STATUS REPORT OF MY HOME ABHRA Tower-”A” As On 27.04.13 1.Ground Floor slab Completed 2.First Floor slab 1 & 2 flats Completed 3.Remains Columns Work In Progress
Transcript
Page 1: 27.04.2013

STATUS REPORT OF MY HOME ABHRA Tower-”A” As On 27.04.13

1.Ground Floor slab Completed2.First Floor slab 1 & 2 flats Completed3.Remains Columns Work In Progress

Page 2: 27.04.2013

STATUS REPORT OF MY HOME ABHRA Tower-”B” As On 27.04.13

1.Ground Floor slab Completed2.First Floor slab flat no 01 & 02 completed 3 & 4 flats Bar Bending

and Shuttering Work In Progress

Page 3: 27.04.2013

STATUS REPORT OF MY HOME ABHRA Tower-”C” As On 27.04.13

1.Basement I slab Completed2.Ground Floor Flat No 01 Shuttering work in progress

Page 4: 27.04.2013

STATUS REPORT OF MY HOME ABHRA Tower-”D”As On 27.04.13

1.Ground Floor slab Completed2.First Floor 1 & 2 flats Slab Completed 3rd Flat Bar Bending work In Progress

Page 5: 27.04.2013

STATUS REPORT OF MY HOME ABHRA Tower-”E”As On 27.04.13

1.Ground Floor slab Completed2.First Floor Slab Flat No 01 Shuttering work in Progress

Page 6: 27.04.2013

STATUS REPORT OF MY HOME ABHRA “TOTAL SITE & CENTRAL LAWN”As On 27.04.131.Total Site Ground Floor slab except Tower-C Remain all Completed

2.Total Site First Floor slab Tower : A-2 flats, B-2 flats & D-2 Flats Completed3.Central Lawn Basement II Slab 15% Completed