Contemporary designers creating residential proposals in sequence with open concept living and sustainable building design. The condominium proposal on 300 Front St. is our way of eliminating typical condo plans by incorporating a unique, iconic figure that will not only move its’ inhabitants but the Toronto community as a whole.
MISSION STATEMENT
SITE SURROUNDINGS
SOUTH EAST
SOUTH WEST
EASTNORTHWEST
SUN STUDY
7 AM 12 PM 4 PM
DESIGN PROCESS
STAGE 1 STAGE 2 STAGE 3 STAGE 5
3D VIEW: FINISH PRODUCT
3D VIEW 3D VIEW
andrew
SITE PLAN
FRONT STREET
JOHN
STR
EET
PARKING
Number of Parking Spaces 61Number of Handicap Spaces 6Total Number of Parking Spaces 67Total Number of Floors 5
PARKING LEVEL
GROUND FLOOR RENDERING
GROUND FLOOR PLAN
LEVEL 1 FLOOR PLAN
SUITE RENDERING
Alex
SUITE RENDERING
LEVEL 2 FLOOR PLAN
OUTDOOR SITTING AREA RENDERING
AMENITIES LEVEL
Level 14
Osama
INTERIOR KITCHEN VIEW
LEVEL 14 FLOOR PLAN
Penthouse
Ronaldo
LOFT SUITE RENDERING
PENTHOUSE PLAN
ELEVATIONS
ELEVATIONS
1) Photovoltaic Panels2) Low Voc Paint3) Natural Flooring4) Supplementary Cementing Materials5) Rainwater Collection6) Motion Censored Lighting7) Site Vegetation8) Bike racks on ground and parking levels
SUSTAINABLE BUILDING COMPONENTS
9) Low maintenance vegetation for dwelling10) Energy efficient washer/dryer11) Recycled rainwater12) Low flow toilet system13) Green roof over amenities14) High efficiency HVAC units
BUILDING SECTION
ROOF TOP RENDERING
THANK YOU