Managing Compliance from Bid through Execution
Holly MeyerKarin Olson Held
Jill Hebl
Introduction
3
Presenters
• Holly Meyer – Director, Business Development
• Karin Olson Held – Proposal Coordinator, Business Development
• Jill Hebl – Senior Contract Specialist, Contract Administration
10/21/2015
4
Noridian Healthcare Solutions
• 48 years, 50 states• Federal and state presence• Wholly-owned subsidiary of Noridian
Mutual Insurance Company (dba Blue Cross Blue Shield of North Dakota)
• Health care-focused
10/21/2015
5
National Presence
05/02/2023 6
Introductions, continued
• How about you?– Industry?– Departments?
• What does compliance mean to you?
05/02/2023 7
05/02/2023 8
Focus on Compliance
RFP Response •Compliance matrix•Credible strong writing
Bid Award •Implementation success•Successful performance
Continued Growth•Contract renewal•Contract extensions•Award Fee
Lifecycle of Compliance
10
Different CustomersFederal State/Local Commercial
• RFP requirements are very prescriptive
• Expect strict adherence to RFP requirements
• Response must be compliant to withstand (or lodge) protests
• Often prescribe solution and performance requirements
• RFP requirements may have differing levels of definition
• Often interested in innovation
• RFP expectations may not all be specifically prescribed
• Levels of clarity differ around performance expectations
• RFP requirements may be vague
• Often less prescriptive in response format
• More often expect innovation; therefore, include less prescriptive requirements
• Performance expectations are key
10/21/2015
11
Bid Compliance• Review RFP• Identify requirements
– Visible Thread: Key words/phrases such as should/shall
• Respond to requirements– Visible Thread: Confirm presence of key words in
response• Develop compliance matrix
– Visible Thread: Starter matrix– Add assignments and evaluation factors
10/21/2015
12
After AwardFederal State/Local Commercial
Successful implementation Positive performance Customer service Enhanced employee/customer satisfaction Improved perception with public Cost savings
= “Squishy” expectations
10/21/2015
13
After Bid
• From bid team to delivery team– RFP responses are often incorporated as part
of the contract– Visible Thread: Compliance/response matrix
is the foundation for preparing for solution implementation
– Creates a mechanism to ease handoff between teams
10/21/2015
14
Contract• Regardless of level of specificity in the
RFP, all customers expect you to perform!• All customer types issue a contract
– Contract should outline performance expectations
– Define any expectations that weren’t clear– May incorporate RFP response– Visible Thread: Create a compliance matrix
from the contract
10/21/2015
15
Corporate Purchasing
• Future uses: – Purchasing or procurement
• When issuing an RFP and selecting a vendor, a compliance matrix corresponding to RFP requirements can assist in evaluating responses.
– Subcontractor and vendor management• After selection, we keep scorecards of vendor
performance. A matrix developed from the contract is ideal to track performance.
10/21/2015
16
Benefits
• Consistency from bid cycle through hand -off to implementation through the operational delivery
• Mechanism to self-assess performance• Opportunity to course-correct early• Visibility throughout operation • Minimizes chance of sales promising but
operations being unaware
10/21/2015
VisibleThread – Proposal Development
18
The Matrix
• Create after RFP release– Track for both compliance and assignments
• Tailor VisibleThread starter compliance matrix– Shred the RFP first, then format to Noridian’s
template– Create matrix in about 50% less time
10/21/2015
19
Starter Matrix
10/21/2015
20
Final Matrix
10/21/2015
21
Reviews – Readability Checkpoint
• Build readability assessment into color team reviews– Offer authors early feedback to improve text
• Run Clear Language and Quality analyses– “To-be” state – currently revising our proposal
process
10/21/2015
22
Editing – Final Polishing
• Focus on one voice, tense, and consistency among proposal sections
• Run Clear Language and Quality analyses– Identify “low-hanging fruit,” address, and
move on
10/21/2015
23
Case Study – Proposal A
• Compared clarity scores for original and edited proposal sections
• Sections edited by same person using the Clear Language reports – Long sentences– Average sentence length– Passive language – Readability
10/21/2015
24
Original Version Clarity Scores
10/21/2015
Proposal A – Original Version
Long Sentences Average Sentence Length
Passive Language Readability
Section 1 87 sentences18.75% 15 59 sentences
12.72% 20
Section 2 54 sentences9.06% 7 17 sentences
2.85% 47
Section 3 91 sentences18.65% 14 45 sentences
9.22% 32
Section 4 116 sentences30.05% 19 35 sentences
9.07% 24
goal Fewer Fewer Fewer Higher – above 30; 50 is best
25
Edited Version Clarity Scores
10/21/2015
Proposal A – EDITED Version
Long Sentences Average Sentence Length
Passive Language Readability
Section 1 77 sentences16.14% 14 40 sentences
8.39% 21
Section 2 44 sentences7.25% 7 14 sentences
2.31% 47
Section 3 90 sentences18.29% 14 43 sentences
8.74% 32
Section 4 101 sentences24.75% 17 18 sentences
4.66% 26
goal Fewer Fewer Fewer Higher – above 30; 50 is best
26
Measurable Improvements
10/21/2015
Proposal A – EDITED Version
Long Sentences Average Sentence Length
Passive Language Readability
Section 1 # and % reducedRed to Yellow
ReducedYellow to Green
# and % reduced Increased
Section 2# and % reduced No change # and %
reduced No change
Section 3# and % reduced No change # and %
reduced No change
Section 4# and % reduced Reduced
Red to Yellow# and % reduced Increased
27
Next Steps…• Build readability checkpoints into the
proposal process• Consider that proposal content is often
technical and contains medical terminology– Readability is an even greater challenge —and
likely even more important.– What are OUR goals for readability? – Do we accept lower scores in those page-
constrained, highly-technical sections?
10/21/2015
VisibleThread – Contract Administration
29
Benefits for Contract Monitoring
• Use VisibleThread to monitor both prime contracts and subcontracts– Should/shall statements
• Requirements– Terms and conditions– SOWs– Responsible party/owner– Comments and action items
10/21/2015
30
Should/Shall Organization
• Depends on type of contract– Contract section– Content– Responsible party– Specific owner– Met/unmet– Follow-up/comments
10/21/2015
31
Example Subcontract SOW
10/21/2015
Requirements Compliance Matrix for Example Subcontract Statement of Work
Section Content Requirement Met/Unmet
Your comments here...
1.5a Goal 1.5a Identify the business processes, operational activities
and systems within the Appeals group with the highest potential for productivity improvement by way of and use of Project 1.5b activities.
MetA/B/DME would agree that these were identified.
1.5a Business Benefits 1.5a Validates and prepares Project 1.5b activities so as to
powerfully initiate productivity gains with particular emphasis on Appeals MRE and MRS staff.
Unmet Preparation to initiate the productivity is not an "apples to apples" comparison so cannot validate the increases to be accurate.
1.5a Provides a high level overview of Appeals' business processes, pain points and strengths.
Met These are pain points we provided them.
1.5a Identifies root causes of major pain points, lower-than-desired productivity, and operational redundancies
Unmet Root causes not identified with this group.
1.5a Sets the foundation for Future State development. Met Recommendations received.
What questions do you have?
Thank you!