WILLIAM PATERSON UNIVERSITY
WIGHTMAN GYM
300 POMPTON ROAD WAYNE, NJ 07470
FACILITY ENERGY REPORT
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 1 of 25
TABLE OF CONTENTS
I. HISTORIC ENERGY CONSUMPTION/COST ................................................................. 2
II. FACILITY DESCRIPTION ................................................................................................ 7
III. MAJOR EQUIPMENT LIST .............................................................................................. 9
IV. ENERGY CONSERVATION MEASURES ..................................................................... 10
V. ADDITIONAL RECOMMENDATIONS ......................................................................... 25
Appendix A – ECM Cost & Savings Breakdown
Appendix B – New Jersey Smart Start® Program Incentives
Appendix C – Portfolio Manager “Statement of Energy Performance”
Appendix D – Major Equipment List
Appendix E – Investment Grade Lighting Audit
Appendix F – Vending Miser Analysis
Appendix G – Combined Heat and Power Analysis
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 2 of 25
I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: Public Service Electric & Gas Electric Utility Rate Structure: General Lighting & Power (GLP) Third Party Supplier: Hess Natural Gas Utility Provider: Public Service Electric & Gas Utility Rate Structure: General Service Gas (GSG) Third Party Supplier: Hess The electric usage profile represents the actual electrical usage for the facility. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile within each facility report shows the actual natural gas energy usage for the facility. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 3 of 25
Table 1 Electricity Billing Data
Utility Provider: PSE&GRate: GLP (General Power and Lighting Service)
Meter No: Part of Campus Customer ID No: 42-010-575-18 (Account #)
Third Party Utility Provider:TPS Meter / Acct No:
MONTH OF USECONSUMPTION
KWHTOTAL BILL
May-11 58,441 $8,359 Jun-11 63,766 $10,506 Jul-11 66,966 $12,036
Aug-11 48,181 $7,792 Sep-11 51,327 $9,131 Oct-11 48,794 $6,406 Nov-11 52,284 $6,861 Dec-11 57,979 $7,515 Jan-12 57,729 $7,489 Feb-12 56,350 $7,485 Mar-12 47,913 $6,415 Apr-12 42,264 $5,698 Totals 651,993 0.0 Max $95,694
AVERAGE DEMAND 0.0 KW average
AVERAGE RATE $0.147 $/kWh
0.00.0
0.0
0.0
0.0
0.0
ELECTRIC USAGE SUMMARY
0.0
0.00.0
DEMAND
0.00.00.0
Electric data for this facility was estimated based on size and type of facility, due to this meter being assigned to a total of six campus buildings.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 4 of 25
Figure 1 Electricity Usage Profile
00000111111
0
10,0
00
20,0
00
30,0
00
40,0
00
50,0
00
60,0
00
70,0
00
80,0
00
Demand (kW)
Usage (kWh)
Mon
th
Wig
htm
an G
ymE
lect
ric
Usa
ge P
rofi
le
May
-201
1 th
rou
gh A
pr-
2012
ELEC
TRIC
USA
GE
KW
H
DEM
AN
D K
W
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 5 of 25
Table 2 Natural Gas Billing Data
Utility Provider: PSE&GRate: GSG (General Service Gas)
Meter No: 2600277Point of Delivery ID: 6947815401
Third Party Utility Provider: HessTPS Meter No:
MONTH OF USE CONSUMPTION (THERMS) TOTAL BILL
May-11 3,368.08 $3,123.76Jun-11 1,372.52 $2,076.56Jul-11 359.87 $431.97
Aug-11 417.92 $489.09Sep-11 895.63 $934.79Oct-11 1,257.43 $1,260.51Nov-11 4,097.13 $5,174.80Dec-11 7,051.99 $8,049.95Jan-12 6,742.73 $7,735.84Feb-12 5,270.00 $5,999.47Mar-12 4,595.21 $5,341.88Apr-12 3,473.22 $3,212.60
TOTALS 38,901.71 $43,831.22
AVERAGE RATE: $1.13 $/THERM
NATURAL GAS USAGE SUMMARY
Peak Natural Gas Usage based on utility data.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 6 of 25
Figure 2 Natural Gas Usage Profile
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 7 of 25
II. FACILITY DESCRIPTION
The Wightman Gym is a 47,001 SF athletics facility built in 1960 with no renovations. The building is a two story facility with a basement comprised of gym spaces, pool, mechanical room, offices, and classrooms.
Occupancy Profile
The typical hours of operation for the Wightman Gymnasium are Monday through Thursday between 8:00 am and 9:00 pm, Friday and Saturday between 9:00 am and 5:00 pm. The Wightman Gym occupancy can vary during the day and this specific facility employs 22 people.
Building Envelope
The exterior walls for the Wightman Gym are brick faced. The amount of insulation within the walls is approximately ¾” foam insulation. The windows throughout the Wightman Gym are in good condition and appear to be maintained. Typical windows throughout the Wightman Gym are double pane, operable, ¼” clear glass with aluminum frames. . The roof is a flat, built up rubber roof where the HVAC equipment resides. The amount of insulation below the roofing ranges from 2” to 5” depending on the location and slope of the roof.
HVAC Systems
The Wightman Gym system consists of seven (7) hot water boilers, four (4) Air conditioning units, one (1) roof top unit and three (3) Heating & Ventilator units.
The boilers are gas-fired condensing hot water boilers with an input of 2,000 MBH and an output of 1,706 MBH. The boilers are manufactured by Aerco and have a boiler efficiency of 86%. These boilers serve the unit ventilators which run throughout the perimeter of the building. The boilers also serve the domestic hot water system, pool heating, and the hot water coils within the Heating & Ventilator units located in the attic. These boilers were installed nine years ago and operating within their ASHRAE recommended service life and are in good condition.
Hot water is circulated throughout the building’s heating hot water loop via eight (8) inline end suction circulating pumps. From the eight (8) pumps, P-7 & P-8 alternate run time for domestic hot water, Pumps P-9 & P-10 circulate pool heating water, and pumps P-1 to P-6 alternate operation for space heating hot water. These pumps have horsepower rating from 2 to 10. The circulating pumps are installed 4 years ago and appear to be in good condition.
The HV units manufactured by Trane serve the Gym and are located in the Attic. These units provide outside air and heating to the space. Each unit is equipped with a hot water coil and three way control valve. The HV units are over the ASHRAE recommended useful life and are good candidates for replacement. These units will be improved by new equipment with better operating efficiency.
The AC units are manufactured by York and only provide cooling throughout the office section of building. The Cooling Capacities of the AC units are from 4 to 12.5 Tons and are charged by Refrigerant R-22. These units were installed 20 years ago and are well past their useful service
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 8 of 25
life per ASHRAE. The only RTU manufactured by AAON is located on the lower roof level and has a cooling capacity of 4 tons. This unit (RTU-1) has included a cooling unit and a Central Furnace with a Heating input of 90 MBH supplied by natural gas. This unit is under ASHRAE recommended useful life and is in good condition.
The unit ventilators located in the Classrooms 202 & 203 are being served by the Gas-Fired hot water boilers. These units are currently defected and their function is trying to be replaced by electrical AC windows.
Exhaust System
Air is exhausted from the toilet rooms through the roof exhausters. The Gym Exhaust System is being served by four (4) EF units in the Attic above the Gym. These units are manufactured by Trane and are over useful life recommended by ASHRAE. These units are good candidate for replacement.
HVAC System Controls
Individual spaces temperature within the Wightman Gym is controlled through wall mounted thermostats. The Wightman Gym is one of the buildings controlled via vintage electronic controls, manufactured by Andover. The building equipment (unit ventilators, exhaust fans, H&V units) operational status (on/off) are controlled through a switchboard, located in the boiler room. Occupied modes are set for the same hours of operation in that 8:00 am to 9:00 pm from Monday to Thursday and 9:00 am to 5:00 pm on Friday and Saturday, the temperature set-points are approximately 72°F for cooling and 70°F for heating in occupied with roughly a 10 degree setback during unoccupied. The outside air is shut off from the building during unoccupied periods. The room set points are approximately 72°F for cooling and 70°F for heating.
Domestic Hot Water
Domestic hot water is provided by one (1) Indirect Fired Tank manufactured by Alfa Laval. The DHWH is located in the boiler room and the Domestic Hot water is circulated via two (2) Inline End Suction pumps. These pumps (P-9 & P-10) have 2 HP motors and have 2 minutes off delay run time after the call to run is removed.
Lighting
Refer to the Investment Grade lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 9 of 25
III. MAJOR EQUIPMENT LIST
The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment’s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix.
Refer to the Major Equipment List Appendix for this facility.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 10 of 25
IV. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed:
Table 1 ECM Financial Summary
ECM #1 AC Replacement $88,160 $1,400 63.0 -76.2%
ECM #2 NEMA Premium Efficiency Motor
$21,876 $1,027 21.3 -15.5%
ECM #3 Pool Cover $20,225 $1,734 11.7 -14.3%
ECM #4 Vending Miser Controls $300 $230 1.3 666.6%
ECM #5 100 kW CHP $375,000 $20,078 18.7 7.1%
ECM #6 Lighting Controls $5,180 $993 5.2 91.7%
Notes:
NET INSTALLATION
COSTA
ANNUAL
SAVINGSB
A. Cost takes into consideration applicable NJ Smart StartTM incentives.B. Savings takes into consideration applicable maintenance savings.
ECM NO.
DESCRIPTIONSIMPLE
PAYBACK (Yrs)
SIMPLE LIFETIME
ROI
ENERGY CONSERVATION MEASURES (ECM's)
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 11 of 25
Table 2 ECM Energy Summary
ECM #1 AC Replacement 5.6 9,521 0
ECM #2 NEMA Premium Efficiency Motor
2.6 6,988 0
ECM #3 Pool Cover 0.0 0 1,462
ECM #4 Vending Miser Controls 0.0 1,564 0
ECM #5 100 kW CHP 0.0 152,111 (31,214)
ECM #6 Lighting Controls 0.0 6,754 0
ECM NO.
DESCRIPTION
ANNUAL UTILITY REDUCTION
NATURAL GAS (THERMS)
ENERGY CONSERVATION MEASURES (ECM's)
ELECTRIC DEMAND
(KW)
ELECTRIC CONSUMPTION
(KWH)
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 12 of 25
Table 3 Facility Project Summary
AC Replacement $1,400 $90,000 $1,840 $88,160 63.0
NEMA Premium Efficiency Motor
$1,027 $22,916 $1,040 $21,876 21.3
Pool Cover $1,734 $20,225 $0 $20,225 11.7
Vending Miser Controls $230 $300 $0 $300 1.3
100 kW CHP $20,078 $475,000 $100,000 $375,000 18.7
Lighting Controls $993 $5,600 $420 $5,180 5.2
Design / Construction Extras (15%)
$92,106 $92,106 #DIV/0!
Total Project $25,462 $706,147 $103,300 $602,847 23.7
ENERGY SAVINGS IMPROVEMENT PROGRAM - POTENTIAL PROJECT
ENERGY CONSERVATION
MEASURES
ANNUAL ENERGY
SAVINGS ($)
PROJECT COST ($)
CUSTOMER COST
SIMPLE PAYBACK
SMART START
INCENTIVES
Design / Construction Extras is shown as an additional cost for the facility project summary. This cost is included to estimate the costs associated with construction management fees for a larger combined project.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 13 of 25
ECM #1: Replace AC Unit with High Efficiency Unit
Description:
The Wightman Gym Facility has four (4) AC units. The cooling capacities range from 4 to 13 Tons. These units are in good condition; however the current units in operation are not high efficiency units when compared to a modern unit. New condensing units provide higher full load and part load efficiencies due to advances in inverter motor technologies, heat exchangers and higher efficiency refrigerants such as R410A which would be used in place of R22 that is currently used in the units. This ECM includes one-for-one replacement of the older units with a new higher efficiency system. It is recommended to fully evaluate the capacity needed for all new systems prior to moving forward with this ECM. A summary of the unit replacement for this ECM can be found in the table below:
ECM INPUTS
SERVICE FORNUMBER OF UNITS
COOLING CAPACITY,
BTU/HR
TOTAL CAPACITY,
TONSREPLACE UNIT WITH
AC AC-1 1 72000 6 Carrier - Weathermaster 48HC - 6 TonAC AC-2 1 48000 4 Carrier - Weathermaster 48HC - 4 TonAC AC-3 1 72000 6 Carrier - Weathermaster 48HC - 6 TonAC AC-4 1 156,000 13.0 Carrier - Weathermaster 48HC 12.5 TonTotal 1 348,000 29.0
IMPLEMENTATION SUMMARY
The manufacturers used as the basis for the calculation is Carrier. Energy Savings Calculations: Cooling Energy Savings: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below:
Energy Savings, kWh = Cooling Capacity,BTUHr
× �1
SEEROld−
1SEERNew
� ×Operation Hours
1000 WkWh
Demand Savings, kW =Energy Savings (kWh)
Hours of Cooling
Cooling Cost Savings = Energy Savings, kWh × Cost of Electricity� $
kWh�
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 14 of 25
ECM INPUTS
COOLING CAPACITY,
BTU/Hr
ANNUAL COOLING
HOURS
EXISTING UNITS EER
AC UNITS EER# OF
UNITS
ENERGY SAVINGS
kWh
DEMAND SAVINGS
kWAC 72,000 1,131 8.5 EER 11.5 EER 1 2,499 1.5AC 48,000 1,131 10.5 EER 14 EER 1 1,293 0.8AC 72,000 1,131 8.5 EER 11.5 EER 1 2,499 1.5AC 156,000 1,131 9.5 EER 11.5 EER 1 3,230 1.9Total 1 9,521 5.6
ENERGY SAVINGS CALCULATIONS
Energy Savings Summary:
Installation Cost ($): $90,000NJ Smart Start Equipment Incentive ($): $1,840Net Installation Cost ($): $88,160Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $1,400Total Yearly Savings ($/Yr): $1,400Estimated ECM Lifetime (Yr): 15Simple Payback 63.0Simple Lifetime ROI -76.2%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $21,000Internal Rate of Return (IRR) -14%Net Present Value (NPV) ($71,446.89)
ECM #1 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 15 of 25
ECM #2: Install NEMA Premium® Efficiency Motors Description: Three (3) Heating and Ventilator units and hot water heating pump motors can be replaced with improved efficiency of the NEMA Premium® efficient motors due to better designs with use of better materials to reduce losses. Surprisingly, the electricity used to power a motor represents 95 % of its total lifetime operating cost. Because many motors operate continuously 24 hours a day, even small increases in efficiency can yield substantial energy and dollar savings. This energy conservation measure replaces existing inefficient electric motors with NEMA Premium® efficiency motors of 2 to 10 HP. NEMA Premium® is the most efficient motor designation in the marketplace today. IMPLEMENTATION SUMMARY
EQMTID
FUNCTIONMOTOR
HPHOURS OF
OPERATIONEXISTING
EFFICIENCY
NEMA PREMIUM
EFFICIENCYHV-1 Supply Fan 10 3,391 85.5% 92.4%HV-2 Supply Fan 10 3,391 85.5% 92.4%HV-3 Supply Fan 10 3,391 87.5% 92.4%HP-1 Hot Water Pump 10 2,000 89.5% 92.4%HP-2 Hot Water Pump 10 2,000 89.5% 92.4%HP-3 Hot Water Pump 3 2,000 84.0% 89.5%HP-4 Hot Water Pump 3 2,000 84.0% 89.5%HP-5 Hot Water Pump 7.5 2,000 88.5% 91.7%HP-6 Hot Water Pump 7.5 2,000 88.5% 91.7%HP-7 Domestic Hot Water Pump 3 1,373 84.0% 89.5%HP-8 Domestic Hot Water Pump 3 1,373 84.0% 89.5%HP-9 Pool Hot Water Pump 2 2,745 84.0% 86.5%HP-10 Pool Hot Water Pump 2 2,745 84.0% 86.5%
Energy Savings Calculations: Error! Bookmark not defined.
Electric usage, kWh =HP × LF × 0.746 × Hours of Operation
Motor Efficiency
where, HP = Motor Nameplate Horsepower Rating LF = Load Factor Motor Efficiency = Motor Nameplate Efficiency
ProposedExisting UsageElectricUsageElectrickWhSavings,UsageElectric −=
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 16 of 25
Electric Usage Savings, kWh = Electric UsageExisting − Electric UsageProposed
Electric cost savings = Electric Usage Savings × Electric Rate �$
kWh�
The calculations were carried out and the results are tabulated in the table below: PREMIUM EFFICIENCY MOTOR CALCULATIONS
EQMTID
MOTOR HP
LOAD FACTOR
EXISTING EFFICIENCY
NEMA PREMIUM
EFFICIENCY
POWER SAVINGS
kW
ENERGY SAVINGS
kWH
COST SAVINGS
HV-1 10 75% 85.5% 92.4% 0.49 1,666 $245HV-2 10 75% 85.5% 92.4% 0.49 1,666 $245HV-3 10 75% 87.5% 92.4% 0.34 1,156 $170HP-1 10 75% 89.5% 92.4% 0.20 395 $58HP-2 10 75% 89.5% 92.4% 0.20 395 $58HP-3 3 75% 84.0% 89.5% 0.12 247 $36HP-4 3 75% 84.0% 89.5% 0.12 247 $36HP-5 7.5 75% 88.5% 91.7% 0.17 333 $49HP-6 7.5 75% 88.5% 91.7% 0.17 333 $49HP-7 3 75% 84.0% 89.5% 0.12 169 $25HP-8 3 75% 84.0% 89.5% 0.12 170 $25HP-9 2 75% 84.0% 86.5% 0.04 106 $16
HP-10 2 75% 84.0% 86.5% 0.04 106 $16TOTAL 2.6 6,988 $1,027
Energy Savings Summary:
Installation Cost ($): $22,916NJ Smart Start Equipment Incentive ($): $1,040Net Installation Cost ($): $21,876Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $1,027Total Yearly Savings ($/Yr): $1,027Estimated ECM Lifetime (Yr): 18Simple Payback 21.3Simple Lifetime ROI -15.5%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $18,486Internal Rate of Return (IRR) -2%Net Present Value (NPV) ($7,751.14)
ECM #2 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 17 of 25
ECM #3: Pool Cover Description: The Pool is used throughout the year at the University however there is still a significant amount of time when the pool area is unoccupied. While the pool is occupied and unoccupied evaporation occurs from the pool to the space resulting in heat loss and water loss. As the evaporation occurs the buildings boiler system and domestic water system make up for the losses heat and water. Over the course of a year these losses add up to almost 70% of the operating cost of an indoor pool. This ECM recommends installing a pool cover that used during unoccupied periods to reduce the evaporation rate. This measure includes the purchasing of the cover and roller. Energy Savings Calculations: Savings are calculated based using the Shah described in “Calculating Evaporation from Indoor Water Pools” (Shah, 2004). Based on DOE data pool covers can save anywhere from 25% to 50% of the evaporative losses during unoccupied times. Water savings were also estimated for this ECM based on an estimated water rate of $5.00 per 1,000 gallons.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 18 of 25
ECM INPUTS EXISTING PROPOSED SAVINGS
Pool Area (sq-ft.) 5,382
Pool Temperature (oF) 82
Air Temperature (oF) 80
Evaporation Rate Occupied (lbs/hr)
215.28 215.28 0.00
Evaporation Rate Unoccupied (lbs/hr)
101.18 75.89 25.30
Occupied Hours per Year 3,368
Unoccupied Hours per Year 5,392
Pool Heater Efficiency 86.0%
Occupied Losses (kBtu) 777,227 777,227 0
Unoccupied Losses (kBtu) 584,822 438,617 146,206
Natural Gas Cost ($/therm) $1.13 $1.13
Water Cost ($/1000gal) $5.00 $5.00
ECM RESULTS EXISTING PROPOSED SAVINGS
Natural Gas Usage (therm) 13,620 12,158 1,462
Water Usage (1,000 gallons) 153 136 16
Energy Cost ($) $16,154 $14,420 $1,734
POOL COVER SAVINGS CALULATION
ENERGY SAVINGS CALCULATIONS
COMMENTS: Shah method described in “Calculating Evaporation from Indoor Water Pools” (Shah, 2004)
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 19 of 25
Energy Savings Summary:
Installation Cost ($): $20,225NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $20,225Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $1,734Total Yearly Savings ($/Yr): $1,734Estimated ECM Lifetime (Yr): 10Simple Payback 11.7Simple Lifetime ROI -14.3%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $17,340Internal Rate of Return (IRR) -3%Net Present Value (NPV) ($5,433.18)
ECM #3 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 20 of 25
ECM #4: Vending Miser Controls Description: The Wightman Gym currently has vending machines in the reception areas for the Wightman Gym which can be in use for a limited time during the day. The installation of the Vending Miser system will help reduce the operating hours of vending machines. Cold beverage machines regularly operate inefficiently trying to maintain a constant cool temperature within the machine and snack machines with no cooling usually have lights that operate 24/7. The VendingMiser® system incorporates innovative energy-saving technology into a small plug-and-play device that in conjunction with a passive infrared sensor regulate the operation of the cold beverage and snack machines based on occupancy and room temperature. This ECM approximates the installation of two (2) of these control systems, one (1) for the snack machines and one (1) for the cold beverage machines. Energy Savings Calculations: See Vending Miser Appendix for calculation methods and analysis. Energy Savings Summary:
Installation Cost ($): $300NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $300Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $230Total Yearly Savings ($/Yr): $230Estimated ECM Lifetime (Yr): 20Simple Payback 1.3Simple Lifetime ROI 1433.1%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $4,599Internal Rate of Return (IRR) 77%Net Present Value (NPV) $3,121.37
ECM #4 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 21 of 25
ECM #5: 100 kW Combined Heat and Power Description: Combined heat and power, or cogeneration is the simultaneous production of two useful forms of energy (electricity and thermal) from a single fuel source. The standard CHP system is comprised of a prime mover (reciprocating engine or turbine generator) and a heat recovery unit. The heat recovery unit utilizes the waste and exhaust heat from the prime mover to produce hot water or steam. The hot water or steam can in turn be utilized to produce chilled water. In some cases the prime mover exhaust can be directly vented into an absorption chiller, which will produce chilled water without the need for a heat recovery unit.
Depending on the design and application CHP systems can have total efficiencies of 70% to 90%. This is much higher than the traditional utility grid generation with simple cycle generators (25% to 45%) and combined cycle power plants (50% to 60%) due to the more complete utilization of the exhaust and/or waste heat from the prime mover. The higher efficiency of CHP can result in significant energy cost savings. In addition the higher fuel efficiency results in lower emissions per unit of power produced compared to traditional electrical and steam generating units.
The efficiency and cost savings of CHP systems depend on the complete use of the exhaust thermal energy from the prime mover. The economics of CHP are very sensitive to the thermal energy production and consumption. If the prime mover exhaust thermal energy cannot be completely used, the system efficiency is reduced, which will negatively impact the project lifecycle cost and payback. Therefore when examining a potential CHP system it is important to consider the thermal load profiles first and then review the electrical profiles.
Based on review of the existing facilities thermal load and the year round nature of the pool load it was determined that only a small combined heat and power plant could be installed on site that would operate at peak efficiency. The analysis assumes the plant will operate year round at a 92% availability, which takes into account periodic downtime for maintenance. Based on the load information we recommend the installation of one TeCogen 100 kW engine. The proposed plant will recover the waste engine heat and utilize it for domestic hot water, building space heating, and pool heating. The installation will include the necessary heat exchangers, electrical interconnection equipment, and radiator. Energy Savings Calculations: See Appendix for Combined Heat and Power Analysis. Incentives for this measure are based on current NJ Clean Energy CHP Incentive Program.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 22 of 25
DESCRIPTION VALUEAnnual Offset Electric, kWh 499,882Annual Offset Natural Gas, Th 35,016Annual CHP Natural Gas Usage, Th 66,230
ENERGY SUMMARY TABLE
Electric Usage, kWh 651,993Natural Gas Usage, Th 38,902Total Energy Cost $139,802
Electric Usage, kWh 152,111Natural Gas Usage, Th 70,116Total Energy Cost $101,591
Savings $38,211
EXISTING ENERGY COST W/OUT CHP
PROPOSED ENERGY COST W/ CHP
Energy Savings Summary:
Installation Cost ($): $475,000NJ Smart Start Equipment Incentive ($): $100,000Net Installation Cost ($): $375,000Maintenance Savings ($/Yr): ($18,133)Energy Savings ($/Yr): $38,211Total Yearly Savings ($/Yr): $20,078Estimated ECM Lifetime (Yr): 20Simple Payback 18.7Simple Lifetime ROI 7.1%Simple Lifetime Maintenance Savings ($362,660)Simple Lifetime Savings $401,560Internal Rate of Return (IRR) 1%Net Present Value (NPV) ($76,290.06)
ECM #5 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 23 of 25
ECM #6: Lighting Controls Description: While many of the areas of the facility utilize occupancy sensors to control the operation of lights, some of the lights in the building are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off.
Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report:
• Occupancy Sensors for Lighting Control 20% - 28% energy savings.
Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors and daylight sensors. This ECM includes installation of ceiling or switch mount sensors for the weight room, auxiliary gym, offices, locker rooms, and classroom. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations:
( )( )kWh/YrEnergyLightControlledSavings%SavingsEnergy ×=
( )
×=
kWh$CostElecAvekWhSavingsEnergySavings.
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 24 of 25
Energy Savings Summary:
Installation Cost ($): $5,600NJ Smart Start Equipment Incentive ($): $420Net Installation Cost ($): $5,180Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $993Total Yearly Savings ($/Yr): $993Estimated ECM Lifetime (Yr): 10Simple Payback 5.2Simple Lifetime ROI 91.7%Simple Lifetime Maintenance Savings 0Simple Lifetime Savings $9,930Internal Rate of Return (IRR) 14%Net Present Value (NPV) $3,290.49
ECM #6 - ENERGY SAVINGS SUMMARY
William Paterson University – Wightman Gym Energy Audit
Concord Engineering Group, Inc. 9C12007 December 19, 2012 – FINAL Page 25 of 25
V. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less.
A. Install sub metering equipment to track electric usage for this facility.
B. Small Lighting Upgrade See Appendix E for three (3) T12 fixtures to be retrofitted and one (1) LED Exit Sign.
C. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.
D. Maintain all weather stripping on windows and doors.
E. Clean all light fixtures to maximize light output.
F. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ.
G. Ensure outside air dampers are functioning properly and only open during occupied mode.
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX A
APPENDIX A1 of 1
LIFETIME ENERGY SAVINGS
LIFETIME MAINTENANCE
SAVINGSLIFETIME ROI SIMPLE PAYBACK
INTERNAL RATE OF RETURN (IRR)
NET PRESENT VALUE (NPV)
MATERIAL LABORREBATES,
INCENTIVES
NET INSTALLATION
COSTENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime)
(Yearly Maint Svaing * ECM Lifetime)
(Lifetime Savings - Net Cost) / (Net Cost)
(Net cost / Yearly Savings)
($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($)
ECM #1 AC Replacement $50,000 $40,000 $1,840 $88,160 $1,400 $0 $1,400 15 $21,000 $0 -76.2% 63.0 -14.20% ($71,446.89)
ECM #2 NEMA Premium Efficiency Motor $13,682 $9,234 $1,040 $21,876 $1,027 $0 $1,027 18 $18,486 $0 -15.5% 21.3 -1.72% ($7,751.14)
ECM #3 Pool Cover $15,898 $4,327 $0 $20,225 $1,734 $0 $1,734 10 $17,340 $0 -14.3% 11.7 -2.70% ($5,433.18)
ECM #4 Vending Miser Controls $300 $0 $0 $300 $230 $0 $230 10 $2,300 $0 666.6% 1.3 76.39% $1,661.69
ECM #5 100 kW CHP $325,000 $150,000 $100,000 $375,000 $38,211 ($18,133) $20,078 20 $401,560 -$362,660 7.1% 18.7 0.66% ($76,290.06)
ECM #6 Lighting Controls $4,800 $800 $420 $5,180 $993 $0 $993 10 $9,930 $0 91.7% 5.2 14.00% $3,290.49
Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period.2) The variable DR in the NPV equation stands for Discount Rate3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period .
ECM COST & SAVINGS BREAKDOWN
CONCORD ENGINEERING GROUP
WPU – Wightman Gym
INSTALLATION COST YEARLY SAVINGS
ECM LIFETIMEDESCRIPTIONECM NO.
ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX B
Appendix B Page 1 of 4
Concord Engineering Group, Inc. 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508
SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives as of February 15, 2011:
Electric Chillers Water-Cooled Chillers $12 - $170 per ton
Air-Cooled Chillers $8 - $52 per ton
Energy Efficiency must comply with ASHRAE 90.1-2007
Gas Cooling Gas Absorption Chillers $185 - $400 per ton
Gas Engine-Driven Chillers Calculated through custom measure
path)
Desiccant Systems $1.00 per cfm – gas or electric
Electric Unitary HVAC Unitary AC and Split Systems $73 - $92 per ton
Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton
Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton
Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat
(Hospitality & Institutional Facility) $75 per thermostat
Energy Efficiency must comply with ASHRAE 90.1-2007
Gas Heating
Gas Fired Boilers < 300 MBH $300 per unit
Gas Fired Boilers ≥ 300 - 1500 MBH $1.75 per MBH
Gas Fired Boilers ≥1500 - ≤ 4000 MBH $1.00 per MBH
Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure
Path)
Gas Furnaces $300 - $400 per unit, AFUE ≥ 92%
Appendix B Page 2 of 4
Ground Source Heat Pumps
Closed Loop $450 per ton, EER ≥ 16 $600 per ton, EER ≥ 18 $750 per ton, EER ≥ 20
Energy Efficiency must comply with ASHRAE 90.1-2007
Variable Frequency Drives Variable Air Volume $65 - $155 per hp
Chilled-Water Pumps $60 per VFD rated hp
Compressors $5,250 to $12,500 per drive
Cooling Towers ≥ 10 hp $60 per VFD rated hp
Natural Gas Water Heating
Gas Water Heaters ≤ 50 gallons, 0.67 energy factor or better
$50 per unit
Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH
Gas-Fired Booster Water Heaters $17 - $35 per MBH
Gas Fired Tankless Water Heaters $300 per unit
Prescriptive Lighting Retro fit of T12 to T-5 or T-8 Lamps
w/Electronic Ballast in Existing Facilities
$10 per fixture (1-4 lamps)
Replacement of T12 with new T-5 or T-8 Lamps w/Electronic Ballast in
Existing Facilities $25 per fixture (1-4 lamps)
Replacement of incandescent with screw-in PAR 38 or PAR 30 (CFL)
bulb $7 per bulb
T-8 reduced Wattage (28w/25w 4’, 1-4 lamps)
Lamp & ballast replacement $10 per fixture
Hard-Wired Compact Fluorescent $25 - $30 per fixture
Metal Halide w/Pulse Start Including Parking Lot
$25 per fixture
T-5 and T-8 High Bay Fixtures $16 - $200 per fixture
HID ≥ 100w Retrofit with induction lamp, power coupler and generator
(must be 30% less watts/fixture than HID system)
$50 per fixture
HID ≥ 100w Replacement with new HID ≥ 100w
$70 per fixture
Appendix B Page 3 of 4
Prescriptive Lighting - LED
LED New Exit Sign Fixture Existing Facility < 75 kw Existing Facility > 75 kw
$20 per fixture $10 per fixture
LED Display Case Lighting $30 per display case
LED Shelf-Mtd. Display & Task Lights $15 per linear foot
LED Portable Desk Lamp $20 per fixture
LED Wall-wash Lights $30 per fixture
LED Recessed Down Lights $35 per fixture LED Outdoor Pole/Arm-Mounted Area
and Roadway Luminaries $175 per fixture
LED Outdoor Pole/Arm-Mounted Decorative Luminaries
$175 per fixture
LED Outdoor Wall-Mounted Area Luminaries
$100 per fixture
LED Parking Garage Luminaries $100 per fixture
LED Track or Mono-Point Directional Lighting Fixtures
$50 per fixture
LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs.
$150 per fixture
LED High-Bay-Aisle Lighting $150 per fixture
LED Bollard Fixtures $50 per fixture
LED Linear Panels (2x2 Troffers only) $100 per fixture
LED Fuel Pump Canopy $100 per fixture
LED Refrigerator/Freezer case lighting replacement of fluorescent in medium
and low temperature display case
$42 per 5 foot $65 per 6 foot
Appendix B Page 4 of 4
Lighting Controls – Occupancy Sensors
Wall Mounted $20 per control Remote Mounted $35 per control
Daylight Dimmers $25 per fixture
Occupancy Controlled hi-low Fluorescent Controls
$25 per fixture controlled
Lighting Controls – HID or Fluorescent Hi-Bay Controls Occupancy hi-low $75 per fixture controlled Daylight Dimming $75 per fixture controlled
Daylight Dimming - office $50 per fixture controlled
Premium Motors Three-Phase Motors $45 - $700 per motor
Fractional HP Motors Electronic Communicated Motors (replacing shaded pole motors in
refrigerator/freezer cases)
$40 per electronic communicated motor
Other Equipment Incentives
Performance Lighting
$1.00 per watt per SF below program incentive threshold, currently 5% more energy efficient than ASHRAE 90.1-
2007 for New Construction and Complete Renovation
Custom Electric and Gas Equipment Incentives
not prescriptive
Custom Measures
$0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year
payback on estimated savings. Minimum required savings of 75,000 KWh or 1,500 Therms and a IRR of at
least 10%. Multi Measures Bonus 15%
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX C
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEWightman Gym
Building ID: 3255350 For 12-month Period Ending: April 30, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: September 18, 2012
FacilityWightman Gym300 Pompton RoadWayne, NJ 07470
Facility OwnerWilliam Paterson University300 Pompton Road Wayne, NJ 07470
Primary Contact for this FacilityN/A
Year Built: 1960Gross Floor Area (ft2): 47,001
Energy Performance Rating2 (1-100) N/A
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 0 Natural Gas - (kBtu)4 0 Total Energy (kBtu) 0
Energy Intensity4 Site (kBtu/ft2/yr) Source (kBtu/ft2/yr) N/A Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) N/A Electric Distribution Utility Public Service Electric & Gas Co National Median Comparison National Median Site EUI 104 National Median Source EUI 244 % Difference from National Median Source EUI Building Type College/University
(Campus-Level)
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
ENERGY STAR®
Data Checklistfor Commercial Buildings
In order for a building to qualify for the ENERGY STAR, a Professional Engineer (PE) or a Registered Architect (RA) must validate the accuracy of the data underlyingthe building's energy performance rating. This checklist is designed to provide an at-a-glance summary of a property's physical and operating characteristics, as well asits total energy consumption, to assist the PE or RA in double-checking the information that the building owner or operator has entered into Portfolio Manager.
Please complete and sign this checklist and include it with the stamped, signed Statement of Energy Performance.NOTE: You must check each box to indicate that each value is correct, OR include a note.
CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES
Building Name Wightman Gym Is this the official building name to be displayed inthe ENERGY STAR Registry of LabeledBuildings?
Type College/University(Campus-Level)
Is this an accurate description of the space inquestion?
Location 300 Pompton Road, Wayne,
NJ 07470 Is this address accurate and complete? Correctweather normalization requires an accurate zipcode.
Single Structure Single Facility
Does this SEP represent a single structure? SEPscannot be submitted for multiple-buildingcampuses (with the exception of a hospital, k-12school, hotel and senior care facility) nor can theybe submitted as representing only a portion of abuilding.
Wightman Gym (Other)
CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES
Gross Floor Area 47,001 Sq. Ft.
Does this square footage include all supportingfunctions such as kitchens and break rooms usedby staff, storage areas, administrative areas,elevators, stairwells, atria, vent shafts, etc. Alsonote that existing atriums should only include thebase floor area that it occupies. Interstitial(plenum) space between floors should not beincluded in the total. Finally gross floor area is notthe same as leasable space. Leasable space is asubset of gross floor area.
Number of PCs N/A(Optional) Is this the number of personal computers in thespace?
Weekly operatinghours N/A(Optional)
Is this the total number of hours per week that thespace is 75% occupied? This number shouldexclude hours when the facility is occupied only bymaintenance, security, or other support personnel.For facilities with a schedule that varies during theyear, "operating hours/week" refers to the totalweekly hours for the schedule most often followed.
Workers on MainShift N/A(Optional)
Is this the number of employees present during themain shift? Note this is not the total number ofemployees or visitors who are in a building duringan entire 24 hour period. For example, if there aretwo daily 8 hour shifts of 100 workers each, theWorkers on Main Shift value is 100.
Page 1 of 2
ENERGY STAR®
Data Checklistfor Commercial Buildings
Energy ConsumptionPower Generation Plant or Distribution Utility: Public Service Electric & Gas Co
Fuel Type: Electricity
Meter: Electric #6947815401 (kWh (thousand Watt-hours))Space(s): Entire Facility
Generation Method: Grid Purchase
Start Date End Date Energy Use (kWh (thousand Watt-hours))
04/01/2012 04/30/2012 0.00
03/01/2012 03/31/2012 0.00
02/01/2012 02/29/2012 0.00
01/01/2012 01/31/2012 0.00
12/01/2011 12/31/2011 0.00
11/01/2011 11/30/2011 0.00
10/01/2011 10/31/2011 0.00
09/01/2011 09/30/2011 0.00
08/01/2011 08/31/2011 0.00
07/01/2011 07/31/2011 0.00
06/01/2011 06/30/2011 0.00
05/01/2011 05/31/2011 0.00
Electric #6947815401 Consumption (kWh (thousand Watt-hours)) 0.00
Electric #6947815401 Consumption (kBtu (thousand Btu)) 0.00
Total Electricity (Grid Purchase) Consumption (kBtu (thousand Btu)) 0.00
Is this the total Electricity (Grid Purchase) consumption at this building including allElectricity meters?
Additional FuelsDo the fuel consumption totals shown above represent the total energy use of this building?Please confirm there are no additional fuels (district energy, generator fuel oil) used in this facility.
On-Site Solar and Wind EnergyDo the fuel consumption totals shown above include all on-site solar and/or wind power located atyour facility? Please confirm that no on-site solar or wind installations have been omitted from thislist. All on-site systems must be reported.
Certifying Professional (When applying for the ENERGY STAR, the Certifying Professional must be the same PE or RA that signed and stamped the SEP.)
Name: _____________________________________________ Date: _____________
Signature: ______________________________________ Signature is required when applying for the ENERGY STAR.
Page 2 of 2
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityWightman Gym300 Pompton RoadWayne, NJ 07470
Facility OwnerWilliam Paterson University300 Pompton Road Wayne, NJ 07470
Primary Contact for this FacilityN/A
General InformationWightman Gym
Gross Floor Area Excluding Parking: (ft2) 47,001 Year Built 1960 For 12-month Evaluation Period Ending Date: April 30, 2012
Facility Space Use SummaryWightman Gym
Space Type
Other -College/University(Campus-Level)
Gross Floor Area (ft2) 47,001
Number of PCs o N/A
Weekly operating hours o N/A
Workers on Main Shift o N/A
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 04/30/2012)
Baseline(Ending Date 06/30/2009) Rating of 75 Target National Median
Energy Performance Rating N/A N/A 75 N/A N/A
Energy Intensity
Site (kBtu/ft2) N/A 6 0 N/A 104
Source (kBtu/ft2) N/A 6 N/A N/A 244
Energy Cost
$/year N/A $ 4,695.89 N/A N/A N/A
$/ft2/year N/A $ 0.10 N/A N/A N/A
Greenhouse Gas Emissions
MtCO2e/year N/A 15 N/A N/A N/A
kgCO2e/ft2/year N/A 0 N/A N/A N/A
More than 50% of your building is defined as College/University (Campus-Level). This building is currently ineligible for a rating. Please note the National Mediancolumn represents the CBECS national median data for College/University (Campus-Level). Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX D
Appendix D
Page 1 of 7
AC UnitsTag AC-1 AC-2 AC-3
Unit Type Air Cooled Unit Air Cooled Unit Central Cooling Air Cooled
Qty 1 1 1
Location West Lower Roof East Lower Roof Middle Lower Roof
Area ServedSpace Classrrom
TrainingSpace Classrrom
Training Classrooms
Manufacturer YORK YORK YORK
Model # DCHB-T076AA DCHB-T048AA DCHB-T076AA
Serial # NLAM1613930 NKAM54738 NLAM161392
Cooling Type R-22 R-22 R-22
Cooling Capacity (Tons) 6 4 6
Cooling Efficiency (SEER/EER)
8 EER (est.) 8 EER (est.) 8 EER (est.)
Heating Type None None None
Heating Input (MBH) N/A N/A N/A
Efficiency N/A N/A N/A
Fuel N/A N/A N/A
Approx Age 20 20 20
ASHRAE Service Life 15 15 15
Remaining Life (5) (5) (5)
Comments 208-230/3/60; 1 HP SF 208-230/3/60 208-230/3/60; 1 HP SF
Note:
MAJOR EQUIPMENT LISTConcord Engineering Group
Wightman Gym
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D
Page 2 of 7
AC UnitsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model #
Serial #
Cooling Type
Cooling Capacity (Tons)
Cooling Efficiency (SEER/EER)
Heating Type
Heating Input (MBH)
Efficiency
Fuel
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
AC-4 RTU-1Central Cooling Air
Cooled Roof Top Unit
1 1
Middle Lower Roof Middle Lower Roof
Classrooms Office Space
YORK AAON
DBHB-T150AA RK-04-2-EO-222
NGAM142713 20012-AKGC19747
R-22 Cooling Unit
12.5 4
8 EER (est.) -
None Central Furnace
N/A 90
N/A -
N/A Natural Gas
20 11
15 15
(5) 4
208-230/3/60; 5 HP SF
Appendix D
Page 3 of 7
AHUsTag HV-1, 2 & 3
Unit TypeHeating & Ventilator
Units
Qty 3
Location Attic
Area Served Gym
Manufacturer Trane
Model # V315C3
Serial # D927-01/80/81
Cooling Type N/A
Cooling Capacity (Tons) N/A
Cooling Efficiency (SEER/EER)
N/A
Heating Type Hot Water Coil
Heating Input (MBH) -
Efficiency N/A
Fuel N/A
Approx Age 20
ASHRAE Service Life 15
Remaining Life (5)
Comments The Attic is located right above the Gym.
Note:
MAJOR EQUIPMENT LISTConcord Engineering Group
Wightman Gym
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D
Page 4 of 7
BoilersTag B-1 TO 7
Unit TypeGas Fired Hot Water
Boiler
Qty 7
Location MER
Area Served HW Loop of the Gym
Manufacturer AERCO
Model # BMK 2.0
Serial #G-03-
0448/0444/0445/0443/0449/0446/0447
Input Capacity (Btu/Hr) 2,000,000
Rated Output Capacity (Btu/Hr)
1,706,000
Approx. Efficiency % 85.3%
Fuel Natural Gas
Approx Age 9
ASHRAE Service Life 24
Remaining Life 15
Comments
Note:
MAJOR EQUIPMENT LIST
Concord Engineering Group
Wightman Gym
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D
Page 5 of 7
Domestic Water HeatersTag Domestic Hot Water
Unit Type Indirect Fired Tank
Qty 1
Location Boiler Room
Area ServedDomestic Hot Water
System
Manufacturer Alfa Laval
Model # M6-FG
Serial # 30105-71311
Size (Gallons) -
Input Capacity (MBH/KW)
-
Recovery (Gal/Hr) N/A
Efficiency % N/A
Fuel N/A
Approx Age 9
ASHRAE Service Life 12
Remaining Life 3
Comments Area: 117.82 sqft
Note:
MAJOR EQUIPMENT LIST
Concord Engineering Group
Wightman Gym
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D
Page 6 of 7
PumpsTag HP-1 & 2 HP-3 & 4 HP-5 & 6
Unit Type Inline End Suction Inline End Suction Inline End Suction
Qty 2 2 2
Location MER MER MER
Area Served Attic Training Rooms & South End Office HW Loop
Manufacturer Bell & Gossett Bell & Gossett Bell & Gossett
Model # 80 BF-8-750 - 80 BF-8-8.750
Serial # CQ1444-01-F30 - CQ1447-01 F30/02 F30
Horse Power 10 3 7.5
Flow 310 GPM @ 60 FT.Hd. - 225 GPM @ 70 FT.Hd.
Motor InfoMarathon. Model
AVDMarathon. Model
AVDMarathon. Model
AVD
Electrical Power 230/460/3/60 230/460/3/60 230/460/3/60%
RPM 1745 1740 1745
Motor Efficiency % 89.5% 84.0% 88.5%
Approx Age 4 4 4
ASHRAE Service Life 20 20 20
Remaining Life 16 16 16
Comments
Note:
MAJOR EQUIPMENT LISTConcord Engineering Group
Wightman Gym
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D
Page 7 of 7
PumpsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model #
Serial #
Horse Power
Flow
Motor Info
Electrical Power
RPM
Motor Efficiency %
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
HP-7 & 8 DHWP-9 & 10
Inline End Suction Inline End Suction
2 2
MER MER
Domestic Hot Water HX Pool Hot Water HX
Bell & Gossett Bell & Gossett
- 80 BF 6.625
- 07-0498
3 2
- 57 GPM @ 40 FT.Hd.
Marathon. Model AVD
US Motor: Model G152
230/460/3/60 230/460/3/60
1740 1740
84.0% 84.0%
4 4
20 20
16 16
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX E
CEG Project #:
Facility Name:
Address:
City, State, Zip
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackControl Ref
#Controls Description
Qty of Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
242.22 Lobby 30002x4, 4 Lamp, 32w T8, Elect.
Ballast, Recessed Mnt., Parabolic Lens
4 104 4 0.42 1,248 Existing to Remain 0 4 104 0 0.42 1,248 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
221.11 Weight room 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 6 0.37 967 Existing to Remain 0 2 62 0 0.37 967 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 193 $28
221.11 Men's Restroom 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 1 0.06 161 Existing to Remain 0 2 62 0 0.06 161 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
237.22 G110A Lab 2600
2x2, 3 Lamp, 31w T8 Ulamp, Elect. Ballast,
Recessed Mnt., Prismatic Lens
3 92 12 1.10 2,870 Existing to Remain 0 3 92 0 1.10 2,870 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 574 $84
221.11 Men's Locker Room 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 9 0.56 1,451 Existing to Remain 0 2 62 0 0.56 1,451 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 290 $43
601 Men's Locker Room 8760 (2) 7w CFL Exit Sign 2 16 1 0.02 140 Remove and Return LED Exit Sign 1 2 1 0.00 18 0.01 123 $18 $25.00 $100.00 $125.00 $0.00 6.93 0 No New Controls 0 0.0% 0 $0
237.22 Men's locker Room Hall 3000
2x2, 3 Lamp, 31w T8 Ulamp, Elect. Ballast,
Recessed Mnt., Prismatic Lens
3 92 4 0.37 1,104 Existing to Remain 0 3 92 0 0.37 1,104 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
242.21 110 Trainer 26002x4, 4 Lamp, 32w T8, Elect.
Ballast, Recessed Mnt., Prismatic Lens
4 107 12 1.28 3,338 Existing to Remain 0 4 107 0 1.28 3,338 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 668 $98
2242.21 Ice 2600 "Industrial" Relector, 26w CFL 1 26 2 0.05 135 Existing to Remain 0 1 26 0 0.05 135 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
222.34 Women's Locker Room 2600
2x4, 2 Lamp, 32w Elect. Ballast, Pendant Mnt., No
Lens2 58 10 0.58 1,508 Existing to Remain 0 2 58 0 0.58 1,508 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4
Dual Technology Occupancy Sensor - Remote
Mnt.1 20.0% 302 $44
242.24 Gym 26002x4, 4 Lamp, 32w T8, Elect.
Ballast, Recessed Mnt., Parabolic Lens
4 104 36 3.74 9,734 Existing to Remain 0 4 104 0 3.74 9,734 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
3 20.0% 1,947 $286
211.11 Mechanical Room 12001x4, 1 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
1 28 6 0.17 202 Existing to Remain 0 1 28 0 0.17 202 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
331.11 Pool 2600 1x4, 3 Lamp, 54w T5HO Fixture 3 177 10 1.77 4,602 Existing to Remain 0 3 177 0 1.77 4,602 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4
Dual Technology Occupancy Sensor - Remote
Mnt.2 20.0% 920 $135
221.11 Pool 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 9 0.56 1,451 Existing to Remain 0 2 62 0 0.56 1,451 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 290 $43
221.11 Men's Room 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 3 0.19 484 Existing to Remain 0 2 62 0 0.19 484 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
221.11 Women's Room 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 3 0.19 484 Existing to Remain 0 2 62 0 0.19 484 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
221.11 Aux Gym 26001x4, 2 Lamp, 32w T8, Elect.
Ballast, Surface Mnt., Prismatic Lens
2 62 15 0.93 2,418 Existing to Remain 0 2 62 0 0.93 2,418 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
2 20.0% 484 $71
121.44 Back Stairwell 30001x4, 2-Lamp, 34w T12,
Mag. Ballast, Wall Mnt., No Lens
2 78 3 0.23 702 Reballast & Relamp Sylvania Lamp FO28/841/SS/ECO 2 50 3 0.15 450 0.08 252 $37 $75.00 $150.00 $225.00 $225.00 0.00 0 No New Controls 0 0.0% 0 $0
221.11 107 Men's Locker Room 2600
1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,
Prismatic Lens2 62 3 0.19 484 Existing to Remain 0 2 62 0 0.19 484 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
221.11 109 Women's Locker Room 2600
1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,
Prismatic Lens2 62 3 0.19 484 Existing to Remain 0 2 62 0 0.19 484 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
227.22 Pool Lobby 30002x2, 2 Lamp, 32w T8, Elect.
Ballast, Recessed Mnt., Parabolic Lens
2 58 6 0.35 1,044 Existing to Remain 0 2 58 0 0.35 1,044 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
227.21 Classroom 202 26002x4, 2 Lamp, 32w Elect.
Ballast, Pendant Mnt., No Lens
2 58 9 0.52 1,357 Existing to Remain 0 2 58 0 0.52 1,357 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 271 $40
227.21 Classroom 203 26002x4, 2 Lamp, 32w Elect.
Ballast, Pendant Mnt., No Lens
2 58 9 0.52 1,357 Existing to Remain 0 2 58 0 0.52 1,357 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 271 $40
227.21 204 Lab 26002x4, 2 Lamp, 32w Elect.
Ballast, Pendant Mnt., No Lens
2 58 18 1.04 2,714 Existing to Remain 0 2 58 0 1.04 2,714 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 4Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 543 $80
Retrofit Energy SavingsExisting Fixtures Proposed Fixtures Retrofit
9C12007
Wightman Gym
Wayne, NJ
Proposed Lighting ControlsLighting Retrofit Costs
Pompton Road
Appendix E - Lighting Audit - Wightman Gym.xlsx Page 1
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings, kW
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackControl Ref
#Controls Description
Qty of Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Retrofit Energy SavingsExisting Fixtures Proposed Fixtures Retrofit Proposed Lighting ControlsLighting Retrofit Costs
651 Custodial Closet 1200 "Industrial" Relector, 26w CFL 1 26 1 0.03 31 Existing to Remain 0 1 26 0 0.03 31 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
227.21 2nd Floor Hall 30002x4, 2 Lamp, 32w Elect.
Ballast, Pendant Mnt., No Lens
2 58 5 0.29 870 Existing to Remain 0 2 58 0 0.29 870 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
227.21 Hall 30002x4, 2 Lamp, 32w Elect.
Ballast, Pendant Mnt., No Lens
2 58 5 0.29 870 Existing to Remain 0 2 58 0 0.29 870 0.00 0 $0 $0.00 $0.00 $0.00 $0.00 - 0 No New Controls 0 0.0% 0 $0
TOTAL 205 16 42,211 4 15.90 41,836 0.10 375 $55 $100.00 $250.00 $350.00 $225.00 16 6,754 $993
Appendix E - Lighting Audit - Wightman Gym.xlsx Page 2
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX F
Energy Analysis Prepared For: Energy Costs ($0.000 per kwh) $0.147Facility Occupied Hours per Week 102
Wightman Gym Number of Cold Drink Vending Machines 1Number of Uncooled Snack Machines 1
www.VendingMiserStore.com Power Requirements of Cold Drink Machine (avg watts) 427Power Requirements of Snack Machine (avg watts) 100VendingMiser Sale Price (for cold drink machines) $200.00OfficeMiser Sale Price (for snack machines) $100.00
Savings AnalysisBefore After
Cold Drink Machines $550.23 $370.71 Cost of Operation3,743 2,522 kWh
33% % Energy Savings
Snack Machines $128.42 $77.97 Cost of Operation874 530 kWh
39% % Energy Savings
Project Summary
Present kWh Projected kWh kWh Savings per Year
4,617 3,052 1,564
Present Cost Projected Costs Annual Savings Per Cent Savings Total Project Cost Break Even (Months)
$678.65 $448.68 $229.97 34% $300.00 15.7
Five Year Savings on 2 Machines = $1,149.85Five Year Return on Investment = 283%
Version 1.0
Input Variables
Cold Drink and Snack Vending Machine Energy Conservation Project
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
Year 1 Year 2 Year 3 Year 4 Year 5
Five Year Operational Costs for Vending Machines
Cost Without Misers
Cost With Miser
Appendix Energy Audit
Concord Engineering Group, Inc.
APPENDIX G
Jan-12 100.0 8,643 67,079 458,866 579,875 0 0 294 66,785 121,009Feb-12 100.0 7,806 60,588 414,459 453,220 0 0 265 60,322 38,760Mar-12 79.3 6,725 53,179 378,194 395,188 0 0 294 52,885 16,994Apr-12 61.9 5,121 40,195 300,814 298,697 2,118 10 284 39,900 0May-12 58.1 4,999 38,978 296,083 289,655 6,428 31 294 38,654 0Jun-12 40.0 3,588 25,966 218,809 118,037 100,772 481 284 25,201 0Jul-12 40.0 3,708 26,832 226,102 30,949 195,153 931 294 25,607 0Aug-12 40.0 3,708 26,832 226,102 35,941 190,161 907 294 25,631 0Sep-12 40.0 3,588 25,966 218,809 77,024 141,785 676 284 25,005 0Oct-12 40.0 3,708 26,832 226,102 108,139 117,963 563 294 25,975 0Nov-12 73.0 5,993 47,415 342,553 352,353 0 0 284 47,131 9,800Dec-12 100.0 8,643 67,079 458,866 606,471 0 0 294 66,785 147,605TOTAL 64.4 66,230 506,940 3,765,759 3,345,547 754,380 3,598 3,460 499,882 334,168
651,99338,902
499,882152,111
66,2303,886
70,116$38,211
71.22%
Rejected Heat, kBtu
Existing Facility Electric Usage (kWh)
Add'l Parasitic Electric,
Additional Heating Gas Usage (therm)
Existing Facility Natural Gas Usage (therm)CHP Generated Electric (kWh)Total Utility Purchased Electric (kWh)CHP Gas Usage (therm)
ANALYSIS COMBINED HEAT AND POWER OPERATION W/ RADIATORLoad
Capacity, kW
Fuel Usage, therms
Electric Generation,
kWh
Recoverable Heat, kBtu
Actual Heat Load, kBtu
Month
Total Natural Gas Usage (therm)
Operating System Efficiency
Annual Utility Cost Savings
Electric to Reject Heat,
kWh
Net Electric Generation,
kWh
Alt. Heat Source
Load, kBtu
Page 1 of 3
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
Jan. Feb. Mar. Apr May Jun July Aug. Sept. Oct. Nov. Dec.
DE
MA
ND
(K
W)
EL
EC
TR
IC (
KW
H)
MONTH
CHP OPERATION W/ RADIATOR (MIN LOAD) ELECTRIC
CHP Electric Generation Remaining Electric Load CHP Load Pre-CHP Electric Demand
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
Jan. Feb. Mar. Apr May Jun July Aug. Sept. Oct. Nov. Dec.
TH
ER
MA
L L
OA
D (
KB
TU
)
MONTH
CHP OPERATION W/ RADIATOR (MIN LOAD) THERMAL
Recovered Heat Remaining Load Rejected Heat
Page 2 of 3
ECONOMIC ANALYSIS: WPU - WIGHTMAN GYM 100 KW COMBINED HEAT AND POWER PROJECTGross Construction Cost $475,000 Electric Rate ($/kWh) $0.1470 Existing Plant Thermal Efficiency 86%NJ CHP Incentive $100,000 Natural Gas Rate ($/Th) $1.1300 CHP Availability 92%Matching Utility Incentive $0 CHP Gas Rate ($/Th) $1.1300 CHP Average Load Factor 64%Net Construction Cost $375,000 Utility Escalation Rate 3%
Maintenance Escalation 2% Federal Tax Rate 0%Interest Rate (10 yr) 3.50%Discount Rate 8%
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Total Existing Electric Usage (kWh) 651,993Existing Natural Gas Usage (Th) 38,902NG Used for Hot Water Heating (Th) 38,902
CHP OperationGross Electric Generation (kWh) 506,940 506,940 506,940 506,940 506,940 506,940 506,940 506,940 506,940 506,940 5,069,399Parasitic Electric Usage (kWh) 7,058 7,058 7,058 7,058 7,058 7,058 7,058 7,058 7,058 7,058 70,579Net Electric Generation (kWh) 499,882 499,882 499,882 499,882 499,882 499,882 499,882 499,882 499,882 499,882 4,998,819CHP NG Fuel Usage (Th) 66,230 66,230 66,230 66,230 66,230 66,230 66,230 66,230 66,230 66,230 662,301Gross Recovered Heat (Th) 37,658 37,658 37,658 37,658 37,658 37,658 37,658 37,658 37,658 37,658 376,576Unused/Rejected Heat (Th) 7,544 7,544 7,544 7,544 7,544 7,544 7,544 7,544 7,544 7,544 75,438Net Recovered Heat (Th) 30,114 30,114 30,114 30,114 30,114 30,114 30,114 30,114 30,114 30,114 301,138Offset Natural Gas Usage (Th) 35,016 35,016 35,016 35,016 35,016 35,016 35,016 35,016 35,016 35,016 350,160Additional Thermal Gas Usage (Th) 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886 3,886 38,857
Utility SavingsGenerated Electric Value $73,483 $75,687 $77,958 $80,296 $82,705 $85,187 $87,742 $90,374 $93,086 $95,878 $842,396Recovered Thermal Value $39,568 $40,755 $41,978 $43,237 $44,534 $45,870 $47,246 $48,664 $50,124 $51,627 $453,604Gross Utility Cost Savings $113,051 $116,442 $119,936 $123,534 $127,240 $131,057 $134,989 $139,038 $143,209 $147,506 $1,296,000
CHP Operating CostsNatural Gas Fuel Cost $74,840 $77,085 $79,398 $81,780 $84,233 $86,760 $89,363 $92,044 $94,805 $97,649 $857,957Annual Maintenance Costs $18,133 $18,496 $18,866 $19,243 $19,628 $20,021 $20,421 $20,829 $21,246 $21,671 $198,553Gross Operating Costs $92,973 $95,581 $98,264 $101,023 $103,861 $106,781 $109,784 $112,873 $116,051 $119,320 $1,056,510
Net Annual Operating Savings $20,078 $20,861 $21,672 $22,511 $23,379 $24,276 $25,205 $26,165 $27,158 $28,185 $239,490
Project CostsReceived NJ Incentive $0 $100,000Capital Outlay ($71,250)Financed Amount $403,750Interest Expense ($14,131) ($12,927) ($11,680) ($10,390) ($9,054) ($7,672) ($6,241) ($4,760) ($3,228) ($1,642) ($81,725)Principle Payment ($34,416) ($35,621) ($36,867) ($38,158) ($39,493) ($40,876) ($42,306) ($43,787) ($45,320) ($46,906) ($403,750)Total Payment ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($48,547) ($485,475)
Tax BenefitsBuisness Energy Investment Tax Credit $0Bonus Depreciation (Year 1) 0%MACRS Accelerated Depreciation 0% 0% 0.00% 0.00% 0.00% 0.00%End of Year Depreciable Costs*Bonus Depreciation (Year 1) $0Accelperated Depreciation $0 $0 $0 $0 $0 $0Total Depreciation $0 $0 $0 $0 $0 $0Cash Value of Depreciation $0 $0 $0 $0 $0 $0
Net Cashflow ($71,250) ($28,470) $72,314 ($26,875) ($26,037) ($25,169) ($24,271) ($23,343) ($22,382) ($21,389) ($20,362) ($217,235)Cumulative Cashflow ($99,720) ($27,406) ($54,282) ($80,318) ($105,487) ($129,758) ($153,101) ($175,484) ($196,873) ($217,235)
Simple Payback, yrs*: 18.68Net Present Value: ($142,921)
Internal Rate of Return: -COMMENTS: 1. Depreciation Value based on Project Cost after incentives.
2. Simple payback is calculated based on Year 1 operating savings only. 3. Th = Therms