+ All Categories
Home > Documents > 300 FRONT ST. PROPOSAL

300 FRONT ST. PROPOSAL

Date post: 15-Apr-2017
Category:
Upload: osama-mannan
View: 169 times
Download: 0 times
Share this document with a friend
18
AROMA DESIGN Alex Teloniatis 100754891 Osama Mannan 100726077 Mazhar Kakar 100722593 Andrew Doubelt 100740318 Ronaldo Benitez 100556950
Transcript
Page 1: 300 FRONT ST. PROPOSAL

AROMA DESIGN

Alex Teloniatis 100754891Osama Mannan 100726077Mazhar Kakar 100722593Andrew Doubelt 100740318Ronaldo Benitez 100556950

Page 2: 300 FRONT ST. PROPOSAL

AROMA DESIGN

Contemporary designers creating residential proposals in sequence with open concept living and sustainable building design. The condominium proposal on 300 Front St. is our way of eliminating typical condo plans by incorporating a unique, iconic figure that will not only move its’ inhabitants but the Toronto community as a whole.

MISSION STATEMENT

Page 3: 300 FRONT ST. PROPOSAL

SITE SURROUNDINGS

SOUTH EAST

SOUTH WEST

EASTNORTHWEST

Page 4: 300 FRONT ST. PROPOSAL

SUN STUDY

7 AM 12 PM 4 PM

Page 5: 300 FRONT ST. PROPOSAL

DESIGN PROCESS

STAGE 1 STAGE 2 STAGE 3 STAGE 5

Page 6: 300 FRONT ST. PROPOSAL

3D VIEW: FINISH PRODUCT

3D VIEW 3D VIEW

Page 7: 300 FRONT ST. PROPOSAL

andrew

SITE PLAN

FRONT STREET

JOHN

STR

EET

Page 8: 300 FRONT ST. PROPOSAL

PARKING

Number of Parking Spaces 61Number of Handicap Spaces 6Total Number of Parking Spaces 67Total Number of Floors 5

PARKING LEVEL

Page 9: 300 FRONT ST. PROPOSAL

GROUND FLOOR RENDERING

GROUND FLOOR PLAN

Page 10: 300 FRONT ST. PROPOSAL

LEVEL 1 FLOOR PLAN

SUITE RENDERING

Page 11: 300 FRONT ST. PROPOSAL

Alex

SUITE RENDERING

LEVEL 2 FLOOR PLAN

Page 12: 300 FRONT ST. PROPOSAL

OUTDOOR SITTING AREA RENDERING

AMENITIES LEVEL

Page 13: 300 FRONT ST. PROPOSAL

Level 14

Osama

INTERIOR KITCHEN VIEW

LEVEL 14 FLOOR PLAN

Page 14: 300 FRONT ST. PROPOSAL

Penthouse

Ronaldo

LOFT SUITE RENDERING

PENTHOUSE PLAN

Page 15: 300 FRONT ST. PROPOSAL

ELEVATIONS

Page 16: 300 FRONT ST. PROPOSAL

ELEVATIONS

Page 17: 300 FRONT ST. PROPOSAL

1) Photovoltaic Panels2) Low Voc Paint3) Natural Flooring4) Supplementary Cementing Materials5) Rainwater Collection6) Motion Censored Lighting7) Site Vegetation8) Bike racks on ground and parking levels

SUSTAINABLE BUILDING COMPONENTS

9) Low maintenance vegetation for dwelling10) Energy efficient washer/dryer11) Recycled rainwater12) Low flow toilet system13) Green roof over amenities14) High efficiency HVAC units

BUILDING SECTION

ROOF TOP RENDERING

Page 18: 300 FRONT ST. PROPOSAL

THANK YOU


Recommended