+ All Categories
Home > Documents > 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and...

2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and...

Date post: 24-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
37
Overview of the 2nd Quarter 2008 Surveillance and Maintenance Report for the DOE-LM Rocky Flats Site
Transcript
Page 1: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

Overview of the 2nd Quarter 2008 Surveillance and

Maintenance Reportfor the

DOE-LM Rocky Flats Site

Page 2: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

2

Surface-Water Monitoring and Operations

2nd Quarter 2008

George Squibb, S.M. Stoller

Page 3: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

3

Pond Operations – 2nd Quarter 2008• Terminal Pond Discharges

– None• Transfers

– A-3 to A-4; 3/24/08 to 4/15/08 (3.89 MG)

• Pond Levels– As of 6/30/08, Ponds A-

3, A-4, B-5, and C-2 and the Landfill Pond were holding approximately 16.2 MG (16.4% of capacity).

Recent Pond Levels (10/20/08)– Landfill (21.5%)– A-3 (10.5%)– A-4 (9.3%)– B-5 (22.1%)– C-2 (12.8%)

Page 4: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

4

Hydrologic Data – 2nd Quarter 2008

• Precipitation– 3.4” total

precipitation– 62% of WY93-07

average• Flow rates

(percentage of average)– GS01 (4%)– GS03 (No Flow)– GS10 (8%)– SW027 (No Flow)– SW093 (5%)

Page 5: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

5

POC GS01

• Plutonium and Americium

• Total Uranium

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

7/1/

2007

8/1/

2007

9/1/

2007

10/1

/200

7

11/1

/200

7

12/1

/200

7

1/1/

2008

2/1/

2008

3/1/

2008

4/1/

2008

5/1/

2008

6/1/

2008

7/1/

2008

Date

Act

ivity

in p

Ci/L

RFLMA Standard for Pu-239,240 and Am-241 of 0.15 pCi/L

Pu-239,240 30-Day Average

Am-241 30-Day Average

Gaps in data are for periods of zero flow, no flow data, or

no analytical result.

30-Day Averages2nd Quarter CY08

0

2

4

6

8

10

12

7/1/

2007

8/1/

2007

9/1/

2007

10/1

/200

7

11/1

/200

7

12/1

/200

7

1/1/

2008

2/1/

2008

3/1/

2008

4/1/

2008

5/1/

2008

6/1/

2008

7/1/

2008

Date

Act

ivity

in p

Ci/L

RFLMA Standard for Total Uranium of 11 pCi/L

Total Uranium 30-Day Average

Gaps in data are for periods of zero flow, no flow data, or

no analytical result.

30-Day Averages2nd Quarter CY08

Page 6: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

6

POC GS03

• Plutonium and Americium

• Total Uraniumand Nitrate + Nitrite as N

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

7/1/

2007

8/1/

2007

9/1/

2007

10/1

/200

7

11/1

/200

7

12/1

/200

7

1/1/

2008

2/1/

2008

3/1/

2008

4/1/

2008

5/1/

2008

6/1/

2008

7/1/

2008

Date

Act

ivity

in p

Ci/L

RFLMA Standard for Pu-239,240 and Am-241 of 0.15 pCi/L

Pu-239,240 30-Day Average

Am-241 30-Day Average

Gaps in data are for periods of zero flow, no flow data, or no

analytical result.

30-Day Averages2nd Quarter CY08

0

2

4

6

8

10

12

7/1/

07

8/1/

07

9/1/

07

10/1

/07

11/1

/07

12/1

/07

1/1/

08

2/1/

08

3/1/

08

4/1/

08

5/1/

08

6/1/

08

7/1/

08

Date

Act

ivity

or C

once

ntra

tion

in p

Ci/L

or m

g/L

RFLMA Standard for Total Uranium and Nitrate of 10 (pCi/L and mg/L,respectively)Total Uranium 30-Day Average

Nitrate+Nitrite as N 30-Day Average

Gaps in data are for periods of zero flow, no

flow data, or no analytical result.

30-Day Averages2nd Quarter CY08

Page 7: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

7

POC GS08

• Plutonium and Americium

• Total Uranium and Nitrate + Nitrite as N

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

7/1/

07

8/1/

07

9/1/

07

10/1

/07

11/1

/07

12/1

/07

1/1/

08

2/1/

08

3/1/

08

4/1/

08

5/1/

08

6/1/

08

7/1/

08

Date

Act

ivity

in p

Ci/L

RFLMA Standard for Pu-239,240 and Am-241 of 0.15 pCi/L

Pu-239,240 12-Month Rolling

Am-241 12-Month Rolling

12-Month Rolling Averages2nd Quarter CY08

Gaps in 12-month rolling averages are for periods of zero discharge or

no analytical result.

0

2

4

6

8

10

12

7/1/

07

8/1/

07

9/1/

07

10/1

/07

11/1

/07

12/1

/07

1/1/

08

2/1/

08

3/1/

08

4/1/

08

5/1/

08

6/1/

08

7/1/

08

Date

Act

ivity

or C

once

ntra

tion

in p

Ci/L

or m

g/L

RFLMA Standard for Total Uranium and Nitrate of 10(pCi/L or mg/L, respectively)

Total Uranium 12-Month Rolling

Nitrate+Nitrite as N 12-Month Rolling

12-Month Rolling Averages2nd Quarter CY08

Gaps in 12-month rolling averages are for periods of zero discharge or

no analytical result.

Page 8: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

8

POC GS11

• Plutonium and Americium

• Total Uranium and Nitrate + Nitrite as N

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

7/1/

07

8/1/

07

9/1/

07

10/1

/07

11/1

/07

12/1

/07

1/1/

08

2/1/

08

3/1/

08

4/1/

08

5/1/

08

6/1/

08

7/1/

08

Date

Act

ivity

in p

Ci/L

RFLMA Standard for Pu-239,240 and Am-241 of 0.15 pCi/L

Pu-239,240 12-Month Rolling

Am-241 12-Month Rolling

Gaps in 12-month rolling averages are for periods of zero discharge or

no analytical result. 12-Month Rolling Averages,2nd Quarter CY08

0

2

4

6

8

10

12

7/1/

07

8/1/

07

9/1/

07

10/1

/07

11/1

/07

12/1

/07

1/1/

08

2/1/

08

3/1/

08

4/1/

08

5/1/

08

6/1/

08

7/1/

08

Date

Act

ivity

or C

once

ntra

tion

in p

Ci/L

or m

g/L

RFLMA Standard for Total Uranium and Nitrate of 10 (pCi/L or mg/L, respectively)

Total Uranium 12-Month Rolling

Nitrate+Nitrite as N 12-Month Rolling

12-Month Rolling Averages,2nd Quarter CY08

Gaps in 12-month rolling averages are for periods of zero discharge or

no analytical result.

Page 9: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

9

POC GS31

• Plutonium and Americium

• Total Uranium

No Pond C-2 discharge during the last 12 months.

Page 10: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

10

Point of Evaluation Monitoring – 2nd Quarter 2008

• Water quality at all Points of Evaluation, except GS10, was below applicable standards.

– Reportable values for total uranium at GS10 continue to be observed and are likely caused by groundwater contributions of naturally occurring uranium to South Walnut Creek.

Page 11: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

11

Performance Monitoring – 2nd Quarter 2008Original and Present Landfills• Original Landfill: Surface-water quality results triggered monthly

sampling for selenium.– Selenium was not detected in the third monthly sample;

monthly sampling was discontinued.• Present Landfill: Surface-water quality results triggered monthly

sampling for selenium.– Selenium was not detected in the third monthly sample;

monthly sampling was discontinued.

Page 12: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

12

Questions?

Page 13: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

13

Groundwater Monitoring

and Operations

2nd Quarter 2008

John Boylan S.M. Stoller

Page 14: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

14

RFLMA Monitoring

• All RFLMA wells and groundwater-related locations monitored– RCRA wells (quarterly)– AOC wells (semiannually)– Surface Water Support (semiannually)– Sentinel wells (semiannually)– Treatment systems (semiannually)– Boundary wells (annually)– Evaluation wells (biennially)Results will be evaluated in 2008 Annual Report

Page 15: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

15

SPPTS Update• Phase I upgrades are complete.

– Water intercepted by the ITS is now routed to a collection sump, then pumped to the SPPTS for treatment.

– Treated effluent is discharged via a separate, non-perforated line. It still exits at the Discharge Gallery.

– Have new metering vault at SPIN.• Monitors flow from SPIN into SPPTS and from ITSS

(the collection sump) to SPIN.– Have new discharge monitoring vault near ITSS to monitor

treated effluent (SPOUT).se1

Page 16: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

Slide 15

se1 Both "ITS" and "ITSS" appears on this slide and in this presentation. Please make consistent.Stacey Elza, 10/22/2008

Page 17: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

16

SPPTS Update (continued)

Previous SPPTS and ITS Configuration

SPP DG

1,100-foot-long ground water intercept trench (intercepts ITS lines as shown)

Treatment cells

ITS line (“west manifold”) transports treated water

Former ITPH

ITS feeder lines (“laterals”)

Solid line links ITS line to DG

Generalized ground water flow direction

ITS line (“east manifold”)

Former Solar Evaporation Ponds

SPIN location

Effluent manhole

N

Page 18: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

17

SPP DG

ITS east manifold

SPIN location

Effluent manhole

ITS west manifold

SPPTS Update (continued)

Schematic of Current SPPTS and ITS Configuration

ITSS (ITS Sump) collects ITS water

Discharge line

ITSS transfer line

Solar vault, effluent monitoring point (SPOUT)

Metering vault

Page 19: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

18

Questions?

ITSW (west ITS manifold)

ITSE (east ITS manifold)

B1

Page 20: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

Slide 18

B1 BoylanJ, 7/17/2008

Page 21: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

198/4/08

– Petition to adopt statewide basic uranium standard (MCL 30 ug/L ~ 20 pCi/L): Hearing 1/09• Eliminate site-specific standards (10 pCi/L Walnut

Creek; 11 pCi/L Woman Creek)• Natural uranium in groundwater now higher

proportion of surface water– LANL sampling in 2007 and 2008 completed; some

analysis pending • Except for SPPTS Discharge Gallery, results to date

show predominantly natural uranium

Update on WQCC Rulemaking

Page 22: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

20

Post-Closure LANL Data (Q-2 samples) Post-Closure High Resolution Uranium Isotopic AnalysisLocation Sample Date Total U (ug/L) % NaturalGS03 7/9/2007 3.7 77GS10 7/23/2007 10.1 71GS10 8/25/2008 pendingGS13 (Lo) 12/6/2007 47.3 71GS13 (Hi) 5/15/2008 21.5 75SW093 (Lo) 12/6/2007 9.93 91SW093 (Hi) 5/15/2008 7.11 93POM2 8/28/2008 pendingSPIN (Lo) 6/6/2008 pendingSPIN (Hi) 8/20/2008 pendingSPPDG 9/12/2007 62 43SPPDG (Lo) 12/6/2007 60.7 42SPPDG (Hi) 5/14/2008 58.7 41B206989 9/2/2008 pending00193 8/25/2008 pending10594 9/11/2007 103 9715699 8/24/2008 pending80205 9/7/2007 79.2 10099405 9/12/2007 439 100PLF Pond Eff 9/16/2008 pendingA3 Pond 9/16/2008 pendingA4 Pond 9/16/2008 pendingB5 Pond 9/16/2008 pendingC2Pond 9/16/2008 pending

Page 23: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

21

Update on WQCC Rulemaking (continued)

– Expiring Temporary Modifications (TMs) Annual Review: Hearing 12/08• Current Rocky Flats TMs (six VOCs; nitrate/nitrite) set to

expire 12/31/09• SPPTS upgrade should reduce nitrate loading to North

Walnut Creek– Triennial Review South Platte River Basin

• Issues Formulation Hearing 11/10/08; Rulemaking Hearing 6/09

• Potential Rocky Flats Issues– Rocky Flats TMs expire 12/31/09 – New statewide basic standard for arsenic (10 ug/L)

below site-specific standard (50 ug/L)

Page 24: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

22

Site Operations2nd Quarter 2008

se2

Page 25: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

Slide 22

se2 Insert comma between "McLaughlin" and "S.M."Stacey Elza, 10/22/2008

Page 26: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

23

Site Operations – 2nd Quarter 2008Original Landfill – InspectionsLandfill inspections were completed on April 30, May 29, and June 24.

A vegetation inspection was completed on May 19.

Page 27: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

24

Site Operations – 2nd Quarter 2008 (continued)

Original Landfill – Seeps and SlumpsSeep #7 was dry throughout the 2nd quarter.

Seeps #4 and #8 showed active groundwater seepage throughout the 2nd quarter (~ 1-3 gpm).

Slumping areas of OLF continued to be monitored (no significant changes).

Page 28: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

25

Site Operations – 2nd Quarter 2008 (continued)

Original Landfill – Settlement Monuments and Inclinometers

Settlement monuments were surveyed on June 26; data are within expected range per OLF Monitoring and Maintenance Plan.

Consolidation monitors were surveyed on April 4, May 2, and June 5. There was no significant movement.

Inclinometers were measured from April 2 through 23, from May 8 through 12, and on June 17.

Page 29: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

26

Site Operations – 2nd Quarter 2008 (continued)

Present Landfill – Inspections and SurveysThe quarterly inspection was completed May 29.The vegetation inspection was completed May 21.The settlement monument surveys were completed June 21.

Page 30: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

27

Annual Site (Central OU) Inspection 4/14/08

• Inspection and monitoring for evidence of significant erosion – Conduct visual observation for precursors of

significant erosion– Evaluate proximity of any significant erosion to

subsurface features• Inspect effectiveness of institutional controls (ICs)

– Determine effectiveness by any evidence of violation of ICs and determine whether required signs are in place

– Verify that Environmental Covenant is in AR and on file with Jefferson County (verified 4/8/08)

• Evidence of any adverse biological conditions observed during inspection

Page 31: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

28

Annual Site (Central OU) Inspection (continued)

• Central OU divided into 5 areas:– A – Former 300 and 400 Areas– B – Former 700 and 991 Areas– C – Former 800 Area– D – Former 903 Pad and East Trenches Area– E – Former Ash Pits Area

• Landfills, treatment systems, and water monitoring stations inspected during the year on a routine basis.

• Team walked down surface of each area (A-E) to observe conditions.

Page 32: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

29

Annual Site (Central OU) Inspection (continued)

• No significant erosion noted –minor holes, small animal evidence, and depressions identified– Very limited aerial extent

– Filled in– Debris and trash collected

or flagged for pick up• No adverse biological

conditions noted• No evidence of IC violations• Signs in place

Page 33: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

30

Questions?

Page 34: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

31

Original Landfill Investigation and Path Forward

Page 35: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

32

Original Landfill Investigation• Field work completed early 4/08• Geotechnical Investigation Report completed

6/4/08• CDPHE found report acceptable 6/28/08• Consultation for path forward

– Contact Record 2008-07– Geotechnical Investigation Report posted to

website with Contact Record• Construction in 4th quarter FY08 and 1st

quarter FY09

Page 36: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

33

Page 37: 2nd Quarter 2008 Presentation Final · DOE-LM Rocky Flats Site. 2 Surface-Water Monitoring and Operations 2nd Quarter 2008 George Squibb, S.M. Stoller. 3 ... no analytical result.

34

Original Landfill Path Forward• Repair localized slumping/differential settlement

by filling/grading.• Fill/regrade west perimeter channel (east side

slope) to reduce slope and improve stability.• Two-foot berm height difficult – adjust height

along length based on sub-basin model.– Approximately 23% of berm lengths need several

inches of soil.• Conduct routine maintenance for observed

ponding in berm channels – regrade high and low spots.

• Install extension to Seep #7 drain to direct water to buttress drain.


Recommended