2013-02-18 1 Ms.Khin Aye Myint Executive Engineer Engineering Department ( Water   & Sanitation ) Yangon,Myanmar Yangon OVERVIEW OF MYANMAR
Transcript

2013-02-18

1

Ms.Khin Aye Myint

Executive Engineer

Engineering Department ( Water  & Sanitation )

Yangon,Myanmar

Yangon

OVERVIEW OF MYANMAR

2013-02-18

2

OVERVIEW OF YANGON CITY AREA

Yangon Division

YANGON CITY AREA : 730 Km²

POPULATION : About 6 Millions

DISTRICTS : 4 Districts

TOWNSHIPS : 33 Townships

AVERAGE ANNUAL : 2700 mmRAINFALL

MEAN MAX: TEMP: : 33 ◌۫C

MEAN MIN: TEMP: : 21 ◌۫C

 

 

 

 

 

   

MAYOR (Chairman of Y.C.D.C)  

Minister of Development Affairs

(Yangon region )

  SECRETARY DEPARTMEN  OF BUDGET 

AND ACCOUNT 

DEPARTMENT OF PUBLIC 

RELATION & INFORMATION

DEPARTMENTOF CITY PLANNING & 

LAND ADMINISTRATION

ORGANIZATION CHART OF YANGON CITY DEVELOPMENT COMMITTEE

COMMITTEE‐3   COMMITTEE‐4    COMMITTEE‐7 

DEPARTMENT    

OF ENGINEERING 

(BUILDING) 

DEPARTMENT    

OF POLLUTION 

CONTROL AND

DEPARTMENT     

OF MARKETS 

DEPARTMENT     

OF 

ADMINISTRATION 

DEPARTMENT        

OF PLAYGROUNG, 

PARK AND GARDEN 

DEPARTMENT     

OF ASSESSORS 

DEPARTMENT    

OF REVENUE 

DEPARTMENT        

OF ENGINEERING 

(WATER &

 COMMITTEE‐5 

DEPARTMENT OF 

PRODUCTION UNIT

CONTROL AND 

CLEANSINNG 

DEPARTMENT   

OF WORK 

INSPECTION 

 DEPARTMENT   OF MOTOR 

TRANSPORT AND WORKSHOP 

DEPARTMENT    

OF SECURITY AND 

DISCIPLINE 

(WATER & 

SANITATION)

DEPARTMENT        

OF COORDINATION 

DEPARTMENT    

OF VETERINARY 

AND SLAUGHTER 

HOUSE 

 DEPARTMENT OF 

ENGINEERING 

(ROAD & BRIDGE)  

District Office 

(South) 

District Office

(West)) District Office

(North)) 

DEPARTMENT    

OF CENTRAL 

STORE 

District Office

(East) 

DEPARTMENT        

OF HEALTH 

2013-02-18

3

Chief Engineer(Head Of Department)

ORGANIZATION CHART OF ENGINEERING DEPATMENT(WATER & SANITATION)

ACEElectrical & Mechanical

Division

ACEFinancialDivision

SupportingBranch

ACESewageDivision

ACEWater Dist:

Division

DeputyChief Engineer

(DYCE-2)

DeputyChief Engineer

(DYCE-1)

ACEPipe PlantDivision

ACEReservoirDivision

Division

AEWater Quality &

MonioringSection

AEStore

Section

AEResearch

And DesignSection

AEComputerSection

My position is one of executive

engineers in this division

Disposal of sewerage into the river without treatment before 

CONDITION BEFORE THE ESTABLISHMENT OF SEWAGE TREATMENT PLANT

treatment before establishment of Sewage Treatment Plant

6

2013-02-18

4

EXISTING SEWERAGE SYSTEM

CROSS SECTION OF EJECTOR AND SEWER PIPE LINES

2013-02-18

5

Main Air Compressor in Botadaung Township, Sewageare driven by air compressing to Treatment Plant

MAIN AIR COMPRESSOR FOR SEWERAGE SYSTEM

◆ Year of Establishment                                      ‐1888 year◆ (6) Steam Turbine Engines of 160 Horse power ◆ Change of year to electrical driven                  ‐( 1962‐1963) ◆(2) Electrical Air Compressors of 200 Horse power were reinstalled◆(2) Electrical Air Compressors of 120 Horse power were reinstalled◆Total land areas   ‐ 2.75 acres

Air Compressor Station constructed in 196310th Street Air Compressor in Lanmadaw Township, Sewage are driven by air compressing to Treatment Plant

SUB-MAIN AIR COMPRESSOR FOR SEWERAGE SYSTEM

◆ Year of Establishment - (1962-1963) year

◆ (2) Electrical Air Compressors of 200 Horse power have been installed

◆ Total land areas - 0.3 acres

2013-02-18

6

Sanitation and sewerage for the Yangon City area is main responsibility of Engineering

Department ( Water and Sanitation) under Yangon City Development Committee.

Existing system, conventional sewerage, consists of :-

⌂ Gravity sewers

OVERVIEW OF SEWERAGE SYSTEM IN DOWNTOWN AREA OF YANGON CITY

y

⌂ 39 pneumatic ejector stations

⌂ Air distribution main

⌂ Two sewage force mains and outlet

At present Existing Sewerage System covers only 4.33 km2 area of CBD and serves around 350,000

peoples, 7% of the city population.

Daily Volume of sewage disposal - 111840 gal.(508 m³)

11

Major Issues in Existing Sewerage System:-

⌂ To establish proper treatment process for the existing sewerage system.

⌂ To expand and set up the existing sewerage system.

⌂ To improve urban sanitation environment in Yangon City Area

LOCATION OF EXISTING SEWAGE TREATMENT PLANT

Yangon City DevelopmentCommittee started to constructwastewater treatment in June 2003by own human resources with theguidance of State Government toprotect the environment.

12

2013-02-18

7

EXISTING SEWAGE TREATMENT PLANT

Year of Establishment - 12th April 2003Year of Completion - 17th January 2005 Year of Opening ceremony - 22nd December 2006Volume of Daily Treatable sewage - 3.25MGDDeveloper - Myanmar Engineers of Yangon City Development CommitteeCost of Project - US$ 0.96 Millions (Myanmar Kyat -2065.7 Millions)Areas of Plant – 5.56 Acres

Detail Design Implementation Installation Commissioning Installation

Programme for Sewage Treatment Project

LAYOUT PLAN OF EXISTING SEWAGE TREATMENT PLANT

Design Criteria:

Area of Plant - 5.56 acresDesign population - 300,000Daily wastewater

Installation Training

discharge- - 14775 m3/dayBOD influent - 600mg / lBOD effluent - 60 mg / lSuspended solid influent- 700 mg / lSuspended solid effluent- 40 mg / l

2013-02-18

8

PROCESS OF EXISTING SEWAGE TREATMENT PLANT

15

Pump Sump

Auto Bar Screen

2013-02-18

9

Grit Separator

Primary Sedimentation Tank

Aeration tank

Secondary Sedimentation Tank

Wastewater treatment plant was operated in January 2005. Waste are treated by activated sludge process with the aid of surface aerators.

18

2013-02-18

10

Chlorination Tank

Effluent Waste Water

Sludge Thickener Tank 

Sludge Digester Tank

20

Aerobic sludge digester. Sludge from primary sedimentation tank and secondary sedimentation tank are treated by aerobic bacteria before production of sludge cake.

2013-02-18

11

Dewatering house

Vaccum truck

Equalization tank

Zoning

1) Central Zones: • C1 and C2 (2 Zones) N-2

N-3

PROPOSED SEWERAGE ZONE FOR THE WHOLE YANGON REGION

C1 and C2 (2 Zones)2) East Zones:

• E1~E4 (4 Zones)3) West Zones:

• W1~W4 (4 Zones)4) North Zones:

• N1~N3 (3 Zones)5) South Zone:

W-4

N-1E-2

E-3

E-1

W-2

• S1 (1 Zone) C-2

E-4W-1

C-2

S-1

W-3

2013-02-18

12

Daily Ave. Daily Max.

C 1 178,127 64,275 70,213 499 6.4 Pazundaung, Botahtaung, Kyauktada, Pabedan

SewerageZone

Population(person)

W. Flow (m3/day) Area (ha)

WWTPArea (ha)

Township

27.0a part of Bahan, Mingalar Taung Nyunt, Tamwe,South Okkalapa, Thingangyun, Yankin, a part ofC 2+E1 1,902,155 659,542 714,184 11,286

POPULATION.WASTEWATER FLOW BY SEWERAGE ZONES

W 2 349,512 98,581 106,205 2,356 8.3 Hlaing, a part of Kamaryut, a part of Mayangon

W 3 74,419 24,187 26,047 1,485 3.5 A part of Kyee Myin Daing, Seikgyikhanaungto

W 4 737,724 143,855 154,921 7,761 10.5 Hlaing Tharyar

N 1 377,188 98,069 105,613 3,163 8.3 Insein

N 2 906 748 235 755 253 890 12 783 14 2 Mi l d

p , g gy , , pMayangone, North Okkalapa, North Dagon

W 1 483,058 134,943 146,552 1,654 10.1Lanmadaw, Latha, Dagon, a part of Bahan, a partof Kyee Myin Daing, Ahlone, Sanchaung, a partof Kamaryut

, , , , ,

N 2 906,748 235,755 253,890 12,783 14.2 Mingaladon

N 3 514,954 100,416 108,140 5,271 8.4 Shwe Pyi Thar

E 2 1,183,320 230,747 248,497 17,064 14.0 East Dagon

E 3 920,933 196,986 212,652 5,418 12.7 Dawbon, Taketa, South Dagon

E4 399,111 77,827 83,814 4,202 7.1 Dagon Seikkan

S 1 490,032 95,557 102,907 9,840 8.1 Dala

Out of SZ 2,241 582 627 117 Seikkan

Total 8,519,522 2,161,322 2,334,262 82,899 138.6