+ All Categories
Home > Documents > 28 th January 2016 LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and...

28 th January 2016 LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and...

Date post: 18-Jan-2018
Category:
Upload: mitchell-dennis
View: 216 times
Download: 0 times
Share this document with a friend
Description:
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Outline Status of the preparation of the LIU installations List of activities and draft schedules of LS2 Supports needed Conclusions 3 Long Shutdown Commissioning Operation Technical Stop YETS EYETS *YETS LS2 4 4 Activities independent from the operation (i.e. surface, Linac4…) *Be ready by end of 2016 in the event of possible full linac4 connection
23
Transcript
Page 1: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
Page 2: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

2

LIU activities during LS2 (including the (E)YETS)

Highlight of changes with respect to last year(20 min)

Julie COUPARD (EN-ACE)

The baseline LIU installation activities corresponding to both ion and proton upgrades will be reviewed to show-up changes approved and/or proposed with respect the 2014 baseline. An advanced draft schedule of LIU activities will be presented, underlining the corresponding support needed from the various CERN groups together with the required technical expertise.

Page 3: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

3

Outline• Status of the preparation of the LIU installations• List of activities and draft schedules of LS2• Supports needed• Conclusions

Long ShutdownCommissioningOperationTechnical Stop

YETS 2015

1EYETS 2016

2* YETS 2017

3LS2

4

Activities independent from the operation (i.e. surface, Linac4…)

*Be ready by end of 2016 in the event of possible full linac4 connection

Page 4: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

4

Status of the preparation of the LIU installations• Safety Files

Safety Packages (SP)

SP Coordinators (SPC) Editors HSE-SEE Correspondents

HSE-RP Correspondents

Status of the Safety Files

LIU new / upgraded equipment only SF part I SF part II SF part III

SF IV (released versions as

needed, including conformity certificates)

HSE Launch Safety Agreement (LSA)

PSB

1 PSB Rings (without 1L1 & 15L1) K. Hanke I. Kobzeva S. Marsh R. Froeschl Engineering Check - EDMS 1561793 May-16 Sep-16 Dec-15 to Sept-21 In Work

2 Injection (including 1L1 & 15L1) W. Weterings I. Kobzeva S. Marsh R. Froeschl Engineering Check - EDMS 1543246 May-16 Sep-16 Dec-15 to Sept-21 In Work

3 Extraction J. Borburgh I. Kobzeva M. Andreini R. Froeschl In Work May-16 Sep-16 Dec-15 to Sept-21 In Work

4 B245 - POPS B F. Boattini I. Kobzeva S. La Mendola R. Froeschl In Work - EDMS 1561814 May-16 Sep-16 Dec-15 to Sept-21 EDMS 1326793

PS&TT2

1 PS Ring H. Damereau I. Kobzeva D. Rio J. Vollaire Engineering Check - EDMS 1557131 May-16 Sep-16 Dec-15 to Sept-21 In Work

2 Injection J. Borburgh I. Kobzeva M. Andreini J. Vollaire Engineering Check - EDMS 1547449 May-16 Sep-16 Dec-15 to Sept-21 In Work

3 RF Systems C. Rossi I. Kobzeva O.Tison J. Vollaire Engineering Check - EDMS 1557132 May-16 Sep-16 Dec-15 to Sept-21 In Work

4 PS Dump F.-X. Nuiry I. Kobzeva S. Schadegg J. Vollaire In Work -EDMS 1555948 May-16 Sep-16 Dec-15 to Sept-21 In Work

5 TT2 Consolidation K. Papastergiou I. Kobzeva O.Tison J. Vollaire Engineering Check- EDMS 1554170 May-16 Sep-16 Dec-15 to Sept-21 In Work

SPS

1 SPS Ring & Transfer lines B. Goddard A. Funken

LSS4 (MKE4): A. Cunha H. Vincke In Work In Work In Work In Work EDMS 1563343

LSS2/4/6: A. Cunha H. VinckeIn Work

May-16 Sep-16 Dec-15 to Sept-21In Work

LSS1/3/5: D. Fallavier H. Vincke May-16 Sep-16 Dec-15 to Sept-21

2 SPS Dump Upgrade E. Carlier A. Funken F. Corsanego H. Vincke In Work May-16 Sep-16 Dec-15 to Sept-21 EDMS 15017023 RF System Upgrades (200MHz and 800

MHz) E. Montesinos A. Funken O. Tison H. Vincke In Work May-16 Sep-16 Dec-15 to Sept-21 EDMS 1158474

4 aC Coating & Impedance reduction P. Cruikshank A. Funken J. Gulley H. Vincke In Work May-16 Sep-16 Dec-15 to Sept-21 In Work

Ions

1 Linac3 D. Kuchler A. Funken D. Rio R. Froeschl In Work May-16 Sep-16 Dec-15 to Sept-21 In Work

2 LEIR D. Manglunki I. Kobzeva Tbd R. Froeschl Not started May-16 Sep-16 Dec-15 to Sept-21 Not started

3 SPS RF Ions W. Holfe A. Funken Tbd H. Vincke Not started May-16 Sep-16 Dec-15 to Sept-21 Not started

Courtesy Anne Funken and Lisa Kobzeva

Identification of the risks and hazards

Page 5: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

5

Status of the preparation of the LIU installations• Integration studies // Space Reservation and Engineering

Change Requests (SRR and ECR)Roadmap for 2016-2017-2018 (objectives)

LIU-Linac3Linac4 and LEIR LIU-PS

LIU-PSB LIU-SPSGlobal LIU Project

Integration studies Validation of the ECR Installation

Page 6: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

6

List of activities and draft schedules of LS2

Linac3 and LEIR• LIUYETS 2015-2016 Upgrade of the Linac3YETS 2017-2018 New external beam dump for LEIRLS2 Replace the bending BVT10 on LBS line

• Consolidations required for LIU

Ref. Richard Scrivens’s talk (session 6)

System Consolidation item Group When Approved by CONS? Needed for

Cooling/Ventilations CV of Linac3 building EN/CV In LS2 Yes Needed to operate the Linac at 10 Hz

Beam transfer LEIR SEH10 Injection septum LEIR TE/ABT 2016 No PS complex operation and reliability/availability issues

Beam transfer LEIR SMH40 Extraction septum LEIR TE/ABT 2016 No PS complex operation and reliability/availability issues

Beam transfer Magnet KFH31/32/34 + Generator Extraction kicker LEIR TE/ABT in LS2 No PS complex operation and reliability/availability issues

Beam transfer KFA28 spare magnet Injection Kicker PS TE/ABT in LS2 No PS complex operation and reliability/availability issues

Beam instrumentation LEIR Orbit + Trajectory spare monitors BE/BI in LS2 No PS complex operation and reliability/availability issues

Magnets LEIR spare magnets coils TE/MSC Ongoing Yes PS complex operation and reliability/availability issues

Magnets Ions lines spare coils TE/MSC Ongoing Partially PS complex operation and reliability/availability issues

Page 7: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

7

List of activities and draft schedules of LS2

Linac4• New Mid-term and Long-term Schedule of the Linac4

completion at 100 MeV completion at 160 MeV

Start of the Half sector test

Today

ready at 50 MeV

Ref. Alessandra Lombardi’s talk (session 6)

EYETS YETS LS2

HST

Spa

re

Be ready by end of 2016 in the event of possible full linac4 connection

Page 8: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

8

List of activities and draft schedules of LS2

Connection of the Linac4• Connection of the Linac4

• Dismantle part of the Linac2• Dismantle the measurement lines LTE and

LTL• New bending magnet LT.BHZ20• Radioprotection safety aspects

• Civil engineering works (“chateau”, new wall)• Transport & Handling (new chicanes)

• General safety aspects• Civil engineering works (opening wall for emergency

exit)

• New access sectorization

• New emittance measurement line LBE

Pending questions being addressed• Complete dismantling of the Linac2• Access strategy for Linac2 area sectorization• Cleaning of building 363 (Linac2) general

services • Approved consolidations of the transfer lines

LT, LTB and BI (PS Switch Yard side)

Page 9: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

9

List of activities and draft schedules of LS2

Connection of the Linac4• Draft Schedule

• Connection at 160 MeV H-

• Co-activities and constraints with the PS Switch Yard schedule

IN WORKCourtesy Aurelio Berjillos

Page 10: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

10

List of activities and draft schedules of LS2

PS Booster• LIU

New injection for Linac4 160 MeV

Upgrade to 2 GeV

• Consolidations required for LIU

Be ready by end of 2016 in the event of possible full linac4 connection

System Consolidation item Group When Approved by CONS? Needed for

Cooling systems Cooling plant replacement / Chilled water plant replacement EN/CV in LS2 Yes PS Complex operation and HSE issuesVentilation systems Renovation of ventilation system EN/CV in LS2 Yes PS Complex operation and HSE issues

Electrical distribution Replacement of ERD16/17/18*25 EN/EL in LS2 No PS complex operation and reliability/availability issues

Beam stoppers BI and BTP beam stoppers (under study) EN/STI in LS2 No PS complex operation, safety elements (EIS)

Vacuum systems Exchange of 12 pumping groups - 4 in BI and BT lines TE/VSC in LS2 Yes PS complex operation and reliability/availability issues

Power converters systems MidiDiscap and MaxiDiscap PCs for LT, LTB and BI lines TE/EPC in LS2 Yes PS complex operation and reliability/availability

issuesPower converters systems

PC controls renovation (full injectors chain) based on G64 and MIL-1553 TE/EPC in LS2 Yes PS complex operation and reliability/availability

issues

Magnet system BT.BHZ10 TE/MSC in LS2 Yes PS complex operation and reliability/availability issues

Magnet system Spare Coils for Injection and extraction main bends TE/MSC in LS2 Yes PS complex operation and reliability/availability issues

Magnet system Spare multipoles TE/MSC in LS2 Yes PS complex operation and reliability/availability issues

Page 11: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

11

IN WORK

List of activities and draft schedules of LS2

PS Booster• Draft Schedule

Notes for EN-EL activities• De-cabling = replacement of systems (in addition to the de-cabling project)• Only LIU requests

Important to make the DEC/DIC/DIF*

*DEC/DIC/DIF Demande d’Enlèvements/Installation de Câbles/Fibres

Close PSB

Page 12: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

12

List of activities and draft schedules of LS2

PS&TT2• LIU

Injection energy at 2 GeV

• Consolidations required for LIUSystem Consolidation item Group When Approved

by CONS? Needed for

40-80 MHz cavities 40-80 MHz Power converters replacement TE/EPC Ongoing Yes Increase reliability and voltage available for cavities

Vacuum Replacement of enamelled Flanges TE/VSC in LS2 Yes PS complex operation and reliability/availability issues

Power converters FTN power converters TE/EPC in LS2 Yes Needed to avoid hybrid renovation of building

Beam transfer KFA45 Magnet (modules) Generator TE/ABT in LS2 Yes PS complex operation and reliability/availability issues

Beam transfer PS extraction kickers KFA71-79 TE/ABT in LS2 Yes PS complex operation and reliability/availability issues

Beam stoppers Beam stoppers EN/STI in LS2 No PS complex operation and reliability/availability issues

HL-RF 10 MHz system BE/RF in LS2 Yes RF Power upgradeBeam instrumentation TT2 BLMs BE/BI LS2 No Loss management and activationBeam instrumentation Injection SEMgrids BE/BI YETS 2015-16 Yes Injection optics measurements

Magnets TT2 quadrupoles consolidation TE/MSC in LS2 Yes PS complex operation and reliability/availability issues

Magnets Pole face windings TE/MSC in LS2 Yes PS complex operation and reliability/availability issues

Cooling systems TT2 -water cooling station EN/CV in LS2 Yes PS Complex operation and HSE issues

Page 13: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

13

IN WORK

List of activities and draft schedules of LS2

PS&TT2• Draft Schedule

Notes for EN-EL activities• De-cabling = replacement of systems (in addition to the de-cabling project)• Only LIU requests (some groups did not yet send their requests)

Important to make the DEC/DIC/DIF*

*DEC/DIC/DIF Demande d’Enlèvements/Installation de Câbles/Fibres

Close PS

Page 14: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

14

List of activities and draft schedules of LS2

SPS• LIU

Increase SPS performance• HL-LHC - Crab cavity in P6EYETS 2016-2017large work volumes + coactivity (mainly) in tunnel

YETS 2017-2018Installation of large items + Hardware commissioning: Very tight schedule

• Consolidations required for LIURef. Giovanna Vandoni’s talk (session 7)

System Consolidation item Group When Approved by CONS? Needed for

800 MHz Replacement of analogue control with digital BE/RF For Jan 2016 Yes Beam control

800 MHz New 1-turn feedback and feed-forward (essential for beam control) in low level BE/RF For Jan 2016 Yes Beam control

BLM Replace obsolete BLM electronics using new MOPOS fibre BE/BI For LS2 Pending Loss management and activationMKDV switches Replacement of thyratron/ignitron with GTO switch TE/ABT In LS2 Yes New LSS5 dumpECX5 crane Refurbishment and upgrade of EXC5 crane, CONS part EN/HE In EYETS/LS2? Partially New LSS5 dump

200 MHz Replacement YL1530 from Richardson being replaced with TH335 from Thales BE/RF In LS2 Yes 200 MHz power upgrade

Electrical distribution BA3/BB3/BF3 distribution for upgraded 200 MHz EN/EL In LS2 Yes 200 MHz power upgradeElectrical distribution ECA5/ECX5 distribution for new LSS5 beam dump EN/EL In LS2 Partially New LSS5 dumpElectrical distribution MOPOS crates to move to UPS EN/EL In LS2 Partially MOPOS upgrade

De-cabling Various de-cabling activities, especially in LSS3 and LSS5, maybe also LSS1 EN/EL Through LS2 Yes New installations

Page 15: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

15

IN WORK

List of activities and draft schedules of LS2

SPS• Draft Schedule

Note for EN-EL activities• No request received so far for cabling removal and new cables

Close SPS

Page 16: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

16

List of activities and draft schedules of LS2

• Summary overview of the injectors chain Master Schedule

Stop the beamin the PSB12/11/18

Stop the beamin the PS and SPS

10/12/18

Beam readyfor PSB13/09/20

Beam readyfor PS

27/11/20

Beam readyfor SPS21/01/21

LHCPROBE BeamReady 04/03/21

Linac4 Beam testsTo LBE line

01/07/19Close PSB Close PS

Close SPS

Page 17: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

17

List of activities and draft schedules of LS2

• Summary overview of the injectors chain Master Schedule• Objectives to make a linear schedule of the injector chains (like LHC machine) for the EYETS

2016-2017.

• Close collaboration with BE-OP re-commissioning coordinators to schedule the hardware commissioning tests to anticipate within the stops.(ref. IRWG – Injectors re-commissioning Working Group)

Page 18: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

18

Support needed• Overview on PLAN activities for LIU Project

BE-ABP BE-BI BE-ICS BE-RF EN-ACE EN-CV EN-EL EN-HE EN-STI GS-ASE GS-SE TE-ABT TE-EPC TE-MSC TE-VSC0

2

4

6

8

10

12

14

16

18

PLAN toolWBS LIU Project

LIU-PROJ PBU-PRJ PSU-PRJ SPU-PRJ IIU-PRJ

BE-ABP BE-BI BE-ICS BE-RF EN-ACE EN-CV EN-EL EN-HE EN-STI GS-ASE GS-SE TE-ABT TE-EPC TE-MSC TE-VSC01234567

PLAN toolWBS LINAC4

LINAC4 LINAC4-INS LINAC-MO

Ref. Katy Foraz’s talk (session 8)

Page 19: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

19

Support needed• Overview on PLAN contributions requests within the LIU

Project

All the groups are very involved but we can already identify a huge contribution requests for• EN-EL // EN-HE• EN-MME // TE-VSC• EN-ACE // HSE-RP• BE-OP

Ref. Katy Foraz’s talk (session 8)

Page 20: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

20

ConclusionsConclusions from LS2 Day (sept-2015)• Some equipment installations have been anticipated to (E)YETS and will require the

general services and infrastructure to be performed in the same timeline (EN-CV, EN-EL, EN-HE, EN-MEF, GS-SE, etc…).

• The groups have to make the corresponding adequate requests, well ahead of time.

• All equipment groups will be committed to the approved injectors master schedule.• The preparation phase need to fit with the installation forecast (studies, procurement, tests etc…)

• The LIU schedule needs to integrate work from all projects, upgrade and maintenance activities and be presented as the Injectors schedule.

• All LIU activities need to be entered into PLAN and will be cross-checked with our LIU schedule.

In addition• Identification of the hazards in progress to take into account in the coordination and

scheduling

• Need to know the definitive list of activities to add in the schedule (i.e. consolidations and safety requirements such as fire risks, asbestos)

Still valid

Still valid

In progress

Almost complete

Page 21: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

21

THANK YOU FOR YOUR ATTENTION

Page 22: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

References• LS2 Day

http://indico.cern.ch/event/436424/ • Joint LIU/HL-LHC

http://indico.cern.ch/event/437662/ • EDMS 1470895 – Length of the (E)YETS

https://edms.cern.ch/document/1470895• LIU – Planning and Installation

https://espace.cern.ch/LIUPLI/_layouts/15/start.aspx#/SitePages/Home.aspx • IRWG – Injector Re-commissioning Working Group – last report to

IEFChttps://indico.cern.ch/event/469496/

Page 23: 28 th January 2016  LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

28th January 2016 http://indico.cern.ch/event/448109/LHC Performance Workshop

Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation.

23

Early connection of the Linac4• Different scenarios for the connection of the Linac4

Courtesy Aurelio Berjillos