Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks 1 Balaji Amines Ltd., Plot No E-27 & E-8, MIDC Chincholi, Tal - Mohol, Dist- Solapur 45.30 Crs Establish (Expansion) AS(T) 1 to 25 2 Maersk India Pvt. Ltd., Sector- 6, Dronagiri Warehousing Complex, Navi Mumbai 71.86 Crs Amendment RO(HQ) 26 to 45 3 Synergy Green Industries Pvt. Ltd. C-18, Five Star MIDC Kagal Hatkangale, Kolhapur 42.53 Crs 1st Operate JD(APC) 46 - 59 Fresh Agenda 1 Aurangabad Distillery Pvt. Ltd., Gat No. 47, At - Rangaon, Walchandnagar, Tal - Indapur, Dist - Pune 62 Crs Establish JD(WPC) 60 - 69 2 Polygomma Industries Pvt. Ltd. (Formaly Know as M/s D. K. Ranjane), Plot No. 59, Vill. Ajiwali, P.O. Donwat, Tal - Khalapur, Dist- Raigad 20.02 Crs Establish JD(WPC) 70 - 114 3 Venkys (India) Ltd., C-6, MIDC Krishnoor, Dist. - Nanded 32 Crs Establish JD(WPC) 115 - 120 4 Pune Muncipal Corporation Redevelopment Project, Sr. No. 24 (Part), F.P. No. 53, Wakdewadi, Shivajinagar, Pune 50 Crs Establish RO(HQ) 121 - 129 5 Shri Sai Associates "Oval Nest" 77/2/1 +2+3+4+5+77/1 (P) 7 Sr. No. 78/18/1, Warje, Dist- Pune 96.22 Crs Establish RO(HQ) 130 - 140 6 Shiur Sakhar Karkhana Pvt. Ltd., Survey No. 82, A/p Wakodi, Tal- Kalamnuri, Dist- Hingoli 70 Crs Establish JD(WPC) 141 - 151 7 Vinita Estate Pvt. Ltd., CTS No. 3/5, At Kandarpada, Village - Dahisar (W), Mumbai 79.10 Crs Establish RO(HQ) 152 - 171 8 Shambhu Mahadev Sugar & Allied Ind. Ltd., Villagae Havargaon, Kallam, Osmanabad 38.7 Crs Establish (Expansion) JD(WPC) 172 - 177 9 Lason India Pvt. Ltd., Plot No. C-18, MIDC Industrial, Taloja 36.04 Crs Renewal & Establish (Expansion) AS(T) 178 - 194 List of Cases to be submitted before 2nd Consent Committee Meeting (Part-II) of 2013 scheduled on 29.04.2013 at 14:30 Hrs. Resubmitted Agenda
Transcript
Page 1: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

Sr. No. Name & Address Capital

Investment Applied

For Section Page No. Remarks

1 Balaji Amines Ltd., Plot No E-27 & E-8, MIDC Chincholi, Tal - Mohol, Dist- Solapur

45.30 Crs Establish (Expansion) AS(T) 1 to 25

2Maersk India Pvt. Ltd., Sector- 6, Dronagiri Warehousing Complex, Navi Mumbai 71.86 Crs Amendment RO(HQ) 26 to 45

3Synergy Green Industries Pvt. Ltd. C-18, Five Star MIDC Kagal Hatkangale, Kolhapur 42.53 Crs 1st Operate JD(APC) 46 - 59

Fresh Agenda

1Aurangabad Distillery Pvt. Ltd., Gat No. 47, At - Rangaon, Walchandnagar, Tal - Indapur, Dist - Pune

62 Crs Establish JD(WPC) 60 - 69

2

Polygomma Industries Pvt. Ltd. (Formaly Know as M/s D. K. Ranjane), Plot No. 59, Vill. Ajiwali, P.O. Donwat, Tal - Khalapur, Dist-Raigad

20.02 Crs Establish JD(WPC) 70 - 114

3 Venkys (India) Ltd., C-6, MIDC Krishnoor, Dist. - Nanded

32 Crs Establish JD(WPC) 115 - 120

4

Pune Muncipal Corporation Redevelopment Project, Sr. No. 24 (Part), F.P. No. 53, Wakdewadi, Shivajinagar, Pune

50 Crs Establish RO(HQ) 121 - 129

5Shri Sai Associates "Oval Nest" 77/2/1 +2+3+4+5+77/1 (P) 7 Sr. No. 78/18/1, Warje, Dist- Pune

96.22 Crs Establish RO(HQ) 130 - 140

6Shiur Sakhar Karkhana Pvt. Ltd., Survey No. 82, A/p Wakodi, Tal- Kalamnuri, Dist- Hingoli

70 Crs Establish JD(WPC) 141 - 151

7Vinita Estate Pvt. Ltd., CTS No. 3/5, At Kandarpada, Village - Dahisar (W), Mumbai 79.10 Crs Establish RO(HQ) 152 - 171

8Shambhu Mahadev Sugar & Allied Ind. Ltd., Villagae Havargaon, Kallam, Osmanabad

38.7 Crs Establish (Expansion) JD(WPC) 172 - 177

9Lason India Pvt. Ltd., Plot No. C-18, MIDC Industrial, Taloja 36.04 Crs

Renewal & Establish

(Expansion)AS(T) 178 - 194

List of Cases to be submitted before 2nd Consent Committee Meeting (Part-II) of 2013 scheduled on 29.04.2013 at 14:30 Hrs.

Resubmitted Agenda

Page 2: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

10

Venkateshwara Hatcheries Pvt. Ltd., (Ventri Bio, Vaccine Div), Plot No. 20, Rajeev Gandhi ITBT Park, Hinjewadi, Village- Mann, Tal - Mulshi, Dist- Pune

70.81 Crs Establish (Expansion) AS(T) 195 - 202

11 Dai Ichi Karkaria Ltd., Mumbai Pune Rd., Kasarwadi, Pune

52.39 Crs Establish (Expansion) AS(T) 203 - 208

12 Sai Sharan Hotel, Plot No. 26 B, Sector-7, Kharghar, Navi Mumbai, Dist- Raigad

25.34 Crs 1st Operate RO(HQ) 209 - 223

13Haware Engineers & Builders Pvt. Ltd., " Haware City" At Survey No. 19,20,21, SectorVI, Vadavali, Thane

201.31 Crs 1st Operate RO(HQ) 224 - 232

14Sunshine Pap-Tech Pvt. Ltd., Sr. No. 375 & 375, Vill. Abitghar, Tal - Wada, Dist- Thane 24.50 Crs 1st Operate JD(WPC) 233 - 242

15Dr. Acharya Laboratories Pvt. Ltd., Plot No. N-42, MIDC Addl. Ambernath, Dist- Thane 31.83 Crs 1st Operate AS(T) 243 - 252

16

Omkar Realtors & Developers Pvt. Ltd., Plot bearing CTS No. 61(pt), Jai Ambe (Chembur) SRA CHS Ltd., Village- Chembur, Kurla, M/W Ward - 71

63.78 Crs Operate RO(HQ) 253 - 272

17Scigen Bio Pharma Pvt. Ltd., Plot No. 18, MIDC Hinjewadi, Tal - Mumbai, Dist- Pune 70.72 Crs

Renewal & 1st Operate

(Amalgamation)AS(T) 273 - 278

18Birla Cotcyn (India), Plot No. A-82, MIDC Khamgaon, Dist- Buldhana 49.11 Crs Renewal

(Amalgamation) JD(WPC) 279 - 286

19 Rajgad SSK Ltd., Anantnagar-Nigade, Tal- Bhor, Dist - Pune

26.83 Crs Renewal JD(WPC) 287 - 296

20Shriram SSK Ltd., (Distillery), Nira Valley Arkshala Vibhag, At - Phaltan, Dist- Satara 26.02 Crs Renewal JD(WPC) 297 - 302

21 Dicitex Furnishing Ltd., G-58, MIDC, Boisar-Tarapur, Tal - Palghar, Dist- Thane

51.17 Crs Renewal JD(WPC) 303 - 310

22

Padamshree Dr. D. Y. Patil Sahakari Sakhar Karkhana Ltd., Dnyanshantinagar, A/p - Aslaj, Tal - Gaganbavada

57.64 Crs Renewal JD(WPC) 311 - 320

23Shri Bhogawati SSK (Distillery), Sr. No. 295, 296, 297 & 298, A/p- Shahunagar (Parite), Tal - Karveer, Dist- Kolhapur

57.64 Crs Renewal JD(WPC) 321 - 331

24 Venky (India) Ltd., (Food Division), Village - Baur, Tal - Maval, Dist- Pune

63.86 Crs Renewal JD(WPC) 332 - 339

25Hinjewadi Tech Park Pvt. Ltd., Plot No. 23, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Pune

42.35 Crs Renewal RO(HQ) 340 - 347

Page 3: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

26Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon- Paithan Road, Gangapur 48.73 Crs Renewal JD(WPC) 348 - 355

27Mahatma Sugar & Power Ltd., (Sugar Expansion), Dinkar Jamni, Tal - Seloo, Dist- Nagpur

50.43 Crs Renewal JD(WPC) 356 - 363

28 Shree Saibaba Sugar Ltd., Gut No. 55, 57 & 59, Vill. Gondri, Shivani, Ausa, Latur.

42.27 Crs Renewal JD(WPC) 364 - 371

29 Balaghat Shetkari Sakhar Karkhana, Charwak nagar ujana

36.83 Crs Renewal JD(WPC) 372 - 378

30 Pannageshwar Sugar Mills, Vill. Pangaon, Rampur

32.68 Crs Renewal JD(WPC) 379 - 385

31 Shree Vitthal SSK Ltd., Murum, Tal - Omerga

57.50 Crs Renewal JD(WPC) 386 - 392

32Chatrapati Sambhaji Raje Sakhar Udyog, Hussainpur, Chitepimpalgaon, Dist- Aurangabad

39.44 Crs Renewal (Amalgamation) JD(WPC) 393 - 402

33 Indapur Dairy & Milk Products Ltd., Vill. Gokhali, Tal - Indapur, Dist- Pune

41.35 Crs Renewal JD(WPC) 403 - 413

34 Tata Chemicals Ltd., MIDC Krushnoor, Tal- Naigaon, Dist - Nanded

54.04 Crs Renewal JD(WPC) 414 - 419

35 Jai Shiv Shankar SSK Ltd., Shesh Nagar, Tal - Mukhed, Dist - Nanded

28 Crs Renewal JD(WPC) 420 - 429

36 Apar Industries Ltd., Plot No. 18 & 18/1, MIDC TTC, Rabale, Navi Mumbai

53.15 Crs Renewal (Expansion) AS(T) 430 - 446

37 Avon Organics Ltd., Plot No. E-2, MIDC Chincholi, Tal & Dist- Solapur

73.83 Crs Renewal AS(T) 447 - 455

38 Devi Construction Company, ICC Devi Gaurav Technology Park, Pimpri, Pune

81.95 Crs Renewal RO(HQ) 456 - 465

39 S. I. Group Ltd., Vill - Rasal, Post- Pali, Tal - Sudhagad, Dist- Raigad

52.13 Crs Renewal AS(T) 466 - 474

40 Hindustan Petroleum Corporation Ltd., Pakani, Tal- Norht Solapur, Dist- Solapur

26.08 Crs Renewal RO(HQ) 475 - 490

41Oriental Rubber Industries Ltd., (Unit-I), G. No. 519/2, 523, 524 & 525, Village- Koregaon, Bhima, Tal- Shirur, Dist- Pune

34.09 Crs Renewal AS(T) 491 - 497

42Oriental Rubber Industries Ltd., (Unit-I), G. No. 735 A, 736, 737, 738, Village- Karamdi, Bhima, Tal- Shirur, Dist- Pune

42.62 Crs Renewal AS(T) 498 - 507

43Rajendra Mechanical Industries, N-211/1, MIDC Tarapur, Boisar, Tal- Palghar, Dist - Thane

66.92 Crs Renewal with change of name JD(APC) 508 - 516

44Sunflag Iron Ore & Steel Co. Ltd., (Belgaon Mine), Vill- Belgaon, Tal- Warora, Dist - Chandrapur

38.75 Crs Renewal JD(APC) 517 - 526

Page 4: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

45B S Ispat Ltd., Makri Mangli Coal Mine Project, Vill- Makri Buzurg, Tal- Zarizamini, Dist- Yavatmal

26.93 Crs Renewal JD(APC) 527 - 534

46Demag Cranes and Components (I) PVt. Ltd., Gat No. 330,332,333,334, A/p- Nankarwadi, Tal- Khed, Dist - Pune

50.66 Crs Renewal JD(APC) 535 - 542

1 Application for renewal of consent of Balloon Industries in Dhahnu Area

Renewal JD(WPC) 543 - 548

2Eco Logistic, Plot No. A-05, TTC Industrial Estate, Village- Pawane, Thane-Belapur Road, Navi Mumbai

NOC RO(HQ) 549 - 555

JD(WPC) 23AS(T) 11RO(HQ) 10JD(APC) 5Total 49

Review Item

Page 5: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    1 

 

PART-II CC-Resubmission Agenda No 1 Name of the Industry: Balaji Amines Ltd.,

Plot No E-27 & E-8, MIDC Chincholi, Tal - Mohol, Dist- Solapur

• Application recd at SRO Solapur office on 07/10/2011 • Application recd at HQ on 25/10/2011 at RO(HQ) section and on 27/09/2012 at JD

(PAMS) section. • Industry engaged in Bulk Drug Manufacturing activity. • Existing Consent to operate is valid up to 31/03/2013. Now applied for Consent to

Establish for installation of Incineration facility in the same premises to incinerate their own HW.

• Existing CI ` -42 Cr + Increased CI - ` 3.30 Total CI ` 45.30 Cr • SRO Solapur has recommended to grant consent to establish. • The case was discussed in CC meeting dated 06.12.2012 and it was decided to issue

SCN for refusal. • Accordingly, SCN was issued by legal wing on 06/02/2013 & reply received from

industry. • Show cause notice is issued in view of required to continuous operation, needs

specialized supervision and instrumentation require of capability for holding the waste for atleast 25 years and individual industry may not be operate the said facility and in view of the guidelines issued by CPCB, Board is not encouraging the individual HW facility.

• The industry has submitted reply to the show cause notice wherein they have mentioned that it is a incineration-cum-waste heat recovery system and they are having entire state of art infrastructure, trained and experienced staff and man power dedicated to monitoring cell to management of environmental issue. Further they have also pointed out that Board has granted one such consent to M/s.Asian Paints Ltd; for captive incineration purpose. The said industry is smaller than their production. They have also mentioned that residue that having high calorific value from their plant only be burned to recover heat and energy. Its conservation will reduce the weight and volume of the waste. Inorganic left over in the plant will be sent to CHWTSDF.

The reply of the industry to SCN, is not convencing. The decision regarding grant of permission to individual incinerator needs to be taken as a policy decision.

 

 

 

 

Page 6: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    2 

 

Agenda No 2 Name of the Industry: Maersk India Pvt. Ltd.,

Sector- 6, Dronagiri Warehousing Complex, Navi Mumbai Application received for grant of amendment in consent.

Consented Activity- (CFS) Cargo ware housing complex handling of containerized cargo &storage which covers operational area and inside company premises excluding handling of chemical.

Proposed activity-Container yard (CFS) All type of cargo ware housing complex. (Handling of all type of containerized/non containerized cargo & storage ,which & inside company)

Application received at SRO,Taloja , dt: 4/7/2011 and at HQ on 24/01/12.

Applicant has submitted C.A. Certificate stating project cost is Rs.71.86 Cr.

Industry category-Orange.

The case was discussed in CC meeting held on 15/3/2013 & it was decided to call industry representative for separate personal hearing to get details of actual proposed activity in view of EIA notification 2006. In this regard separate note is attached.

RO-Navi MumbaiTaloja - Consent may be granted with overriding effect over earlier

consent in orange category.

Legal wing:-We may impose condition of threshold limits & they should not handle the chemicals more than the threshold limits.

Remarks of HOD- We may consider the case for C to E by imposing condition of threshold limits & they should not handle the chemicals more than the threshold limits.

 

Page 7: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    3 

 

Agenda No 3 Name of the Industry: Synergy Green Industries Pvt. Ltd.

C-18, Five Star MIDC Kagal Hatkangale, Kolhapur  

Case was discussed in CC meeting held on 4/12/12, the case was approved & was decided to

grant the consent to operate after getting the verification report from RO/SRO regarding the

installation of STP. Now SRO submitted the report through e mail dated 6/4/2013 and reported

that 70% work of installation of STP is completed and will complete the remaining in next six

months due to financial constraint. At present only 2 CMD effluent is generate & for which septic

tank is provided.

We may grant consent to operate upto 30/5/2015 with condition of BG of Rs. 200000/- for

commissioning of STP within period of six months.

We may place the case before for further discussions. Submitted for further orders please 

Page 8: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    4 

 

CC-Fresh Agenda

Agenda No 1

Name of the Applicant: Aurangabad Distillery Pvt. Ltd., Gat No 47, At - Rangaon, Walchandnagar, Tal - Indapur, Dist – Pune

• Existing distillery unit of 30 KLPD, valid consent up to 31.12.2016. • Unit has applied for consent to establish (Expansion) for 60 KLPD. • Capital Investment of expansion is Rs. 62.00 Crs. • SRO reported the Nira River A-II class is 2.7 Km away, which shows it satisfies the RRZ

criteria. • Unit has already obtain Environmental Clearance for 90 KLPD distillery dated

19.08.2008. • Unit has provided Biomethanation, RO system and proposed spent wash will be

concentrated and incinerated in an incineration boiler to achieve Zero Discharge. • RO/SRO has recommended for grant of C to E for expansion. • Recommended for grant of consent to establish with Rs. 2 lakh towards compliance of

zero discharge, only after receipt of distance certificate from Exe. Engineer, Irrigation department, if agreed please.

Page 9: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    5 

 

Agenda No 2 Name of the Applicant: Polygomma Industries Pvt. Ltd.

(Formaly Know as M/s D. K. Ranjane), Plot No 59, Vill. Ajiwali, P.O. Donwat, Tal - Khalapur, Dist- Raigad

• Applied for C to E. • Proposed the industry is located 612 meters from Banganga River (A-I Class) River

distance certificate from Executive Engineer, Irrigation Dept. Submitted. • Industry does not full- fill the distance criteria of RRZ policy dated 13.07.2009. • Industry has submitted previous consent issued by Board on same location. • Previous consent to establish was issued in Name of M/s. D.K. Ranjane for

manufacturing of Cutting & Polishing stone marbles & Granite – 500 Brass in Green Category.

• Now, M/s. Polygomma Industries Pvt. Ltd., have applied for C to E for mfg. of Rubber sheet – 850 Ton/month.

• Rubber Sheet manufacturing is under Green Category. • Industrial effluent is NIL.

                      

Page 10: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    6 

 

Agenda No 3 Name of the Industry: Venkys (India) Ltd., C-6, MIDC Krishnoor, Dist. – Nanded

1.Applied for Consent to establish for Vegetable Oil refinery. Application received at SRO Nanded on 26.02.13 and at HQ on 19.03.13

2.Proposed to be located in MIDc Area. @ 15 kms from Godavari River. Satisfy RRZ policy.

3. IE generation 40 CMD proposed to provide Secondary treatment.

4.Treated effluent will be used on land for gardening.

5.Land available is 2.4 acres which is sufficient.

6.Proposed to provide Wet scrubber as an APC to Coal fired Boiler.

7.HW generated will be send to CHWTSDF.

8.SRO & RO recommended for grant of Consent to Establish.

9.We may grant Consent to establish with B.G of Rs 5.0 lakhs as per policy of Board for providing PCS and not operating prior to C to O.

Page 11: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    7 

 

Agenda No 4 Name of the Industry: Pune Muncipal Corporation Redevelopment Project, Sr. No 24 (Part), F.P. No 53, Wakdewadi, Shivajinagar, Pune

1. Pune Municipal Corporation has proposed redevelopment project at S. No. 24 (part), F. No. 53, Wakadewadi, Shivajinagar, Pune on total plot area of 38087 m2 & total BUA of 26137.38m2

2. PMC by tender process given work of redevelopment project of at S. No. 24 (part), F. No. 53, Wakadewadi, Shivajinagar, Pune site to M/s. Patil Construction, 2nd & 3rd Floor, PMPML Bldg. No.1, Opposite Income Tax Bldg, Swargate, Pune – 411 042 vide letter dated 18.01.2010. (Pune Municipal Corporation is actual Project Proponent)

3. On the existing project site there are 9 nos of old residential building has demolished by the project proponent and applied for consent to establish for Residential, Commercial, School & shopping project on the total plot area is 38,087.98 Sq. Mtrs and total construction built up area is 26,137.38 Sq. Mtrs.

4. RO, Pune has instructed PP to submit the demolishing plan during visit. 5. They have applied for EC to SEIAA, yet they have not obtained. 6. The proposed site is located about 0.2 Km from River Mutha (A-II Class). 7. Total open area available for gardening purpose is 6187.718 Sq. Mtrs. 8. Total water requirement will be 298 CMD. Domestic sewage will be 259 CMD for which

Sewage Treatment Plant will be provided comprising of primary, secondary & tertiary of capacity 300 CMD. The treated sewage effluent is used for flushing & gardening purpose and excess is disposed into drainage line.

9. About 1159 Kg/day solid waste is generated. The Bio-degradable waste about 463 Kg/day is treated by way of composting. Non Biodegradable waste about 696 Kg/day is disposed at MSW site.

10. The total estimated cost of the project is 50.0 crores for which they have paid consent fees as per revised fee structure of Rs. 1,00,100/-.

11. The site is visited by the field officer on 07.08.2012. 12. This office has called information from RO, Pune as per the query arises in the application

vide letter dated 26.09.2012 & due to not receiving the information from RO, Pune, this office has sent back the application to RO, Pune vide letter dated 09.11.2012.

13. Now, RO, Pune has resubmitted the said application to this office vide letter dated 21.12.2012 with relevant information & no work started statement of developer.

14. RO, Pune has recommended for grant of consent to establish by imposing condition not to take an effective step till they obtain Environmental Clearance.

15. But, as the proposed site is located about 0.2 Km from River Mutha (A-II Class) which not satisfy RRZ criteria & PP has yet not obtained Environmental Clearance from competent authority, hence we may place the case before CC for further decision.

Page 12: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    8 

 

Agenda No 5 Name of the Industry: Shri Sai Associates "Oval Nest" 77/2/1 +2+3+4+5+77/1 (P) 7 Sr. No

78/18/1, Warje, Dist- Pune

1. Project proponent has proposed development residential building 07 nos. & commercial shops & common hall with total BUA – 26,363.50 M2 as “Oval Nest” 77/2/1+2+3+4+5+77/1(P) & S. No. 78/18/1.

2. During visit, the construction of 06 no. of Bldgs. (E1,E2,E3, D1, D2 & B) 08 no.s of shops was completed & 01 of Bldg. (C) yet to be started. Out of 06 Bldgs, 01 of Bldg (E3) is constructed up to 09 floors out of 11 floors as per sanctioned plan dated 21.06.2011 for total BUA 20,279.6 sq.mtrs.

3. PP has informed that initially, construction was started for total BUA 13,444 sq.mtrs. as per sanctioned plan dated 02.06.2008. then it was further revised for total BUA 16,592.62 sq. mtrs. Vide sanctioned plan dated 01.01.2010 & started the construction activity.

4. PP informed that they have applied for additional TDR near about 3,032.51 sq.mtrs., which in the process. After receipt of additional TDR the Total BUA will go up to 23,312.16 sq. mtrs. Which includes Bldg no. C (22 floors). The construction of Bldg C & 02 fllor of Bldg no. E3 will start after obtaining the EC from GoM.

5. PP has applied for EC to GoM for total plot area 33,802.70 sq. mtrs. & total BUA 23,312.16 sq. mtrs. For 07 nos. of Buildings, 08 nos. of commercial shops vide letter dated 12.10.2011

6. River Mutha is more than 02 Km from the site. 7. STP having capacity 150 CMD provided. The treated effluent is reused for gardening & flushing

purpose. Additional STP of 15.0 CMD is proposed for Bldg no. C (22 floors) 8. Pp has provided vermicompost system for 534.25 kg/D bio degradable solid waste management &

also provided solar water heater & renewable wind solar system to each building. 9. RO, Pune has issued SCN to PP on 15.03.2012 & compliance status as per SCN is covered in the

SRO, Pune – I report dated 14.03.2013. 10. PP has installed 02 nos of DG sets having capacity 125 KVA each. 11. PP has provided Rain water harvesting system. 12. PP has completed most of construction of Bldg. & from the period of the visit the construction was

below 20,000 sq. mtrs. Hence, does not attract EC. Now, the PP has applied for additional TDR & crosses the limit of 20,000 sq. mtrs. & which attracts the EC & PP has obtained the same from GoM.

13. RO, has recommended the case for grant of C to E. 14. Consent fee of Rs. 125000/- paid. 15. Hence, we may consider the case for grant of C to E.

Page 13: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    9 

 

Agenda No 6 Name of the Industry Shiur Sakhar Karkhana Pvt. Ltd., Survey No 82, A/p Wakodi, Tal- Kalamnuri, Dist- Hingoli  1)Applied for Consent to establish. Proposed sugar industry of 2500TCD.Does not attract EC.Applied at SRO on 21.03.13 & received at HQ on 05.04.13

2) Proposed location from river Penganga, A-II class is @ 2.8 Kms from SRO report & 2 Kms from RO’s processing report.

3) IE generation 210 CMD, Proposed Secondary treatment. Treated effluent will be used on land for gardening. Land available is 10 Hectors seems to be sufficient.

4) proposed wet scrubber as an APC system.

5) SRO & RO recommended for grant of Consent to establish.

6) Recommended to grant Consent to Establish subject to distance certificate from Executive engineer if it satisy RRZ policy or For refusal of consent .

       

Page 14: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    10 

 

Agenda No 7

Name of the Applicant: Vinita Estate Pvt. Ltd., CTS No 3/5, At Kandarpada, Village - Dahisar (W), Mumbai

Application for C to E for Residential Project o, Total Plot Area -15,616.20 Sq.mtrs. Total Construction BUA - 36,243.59 Sq.mtrs. Application received at SRO, Mumbai, dt: 10/06/2010 and at HQ on dt: 26/02/2013 and SRO Reported that Project proponent has applied for consent to establish for residential project on 10.05.2010,  this  office  has  submitted  application  to  RO(P&P)  on  10.06.2010  (IMIS No.CE1006000391). Said project consist of 2 Nos of Tower( A & B alongwith Clubhouse) Tower A(g+2P+18th floor) and Tower B(g+2P+17th floor) and Club house.

Applicant has submitted undertaking that C.I. of project is Rs.79.10 Cr . This Office has mailed to RO Mumbai/SRO Mumbai Regarding submission present status of Project dated 9/4/2013. SRO Mumbai-IV has submitted communicated present status of the project vide mail dated 15/4/2013,SRO Mumbai-IV has reported that, SRO Mumbai-IV has reported that, 1) Project proponent has applied for C to E on 10/5/2010.At the time of visit, project proponent

has stated that applicant has not obtained C to E and construction work was stopped. 2)Applicant has not obtained EC for said project from competent Authority but

Application was discussed in 57th Meeting of SEIAA, Maharashtra dated 7th and 8th March,2013 (Minutes attached)

3)Applicant has obtained CRZ Clearance from MCZMA dated 29/11/2012 in which mentioned that ie.Point no.1,As per DP Remarks of MCGM Dated 23/12/2009.the land under reference is situated in Rsedintial Zone and reservation affecting the land for Best Bus Depot,Municipal/Private Maternity home(All are part of larger reservation) and for

Total Plot Area -15,616.20 Sq.mtrs. Permissible BUA -50% BEST(6424.38)

50% Dev (6424.38). . 4)SRO Reported that during visit construction of 1) Tower A completed upto G+2P+18th up floor an 2) construction of Tower B completed upto G+2P+8th floors. 3) construction of club house not yet started. 5) Applicant has submitted letter dated 5/4/2013,in which mentioned that Applicant after Receiving Commencement Certificate, applicant has started construction activity as per CC Certificate .subsequently applicant has immediately applied for EC towards GOM and C to E. Applicant has stopped construction activity. We may place the application in CC Meeting for further decision.

Page 15: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    11 

 

Agenda No 8 Name of the Applicant: Shambhu Mahadev Sugar & Allied Ind. Ltd., Villagae Havargaon,

Kallam, Osmanabad

1. Applied for Consent to establish. (Expansion of sugar ind from 1250 TCD to 2500 TCD).application submitted at SRO on 2.01.12 & received at HQ on 06.03.13 2.Existing consent of Sugar is valid till 31.12.2013.Does not require E.C. [email protected] km from river Manjara A-II class. Satsfy RRZ policy. 4.Existing effluent generation 400 CMD & proposed 90 CMD. 5.Secondary treatment provided for existing ind & proposed to Upgrade by installation of additional aeration tank with secondary clarifier. 6.Treated effluent will be used on land for gardening. Land available for disposal of effluent 12.5 hecters which is sufficient for existing effluent generation with proposed expansion. 7.Presently Fly ash arrester provided & proposed to provide Wet scrubber. 8.RO reported that ind has submitted Bank guarantee of Rs 5 lakhs, 2 lakhs & 3 lakhs for O & M of ETP, Avoiding Ingress in to effluent carrying pipeline & provision of Wet scrubber/APC as per CREP norms. 9.SRO & RO recommended for grant of Consent to Establish. 10We may place application in CC as C.I of industry is Existing 28.8 crores & proposed 9.90 crores. Total 38.7 Crores.

Page 16: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    12 

 

Agenda No 9

Name of the Industry: Lason India Pvt. Ltd., Plot No C-18, MIDC Industrial, Taloja

1. Application received at SRO Taloja on 29/12/2012 and at HQ on 14/01/2013. 2. capital investment : Existing Rs 9.97 Cr , Applied Rs 36.04 Cr 3. Application is for grant of renewal of consent for manufacturing of bulk drugs and

consent to establish for installation of Briquette Imported coal fired boiler and thermic fluid heater.

4. IE 8.40 CMD, DE-21 CMD. Presently primary ETP followed by MEE system for high COD.

5. For better air emission controls 4 nos. of scrubbers are provided by increasing the stack height from 3 mtrs to 10 mtrs with additional chilling unit.

6. Earlier interim directions was issued on 2.3.2012. 7. Compliance report enclosed (C-49) to industry has complied the I/D conditions except

ETP up-gradation. ETP up-gradation work is in progress. 8. As per RO Navi Mumbai report due to fire incidence occurred on 3.11.2012, industry is

not in operation. 9. CI is increased from Rs.9.97 crs to Rs.36.04 crs. It is due to change in design of the

plant adoption of automation system by industry. Existing BG of Rs 5 lakhs were forfeited and new BG of Rs 7 lakhs submitted.

10. Information called from industry reg use of fuel, APC system, accordingly Industry reported that, they has change the fuel type FO to Imported Coal / briquettes. Existing fuel FO – 6.6 KL/day and proposed Briquettes or imported coal – 18 MT/day and for these fuel change they install one boiler and thermopac for substitute of existing and used as standby for availability of fuel.

11. RO NM has recommended for grant of renewal of consent with addition of boiler and thermopac using briquette / imported coal for boiler and FO/LDO for thermopac

We may consider the case for Renewal and C To E for installation of standby briquette/ imported coal fired boiler & thermic fluid heater by imposing additional BG of Rs 2 lakhs towards up-gradation of ETP and installation of additional scrubbing system and multi-cyclone type dust collector.

Page 17: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    13 

 

Agenda No 10 Name of the Industry: Venkateshwara Hatcheries Pvt. Ltd., (Ventri Bio, Vaccine Div), Plot

No 20, Rajeev Gandhi ITBT Park, Hinjewadi, Village- Mann, Tal - Mulshi, Dist- Pune

1. Application received at RO Pune on 28/11/2012 and at HQ on 16/02/2013

2. Capital Investment is Existing Rs. 9.68 cr + Proposed expansion Rs 70.81 Cr

3. Industry engaged in Chemicals .

4. Existing consent is valid up to 31.01.2015.

5. Applied for consent to establish for manufacturing of poultry vaccines-500 millions

doses/M.

6. Existing IE: 43 CMD, Proposed IE : 7 CMD. DE: 20 CMD.

7. Unit provided full-fledged ETP comprising primary, secondary & tertiary system.

8. Disposal: The treated effluent will be partly reused for washing & flushing purpose &

remaining will be used for gardening purpose.

9. Total effluent generation will be 50 CMD for which 60 CMD existing ETP will be

adequate.

10. JVS reports are within limits.

11. RO Pune has recommended for grant of consent to establish for expansion.

We may consider for grant of consent to establish for expansion.

Page 18: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    14 

 

Agenda No 11 Name of the Industry: Dai Ichi Karkaria Ltd., Mumbai Pune Rd., Kasarwadi, Pune

1. Application received at SRO Pimpri Chinchwad on 09/10/2012 and at HQ on 05/12/2012

2. Industry engaged in mfg of Chemical.

3. Capital investment : Existing consent is valid up to 30.09.2016.

4. Existing Rs. 34.16 Cr, Proposed Rs 52.39 lakhs

5. Applied for consent to establish for installation of new briquette fired boiler.

6. Existing one oil fired boiler will be kept stand by and another will be replaced.

7. Boiler blow down effluent quantity 1.5 CMD will be treated in existing ETP and

mechanical dust collector will be proposed.

8. However in existing consent there is a condition for disposal of treated quantity is

restricted upto 80 CMD as the land availability is less upto the period of 30.06.2012.

Report called from RO / SRO Pune & industry on 17/01/2013 & 18/04/2013. Reply is

awaited.

9. RO Pune has silent on this condition.

10. RO Pune has recommended for grant of consent to Establish.

We may consider the case to grant consent to establish for installation of new briquette fired boiler.

Page 19: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    15 

 

Agenda No 12 Name of Industry: Sai Sharan Hotel,

Plot No 26 B, Sector-7, Kharghar, Navi Mumbai, Dist- Raigad

Application received for grant of Consent to operate. Application received at RO,Navi Mumbai-II, dt: 10/07/2012 (D.R Date) and at HQ FTS-

12004FT0178.

The C.I of the project is Rs. 25.34 Crs. C to E dtd-11/10/2010 was granted under Orange category for Hotel Activity for 90

rooms. Total plot area is 16764 sq.mtrs & total BUA-3229.223 Sq. Mtrs. It is 3 star hotel (C-116). C to E was granted with condition of STP but Hotel Authority has claimed that they have

connected their drainage to municipal sewer line provided by CIDCO Ltd.(C-2) The CIDCO Ltd has issued letter to said hotel stating that the sewage from the plots in sector-7 is transmitted to STP provided by CIDCO Ltd in sector-15 (C-1).Their hotel is located at plot no-26, B Sector 7,of Kharghar.

The case was discussed in CC meeting dated-4/1/2013, & it was decided to keep the case in abeyance & inform to PP that Board cannot consider their case for grant of C to O’ till STP is provided.

Accordingly letter was issued dated-16/01/2013 (C-129). Hotel Authority has submitted reply dated-09/04/2013 (C-130)

RO-Raigad- has recommended to grant C to O with appropriate B.G.

Recommendation of HQ- Keeping in the view the infrastructure developed by town

planning authority i.e. CIDCO with STP, We may consider the case for grant of C to O  

 

Page 20: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    16 

 

Agenda No 13 Name of Industry: Haware Engineers & Builders Pvt. Ltd., " Haware City" At Survey No 19,20,21, Sector- VI, Vadavali, Thane

Application received for grant of 1st Consent to Operate for Residential cum commercial Project having area details as under:

Application received at RO, Thane , dt: 04/02/2013 and at HQ on 20/02/2013 Earlier Project proponent has obtained consent to establish from MPCB vide no:

MPCB/RO(HQ)/Thane/CE/CC/303 dated: 10/04/2012, having area details as under: Area Details of Project:- Total Plot Area : 1, 15,750.00 sq.meters Total Construction BUA Area : 1,49,163.12 Sq. meters

Capital investment of Project is Rs. - 201.31 Crs The project proponent has obtained Environment Clearance from Expert Appraisal

Committee of Envt Dept. Govt Maharashtra vide no: SEAC-2010/CR.223/TC-2 dated: 19/10/2010 for Residential cum commercial project.

Provided two STPs of the capacity- 1300 CMD and 300 CMD capacity for treatment of sewage.

STPs comprising of collection tank, Rotary Film Bio-reactors , Primary tank, settling tank, Filter feed tank and pressure sand filter and activated sand filter Treated effluent collection tank, filter press

Details of water consumption as under :- Water consumption - 1948 CMD Sewage Generation –1558 CMD

Non-hazardous Waste: Dry Waste : - 4375.20 kg/day Wet Waste :- 2916.30 kg/day STP Sludge ( Dry sludge) : 171 Kg/day

Provided MSW Treatment facility for treatment and disposal of MSW. Provided Rain Water Harvesting system, Solar System at residential commercial project. Project proponent has submitted Bank Guarantee of Rs. 10 lakhs to MPC Board as per

consent to establish conditions.

Project proponent has paid consent fees of Rs. 402731.00/- towards grant of 1st consent to operate

SRO Thane-I has recommended grant of 1st consent to operate for Residential cum commercial project.

As capital investment of project is Rs. 201.31 crs, it is proposed to place application for grant of 1st consent to operate for Residential cum commercial project before Consent Committee of the MPC Board for further discussion.

 

 

 

Page 21: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    17 

 

Agenda No 14  

Name of Industry: Sunshine Pap-Tech Pvt. Ltd., Sr. No 375 & 375, Vill. Abitghar, Tal - Wada, Dist- Thane

• Applied for first consent to operate. • Category RD/LSI. • Existing consent dtd.18.01.2010, valid up to C to E. • Industry manufactures Dupelx Board from waste paper. • C.I. of Rs. 24.50 Cr. • I.E. generation is NIL . • D.E. 11.20 CMD. • Entire I.E. will be recycled back in the process. • ETP, comprising primary followed by tertiary treatment provided. • Industry has proposed to start production activity in Mach – 2013. • Air pollution control . • Boiler with chimney height 31.0 mtr, cyclone followed by bag house provided, as APC

system. • Industry has submitted fees of Rs. 100100/- for grant of consent for further period of two

years. i.e. up to: 31.03.2015. • RO/SRO recommended case may be considered for grant of first consent to operate.

Page 22: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    18 

 

Agenda No 15

Name of Industry: Dr. Acharya Laboratories Pvt. Ltd., Plot No N-42, MIDC Addl. Ambernath, Dist- Thane

1. Application for 1st Consent to Operate 2. Product- API & Speciality Chemicals. C to E granted on 28/09/2010 which is

valid up to COU. 3. Application received at SRO on 17/02/2013 and at HQ on 18/03/2013 4. Industry has obtain C to E vide letter dtd. 28.09.2010 with EC condition. Industry

proposes to manufacture API and Speciality chemicals. 5. IE generation is 92 m3/d. Industry has provided primary, secondary and tertiary

treatment. Industry is a member of CETP & CHWTSDF. 6. Industry has provided Scrubbers to control process emissions. 7. Industry vide their letter dtd. 09.04.2013 submitted the copy of EC dtd.

02.02.2013. 8. As per C to E CI was Rs. 13.99 Crore. Now applied with CI of RS. 31.13 Crore. It

is new entry to CC list.

In view of submission of EC copy, we may consider 1st Consent to Operate subject to submission of additional two months consent fees. 

 

 

Page 23: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    19 

 

Agenda No 16 Name of the Industry: Omkar Realtors & Developers Pvt. Ltd.,

Plot bearing CTS No 61(pt), Jai Ambe (Chembur) SRA CHS Ltd., Village- Chembur, Kurla, M/W Ward – 71

• Application for C to Operate for building project under SRA Scheme for

Total Plot Area-4404.5 Sq.mtrs. Total Built Up Area-25,285.48 Sq.mtrs.

• Application received at SRO, Mumbai, dt: 11/02/2013 and at HQ on dt: 8/03/2013.

• Praposed project consist of 2 Nos. of buildings ,

1)Sale Building=B +G+13 Upfloor. 2)Rehab=G+14th Upfloor.

• Board has issued C to E dated 27/5/2009 Total Plot Area-4324.30 Sq.mtrs. Total Built Up Area-27,582.89Sq.mtrs.

• Said project obtained EC from GOM Dated 20/03/2010. Total Plot Area-4324.30 Sq.mtrs. Total Built Up Area-28,131.97Sq.mtrs. SRO Reported that construction and superstructure work is found completed.

• Applicant has obtained Part Occupation Certificate and LOI from SRA.

• SRO Reported that project proponent increase in floor and modification in project

planning and documents regarding same is not submitted and applicant has submitted reply which is received in HQ dated.

• We may place the application in CC for furthur decision.

 

Page 24: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    20 

 

Agenda No 17 Name of the Industry: Scigen Bio Pharma Pvt. Ltd.,

Plot No 18, MIDC Hinjewadi, Tal - Mumbai, Dist- Pune

1. Application received at SRO Pimpri Chinchwad on 14/10/12 and at HQ on 09/11/2012.

2. Capital investment: Rs.70.72 Cr.

3. Industry engaged in mfg of Pharmaceuticals & Genetically engineered various products

related to R & D activities.

4. Applied for consent to operate with amalgamation.

5. IE: 119 CMD, DE: 15 CMD. Unit provided fully fledged ETP comprising primary,

secondary & tertiary system.

6. Disposal: On land for gardening.

7. JVS report not submitted.

8. Industrial effluent is changed from 37 CMD to 119 CMD & dom. Effluent from 7 CMD to

15 CMD.

9. Treated effluent will be used for gardening within premises.

10. However land availability is less for land application.

11. Proposal called for reduction the discharge of effluent quantity up to 125 CMD or make

an arrangement of additional land 6 acres.

12. Industry reply received. Industry has stated that out of 242 CMD effluent , 108 CMD

utilized for make up of cooling towers and remaining 134 CMD will be used for

gardening.

13. There is no additional land available.

14. RO Pune has recommended for grant of renewal of consent to operate with expansion.

We may consider the case for renewal with 1st Operate by imposing condition that the industry will utilize 108 CMD for make up of cooling towers and remaining 134 CMD will be used for gardening with extending the existing BG Rs 5 lakhs for further one year.

Page 25: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    21 

 

Agenda No 18 Name of the Industry: Birla Cotcyn (India),

Plot No A-82, MIDC Khamgaon, Dist- Buldhana

• Industry has applied for Renewal of Consent for amalgamation of Cotton yarn and yarn dying in same premises. It is RED/LSI unit.

• Previous consent is valid up to 30.09.2012 • CI of industry has decreased from 71.41 Cr. to 49.11 Cr. as repetition of CI on both

consents. • Water consumption is - 330 CMD; IE - 57 CMD; DE - 55 CMD • Industry has upgraded its ETP comprising Primary, Secondary and Tertiary Treatment. • Treated waste water is dispose on 3 acre of land. • Provided Dust collector to Boiler, blow room & carding section as an APC system. • Industry has paid fees of Rs. 2,25,000/- for renewal of consent for next three years. • Industry has paid Cess up to July 2011 and submitted returned up to September 2012 • Industry has submitted Environmental Statement for the year 2011-12 • Member of CHWTSDF, butibori, Nagpur • JVS results dt. 28.12.2011 & 12.05.2012 and are exceeding. • RO Amaravati has recommended application for renewal of consent to operate up to

30.09.2015 • As per Sectoral approach circular issued by the Board, dt. 30.03.2013 for consent

processing practice, this industry is engaged in manufacturing of synthetic yarn grey and synthetic yarn dyed which falls in month of September and cotton Yarn which fall under month of January.

• Considering above it is recommend to grant renewal with amalgamation of both the consent up to 30.09.2015 (now decision need to be taken regarding validity either Jan 2015 or Sept 2015) with BG of 5 lakhs for O&M of ETP

Page 26: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    22 

 

Agenda No 19 Name of the Industry: Rajgad SSK Ltd.,

Anantnagar-Nigade, Tal- Bhor, Dist - Pune  

• Applied for the renewal of consent without change in production quantities. • Industrial effluent generation is 200 CMD. • JVS analysis results dt.05.02.2010 are enclosed, which are within limits. • Called latest JVS, the JVS dt.01.02.2013 submitted vide email dt.04.04.2013 which is

highly exceeding the consented norms in respect of BOD, COD, SS, TDS, and Chlorides.

• APC system is not provided as per CREP. Dust collector is provided. • SRO / RO has recommended for renewal of consent subject to submission of additional

consent fees, satisfactory reply and appropriate BG for CREP compliance. • Submitted for consideration of CC and disposal with renewal upto 31.07.2014 or as per

fees to be paid by industry including balance fees recommended by RO/SRO and BG of Rs. 5.0 Lakhs towards O & M of pollution control systems, Rs.2.0 Lakhs towards providing the covering arrangement to avoid the ingress of bagasse and BG of Rs.3.0 Lakhs for the provision of ESP / Wet Scrubber as per policy of Board.

 

Page 27: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    23 

 

Agenda No 20 Name of the Industry: Shriram SSK Ltd., (Distillery),

Nira Valley Arkshala Vibhag, At - Phaltan, Dist- Satara

• Applied for Renewal of Consent without change in production quantities. • 30 KLPD Distillery unit • Industrial effluent is 265 CMD. • For the treatment of I.E provided Biomethanization followed by composting to achieve

Zero discharge. • CREP complied. • Provided 7.5 Acres compost yard as per CREP norms. • Industry has submitted BG of Rs. 1.0 lakhs valid upto 28.02.2013 as per I.D issued

dt.09.02.2011. • R.O has recommended for renewal of consent. • Industry has applied for period upto 30.06.2016. • C.I of the Distillery unit is Rs.8.33 Cr and total C.I of the industry including sugar unit is

26.02 Cr. • Application is under the purview of Consent Committee meeting. • Submitted for further orders please. • Considering compliance as above the case is recommended for grant of renewal up to

31.08.2016 if company deposits additional consent fees of 2 months and BG of Rs. 2 Lakhs towards continuous compliance of CREP.

Page 28: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    24 

 

Agenda No 21 Name of Industry: Dicitex Furnishing Ltd., G-58, MIDC, Boisar-Tarapur, Tal - Palghar, Dist- Thane 1) Applied for renewal of Consent at SRO office on 01.11.12 & application received at HQ on 21.12.12.

2)Textile processing industry.

3) IE generation 880CMD. Provided Secondary & tert. treatment. Treated effluent is further sent to CETP for further treatment & disposal.

4) JVS results dtd 07.12.2011,08.02.12 & 26.04.2012 are within limits.

5)Multi cylone dust collector followed by wet scrubber provided to Coal fire termopcak & Multicyclone dust collector provided to Coal fired Bpoiler.

6) Consent to Operate for Coal fired boiler is issued on 12.02.2013 with condition of B.G of Rs 10 lacs for use of Coal having ash content less than 18%.

7) Cess returns submitted upto Jan 2012 & Paid upto March 2011.

8) Evt Statement submitted for the Year 2011-12.

9) SRO recommended for renewal. 10) We may renew the consent for five years with amalgamation of consent of Coal fired boiler with B.G of rs 2.0 Lakhs for submission of Cess returns & statements.

Page 29: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    25 

 

Agenda No 22 Name of the Industry: Padamshree Dr. D. Y. Patil Sahakari Sakhar Karkhana Ltd.,

Dnyanshantinagar, A/p - Aslaj, Tal - Gaganbavada

• Industry has applied for consent to renewal. It is RED/LSI unit. • Previous consent was valid up to 31.10.2010 • Capital investment of the sugar industry is Rs. 57.64 Cr. • Capacity of the unit 2500 TCD which manufacture Sugar- 9600 MT/M, Bagasse - 25000

MT/M, Molasses – 3000 MT/M & Press Mud - 3000 MT/M. • Water consumption 1160 CMD and IE 270 CMD for treatment of which industry has

provided ETP. DE 90 CMD which is treated in septic tank and soak pit. • Provided 240 acres land for disposal of treated effluent. • CERP compliances are as follows, - Waste water generation is 108 lit/ton of cane crushed. - Industry has provided multi cycle ash arrestor, boilers having stack of height 60 m. - Provided 15 days storage tank

• Industry has paid consent fees Rs.1,75,000/- • JVS Results on 22.02.2012 are exceeding. • Cess paid up to 2011 • Submitted environmental statement for year 2011-12 • SRO recommend grant of consent up to 31.10.2013 • We may impose the Bank Guarantee of Rs. 2 Lakhs towards ingress of Bagasse and

any other material along with performance Bank Guarantee of Rs. 5 Lakhs towards operation and maintenance of ETP and Air Pollution Control Devices to meet the consented standards as per decision taken in the CAC meeting dt. 07/12/2011

• As per Sectoral approach circular issued by the Board, dt. 30.03.2013 for consent processing practice, this industry is engaged in manufacturing of Sugar which falls in month of July, we may issue consent to operate up to 31.07.2013.

• Recommend for grant of renewal as per fees that will be paid by industry (i.e. up to 31.07.2013 or 31.07.2014) and with BG of Rs. 5 + 2 + 3 Lakh as per our circular dt. 19.01.2013.

Page 30: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    26 

 

Agenda No 23 Name of the Industry: Shri Bhogawati SSK (Distillery),

Sr. No 295, 296, 297 & 298, A/p- Shahunagar (Parite), Tal - Karveer, Dist- Kolhapur

Sr. No Condition of direction Compliance/Non Compliance reported by

SRO Kolhapur 1 Entire solar evaporation pits shall be scrapped

and leveled before 31.05.2007. Industry has scrapped the solar evaporation ponds.

2 You shall scrap and level the existing kuccha lagoons by 31st May-07 so as to avoid ground water contamination in the nearby area. The quality of stored spent wash in kuccha lagoon is not fit either for ferti-irrigation or one time controlled land application, hence, should not be utilized for the said purpose.

The kaccha pit lagoons on site have been scrapped and leveled as per the directions. The photographs of the same are enclosed.

3 You shall provide 30 days storage facility in the form of impervious lagoon for storage of spent wash by 31st May-07. The design and construction of the lagoon shall be strictly as per MPCB/CPCB guidelines, which inter-alia include HDPE liner (250 micron as per BIS specifications), and pitched by brick with cement mortar so as to prevent leakages.

Industry is provided 30 days spentwash storage tank having capacity 60 MLD with 500 micron thick HDPE liner provided at site. The photographs enclosed.

4. You shall revamp/reconstruct the existing compost yard by 31st May-07, as per MPCB/CPCB guidelines, which inter-alia include HDPE liner (250 micron as per BIS specifications), leachate collection system, brick on edge, test well, fencing etc. The composting method shall be fully automatic, where auto spray of spent wash and it’s mixing shall be simultaneously carried out

The existing compost yard has been totally revamped by constructing a new 2.5 acres with 250 micron HDPE and RCC lining along with leachate management system as per CPCB norms. The photographs of the compost yard are enclosed.

5.

You shall reduced the volume of spent wash/ Rectified spirit productions commensurate with the availability of pressmud (filler material) for composting, by upgrading the existing manufacturing technology as well as reducing the spentwash volume after bio-digester by adopting various techniques like- nano filtration, concentration, etc. This shall be achieved by Nov. 2007. As the existing 15 KLPD batch process plant is not viable, you should scrap the same and switch over to continuous process plant of higher capacity by 31st Dec. 2008.

The industry has modified the distillery set up and upgraded. There under, the previous batch type plant is changed and now a continuous fermentation process plant is installed. Also the Reboiler installed for spentwash to reduce the volume. The photographs of the changes made in the fomenters are enclosed.

6. You shall achieve zero discharge of effluent in surface water by Nov. 2007 by utilization of 100% spent wash in scientific manner

As the industry has changed the process batch to continuous type. The volume of spent wash generation will less. Industry also provided reboiler system to reduce

Page 31: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    27 

 

the spentwash volume. Industry is provide RCC HDPE lining 30 days storage tank to store the spent wash and also provided RRC pacca compost yard 2.5 acres with leachet collection system. Industry has assured to achieve Zero discharge.

7. The Distillery operation shall remain closed during monsoon i:e from June 10th to September 10th every year.

Distillery is not in operation since 2008 and as per consent condition it will be closed from June 10th to September 10th every year.

8. You shall utilize the operation of bio-digester to its optimum capacity by 15th March 2007 so as to ensure the desired standard in respect of outlet BOD up to 5000 mg/l.

Industry has not provided Bio-Digester till date and will utilize the spent wash for Bio Composting. As company provided reboiler to reduce volume.

9. The industry should adopt latest technology such as evaporation, concentration, nano filtration, reverse osmosis etc. for reduction of spent wash volume.

As the industry has changed the process batch to continuous type. To reduce the volume of spent wash generation industry provided Reboiler system. Industry is provide RCC HDPE lining 30 days storage tank to store the spent wash and also provided concrete RRC pacca compost yard 2.5 acres with leachet collection system

10. You shall immediately stop Land application of spent wash.

As the distillery is not operation since 2008 and also provided RRC pacca compost yard for the Bio Composting.

11. In order to minimize the adverse effect on ground water in nearby area, practices such as rain water harvesting, fresh water injection etc. Should be adopted & proposal in this regard shall be submitted by March, 2007

Industry has not provided rain water harvesting, fresh water injection etc. techniques till date.

• Since industry has previous consent valid up to 31.12.2008 fees of Rs. 2,00,000 /- for

the years 2008-2012 is to be recovered from industry. • SRO Kolhapur has reported vide email dt. 05.04.2013 that industry has paid additional

fees of Rs. 2,00,000/- for previous years and Rs. 50,000/- to extend consent period up to 31.12.2014.

• As per Sectoral approach circular issued by the Board, dt. 30.03.2013 for consent processing practice, this industry is distillery which falls in month of August, we may issue consent to operate up to 31.08.2014 for uniform validity with balance consent fees for four months.

• Since reboiler is provided with continuous process, bio-digester is not required. • Considering above it is recommended to grant renewal of consent up to 31.08.2014 with

BG of Rs. 2 Lakhs towards continuous compliance.

Page 32: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    28 

 

Agenda No 24 Name of the industry: Venky (India) Ltd., (Food Division),

Village - Baur, Tal - Maval, Dist- Pune

• Industry has applied for consent to renewal. • Increase in capital investment. Previous C.I. 47/07 Crs existing applied for 63.86 Crs. • No increase in Production quantity and effluent quantity. • Increase in investment due to modernization of plant machinery and installation of new

boilers. • JVS results dated 21.08.2012 and 19.10.2012 are exceeding prescribed consented

standard. • Instruction letter dated 3.10.2012 & 01.12.2012 from SRO, Pune-II regarding

improvement of O & M of ETP. • Case is under purview of CC, as C.I. is 63.86 Crs. • Recommended for grant of consent renewal with BG of Rs. 5 lakhs towards O and M of

PCS but only after required fees calculations from account wing due to increased in CI & submission of said fees by company for renewal up to 3 yrs or as per consent fees to be submitted by company.

 

 

Page 33: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    29 

 

Agenda No 25 Name of the industry: Hinjewadi Tech Park Pvt. Ltd.,

Plot No 23, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Pune

1. Board has granted C to O for period upto 31.12.2010 for IT & IT activities. Now applied for renewal of C to O for IT & ITE's, built up area is 18312.80 Sq. Mtr. Unit is located about 4.0 Km from Mula River, 7.0 Km from Pune - Mumbai express way which satisfies the RRZ criteria.

2. Generation of Industrial Effluent is Nil and for Domestic Effluent STP is provided of capacity 50 CMD for the treatment of domestic sewage.  

3. Hazardous waste is generated in the form of Used oil which is send to auth. Reprocessor.  

4. The capital investment of the Industry is 42.35 crores for which Industry has paid fees as per revised fee structure of Rs. 1,50,100/-.  

5. The site is visited by the field officer on 23.07.2012 6. RO, Pune has recommended for grant of renewal of consent for period upto 31.12.2016. 7. This office has issued letter to RO, Pune on 29.10.2012 for submission of relevant

information & reply of SRO, Pune – II on 29.01.2013 without signature. Therefore, this office has informed to SRO, Pune – II for submission of report with the signature vide letter dated 05.03.2013 & reply is still awaited. 

We may consider the case for grant of Renewal of C to O.

Page 34: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    30 

 

Agenda No 26 Name of the industry: Mukteshwar Sugar Mills Ltd.,

Gat No 194-198, Dahegaon- Paithan Road, Gangapur 1. Applied for Renewal of Consent without change.2500TCD sugar ind.Application submitted at SRO on 01.01.13 and received at HQ on 14.02.13 2.C.I is increased to the tune of 26.73 crores as compared to previous investment.(Previous 22 crore present 48.73 Crores.) 3.IE 300 CMD not complied with CREP condition of water consumption i.e 100 Ltrs/Ton of crushing. 4.Provided Secondary & tert treatment. 5.Treated effluent is used on land for gardening. Land available for disposal of effluent 22 acres which is sufficient. 6.JVS results are fluctuating in respect of BOD COD,TDS. 7.Wet scrubber provided as an APC system. 8.RO issued I.D on 05.01.13 for CREP condition compliance. 9.Ind submitted B.G of Rs 2.0 lakhs for compliance of CREP as per interim directions issued by RO. 10.RO reported by a separate office note that complaint was received against the ind investigation was done on 18.01.13 and 24.01.13. The JVS results dtd 18.01.13 & stack monitoring results are also exceeding the standards. 11. RO recommended for forfeiture of B.G of rs 2.0 and issuance of Consent for shorter period with bank Guarantee of Rs 5.0 Lakhs & 2.0 lakhs.

Page 35: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    31 

 

Agenda No 27 Name of the industry: Mahatma Sugar & Power Ltd., (Sugar Expansion),

Dinkar Jamni, Tal - Seloo, Dist- Nagpur

Applied for renewal of Consent. With change in Capital investment.Application submitted at SRO on 27.12.12 received at HQ on 15.01.13. •Sugar industry 1250TCD. •Capital Investment 50.43 Crores. Increase in C.I to the tune of 16 crores. •IE 450CMD not complied to CREP condition. •Provided Secondary treatment. •JVS results dtd 19.01.12 are exceeding the standards with respect to BOD,COD however JVS dtd 18.02.12 & 24.03.12 are within limits. •Treated effluent used on land for gardening. •Multi cyclone dust collector provided as an APC to bagasse fired boiler. non complied with CREP condition as not provided wet scrubber/ESP. •SRO recommended for renewal of Consent . •Capital investment of industry is increased to the tune of 16 Crores in comparison with earlier C.I. •Industry has paid consent fee for increased C.I. • Recommended for renewal of Consent with B.G of rs 3 lakhs & extension of B.G of Rs 5.0 lakhs and 2.0 lakhs upto 31.07.13 or further period i.e 31.07.14 if fees paid by industry

Page 36: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    32 

 

Agenda No 28 Name of the industry: Shree Saibaba Sugar Ltd.,

Gut No 55, 57 & 59, Vill. Gondri, Shivani, Ausa, Latur. .Applied for renewal with no Change in production at SRO latur on 06.12.12 c received at HQ on 24.01.13 •Earlier consent was valid till 30.11.2010 subsequently applied for renewal upto period 30.11.2012 . •Effluent generation 400 CMD. Not complied with CREP condition of water consumption i.e 100 Ltrs/Ton of crushing. •Provided Secondary treatment. •JVS results dtd 15.12.2011,25.02.12 & 21.03.12 are exceeding the standards in respect ofss, BOD,COD & TDS. •Treated effluent used on land for gardening. Land available for disposal of effluent 80 acres.. •Fly ash arrester provided as an APC system. AS per CREP condition not provided wet scrubber/ESP as an APC system. •Envt. Statement submitted for year 2011-12. •Cess returns submitted up to Nov 2012 & paid up to May 2008. •During visit to ind on 15.12.12 ETP was not in operation & untreated effluent was stored in Kaccha lagoon. •Proposed directions were issued to ind on 21.11.12 for non compliance of CREP conditions. Ind was called for personal hearing two times but did not attended the hearing. •B.G of Rs 2.0 lakhs was obtained with validity 31.12.12. •RO recommended for extension of hearing at HQ & grant renewal ensuring B.G of Rs 5.0 lakhs & 2.0 lakhs with forfeiture of B.G of rs 1 lakhs. .Recommended for renewal with B.G.Of rs 5+2+3 lakhs as per circular of Board dated 19.01.13 upto the period co submit the consent fees or else upto 31.07.13

Page 37: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    33 

 

Agenda No 29 Name of the industry: Balaghat Shetkari Sakhar Karkhana, Charwak nagar ujana

1) Applied for renewal with no Change in production. 2) •Last year Ind was put into operation after 4 years. Now ind is taken over by M/s Siddhi

Sugar & allied industries. 3) •Effluent generation 250 CMD complied CREP norm of effluent generation. 4) •Provided Secondary treatment. 5) •JVS results dtd 04.01.12,28.03.12, are exceeding the standards in respect of , SS,

BOD,COD & TDS. 6) •Treated effluent used on land for gardening. Land available for disposal of effluent 25

hecteters. 7) •Fly ash arrester provided as an APC system. AS per CREP condition not provided wet

scrubber/ESP as an APC system. 8) •Envt. Statement submitted for year 2011-12. 9) •Cess returns submitted up to Nov 2012. 10) •B.G of Rs 5.0 lakhs & 2.0 lakhs is submitted by industry with validity 07.02.13 &

30.04.2013. 11) •SRO reported that ind has covered effluent carrying pipeline by Shahabadi Stone &

recently provided 15 days storage tank. 12) •I.D issued on 03.01.2013 for providing Air Pollution Control Equipment as per CREP

guidelines i.e Wet scrubber/ESP, for which B.G of Rs 3.0 lakhs is prescribed in ID. 13) •RO recommended for renewal of Consent subject to obtaining lapse period consent

fees of Rs 4.55 lakhs. 14) Recommended for renewal with extension of B.G of Rs 5 lakhs and 3 lakhs upto

validity of consent & payment of lapse period fees. And return B.G of Rs 2.0 lkhs as ind has complied condition.

Page 38: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    34 

 

Agenda No 30 Name of the industry: Pannageshwar Sugar Mills, Vill. Pangaon, Rampur . Applied for renewal with no Change in production. Application received at HQ on 03.01.13 and at HQ on 01.2.13 •Effluent generation 225 CMD. •Provided Secondary treatment. •JVS results dtd 22.02.12 are exceeding the standards in respect of BOD,COD & TDS. •Treated effluent used on land for gardening. Land available for disposal of effluent 12.5 Hectres. •Fly ash arrester provided as an APC system. AS per CREP condition not provided wet scrubber/ESP as an APC system. •Envt. Statement submitted for year 2011-12. •Cess returns submitted up to Dec 2012 & paid up to May 2008. •As per previous Consent ind has submitted B.G of Rs 5.0 Lakh & 2.0 Lakh. •I.D issued on 17.01.2013 for providing Air Pollution Control Equipment as per CREP guidelines i.e Wet scrubber/ESP, for which B.G of Rs 3.0 lakhs is prescribed in ID. •Fees paid for 2 Years period. .Recommended for renewal with extension of B.G.Of Rs 5 lakh upto consent period & obtain B.G of Rs 3.0 lakh for provision of APC system as per CREP condition . Return B.G of Rs 2.0 lakh as ind has complied I of providing cover to effluent carrying puipeline.

Page 39: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    35 

 

Agenda No 31 Name of the industry: Shree Vitthal SSK Ltd., Murum, Tal – Omerga Applied for renewal of Consent at SRO office on 06.12.12 & application received at HQ on 24.01.13 . Effluent generation 300 CMD. Not complied with CREP condition of water consumption i.e 100 Ltrs/Ton of crushing. •Provided Secondary treatment. •JVS results dtd 06.01.12,17.02.12,02.03.12 are exceeding the standards in respect of , BOD,COD & TDS. •Treated effluent used on land for gardening. Land available for disposal of effluent 42.76 hecteters. •Fly ash arrester provided as an APC system. AS per CREP condition not provided wet scrubber/ESP as an APC system. •Envt. Statement submitted for year 2011-12. •Cess returns paid up to Nov 2007. •B.G of Rs 2.0 lakhs was obtained with validity 29.12.12. •I.D issued on 03.01.2013 for providing Air Pollution Control Equipment as per CREP guidelines i.e Wet scrubber/ESP, for which B.G of Rs 3.0 lakhs is prescribed in ID. •Enquired on Telephone B.G of Rs 3.0 lakh is not submitted by ind. •RO recommended to grant renewal ensuring B.G of Rs 5.0 lakhs & 2.0 lakhs. . Recommended for renewal with B.G.Of Rs 5+2+3 lakhs as per circular of Board dated 19.01.13 upto 31.07.15 with balance fees of 5 months & validity of BG up to consent period.

Page 40: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    36 

 

Agenda No 32 Name of the industry: Chatrapati Sambhaji Raje Sakhar Udyog,

Hussainpur, Chitepimpalgaon, Dist- Aurangabad

1) Applied for renewal to sugar unit & 1st operate for co-gen with amalgamation 2) Existing consent of sugar dtd. 19.04.2012 valid up to: 31.12.2012. 3) Existing consent of co-gen, dtd. 18.07.2012 valid up to : C To E. 4) Category RED/LSI. 5) Capacity 1250 TCD. 6) C.I. of sugar unit Rs. 31.29 Cr. 7) C.I. of Co-gen unit Rs. 08.15 Cr. 8) Total C.I. (Sugar + Co-gen) Rs. 39.44 Cr. 9) I.E. generation to the tune of 400 CMD. 10) D.E. generation to the tune of 30 CMD. 11) ETP provided but not adequate. 12) JVE result exceeding the limit. 13) Industry has not covered effluent collection system to avoid ingress of bagasses. 14) ESP/wet scrubber not provided to boiler. 15) Industry has not complied with CREP guidelines. 16) Environmental statement submitted for the year 2011-12. 17) Ces return submitted up t: Sept. 2012 & Cess paid up to 31.10.2010. 18) I.D. issued on 03.01.2013. 19) B.G. of Rs. 5.0 Lakhs submitted valid up to: 16 August 2013. 20) B.G. of Rs. 2.0 Lakhs submitted valid up to: 16 August 2013. 21) B.G. of Rs. 3.0 Lakhs submitted valid up : December 2013. 22) RO/SRO recommended to forfeit the B.G of Rs. 5+2 /- Lakhs and grant consent by

imposing additional BG of Rs. 10+4 /-Lakh.

Page 41: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    37 

 

Agenda No 33 Name of the industry: Indapur Dairy & Milk Products Ltd.,

Vill. Gokhali, Tal - Indapur, Dist- Pune  

• Applied for the Renewal of Consent with expansion. • The C.I of the unit is shown as Rs.41.35 Crs against the previous consented C.I of

Rs.7.0 Cr. • SRO, Pune –I has issued discrepancy letter dt.03.01.2013 for the additional consent

fees of Rs.2, 15,000/- for increased in C.I., reply awaited to this office. • Total Industrial effluent for existing and proposed expansion is 544 CMD. • SRO reported ETP provided with primary and secondary treatment of capacity of 600

CMD. • Present effluent generated is treated in the existing ETP of capacity 100 CMD. • The JVS analysis results are exceeding with respect to BOD and COD. • Previous consented LDO fired boiler is not in operation. • Now industry has installed two bagasse and wood fired boilers of capacity 12.5 T and 5

T with dust collector as an APC system. • Installed two Nos. of DG set of capacity 400 KVA each with stack height 2.5 mtrs. • The H.W. i.e used oil and waste oil is mixed with bagasse and burn in own boiler. • SRO reported that details of the water cess returns submitted and paid are not provided

and Environmental statement for the year 2011-12 is not submitted. • SRO/RO has recommended for grant of renewal of consent with expansion by imposing

BG towards O & M of ETP after receipt of additional consent fees. • Recommended for grant of renewal of existing capacity with BG of Rs. 5 lakhs for O & M

and expansion only after fees calculations from account section and company submit this consent fees along with environmental statement and cess details and payment.

 

 

 

 

 

 

 

 

 

 

Page 42: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    38 

 

Agenda No 34 Name of the industry: Tata Chemicals Ltd.,

MIDC Krushnoor, Tal- Naigaon, Dist – Nanded 1)Applied for renewal of Consent with no change.Application received at SRO on 15.2.13 and at hq on 26.03.13.

2)Sweet sorghum and sugar cane based distillery unit.

3)IE 185 CMD. Provided Secondary treatment & composting yard .

4)Baggase fire boiler provided with ESP an APC system.

5)Cess returns submitted upto Dec2012.

6)Ind is not in operation from last one & half year due to lack of raw material.

7)SRO & RO recommended to grant renewal of consent for one Year period.i.e upto 30.11.2013.

8) Renewal of consent for three years period or upto the period ind deposits the consent fees with B.G of Rs 2.0 lakhs for continued compliance.

Page 43: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    39 

 

Agenda No 35 Name of the industry: Jai Shiv Shankar SSK Ltd.,

Shesh Nagar, Tal - Mukhed, Dist – Nanded 1.Industry has applied for renewal of Consent. Sugar industry . Application received at SRO on 05.12.12 and at HQ on 09.1.13

2.Capital investment 28.00 Crores, Previous consent of sugar was valid till 31.12.2008.

3.In Crushing Season 2009-10 industry was not in operation & not applied for renewal of Consent & not p[aid the consent fees.

4.For the year 2010-11 the application was submitted to HQ .

5.Consent was refused on 28/10/2010.

6.Industrial effluent generated 350 CMD.

7.Provided Secondary treatment plant. Treated effluent is used on land. Available land for disposal is 20 Hectres.

8.As industry was running without valid Consent , Ind has not submitted bank guarantee of Rs 2.0 Lakhs.

9.Fly ash arrester provided to boiler. Sugar dust catcher to bagging section.

10As per decision of CC consent was refused on 17.12.12 & RO issued closure directions on 27.12.12. Prosecution proposal of ind is submitted by SRO & RO.

11.Again ind has applied for renewal of consent . The industry is non comp[lied with CREP conditions.

12. Recommended for refusal of consent . Needs discussion & policy decision with opinion of SLO.

Page 44: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    40 

 

Agenda No 36 Name of the industry: Apar Industries Ltd.,

Plot No 18 & 18/1, MIDC TTC, Rabale, Navi Mumbai

• Application received at Navi Mumbai on 05/09/2012

• Application received at HQ on 04/12/12.

• Industry is engaged in manufacturing of Lubricating oils, greases, or petroleum- based

products holding consent valid up to 30/11/2012.

• Renewal of consent with expansion. • Existing & Proposed Product list with quantity is enclosed • I.E. – 17.3 CMD, D.E. – 4.5 CMD. Full fledged ETP provided with primary, secondary

and tertiary treatment. The treated effluent is discharged in CETP. JVS results are within

limit.

• Industry is member of CHWTSDF.

• Industry has provided scrubber to the process stack

• Returns regarding Hazardous waste submitted for 2011-12.

• Report from SRO NM-2 is received. SRO has report that, industry is using imported

fresh oil as a raw material for blending activity and not carrying out reprocessing of

waste oil or used oil, in case of receipt of lower grade of based oil they have to give

purification treatment to improve the base oil quality. Since last 18 months, industry has

not given acid treatment to improve the base oil quality.

• RO has recommended for renewal of consent subject to following:

o Increase in quantity of 3 products and decrease in quantity of 1 product.

o Increase in fuel F.O quantity and diesel quantity with condition to shift-over to rise

of PNG as and when avail.

The applicability of actual user authorization in present case needs to be

discuss in depth because there is use of Sulphuric Acid for purification of base Oil.

Page 45: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    41 

 

Agenda No 37 Name of the industry: Avon Organics Ltd.,

Plot No E-2, MIDC Chincholi, Tal & Dist- Solapur

1. Application received at SRO Solapur on 15/1/2013 and at HQ on 13/02/2013

2. Capital Investment is Rs 73.83 Cr

3. Industry engaged in mfg of Bulk Drugs.

4. Existing consent was valid up to 31.12.2012.

5. Applied for renewal of consent for manufacturing of bulk drugs.

6. IE: 90 CMD, DE: 20 CMD. Unit provided full-fledged ETP comprising primary &

secondary system followed by MEE system.

7. Disposal: Treated effluent from ETP is sent to CETP by tankers & MEE condensate is

recycled for cooling tower makeup & flushing.

8. JVS reports are sometimes exceeding consented limits.

9. Board has issued conditional direction on 4.1.2013 with condition of segregation of High

COD in MEE and proper O & M of ETP

10. Forfeiture of existing BG Rs 5.00 lakhs and submission of fresh BG of Rs 10 lakhs.

Industry has submitted fresh BG of Rs 10 Lakhs.

11. RO Pune has recommended that, consent may be granted by imposing condition

towards proper operation of ETP.

We may consider the case for renewal by extending BG of Rs 10 lakhs towards timely compliance of conditional directions.

Page 46: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    42 

 

Agenda No 38 Name of the industry: Devi Construction Company,

ICC Devi Gaurav Technology Park, Pimpri, Pune

1. Earlier Board has granted consent to operate for IT & ITES activity, for the period upto 30.06.2012 for total built up area 78864.36 Sq. Mtrs.

2. Now applied for renewal of C to O of the same by increase in the C.I. i. e. 8195.93 Lakhs.

3. Site located about 1.5 Km from Pawana River (Class A-IV). 4. Total water requirement is 702 CMD. Domestic sewage is 339 CMD for which Sewage

Treatment Plant having 700 CMD capacity is provided. 5. The treated sewage effluent is used for flushing & gardening purpose and excess is

disposed into drainage line. 6. Total open area is 2000.0 Sq. Mtrs. 7. APCS are provided to DG Sets. 8. Hazardous waste in the form of Used oil & E- Waste which is sent to Auth party. About

511 Kg/day solid waste is generated. 9. The Bio-degradable waste about 311 Kg/day & Non Biodegradable waste about 200

Kg/day is disposed at MSW site. 10. The total capital investment of the whole project is 81.95 crores. 11. Applicant has paid consent fees as per revised fee structure of Rs. 1,25,100/. 12. As per the visit report of Board official dated 13.08.2012 & non compliances are

observed that applicant has not submitted HW annual returns, CESS returns & ESR. 13. This office has called information as queries observed in the application from RO, Pune

vide letter dated 29.10.2012. 14. As per the directives of M.S. this office called RO/SRO with information at HQ & RO,

Pune has submitted the compliance report as per the letter issued by HQ dated 29.10.2012 along with visit report dated 12.01.2013.,

15. RO, Pune recommended for grant of renewal consent to operate for period upto 30.06.2014.

16. We may consider the case for grant of renewal consent to operate for period upto 30.06.2014.

Page 47: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    43 

 

Agenda No 39 Name of the industry: S. I. Group Ltd.,

Vill - Rasal, Post- Pali, Tal - Sudhagad, Dist- Raigad

1. Application for Renewal of Consent.

2. Application received at SRO on 30/01/13 and at HQ on 01/04/2013.

3. Previous consent was granted for manufacturing of nine Chemical products, with

Electricity (Bio-Mass based power project with Coal)-5000 Kw/Hr.

4. While processing the application following points were noted for which information is

called from SRO/RO/Ind. vide E-mail dtd-15/4/2013:-

a) Previous C.I given in consent is 67.64 Cr now industry has submitted undertaking on Rs.100 stamp paper showing C.I as 52.13 Cr. Clarification with balance sheet of the industry and justification regarding decrease in C.I. has been called.

b) H.W category 5.2 and 35.1 not given in process sheet. c) The details of stack given in process sheet and previous consent differ. d) Cess paid and returns submitted not given.

5. Reply is from industry, SRO/RO is awaited.

6. We may consider the case for renewal with decrease C.I of 52.13 Cr subject to

satisfactory clarification/justification about above raised points.

Page 48: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    44 

 

Agenda No 40 Name of the industry: Hindustan Petroleum Corporation Ltd.,

Pakani, Tal- Norht Solapur, Dist- Solapur

M/s HPCL Pakani Tal- North Solapur has applied for renewal of consent with first operate for proposed expansion (Two additional storage tanks of capacity 20 KL & 360 KL).

Application received at SROM-Solapur, dt: 21/01/2013 and at HQ on 14/02/2013.

C.I. Rs.26.08 Cr. (C-31)

Industry category-Red/LSI.

Industrial effluent –NIL.

Industry has provided Bio-remediation method for disposal of hazardous waste.

Environment statement submitted for year-2011-2012.

RO Pune:- has recommended to grant consent by imposing condition of B.G towards provision

of volatile matter absorption system to arrest emission of volatile hydrocarbons.

Remarks of HOD-. May be considered for renewal with inclusion of two new tanks. 

 

 

 

 

 

 

 

 

 

Page 49: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    45 

 

 

Agenda No 41 Name of the industry: Oriental Rubber Industries Ltd., (Unit-I),

G. No 519/2, 523, 524 & 525, Village- Koregaon, Bhima, Tal- Shirur, Dist- Pune 

1. Application received at RO Pune on 05/12/2012 and at HQ on 24/01/2013

2. Capital Investment is Existing Rs 9.06 cr , Applied Rs 34.09 Cr

3. Industry engaged in mfg of Rubber belting & other rubber products.

4. Earlier consent was valid upto 31.10.2009.

5. Industry has applied for renewal of consent on 10.11.2009 with CI Rs 9.06 Cr for the

period upto 31.10.2012.

6. Now they have applied for renewal of consent with CI Rs. 34.09 cr.

7. Industry has submitted that, CI is increased due to modernization in plant & machinery

and civil work.

8. There is no change in consented production quantity.

9. Existing IE: 0.15 CMD, DE: 28 CMD.

10. Unit provided primary ETP system.

11. Disposal: The treated effluent will be partly used for on land for gardening purpose.

12. JVS reports are exceeding the consented limits.

13. SRO Pune II has issued warning letter on 26.07.2012 and directed to improve or

upgrade air pollution control system.

14. RO has issued proposed direction to the unit on 7.1.2013 due to non compliance of the

industry.

15. Compliance report called from RO Pune and industry. Reply till awaited.

16. RO Pune has remarked that the case is forwarded for further decision at Higher level.

We may consider renewal of consent by imposing condition of Board Resolution for increased CI and BG of Rs 2 lakhs for its timely submission and Rs 3 lakhs towards O&M of pcs.

 

Page 50: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    46 

 

 

Agenda No 42 Name of the industry: Oriental Rubber Industries Ltd., (Unit-I),

G. No 735 A, 736, 737, 738, Village- Karamdi, Bhima, Tal- Shirur, Dist- Pune 

1. Application received at RO Pune on 05/12/2012 and at HQ on 24/01/2013

2. Capital Investment is Existing Rs 28.49 cr , Applied Rs 42.62 Cr

3. Industry engaged in mfg of Rubber Conveyer & other specialized rubber products.

4. Existing consent was valid upto 31.10.2012.

5. Now they have applied for renewal of consent with CI Rs. 42.62 cr.

6. Industry has submitted that, CI is increased due to modernization in plant & machinery.

7. There is no change in consented production quantity.

8. IE: NIL DE: 4.50 CMD. Industrial effluent is NIL. For domestic effluent septik tank &

soak pit is provided.

9. Disposal : On land for gardening.

10. Regarding air & noise pollution complaints, RO Pune had issued SCN on 14.03.2012.

The same complaint also approached before Hon’ble Lokayukt, Mumbai in the month of

Jan 2012 and they have extended several hearing on the said issue.

11. RO Pune has remarked that case is forwarded for further decision at higher level

                   We may consider the case for renewal subject to condition that without prejudice the order passed or being passed in the complaint pending before the Hon’ble Lokayukta Mumbai and Bank guarantee of 3 lakhs towards O&M of pollution control system. 

 

 

 

 

 

 

 

Page 51: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    47 

 

 

Agenda No 43 Name of the industry: Rajendra Mechanical Industries,

N-211/1, MIDC Tarapur, Boisar, Tal- Palghar, Dist - Thane

1. Applied for renewal of Consent to operate with change in name from M/s. Rajendra Mechanical Industries to Remi Edelstahl Tubulars Ltd. submitted copy of company registar.

2. Application received at SRO-Tarapur-I on dtd 18.12.2012 and at HQ on dtd 22.02.2013. 3. Previous consent was valid upto 31/12/2012.

4. Industrial effluent is 20 CMD. Provided ETP. Disposal of CETP. JVS results dtd.12.7.2012 (TDS increased) and 15.9.2012 are within limit.

5. Domestic effluent is 30 CMD. Provided Septic tank and Soak pit.

6. Industry has provided scrubber system to pickling section.

7. This office has issued letter on dtd. 2/3/2013. Submitted reply on dtd 15/3/2013.

8. Call verification report for RO/SRO on dtd. 21/3/2013.. submitted reply on dtd 4/4/2013.

9. SRO recommended for grant of renewal of consent upto 31.12.2015 with change in name.

10. HOD Remark – We may grant renewal of consent upto 31.12.2013 with operational B.G. of Rs. 5/- Lakh.

11. We may pace the consent application before CC for further consideration.

Joint Director (Air Pollution Control)

Page 52: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    48 

 

Agenda No 44 Name of the industry: Sunflag Iron Ore & Steel Co. Ltd., (Belgaon Mine),

Vill- Belgaon, Tal- Warora, Dist – Chandrapur

• Applied for renewal of consent.  

• Capital Investment of the industry is Rs.38.75 Crores.

• 4 Rain fun type water sprinklers at coal stock yard provided.

• Fixed water sprinklers at Conveyor belt provided.

• Fixed water sprinklers are provided at internal road, external road and railway siding.

• Tarring of external coal transportation road of 2.4 km yet not completed.

We may issue show cause notice for refusal of consent.

Joint Director (APC) 

                          

Page 53: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    49 

 

 

Agenda No 45 Name of the industry: B S Ispat Ltd., Makri Mangli Coal Mine Project,

Vill- Makri Buzurg, Tal- Zarizamini, Dist- Yavatmal

• Applied for renewal of consent.  

• Capital Investment of the industry is Rs.26.93 Crores.

• Analysis results of AAQM carried out on 6 & 7 March, 2013 are exceeding the standards

for RSPM.

P.I.L. is pending with Hon’ble High Court, Nagpur Bench. Results are exceeding. We

may issue Show cause notice for refusal of consent.

Joint Director (APC) 

Page 54: 2CC Agenda part2 - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/CCAgenda29042013part_II.pdf · Shri Sai Associates "Oval Nest" 77/2/1 ... Padamshree Dr. D.

 

Web agenda of Part‐II of 2nd CC meeting of 2013‐14 dtd 29.04.2013    50 

 

Agenda No 46 Name of the industry: Demag Cranes and Components (I) PVt. Ltd.,

Gat No 330,332,333,334, A/p- Nankarwadi, Tal- Khed, Dist – Pune  

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 17/01/2013 and at HQ on 14/03/2013

• Previously consent was valid up to 31/03/2013

• Industrial effluent generation is 1.0 CMD for which primary ETP provided.

• Domestic effluent is 27 CMD for which they have provided STP. The treated effluent & sewage is used on land for gardening within premises.

• Adequate height of stack is provided to DG Sets, dust collector with stack provided to shot blasting section.

• SRO reported that As per previous consent condition industry has provided wet scrubber with stack to paint booth

• RO Pune recommended the case for grant of renewal of consent for period up to 31/03/2016

• We may grant consent to operate 31/03/2016 with operation B.G. of Rs. 5/- Lakh

• We may place the consent application before CC for further consideration.

Joint Director (APC)

 


Recommended