Contents
I.- Main Areas of Interest II.- Infrastructure in Valencia III.- GRID activities IV.- ATLAS Computing
24th May2002 3
I.- Main Areas of Interest
Fabric Management and Operation– Automatization– Monitoring
Experiment -oriented use of the farm– Data Challenges in ATLAS (Monte Carlo
Production)– Data Analysis
24th May2002 4
II.- Infrastructure at IFIC GoG (Grupo de Ordenadores para el GRID) Farm
192 Athlon PC (134 IFIC + 58 ICMOL)– VIA KT133A & KT266A based MotherBoard– CPU: AMD Athlon K7 @ 1.2 & 1.4 GHz– RAM: 2x512 Mbytes (SDRAM & DDR SDRAM)– HD: 40 Gbytes– NIC: 3COM 905CX & RealTek RTL8139 (Fast
Ethernet + PXE)– 2U chassis
24th May2002 5
GoG Farm
9 racks (800x600 mm) 22 PCs + 1 network switch per rack 2U chassis with 3 fans
– pros:• less space required
– cons:• add 240 euros per PC (aprox.)
• heat concentration
24th May2002 10
Local Network All Worker Nodes have private IP addresses in the net 192.168.4.0/22
– secure environment– administrative independence from University
network management staff
Communication equipment have public IP addresses in the net 147.156.149.64/26– can be monitored and upgraded from University
centralized service
24th May2002 11
Infrastructure in Valencia :Human resources
5 staff persons + 1 postdoc ( EDP = 3.5) support from the Informatic Section of
IFIC ...(2 new contracts in the next two months)
24th May2002 12
III - GRID Activities
In DataGrid, involved in WP6 (Testbed and Demonstrators)
In CrossGrid:– HEP Data Analysis (CrossGrid Appl. Development)– New GRID Services and Tools (Resource
Management and Integration)– International Testbed Organisation–
24th May2002 13
IV- ATLAS Computing
Data Challenges, involved in phase 1: • full chain implemented and tested at IFIC
•Event generator • Det. Simulation •Reconstruction •Analysis
• Files: Dijets and Zjets (10 Kevts)
• Computing Resources available from June to December:• 100 PC’s (4 KSpecInt95)
•Massive Production (10**7 evts for the whole ATLAS Coll.): •with EDG 1.2
•by the end of June