Central Office – P.O. Box 30099 Nairobi, Kenya Telephone – 254-02-2301174 – Telegrams “ELECTRIC”
Telex No. 22253 Fax No. 254-02-3201889 Stima Plaza, Kolobot Road.
Our Ref: KP1/6BA/PROJ/PT/29/12/VOO/voo 26th
October, 2012
M/s
Dear Sir/Madam,
ADDENDUM NO. 2 TO THE TENDER FOR SUPPLY, DESIGN & INSTALLATION OF
KAINUK 220/66/11kV SUBSTATION & ASSOCIATED 220kV LINE- KP1/6BA/PROJ/PT/29/12
The following amendments are made to the specified provisions of the Tender documents for Supply,
Design and Installation of Kainuk 220/66kV substation & associated 220kV line.
1. RELATIONSHIP WITH THE PRINCIPAL TENDER DOCUMENT
Save where expressly amended by the terms of this Addendum, the Principal Tender Document shall
continue to be in full force and effect.
The provisions of this Addendum shall be deemed to have been incorporated in and shall be read as
part of the Principal Tender Document.
2. RESPONSES TO CLARIFICATION
Please refer to the attached Appendix 1 for responses to Bidders requests for clarifications.
3. AMENDMENT TO TECHNICAL SCHEDULES
Refer to Appendix 2 for amendment to Technical schedules in Volume 2, Section 4 in respect to
details of 500kVA auxiliary transformer.
4. MINUTES OF PRE-BID CONFERENCE ON 24TH
OCTOBER 2012
Refer to Appendix 3 containing minutes of pre-bid conference held on 24th October 2012 at Stima
plaza auditorium.
5. AMENDMENT TO DRAWINGS IN APPENDIX B VOLUME 1 OF BID DOCUMENT
Correction of single line drawing Sk.No.11081 ,One Line drawing of MV/EHV system and general
equipment layout at existing Turkwel.
Google Map showing approximate location of the plot at Turkwel power station is available on the
website.
All the other terms and conditions remain as per the Tender document.
Yours faithfully, For: THE KENYA POWER & LIGHTING COMPANY LIMITED
A. GATUKUI (MRS)
PROCUREMENT MANAGER
SL. NO Sec/ Part/
Sub-Sec
Clause Number and
Page NumberSpecification Requirement Comments/ Clarification/ Deviations Kenya Power Clarification
1 Volume-2, Section VII Part 4.0 Schedules of
technical information
Datasheet of power
transformer
Please provide the technical datasheet of double wound power
transformer 220/66/33kV,45 MVA.
Details provided in Addendum number
1
2Volume-1, Section VI
Part A1.2.1(Page 17 of 325) Scope of work
As per specification clause 1.2.1(Page 17 of 325) 33kV system is
with single bus bar configured to house the local supply and one
feeder bay. As per SLD drawing no:SK No.11081,the 33kV system
33kV system NOT in Scope of Works
3Volume-1, Section VI
Part A
8.2.2.3 (Page 103 of
325) &
10.1 (Page 164 of 325
Rating of Auxiliary
Transformer in 33kV Bus
As per specification clause 8.2.2.3 (Page no 103 of 325) & 10.1
(Page no 164 of 325) 200kVA, 33/0.415kV Auxiliary Transformer
is indicated but as per Price schedule no:2, 500 kVA,33/0.433kV is
indicated. Please clarify the rating of Auxiliary transformer.
Auxiliary transformer is 1noX 500kVA
11/.433kV transformer.Amend Price
schedules accordingly.
4
Volume-2,Section VII –
Forms and Procedures
Part 1.2 – Price
Schedules
Bills of Quantities
Number of 220kV Isolator
Number of 220kV isolator with two integral earth switches is
mentioned as 1 in Price Schedule no-2 whereas it is not shown in
SLD Drawing no: SK.No.11081 .Please clarify the requirement of
220kV isolators with two earth switches.
220kV isolator with two integral earth
switches is Nil.Refer to Price Schedule 3-
220kV Kainuk.
5Volume-1, Section VI
Part A
5.2(Page 74,75 of
325)
Dedicated CT and PT for
tariff metering
As per specification clause 5.2(Page no 74,75 of 325) dedicated
CT, PT shall be provided for tariff metering purpose. As per SLD
drawing no:SK No.11081, dedicated CT, VT for tariff metering is
not indicated. Please clarify the requirement of dedicated CT , PT
for tariff metering for 220kV system at proposed Kainuk
Substation.
High Precision tariff metering to be
provided for the 220kV line from
existing Turkwel to proposed Kainuk
s/s.The high precision tariff metering CT
& PT is to be positioned at Turkwel
220kV switchyard.
6Volume-1, Section VI
Part A
5.2(Page 74,75 of
325)Tariff metering
We presume tariff metering system to be considered only for the
incomer of 220kV and 66kV line feeder. Please confirm.
High Precision tariff metering is only
applicable to the 220kV line from
7Volume-1, Section VI
Part A11.1(Page 179 of 325)
Tariff metering for 33kV
outgoing line
We presume the tariff metering system is not required for 33kV
system. Please confirm.
33kV system NOT in Scope of Works
8Volume-1, Section VI
Part A
10.1(Page 164 of
325)
11/0.415kV Distribution
offsite transformer
As per specification clause 10.1,(Page 164 of 325) one Number of
11/0.415kV offsite transformer will provided for auxiliary supply
to 415V switchgear. We presume that same will be located close
to switchyard fence and 11kV supply shall be made available by
client near the switchyard fence. Please confirm.
The Scope of Works require Bidder to
design,install & commission off site
433VAC supply.
9Volume-1, Section VI
Part A
12.3.4(Page 188 of
325)
Tertiary winding neutral
earthing arrangement.
As per specification clause 13.1, (Page 213 of 325) the 33kV earth
fault requirement is indicated as 750A. Please clarify the neutral
earthing arrangement of 33kV tertiary winding of power
transformer.
33kV system NOT in Scope of Works
Appendix 1 Responses to Bidders queries & requests for clarifications.
ELECTRICAL QUERIES FOR KAINUK SUBSTATION
Design Supply & Construction of Kainuk 220/66kV Substation for Kenya Power
Page 1 of 15
10Volume-1, Section VI
Part A1.4 (Page 18 of 325)
Terminal Points for 220kV
Transmission line
Kindly provide the drawing indicating the length between the
switchyard and transmission line.
Bidders are required to familiarise with
the existing site conditions and factor
the same in their designs for the 220kV
TL.
11Volume-1, Section VI
Part A
10.3.2.2(Page 170 of
325)110V DC battery
We presume the 110V battery ,battery charger & DCDB shall be
designed to cater for the present scope of work. We have not
considered any load for future scope. Please confirm.
Bidders are required to submit detailed
designs fulfilling the Employer's
requirements for 110VDC as set in
Volume 1 of the Bid document.
12 General -Single Line diagram for
substation
Kindly provide the legible copy of single line diagram for the
Kainuk substationRefer to attached SLD in Volume 3.
13Volume-1, Section VI
Part A 3.2.1(Page 47 of 325) Plan and section layout
As per specification clause 3.2.1(Page 47 of 325)the substation
arrangements and layouts shall be part of bid documentation.
Kindly provide the 220kV/66kV/33kV Kainuk substation Plan and
section layout.
This is a turnkey project and Bidders
are required to undertake a detailed
design for the required 220/66/11kV
substation and associated 220kV TL and
submit the same for approval by the
Employer.
14Volume-1, Section VI
Part A 3.2.1(Page 47 of 325) Control room layout
Kindly provide the control room building layout for kainuk
substation as mentioned in specification clause 3.2.1(Page 47 of
325) .
This is a turnkey project and Bidders
are required to undertake a detailed
design for the Control room building
within the Employer's requirements as
set in the Bid document & submit the
same for approval by the Employer.
15Volume-1, Section VI
Part A Page 108 of 325 Telecommunication system
Please clarify the requirement of Telecommunication system at
Kainuk to Kitale substation line feeder. Please clarify the scope of
telecommunication system at Kainuk and Kitale substation.
Refer to Para.8.3 for details of the
Telecommunication scheme Scope of
Works.The Scope of Works does not
include Kitale.
16Volume-1, Section VI
Part A3.3.9 (Page 54 of 325) Type of ACSR conductor
Kindly provide the types of ACSR conductor to be used in 220kV,
66kV and 33kV system.
Bidder is required to undertake
detailed design using the Employer's
requirements as set in the Bid
document and submit the same for
approval by the Employer.
17Volume-1, Section VI
Part A
16.17.1.2(Page 264 of
325)Lighting
We presume light fittings shall be mounted on Lightning
mast/Gantry structures/Building. Please confirm.
Bidder is required to undertake
detailed design using the Employer's
requirements as set in the Bid
document and submit the same for
approval by the Employer.
18Volume-1, Section VI
Part A12.6(Page 202 of 325)
Online DGA,FO based
temperature measurement
As per specification clause 12.6 (Page no 202 of 325) Online
DGA,FO based temperature measurement is required for
transformers above 100MVA.We presume it is not applicable for
the 45 MVA power transformer. Please confirm.
Online DGA,FO based temperature
measurement is not applicable to the
project.
Page 2 of 15
19Volume-1, Section VI
Part A1.2.1(Page 17 of 325) Scope of work
As per specification clause 1.2.1(Page 17 of 325) 220kV Kainuk
Substation is with one and half arrangement. As per SLD drawing
no:SK No.11081,ring main bus scheme is indicated. Please clarify
the arrangement of 220kV system.
The required 220kV busbar at Kainuk is
to fulfill one and a half diameter.Refer
to ammended SLD .
20Volume-1, Section VI
Part A4.3.1 (Page 63 of 325) Type of disconnectors
Centre break isolator shall be considered for 220kV, 66kV, and
33kV system. Please confirm.
Bidder is required to undertake
detailed design using the Employer's
requirements as set in the Bid
document and submit the same for
approval by the Employer.
21Volume-1, Section VI
Part A
4.2.1, 5 (Page 59,74
of 325)
Live tank CT, PT, Live tank
CB
Live tank CT, CB shall be provided for 220kV, 66kV and 33kV
system. Bidder to rephrase the question.
22Volume-1, Section VI
Part A
8.2.1.2 (Page 91 of
325)
Remote end protection
scope
We presume that 220kV line feeder remote end current
differential relay at Kitale substation is not included in our scope
of work. Please confirm
Please refer to Employer's reuirements
as set in Para.8.2.1.2 when undertaking
detailed design for 220kV TL protection
and submit the same for
approval.Kitale is NOT part of the Scope
o Works.
23Volume-1, Section VI
Part A
8.2.2.2 (Page 101 of
325)
Distance protection for
33kV systems
As per specification 33kV outgoing lines are to be provided with
distance protection with PLC / fiber optic communication system.
As per general practice 33kV line feeder will be provided with
feeder protection relay including functions for over current, earth
fault, sensitive earth fault protection .Please confirm the
protection/communication requirement for 33kV system.
33kV system NOT in Scope of Works
24Volume-1, Section VI
Part A
8.2.2.2 (Page 101 of
325)
Distance protection for
66kV systems
As per specification 66kV outgoing lines are to be provided with
distance protection with PLC / fiber optic communication system.
Please clarify the type of communication system to be used for
66kV line.
Please refer to Employer's
requirements as set in Para.8.2.2 when
undertaking detailed design for66kV
feeder protection and submit the same
for approval.
25
Volume-2, Section VII
Part 4.0 Schedules of
technical information
Page 22 of 11733kV isolator operating
mechanism
As per technical schedule, operating mechanism of 33kV isolator
is mentioned as Motor operated. As per KENYA practice the 33kV
isolator operating mechanism will be manual. We are considering
only manual operating mechanism for 33kV isolator. Please
confirm.
33kV system NOT in Scope of Works
26Volume-1, Section VI
Part A14(Page 216 of 325) DG set
We presume separate room for DG set is not required and DG
shall be outdoor , silent type. Please confirm.
Please refer to Employer's
requirements as set in Para.14 when
undertaking detailed design for
Emergency Diesel Generator and
submit the same for approval by the
Employer.
27 Volume-2, Section VII Part 4.0 Schedules of
technical informationExisting Turkwell scope
As per price schedule no:1,2, three phase link box is indicated
Turkwell substation and Kainuk substation. As per scope of work
EHV cable is not included. Please clarify the requirement of link
box.
There is no EHV cable works in the
Scope of Works.Amend Price schedules
i.e. Volume 2, 7-1-2-2
Page 3 of 15
28 Volume-2, Section VII Part 4.0 Schedules of
technical information
Kainuk Substation control
room
As per price schedule no:2,Kainuk substation control room area is
given as 600 sq.m. We presume control room shall be optimized
as per requirement. Please confirm.
Please refer to Employer's
requirements as set in Para.14 7 & size
stated in schedule 2 of Price forms
when undertaking detailed design for
the Kainuk Control room and submit
the same for approval by the Employer.
29 GeneralSLD drawing no:SK
Number11081
220kV Lightning arresters in
SLD
Please clarify the purpose of two set of lightning arresters in Kitale
line feeder at Kainuk Substation.
Only One (1no.) 220kV surge arrester is
proposed.refer to ammended SLD.
30 Volume-2, Section VII Part 4.0 Schedules of
technical information
Requirement of CTs in
220kV system at Kainuk
substation
As per price schedule no:2, 24 Nos of CT is indicated for 220kV
system at Kainuk substation but only 12 Nos. of CT is shown in
SLD drawing no:SK No.11081. Please clarify the requirement of 24
Number of CT in the substation.
24Nos. 220kV CTs required in Kainuk
220kV busbar.Refer to amended SLD.
31 Volume-2, Section VII Part 4.0 Schedules of
technical information
Requirement of PTs in 66kV
system at Kainuk substation
As per price schedule no:3, 12 Nos of PT is indicated for 66kV
system at Kainuk substation but only 9 Nos. of PT is shown in SLD
drawing no:SK No.11081. Please clarify.
Correct numbers is 9nos.refer to SLD.
32 Volume-2, Section VII Part 4.0 Schedules of
technical information
Requirement of Surge
arresters in 66kV system at
Kainuk substation
As per price schedule no:3, 9 Nos of Lightning arresters is
indicated for 66kV system at Kainuk substation but 12 Nos.of
Lightning arresters is shown in SLD drawing no:SK
No.11081.Please clarify.
Number of 66kV surge diverters is
9nos.Refer to SLD.
33 Volume-2, Section VII Part 4.0 Schedules of
technical information
Number of Isolators without
earth switch in 66kV
system at Kainuk substation
As per price schedule no:3, 7 Nos of Isolators without earth switch
is indicated for 66kV system at Kainuk substation but 11 Nos.of
Isolators without earth switch is shown in SLD drawing no:SK
No.11081.Please clarify.
Number of 66kV airbreak switches is
11nos.Refer to SLD.
34 Volume-2, Section VII Part 4.0 Schedules of
technical information
Requirement of Surge
arresters in 33kV system at
Kainuk substation
As per price schedule no:4, Number of Lightning arresters is
indicated as zero for 33kV system at Kainuk substation but 1
Lightning arrester is shown in SLD drawing no:SK No.11081 at
33kV side of 33/0.415kV Auxiliary Transformer.Please clarify.
33kV system NOT in Scope of Works
35 Volume-2, Section VII Part 4.0 Schedules of
technical information
Number of isolators in 33kV
system
As per price schedule no:4,1 No of Isolator is indicated for 33kV
system at Kainuk substation but 2 Nos. of Isolator is shown in
SLD drawing no:SK No.11081.Please clarify.
33kV system NOT in Scope of Works
36Volume-1, Section VI
Part A8 (Page 81 of 325)
Bus bar protection for 33kV
bus
We presume bus bar protection for 33kV system is not applicable.
Please confirm.
33kV system NOT in Scope of Works
37 General - Soil resistivityKindly provide the value of soil resistivity in Kainuk substation for
earthing design.
Refer to Para.16.6.2.2.Bidder required
to carry out own investigations.
38 Volume-2, Section VII Part 4.0 Schedules of
technical information
Number of CTs in 220kV
system at Turkwell yard
As per price schedule no:1, 9 Nos of CT is indicated for 220kV
system at Turkwell yard but it is not shown in SLD drawing no:SK
No.11081. Please clarify the requirement of 9 Number of CT in the
substation.
Ammend Price Schedule 1 as follows:-
i)number of 220kV CTs to 12nos. ii)
Number of 220kV CB is two (2nos.) iii)
220kV Disconnector, motorised
(3-phase) is four (4nos.)
ELECTRICAL QUERIES FOR EXISTING TURKWELL SUBSTATION
Page 4 of 15
39 Volume-2, Section VII Part 4.0 Schedules of
technical information
Number of CVTs in 220kV
system at Turkwell yard
As per price schedule no:1, 9 Nos of CVT is indicated for 220kV
system at Turkwell yard but it is not shown in SLD drawing no:SK
No.11081. Please clarify the requirement of 9 Number of CVT in
the substation.
Ammend Price Schedule 1 as follows:-
i)number of 220kV CVT to 3nos.
40Volume-1, Section VI
Part A
5.2(Page 74,75 of
325)
Dedicated CT and PT for
tariff metering
As per specification clause 5.2(Page no 74, 75 of 325) dedicated
CT, PT shall be provided for tariff metering purpose. As per
schedule no: 1 dedicated CT, VT for tariff metering is not
indicated. Please clarify the requirement of dedicated CT , PT for
tariff metering for 220kV system at Turkwell yard.
220kV Tariff metering is indicated
under item 1.13 in Schedule One of
prices.
41 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
As per specification, Turkwell substation to be extended to allow
for the 220kV Tee off to the proposed Kainuk substation. Please
clarify whether below ground earthing to be extended for the
switchyard extension.Incase included in scope please furnish the
existing earth grid size, material and spacing.
The earthing of switchyard extension is
to to be connected to earthing system
of existing 220kV switchyard and
overall earth resistance value MUST be
less than one (1) ohm.
42 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
We presume lighting, lightning protection for the Turkwell
substation extension is not in scope. Please confirm.
Lightining protection of the extended
220kV switchyard at Turkwel is part of
Scope of Works.Refer to Para.3.3.1 and
item 7.2 in Price Schedule 1.
43 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
We presume necessary AC,DC supply for the Turkwell substation
extension work will be made available by client. We have not
considered the AC & DC distribution board, lighting distribution
board,110V & 48V battery, battery charger in our scope of work.
Please confirm.
LVAC & DC for 220kV extension works
at Turkwel switchyard part of Scope of
Works.Refer to items 11.1,11.2 and
11.3 in Price Schedule 1
44 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
We have not considered any control building extension in
Turkwell substation. Necessary space provision to keep control,
relay panel /Communication panel shall be provided in the
existing control room. Please confirm.
Refer to item 10.13 of Price schedul 1.A
Control building for the
communication,control & relay panels
to be provided for the 220kV extension
works at Turkwel.
45 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
Kindly provide the existing bus bar protection panel make , model
& drawing and existing SAS architecture to extend the same for
the present scope.
Please refer to attached drawings
showing existing single line drawing &
equipment layout for existing 220kV
switchyard at Turkwel.Modification of
existing SAS/SCADA system for Kengen
generating station NOT in scope of
works.
46 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
Please clarify the type of bus bar protection available in existing
Turkwell substation-Centralized/Decentralized , single main or
Double main bus bar protection.
Bidders required to familiarise
themselves with existing network and
use the attached existing single line
drawing & equipment layout for
existing 220kV switchyard at Turkwel
Page 5 of 15
47 Scope of work 1.2 Page (17 of 325) Existing Turkwell scope
Please clarify whether Turkwell Substation is equipped with
Substation Automation System.
Bidders required to familiarise
themselves with existing network and
use the attached existing single line
drawing & equipment layout for
existing 220kV switchyard at Turkwel
48Volume-1, Section VI
Part A 3.2.1(Page 47 of 325)
Layout of existing 11/220kV
Turkwell substation.
Kindly provide the existing 11/220 kV Turkwell substation Plan
and section layout as mentioned in specification clause 3.2.1(Page
47 of 325) ..
Bidders required to familiarise
themselves with existing network and
use the attached existing single line
drawing & equipment layout for
existing 220kV switchyard at Turkwel
49Volume-1, Section VI
Part A 3.2.1(Page 47 of 325)
Layout of existing 11/220kV
Turkwell substation.
Kindly provide the Turkwell substation existing control room
layout.
Bidders may familiarise themselves
with existing Turkwel control room
layout for purposes of raising their
designs for the Control rooms proposed
under this project.
1
Technical Specification
for substation Section
VI Part A
Clause 16.6.1 (Page
232/325)
Contour map &
Photographs
Please arrange to provide the contour map & Photographs of the
jobsite.
This is a turnkey project and Bidders
are required to undertake a detailed
study of ground conditions and
topography as stated in Volume
1,Chapter 16-Civil Works.
2
Technical Specification
for substation Section
VI Part A
Clause 16.15.3.2
(Page 236/325)Wind load
We propose DIN VDE 0210 to be used for wind load on steel
structures & BS 6399 Part II for wind load on building. Kindly
confirm
Refer to Volume 1 Para.1.5 service
Conditions.
3
Technical Specification
for substation Section
VI Part A
D 1.00 b) (Page
241/325) Finished Ground Level Please specify Finished Ground Level of the substation
This is a turnkey project and Bidders
are required to erect buildings in
conformity to employer's requirements
as stated in Volume 1,Chapter 16-Civil
Works and the mentioned standards..
4
Technical Specification
for substation Section
VI Part A
Clause 16.16.8.1
(Page 241/325)Blinding concrete
As blinding concrete shall have a minimum PCC grade of M15 as
per IS code will be used .Hope this is in order. Kindly confirm
This is a turnkey project and Bidders
are required to utilise construction
methods,subject to Employer's
approval , as stated in Volume
1,Chapter 16-Civil Works and the
standards mentioned therein.
CIVIL QUERIES FOR KAINUK SUBSTATION
Page 6 of 15
5
Technical Specification
for substation Section
VI Part A
Clause 16.16.8.1
(Page 241/325) Concrete for Foundation
As per clause no h) 10.3 of section VI part B concrete for
foundation shall be C25 Grade with minimum cement content of
300kg/cum & maximum w/c ratio of 0.6. Eleventh line of page
241/325 of section VI part A says concrete to be C35 which
requires 300kgs of cementitious content as per BS 5328 Part I,
where as the 4th point of minimum mix design requirement of
specification asks for minimum total cementitious quantity of 370-
380kg/cum.Third point of minimum mix design requirement asks
for minimum 120kg of OPC & minimum 280kgs of GGBS which
aggregates to minimum of 400kgs.We propose C25 grade of
concrete with 300kgs of cementitious content with w/c ratio of
0.6.Kindly confirm.
This is a turnkey project and Bidders
are required to utilise construction
methods,subject to Employer's
approval , as stated in Volume
1,Chapter 16-Civil Works and the
standards mentioned therein.
6
Technical Specification
for substation Section
VI Part A
Clause 16.16.9 (Page
255/325)Grade of Steel
As per the clause minimum grade of steel is 460 whereas as per
clause 7.2 section VI Part B page 57/109 grade of structural steel
is S235JR and S355JO. We propose to use S235JR. Kindly confirm.
This is a turnkey project and Bidders
are required to utilise construction
methods,subject to Employer's
approval , as stated in Volume
1,Chapter 16-Civil Works and the
standards mentioned therein.
7
Technical Specification
for substation Section
VI Part A
Clause 16.6.2
(Page 241/325)Soil Investigation Report
Please arrange to provide the detailed Soil Investigation Report as
per attached annexure. Also ascertain presence of
montmorillonite,chilkinite & kaolinite & any other element
causing volumetric change in soil.(within 3m of natural ground.)
Refer to Para.16.6.2.2.Bidder required
to carry out own investigations.
8
Technical Specification
for substation Section
VI Part A
Clause 16.6.2
(Page 241/325) Depth of Water table level Kindly confirm the depth of Water table level.
Refer to Para.16.6.2.Bidder required to
carry out own investigations.
9
Technical Specification
for substation Section
VI Part B
Clause 7.1
(Page 56/109)
Steel works for switchyard
structure
We propose to extend the clause 7.1 to Substation switchyard
structure for 6mm thickness of main leg & 4mm thickness for
other tower steel works & bracings. Kindly confirm.
Refer to Volume 1 Para.2.11 Galvanized
Work in respect to steel structures
intended for outdoor use in the
substation switchyard.
10
Technical Specification
for substation Section
VI Part A
Clause 16.6.1
(Page 232/325)Depth of Foundation Minimum depth of foundation below NGL.
Bidder is required to undertake
complete topographical & Condition
surveys.
11
Technical Specification
for substation Section
VI Part A
Clause 16.6.1
(Page 232/325) Highest Flood Level Please confirm Highest Flood Level
Bidder is required to undertake
complete topographical & Condition
surveys.
12
Technical Specification
for substation Section
VI Part A
Clause 16.16.13.1
(Page 232/325) Access road width
Major access road will be 7.3m wide. The same is not reflected in
prices & quantities for definite work section VII part 1.2 page 9 of
12.
Major access roads to be considered as
7.3meteres wide.
Page 7 of 15
13 General - Tender documentPages 283 to325of sec. VI part A & 108,109 of sec.VI part B are
missing from the copy of technical specification
Pages 283 to 285 of sction VI are in
Appendix A Drawings.Drawings are
single line drawing.pages 108-109 are
drawings of typical 220kV lattice steel
structure.Retrieve correct document
i.e. Volume 1 from KPLC website.
Page 8 of 15
14 General -
Layout and section for
control room Building
Please provide Layout and section for control room Building &
gate house.(and any other building if any)
This is a turnkey project and Bidders
are required to provide a detailed
design of Control building and others
as required in Scope of Works and in
conformity to requirements in Volume
1,Chapter 16-Civil Works.The designs
will be subject to Employer approval.
15 General - Type of building confirm type of building whether RCC or Steel ditto
16 General - Finishing schedules Please provide Finishing schedules. ditto
17 General - Water tank capacity Please confirm Water tank capacity. ditto
18 General - Septic tank capacity Please confirm Septic tank capacity. ditto
19 General - Plinth height Please confirm plinth height above FGL. ditto
20 General - Height of building Clear height of building. ditto
21 General -Provision of crane/mono
rail & capacity
Please confirm provision of crane/mono rail & capacity(if
required)
ditto
22 General - Cable pull pit in CRB Confirm Requirement of cable pull pit in CRB. ditto
23 General -Provision of access to roof Please confirm provision of access to roof through
Staircase/ladder.
ditto
24 General - Type of parapet wall Confirm type of parapet wall(brick/RCC) and size. ditto
25 General - Requirement of roof
projectionConfirm requirement of roof projection.
ditto
26 General - Joinery details Describe Joinery details.(type of door and windows) ditto
27 General -
Requirement of false
ceiling/false flooring/under
deck insulation.
Any requirement of false ceiling/false flooring/under deck
insulation.
ditto
28 General - Width of Brick wallPlease specify Width of Brick wall & any special requirement like
insulation/cavity .
ditto
29 General - Requirement of garland
drainWhether garland drain is required around building
ditto
30 General -Requirement for Fire rated
doors/windows and walls. Confirm requirement for Fire rated doors/windows and walls.ditto
31 General -
Requirement of special type
of toilet for physically
challenged personAny requirement of special type of toilet for physically challenged
person.
ditto
32 General -Type of roof water proofing
Please specify type of roof water proofingditto
33 General - Screed concrete Please give specification for screed concrete if required. ditto
34 General - Specification of roof water
pipeCheck for specification of roof water pipe.
ditto
35 General - Roof water pipe Whether roof water pipe has to be claded.Kindly confirm ditto
CIVIL QUERIES FOR BUILDINGS
Page 9 of 15
36 General - Chequered plate Kindly confirm chequered plate thickness. ditto
37 General - Hand rail Type of hand rail for staircase. ditto
38 General - Rubble stone masonryWhether rubble stone masonry is required below grade
slab/cable pull pit. Kindly confirm
ditto
39 General - Rating for green building Rating for green building and standard to follow. Kindly specify (If
required)
ditto
40 General - Height of AHU room Clear height of AHU room. Please specify. ditto
41 General - Miscellaneous buildings Miscellaneous buildings to be constructed. Please mention ditto
42 General - Minimum width of
staircase flightPlease mention minimum width of staircase flight.(If required)
ditto
43 General - Factor of Safety under
Normal condition
Please specify Factor of Safety under Normal condition against
Sliding & Overturning.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
44 General -Factor of Safety under SCF
condition
Please specify Factor of Safety under SCF condition against Sliding
& Overturning.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
45 General -
CBR Value
Please specify CBR Value.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
46 General -
Height of fence & Boundary
wallPlease specify Height of fence & Boundary wall.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
47 General -
Thickness of micro grading
Please mention thickness of micro grading.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
48 General -
Plinth height
Please mention Plinth height above FGL.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
QUERIES RELATED TO OUTDOOR CIVIL
Page 10 of 15
49 General - Surchage PressurePlease mention Surchage Pressure required for Cable trench
design.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
50 General -
Minimum fire resistance
hoursPlease mention minimum fire resistance hours.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
51 General - Loss of contactWe understand 20% Loss of contact is allowed for foundation
design. Kindly confirm.
This is a turnkey project and Bidders
are required to ensure all materials &
workmanship is within the Employer's
requirements in the Bid document.
52 General - DrainWe propose Drain to be provided on one side of road. Kindly
confirm.
This is a turnkey project and Bidders
are required to ensure all detailed &
completed design ,equipment selection
& construction meets the Employer's
requirements as stated in the Bid
document and standards mentioned
therein.
53 General - Type of fire wall Please confirm type of fire wall (Brick / RCC) ditto
54 General - Size of gate Please specify Size of gate with wicket gate required or not ditto
55 General - Trafo. Soak pit Please specify Trafo. Soak pit with gravel filling or gratings ditto
56 General -Requirement of Common
oil collection pit
Please specify requirement of Common oil collection pit capacity
for Trafo.
ditto
57 General - Rain water harvesting Whether Rain water harvesting required or not ditto
58 General - Landscape Whether Landscape required or not in front of building. ditto
59 General - DG set building /platform Requirement of DG set building /platform (if required) ditto
60 General - Type of Boundary wall Please specify type of Boundary wall ditto
61 General -Fire Fighting pump house &
Water Tank Whether Fire Fighting pump house & Water Tank required.
ditto
62 General - Stool arrangementCan we adopt stool arrangement for equipment support
structures.
This is a turnkey project and Bidders
are required to ensure all detailed &
completed design ,equipment selection
& construction meets the Employer's
requirements as stated in the Bid
document and standards mentioned
therein.
63 General -Factor of safety under
normal conditionPlease specify Factor of safety under normal condition.
ditto
QUERIES RELATED TO OUTDOOR STRUCTURAL
Page 11 of 15
64 General - Factor of safety under SCF
Please specify Factor of safety under SCF.ditto
65 General -Type of Equipment support
structuresPlease specify Type of Equipment support structures-(lattice/Pipe)
ditto
66 General - LM Height Please specify LM Height with No. of Platforms. ditto
67 General - Grade of bolt Please specify Grade of bolt ditto
68 General - SCF & WIND loadSCF & WIND load will not be considered acting together. Hope it
is in order. Kindly confirm.
ditto
69 General - Site location map Site location map to visit ditto
70 General - Coordinates of boundary Please specify coordinates of boundary ditto
71 General - Approach road from public
road to site
Understand that Approach road from public road to site is not in
bidder's scope. Kindly confirm
ditto
72 General -Presence of any well in the
job sitePlease confirm presence of any well in the job site
ditto
73 General - Presence of any structure
to be demolished in job sitePlease confirm presence of any structure to be demolished in job
site
Refer to Para.16.6 Site surveys.
74Volume-1, Section VI
Part A 3.2.1(Page 47 of 325) Existing Turkwell Substation
Understand that the location where new bay is to be installed is
levelled & aggregates is already laid. We shall use the same
aggregates & any shortcoming shall be made good. Please
confirm.
Refer to Para.16.6 Site surveys.
75Volume-1, Section VI
Part A 3.2.1(Page 47 of 325) Existing Turkwell Substation
Kindly provide the existing 11/220 kV Turkwell substation Plan
and section layout as mentioned in specification clause 3.2.1(Page
47 of 325)
ditto
76Volume-1, Section VI
Part A 3.2.1(Page 47 of 325) Existing Turkwell Substation
Kindly provide the Turkwell substation existing control room
layout.
No plan will be provided.Bidders may
familiarise themselves with existing
Turkwel control room layout for
purposes of raising their designs for the
Control rooms proposed under this
project.
1Section V1 Part- A Vol
1 of 2
Clause No : 16.17.2.5
(Page 272 of 325)General
If the AC capacity is less than
a) 30 TR can we propose Air cooled Package air conditioners.
Kindly confirm
b) 10TR can we propose Air cooled split air conditioners. Kindly
confirm
Bidders to refer to service conditions &
Employer requirements stated in
Para.16.17.2.5.
2Section V1 Part- A Vol
1 of 2
Clause No : 16.17.2.5
(Page 272 of 325)General
Kindly provide the specification for thermal insulation (for ducts
and chilled water pipes of both above ground and under ground)
ditto
3Section V1 Part- A Vol
1 of 2
Clause No :
16.17.2.5( Page 273
of 325)
Type of system for standby
diesel generator room
Booster ventilation has been preferred for DG when it is running.
Kindly provide the specification for the same.
ditto
CIVIL QUERIES FOR EXISTING TURKWELL SUBSTATION
HVAC QUERIES FOR KAINUK SUBSTATION
Page 12 of 15
4Section V1 Part- A Vol
1 of 2
Clause No : 16.17.2.5
(Page 273 of 325)
Type of system for Battery
room
As per clause ventilation has to be provided for battery room but
in Section V1 Part- A Vol 1 of 2, Clause No : 16.17.2.5, Page 278
of 325 air conditioning system has been preferred for battery
room. Kindly confirm which system shall to be adopted
ditto
5Section V1 Part- A Vol
1 of 2 Clause No : 16.17.2.5 General
If the central air conditioning system has to be considered as per
specification
a) Kindly provide the type of system ( DX AHU / chiller) to be
considered for air-conditioning system
b) Kindly provide the type of compressor to be considered for AC
system
c) We have considered horizontal split casing pumps for chilled
water pumps. Please confirm d)
whether the AC system shall be provided with BEMS. Please
confirm.
ditto
6Section V1 Part- A Vol
1 of 212.5 Transformer fire protection
We have considered nitrogen fire protection for transformers.
Please confirm
Bidder to provide offer in compliance
to Para.12.5,Volume for Employer's
approval.
HVAC QUERIES FOR FIRE PROTECTION
Page 13 of 15
7Section V1 Part- A Vol
1 of 2 Clause No : 16.17.2.1
Fire detection & Fire
suppression system
In the clause Fire detection & Fire suppression system has been
but we are not able to find the technical specification and the
area for which the same has to be considered. Kindly provide the
specification if it has to be considered.
Bidder is required to undertake
detailed design in fire protection using
the Employer's requirements as set in
the Bid document and submit the same
for approval by the Employer.
8Section V1 Part- A Vol
1 of 2General Scope of hydrant system
Specification does not calls for hydrant system, kindly confirm the
scope of hydrant system for switchyard area and if is there kindly
confirm the distance of the tapping point to be considered and
the pressure available at that point.
ditto
9Section V1 Part- A Vol
1 of 2General Scope of MVWS system
Specification does not calls for MVWS system for cable celler
room. kindly confirm the same.
Bidder to re-phrase query.
10Section V1 Part- A Vol
1 of 2 Clause No : 16.17.2.1 Tapping point
Kindly confirm the location of the tapping point to be considered
and the pressure availability.
Bidder required to familiarise
themselves with site conditions.
Section II-ITB ITB 20 Bid bond FormatOur bank can’t issue a bid security with a validity more than 120
days.
According to the tender bid security should be valid for 208 days.
In this case our bank could issue two bid securities 120 + 88 days.
So it will be two bid securities in consecutive order.
I would like to know if this is acceptable by Kenya Power.
Two bid securities NOT acceptable.Bid
bond to be in conformity to ITB 20.
Kindly confirm where to use under hang post insulators for 220 & 66kV
Bidders are to state where they are to
be used in their detailed designs for the
220kV line towers & substation works.
Provide core wise details. Bidders to refer to Para.5 & 6 of
volume 1 in design calculations for
determining current ratio,knee point
voltage and excitation currentsProvide details of existing busbar protection system at Turkwel Refer to attached drawings of existing
single MV/HV system at Turkwel.
Elaborate scope of supply & installation work for OPGW in
Turkwel substation.
Refer to Para.8.3 for details.
Will there be a new building or an extension of existing control
building.Kindly furnish plan & elevation drawings for control
building.
Scope of Works is for new control
building at Turkwel of about 40 sq.m
detached from exisiting control room .
Installation work for OPGW at Kainuk. Refer to Para.8.3 for details.
GENERAL QUERIES
OTHER QUERIES
HVAC QUERIES FOR POTABLE WATER
Page 14 of 15
2) Referring to Paragraph 1.30 on page 28 of 109 of the Technical
Specifications for Transmission Line Works regarding Training.
2.1) The document states that “There shall be no constraints on
the number and category of Kenya power’s staff to be trained on
site” We request that the maximum number be specified as to
accurately estimate the cost.
2.2)In addition the second last paragraph reads: “ The Training
shall be specific to this project and shall include, but not limited
to, foundation design, tower design and detailing, the use of PLS
Tower or similar tower design software and the use of the PLS
CADD or similar profiling software, both of which shall be
provided as part of the Contract.”
The training should at the minmum
cater for 2nos. Kenya power staff.
Page 15 of 15
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
1. Earthing/Auxiliary Transformer 11/0.415kV; with 500 kVA
auxiliary winding
1.1 Manufacturer & Place of manufacturing
1.2 Type designation
1.3 Type
Three phase, oil
immersed,
core type
1.4 Standards
IEC 60076-1, -2,
-3, -5, -10,
60296
NEMA TR1
1.5 Mounting Outdoor, wheel
1.6 Rated voltage ratio
kV 11/0.415
1.7 Rated frequency
Hz 50
1.8 Vector group
ZNyn11
1.9 Cooling
ONAN
1.10 Method of earthing
- HV winding Solid
- LV winding Solid
1.11 Type (graded/non-graded) of windings
- HV winding Non-graded
- LV auxiliary winding Non-graded
1.12 Rated voltage of windings
- HV winding kV 11
- LV auxiliary winding kV 0.415
1.13 Highest voltage for equipment
- HV winding kV 12
- LV auxiliary winding kV 0.433
1.14 Rated lightning impulse withstand voltage at HV Terminal
kV 95
1.15 Rated power frequency withstand voltage at
- HV terminal kV 38
- LV terminal kV 38
- HV neutral terminal kV 38
1.16 Rated power at site conditions
kVA 500
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
1.17 Maximum temperature rise at rated power at:
- Windings K 55
- Hot spot of windings K 68
- Top oil K 50
- Oil at inlet of cooler K
- Oil at outlet of cooler K
- Core K
1.18 Temperature rise of winding due to short circuit duration of 2
s and HV side short circuit current of 25 kA
1.19 No load losses at rated voltage and rated frequency
kW
1.20 Load losses at 75 C, and rated frequency, rated power and
principal tapping:
1.21 Maximum current density at rated power:
- HV winding A/mm2
- LV auxiliary winding A/mm2
1.22 Symmetrical short circuit withstand current (duration 2 s) at:
- HV terminal kA 25
- LV auxiliary terminal kA
1.23 Magnetising current (HV winding)
- At 90% rated voltage A
- At 100% rated voltage A
- At 110% rated voltage A
1.24 Maximum flux density in core at rated voltage, power
frequency and principal tapping
T
1.25 Type of tap changing
Off-load
1.26 Type designation of off-load tap changer
1.27 Tapped winding
HV
1.28 Tapping range
+5% -5%
1.29 Tapping step
2.5%
1.30 Number of steps (positions)
4 (5)
1.31 Limitation and withstanding of fault current in neutral for 30 s
A 750
1.32 Impedance voltage range at 75 C and principal tapping:
- At principal tapping > 4%
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
- At maximum voltage ratio >4%
- At minimum voltage ratio >4%
1.33 Resistance of winding at 75 C and principal tapping:
- HV side /phase
- LV auxiliary side /phase
1.34 Zero phase sequence impedance of inter-star windings at
75 C (LV windings open-circuit)
/phase
1.35 Zero phase sequence impedance of LV windings at 75 C
(inter-star windings open-circuit)
/phase
1.36 Terminal connection
- HV terminal Air-filled cable
box
- LV terminal Air-filled cable
box
- HV neutral terminal Air-filled cable
box
- LV neutral terminal Air-filled cable
box
1.37 Isolating link for test purposes (not required if separable
connector allows testing)
- HV terminal Yes
- LV terminal No
1.38 Mounting of current transformer at
- HV terminal In tank
- Neutral terminals In tank or box
1.39 Current transformers
HV Line
- Number of cores 2
- Rated extended primary current 120%
- Ratio (TR = turns ratio)
I core 1/50 (TR)
II core A 50/1
- Class
I core PX
II core 5P20
- Knee point voltage (Ek)
I core V
II core V N/A
- Exciting current (IE ) at Ek
I core mA
II core mA N/A
- Rated output (Burden to be 25-100% rated burden)
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
I core VA N/A
II core VA 15
HV Neutral
- Number of cores 3
- Rated extended primary current 120%
- Ratio (TR = turns ratio)
I core A 750/1
II core 1/50 (TR)
III core 1/2000 (TR)
- Class
I core 5P20
II core
III core PX
- Knee point voltage (Ek) PX
I core V N/A
II core V
III core V
- Exciting current (IE ) at Ek
I core mA N/A
II core mA
III core mA
- Rated output (Burden to be 25-100% rated burden)
I core VA 15
II core VA N/A
III core VA N/A
LV Line (Only AIS connections)
- Number of cores N/A
- Rated extended primary current N/A
- Ratio (TR = turns ratio)
I core A N/A
- Class
I core N/A
- Knee point voltage (Ek)
I core V N/A
- Exciting current (IE ) at Ek
I core mA N/A
- Rated output (Burden to be 25-100% rated burden)
I core VA N/A
LV Neutral
- Number of cores 1
- Rated extended primary current 120%
- Ratio (TR = turns ratio)
I core A 1/750 (TR)
- Class
I core PX
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
- Knee point voltage (Ek)
I core V
- Exciting current (IE ) at Ek
I core mA
- Rated output (Burden to be 25-100% rated burden)
I core VA N/A
All class PX CTs shall have a rated secondary current, ISN
A 1.2
1.40 Oil:
Manufacturer
Type designation
Standards IEC 60296
Minimum flash point oC
Viscosity
At 20oC mm
2/s
At 50oC mm
2/s
At 80oC mm
2/s
Maximum dielectric strength for 1 min kV
Dielectric factor
Acidity (neutralization value) mgKOH/g
1.41 Type of dehydrating breather (Non-sealed transformers)
Silicagel –
automatic
recharge type
1.42 Conductor material (e.g. copper, work hardened copper, etc.):
HV windings
LV windings
1.43 Conductor insulation:
HV winding
LV winding
1.44 Calculated thermal time constant
min
1.45 Thickness of transformer tank
- Sides mm
- Bottom mm
- Top mm
1.46 Material of transformer tank
1.47 Thickness of radiator plates
mm
1.48 Total volume of conservator
litres
1.49 Masses of transformer
- Core and coils kg
- Total mass excluded oil kg
Appendix 2 Technical Schedules for Auxiliary transformer.
11/0.415kV; 500kVA EARTHING/AUXILIARY TRANSFORMERS
(CAF-CAF)
UNIT DATA
Required Offered
- Oil mass in tank kg
in radiators kg
total kg
- Total mass kg
1.50 Mass of transformer as arranged for transport (heaviest part) kg
1.51 Dimensions of transformer arranged for transport
- Height m
- Width m
- Length m
1.52 Maximum noise level (to NEMA TR1)
dB 56
1.53 Vibration test (Y/N) N
1.54 Conservator vessel, radiators, fan grilles, control boxes or
cubicles and pipework anticorrosion protection
Hot dip
galvanized and
painted
1.55 Tank anticorrosion protection
1.56 Control/Protection voltage
V 110 DC
1.57 Manufacturer quality assurance Yes
- According to ISO 9000, 9001, 9002, 9003 and 9004
1.58 Type test certificates to be issued by:
- Independent Laboratory or independently witnessed type
test certificate
Yes
1.59 Special Tests to be performed:
- Measurement of zero-sequence impedance
- Determination of sound levels
- Measurement of harmonics of no-load current
Yes
No
No
Appendix 3 Minutes of Pre-Bid conference
Pre-Bid Meeting for Tender number KP1/6BA/PROJ/PT/29/12-Design,
Supply and Construction of 220/66/11kV substation & associated 220kV
line.
Date held: 24th
October 2012
Time: 10.30 a.m. to 11.30 a.m.
KPLC staff present 1 Eng Elijah Bosire – Projects Manager
2 Eng Vincent Odhiambo - Senior engineer, Projects Turnkey
Bidders Present
No Name Company/Firm
1 Zhu Xuhao Hydrochina
2. Victor Chore Efesk corp.
3. Stephen Mitau Airforce cooling systems
4. Samuel odila Siemens South africa
5. Suraj Prakash KEC Intl
6. Xie Xin Chint Electric
7. Michael sigwe Conco
8. Mark Kuka ABB
9. Madrin Maina Efesk Corp.
10. Rachit Shah Shreem Electric
11. John Angwenyi Cool Xtreme
12. Leah Muli Zhejiang Machinery
13. Moses W. Namasake ECI Eng & Const
14. Catherine Ahenda Snowpeak refrigeration
15. Peterson Maina Baording taupwei
16. A. Chockilingam Larsen & Toubro
Minutes
Min.1: Bidders advised that cancellation of earlier tender was occasioned by change of
substation site to plot within the Kengen compound at Turkwel.
Min.2: Bidders informed that the site visit will be conducted by themselves i.e. without
presence of KPLC engineers between dates of 25th
and 26th
October 2012.
The Chief engineer of Turkwel power station will be apprised of the Bidders visit.
Min3: Project manager ruled out possibility of extension of tender closing date.
Min.4
Matters arising from Bidders.
Q. Exact location of plot.
A. Clarification
Appendix 3 Minutes of Pre-Bid conference
The Project manager advised Bidders that i) the identified plot was not more than
300meteres from the existing Turkwel 220kV switchyard.
Meeting adjourned at 1130 am.
KE
Y
PRO
POSE
D 220K
V E
QU
IPME
NT
PRO
POSE
D 66K
V E
QU
IPME
NT
18
31
81
TX
1
75
MV
A
22
0/1
32
/12
.3kV
H2
1
H1
3
S4
4S
40
S4
8S
24
S2
0S
28
S3
4S
30
S3
8
L1
3
H2
3
H1
1
28
128
3
220 K
VL
11
Te
rtiary
=1
5M
VA
Te
rtiary
=1
5M
VA
TX
1
75
MV
A
22
0/1
32
/12
.3kV
LE
SS
OS
S/S
22
0 /1
32
KV
220 KV FROM TURKWEL P/STN.
FUT
UR
E E
QU
IPME
NT
(NO
T PA
RT
OF SC
OPE
)E
XIST
ING
EQ
UIPM
EN
T
H1
1
H1
3
1M
1
E1
S1
1S
1
L1
1
.5km
S3
8S
30
S3
4S
28
S2
0S
24
S4
8S
40
S4
4
L1
3
11
KV
BU
S B
AR
S
1M
0
ST
N T
X1
GE
N. T
X1
11
/23
4 K
V
59
MV
A
BR
1B
R2 1S
2
GE
N 3
ST
N T
X2
GE
N 2
GE
N. T
X2
11
/23
4 K
V
59
MV
AH
21
H2
3
2M
1
2M
0E1
S2
TU
RK
WE
LL 2
20 K
V
TU
RK
WE
LL
S/S
11
/ 22
0 K
V
58
.05
MV
A
Xd
"=1
8%
Xo
=2
2%
Xo
=2
2%
58
.05
MV
A
Xd
"=1
8%
S
S
YX=
12
%
d1
1N
YX=
12
%
d1
1N
45M
VA
220/6
6/1
1K
V T
x.
220K
VS/D
s
66K
VA
/Bs
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VS/D
s
22
0KV
A/B
s
22
0KV
S/Ds
22
0KV
A/B
s
22
0KV
S/Ds
KIT
ALE
22
0KV
A/B
s
66K
VS/D
s
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VA
/Bs
SP
AR
E
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VA
/Bs
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VA
/Bs
SP
AR
E 6
6K
V F
EE
DE
R
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VA
/Bs
22
0KV
E/S6
6kv
E/S
66K
VV
Ts
66K
VC
VTs
66K
VV
Ts
66K
VC
VTs
45M
VA
220/6
6K
V T
x.
220K
VS/D
s
66K
VA
/Bs
66K
VC
Ts66K
VC
B
66K
VA
/Bs
66K
VS/D
s
22
0KV
E/S6
6KV
E/S
FU
TU
RE
BA
Y ( N
OT
PA
RT
OF
SC
OP
E)
66K
VC
B
66K
VC
Ts66K
VC
Ts
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
KA
CH
ELIB
A/O
RT
UM
FE
ED
ER
66KV B.B 1
66KV B.B 2
DA
TESIG
N
CH
ECK
EDR
EFD
ESCR
IPTION
SIGN
DA
TEC
HEC
KED
CH
ECK
EDPR
INC
IPAL D
'MA
N
DR
AW
N
TRA
CED
05-09-2012S.M
.Kim
ani
7 6 5 4 3 2EN
GIN
EER I/C
1
PRO
POSED
SLD A
T KA
INU
K SU
B STA
TION
- WEST PO
KO
T
SIGN
L.Obalo
NA
ME
APPR
OV
ED
F. Kavita
Kenya Pow
er
SK N
o.11081
22
0KV
E/S
22
0KV
E/S
220K
V A
/Bs
220K
V A
/Bs
220K
V C
Ts
220K
V C
/Bs
220K
V A
/Bs
220K
V A
/Bs
220K
V C
Ts
220K
V C
/Bs
220K
V A
/Bs
220K
V A
/Bs
220K
V C
Ts
220K
V C
/Bs
220K
V A
/Bs
220K
V A
/Bs
220K
V C
Ts
220K
V C
/Bs
220K
V A
/Bs
220K
V A
/Bs
220K
V C
Ts
220K
V C
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
66K
VA
/Bs
220K
VA
/Bs
22
0KV
A/B
s
22
0KV
S/Ds
22
0KV
E/S
22
0KV
S/Ds
22
0KV
CV
TS
22
0KV
CV
TS
22
0KV
CV
TS
22
0KV
CV
TS
LO
KIC
HA
R 6
6K
V F
EE
DE
R
66K
VS/D
s
66K
VS/D
s
66K
VC
VTs
66K
VC
VTs
LO
KIC
HA
R
22
0K
V L
INE