Overview of Global Decommissioning
Presented by
Dr. Brian Twomey [email protected]
Mobile: +44 7831 355837
CCOP & EPPM Workshop on End of Concession & Decommissioning Guidelines Bangkok, 13thJune 2012
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SLVAGE & DECOMMISSIONING
Worldwide Location of Offshore Installations
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Where are the Offshore Platforms
Mediterranean 100+
Lake Maracaibo 100+
Brazil 50+
Caspian Sea 50+
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg Offshore Installations in USA
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Location of US Offshore Facilities
California Federal Waters (23) California State Waters (4 platforms & 5 Islands)
Cook Inlet 16 GOM 3450
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Location of GOM Facilities
Post Maconao renamed: The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
GOM Summary
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012 Ref: www.miller-mccune.com
Types of Offshore Facilities In GOM
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SALVAGE & DECOMMISSIONING
Offshore Installations in SE Asia
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Location of Offshore Installations in Asia (2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Types of Offshore Installations in Asia (2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Asia Summary (2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SALVAGE & DECOMMISSIONING
Offshore Installations in Europe
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Northern European Offshore Installations
Data from 2006
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Offshore Installations in Denmark (Circa 30 Installations)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Location of Danish Platforms
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
SALAGE & DECOMMISSIONING
Offshore Installations in Netherlands
(Circa 84 Installations in 2006)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Location of Dutch Platforms
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Dutch Platform Removals??
Source:
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Offshore Installations in Norway
(Circa 93 Installations in 2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
From Guinness Book of Records: “The Troll Offshore Gas Platform, located off Norway in the North Sea, is the heaviest man made mobile object ever made, with a dry weight of the gravity base structure at 656,000 tonnes. Standing 472m tall, it was made from 245,000m3 of concrete, (the equivalent to 215,000 foundations for ordinary homes) and 100,000 tonnes of steel (approximately 15 Eiffel towers).”
Size of Troll A Offshore Platform
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ORMEN LANGE (Norway): Europe’s Deepest Subsea Development at 1,000 m (3,300 ft)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Norwegian Decommissioning Market (2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SALVAGE & DECOMMISSIONING
Offshore Installations in UKCS
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
UK OIL & GAS FALILITIES TO BE DECOMMISSIONED IN FUTURE YEARS
Source; DECC
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
Summary of UKCS (2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
ALVAGE & DECOMMISSIONING
UKCS Approximate Market Timing & Value
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
UKCS DECOMMISSIONING Decommissioning – When – Expected Timeframes
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
UKCS DECOMMISSIONING
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
UKCS Decommissioning Market(2010)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SALVAGE & DECOMMISSIONING
Examples of Decommissioning in Southern North Sea
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
TYPICAL SOUTHERN NORTH SEA GAS PLATFORMS
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Alternative Method of Topside Removal Piece Small
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
ut.o
rg
SALVAGE & DECOMMISSIONING
Decommissioning in Northern North Sea
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ww
w.s
utor
g
Ref: www.miller-mccune.com
Topsides 20,160 tonnes
Jacket 18,000 tonnes
Water depth 144 metres
Operational Crew: ~120
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Installation of A Northern North Sea Platform
22 Main Lifts
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
INSTALLATION OF NNS PLATFORM Installation of A Northern North Sea Platform
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Giant Crane Vessel Decommissioning NW Hutton (Only 4 in the world)
DECOMMISSIONING OF NNS PLATFORM
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Installation of Large Jackets Using Buoyancy
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
NW HUTTON JACKET DECOMMISSIONING
Allowed to leave Footings ~ 8,500mt approximately Jacket + Piles ~18,000mt
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Hundreds of complex subsea cuts using cranes, ROV’s and 4 types of cutting tools Footings left
DECOMMISSIONING NWH JACKET
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
DECOMMISSIONING NWH JACKET
Installed Barge Launched with Buoyancy
Decommissioned in Pieces (Major subsea cutting needed)
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Subsea Jacket Cutting During Decommissioning
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Subsea Cutting Methods Used To NWH Jacket
Abrasive Water Jet (AWJ)
Diamond Wire Cutting System (DWCS)
Gated Hydraulic Shears
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
ROV Deployed Subsea Diverless Cutting Tools
© 2011 RESL. All Rights Reserved. CCOP/EPPM Workshop on End of Concession & Decommissioning 12-14 June 2012
Crane Deployed Diverless Subsea Cutting Tools
Source: Eamon Sheehan, BP, Aberdeen, 17th November 2010
Thank you for your attention
Any Questions ?