73
Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding Employer Hashoo Group Ltd. Main Contractor LIB Y A Summa-Libya for Construction JSC Main Contract Between Hashoo Group Ltd. (B.V.I.) & Summa Libya, JSC For Burj Al Baher Project Tripoli - Libya Volume 2 EMPLOYER'S REQUIREMENTS 2.4 Arch Sol Facades Technical Specification of Design, Supply & Installation of Curtain Wall & External Cladding AI Baher. Tripoli, libya
Transcript
  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    Employer

    Hashoo Group Ltd.

    Main Contractor

    LIB Y ASumma-Libya for Construction JSC

    Main ContractBetween

    Hashoo Group Ltd. (B.V.I.)&

    Summa Libya, JSCFor

    Burj Al Baher ProjectTripoli - Libya

    Volume 2EMPLOYER'S REQUIREMENTS

    2.4 Arch Sol FacadesTechnical Specification of Design,

    Supply & Installation of Curtain Wall & External Cladding

    BU~ AI Baher. Tripoli, libya

  • JJoDDoQD

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj UI Behar-Tripoli TECHNIcAL SPEOFICATIONPREPARED: August 2006 CURTAIN WALL & GLAZING PACKAGE

    THEBURJULBEHARJEWEL OF THE MEDITARRANEAN

    TRIPOLI

    , .

    ..

    o TECHNICAL SPECIFICAnONForDESIGN, SUPPLY AND INSTALLAnON OF

    CURTAIN WALL AND EXfERNAL CLADDING

    PREPARED ON BEHALF OF

    DATE REVISION: PREPARED BY: CHECKED BY: APPROVED BY:

    Auust Pre RY RY

    Arth- Sol Facades I Tripoli I Curtain Wall Specs I Aug 06/"1 Page 1 or60

    HASHOO GROUP LTD

    Arch Sol FacadesP.D.Box 213452Dubai, U.A.E

    Project No : ASF-OOl/vlDocument No: ASF/OOI/Tripoli/CW Spec

    By:

    SUfj AI Baher, Tripoli. Libya

    II

    DJ

  • PART 1 -GENERAL

    DESIGN AND BUILD PACKAGE FOR ALUMINIUM GLAZED CURTAIN WALLS

    1.1 PROJECT DESCRIPTION

    The Burj Ul Behar-TripoliPREPARED, Augusl2006

    TECHNICAL SPECIFICAnONCURTAIN WALL & GLAZING PACKAGE

    2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & Extemal Cladding

    The main towers are clad in an aluminium and glass curtain wall with a large glasspodium area at ground level. The curtain wall on the main tower will wrap around thebuilding with a small section of glass wall cover at the lift area. At the roof, the curtainwall will continue past the roof in a spiral affect.

    A, This project is the proposed new combined residential, office and holel developmentin Tripoli libya. The building will consist of 3 main towers circular on plan linked atthe base by a podium retail space.

    Volume 2~IQaoo'r-A

    Q

    QQ:Ju

    1.2

    The podium levels will have fixed glazing and the restaurants and lobbies will be cladwith point fixed glazing with glass fins.

    SCOPE OF WORK

    A Introduction:

    This specification is for the curtain wall and solid claddings, and shall include:Unitised Glass and aluminium curtain wall all aroundAluminium claddingGrilles and its supporting structure to M&E 1Ioors and refuge 1IoorsAluminium and glass curtain wall for the roof features and its associatedsecondary steelwork.Cladding to the back of exposed parapetsAnticarbonation coating to exposed concrete (behind aluminium cladding areasin CW specialist scope)Point fixed Glass wall with fins and screens as indicated on drawingsLaminated Glass SkylightsAluminium Sun ShadesEntrance Canopies

    The following items are excluded:Concrete structuresSteel structures that do not directly support curtain wall and glass walls

    ~\I, ''y B Generally:This Specification shall be read in conjunction with all other related Specifications.

    Design, engineer, document, test, manufacture, deliver, install, protect andcommission curtain wall cladding systems complete with all glass, glazingaccessories, fixings, trims, finishes, louvres, 1Iashings. sealants and the like inaccordance with the Contract Documents.

    The work of this Section is performance based, and shall be developed, tested andwarranted to comply with the design intentions indicated on the Drawings, specifiedperformance criteria and requirements, and relevant statutory and projectrequirements. Drawings indicate generic design principles and intentions only.

    Arch- Sol Facades I Tripoli I Curtlm Wall Spc:a' Aug 061 vI

    SUfj AI Baher, Tripoli, libya

  • C Language and Communication

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj UI Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: Augusl2006 CURTAIN WALL &< GLAZING PACKAGE

    L1

    dnf)to.\]!:J,.oDo,0It:...

    oQDnUo

    D

    The Tender Drawings and Specification are written in English.

    The Sub-contractor is to provide an experienced Design Manager and QualityControl Manager able to communicate in English. This is to ensure that the technicalrequirements of Intemationai Design Standards referred to herein, written in English,are fully complied with.

    All calculations, drawings and technical documents (quality plans, company profiles,etc.) shall be wrillen in English.

    Provide all labor, materials, and equipment necessary to provide a complete curtainwall system, and shall also design, engineer. test, fabricate, deliver, install, maintainand guarantee complete curtain wall as per the architectural concept designincluding, but not limited to, the following:

    1 Exterior aluminum curtain wall, window wall, windows, doors, canopies,automatic sliding door, glass, glazing accessories, gaskets, sealants, flashings,vents, doors, hardware, multi-point locks, opening limit deVices, safety rails,louvres, grilles, blanked off panels, bird screens, cleats, fixings, components toprevent galvanic action, stainless steel BMU plunger tie-backs and receptorsfor the curtain wall, interior aluminum trimming. Pre-formed metal panelsystem, soffits. sills, jamb returns, with anchors, embeds, reinforcements andaluminum copings.

    2 All glass and glazing for the above components, including the fin walls.

    3 All sealants, caulking, joint fillers and gaskets in conjunction with the abovecomponents for weather tight perfonnance in the fabrication and erection of thecurtain wall systems.

    4 All anchorage of above components, including pre-set inserts in concrete slab,bracing to or bracing of structure, kickers, reinforcing etc. as required.Contractor shall be responsible for the bracing s:.ucture when wall lickersindude rotation into structural members.

    5 Field testing of installed work

    6 Pro-type performance Testing at approved laboratory.

    7 All internal ( to the system) vents, trims, weeps, weep tubes, bellows, baffles,closures, end dams, gutters, flashings as shown or as may be required inconjunction with the system or to join the system to adjacent construction.

    8 Fire safing and smoke seals at siab edges, inclUding support system.

    9 All external wall exterior wall insulation and vapor barrier required on aboveitems.

    10 Patching of sprayed on fire proofing at kickers, anchor, or bracing attachments

    11 Protection and cleaning.

    12 All engineering calculations and shop drawings of the system, includinganchorages. Drawing shall be presented so other contractors cancoordinate their work..

    13 Connection of lightning protection system lead wires to curtain wall and

    Arch- Sol F.c:adcs /Tripoli ICuru..in Wall Spca; I Aug 06' vi

    Burj AI Baher, Tripoli. Libya

    Page J of6O

  • Volume 2 2.4 Arch Sol Facades Technical S"pecs of Design Supply & Installation of Curtain Wall & External CladdingThe Bwj Ul Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: Augusl2006 CURTAIN WALL &< GLAZING PACKAGE

    oDon~.....

    panel systems atlypical areas.

    14 Coordination of window washing or Building Maintenance Equipment,tracks, tie-back, anchors, brackets, rails, etc. that interface with thecurtain walls and metal panels.

    . 15 Intemniltent swing stage stabilization anchors using flush mountedreceptors.

    16 Provide all material samples as requested by the Architect.

    17 Integration of exterior light fixtures, wiring conduit, transformers andassociated accessories.

    18 Steel frames for curtain walls together with fixings back to the buiiding (exceptthose indicated on the Tender Drawings to be installed by others) shall bedesigned and suppiied by the Curtain Wall Sub-Contractor.

    o19 The curtain wall sub-

  • u Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj U1 Behar-TripoliPREPARED: Augu'12006

    1.5 QUALITY ASSURANCE

    TECHNICAL SPEClFICATIONCURTAIN WALL &0 GLAZING PACKAGE

    oll ..fU

    ~)~[iJ:0,, i; ".

    G,..,(;

    uDD"1:0

    A Prepare, submit, and implement a detailed project specific Quality Plan.

    Products shall be reputable proprietary products, lactory manufactured under ISO9002. Submit quality assurance documentation for all bought-in products, includingISO 9002 certification and evidence of satisfactory long-term performance insimilar commercial conditions.

    B. Engage a single firm to assume undivided responsibility for fabrication andinstallation and total coordination of all components of the curtain wall work. Thisfirm must demonstrate not less than 10 years successful experience in fabricationand instaliation of work similar in height to the work of this project. The work of thissection shali be performed by a Contractor, who is regularly engaged in theengineering, fabrication, finishing and installation, of similar work.

    C. If possible, all fabrication shall be done using CNC digital machines with automaticprogramming.

    D Appoint an Independent Checking Engineer for review and checking of alicalculations and drawing submissions. Submit name and details.

    E Architect and Fayade Consultants ane to be given sufficient notice (not less than 24hours) so that inspections may be made of the following:

    Required testing prototypes and first constructed exampleslbenchmarksconstnucted and ready for inspection or testing.Commencement of any required testing, on or off site.Factory inspections.Fabricated assemblies at the factory ready for delivery.BUilding substrates, including sub-framing, prepared and ready for theinstallation of the fabricated assemblies, with anchor brackets and otherattachments (including BMU components and lightning conduction) fixed inplace.Pneparation for. and commencement of, any site glazing or re-giazing.Field tests inclUding gutter testing and water testing.Any other inspection as may be required at the Facade Consultant's discretion.

    F For panel inspections in the factory, the minimum number of paneis to be availablefor inspection shall be agreed with the Main Contractor, 10 approval of theArchitect, but generally shall be in logical groupings of finished wor!

  • iJ::)on~1:J,''1

    \.5

    q'"

    t)t'.

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj VI Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: Augusl2006 CURTAIN WALL &< GLAZING PACKAGE

    and modifications have been included.

    3. Compliance with manufacture~s (ecommended installation procedures (oncommencing fabrication and periodically).

    4. Compliance of performance design, including materials and components, withContract Documents (on completion).

    5. As a cond~ion of supply, the manufacturer and/or supplier of components andmaterials shall be required to:

    6 Inspect the Contract Documents, and certify the suilabil~y of proposedmaterials and products for the relevant substrates and cond~ions, duringTender period.

    7 WMess the first site installation of each type and condition, and certify thatthe preparation and installation procedures are in accordance with themanufacturer's written recommendations and have not in any way breachedthe manufacturer's warranties.

    8 Periodically inspect the ongoing and/or subsequent installation(s) to ensurethat certified procedures are being mainlained.

    nD"",

    'I',:j"rO:.d

    1.6

    9 Following certification, the installer shall not vary the methods of preparationand inslallation from that recommended by the manufacturer.

    10 The first completed Benchmark area shall constitute not less than 25 sqmand not less than 5 m of lineal work of each type of system, and shall includeany non-slandard parts. These constructed examples are to be inspected andapproved by the Archilect before proceeding with the remainder of work. Theconstructed examples, if accepted, shall be used as part of the permanentworks and shall constil~e a Benchmark against which all future work will beassessed. All further works are required to match or exceed the finishedquality of the accepted Benchmark. The bench mark zone will be required tobe protected to avoid damage and also be made available to view and checknew work being installed.

    TENDER DRAWINGS & SPECIFICATIONS

    /).J.(')

    ~u'J:Un

    . c_

    A.

    B.

    C.

    D.

    The character of these documents Is intended to provide a performancespecification for the design, fabrication and installation of the aluminum curtain wallsystems. Contractor is responsible for the design and engineering as certified by aProfessional Engineer licensed in the State of Libya of all components andmaterials as well as the fabrication, installation and performance of the curtain wallsystems.

    The Tender drawings are diagrammatic and do not purport to identify or solvecompletely, the problems of thermal or structural movement, pressure equalization,vapour barriers, fixing and anchorages. flatness and stability of facing and moisturedisposal.

    The Tender drawings do not purport 10 solve probiems at the glass line associatedw~h glass movement, pressure factor or thermal shock.

    The Tender draWings indicate profile and conf'9uralion required together withrelationship to structural frame and interior building elements.

    'Ih. I

    \

    Arch. Sol Facades {Tripoli I Curtain Wall Sp:s I Aug 061 vi

    Surj Al Baher, Tripoli, Libya

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    E. The Tender drawings contain details that suggest directions for solving some of themajor design requirements, and the Sub-contractor may use these details anddevelop them as he deems best. Alternatives proposed by the tenderer to thedesign nominated on the tender draWings will be considered provided they satisfyall the performance requirements of this specification.

    '-:"1.j(Il )

    The Burj Ul Behar~TripoliPREPARED, August 2006

    TECHNICAL SPECIFICATIONCURTAIN WALL &< GLAZING PACKAGE

    [Jn),.I\.

    1.7

    F. The specification is of the "performance" type and includes the minimumrequirements of the External Cladding and Curtain Wall System without limiting theSub-contractor to the methods of achieving such performance.

    REFERENCE STANDARDS

    A The following sections outline Intemational Codes, Standards and Regulations towhich all work outlined in the Tender Documents must conform. The Sub-contractor is responsible to ensure that all works are in complete compliance withthese and other Codes, Standards and Regulation referred to within thisSpecification.

    No substitution for the following codes will be accepted without endorsementfrom the Architect.The Curtain Wall Sub-Contractor shall be responsible for ensuring all work iscarried out in accordance with local Building Authority requirements.Wherever there is a conflict between different codes, the requirements of themore stringent code shall apply.

    The work of this s.ection shall comply with the latest edition of the following. Whenconflicts arise between references, the more stringent shall apply. The curtain walldesign shall accommodate and incorporate any miscellaneous devices or work asrequired by the standards.

    Comply with current edition of required Standards and Codes of Practice,including:

    British Standards (BS and CP) recognised by the Buildings Department.AAMA Architectural Aluminium Manufacturers' Association Standardsmentioned herein.ANSI American National Standards Institute Standards mentioned herein.AS/NZ Australian/New Zealand Standards mentioned herein.ASTM Standards mentioned herein

    1 Strength of Aluminum, AlCAN

    2 AAMA:AAMA 501-05AAMA 501.1

    AAMA 501.2AAMA 501.3

    AAMA 1502.7

    AAMA 1503.1-98(04)

    AAMA 1504-97

    Methods of Tests for Exterior WallsStandard Test Method for Exterior Skylights, CurtainWalls. and Doors for Water Penetration Using DynamicPressureField Check of Metal Curtain Walls for Water LeakageReid Check of Water Penetration through InstalledExterior Windows, Curtain Walls, and Doors by UniformAir Pressure DifferenceVoluntary Test Method for Condensation Resistance ofWindows, Doors, and Glazed Wall SectionsVoluntary Test Method for Thermal Transmittance andcondensation resistance of windows and doors, andGlazed Wall SectionsVoluntary Standard for Thermal Performance andCondensation Resistance of Windows, Doors and Glazed

    'I''. i

    Acch- Sol FKldes I Tripoli 'Curtain Wall Specs I Au& 061 vi

    Surj AI Baher, Tripoli, Libya

    Page 7 of6O

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Bwj U1 Behar-Tripoli TECHNICAL SPECIFlCATIONPREPARElF. August 2006 CURTAIN WALL &0 GLAZING PACKAGE

    'G-1; ,

    ,

    AAMA 501.5-98

    AAMA 507-03

    3. ASTM;ASTMA0036ASTMA0123ASTMA0143ASTM A 0153ASTM A 0307ASTM A 0325ASTM A 0480ASTM A 0501ASTM A 0509ASTM A 0611ASTM A 0653ASTMA0666ASTMA0864ASTM B0209

    ASTM B 0221ASTM B0449ASTM C 1115

    ASTM D 3542ASTM D4637ASTM E 90

    ASTM E0283

    ASTM E0330

    ASTM E 0331

    ASTM E 0413ASTM E0488

    ASTM F 0594

    4. DesignBS 6399.1BS 6399.2BS 5588

    BS 5588BS 5750BS 7543

    5. FabricationBSEN 288

    Wall SectionsTest Method for Thermal Cycling of Exterior Walls.

    Standard Practice for the Thermal PerformanceCharacteristics of Fenestration Systems Installed inCommercial Buildings

    SteelGalvanizing Carbon Steel Shapes, Bars, Plates, and StripsProtection Against Hydrogen EmbrittlementGalvanizing Carbon Steel Hardware and FastenersFastenersHi Strength Fasteners,General Requirements for Flat RoliedStainlessHot Rolled Steel TubesNeoprene Sponge GasketsCold Rolled SheetGalvanizing Cerbon Steel SheetStandard Specification for Austenitic Stainless SteelGlazing Gaskets, Accessories;Standard Specification For Aluminum And Alloy Sheet AndPlateAluminum ExtrusionsConversion CoatingsStandard Specification For Dense Elastomeric Siliconetype Rubber Gaskets And AccessoriesDense I Neoprene Expansion Joint CoversElastomeric Sheet Material I Cured NeopreneStandard Method for Laboratory Measurement of AirborneSound Transmission Loss of Building PartitionsStandard Test Method for Rate of Air Leakage ThroughExterior Skylights, Curtain Walls, and DoorsStructural Performance of Exterior Skylights, CurtainWalls, and Doors by Static Air Pressure Difference(Proof Load)Standard Test Method for Water Penetration of ExteriorSkylights, Curtain Walls, and Doors by Uniform Slatic AirPressure DifferenceClassification for Rating Sound InsulationTest Method for Strength of Anchors in Concrete andMasonry ElementsNuts

    Code of Practice for Dead and Imposed LoadsCode of Practice for Wind LoadsFire Precautions in Design, Construction and Use ofBuildingPart 3; 1983 Code of Practice for Office BuildingsQuaiity SystemsGuide to the Durability of Buildings and Building Elements,Products and Components

    Specification and Approval of Welding Procedures forMetallic Materials

    AKb- Sol Facades JTripoli I Curtlin Willi SpeesJ Aug 06/v!

    Burj AI Baher, Tripoli, Libya

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj UI Behar-Tripoli TECHNICAL SPEOFICATIONPREPARED: August 2006 CURTAIN WALL & GLAZING PACKAGE

    qL,

    BS 4870

    BS 4871

    BS 3019BS 3571BSEN 287BS 7475

    Steel

    Specification for Automatic Fusion Welding of Materials,Including Welding Operator ApprovalSpecification for Approval Testing of Welders Working toApproved Welding ProceduresTIGWeldingMIG WeldingApproval Testing of Welders for Fusion WeldingSpecification for Fusion Welding of Austenitic Slainless

    6. Aluminium, Steelwork and Stainless Steel

    ......);1"is.

    :~.l

    \'I.':l-'

    BS 8118as 5950as 7613

    BS 7668

    BSEN 10029

    aSEN 10113

    as 2994BS 4848BS 5950.5

    BS 729

    as 1449.2

    as 6105

    BSEN 485aSEN 515

    BSEN 573

    as 1474

    BS 1706

    BS 2569BSEN 22063

    8SEN 10143

    BS 4190

    as 6338

    DIN 1706ASTMA743MASTMA744MBS 3100

    The Structural Use of Aluminium (British Standard)Structural Steel SectionsSpecification for Hot Rolled Quenched and TemperedWeldable Structural Steel PlatesSpecification for Weldable Structural Steels. Hot FinishedStructural Hollow Sections in Weather Resistant SteelSpecification for Tolerance on Dimensions, Shape andMass for Hot Rolled Steel Plates 3mm Thick and aboveHot-Rolled Products in Weldable Fine Grain StructuralSteelSpecification for Cold Rolled Steel Sections'Hot Rolled Structural Steel SectionsCode of Practice for Design of Cold-Formed SteelSectionsSpecification for Hot-Dip Galvanised Coatings on iron andSteel ArticlesSpecification for Slainless and Heat-Resisting Steel Plate,Sheel SltipSpecification for Corrosion Resistant Stainless SteelFastenersAluminium and Aluminium Alloys. Sheet Sltip and Plate.Aluminium and Aluminium Alloys. Wrought Products.Temper Designations.Aluminium and Aluminium Mays. Chemical Compositionand Form of Wrought Products.Specification for Wrought Aluminium and Aluminium Alloysfor General Engineering purposes: Bars, Exltuded RoundTubes and Sections.Method for Specifying Electroplated Coatings of Zinc andCadmium on Iron and Steel AMD 6731, May 1991 (Gr 0).Specifications for Sprayed Metal CoatingsMetallic and Other Inorganic Coatings. Thermal Spraying.Zinc, Aluminium and Other Alloys.Continuously Hot Dip Melal Coated Steel Sheet and Strip.Tolerances on Dimension and Shape.Specification for ISO Meltic Black Hexagon Bolts, Screwsand Nuts.Specifications for Chromate Conversion Coatings onElectroplated Zinc and Cadmium Coatings.Stainless Steel CastingsStainless Steel CastingsSlainless Steel CastingsStainless Steel Castings

    .',

    II j:.',

    7. Glazing and Caulking

    BS 952 Glass for Glazing

    Arch- Sol Facades I Tripoli I Curt.lIin Walt Specs I Aug 061v1 Page 9 0(60

    J ~,

    " I

    Burj AI Baher, Tripoli, Libya

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj UI B.h.....Tripoli TECHNICAL SPECIFICAnONPREPARED: Augusl2DD6 CURTAIN WALL & GLAZING PACKAGE

    Arcll- Sol Facades I Tripoli IC\lf1IIin Wall Spees I AUI 06 Ivl

    \]JnnafJ",

    DoofJJ;,nJ""

    '.1

    r,\':i'

    n'_ ...-'

    (IJ\1-I

    ~ .(

    BS 5889BS 6206

    BS 6262BS 6375CP 153

    BS 4254BS 4255

    BS 4255BS 5215

    ASTM C509

    ASTMC794

    19/GP-18M

    TT-S-0227E

    AS 1288GANA

    8. Fire Protection

    BS 476

    9 Protective Coatings

    CP 3012

    BS 1615BS 6161BS 5493

    BS 6496

    BS 4642

    BS 5411BS 6161

    BS 6161

    BS 6497

    ASTM 0523ASTM 04214

    ASTMD714

    Surj AI Saher, Tripoli, Libya

    Silicone SealsSpecification for Impact Performance Requirements forFlat Safety Glass and Safety Plastics for Use in BuildingCode of Practice for Glazing in BUildingsPerfonnance of WindowsCode of Practice for Windows and Roof-lights (BritishStandard)Specification for Two-Part Polysulphide Based SealantsRubber Used in Pre-Fanned Gaskets for WeatherExclusion From Buiidings.Part 1: Specification for Non-Cellular GasketsSpecification for One-Part Gun Grade Polysulphide BasedSeaJants.Specification for Cellular Elastomeric Pre-Formed Gasketand Seating MaterialTest Methods for Adhesion - in Peel of Elastomeric JointSealantsSealing Compound Elastomeric Type, Mult~Component.(Canadian Government Specification Board)Sealing Compound Elastomeric Type, Multi-Component(US Federal Interim Specification Board).Glass in Building - Selection and Installation.Glazing Association of North America.

    Fire tests on Building Materials and Structures.

    Code of Practice for Cleaning and Preparation of MetalSurfacesSpecification for Anodised AluminiumMethods for Testing Ancdlsed Aluminium FinishesCode of Practice for Protective Coating of Iron and SteelStructures against CorrosionSpecification for Powder Organic Coatings for Applicationto AluminiumSpecification for Liquid Organic Coatings for Application toAluminium Alloy Extrusions, Sheet, and Pre-FormedSections for Extemal Architectural Purposes, and for theFinish on Aluminium Alloy Extrusions, Sheet and Pre-Formed Sections Coated With liqUid Organic Coatings.Method of Test for Metallic and Related Coatings.Methods of Test for Anodic Oxidation Coatings onAluminium and its Alloys.Part 8: Detennination of the Fastness to Ultraviolet light ofColoured Anodic Oxide CoatingsSpecification for Powder Organic Coatings for Applicationand Staving to Hot-Dip Galvanised Hot-Rolled SteelSections and Pre-Formed Steel Sheet for Windows andAssociated External Architectural Purposes, and for theFinish on Galvanised Steel Sections and Pre-FormedSheet Coated with Powder Organic Coatings.Test Method for Specular Gloss .Test Method for Evaluating Degree of Chalking of ExteriorPaint FilmsTest Method for Evaluating Degree of Blistering of Paints

    Page: 100r6O

  • 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & Extemal Cladding

    10. Painting Reference Specification

    r'"r ),!.,

    nU

    Volume 2The Burj UI BehaI-TripoliPREPARED: Augus12006

    ASTMD968

    ASTM 01654

    ASTM 02244

    ASTM 02247

    ASTM 03363ASTMG23

    TECHNICAL SPECmCATIONCURTAIN WALL &: GLAZING PACKAGE

    Test Method for Abrasion Resistance of Organic Coatingsby the Falling Abrasive TesterMethod for Evaluation of Painted or Coated SpecimensSubjected to Corrosive EnvironmentsMethod for Instrumental Evaluation of Colour Differencesof Opaque MaterialsMethod for Testing Coated Metal Specimens al 100%Relative HumidityTest Method for Film Hardness by PencilRecommended Practice for Operating Light and WaterResistant Exposure Apparatus (Carbon Alc Type) forExposure of Non-Metallic Materials.

    AS/NZ 4284:1995 Testing of Building FacadesASTM E283 Test Method for Rate of Air Leakage Through Exterior

    Windows, curtain Walls and Doors.ASTM E330 Test Method for Structural Performance of Exterior

    Windows, Curtain Walls and Doors by Uniform Static AirPressure Difference.

    ASTM E331 Standard Test Method for Water Penetration of ExteriorWindows, Curtain Walls and Doors by Uniform Static AirPressure Difference.

    ASTM E547 Test Method for Water Penetration of Exterior Windows,Curtain Walls and Doors by Cyclic Static Air PressureDifferential.

    AAMA 501.1 Standard Test Method for Exterior Windows, Curtain Wallsand Doors for Water Penetration using Dynamic Pressure.

    AAMA 501.2 Specification for Field Testing of Metal Curtain Walls: FieldCheck of Water Penetration Through Installed ExteriorWindows, Curtain Walls and Doors by Uniform AirPressure Difference.

    ,

    lDn)h.iD'f),.ii:"'J-

    1'0''; I. ,

    AAMA2605.2

    11 . Performance Testing

    12. Lightning Protection

    Voluntary Specification for High Performance OrganicCoatings on Architectural Extrusions and Panels

    BS 6651 Code of Practice for the Protection of Structures AgainstLightning

    13. Quality Assurance

    ISO 9001 to 9004 Quality Systems for Design Development, Production,InSlaliation and Service

    14. GANA Giazing Manual, 2004 Edition

    17. Specifications for the Design of Cold - Formed Steel Structural Members",

    15. Aluminum Association Specifications of Aluminum Structures

    16. Specifications for the Design, Fabrication and Erection of Steel for Buildings,commentary of the AISC Specifications, AISC - 8'" Editlon .

    .~,--

    , .

    18 "Structural Welding Code", AWS 01.1; !1WS 01.2; AWS 01.3,

    ,

    An:h Sol Facades 1Tripoli I Curtain W.II Specs' Aut 061 ,,1

    Bur; Al Baher, Tripoli, libya

    ..

  • i UU Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Bwj mBehar-Tripoli TECHNICAL SPEOFICATIONPREPARED, Augusl2006 CURTAIN WALL &< GLAZING PACKAGE

    19. "Handbook on Bolt, Nut and Rivet Slandards. Industrial FastenersInstitute.

    n~,20. Air Movement and Control Association International Inc, AMCA SOOl and 501.

    21, ISO 140-3 laboratory Measurement of Airborne Sound Insulation of BuildingElements

    22. ISO 140-9 Laboratory Measurements of Room-ta-Room Airborne Sound Insulationof a Suspended Ceiling with a Plenum Above It.

    23. ISO 717-1 Rating of Sound Insulation in BUildings and of Building Elements,

    24. State of Libya Building Code

    1.9 SUBMITTAlS

    "("1I, j')

    A. The Tenderer shall submit the following documents at no cost or obligation to the Employerand consultants:

    Information regarding place of assembly, fabrication and locai storage provision.

    A preliminary curtain wall hoisting proposal, and a safety plan cleariy indicatingintent.

    Anchorage details and calculations. The Architect reserves the right to use the anchoragedesign and calculations prior to tender award, for Government submissions without bindingthe Employer to accept the Tenderer.

    Preliminary design drawings and calculations of the curtain wall systems, mullions,transoms and cladding system and standard fixing details at full size. This is to includepreliminary calculation of joint requirements based on the building movements given in thisspecification and in accordance with international standards guidelines.

    Design, submissions and approvals of shop drawings.Submission, approval and consent application andacknowledgement for Buildings Department Submission.Material ordering, fabrication and installation of the curtain wall.c)

    a)b)

    Program for

    nt~

    :0;\.n:0:0\'\;

    Oulline of a Quality Plan suitable for this project and conforming to IS09002.~,

    J, i.V

    Samples of glass, aluminium and other finishes specified.

    Completed Materials Schedule and Team Structure.

    Confirmation that all warranties will be provided as stated in this Specification.

    ,n--'

    Preliminary method statement for the supply and installation of the curtain wall,ouUining all storage space on ground level and equipment to be used on site.

    Staffing structure that is proposed, together with the names, positions, levels ofattendance and resumes of key staff.

    A list of current jobs that are in hand, together with an outline of capacity to handlethis project.

    Current test reports for manufacturer's standard system in a size and shape similar tothis project showing that the system will meet or exceed all specified performance

    -,I ..

    11, Arcb- 501 Faa.dc:li fTripoli I CUrtain Wall Specs I Aug06/.1Surj Al Baher, Tripoli. Libya

  • '} II

    '. \ Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Cu.rtain Wall & External Cladding

    Identify any new extrusions or non-standard conditions required for the job.

    Proposal scope drawings for all typical areas including comers, slots and fins. Qualityand content of scope drawings shall be the same as required for shop drawings,

    The Burj VI Behar-TripoliPREPAREO, August 2006

    requirements.

    TECHNICAL SPECIFICATIONCURTAIN WALL & GLAZING PACKAGE

    r .. )'.1!\ ':J

    T]L\Jru'\.'T)oin\!Jr'!Jr.\1 jl...

    Ij_I,

    B

    C,

    D,

    E.

    F.

    Prior to submitting any documents required for approval, provide an itemized list ofspecification requirements and architectural drawing requirements which are not embodiedin the contract, or intended contract, for work of this section. Identify the specification pageand paragraph, or the architectural drawing sheet, elevation, plan, section or detail for eachitem. Deviations not specifically identified in this manner shall not be deemed valid insubmittal review, and shall be cause for disapproval at the reviewers' discretion. In theevent that there are no deviations, provide a written statement of full compliance witharchitectural concept drawings and specifications. Failure to provide an itemized list ofdeviations in the required form or a statement of full compliance shall at the reviewer'sdiscretion, be cause for return of any and all submittals for approval without review, with thecontractor bearing full for any resultant delay.

    Prior 10 or simultaneous with first submittal of calculations for approval, providedimensioned die drawings for all aluminum extrusions. In the event that extrusion profilesare not finalized, provide die drawings for the profiles contemplated at that lime. If profilesare revised, provide revised die drawings with the first or shop drawing submittal whichfollows the revision, Die drawings shall show profile dimensions, metal thickness, alloy andtemper

    Prior to building construction, provide giass manufacturer's wind and thermal stressanalysis, and center deflection calculations that specified maximum probabilities ofbreakage are not exceeded,

    Prior to building construction, provide sealant manufacturers test reports confirmingadhesion of sealant to all substrates, Provide samples of production materials 10 sealantmanufacturer for adhesion tests. Adhesion shall be evaluated, and is required to beacceptable. after initial cure and after water immersion for seven days. Evaluate adhesionof immersed samples immediately after removal from water. Provide stain lest reports onthe granite and pre-cast panels. Provide written certification from the sealant manufacturerIhat sealant selected is compatible with all adjacent materials and finishes, Provide printreview from sealant manufacturer. Submit proposed structural silicone quality controlprogram.

    Prior to bUilding construction, provide glass manufacturer's written statement thatinsulating, heat treated, reflective, coated, spandrel and laminated glass is suitable for suchapplication. Submit letter stating manufacturer has reviewed the curtain wall shop drawingsand has approved the glazing details shown therein.

    G, Provide the following submittals for acceptance. First submittals and re-submlttals shall becomplete and in the required form. Re-submittals shall include requested corrections andshall respond to previous comments. Each sheet that is revised shall bear a revision dateand number. Revisions shall be flagged with a conspicuous revision symbol and numberand revised detail clouded, Failure of a submittal to be complete, in the proper form,responsive to comments or identify revisions shall, at the reviewers' discretion, be cause fordisapproval and retum of documents without review, with the Contractor bearing fullresponsibility for any resultant delay, Failure to review comments or to note anoncompliance with plans and specifications shall not relieve the Contractor from hisobligation to comply. Failure to review comments or to note a noncompliance on a givensubmittal shall not preclude a directive to comply on future submittals. Allow sufficient timefor preparation and processing of submitlals and re-submittals to avoid conflicts withschedules.iJ

    JViH

    Arch Sol Facades 'Tripoli' Curtaia Wall Specs' Aug 06' vi

    Burj AI Baher, Tripoli, Libya

    t

  • ! \." .

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & Extemal CladdingThe Burj III Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: August 2006 CURTAIN WALL &< GLAZING PACKAGE

    n,n_.,n

    roif)I(q)L.

    D;.f)I''.,.'C_

    "I \JJ

    H. Provide shop drawings showing matenals in place on the bUilding including coordination ofrelated and adjoining war!

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe BUIj m Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED, August 2006 CURTAIN WALL &, GLAZING PACKAGE

    d.e.f.g.

    h.i.j.

    Tech data on all proposed sealants. along with color chart. and cured samples.12"x 12"samples of insulation with tech data.12"length of fire safing with tech data.All extrusion die drawings and 12" long samples of the production run on allextrusion shapes involving a snap fit Snap fits are to be designed using 112standard tolerances.Glass selling blocks side spacers, gaskets and shims.Samples of fire knock-out decals or markings, if required.Samples of gaskets. rods. tapes, glazing accessories. Gasket test reports.sealant test reports. and technical data on all glazing accessories.

    1.

    ru-l.

    [1).l"

    I.

    J.

    1B. Subm~ manufacture~s product data and specifications for any materials, orfabrication techniques used in the curtain wall work. Include instructions Irecommendations for installation and maintenance. Include certified test reportsshowing compliance with requirements where test methods are indicated.

    Seal and signature of structural engineer currently licensed in the State of Libya. This shallbe same engineer who signs the calculations.

    Submit structural calculations, sealed by a licensed structural engineer in the Stateof Libya prepared in compliance with referenced do.cuments and specifications.

    When two-part, factory-applied structural silicone sealants are used to adhere any glazingproduct to the building or curtain wall framing. the Contractor shall establish and submit tothe architect, an acceptable Quality Control program to mon~or quality of materials andworkmanship. The Q.C. program shall include. but not be limited to. such items as"butterfly" tests, "snap time" tests, "adhesion" tests. weather seal" tests. "plug" tests andall fabrication and erection procedures. The Contractor shall employ full time qual~yassurance staff in both shop and field who will prepare daily inspection reports. A copy ofthe daily inspection results shall be available to the architect for his records. The qualitycontrol program shall include a full negative design pressure test of one full size vision andspandrel unit from the production line at the rate of one every 50 units. The test to beconducted at the Manufacture~s facil~. The Contractor may use the test un~s on theproject at the conclusion of successful test results. A failure of any tested unit will requirethe testing of the two (2) additional units manufactured immediately before and after thefailed un~. Depending on the success or failure of the subsequent test, and thedetermination of the cause of initial, additional tests may be required by the architect

    1f'"'1," I .'1'I,..

    1. Note special reqUirements for use of any two part silicone products adhered toKynar-based paints or to stone panels.

    K. Maintenance Program and Manual

    1. Submit (4) four copies of Glazed Aluminum Curtain Wall System MaintenanceProgram and Manual. (1 each for Owner. Architect. General Contractor, with (1) onecopy to be retumed to the curtain wall subcontractor). The manual is to include (butnot limited to) information regarding all required periodic inspections (descriptions.photographs of acceptable unacceptable conditions, etc) and the frequency of suchrepair procedures required for any unacceptable conditions, replacement timeperiods for any I all materials incorporated into the work, copies of warranties fromthe manufacturer and wall contractor, as well as contact numbers for the generalcontractor, wall contractor, and wall manufacturer, Include a CD containing a set ofthe "As buill" shop drawings, denoting any changes made during the constructionthat were not originally on the approved shop draWings.

    Arcb- Sol Facades I Tripoli I Cunai.r:l Wall Specs' Aut 061 vi

    Bu~ AI Baher, Tripoli, libya

  • The Burj m Behar-TripoliPREPARED:Au~t2006

    ;.\

    oVolume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    TECHNICAL SPECIFlCAnONCURTAIN WALL &: GLAZING PACKAGE

    -n( I. J

    nun{)'Il'0

    n.\)t,.

    [Ju

    1.10 PERFORMANCE REQUIREMENTS

    A. The curtain wall and glazing systems generally shall be water proof and wealher proof,able to support all dead loads, wind loads, live loads and other loads imposed on thecurtain wall system, accommodate all movements due to base structure movement anddeflecUons and thermal expansion and conlracUon, and generally retain Its appearance forthe service life of the system without failure or breakdown of individual materials andcomponents.

    B. Methods of fabricaUon and assembly (except as specified herein, or as recommended bythe Architect as a consequence or result of testing), shall be at the discretion of theContractor (subject to acceptance by the Architect) provided that the exterior and interiorvisible architectural effect is not changed, the work of other Conlractors is not affected, andlhe weather lightness and strength qualities, as demonstrated by engineering calculationsand measured by the results of the test for requirements, are not reduced.

    C Remedial measures, which may be necessary on the mock-ups or lhe building, shallmaintain standards of quality and durability, and are subject to acceptance by the Architect.

    o The work, as erected,' shall meet or exceed the herein specified minimum structural andweather resislance requirements, as demonstrated by engineering calculations and testingof mock-ups.

    E All fayade elements are to be designed for 50 years design life for slructural Integrity and a25 year serviceable life for duration to first major maintenance.

    F Additional slructural glazing requirements: Slructural glazing adhesive conlact surfacesshall be anodised, PVF2 or A10dine Conversion Coated. No structural glazing adhesiveshall be applied to mill finished aluminium surfaces. Adhesion tests are required to assessthe correct cleaner and primer to be used.

    G BASE BUILDING TOLERENCE

    The concrete shall be designed to accommodate the primary structure constructiontolerances allowed to tihe Main Contractor. Unless otherwise noted, the maximumconstruction tolerances shall be taken as follows:

    Please note that the figures shown are a guide only and the project specific movementsmust be in accordance with the project structural engineers design.

    Plan position of the bUilding edge +/- 25mmLevel of slab surface and stab soffit: +/- 25mmDeviation of column iocations at any storey relative to required position: +/- 25mm

    Devia~on In plan over 10 floors: < 50mm

    H FABRICATION TOLERANCES

    Submit a schedule of fabrication lolerances for all major curtain wall system components.Indicate exlremes of allowable base building tolerances on shop drawings.

    Tolerances at joints and junction details shall take precedence over tolerances of panelsand major components. Tolerances generally shall be:

    Joinl width: +/- 1 mm.Length and width of major components: +/- 0.5 mm.Diagonals of major components: +/- 1 mm.Aluminium extrusions generally: 50% AOCA standards.

    Mlsa~gnment of mating surfaces: +/- 0.5 mm.'1jJ

    JrJJ Arch- Sol Fle,des/Tripoli I Curtain Wall Spees I Aug 06 {vi

    Burj AI Baher, Tripoli. Libya

  • The Burj VI Behar~TripoliPREPARED: August 2006

    ni Il. "

    n'-.'

    11.LJ

    D

    nI '~)

    ~)cf)l.tD

    Volume 2

    J

    K

    2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    TECHNICAL SPECIFICATIONCURTAIN WALL &: GLAZING PACKAGE

    Aluminium tolerances regarding thickness, straightness. twisting and flatness generallyexceed 50% of ADCA Aluminium Standards and Data-Wrought Products.

    Aluminium sheets for cladding panels shall be tension levelled.

    Flatness of architectural stainless steel shall be not less than "stretcher level" grade.Submit manufacturer's specifications.

    INSTALLATION TOLERANCES

    In addttion to required fabrication tolerances. all parts of the curtain wall, when completed,shall be within Ihe following tolerances:

    Posilion on plan, or vertical surface: +/- 3 mm.Deviation in alignment: Not more than 1 in 300Deviation in level (horizontal): Not more than 1 in 300Deviation in plumb (vertical): Not more than 1 in 800Offset in alignment of adjoining surfaces: +/- 0.5 mm.Offset in alignment of separated surfaces: +/- 1.5 mm.

    Site check the cumulative effect of all building tolerances and adjust installation proceduresas required.

    WATER-TIGHTNESS

    The curtain wall system is 10 be a fully unitised, drained joint pressure equalised system,which shall be 100% watertight, allowing no water to penetrate to the interior of thebuilding. The syslem shall be designed such that water being drained in the system shallnot cause any damage to the penmanent works. The system shall not be face sealed andshall not rely on wet seals.

    Provide a complete water drainage and control system, including pressure equaliseddrained joints, gutters and troughs.

    Water that enters the system, including leakage and condensation, shall be drained ordischarged to the exterior face of the curtain wall system. Water shall not be trapped orretained in the system. Minimise risk of algae or fungal growth

    Where the control device is not pressure equalised, provide mechanical baff1~s to drainageoutlets such as weep holes and slots.

    Sealants and gaskets, which are Inaccessible In the installed system, shall remain effectivefor Ihe service life of the system.

    All glazing rebates, backpan cavities, stack joints, window & doorframes, working louvresand external trims are to be outward draining. Louvres are to be designed so they sit on acatchment tray that will capture any water particles that pass through the system and dripdown inside.

    Drains are to have baffles to prevent the ingress of wind driven water.

    The effect of the drainage system on air now and the partial or full pressure equalisation ofthe system shall be considered in the design of Ihe cladding and backpans.

    AIR-TIGHTNESS

    The design and installation of the air sealing shall be carried out to high standards tominimise air infiltration. Co-ordinate with installers for adjacent work to achieve thespecified maximum air infiltration at junction with curtain wall systems.

    JJ'1 I

    Arcb- Sol Facades /Tripoli / Curtain Wall Specs/ Aug06/ vi

    Burj AI Baher, Tripoli, Libya

  • .1r'J

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingTh. Burj ill Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: Augus12006 CURTAIN WALL &< GLAZING PACKAGE

    nl..I

    n: !U

    IJLrlU

    oDn1)

    "

    :! ~1,.r

    L

    M

    N

    o

    Air infiltration and exhaustion limits are to be confirmed through testing, (Refer to Section192).

    OTHER ENVIRONMENTAL CONSIDERATIONS

    Provide for all weather and precipitation conditions. Submit full details on shop drawings,including all assumptions.

    Design and install all curtain wall systems and cladding systems (generally and allcomponents) to provide for noiseless movement caused by thermal expansion and whensubject to dynamic loading caused by wind as well as BMU and cleaning operations. Thesystem shall not generate noise due to creaking, drumming or rallie. All curtainwalUcladding surfaces/roofs shall not whistle due to wind.

    Metal to metal contact between inter-locking members is not permitted.

    Lightning Protection:

    The Sub-contractor shall coordinate with the Electrical Sub-contractor for the properbonding of the curtain wall at specific locations (as dictated by the curtain wall Sub-contractor) to the main lightning protection system provided by the Electrical Sub-contractor.

    Provide electrical continuity and conductivity within the curtain wall system.

    The Subcontractor shall carry out and demonstrate the uniqueness of lightning protectioncharacteristics of the curtain wall system according to the manufacturers standardrecommendations. The Sub-contractor is then to test jointly with the Electrical Sub-contractor for the successful amalgamation of the curtain wall lightning prevention propertyinto the main (lightning protection) system provided by the Electrical Sub-contractor.The Sub-contractor is to co-ordinate with the Electrical Sub-contractor for the details ofconnection tabs and make all necessary provisions for the earthing strap connection.Earthing straps are to be provided and installed by Electrical Services Sub-contractor.

    Smoke isolation and Fire Separation:

    Design entire system to provide smoke isolation between floors and elsewhere as required.Provide baffles fixed and sealed between base structure and curtain wall system_ Submitdetails on shop drawings.

    Provide materials and methods of fabrication, installation and sealing which meet thestatutory requirements. Use materials that are non-eorroding, or protected againstcorrosion, or of such thickness that corrosion will not impair the required fire stopping orsmoke flashing function during the service life of the system.

    The gap between the curtain wall and the concrete slab edge is to be filled with a BuildingsDepartment approved insulation material with a 2-hour fire resistant period. This includesall horizontal and vertical joints that for a compartment in the building.Weathering:

    The system and its components shall not fail to comply with performance requirements dueto the effects of weathering. This include degradation of components both inside and outdue to UV, dust and other natural causes.

    ( I..Jii'

    Arch- Sol Facadc:s I Tripoli I Curtain Wall Specs JAlI.g061 vi

    Bu~ AI Baher, Tripoli. libya

  • The Burj U1 Behar~TripoliPREPARED: Augusl2006

    JJ

    (1l .Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & Extemal Cladding

    TEOINICAL SPECIFICATIONCURTAIN WALL &< GLAZING PACKAGE

    P STRUCTURAL REQUIREMENTS

    ~1\ .LJ

    Design all components of the curtain wall/glass wall systems, including anchorage, fixings,adhesives and structural adhesives, to carry all temporary and permanent design loads,individually and in combination without causing failure, including failure which may be dueto one or more over-stresses, including cracking, bowing, distortion and looseness, lack ofrigidrty, dislodgement by wind forces, excessive deflection or defects which would causedamage to adjacent or applied work by others.

    [J:}

    Prepare and submit full structural analysis in the form of computations and shop drawings.Co-ordinate with the Main Contractor as required for additional information on basestructure conditions. Materials and components shall be engineered to accommodate allloading conditions.

    Strength, stiffness and sizes of components and fIXings shall be adequate for all conditionsand requirements.

    [~nlJooo

    Dead Loads

    Design curtain wall brackets and cast-in anchors \0 carry 2x the self-weight without causingoverstress or slipping of anchors.

    The total self-weight (un-factored) shall be used in combination with wind load and live loadin the design of all members.

    Live Loads

    Design curtain wall system to carry the following loads in combination with full dead loadand 25% of the design wind loading:

    A point loading of 1.15 kN on all horizontal surfaces including projecting features, sillsand canopies.A line loading of 0.75 kN/m acting either downward or oulwatd on all windowsills.A uniformly distributed loading of 0.75 kPa on all roofs and canopies.A line loading on inner lights of glass of 0.75kN/m acting outwards at a height of1100mm above the finished floor level.

    These live loading requirements do not need to be superimposed with each other.

    Live loading for canopies shall be taken as 0.75 kPa+ allowances for BMU access loading.

    Wind Loads

    The curtain wall and glass wall are to be designed for wind loads conforming to wind loadpredictions based on BS 6399 or other relevant codesThe designed cladding pressures should take into account of parapet loading, loading toplant areas and the like with dominant openings, canopies and other projecting features. Tocalculate wind loads on these areas, local pressure factors according to BS 6399 andAS1170 (Part 2) shall be applied to the calculated wind loads.

    I'U.=r

    BMU Loads

    Co-ordinate with BMU Supplier and obtain details of proposed eqUipment, sockets and allBMU operation live loads and directions of action.

    Install all required restraint fiXings, brackets,' supports and the like, and allowabletolerances for the operation of the equipment. Restraint sockets and (three-ball minimum)plungers are to be supplied by the nominated maintenance unit supplier.

    Ast:h- Sol Facades I Tripoli. I Curtain Wall Sped f Aug 06/ vI

    Bu~ AI Baher, Tripoli, Libya

  • :I'.. Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & Extemal Cladding

    Design curtain wall system to carry all BMU loads acting in combination with full dead loadand a wind load of 1 kPa. BMU loads are not required to be super-imposed with live loads.Verify all loads with BMU Supplier.

    The Burj Ul Behar-TripoliPREPARED: August 2006

    TECHNICAL SPECIFICATIONCURTAIN WALL & GLAZING PACKAGE

    nl-,'n,.'"

    'l'l, ,, ,,=t

    /(1).rlI L"""

    {;L :IY"

    .I. 1:ub

    Q

    Single point loads at any location on the BMU socket (equivalent working loads. dynamicfactors incorporated):

    Inward perpendicular to face: 2.7kNOutward perpendicular to face: 2.7kNUpward load nonmal use: 2.7kNVertically downward: 2.7kNSideward horizontal: 2.7kN

    Other Loads

    Design load reduction for cladding to feature canopies and blanked- off walls:

    Single sealed panel systems to drained cavities with solid backup walls shall not bedesigned to incorporate wind load reduction principles based on (partial) pressureequalisation.

    Temporary and construction loads:

    Design the curtain wall systems to allow for all handling and installation loads withoutcausing overstress. permanent deflection or warping.

    No penmanent defonming of panels, channel legs and the like during installation to enablepanels to fit into place will be approved.

    THERMAL STRESSES/MOVEMENTS

    Design Temperature Range

    Preliminary design shall be based on a metal temperature range from 0 to +70C. Prepareand submit full analysis of weather condijions and proposed design temperature range forall components and/or assemblies and indicate all design movements on the shopdrawings.

    Movements Within Curtain Wall Systems Due to Thennal Loads:

    Provide for all thenmal movement to take place freely in the plane of the curtain wall systemwithout causing harmful buckling, failure of joint seals, undue stress on fasteners and glassor other detrimental effects. No component or system shall be stressed or subject toinduced loading as a result of thenmal movement.

    Full movement allowances including assembly and installation tolerances shall beincorporated into all junction/components at each expansion joint or assembly.

    All joints and interlocking components shall be designed to be separated to be noise freewhen building and thermal movements occur.

    Make reference to:Meteorological records indicating daily and seasonal maximum and minimumtemperatures, wind, and other relevant weather effects.Solar radiant heat loads and any effects of conduction and convection.Shading, including shading from parts of this building and from adjacent buildings.Reflection, including reflection from parts of this building and from adjacent buildings.Orientation and colour.

    AId1. Sol F.cadC:5 'Tripoli I CUrtain Wall Spca I AUK 06/..,\

    Surj AI Baher, Tripoli, libya

  • Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj Ul BeharTripoliPREPARED: August 2006

    TECHNICAL SPECIFICATIONCURTAIN WALL

    i(!J

    "1II"

    _J

    R

    Resultant service temperature of curtain wall system components.

    BUILDING MOVEMENTS

    Design curtain wall system to provide for deflections, displacements and other movementswithin the curtain wall system, and between the curtain wall system and the base building(including fire stop and smoke flashing connections). Include movements caused byambient temperature changes, wind loads, dead loads and live loads, and shrinkage.

    The design shall include moveable joints 10 accommodate the full range of movementrequirements including manufacturing tolerances, site tolerances, thermal movement,lateral movement, floor sag, beam sag, live load deflection and column settlemenl

    Allowance for movement shall be in addition to allowance for building tolerances.

    Joints shall accommodate the worst possible combination of effects to prevent loads of anykind being transfenred from the building into the curtain wall system, excessive movementsof any joints or failure of weather seals.

    Prepare and submit full analysis and complete details of proposed design movementallowances based on the base structure inlonnation contained in the Contract Documents.Indicate movement limits and required clearances on shop drawings.

    . Accommodate movements within the design movement allowances indicated on theapproved shop drawings, silently and without failure of the system, pennanent defonnation,reduction of performance, visible movement at any joint, or other detrimental effectsincluding:

    Application of stresses or induced loads to any component or system, inclUdingstructural elements, fixings, glass or face panels.Damage to any component or system, including structural elements, fixings, glass orface panels.Failure of joint seals.

    Design movement joint and select sealant products to accommodate all required expansionand contraction within joint tolerances indicaled on the approved shop drawings and withinthe sealant movement limits recommended by the sealant manufacturer under loaded andunloaded conditions. All movement allowances shall be consistent and applied across alljunctions and/or components for each expansion joint system or assembly. The sub-contractor shall regularly assess and take into consideration the effect of ongoing basebuilding movements on curtain wall set~ut.

    Base building movements due to lateral displacement of buildi[lgs.

    Design curtain wall system so thai no structural or architectural element, joint or weatherseal failure occurs for the following lateral movements between successive floors.

    Long term bUilding movements:

    The base structure will continue to undergo deflection during the life of the building due tovariation in live load and creep of the concrete structural elements. Design Ihe curtain wallsystem to accommodate the absolute relative vertical deflections and horizontalmovements that may occur due to panel rotations due to the following displacementsoccurring between successive floors:

    Differential column and core shorteningBeam or slab edge displacementAxial Shortening of edge beamsFloor to floor drift of the building

    f) Asch- Sol Faudcs /Tripoli / Curtain Wall Specs / AIII06/vlBu~ AI Baher, Tripoli, libya

  • The Burj Ul Behar.TripoliPREPARED, Augusl2006u

    n_.J

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    TECHNICAL SPECIFICATIONCURTAIN WALL & GLAZING PACKAGE

    Make allowance for long-term axial shortening of edge beams: 0.4 mm per 1 metre length.

    For more detailed information regarding base building movements refer to Appendix B ofthis specification.

    CURTAIN WALL DEFLECTION LIMITS

    o]J.-

    oI~UiJrJlqh.

    S

    1.

    2.

    3.

    The vertical dead load deflection of transoms shall be limited to the lesser ofSpan/300 or 3 mm. This is based on selting blocl

  • L]Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj UI Behar-Tripoli TECHNICAL SPEClFlCATIONPREPARED: Augusl2OC6 CURTAIN WALL&, GI.AZING PACKAGE

    [l~

    on

    ("l!'1Uoo

    1.11

    1.12

    FIELD TESTING

    A The Owne, will engage a qualified independent testing and inspecting agency 10perform field test and inspections and to prepare test reports.

    B A minimum of six air and water tests will be performed in field during construction.Area and time of tests shall be per the direction of the Architect Tests to beconducted per AAMA 501.3 at specified design pressures (No Reduction). Waterpenetration is as defined previously herein. Contractor to provide powered scaffold,hose, water supply, communication system and manpower 10 assist in theperformance of the tests. Test wall at 20%, 60% and 90% completion. Scheduleany work necessary, such as out of sequence sealant work, so that wall can betested as specified. Owner, Architect and their consultants to witness all field tests.Notification to these parties required seventy-two (72) hours in advance ofscheduled tests.

    WARRANTY/GUARANTEEA The warranty shall state that glass shall be guaranteed against breakages due to

    defects in glass material, fabrication of insulating units, and/or installation for aperiod twenty (20) years after substantial completion, as defined in the curtainwarranty.

    B Insulating glass units shall (vision or spandrel) shall carry a twenty (20) yearwarranty from their manufacturer against delamination, obstruction of vision byfogging up and collection of dust or dirt in the enclosed space or cracking, peelingor flaking of coatings.

    f1'I :.~--,.

    r-I 'I'

    .0.1

    'I'. I.1.)

    C

    D

    E.

    F.

    Spandrel glass shall carry a twenty year (20) warranty from their manufactureragainst peeling or flaking of opacifiers.

    The silicone sealant; shall carry a twenty (20) year warranty from the sealantmanufacturer (i) against adhesive or cohesive failure or the discoloring or changingin appearance due to fluid migration of porous substrate and (iI) thai the siliconewill perfomn as a watertight weather seal.

    Kynar paint systems or approved equal finishes shall carry a twenty (20) yearwarranty from the manufacturer and applicator against, paeling, fading, chalking,cra2ing, cracking, fiaking or other damage in appearance or performance. The formof the warranty from the paint manufacturer and applicator shall cover all materials,equipment and labor for repairs and re-installation.

    Warranty to include inslructions to Building Owner that transfer of buildingownership implies transfer of and agreement by the new owners to fully implemenlthe Maintenance Program described in Maintenance Program and Manual(described above) to new owners.1. State conditions which present ownership must meet to satisfactorily transfer

    any and all warranties upon sale or transfer of ownership of the property toindividual owners, hotel operator, office tower association(s), condominiumassociation(s) or to any party who may claim legal rightful ownership to anyportion of the whole of the property.

    2. These conditions shall include notification in writing of the Iransfer of thewarranties to the project's architect, general contractor, and subcontractorperfomning this work and to any entity with outstanding warranties (suppliers,SUb-subcontractors, etc.) for the materials, work or workmanShip undertakenby this specification sect ion. Notification shall include information regardingthe names, addresses and contact information of the new owners of saidwarranties.

    Mh Sol. Facades 1Tripoli 1Curtain Wall Specs 1Aug 061 vi

    Bu~ AI Baher, Tripoli. Libya

  • J[]nL.11lJ

    0[J0[j0]DrOtU

    fI. .1r-. ,:. jIi1l.(/V

    .. r\II'1'

    .. r1\I I~.

    '1J)r. I;.J

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    Th. Burj UI Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: August 2006 CURTAIN WALL & GLAZING PACKAGE

    1.13 SPARE PARTS

    Submit certification that all spares will be available off-the-shelf, or with a lead-time notexceeding 4 weeks from date of order. for the warranty period. Provide name and addressof all suppliers and manufacturers.

    Spare glass shall not be used for glass breakage replacements as may be required duringthe course of installation or the Defects Liability Period.

    All spares shall be new and protected in approved wrapping.

    Deliver the spares at the completion of the worX. Formally hand over and submit completeschedule of types and quantities. inclUding full replacement instructions, and any specialtools required.

    Required spares shall include:(1.5 % or 20 panets maximum) of each glass type and size.(1.5 % or 2 panels maximum) of each Cladding panel type and size.All the dies used to extrude the curtain wall sections on this project shall be availablefor the warranty period.

    Subm~ certification that all spares will be available off-the-she~, or with a lead-time notexceeding 4 weeks from date of order, for the warranty period.

    1,14 MAINTENANCE REQUIREMENTS

    A Co-ordinate design of the curtain wall system with BMU Supplier. Allow for all BMUloads in curtain wall design.

    B Damage:Horizontal or near horizontal surfaces, which form' part of the curtain wall systemsuch as copings. beam encasements, ledges. or the like, shall be designed to carryhuman live loads from maintenance personnel.

    C Se~-CleaningThe design of all components in this contract shall be such that their configurationshall facilitate the self-cleaning of the various systems. Inclined drainage surfacesand flashings, properiy designed drip grooves and self-cleaning joint design areexamples of this requirement.

    D Panel replacement methods:Design and install the curtain wall system to allow for the Mure replacement of anyindividual panel. Submit details and procedures for replacing individual damageditems.

    Arcb- Sol Facades I Tripoli I Curtain Wall Specs JAug 061 vi

    Burj AI Baher, Tripoli, Libya

  • 2.1 SPECIALIST FAC;:ADE CONTRACTORS & MANUFACTURERS

    The specialist contractor nominated for the project must have the relevantexperience and expertise in the manufacturing and installation of unitised curtainwall systems. The following lists of contractors are of the minimum quality wewould expect.

    The system designed and specified for the external envelope of the buildings willbe manufactured from high grade extruded aluminium with structurally glazed fixedand operable vents. The specialist contractors will be required to be pre-qualifiedprior to nominating them for the project consultants to review.

    A. The details shown on the Contract Documents were developed based on a foursided structural silicone glazed unitized wall system. Contractors not listed belowrequesting approval to bid their product as an equal must submit their reques~along with proposed details, calculations. and current test reports and mock-updrawings from a certified independent testing laboratory, in writing ten (10) daysprior to bid date for the approval.

    TECHNICAL SPECIFICATIONCURTAIN WALL &< GLAZING PACKAGE

    2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cla9ding

    PART 2 PRODUCTS

    The Burj UI Behou-TripoliPREPARED: Augusl2006

    Volume 2

    r:I J .b

    u[Jn.,1

    []IIoo

    2,2 MATERiAlS

    Other specialist contractors will be considered SUbject to approval by theconsultant teams.

    Permasteelisa - Italy Focchi - Italy Schmidlin UK/Switzerland Alico UAE AI Abbar Aluminium UAE Arabian Aluminium Co. UAE SGT,China

    nUoori,J

    !L~l, I

    ~IA Provide aluminum profiles and thicknesses as shown and as required to fulfill performance

    requirements. Use suitable alloy for extruding with adequate structural characteristics andsuitable for finishing as specified. Comply with ASTM B 221 for extrusions and ASTM B209for sheets and plates.

    B Any exposed fasteners or fasteners in wet areas of the wall shall be series 300 stainiesssteel. Finish exposed fasteners to match adjacent aluminum. Exposed fasteners may onlybe used if approved by the Architect. The work shall be designed to conceal all fasteners.Unexposed fasteners located on the interior side of the main water barrier plane may besteel with and colored chromate plated, meeting ASTM B 696. Class #5. Type finish 0.0005inch Mill test reports for all structural grade bolts shall be submitted to the Architect for hisapproval prior to installation of those bolts on the job. Nuts used at expansion or movingconnections shall be designed to provide a positive means of preventing disengagement.Stalking of bolts, use of lock washers. or threads being deformed is not acceptable.Matched bolts, nuts, washers shall be used at all friction connections.

    ~l C Steel for Anchorage shall be of shapes and thicknesses required to meet structuralrequirements for their use. All steel shall meet ASTM-A36 requirements and be given ashop prime coat of zinc chromate paint meeting FS n -P-645. Touch up after welding inthe field shall be by this Contractor.

    D

    Arch- Sol Facade:JITripoli I Curtaio WaU Spec.$/ Aug 06/vl

    Bu~ AI Baher. Tripoli, Libya

  • ! \.,

    nn,. I

    DoDJ

    Volume 2 2.4 Arch Sol Facades Technical Specs of Desig~ Supply & Installation of Curtain Wall & External CladdingThe Burj Ul Behar-Tripoli TECHNICAL SPEOFICATIONPREPARED,Au t2l106 CURTAIN WALL & GLAZING PACKAGE

    embeds shall be by others per these drawings. Exposed surface of embeds shall be shoppainted with specified primer.

    E Structure silicone shall be Dow Corning DC 983 ( 2 part) or GE or equivalentF Provide protective coatings to prevent corrosion of metal components, including concealed

    and slructural components. Adjacent materials and products generally shall be chemicallyand electrolytically compatible with each other and with relevant substrates, and shall benon-staining and non-bleeding. Metals shall be isolated to prevent electrolytic action andcorrosion from adjacent dissimilar metals and absorptive substrates, by an approvedcoatings or spacers.

    Submit details of coatings, spacers and other means of isolation between dissimilar orincompatible materials to prevent corrosion, perforation of protective coatings, or otherdamage due to electrolytic action, chemical attack, or to any other cause including badpractice, incorrect installation, or inefficient fixing methods.

    ,~

    uWhere there is a known or anticipated incompatibility between materials proposed underthis Section and materials to be provided by others, submit details of proposed separation,coatings and spacers.

    '[iL.J

    2.3

    A

    Submit certificates from relevant manufaclurers confirming acceptance of the use of theselected products in the manner and on the substrates proposed.

    FINISHES

    Painted Finishes:

    1. All exposed exterior aluminum: spray applied fiuorocarbon coating containing aminimum of 70% Kynar 500 Resin. Coating must meet the high performancerequirements of AAMA 605.2-1980. Color as selected by the Architect.

    a. Coalings shall exceed performance requirements of AAMA 2605 and ASCA 96.b. The coatings application shall be done directly by an applicator. For visual

    applicator shall use an Electrostatic Gun (4 head), not an Electrostatic Bell.c. The Architect and shall review visual control samples of production panels,

    including clear prior to approval of final color.d. The shimmer and flop of mica flakes shall have a consistent color, appearance,

    and directionality. A uniform orientation of finish shimmer shall be coordinatedwith final position of all panels on the building.

    e. The Architect and Owner shall have final approval of each panel finish andinstallation orientation.

    f. All finishing is to be performed after fabrication.

    Surj AI Baher, Tripoli. libya

    Arch- Sol Facades I Tripoli I Curtain Wall Specs I AUK 06/ ... 1

    b. Aluminum surface to which structural silicone will be adhered shall have a finishthat demonstrates by test the ability to satisfy specified requirements. Subjectto demonstrated effectiveness by satisfactory testing, acceptable finishes areas follows:

    a. Mill finish is not acceptable at structural silicone bonding surfaces.

    All exposed interior aluminum shall receive a spray applied thermo-selting modifiedpolyester coating similar to PPG polycnon III. Coating must meet the performancerequirements of AAMA 603.8-1980. Color as selected by the Architect. All finishing isto be performed after fabrication.

    Aluminum Finish at Slructural Silicone3.

    2.

  • Volume 2 2.4 Arch Sol Facades Techni~1 Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj U1 Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: August 2006 CURTAIN WALL &: GLAZING PACKAGE

    nL.ll

    oo

    1) A fluoropolymer paint conforming to AAMA 2605,2.2) Alodine conversion coating.

    a) The product used to the alodine chemical conversion coating onaluminum extrusions or paneling shall conform with ASTM D1730,Type 6, method 5 (amorphous chromium phosphate treatment) ormethod 7 (amorphous chromate treatment).

    b} Coating weight of chemical conversion coating shall conform to thatspecified in ASTM 6449, section 6, class

    c) Processing shali conform to that specified in ASTM 6449 section 5.

    Finish on ali stainless steel exposed to view shali be #6 as per ASTM A480 to produce aduli satin finish.

    Concealed may be mill finish, providing they cannot be seen through the glass, or do notcontact any structural

    Apply coatings uniformly to coating manufacture~s recommended thicknesses so that thereare no streaks, runs, sags, absence of coatings, blisters, peel", or similar imperfections.

    Finish materials after fabrication. Exposed or sawn edges shali not be exposed to view incompleted installed condition.

    Steel reinforcing components, embeds and anchors shali be prepped and paintedper SSPC-3. Paint shali be a zinc rich coating.

    4.

    In the construction of visual mock-ups. finish the various components to show themaximum variation that wili exist in the actual building construction between adjacent andnon-adjacent components.

    It is the intention of the specification.that the color variation between adjacent parts of thesame finish be imperceptible to the naked eye under normal daylight conditions. To thisend, the Contractor shali submit range samples defining the maximum variation of colorthat can be anticipated in the work. Samples shali be on lengths of extrusions not less than12" and on sheet I plate I panels nat less then 24" square. Pieces abutting or within 6" ofeach other in the construction shali not vary in color by more than the range so as thevariation to be Imperceptible to the naked eye under normal daylight conditions. Parts shalibe carefuliy inspected in the shop and graded for assembly compalibility and marked forinstaliation location.

    Establish and submit for approval a quality control program to assure compliance with thespecified reqUirements. The program shali include documented procedures and processes.Contractor shali maintain complete certified inspection, testing and process records offinishing procedures. Said reconds shali be availabie to the Architect upon request. Nofinishing shali be performed prior to approval of this quality control program.

    Each source of paint color shali be of sufficient to volume to be made in one batch for theentire project. This requirement shali apply to finished extrusions and panels as weli as toany painted glass lites.

    H.

    I.

    G.

    F.

    E.

    D.

    C.

    6

    n:1 1, ,

    ~l

    [.I,I:

    ond

    oooo

    Burj AI Baher, Tripoli, Libya

    Arch- Sol Facades/Tripoli I CllJUin Will Specs I Aug 06/ vI

    Do not ship any material that has not been inspected, tested and marked in the prescribedmanner, does not fall within the prescribed color range, or has been rejected by theArchitect

    Fluoropolymer Coating Tests

    1. The manufacturer shali perform the following tests on suitable test coupons includedin each production run of the coating process unless otherwise agreed upon by

    J.

    K.

  • Inw,Q1[11f]o

    ooonC..J

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj Ul Bohar-Tripoli TECHNICAL SPEOFICATIONPREPARED: Augusl2006 CURTAIN WALL &: GLAZING PACKAGE

    Engineer. In house testing to confirm the manufacturer's testing Is also required,

    a, Dry Film Thickness: Within minus 5% to plus 2S% of specified thickness, testingdevice at processor's option,

    b, Abrasion Resistance: ASTM 0968Coefficient of abrasion toaverage 70,

    c, Pencil Hardness: F minimum,d. Salt Spray: ASTM B117, Withstand 1,000 hours in a S% salt fog at 9SoF (3S0C)

    and retain adhesion, corrosion resistance, color and gloss with no more than a"few" blisters -no larger than No, 4 (ASTM d714)

    e. Humidity Test: ATM 02247, Withstand 1,000 hours at 100% relative humidity at95-100F (35-3rC) and retain adhesion, corrosion resistance, color and gloss,

    f. Weatherometer: ASTM G23, Withstand 400 hours exposure in sunshinecarbon-arc weatherometer, under cycles of 60 minutes and 60 minutescondensing with no significant evidence of chalk, color or gloss change,

    g, Post-Formability and Fabrication: ASTM 01737, Withstand bend around a 3mmmandrel.

    h, Specular Gloss: ASTM OS23, 25-35 on 60 glossometer.l. Adhesion: No removal after 1,Smm cross hatching to base metal, impacting to

    the point of metal rupture, and subjecting to application and quick removal ofcellophane tape,

    2 Testing certification from the paint manufacturer must be submitted as required by'the manufacturer's licensing agreement.

    3 In-house test reports must be submitted to the Architect for approval on four (4)equally spaced intervals for the duration of production as a back up to the paintmanufacturer's test certifications,

    2,4 GLASS AND GLAZING

    r.: i, ,Ll

    A Ail glass at curtain wail areas shall be as shown on the contract drawings, and asspecified in the Glass Section of the Specifications, Refer to Appendix A: MaterialsSchedule for types, locations and colours,

    Products shall be reputable proprietary products, factory manufactured under ISO9002, Submit quality assurance documentation for all products, including bought-inprOducts, including ISO 9002 certification, and evidence of satisfactory long-termperformance in similar commercial conditions.

    Products that may be approved include those manufactured and processed by:

    Guardian - USNEuropeAsahi Glass - JapanSaint Gobain - FrancePilkingtoniFlachGlas - UK/GermanyViracon - USAGlaverbel - BelgiumInterpane - GermanyEmirates Glass- UAE

    'lLlJr: J

    Relevant Standards:ASTM C1036 - Standard specification for flat glass,ASTM C1048 - Standard specification for heat-treated flat glass -

    Kind HS, kind FT coated and uncoated glass.GANA - Glazing Manual.

    ;5S""";:"~~M;;,;"US.;;'.F~;;:;;"';;:a;-;/TT;;;rip;;;.ii,701c":u::...,.="Wu..n=S_=-.,.IW:::."..=I.::;1-----------------~7~~.'=e;l::"':;.::;.:ft""\., L.Burj AI Baher. TripoU, Libya ~~~.-761*)~( /:" 'J':).

    "/~ ,;/lV-~y

  • : ij'I It ..

    oQoo

    Volume 2 2.4 Arch $01 Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Burj Ul Behar-Tripoli TECHNICAL SPECIFICATIONPREPARED: Augusl2006 CURTAIN WALL 8< GLAZING PACKAGE

    B All glass shall be heat strengthened, tempered, or laminated as required to meetwind loads, thermal stresses, and safety or building codes,

    C Furnish to the Owner a reserve stock of glass, glazing accessories, and re-glazingaccessories, equal to 1.5% of job requirement. Sizes and exact quantities to be asselected by Archttect, from list of glass sizes provided by Contractor. Submit detailsof replacement procedures, including glass size limitations, and equipmentrequired. Include estimated maximum lead-time reqUired by the glass manufacturerto supply replacement units for each type of glass unit.

    ooo[]n'='

    n" \{.=J

    o

    nb'

    D

    E

    F

    G

    H

    Setting blocks must be 80 to 90 durometer extruded silicone rubber per ASTM C115 and a minimum of 100mm long. Actual size of setting blocks to conform to theFGMA Guidelines. All setting blocks shall be positively restricted from lateralmovement.

    Side spacer blocks shall be 65 + 5 durometer extruded silicone rubber, ASTMC115, properly sized and profiled for intended application.

    Vision glass re-glazing at curtain wall to be from the exterior. Vision glass ra-glazing shall be done without removal of adjacent surrounding condition. Spandrelre-glazing shall be from the exterior.

    Glass types and thickness shall be not less than indicated in Appendix A of thisSpecification: Materials Schedule. The Glass thickness is to be determined inaccordance with relevant Standards, functional requirements including design windloads, deflections and safety, and manufacturer's recommendations. Submitcomputations. Visual distortion of the glass will not be acceptable. The Sub-contractor shall increase the glass thickness as necessary to prevent visibledistortion from oCClJrring. All glass in the same visual plane shall be the samethickness unless otherwise approved in writing.

    Thermal stress:Submit computations demonstrating the elimination of thermal stress breakagerisk, methods of overcoming thermal stress problems, and all assumptions. TheSub-contractor shall consider all potential risk locations including but not limited tothe following:

    Heat bUild-Up at shadow boxes and other un-vented spaces/zones.Make provision for internal curtains or blinds, wihich may temporarily create un-vented spaces prone to heat build-up adjacent to the vision section of thecurtain wall system.Shadowing effects.

    Probability of breakage of glass due to anticipated thermal stress in glass shouldnot exceed 8/1000.

    All Hoat 9'3 tbill tie iA a..c.ordaRB6 \VitR ASTM G1S8S, Table "', "F)~e "~a".S"'~FRit dgtails '\II la68 slolall 99 free tFe... eleelts, sere:tclics, babbles, blisle.s, alliflelk:lsisR9 af eieteteriatf8 FRat:t9r iRelw~iR~ Rirokel SYlp~i9U aRd OlhUr dsefucts; whichdetra9% f.rQFfl apf:laaraR8e 8F iRt9Ff8Fe ....itR f3el'fel'f'l'lsnee. AU slass shall hawc deaR,wRest .1IIt sedges ''lith FRiAiFfl'tlR:a fseatRuF, ",88 fF8FR "8RtS, ReleAee, 9F sRslls. R8~ser toOrSd. ill~9 aRd Pcf313enEtin 'A': Materiels SeheEhde, ter leee'ieRs 8R~ t1f19S af glase.

    "!.. J

    Arch- Sol Facad=s /Tripoli ICunaiLl Wall Sp=1 AUI 061 vi

    Burj AI Baher, Tripoli, Libya

  • 9 To'erances:

    Q~a1ily FS8BrEls:

    9iFRBASiBRal 'BlarBR6B6 af Iaii gQABrally iRall 69FAply ASTM C1Q3S fer laGG ofUS BriSif\. Befell glass shell eeRlpl) hilt. AS 228e, Section 3. (Maxi,IIu!!, ,oller"'a"s GRail RS' BJEBBeE4 9.15 fRffi).

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External CladdingThe Bwj UJ Behar-Tripoli TECHNICAL SPEOFICATlONPREPARED: August 2006 CURTAIN WALL &: GLAZING PACKAGE

    pl.kg GFli~& FJlay BGGYF 9Aly witRiR 200 FJlFJl gf ;OrRVl:t OWptR G!;liilU Rgt 'ilx;vvd1 RUR aR" ISRgtR SF ~iaR=lstwl: GRail RBt 8lEe8BeI " mm.

    ~81:1gR ;Rif:ls, WRist-. BX09Qd aAy gf t R8 aiFJl8RSioRai liFJlili for ftak'il GRipG; iill:WAat peffRilteEt.

    SRiU:l4 tS8tA GRail Ret 198A8tFat8 mare tABA )ljelf 6f ~lass lhieltt 'GSS. SerrstiBA t-.Beltla May a8S\:JF 9Aly witRiA 150 ~FFl of C;OFRWI:G

    FIBre 6Aall Ret el~eeea 1 FflR=l, FRaBS\:IF8a 138f1=1BReliBl;IBf te Blass S\::ll4asB BaressIt:le Beige. FIBfe gAel! Ret BBBblF at S8ttiRg ele6lts.98"81 SRBlI Ret eueeeel1.6 ffUft.

    EEJ~e etHslitl Brite. is fer BRf\eelea BRIl heat str8F\gthef'leeJ siess are 6S feUons.Ed~o ~tl8Iity:

    SltJBffli' I=If8ja8t Blgeeitie pr8alistieR BRei tesl 'GOOlds to AS=rro1 1836, Teele 4,proPOI tioJlally adjasted to piOposed plOject glass thick!!ess. ludicata testpi ocedtJl os, acceptailce elitode 8f\! pass lSlIeWCi feil teltc.

    B

    .~

    ono[]u

    LIon

    HEAT STRENGTHENED AND FULLY TEMPERED GLASSJl1)n. I

    ..h.J

    A Provide approved heat strengthened glass and fully tempered glass, manufacturedusing the 'roller hearth", or an equivalent approved process in accordance with AS2208, ASTM 1048 andlor ANSI Z97.1. Submit details.

    Base material shall be an approved selected quality Uoat glass.

    Relevant Standards:

    ASTM C1048 - Standard specification for heat-treated Uat glass - Kind HS, kindFT coated and uncoated glass.ASTM C1087 - Standard test method for determining compatibility of Iiquid-applied sealants with accessories used in slructural glazing techniques.

    B Edge quality:All toughened glass shall have belt arised edges. All heat-strengthened glass shallhave clean-cut edges. Do not cut, work, or permanently marl< after toughening.Use installation methods that prevent the glass making direct contact with metalsor other non-resilient materials.

    c Compression strength:Surface compression stress of toughened glass shall be not less than 96.8 mPa(14,000 psi) in accordance with ASTM 1048.

    E Warranty:All toughened glass in single pane applications shall be warranted for the warrantyperiod.

    o Quality records:Submit production and test records to AS 2208 andlor ASTM 1048. Indicate testprocedures, acceptance criteria and pass andlor fail rate.

    An;b. Sol FaClldcs 1Tripoli/Curtain WaU Specs 1Aug 061 vi

    Surj Al Baher, Tripoli. libya

  • IJooooo. ,oooooon

    Volume 2 2.4 Arch Sol Facades Technical Specs of Design Supply & Installation of Curtain Wall & External Cladding

    The Burj UI Benar-Tripoli TECHNICAL SPEClFICATIONPREPARlID: August 2006 CURTAIN WALL & GLAZING PACKAGE

    F Roller wave distortion:Roller wave distortion shall not exceed requirements for toughened glass. refer toclause 211 B.

    BS 6262 - Code of practice for glazing for buildings.MMA 101 - Voluntary specificalions for aluminium prime windows and slidingglass doors.

    LAMINATED GLASS

    A Provide all required laminated glass in accordance with AS 2208 and GANAGlazing Manual. Submit details. The base material shall be an approved selected

    qual~y float glass. Glass for laminaling is to be cut into individual panels prior to thelaminaling process.

    Relevant Standards:. GANA - Glazing Manual

    ANSI Zfj7.1 - Glazing materials used in building - Safety performance specificationsand methods of test.

    B Intenayer:Provide an approved polyvinylbutyral (PVB) interlayer. Submit details. Products,which may be approved, include Dupont "Butacite", or approved equivalent.Edges of laminated glass are to be protected to prevent delamination,contamination or other defects, caused by moisture. sealant contact or other8xtematlintemal source.

    C Edge quality:All laminated glass shall have clean-cut edges, or polished edges if required toeliminate thermal stress breakage.risk.

    D Quality records:Submit production and test records to AS 2208, ANSI Z97.1 and/or ASTM 1048.Indicate test procedures, acceptance erneria and pass and/or fail rate. Includerecords for interiayer.

    Provide daily records of maximum factory temperature and humidity and weeklyrecords of water quality used for washing glass. In the event that InterlayerSupplier application requirements are not salisfied, batches of non-complying glassshall be rejected.

    Submit test results in accordance with an approved test programme to confirm thecompatibility of laminated glass wilh adjacent glazing materials.

    E vyarranty:All laminated glass in single pane ap


Recommended