Handover to Manufacturing
Guided Structure Synchronization
Martin BachmannSolution Management SAP PLM
SAP AG
© SAP AG 2011. All rights reserved. / Page 2
Agenda■ Today’s challenges in
synchronizing engineering
and manufacturing
■ Solution approach
■ Demo
■ Wrap-up
© SAP AG 2011. All rights reserved. / Page 3
Function / Requirement CAD-BOD-eBOM mBOM-Routing Production Order Asset
Structure
Structures along the Value Chain
Idea ConceptRequire-
ment
Detail
Design
Product
Validation
Process
Planning
Process
ValidationMRP Source
Produce /
AssembleDeliver
Product Development MFG Planning ServiceManufacturing
#
#
#
GSS
eBOM = Engineering BOM
mBOM = Manufacturing BOM
© SAP AG 2011. All rights reserved. / Page 4
Engineering Structure Manufacturing Structure
Challenges in the transition from engineering
to manufacturing
Function versus assembly sequence
Engineering version versus effectivity in manufacturing
Organizational separation of development and manufacturing
Manufacturing differences at different sites
Bike
Frame
Gear shift
Brake
Handle bar
Saddle
Front wheel
Rear wheel
Shift lever
Derailleur
Bike
Frame
Brake
Handle bar
Saddle
Front wheel
Rear wheel
Shift lever
Derailleur
Bowden cable
Bowden cable
© SAP AG 2011. All rights reserved. / Page 5
Reference via CS07
Extract of currently implemented solutions at
Customers
CS07
The plant-independent BOM (eBOM) is referenced via transaction CS07 into a plant-
specific BOM (mBOM).
Problem: both BOMs cannot be changed independently. If there are multiple plant-
specific BOMs, this means, that the product is build the exact same way in each plant.
Copy via CS01/CEWB
CS01
CEWB
The plant-independent BOM is copied via transaction CS01/CEWB into a plant-specific
BOM.
Problem: both BOMs are completly independently. If the plant-independent BOM is
changed, all plant-specific BOMs need to be updated manually.
Copy, Sync via CN
CS01 /
ECN
The plant-independent BOM is copied via transaction CS01/CEWB into a plant-specific
BOM. Changes are synchronized via a detailed description within the change number.
Problem: both BOMs are completly independently. Even if there is a detailed description
of the changes to be implemented into the plant-specific BOM, it is still manual work.
No plant-independent BOM There is no plant-independent BOM documented within SAP. The plant-specific BOM is
created from scratch or via a Team Data Management (TDM) integration.
Problem: there is no end-to-end change management process possible. No clear
defined, reliable and compliant documented Engineering BOM available.
Manual
input,
integration
of TDM
system
SAP standard
SAP standard
Customer Solution
Customer Solution
CS01
TDM integ.
© SAP AG 2011. All rights reserved. / Page 7
Solution Approach
© SAP AG 2011. All rights reserved. / Page 8
Process steps
Product
Manager
Engineering
Responsible
Manufacturing
Responsible
2) Release
(“GSS” ready)
3) Plan Sync
AND
4) Restruc-
ture, resolve
conflicts
6) Finish/
Release
EC
N1
Change
status of
ECN
Sync Unit
Create a
sync unitM
CN
1
1) Create /
Update E-
BOM
5) Additional
MFG
planning
© SAP AG 2011. All rights reserved. / Page 9
Process steps
Product
Manager
Engineering
Responsible
Manufacturing
Responsible
2) Release
(“GSS” ready)
3) Plan Sync
AND
4) Restruc-
ture, resolve
conflicts
6) Finish/
Release
EC
N1
Sync Unit
MC
N1
1) Create /
Update E-
BOME
CN
2
MC
N2
Loop back with change management usually
5) Additional
MFG
planning
© SAP AG 2011. All rights reserved. / Page 10
How it works
Engineering
Bike
Frame
Wheel
Tire
Rim
Manufacturing
Bike
Frame
Tire
Rim
Version A
Version B
Version C
02 / 2007
02 / 2008
03 / 2009
Handover
Compare
03 / 2009
2.0
2.0
Sync Unit
© SAP AG 2011. All rights reserved. / Page 11
How it works
2.0
2.0
2.0
1.0
1.1
1.2
1.3
ECN01 – 1.1.09
ECN02 – 1.2.09
ECN03 – 1.3.09
ECN04 – 1.4.09
ECN05 – 1.5.09 2.0
1.0
1.2
MCN01 – 1.1.09
MCN03 – 1.3.09
MCN05 – 1.5.09
Bike
Frame
Wheel
Tire
Rim
Bike
Frame
Tire
Rim
Engineering Manufacturing
© SAP AG 2011. All rights reserved. / Page 12
Engineering System
mBOM
System landscape, scenario 1
Synchronization will be made in Engineering system.
Manufacturing System (Plant 1)
CAD-BOD-eBOM
mBOM-Routing
Manufacturing System (Plant 2)
mBOM
mBOM-Routing
GSS
© SAP AG 2011. All rights reserved. / Page 13
Manufacturing System (Plant 1)
eBOM
Engineering System
CAD-BOD-eBOM
System landscape, scenario 2
Synchronization will be made in Manufacturing system.
mBOM-Routing
GSS
Manufacturing System (Plant 2)
eBOM mBOM-Routing
GSS
© SAP AG 2011. All rights reserved. / Page 14
One central System
CAD-BOD-eBOM
System landscape, scenario 3
Synchronization will be made in Manufacturing system.
mBOM-Routing
GSS
CAD
System
Team Data
Mgmt.
© SAP AG 2011. All rights reserved. / Page 15
SAP SCM (APO)ERP System
CAD-BOD-eBOM
System landscape, scenario 4
Synchronization will be made in Manufacturing system.
mBOM-Routing
GSSCIF
mBOM-Routing
© SAP AG 2011. All rights reserved. / Page 16
Synchronize (initial)
copy to target and compare
t1 t2 t3 t4 t5 t6
1
1
2
2
1 2
3
3
3
410
20
30
Engineering Structure Manufacturing Structure
t1 t2 t3
1
1
2
1 2
10
20
30
1
3
Released, mature to handover
in work, not yet mature to handover
© SAP AG 2011. All rights reserved. / Page 17
t1 t2 t3 t4 t5 t6
1
1
2
2
1 2
3
3
3
410
20
30
Engineering Structure Manufacturing Structure
t1 t2 t3 t4 t5 t6
2
3
3
3
410
20
30
1
3
Released, mature to handover
in work, not yet mature to handover
1
1
2
1 2
Synchronize (ongoing)
copy to target and compare
© SAP AG 2011. All rights reserved. / Page 18
t1 t2 t3 t4 t5 t6
1
1
2
2
1 2
3
3
3
410
20
30
Engineering Structure Manufacturing Structure
t1 t2 t3 t4 t5 t6
2
3
3
3
410
20
30
1
1
2
1 2
Change Numbers within synchronization
EC
N 1
EC
N 2
EC
N 3
EC
N 4
EC
N 5
EC
N 6
MC
N 1
MC
N 2
MC
N 3
MC
N 4
MC
N 5
MC
N 6
© SAP AG 2011. All rights reserved. / Page 20
Resources
Article in ProSTEP magazine „ProduktDaten Journal“ No.1 / 2009
http://download.sap.com/SMIGlobal/download.epd?context=9CBB1995D46
8B47F1FEAAE118E7CE8412BD29F1A62FBE6F74BAAE929C5E099D2A
22CA7117E69F60C6808816552EF2657DB9373C204B477A2
SAP Rapid Deployment Solution (RDS) (http://www.sap.com/rds )
What is a RDS? Preconfigured software with fixed-scope
implementation services at a predictable price with the flexibility for future
extension. See also here: http://www.youtube.com/watch?v=O9rwL_yAghI
There is also a RDS for the transition from BOM to BOM:
SAP PLM rapid-deployment solution for synchronizing Bill of
Materials
© SAP AG 2011. All rights reserved. / Page 21
Business Context Viewer – Mobile Analytics
for the Business Suite
3 Reasons You Should Sign Up NOW for Usability Testing
This is an exclusive opportunity for SAP customers to test new and existing products and solutions.
It allows you to give on-the-spot feedback directly to the product teams who are designing the solution.
These are not demonstrations. These are one-on-one sessions where you will be working directly with design prototypes.
13 Available Testing Times (1 hour in duration)
4 Convenient Ways to Register
At the Usability Testing Registration Desk (Room S210A&B)
At the Usability Testing Information Desk (Next to ASUG Registration)
At the SAP Information Desk during Exhibition Hours (In the ASUG Lounge)
Online at https://usability.sap.com
Don’t lets this opportunity pass you by, register today!
© SAP AG 2011. All rights reserved. / Page 22
4 key take aways
More freedom and flexibility for engineering and manufacturing
due to separated structures and effectivitiesFlexibility
Traceability through links between eBOM and mBOM Transparency
Save time due to a system supported handover and
comparison of changes from eBOM to mBOMEfficiency
Integrated into existing SAP Application (BOM, Change
Management, etc.)Integration
Thanks you // Questions
?