document
– Review of the verification status discovered that the image motion requirement had not been completely addressed
– This image motion requirement will be waived based on a better understanding of the observables calculation method
• Camera Gain Stability Analysis
– Camera Gain Stability is the end to end performance of the CCD and CEB system
– Analysis of images taken during observatory thermal vacuum testing indicates that the gain stability requirement is being met
– The formal verification report is in process of being completed
23 - HMI - Page 14SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
PFR Status
PFR# Rating Test Description Disposition
SDO-442NSR set time
Yellow No Step Request
The NSR flag lead time is 300 - 500 ms (vs. the 400 to 600 ms requirement).
Correctable by starting the camera clear 100 ms earlier.
SDO-251LVDS
Yellow Integration LVDS resistance measurements off nominal
Remaining open until the flight spares are repaired at RAL
SDO-452LED camera ratio
Red TV The optical throughput using the HMI LED decreased during thermal vacuum testing
Under review; anticipate use of decontamination heater and HOP bake-out on orbit
SDO-380Odd image
Yellow CPT FSN 1198049 was not received as expected
Monitor for reoccurrence
PFR# Rating Test Description Disposition
SDO-260Processor reset
Risk Flag
Pre-ship B-Side processor occasionally resets when ISS is powered on
•ISS relay closes properly, •CPU autonomously performs soft reset•Operator continues on with startup procedure (use as-is)
•Red-flag PFRs:
•Open (Red, Orange, Yellow) PFRs:
23 - HMI - Page 15SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
LED Camera Ratio in Vacuum (PFR-452)
• Under vacuum aliveness testing, the ratio of the LED intensity as observed with the two cameras changes with time
• The ratio recovers when brought back to room ambient temperature and pressure
• These data and closer study of-LED based images show a reversible effect on the CCD (and perhaps the fold mirror); such as contamination
• Magnitude of the effect seen during TVac would not impact Level 1 Science
• Since effect is reversible there are operational workarounds
– The initial 25-day on-orbit decontamination period will dramatically improve effective venting of any contaminants
– Any lingering/other effects can be managed by periodic warm-up of the CCD and fold mirror; approximately every 6 months (likely during eclipse season).
• Will continue to investigate root cause possibilities, using a Fishbone Analysis to guide and document the investigation
23 - HMI - Page 16SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
HMI Remaining Work
• No Step Request timing verification– Test plan developed. Test needed to verify solution
• Single link performance verification– Test plan being developed. Test needed to verify performance
• LED camera ratio issue resolution
• Open Verification items and open documentation
23 - HMI - Page 17SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
Readiness to Ship
• HMI is good to go with the following liens:– Resolution of PFRs requiring follow-up work
– Verification Closures
23 - HMI - Page 19SDO Pre-Ship Review Part 1 - January 21-22, 2009 –V_20090116
PER Waiver Summary
CCR Type Title Status
SDO-CCR-0372 Deviation In-Rush Current Requirements for HMI and AIA CEBs Approved
SDO-CCR-0811 Waiver HMI Shutter and Focus Wheel Static Imbalances Approved
SDO-CCR-0813 Waiver HMI Induced Jitter Requirements in PJAB Approved
SDO-CCR-0814 Waiver Surface Conductivity Requirement for Some HMI Parts Approved
SDO-CCR-0816 Waiver Floating Metal Requirement for Some HMI Parts Approved
SDO-CCR-0817 Waiver Thermal Cycling of Some HMI Component-level Parts Approved
SDO-CCR-0819 Waiver HMI Oven Controller Operational Transients Approved
SDO-CCR-0820 Waiver HMI EMI/EMC Decontamination Heater Operational Transient Approved
SDO-CCR-0821 Waiver HMI EMI Conducted Emissions (CE) Exceedances Approved
SDO-CCR-0822 Waiver HMI EMI Radiated Susceptibility (RS) Incomplete Exposure Approved
SDO-CCR-0823 Waiver HMI EMI Radiated Emissions (RE) Exceedances Approved
SDO-CCR-0824 Waiver HMI EMI Conducted Susceptibility (CS) Approved
SDO-CCR-0834 Waiver HMI Heater Sizing Margin (Operational and HOP Survival) Cancelled
SDO-CCR-0838 Waiver Reduction in the HMI Field of View Requirement Approved
SDO-CCR-0856 Waiver AIA and HMI Shock Tests Deferred to Observatory Level Approved
SDO-CCR-0883 Waiver HEB vibe under test due to notching of first mode resonance Approved