+ All Categories
Home > Documents > 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project,...

310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project,...

Date post: 28-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
540
A-Number Status Submitted Period Title Tenement No 96153 CONFIDENTIAL 03/01/2013 10/2011 - 10/2012 Gidgee South Project, Annual Report for the period 02/10/2011 to 01/10/2012, E57/417.....E457/876; M57/429 & 485; P57/1149...........P57/1273. [C106/1995] E 5700417 E 5700687 E 5700688 E 5700793 E 5700807 E 5700823 E 5700824 E 5700876 M 5700429 M 5700485 96158 CONFIDENTIAL 02/01/2013 01/2012 - 12/2012 Binduli Project, Annual Report for the period 1st January 2012 to 31st December 2012, M26/346, 499, 549 & 621; P26/3575, 3578, 3584-3589, 3582 -3583 & 3579-3581; P24/4253; E26/127. [C66/2009] M 2600346 M 2600499 M 2600549 M 2600621 96159 CONFIDENTIAL 02/01/2013 01/2012 - 12/2012 Combined Annual Technical Report for C294-1997 For the period: 1st January 2012 to 31 December 2012 Menzies Project Mining Leases 29/14, 29/88, 29/153, 29/154, 29/212 and 29/184. Prospecting Licences 29/1862-1865, 29/2094-2097, E29/772, P29/2165 to 2167, P29/2172, P29/2176, P29/2177, P29/2112, P29/2216 M 2900014 M 2900088 M 2900153 M 2900154 M 2900184 M 2900212 96182 CONFIDENTIAL 04/01/2013 10/2011 - 10/2012 Weld Range Project, Annual Report for the period 16th October 2011 to 15th October 2012, M20/246; M51/434-719; P51/1564-1579. [C99/1995] M 2000246 M 5100434 M 5100442 M 5100443 M 5100457 M 5100481 M 5100498 Printed: 18/02/2019 02:28:38 PM Page 1 of 540 INTERNAL\MIGSDFM 310 - Sunset Clause Report Range of Submitted Dates: 01/01/2013 to 31/12/2013 Status: CONFIDENTIAL
Transcript
Page 1: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96153 CONFIDENTIAL 03/01/2013 10/2011 - 10/2012 Gidgee South Project, Annual Report for the period 02/10/2011 to 01/10/2012, E57/417.....E457/876; M57/429 & 485; P57/1149...........P57/1273. [C106/1995]

E 5700417

E 5700687

E 5700688

E 5700793

E 5700807

E 5700823

E 5700824

E 5700876

M 5700429

M 5700485

96158 CONFIDENTIAL 02/01/2013 01/2012 - 12/2012 Binduli Project, Annual Report for the period 1st January 2012 to 31st December 2012, M26/346, 499, 549 & 621; P26/3575, 3578, 3584-3589, 3582-3583 & 3579-3581; P24/4253; E26/127. [C66/2009]

M 2600346

M 2600499

M 2600549

M 2600621

96159 CONFIDENTIAL 02/01/2013 01/2012 - 12/2012 Combined Annual Technical Report for C294-1997 For the period: 1st January 2012 to 31 December 2012 Menzies Project Mining Leases 29/14, 29/88, 29/153, 29/154, 29/212 and 29/184. Prospecting Licences 29/1862-1865, 29/2094-2097, E29/772, P29/2165 to 2167, P29/2172, P29/2176, P29/2177, P29/2112, P29/2216

M 2900014

M 2900088

M 2900153

M 2900154

M 2900184

M 2900212

96182 CONFIDENTIAL 04/01/2013 10/2011 - 10/2012 Weld Range Project, Annual Report for the period 16th October 2011 to 15th October 2012, M20/246; M51/434-719; P51/1564-1579. [C99/1995]

M 2000246

M 5100434

M 5100442

M 5100443

M 5100457

M 5100481

M 5100498

Printed: 18/02/2019 02:28:38 PMPage 1 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 2: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

GATEWAY MINING LIMITEDESTUARY RESOURCES PTY LTD

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

ESTUARY RESOURCES PTY LTDGATEWAY MINING LIMITED

ESTUARY RESOURCES PTY LTDGATEWAY MINING LIMITED

BLACK MOUNTAIN GOLD LIMITED

INTERMIN RESOURCES LTD

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 2 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 3: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96182 CONFIDENTIAL 04/01/2013 10/2011 - 10/2012 Weld Range Project, Annual Report for the period 16th October 2011 to 15th October 2012, M20/246; M51/434-719; P51/1564-1579. [C99/1995]

M 5100719

P 5101564

P 5101565

P 5101566

P 5101567

P 5101568

P 5101569

P 5101570

P 5101571

P 5101572

P 5101573

P 5101574

P 5101575

P 5101576

P 5101577

P 5101578

P 5101579

96183 CONFIDENTIAL 04/01/2013 07/2011 - 07/2012 Yilgangi Project, Annual Report for the period 3rd July 2011 to 2nd July 2012, E31/721, 814, 958, 959; P31/1815, 1832-1834. [C162/2008]

E 3100814

96186 CONFIDENTIAL 04/01/2013 10/2011 - 10/2012 Croydon Project, Annual Report for the period 13/10/2011 to 12/10/2012, E47/2150.

E 4702150

96215 CONFIDENTIAL 07/01/2013 11/2011 - 11/2012 Trump Project, Annual Report for the period 9th November 2011 to 8th November 2012, P24/4094.

P 2404094

96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090.

P 2404090

96220 CONFIDENTIAL 08/01/2013 11/2011 - 11/2012 Paynesville - Hannah May Project, Annual Report for the period 9th November 2011 to 8th November 2012, M58/264.

M 5800264

96226 CONFIDENTIAL 09/01/2013 10/2011 - 10/2012 Aldiss Project, Annual Report for the period 06/10/2011 to 05/10/2012, E28/469-470, 1681, 2113, 2152, 2167-2168, 2229-2230; M28/43, 171 & 208. [ C63/2000]

E 2800469

E 2800470

E 2802229

M 2800043

M 2800171

M 2800208

Printed: 18/02/2019 02:28:38 PMPage 3 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 4: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PODIUM MINERALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

SARACEN GOLD MINES PTY LTD

COLCHIS RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

RISESHINE PTY LTD

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 4 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 5: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96231 CONFIDENTIAL 10/01/2013 10/2011 - 10/2012 Long Victor Mine M15-1761, M15/1762, M15/1763, M26/317 and M26/491 Annual Combined Report C012/2008. 6 October 2011 to 5 October 2012

M 1501761

M 1501762

M 1501763

M 2600317

M 2600491

96235 CONFIDENTIAL 10/01/2013 12/2011 - 12/2012 Hubert Well (Mesa A) Project, Annual Report for the period 5th December 2011 to 4th December 2012, E08/1453.

E 0801453

96238 CONFIDENTIAL 10/01/2013 10/2011 - 10/2012 Deception Project, Annual Report for the period 13th October 2011 to 12th October 2012, M77/1257.

M 7701257

96239 CONFIDENTIAL 10/01/2013 10/2011 - 10/2012 Deception Project, Annual Report for the period 13th October 2011 to 12th October 2012, M77/1258

M 7701258

96240 CONFIDENTIAL 10/01/2013 10/2011 - 10/2012 Evanston Project, Annual Report for the period 13/10/2011 to 12/10/2012, M77/1259.

M 7701259

96244 CONFIDENTIAL 11/01/2013 01/2012 - 01/2013 Goongarrie Project, Annual Report for the period 8th January2012 to 7th January 2013, E29/412; M29/420; P29/1954-1955, 2070 & 2073.[C219/2010]

M 2900420

P 2901954

P 2901955

96247 CONFIDENTIAL 11/01/2013 11/2011 - 11/2012 Annual Report E28/1724 for the period from the 12th of November 2011 to the 11th of November 2012.

E 2801724

96255 CONFIDENTIAL 11/01/2013 11/2011 - 11/2012 Mount McMahon Project, Annual Report for the period 26th November 2011 to 25th November 2012, M74/184.

M 7400184

96256 CONFIDENTIAL 11/01/2013 11/2011 - 11/2012 Mosaic Project, Annual Report for the period 26th November 2011 to 25th November 2012, M74/136.

M 7400136

96257 CONFIDENTIAL 11/01/2013 11/2011 - 11/2012 Mt McMahon Project, Annual Report for the period 26th November 2011 to 25th November 2012, M74/165.

M 7400165

96260 CONFIDENTIAL 14/01/2013 02/2012 - 01/2013 Annual Report on ML29/189 Menzies for the period 01/02/2012 to 31/01/2013 M 2900189

96272 CONFIDENTIAL 14/01/2013 11/2011 - 11/2012 Mt Egerton Project, Annual Report for the period 20th November 2011 to 19th November 2012, E52/2117.

E 5202117

96273 CONFIDENTIAL 14/01/2013 12/2011 - 12/2012 Annual Report Malcolm Project M37/1164 for the period 8th December 2011 – 7th December 2012

M 3701164

96276 CONFIDENTIAL 14/01/2013 11/2011 - 11/2012 Mulga Downs Project, Annual Report for the period 7th November 2011 to 6th November 2012, E45/3593, 3617-3618, ; E47/2117 & M47/206. [C115/2007]

E 4503593

E 4701244

E 4702117

Printed: 18/02/2019 02:28:38 PMPage 5 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 6: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

INDEPENDENCE LONG PTY LTD

INDEPENDENCE LONG PTY LTD

INDEPENDENCE LONG PTY LTD

INDEPENDENCE LONG PTY LTD

INDEPENDENCE LONG PTY LTD

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

BLACK MOUNTAIN GOLD LIMITED

METALIKO RESOURCES LIMITED

METALIKO RESOURCES LIMITED

INDEPENDENCE NOVA PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

RIQO PTY LTD

EGERTON EXPLORATION PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

MULGA DOWNS IRON ORE PTY LTD

MULGA DOWNS INVESTMENTS PTY LTDMULGA DOWNS IRON ORE PTY LTD

HANCOCK PROSPECTING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 6 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 7: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96276 CONFIDENTIAL 14/01/2013 11/2011 - 11/2012 Mulga Downs Project, Annual Report for the period 7th November 2011 to 6th November 2012, E45/3593, 3617-3618, ; E47/2117 & M47/206. [C115/2007]

M 4700206

96287 CONFIDENTIAL 18/01/2013 11/2011 - 11/2012 Ponton Project, Annual Report for the period 12th November 2011 to 11th November 2012, E28/1716-1718 & E28/1727.

E 2801716

E 2801717

E 2801718

E 2801727

96289 CONFIDENTIAL 17/01/2013 08/2011 - 08/2012 Kintore Partnership Project, Annual Report for the period 18th August 2011 to 17th August 2012, M16/289 & M16/351. [ C100/2012]

M 1600289

M 1600351

96293 CONFIDENTIAL 15/01/2013 01/2012 - 12/2012 Corunna Downs Project, E45/3324 2585-I 3320-I 3321-I 3322 3323 & E45/3579 ANNUAL TECHNICAL REPORT To the Department of Mines and Petroleum For the Period Ending 31 December 2012

E 4502585

E 4503320

E 4503321

E 4503579

96294 CONFIDENTIAL 15/01/2013 11/2011 - 11/2012 Paulsens Project, Annual Report for the period 14th November 2011 to 13th November 2012, E08/1649, 1744, 1745, 1845, 2251-2252; E47/1134 & 1553; M08/99, 196 & 222; P08/516, 543, 544, 565; P47/1313.[C211/1997]

E 0801649

E 0801744

E 0801745

E 0801845

E 4701553

M 0800099

M 0800196

M 0800222

96297 CONFIDENTIAL 16/01/2013 11/2011 - 11/2012 Annual Technical Report Mining Lease 25/104, For the period 18 November 2011 to 17 November 2012

M 2500104

96298 CONFIDENTIAL 16/01/2013 10/2011 - 10/2012 Mt Pleasant Project, Annual Report for the period 19th October 2011 to 18th October 2012, P24/4418-4430, 4406 & 4468. [C46/2010]

P 2404418

P 2404419

Printed: 18/02/2019 02:28:38 PMPage 7 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 8: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MULGA DOWNS INVESTMENTS PTY LTDMULGA DOWNS IRON ORE PTY LTD

PONTON MINERALS PTY LTD

PONTON MINERALS PTY LTD

PONTON MINERALS PTY LTDLEGEND MINING LIMITED

PONTON MINERALS PTY LTDLEGEND MINING LIMITED

DEVANT PTY LTDSOS ENTERPRISES PTY LTDDUGGAN DEANNA MARJORIEDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

DEVANT PTY LTDDUGGAN DEANNA MARJORIESOS ENTERPRISES PTY LTDDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

HBJ MINERALS PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 8 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 9: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96298 CONFIDENTIAL 16/01/2013 10/2011 - 10/2012 Mt Pleasant Project, Annual Report for the period 19th October 2011 to 18th October 2012, P24/4418-4430, 4406 & 4468. [C46/2010]

P 2404420

P 2404421

P 2404422

P 2404423

P 2404424

P 2404425

P 2404426

P 2404427

P 2404428

P 2404429

P 2404468

96303 CONFIDENTIAL 16/01/2013 12/2011 - 12/2012 Brockman Syncline Project, Annual Report for the period 18th December 2011 to 17th December 2012, E47/31 & E47/1038. [C118/1996]

E 4700031

E 4701038

96304 CONFIDENTIAL 17/01/2013 12/2011 - 12/2012 Clara Hills Project, Annual Report for the period 04/12/2011 to 03/12/2012, E04/1533.

E 0401533

96306 CONFIDENTIAL 18/01/2013 10/2011 - 10/2012 Annual Report Jubuk Combined Reporting Group C70/2011 (E70/3536, E70/3716, E70/3782, E70/3888)Western Australia Reporting period 23 October 2011 to 22 October 2012

E 7003536

96312 CONFIDENTIAL 17/01/2013 05/2001 - 10/2012 Yilgarn (Iron Ore) Project, Final Surrender Report for the period 2nd May 2001 to 25th October 2012, E77/946. [C83/2003]

E 7700946

96313 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 Soansville /Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2011 to 30th November 2012 M45/847, M45/588, P45/2250, P45/2269, P45/2292, P45/2293, P45/2294, P45/2296, P45/2297, P45/2298

M 4500588

M 4500847

P 4502250

96314 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 North Pole Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/302, 328-329, 395, 442, 514, 648-651, 665; E45/3218 & 3219. [C282/1997]

M 4500302

M 4500328

M 4500329

M 4500395

M 4500442

M 4500514

M 4500648

M 4500649

Printed: 18/02/2019 02:28:38 PMPage 9 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 10: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

ALEXANDER CREEK PTY LTD

NORTHAM IRON PTY LTD

POLARIS METALS PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NL

HAOMA MINING NL

HAOMA MINING NL

ELAZAC MINING PTY LTD

HAOMA MINING NL

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 10 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 11: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96314 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 North Pole Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/302, 328-329, 395, 442, 514, 648-651, 665; E45/3218 & 3219. [C282/1997]

M 4500650

M 4500651

M 4500665

96315 CONFIDENTIAL 21/01/2013 11/2011 - 11/2012 Bamboo Creek Project, Annual Report for the period 27th November 2011 to 26th November 2012, E45/2982 & 3217; M45/411, 480-481 & 874; P45/2227, 2242-2244, 2301, 2329-2330, 2336 & 2342. [C280/1997]

E 4503217

M 4500411

M 4500480

M 4500481

M 4500874

P 4502227

P 4502242

P 4502243

P 4502244

P 4502301

P 4502329

P 4502330

P 4502336

P 4502342

96316 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14...........M45/873; P45/2133................P45/2391.

M 4500014

M 4500016

M 4500057

M 4500076

M 4500235

M 4500240

M 4500284

M 4500296

Printed: 18/02/2019 02:28:38 PMPage 11 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 12: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NL

MCPHERSON KENNETH JOHN

HAOMA MINING NLKITCHENER MINING NL

HAOMA MINING NLKITCHENER MINING NL

HAOMA MINING NL

ELAZAC MINING PTY LTD

KITCHENER MINING NL

KITCHENER MINING NL

KITCHENER MINING NL

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NL

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

KERAS (PILBARA) GOLD PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 12 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 13: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96316 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14...........M45/873; P45/2133................P45/2391.

M 4500297

M 4500385

M 4500438

M 4500453

M 4500459

M 4500478

M 4500490

M 4500515

M 4500521

M 4500547

M 4500554

M 4500589

M 4500606

M 4500607

M 4500655

M 4500671

M 4500672

M 4500678

M 4500679

M 4500680

M 4500682

M 4500692

M 4500873

P 4502133

P 4502134

Printed: 18/02/2019 02:28:38 PMPage 13 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 14: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

STUBBS JEANETTE RAE

HAOMA MINING NLELAZAC MINING PTY LTD

STUBBS MICHAEL GLEN

HAOMA MINING NL

KERAS (PILBARA) GOLD PTY LTD

KERAS (PILBARA) GOLD PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

TODD GEORGE WILLIAM

HAOMA MINING NLELAZAC MINING PTY LTD

HAOMA MINING NL

HAOMA MINING NLELAZAC MINING PTY LTD

KERAS (PILBARA) GOLD PTY LTD

KERAS (PILBARA) GOLD PTY LTD

ELAZAC MINING PTY LTD

KERAS (PILBARA) GOLD PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

KERAS (PILBARA) GOLD PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTDBHP BILLITON NICKEL WEST PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 14 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 15: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96316 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14...........M45/873; P45/2133................P45/2391.

P 4502231

P 4502251

P 4502275

P 4502288

P 4502316

P 4502317

P 4502331

P 4502356

P 4502391

96317 CONFIDENTIAL 21/01/2013 12/2011 - 11/2012 Stirling Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/238, 346, 357; M46/43-44, 160 & 177. [C286/1997]

M 4500238

M 4500346

M 4500357

M 4600043

M 4600044

M 4600177

96318 CONFIDENTIAL 18/01/2013 10/2011 - 10/2012 Kumarina Project, Annual Report for the period 22nd October 2011 to 21st October 2012, M52/27 & E52/1998. [C173/2010]

E 5201998

M 5200027

96326 CONFIDENTIAL 18/01/2013 10/2011 - 10/2012 Scotia - Goongarrie Project, Annual Report for the period 2nd October 2011 to 1st October 2012, M24/279 & 336;E29/162, 529, 661 & 719; P29/1932-1933, 2025, 2105, 2117-2121. [C589/1994]

E 2900162

E 2900661

M 2400336

96333 CONFIDENTIAL 21/01/2013 11/2011 - 11/2012 Mount Weld Project, Annual Report for the period 25th November 2011 to 24th November 2012, M38/58-59, 326-327 ; E38/2558. [C56/1999]

E 3802558

M 3800058

M 3800059

M 3800326

M 3800327

Printed: 18/02/2019 02:28:38 PMPage 15 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 16: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAOMA MINING NLELAZAC MINING PTY LTDBHP BILLITON NICKEL WEST PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTDBHP BILLITON NICKEL WEST PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTDBHP BILLITON NICKEL WEST PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NLELAZAC MINING PTY LTDBHP BILLITON NICKEL WEST PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NL

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

STUBBS STUART HENRY

MURCHISON COPPER MINES PTY LTD

MURCHISON COPPER MINES PTY LTD

SCOTIA NICKEL PTY LTD

SHINE RESOURCES PTY LTD

SHINE RESOURCES PTY LTD

MT WELD MINING PTY LIMITED

MT WELD MINING PTY LIMITED

MT WELD MINING PTY LIMITED

MT WELD MINING PTY LIMITED

MT WELD MINING PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 16 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 17: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96335 CONFIDENTIAL 21/01/2013 09/2011 - 08/2012 Spitfire Resources South Woodie Woodie Project Combined Annual Report Number C171/2007 1st September 2011, to 1st September 2012

E 4600616

E 4600787

E 4600835

96341 CONFIDENTIAL 21/01/2013 11/2011 - 10/2012 Annual Report for the period 1 November 2011 to 31 October 2012, Cockatoo Island, E04/1131, M04/235, M04/448

E 0401131

M 0400235

M 0400448

96344 CONFIDENTIAL 22/01/2013 01/2011 - 12/2012 Mt. Minnie E08/2041 Surrender Report for the period 21/01/2011 to 05/12/2012

E 0802041

96345 CONFIDENTIAL 22/01/2013 11/2011 - 11/2012 Annual report for the period 9th Nov 2011 to 8th Nov 2012, Argyle Smoke Creek Project , P80/1712 to 1725 and P80/1734 to 1741 (Combined Report C305/2011)

P 8001712

P 8001734

P 8001735

P 8001736

P 8001737

96346 CONFIDENTIAL 23/01/2013 12/2011 - 12/2012 Panhandle Annual Technical Report E47/30 for the period 18 December 2011 – 17 December 2012

E 4700030

96347 CONFIDENTIAL 22/01/2013 12/2011 - 12/2012 Annual Tenement Report for E16/396, Credo Project, for the period ending 08/12/2012

E 1600396

96350 CONFIDENTIAL 23/01/2013 10/2011 - 10/2012 Combined Annual Report (C103/2010) for E59/875, E59/1732, M59/166, P59/1952 Magnetite Range Project for the Period Ending 4 October 2012.

E 5900875

M 5900166

96351 CONFIDENTIAL 23/01/2013 11/2011 - 11/2012 Annual Report for M80/492 Ashmore Diamond Project 25th November 2011 to 24th November 2012

M 8000492

96355 CONFIDENTIAL 22/01/2013 11/2011 - 11/2012 Meckering Project, Annual Report for the period 30th November 2011 to 29th November 2012, E70/3923.

E 7003923

96356 CONFIDENTIAL 21/01/2013 11/2011 - 11/2012 Waite Kauri Project, Annual Report for the period 14th November 2011 to 13th Novembe 2012, M37/1216.

M 3701216

96357 CONFIDENTIAL 21/01/2013 10/2011 - 10/2012 Linden Project, Annual Report for the period 16th October 2011 to 15th October 2012, P39/4637-4638 & E39/1375. [C40/2009]

P 3904637

P 3904638

96367 CONFIDENTIAL 22/01/2013 09/2011 - 09/2012 Gabanintha Project P51/2332 Annual Report for the period 10/09/2011 – 09/09/2012

P 5102332

96368 CONFIDENTIAL 22/01/2013 11/2011 - 11/2012 Gabanintha Project E51/1415 Annual Report for the period 12/11/2011 to 11/11/2012

E 5101415

96371 CONFIDENTIAL 24/01/2013 11/2011 - 11/2012 2012 Combined Annual Report Area 2 - Toodyay for the period 30 November 2011 to 29 November 2012, E70/3002, 3003, 3064, 3159, 3160, 3432, 3564, 3597, 3598, 3651, 3706, 3731, 3828, 3900, 4021, 4022 & 4151. C181/2011

E 7003002

Printed: 18/02/2019 02:28:38 PMPage 17 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 18: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PLANET MINING PTY LTDSPITFIRE AUSTRALIA (SWW) PTY LTD

SPITFIRE AUSTRALIA (SWW) PTY LTD

BELLPIPER PTY LTD

PLUTON RESOURCES LIMITED

PEARL GULL PTY LTD

PLUTON RESOURCES LIMITED

TWELVE MILE PTY LTD

ORDRIVER MINING PTY LTD

ORDRIVER MINING PTY LTD

ORDRIVER MINING PTY LTD

ORDRIVER MINING PTY LTD

ORDRIVER MINING PTY LTD

HAMERSLEY EXPLORATION PTY LIMITED

SANDHU TANVANTH SINGH

ACCENT RESOURCES NL

ACCENT RESOURCES NL

STRIKER DIAMONDS PTY LTD

DANA MINERALS PTY LTD

NIWEST LIMITED

GOLDEN CLIFFS NL

GOLDEN CLIFFS NL

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

YANKUANG RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 18 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 19: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96371 CONFIDENTIAL 24/01/2013 11/2011 - 11/2012 2012 Combined Annual Report Area 2 - Toodyay for the period 30 November 2011 to 29 November 2012, E70/3002, 3003, 3064, 3159, 3160, 3432, 3564, 3597, 3598, 3651, 3706, 3731, 3828, 3900, 4021, 4022 & 4151. C181/2011

E 7003064

E 7003159

E 7003160

E 7003432

E 7003598

E 7003731

E 7003900

E 7004021

96379 CONFIDENTIAL 29/01/2013 11/2011 - 11/2012 Mt Celia Project, Annual Report for the period 30th November 2011 to 29th November 2012, E39/1443; P39/5001-5007. [C21/2010]

E 3901443

P 3905001

P 3905002

P 3905003

P 3905004

P 3905005

P 3905006

P 3905007

96381 CONFIDENTIAL 29/01/2013 10/2011 - 10/2012 Combined Annual Report on Exploration for the period 16/10/2011 to 15/10/2012; Mitchell Well Project; C292/2011, M38/0547, P38/3504, P38/3505, P38/3506

M 3800547

96386 CONFIDENTIAL 25/01/2013 11/2011 - 11/2012 Annual Report for the period 30th November 2011 to 29th November 2012, Fig Tree – C24/2010, E47/1612, E47/1702 & P47/1555

E 4701702

96387 CONFIDENTIAL 25/01/2013 10/2011 - 10/2012 Cue Project, Annual Report for the period 27th October 2011 to 28th October 2012, E20/714 & E20/755. [C342/2011]

E 2000714

96389 CONFIDENTIAL 25/01/2013 12/2011 - 12/2012 Mt Farquhar Project Combined Annual Report (C145/1999) P47/1350, P47/1351, P47/1352, E47/1779 and E47/1780 for the period 1 January 2012 – 31 December 2012

E 4701779

E 4701780

Printed: 18/02/2019 02:28:38 PMPage 19 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 20: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

BAUXITE RESOURCES LIMITED

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

LEGACY IRON ORE LTD

FOCUS MINERALS LTD

FMG PILBARA PTY LTD

CULLEN EXPLORATION PTY LIMITED

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

Printed: 18/02/2019 02:28:38 PMPage 20 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 21: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96390 CONFIDENTIAL 25/01/2013 12/2011 - 12/2012 Angelo River Project, Annual Report for the period 22nd Ecember 2011 to 21st December 2012, E47/754, 1050, 1795, 2086 & E52/1459. [C146/2002]

E 4700754

E 4701050

E 4701795

E 4702086

E 5201459

96409 CONFIDENTIAL 31/01/2013 12/2011 - 11/2012 Angelo C115/2011 Annual report for the period 1st of December 2011 to 30th of November 2012 E52/2034, E52/2035, E52/2470, E52/2594, E52/2621, E52/2699, E52/2738, E52/2739

E 5202034

E 5202035

E 5202594

96410 CONFIDENTIAL 31/01/2013 12/2011 - 11/2012 Bellary Project Combined Reporting Group C116/2011 Annual report for the period 1 December 2011 to 30 November 2012 E47/1681, E47/2229, E47/2238 – 2244, P47/1536, P47/1537

E 4702239

E 4702240

96411 CONFIDENTIAL 31/01/2013 11/2011 - 10/2012 Windarling Project P77/3412, P77/3414, P77/3552 (C241/2011) Yilgarn Mineral Field Combined Annual Report for the period 1 November 2011 to 31 October 2012

P 7703412

Printed: 18/02/2019 02:28:38 PMPage 21 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 22: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

ROBE RIVER MINING CO. PTY LIMITEDMITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

SOUTHERN CROSS GOLDFIELDS LTD

Printed: 18/02/2019 02:28:38 PMPage 22 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 23: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96411 CONFIDENTIAL 31/01/2013 11/2011 - 10/2012 Windarling Project P77/3412, P77/3414, P77/3552 (C241/2011) Yilgarn Mineral Field Combined Annual Report for the period 1 November 2011 to 31 October 2012

P 7703414

P 7703552

96413 CONFIDENTIAL 31/01/2013 11/2011 - 11/2012 Annual Technical Report for the period 2 November 2011 to 1 November 2012, Yanks Bore Project, Exploration Licence E08/1135

E 0801135

96415 CONFIDENTIAL 31/01/2013 01/2012 - 12/2012 South West Project C3/2003 Annual Combined Report for the period 01 January 2012 to 31 December 2012, E70/2372, E70/2464, E70/3681, E70/3682, P70/1583, P70/1584, P70/1585, P70/1586, P70/1587

E 7002372

E 7002464

96417 CONFIDENTIAL 30/01/2013 12/2011 - 12/2012 C187/2008 – Buckland Hills Project Annual Report For the Period 21st December 2011 to 20th December 2012, E08/1554, E47/1538, E08/1899, E08/1900, E08/1901& M47/1464

E 0801554

E 4701538

M 4701464

96422 CONFIDENTIAL 30/01/2013 11/2011 - 10/2012 Combined Annual Report on Mt Monger Peters Dam Project – C135/2007 for period 1 November 2011 to 31 October 2012, E15/869, E25/307, 376, 390, 391, 433, 434, E26/153, 154, P25/2185-2188, P26/3813-3824

E 2500434

E 2600153

E 2600154

P 2603819

P 2603820

P 2603821

96443 CONFIDENTIAL 30/01/2013 01/2012 - 12/2012 Annual Report To the Department of Mines and Petroleum For the period 1 January 2012 to 31 December 2012 Black Swan Project Combined Reporting Number C109/1998 M27/39, M27/200, M27/214, M27/216, E27/357, P27/1808, P27/1809, P27/1810, P27/1811, P27/1813

E 2700357

M 2700039

M 2700200

M 2700214

M 2700216

96444 CONFIDENTIAL 30/01/2013 01/2012 - 12/2012 Annual Report To the Department of Mines and Petroleum For the period 1 January 2012 to 31 December 2012 Albion Downs Joint Venture Combined Reporting Number C203/1998 M53/243, M53/371, M53/483, M53/484, M53/485

M 5300243

Printed: 18/02/2019 02:28:38 PMPage 23 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 24: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SOUTHERN CROSS GOLDFIELDS LTD

SOUTHERN CROSS GOLDFIELDS LTD

API MANAGEMENT PTY LTD

GOVERNOR BROOME SANDS PTY LTD

GOVERNOR BROOME SANDS PTY LTDILUKA RESOURCES LIMITED

MAL'S RIDGE PTY LTD

PEL IRON ORE PTY LTD

BUNGAROO SOUTH PTY LTD

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

POSEIDON NICKEL ATLANTIS OPERATIONS PTY LTD

POSEIDON NICKEL LIMITED

POSEIDON NICKEL ATLANTIS OPERATIONS PTY LTD

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 24 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 25: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96444 CONFIDENTIAL 30/01/2013 01/2012 - 12/2012 Annual Report To the Department of Mines and Petroleum For the period 1 January 2012 to 31 December 2012 Albion Downs Joint Venture Combined Reporting Number C203/1998 M53/243, M53/371, M53/483, M53/484, M53/485

M 5300371

M 5300483

M 5300484

M 5300485

96445 CONFIDENTIAL 30/01/2013 01/2012 - 12/2012 Annual Report To the Department of Mines and Petroleum For the period 1 January 2012 to 31 December 2012 Honeymoon Well Project Combined Reporting Number C203/1998 E53/1243, E53/1244, E53/1317, M53/35, M53/36, M53/55, M53/100, M53/458, M53/908, M53/949, M53/1086, P53/1366

E 5301243

E 5301317

M 5300035

M 5300036

M 5300055

M 5300100

M 5300458

M 5300908

M 5300949

M 5301086

96446 CONFIDENTIAL 01/02/2013 12/2011 - 11/2012 Jillawarra Project Combined Annual Report GSWA C186/2006 For the period1 Dec 2011 to 30 Nov 2012, E52/1413.... P52/1296

E 5201413

96447 CONFIDENTIAL 31/01/2013 11/2011 - 11/2012 Exploration License – 37/1007 Banjawarn Project Annual Technical Report for the Period 13th November 2011 to 12th November 2012

E 3701007

96459 CONFIDENTIAL 29/01/2013 11/2011 - 11/2012 Charteris Creek E45/2763 For the period 8 Nov 2011 to 07 Nov 2012 E 4502763

96461 CONFIDENTIAL 04/02/2013 10/2011 - 10/2012 Tuckanarra Project C45/2012 Annual Report for the period ended 10 October 2012, E20/782, E20/783, P20/2180, P20/2181, P20/2182, P20/2183, P20/2184, P20/2185

E 2000782

E 2000783

P 2002180

P 2002181

P 2002182

P 2002183

P 2002184

P 2002185

Printed: 18/02/2019 02:28:38 PMPage 25 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 26: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

ABRA MINING PTY LTD

BULLSEYE MINING LIMITED

LMTD WITS PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 26 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 27: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96465 CONFIDENTIAL 01/02/2013 12/2011 - 11/2012 Annual Report to the Department of Mines and Petroleum for the period 01/12/2011 to 30/11/2012

M 4500049

M 4500050

M 4500254

M 4500351

M 4500353

M 4500354

M 4500365

M 4500374

M 4500375

M 4500376

M 4500377

M 4500381

M 4500382

M 4500383

M 4500886

M 4500887

M 4500888

M 4500923

M 4500924

M 4500925

M 4500949

M 4500950

96466 CONFIDENTIAL 01/02/2013 12/2011 - 11/2012 WODGINA PROJECT C311/1997 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 30 November 2012, M45/351-I 381 382 50-I 887-I 923-I 924-I 949 950-I

M 4500050

M 4500351

M 4500381

M 4500382

M 4500887

M 4500923

M 4500924

M 4500949

M 4500950

Printed: 18/02/2019 02:28:38 PMPage 27 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 28: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

GLOBAL ADVANCED METALS WODGINA PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

WODGINA LITHIUM PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 28 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 29: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96474 CONFIDENTIAL 25/01/2013 11/2011 - 11/2012 Grafters Project (C276/2008) - P24/4162 & P24/4163 Annual Report 22 November 2011 – 21 November 2012

P 2404162

96475 CONFIDENTIAL 25/01/2013 10/2011 - 10/2012 Combined Mineral Exploration Report Mining Leases 70/250, 249 & 692, Lancelin, South West Mineral Field, 20 October 2011 to 19 October 12

M 7000249

M 7000250

M 7000692

96476 CONFIDENTIAL 30/01/2013 12/2011 - 11/2012 Annual Technical Report for the Period Ending 30 November 2012, EL52/1723 ‘Peak Hill’, Bryah-Padbury Basin Peak Hill Mineral Field, Western Australia.

E 5201723

96477 CONFIDENTIAL 21/01/2013 10/2011 - 10/2012 Dingo Range Project Annual Mineral Exploration Joint Report Combined Project Number 204/2011 for the period 26th October 2011 - 25th October 2012, E53/1352,1377,1380,1407,1421,1447 & E37/925

E 5301377

E 5301380

E 5301407

96478 CONFIDENTIAL 29/01/2013 11/2011 - 11/2012 Rothsay Project C166/2005 Annual Report for the period 27/11/2011 to 26/11/2012, E59/1234, E59/1262, E59/1263, E59/1455, E59/1574 L59/24, M59/39, M59/40, P59/1746

E 5901234

L 5900024

M 5900039

M 5900040

96512 CONFIDENTIAL 25/01/2013 11/2011 - 11/2012 Balmoral Magnetite Iron Ore Project E08/1331 Annual report for the period 29 November 2011 to 28 November 2012

E 0801331

96513 CONFIDENTIAL 29/01/2013 03/2012 - 02/2013 Report of activities, Lake Austin Island Gold Project C158/2009; M21/140; M21/66; P21/709 for the period 1st March 2012 – 28th February 2013

M 2100066

M 2100140

P 2100709

96516 CONFIDENTIAL 04/02/2013 12/2011 - 12/2012 Carina Iron Ore Project M77/1244 Annual Report for the period 7 December 2011 – 6 December 2012

M 7701244

96521 CONFIDENTIAL 04/02/2013 10/2011 - 10/2012 Annual Report on E47/1233, Cape Lambert Project, for the Period 17th October 2011 to 16th October 2012

E 4701233

96527 CONFIDENTIAL 05/02/2013 01/2012 - 12/2012 Bulong Project (C314/1992) Annual Report for the period 01/01/2012 to 31/12/2012

E 2500345

M 2500024

M 2500083

M 2500091

M 2500129

96541 CONFIDENTIAL 06/02/2013 12/2011 - 12/2012 Mount Success Project M58/72 Annual Report for the period 08/12/2011 to 08/11/2012

M 5800072

96542 CONFIDENTIAL 06/02/2013 09/2011 - 09/2012 Annual Report C15/1998 Tiger Iron Project for the period 07/09/2011 to 06/09/2012 (M45/67, M45/451, P45/2335, P45/2516 & P45/2517)

M 4500067

Printed: 18/02/2019 02:28:38 PMPage 29 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 30: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GPM RESOURCES PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

EGAN STREET ROTHSAY PTY LTD

EGAN STREET ROTHSAY PTY LTD

EGAN STREET ROTHSAY PTY LTD

EGAN STREET ROTHSAY PTY LTD

MINERALOGY PTY LTD

GOLDVIEW METALS PTY LTD

GOLDVIEW METALS PTY LTD

GOLDVIEW METALS PTY LTD

POLARIS METALS PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

BULONG MINING PTY LTD

BLACK CAT (BULONG) PTY LTD

BLACK CAT (BULONG) PTY LTD

BLACK CAT (BULONG) PTY LTD

BLACK CAT (BULONG) PTY LTD

HUMBERSTON CLIVE VERNON SHANE

ZEN MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 30 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 31: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96542 CONFIDENTIAL 06/02/2013 09/2011 - 09/2012 Annual Report C15/1998 Tiger Iron Project for the period 07/09/2011 to 06/09/2012 (M45/67, M45/451, P45/2335, P45/2516 & P45/2517)

M 4500451

P 4502335

96545 CONFIDENTIAL 06/02/2013 01/2012 - 12/2012 Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2012, E59/1134.......P59/1737

E 5901240

E 5901241

E 5901242

E 5901274

M 5900049

M 5900068

M 5900132

M 5900133

M 5900224

M 5900294

M 5900335

M 5900336

M 5900356

M 5900391

M 5900392

M 5900442

M 5900507

M 5900522

M 5900530

M 5900531

96548 CONFIDENTIAL 06/02/2013 12/2011 - 12/2012 Annual Report on Exploration conducted on E69/535 & E69/2458 "C123/2000 - WINGELLINA" for the period 23 dec 2011 to 22 Dec 2012

E 6900535

96549 CONFIDENTIAL 06/02/2013 01/2012 - 12/2012 Combined Mineral Exploration Report for the Wildara Project volumes 1,2 & 3 for the period 01/01/2012 to 31/12/2012, C16/2003

M 3600035

M 3600421

M 3600428

M 3600462

M 3600473

M 3600474

M 3600476

Printed: 18/02/2019 02:28:38 PMPage 31 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 32: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ZEN MINING PTY LTD

ZEN MINING PTY LTD

BRANDY HILL IRON PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

BRANDY HILL IRON PTY LTD

CENTRAL INFRASTRUCTURE PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

BRANDY HILL IRON PTY LTD

BRANDY HILL IRON PTY LTD

CENTRAL INFRASTRUCTURE PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

DEFLECTOR GOLD PTY LTD

CENTRAL INFRASTRUCTURE PTY LTD

CENTRAL INFRASTRUCTURE PTY LTD

GULLEWA GOLD PROJECT PTY LTD

GULLEWA GOLD PROJECT PTY LTD

HINCKLEY RANGE PTY LTD

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

DEVANT PTY LTD

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 32 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 33: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96549 CONFIDENTIAL 06/02/2013 01/2012 - 12/2012 Combined Mineral Exploration Report for the Wildara Project volumes 1,2 & 3 for the period 01/01/2012 to 31/12/2012, C16/2003

M 3600494

M 3600503

M 3600504

M 3600512

M 3600513

M 3600516

M 3600525

M 3600527

M 3600541

M 3600542

M 3600582

M 3600584

M 3600585

M 3600586

M 3600587

M 3600588

M 3600589

M 3600599

M 3600600

M 3700437

M 3700493

M 3700494

M 3700998

96555 CONFIDENTIAL 07/02/2013 10/2011 - 10/2012 Tramways Project E15/729 & M63/242 Combined Annual Report for the Period 24 October 2011 to 23 October 2012 – C100/2002

M 6300242

96559 CONFIDENTIAL 05/02/2013 01/2012 - 01/2013 Exploration Licence 45/3488 Annual Report for the period 11th January 2012 to 10th January 2013

E 4503488

Printed: 18/02/2019 02:28:38 PMPage 33 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 34: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

BLACK MOUNTAIN GOLD LIMITEDSARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

MINCOR RESOURCES NL

ALTURA LITHIUM OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 34 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 35: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96562 CONFIDENTIAL 05/02/2013 11/2011 - 11/2012 East Angelas Project Combined Annual Report - Combined Reporting Group C113/2007 East Angelas for the Year Ending 10th November 2012, E47/1307; E47/1308; E47/1313

E 4701307

E 4701308

E 4701313

96563 CONFIDENTIAL 05/02/2013 02/2012 - 01/2013 Milky Lake E77/1582 Annual Report for the Period 1st February 2012 to 31st January 2013

E 7701582

96585 CONFIDENTIAL 06/02/2013 11/2011 - 11/2012 E45/2983 Wallaringa Project Annual Report for the period 27th November 2011 to 26th November 2012

E 4502983

96602 CONFIDENTIAL 08/02/2013 12/2011 - 11/2012 Mt McLeay Project C43/2010 Annual Report for the period 1 December 2011 – 30 November 2012 P27/1711, P27/1748, P27/1749, P27/1954, P27/1979, P27/1990, P27/2006

P 2701979

96603 CONFIDENTIAL 08/02/2013 01/2012 - 12/2012 ANNUAL REPORT COMBINED REPORTING #212/2011 Tandanya (Area C West) E47/1429 E47/1870 E47/1872 E47/1873 E47/1874 P47/1421 Reporting period 01 Jan 2012- 31 Dec 2012

E 4701429

E 4701870

E 4701872

E 4701873

E 4701874

P 4701421

96607 CONFIDENTIAL 08/02/2013 11/2011 - 11/2012 Yarrie Project (E45/3724) Annual Report For the Reporting Period 15th November 2011 to 14th November 2012

E 4503724

96608 CONFIDENTIAL 08/02/2013 11/2011 - 11/2012 Yarrie Project (E45/3728) Annual Report for the period 15/11/11 to 14/11/12 E 4503728

96609 CONFIDENTIAL 08/02/2013 01/2012 - 01/2013 Gabanintha Project C81/2006 Annual Report for the period 01/01/2012 to 01/01/2013, P51/2656.....E51/1030

M 5100836

P 5102656

P 5102661

Printed: 18/02/2019 02:28:38 PMPage 35 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 36: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HANCOCK PROSPECTING PTY LTD

HANCOCK PROSPECTING PTY LTD

HANCOCK PROSPECTING PTY LTD

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

DE GREY MINING LTD

BRIMSTONE RESOURCES LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

WHIM CREEK MINING PTY LTD

XFE PTY LTDCOZIRON RESOURCES LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 36 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 37: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96609 CONFIDENTIAL 08/02/2013 01/2012 - 01/2013 Gabanintha Project C81/2006 Annual Report for the period 01/01/2012 to 01/01/2013, P51/2656.....E51/1030

P 5102662

P 5102663

P 5102690

P 5102691

P 5102692

P 5102693

P 5102694

P 5102695

P 5102700

96610 CONFIDENTIAL 08/02/2013 11/2011 - 10/2012 Burnakura Project C21/2005 Annual Report for the period 1 November 2011 – 31 October 20112, M51/116, M51/117, M51/177, M51/178, M51/252, M51/478

M 5100116

M 5100117

M 5100177

M 5100178

M 5100252

M 5100478

96614 CONFIDENTIAL 11/02/2013 01/2012 - 12/2012 Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M52/722......P52-1200 (C183/2009)

E 5201668

E 5201678

E 5201722

E 5201723

E 5201730

E 5201731

E 5201810

E 5201852

E 5202360

E 5202361

E 5202362

M 5200685

M 5200722

M 5200723

M 5200737

Printed: 18/02/2019 02:28:38 PMPage 37 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 38: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

JACKSON MINERALS PTY LTDALCHEMY RESOURCES (THREE RIVERS) PTY LTD

JACKSON MINERALS PTY LTDALCHEMY RESOURCES (THREE RIVERS) PTY LTD

JACKSON MINERALS PTY LTDALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

JACKSON MINERALS PTY LTDALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

NORTHERN STAR RESOURCES LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

NORTHERN STAR RESOURCES LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 38 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 39: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96614 CONFIDENTIAL 11/02/2013 01/2012 - 12/2012 Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M52/722......P52-1200 (C183/2009)

M 5200753

M 5200795

M 5200796

M 5200797

M 5200844

M 5201049

96615 CONFIDENTIAL 11/02/2013 12/2011 - 12/2012 Annual Report for the period 14 Dec 2011 to 13 Dec 2012 Yandeearra Project E47/2502

E 4702502

96617 CONFIDENTIAL 11/02/2013 01/2012 - 01/2013 CONSIDERABLE 2 ANNUAL REPORT, EXPLORATION LICENCE 47/2232, Annual Report for the Period 07 January 2012 to 06 January 2013.

E 4702232

96619 CONFIDENTIAL 11/02/2013 11/2011 - 10/2012 Combined Annual Technical Report C264/2008 Leonora Project Tenements M37/1202, E 37/893 and E37/1000 Period 1/11/2011 to 31/10/2012

E 3700893

M 3701202

96620 CONFIDENTIAL 11/02/2013 10/2011 - 10/2012 Mineral Exploration - Annual Report Mining Lease: M45/1210 Report Period : 21/10/2011 - 20/10/2012

M 4501210

96621 CONFIDENTIAL 11/02/2013 12/2011 - 12/2012 2012 Annual Report for the John Galt Project, Exploration Licence E80/4298 for the period 8th December 2011 to 7th December 2012

E 8004298

96624 CONFIDENTIAL 11/02/2013 11/2011 - 11/2012 Shovelanna South Project E52/2238 – Annual Technical Report for the year ended 1st November 2012

E 5202238

96628 CONFIDENTIAL 11/02/2013 10/2011 - 10/2012 Nullagine Gold Project M46/170 Annual Report, from 10th of October 2011 to 9th of October 2011

M 4600170

96630 CONFIDENTIAL 12/02/2013 12/2011 - 12/2012 Annual Mineral Exploration Report East Kimberley Region Koongie Park Project E80/4221For the Period 14th December 2011 to 13th December 2012

E 8004221

96637 CONFIDENTIAL 13/02/2013 08/2011 - 08/2012 Annual Technical Report for the period 15 Aug 2011 to 14 Aug 2012 Clampton Gold Mine M77/641

M 7700641

96650 CONFIDENTIAL 13/02/2013 11/2011 - 11/2012 Jurien Project, Annual Report for the period 14th November 2011 to 13th November 2012, M70/434-436. [C198/1994]

M 7000434

M 7000435

M 7000436

96658 CONFIDENTIAL 12/02/2013 08/2011 - 08/2012 Halls Creek Project, Annual Report for the period ending 14th August 2012, E80/3496, 3370 & 3517. [C10/2008]

E 8003496

96662 CONFIDENTIAL 12/02/2013 01/2012 - 12/2012 Annual report for the period 1 January 2012 to 31 December 2012, Greenbushes Project, M1/2-11, M1/16, M1/18, M70/765, C296/1994

M 0100002

M 0100003

M 0100004

M 0100005

M 0100006

Printed: 18/02/2019 02:28:38 PMPage 39 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 40: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NORTHERN STAR RESOURCES LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

ALCHEMY RESOURCES (THREE RIVERS) PTY LTD

FARNO-MCMAHON PTY LTD

HAMERSLEY IRON PTY LIMITED

MESSINA RESOURCES LTD

MESSINA RESOURCES LTD

STIRLING BAY HOLDINGS PTY LTDSWAN BAY HOLDINGS PTY LTD

NORTHERN RARE EARTH METALS PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

MILLENNIUM MINERALS LIMITED

LEGACY IRON ORE LTD

TAPLAN PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

PLATQUEST RESOURCES PTY LTDCAZALY RESOURCES LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 40 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 41: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96662 CONFIDENTIAL 12/02/2013 01/2012 - 12/2012 Annual report for the period 1 January 2012 to 31 December 2012, Greenbushes Project, M1/2-11, M1/16, M1/18, M70/765, C296/1994

M 0100007

M 0100008

M 0100009

M 0100010

M 0100011

M 0100016

M 0100018

M 7000765

96665 CONFIDENTIAL 12/02/2013 01/2012 - 12/2012 Combined Annual Report C45/2004 (Mt Jackson) For the period 1st January to 31st December 2012, E77/1071...... P77/3942.

E 7701221

M 7700993

M 7700994

M 7700995

M 7700996

M 7700997

M 7700998

M 7701109

M 7701248

M 7701249

96666 CONFIDENTIAL 12/02/2013 01/2012 - 12/2012 Combined Annual Report for the period 1st January to 31st December 2012 for Tenements E77/1422-I, M77/999-I, M77/1000-I, M77/1001-I, M77/1038-I, M77/1039-I, M77/1040-I, P77/3954-I and P77/3955-I, Windarling Project

M 7700999

M 7701000

M 7701001

M 7701038

M 7701039

M 7701040

96669 CONFIDENTIAL 14/02/2013 01/2012 - 01/2013 Annual Mineral Exploration Report C35/2000 Scott River – February 2013 for the period 28 January 2012 – 27 January 2013, M70/121, 122, 123, 124, and 125

M 7000121

M 7000122

M 7000123

M 7000124

M 7000125

Printed: 18/02/2019 02:28:38 PMPage 41 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 42: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

TALISON LITHIUM AUSTRALIA PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CABLE SANDS PTY LTD

CABLE SANDS PTY LTD

CABLE SANDS PTY LTD

CABLE SANDS PTY LTD

CABLE SANDS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 42 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 43: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96670 CONFIDENTIAL 14/02/2013 12/2011 - 11/2012 Blue Bar Project, Annual Report for the period 1st December 2011 to 30th Novmeber 2012, M45/591, M45/906; P45/2311, 2125, 2127 & 2226. [C90/2004]

M 4500591

M 4500906

P 4502125

P 4502127

P 4502226

P 4502311

96679 CONFIDENTIAL 14/02/2013 10/2011 - 09/2012 Combined Annual Technical Report Rebecca Project E28/1610 & E28/2146 C302/2012, Period 1st October 2011 – 30th of September 2012

E 2801610

E 2802146

96684 CONFIDENTIAL 14/02/2013 10/2011 - 10/2012 YUNDAMINDERA PROJECT E39/1292 – Top Box Well Annual Report for the period 24 October 2011 TO 23 October 2012

E 3901292

96685 CONFIDENTIAL 14/02/2013 10/2011 - 10/2012 Yundamindera Project E39/1297 - Coffey Bore South Annual Report for the period 24 October 2011 TO 23 October 2012

E 3901297

96686 CONFIDENTIAL 14/02/2013 10/2011 - 10/2012 Annual Report M20/263 Eaglehawk Project for the period 18 October 2011 to 17 October 2012

M 2000263

96688 CONFIDENTIAL 14/02/2013 12/2011 - 12/2012 Annual Report 2012 Erayinia Project C229/2007, E28/1228, E28/1611, E28/1612 for the period to 18/12/2012

E 2801228

96693 CONFIDENTIAL 14/02/2013 10/2011 - 09/2012 Annual Technical Report Mt Mundy Project E37/1018 Period 1st October 2011 – 30th of September 2012

E 3701018

96698 CONFIDENTIAL 14/02/2013 01/2012 - 01/2013 CORUNNA DOWNS PROJECT E46/803, Annual Technical Report to the Department of Mines and Petroleum, For the Period Ending19 January, 2013.

E 4600803

96700 CONFIDENTIAL 14/02/2013 01/2012 - 12/2012 JIGALONG ROBERTSON RANGE PROJECT E52/2132-I 1658-I 2542-I M52/1034-I 1043-I E52/1630-I 1901-I Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 31 December 2012 (C198/2007)

E 5201630

E 5201658

M 5201034

M 5201043

96701 CONFIDENTIAL 14/02/2013 01/2012 - 12/2012 JIMBLEBAR PROJECT E52/1595-I, 1750-I,1772-I, 1823-I, 2303-I, M52/21, 790- 799, P52/1124-I ,1125-I,1238-I, 1326, 1384, 1406 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 31 December 2012 (C121/2007)

E 5201772

E 5202303

M 5200211

M 5200790

96703 CONFIDENTIAL 14/02/2013 01/2012 - 01/2013 Mount Gould Project M52/236-I Annual Report to the Department of Mines and Petroleum for the Period Ending 23 January 2013

M 5200236

Printed: 18/02/2019 02:28:38 PMPage 43 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 44: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAOMA MINING NL

HAOMA MINING NL

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

ELAZAC MINING PTY LTD

HAOMA MINING NL

AC MINERALS PTY LTD

AC MINERALS PTY LTD

HAWTHORN RESOURCES LIMITED

HAWTHORN RESOURCES LIMITED

KLONDYKE GOLD PTY LTD

BLACK RAVEN MINING PTY LTD

EGF NICKEL PTY LTD

ATLAS IRON LIMITED

AUSTRALIAN MANGANESE PTY LTD

AUSTRALIAN MANGANESE PTY LTD

AUSTRALIAN MANGANESE PTY LTD

AUSTRALIAN MANGANESE PTY LTD

WARWICK RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

ACME MIOXIDE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 44 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 45: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96704 CONFIDENTIAL 14/02/2013 01/2012 - 12/2012 Warrawanda E52/1771-I 1815-I 2224-I 2354-I & 2390-I Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 31 December 2012 (C122-2011)

E 5201771

E 5201815

96709 CONFIDENTIAL 11/02/2013 10/2011 - 10/2012 Annual Report, Elverdton Project E74/382 for the period 15th October 2010 to 14th October 2012

E 7400382

96719 CONFIDENTIAL 15/02/2013 10/2011 - 09/2012 Parker Dome Project C261/2008 Combined Annual Report for the period 1 October 2011 to 30 September 2012, E77/1314.....P77/4038

E 7701965

M 7701246

M 7701256

96720 CONFIDENTIAL 15/02/2013 12/2011 - 12/2012 Annual Technical Report for the Red Legs Project, R77/1, Yilgarn Mineral Field, for the period 14 December 2011 to 13 December 2012

R 7700001

96721 CONFIDENTIAL 15/02/2013 12/2011 - 12/2012 Annual Technical Report for the Die Hardy Project, R77/2, Yilgarn Mineral Field, for the period 14 December 2011 to 13 December 2012

R 7700002

96724 CONFIDENTIAL 15/02/2013 10/2011 - 10/2012 C99/2008 Combined Annual Report 2012 Annual Report for the period 24th October 2011 – 23rd October 2012, P24/4091, P24/4092, M24/942, M24/943

M 2400942

M 2400943

P 2404091

P 2404092

96726 CONFIDENTIAL 19/02/2013 12/2011 - 12/2012 Annual Report for combined reporting group C180/2011, Area 3 Williams Western Australia, E70/3179, E70/3180, E70/3618, E70/3633, E70/3634, E70/3652, E70/3890, E70/3623 20 December 2011 - 19 December 2012

E 7003179

E 7003180

E 7003890

96728 CONFIDENTIAL 19/02/2013 12/2011 - 12/2012 Annual Report, Cape Bougainville Project E80/3859 for the period 16 December 2011 to 15 December 2012 North Kimberley Mineral Field,Western Australia

E 8003859

96734 CONFIDENTIAL 15/02/2013 11/2011 - 11/2012 Central Yilgarn Iron Ore Project (CYIP) Mt Ida Magnetite Project and Mt Mason DSO Hematite Project C180/2010, M29/408, M29/414, E29/560, E29/777, E29/801

E 2900560

E 2900777

E 2900801

M 2900408

M 2900414

96741 CONFIDENTIAL 15/02/2013 01/2012 - 01/2013 E52/1561 Horseshoe Range Annual Report for the period 6th January 2012 to 5th January 2013

E 5201561

Printed: 18/02/2019 02:28:38 PMPage 45 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 46: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WARWICK RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

PAXTON ENTERPRISES PTY LTD

BLACK OAK MINERALS LIMITED

HIGHSCORE PTY LTDRICHARD READ & ASSOCIATES PTY LTD

BLACK OAK MINERALS LIMITED

SOUTHERN CROSS GOLDFIELDS LTD

SOUTHERN CROSS GOLDFIELDS LTD

SCHORER DENZLE NORBERTGPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

SCHORER DENZLE NORBERT

SCHORER DENZLE NORBERT

BAUXITE RESOURCES LIMITED

BAUXITE RESOURCES LIMITED

DARLING RANGE PTY LTD

KIMBERLEY BAUXITE PTY LTD

JUPITER MINES LIMITED

JUPITER MINES LIMITED

JUPITER MINES LIMITED

JUPITER MINES LIMITED

JUPITER MINES LIMITED

AUVEX HORSESHOE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 46 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 47: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96750 CONFIDENTIAL 19/02/2013 12/2011 - 11/2012 Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 to 30th November 2012, E45/2510, 2535, 3084, 2852, 2853, 2854, 2855, 2856, P45/2721, M45/1180, 1181, 1182, 1183, 1184, 1211, 1212, and 1213

E 4502510

E 4502535

E 4503084

M 4501180

M 4501181

M 4501182

M 4501183

M 4501184

M 4501211

M 4501212

M 4501213

96751 CONFIDENTIAL 19/02/2013 01/2012 - 01/2013 Annual Combined Report Mount Minnie C174/2012, E08/2041, E08/2043 & E08/2212 for the period 21/01/2012 to 20/01/2013

E 0802041

96762 CONFIDENTIAL 20/02/2013 08/2011 - 08/2012 Annual Mineral Exploration Report PYKE HILL NICKEL – COBALT PROJECT M39 / 159 Report for the Period 1st September 2011 to 31st August 2012

M 3900159

96764 CONFIDENTIAL 20/02/2013 01/2012 - 12/2012 Penfolds Project, Annual Report for the period 01/01/2012 to 31/12/2012, C117/2007, E15/985.....P26/3533

E 1500985

E 1501211

E 2600122

M 1500456

M 1500469

M 1500533

M 1500663

M 1500717

M 1500724

M 1500726

M 1500740

M 1500753

M 1500937

M 1500938

M 2600118

Printed: 18/02/2019 02:28:38 PMPage 47 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 48: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG MAGNETITE PTY LTDFORMOSA STEEL IB PTY LTD

FMG MAGNETITE PTY LTDFORMOSA STEEL IB PTY LTD

FMG NORTH PILBARA PTY LTDFORMOSA STEEL IB PTY LTD

FMG MAGNETITE PTY LTD

FMG MAGNETITE PTY LTD

FMG MAGNETITE PTY LTD

FMG MAGNETITE PTY LTD

FMG NORTH PILBARA PTY LTD

FMG NORTH PILBARA PTY LTD

FMG NORTH PILBARA PTY LTD

FMG NORTH PILBARA PTY LTD

TWELVE MILE PTY LTD

PYKE HILL RESOURCES PTY LTDRICHORE PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

REED INDUSTRIAL MINERALS PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 48 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 49: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96764 CONFIDENTIAL 20/02/2013 01/2012 - 12/2012 Penfolds Project, Annual Report for the period 01/01/2012 to 31/12/2012, C117/2007, E15/985.....P26/3533

M 2600132

M 2600143

M 2600204

M 2600224

M 2600245

M 2600328

M 2600452

M 2600458

M 2600482

M 2600567

M 2600782

P 1505049

P 1505050

96769 CONFIDENTIAL 13/02/2013 02/2012 - 02/2013 Annual Report for the Period 22nd February 2012 to 21st February 2013, Horseshoe Range M52/1048

M 5201048

96770 CONFIDENTIAL 20/02/2013 11/2011 - 11/2012 Springfield Project, Annual Report for the period 25th November 2011 to 24th November 2012, E52/2313, E52/2466 & E52/2282. [C97/2010]

E 5202282

E 5202313

E 5202466

96772 CONFIDENTIAL 21/02/2013 01/2012 - 12/2012 Combined Annual Report (C135/2011), Rocklea Project- E47/952-I, E47/1153-I, P47/1429 For the period 1st January 2012 to 31st December 2012

E 4700952

96773 CONFIDENTIAL 15/02/2013 12/2011 - 12/2012 Koolanooka Project, Annual Report for the period 18th December 2011 to 17th December 2012, M70/1012-1014; E70/2433. [C20/2000]

E 7002433

M 7001012

M 7001013

M 7001014

96774 CONFIDENTIAL 15/02/2013 01/2012 - 01/2013 Annual Report M59/733 Maranalgo Gypsum Deposit Lake Moore Gypsum Project for the period 5 January 2012 to 4 January 2013

M 5900733

96775 CONFIDENTIAL 15/02/2013 01/2012 - 01/2013 Annual Report M59/734 Maranalgo Gypsum Deposit Lake Moore Gypsum Project for the period 5 January 2012 to 4 January 2013

M 5900734

96776 CONFIDENTIAL 21/02/2013 11/2011 - 11/2012 Nullagine South Project, Annual Report for the period 28/11/2011 to 27/11/2012, E46/794.

E 4600794

96778 CONFIDENTIAL 20/02/2013 01/2012 - 12/2012 Murrin Murrin Project, Annual Report for the period 1st January 2012 to 31st December 2012, M39/397-400 & M39/1068. [C165/2012]

M 3900397

M 3900398

Printed: 18/02/2019 02:28:38 PMPage 49 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 50: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

HORSESHOE MANGANESE PTY LTD

SANDFIRE RESOURCES NLSANDFIRE A PTY LTD

SANDFIRE RESOURCES NLSANDFIRE A PTY LTD

SANDFIRE RESOURCES NLSANDFIRE A PTY LTD

RIVA RESOURCES LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

GILES KIMBERLEY JOHN

GILES KIMBERLEY JOHN

MT STEWART RESOURCES PTY LTD

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 50 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 51: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96778 CONFIDENTIAL 20/02/2013 01/2012 - 12/2012 Murrin Murrin Project, Annual Report for the period 1st January 2012 to 31st December 2012, M39/397-400 & M39/1068. [C165/2012]

M 3900399

M 3900400

M 3901068

96779 CONFIDENTIAL 20/02/2013 12/2011 - 12/2012 Annual Report for the period 28 December 2011 to 27 December 2012 Weeriana Project M47/223

M 4700223

96780 CONFIDENTIAL 20/02/2013 01/2012 - 12/2012 Johnston Range Project, Annual Report for the period 1st January 2012 to 31st December 2012, E77/1038, 1155, 1387-1389; P77/3670-3674 & P3676-3677. [C112/2005]

E 7701038

96781 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 Congo Bore Project, Annual Report for the period 18/01/2012 to 17/01/2013, E08/1771.

E 0801771

96782 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 Hubert Well Project, Annual Report for the period 18/01/2012 to 17/01/2013, E08/1148, 1467, 1772; P08/615. [C185/2008]

E 0801148

E 0801772

P 0800615

96783 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 BOURNE HIGHWAY PROJECT AREA COMBINED ANNUAL REPORT (C88/2008) EXPLORATION LICENCES 47/1783, 47/1784, 47/1785 & 47/1786 AND PROSPECTING LICENCES 47/1328, 47/1329, 47/1330, 47/1332, 47/1333 & 47/1334. Annual Report for the Period 18 January 2012 to 17 January 2013

E 4701783

E 4701784

E 4701785

E 4701786

Printed: 18/02/2019 02:28:38 PMPage 51 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 52: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

WESTERN METALS PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

ROBE RIVER MINING CO. PTY LIMITEDMITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 52 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 53: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96783 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 BOURNE HIGHWAY PROJECT AREA COMBINED ANNUAL REPORT (C88/2008) EXPLORATION LICENCES 47/1783, 47/1784, 47/1785 & 47/1786 AND PROSPECTING LICENCES 47/1328, 47/1329, 47/1330, 47/1332, 47/1333 & 47/1334. Annual Report for the Period 18 January 2012 to 17 January 2013

P 4701332

P 4701333

96784 CONFIDENTIAL 13/02/2013 01/2012 - 01/2013 Brockman West Project, Annual Report for the period 18th January 2012 to 17th January 2013, E47/1782.

E 4701782

96785 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 VIVASH EAST PROJECT AREA ANNUAL REPORT (C92/2008) EXPLORATION LICENCE 47/1788 & PROSPECTING LICENCES 47/1338, 47/1339, 47/1340, 47/1342 & 47/1474; Annual Report for the Period18 January 2012 to 17 January 2013.

E 4701788

96786 CONFIDENTIAL 20/02/2013 01/2012 - 01/2013 Mount Wall West Project, Annual Report for the period 18/01/2012 to 17/01/2013, E47/1787 & P47/1336. [C90/2008]

E 4701787

96789 CONFIDENTIAL 21/02/2013 01/2012 - 12/2012 ANNUAL TECHNICAL REPORT NICOLSON’S FIND PROJECT E80/2601, E80/3861, E80/4458, E80/4459, M80/343, M80/355, M80/359, M80/362, M80/471, M80/503 Combined Annual Report C132/2004 For the Period 1 January 2012 to 31 December 2012

E 8002601

E 8003861

E 8004458

E 8004459

M 8000343

M 8000355

M 8000359

M 8000362

M 8000471

M 8000503

96792 CONFIDENTIAL 19/02/2013 11/2011 - 11/2012 Combined Annual Report Mining Leases M70/1122-1125 C32/2003 Warradarge for the period 5th November, 2011 to 4th November, 2012

M 7001122

96799 CONFIDENTIAL 14/02/2013 12/2011 - 12/2012 Gabanintha P51/2602 Annual Report for the period 30/12/2011 to 29/12/2012 P 5102602

96800 CONFIDENTIAL 21/02/2013 12/2011 - 12/2012 Gabanintha P51/2600 Annual Report for the period 30/12/2011 to 29/12/2012 P 5102600

96805 CONFIDENTIAL 21/02/2013 09/2011 - 08/2012 Annual Mineral Exploration Report Pyke Hill Nickel - Cobalt Project M39/159 report for the period 1st September 2011 to 31st August 2012

M 3900159

96810 CONFIDENTIAL 21/02/2013 02/2012 - 02/2013 Duck Creek East Project E47/2215 – Annual Technical Report for the year ended 17th February 2013

E 4702215

Printed: 18/02/2019 02:28:38 PMPage 53 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 54: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

BULLETIN RESOURCES LIMITED

JURIEN INDUSTRIAL MINERALS PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

PYKE HILL RESOURCES PTY LTDRICHORE PTY LTD

BROCKMAN EXPLORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 54 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 55: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96811 CONFIDENTIAL 21/02/2013 01/2012 - 12/2012 ANNUAL EXPLORATION REPORT BIG BELL TENEMENT GROUP YEAR ENDING 31 DECEMBER 2012 Combined Report Number C150/1998

E 2000216

M 2000017

M 2000050

M 2000098

M 2000099

M 2000192

M 2000197

M 2000307

96814 CONFIDENTIAL 21/02/2013 12/2011 - 12/2012 Mount Cattlin Project, Annual Report for the period 18th December 2011 to 17th December 2012, M74/244; E74/400-401, 398, 295, 299 & 415; P74/307-310. [C127/2004]

E 7400400

E 7400401

E 7400415

M 7400244

96818 CONFIDENTIAL 22/02/2013 01/2012 - 12/2012 Combined Annual Report Mindy Mindy Project C28_2004 for the period 1st January 2012 to 31st December 2012, E47/1140, 1191, 1192, 1224, 1225, 1235, 1380 & P47/1156, 1414

E 4701140

E 4701191

E 4701192

E 4701224

E 4701225

E 4701235

E 4701380

P 4701156

96822 CONFIDENTIAL 22/02/2013 09/2011 - 09/2012 Pinjin East Project E31/783 – Pinjin Annual Report for the period 9 September 2011 to 8 September 2012

E 3100783

96823 CONFIDENTIAL 22/02/2013 08/2011 - 09/2012 Pinjin East Project E31/782 - Pinjin North Annual report for the period 9 September 2011 to 8 September 2012

E 3100782

96826 CONFIDENTIAL 22/02/2013 01/2012 - 01/2013 ANNUAL REPORT MEDCALF PROJECT EXPLORATION LICENCES 63/1068, 63/1405, 63/1406, 63/1133 & 63/1134 PROSPECTING LICENCES 63/1528, 63/1529, 63/1530, 63/1531 63/1532, 63/1533, 63/1560 & 63/1561 WESTERN AUSTRALIA Combined Reporting No C193/2012 PERIOD 09 January 2012 to 08 January 2013

E 6301068

E 6301133

E 6301134

E 6301405

Printed: 18/02/2019 02:28:38 PMPage 55 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 56: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

GALAXY LITHIUM AUSTRALIA LIMITED

TRAKA RESOURCES LIMITEDGALAXY LITHIUM AUSTRALIA LIMITED

GALAXY RESOURCES LIMITED

GALAXY LITHIUM AUSTRALIA LIMITED

AMMON DEREK NOEL

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

PILBARA IRON ORE PTY LTD

HAWTHORN RESOURCES LIMITED

HAWTHORN RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 56 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 57: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96826 CONFIDENTIAL 22/02/2013 01/2012 - 01/2013 ANNUAL REPORT MEDCALF PROJECT EXPLORATION LICENCES 63/1068, 63/1405, 63/1406, 63/1133 & 63/1134 PROSPECTING LICENCES 63/1528, 63/1529, 63/1530, 63/1531 63/1532, 63/1533, 63/1560 & 63/1561 WESTERN AUSTRALIA Combined Reporting No C193/2012 PERIOD 09 January 2012 to 08 January 2013

E 6301406

P 6301528

P 6301529

P 6301530

P 6301531

P 6301532

P 6301533

96828 CONFIDENTIAL 22/02/2013 01/2012 - 12/2012 Annual Report - C27/2006 Lennard Shelf Zinc-Lead Project for the period 1st January 2012 – 31st December 2012, E04/1038......P04/243

E 0401649

E 0401893

E 0401894

E 8004240

M 0400134

M 0400135

M 0400136

M 0400140

M 0400141

M 0400189

M 0400271

M 0400283

M 8000270

96830 CONFIDENTIAL 22/02/2013 01/2012 - 12/2012 Napier Range project, Annual Report for the period 1st January 2012 to 31st December 2012, M04/161, M04/162, E04/1526 & E04/1527. [C32/2008]

M 0400161

M 0400162

96831 CONFIDENTIAL 02/01/2013 10/2011 - 10/2012 Annual report for the period 31 October 2011 to 30 October 2012, Moora Quartz Project. M70/191, M70/424, M70/425, E70/2750, M70/1292 (C260/1995)

E 7002750

M 7000191

M 7000424

M 7000425

M 7001292

Printed: 18/02/2019 02:28:38 PMPage 57 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 58: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

MERIDIAN (LENNARD SHELF PROJECT) PTY LTD

RIDGECAPE HOLDINGS PTY LTD

RIDGECAPE HOLDINGS PTY LTD

SIMCOA OPERATIONS PTY LTD

SIMCOA OPERATIONS PTY LTD

SIMCOA OPERATIONS PTY LTD

SIMCOA OPERATIONS PTY LTD

SIMCOA OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 58 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 59: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96832 CONFIDENTIAL 26/02/2013 02/2012 - 02/2013 BELL BIRD PROJECT E29/771, P29/2115, P29/2159 & 2160 Coppperfield - Mt Ida Area, W.A. 2012 Annual Mineral Exploration Report for the Period 12th February 2012 – 11th February 2013 (C180/2012)

E 2900771

96836 CONFIDENTIAL 26/02/2013 01/2012 - 12/2012 Exploration Combined Annual Report C96/1999 Youanmi Project Reporting Period: 1 January 2011 to 31 December 2012, M57/10, 51, 75, 97, 109, 135, 160, 164, 165, 166, 167

M 5700010

M 5700051

M 5700075

M 5700097

M 5700109

M 5700135

M 5700160A

M 5700164

M 5700165

M 5700166

M 5700167

96838 CONFIDENTIAL 26/02/2013 01/2012 - 01/2013 E70/2230 Annual Technical Report for the period 7 January 2012 to 6 January 2013

E 7002230

96839 CONFIDENTIAL 05/02/2013 10/2011 - 10/2012 Annual Report E47/651 for the period 7 October 2011 - 6 October 2012 E 4700651

96843 CONFIDENTIAL 26/02/2013 02/2012 - 02/2013 Combined Annual Report Gascoyne Project C192/2012 For the period 27 February 2012 to 26 February 2013. (E09/1568, 1569, 1570, 1824 and 1825)

E 0901824

E 0901825

96844 CONFIDENTIAL 25/02/2013 01/2012 - 01/2013 MOUNT WINDELL PROJECT AREA COMBINED ANNUAL TECHNICAL REPORT C34/2007 EXPLORATION LICENCELICENCES 47/641, 47/1243; Annual Technical Report for the Period 22 January 2012 to 21 January 2013

E 4700641

E 4701243

96848 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)

E 3802345

E 3901416

M 3800426

M 3800427

M 3800816

M 3800817

M 3900217

M 3900347

M 3900348

M 3900357

Printed: 18/02/2019 02:28:38 PMPage 59 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 60: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HOOPER STUART LESLIE

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

OZ YOUANMI GOLD PTY LTD

MERCATOR METALS PTY LTD

MCNALLY-SMITH JOHN

SERENA MINERALS LIMITED

SERENA MINERALS LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 60 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 61: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96848 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)

M 3900358

M 3900359

M 3900366

M 3900373

M 3900374

M 3900375

M 3900376

M 3900499

M 3900766

M 3900867

M 3900868

96850 CONFIDENTIAL 26/02/2013 12/2011 - 12/2011 Annual Report Peters Hill Project P26/2547-9, 3554, M26/572 C51/2012 Period 1st December 2011- 30th November 2012

M 2600572

96852 CONFIDENTIAL 26/02/2013 11/2011 - 11/2012 East Pilbara Project, Annual Report for the period 21st November 2011 to 20th November 2012, C3/2005.

E 4600413

E 4600467

E 4600516

E 4600518

E 4600519

E 4600568

E 4600569

E 4600595

E 4600600

E 4600601

E 4600623

E 4600675

M 4600292

M 4600293

M 4600314

M 4600315

M 4600316

M 4600317

M 4600318

Printed: 18/02/2019 02:28:38 PMPage 61 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 62: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITED

STRATEGIC PROJECTS MINING PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 62 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 63: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96852 CONFIDENTIAL 26/02/2013 11/2011 - 11/2012 East Pilbara Project, Annual Report for the period 21st November 2011 to 20th November 2012, C3/2005.

M 4600319

96854 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Norseman Project, Annual Report for the period 1st January 2012 to 31st December 2012, M63/225-226, 229, 247, 369; P63/1380-1384 & 1642. [C222/1993]

M 6300225

M 6300226

M 6300229

M 6300247

M 6300369

P 6301380

P 6301381

P 6301383

P 6301384

P 6301642

96857 CONFIDENTIAL 26/02/2013 01/2012 - 01/2013 Cawse Project, Annual Report for the period 8th January 2012 to 7th January 2013, M24/224..........M24/802. [C257/1997]

M 2400224

M 2400389

M 2400517

M 2400518

M 2400519

M 2400520

M 2400543

M 2400544

M 2400547

M 2400548

M 2400549

M 2400550

M 2400573

M 2400579

M 2400619

96858 CONFIDENTIAL 26/02/2013 01/2012 - 01/2013 Warrida Well Project, Annual Report for the period 10th January 2012 to 9th January 2013, M36/177; E36/434-435, 468, 477, 624-629; P36/1609-1642,1653-1654,1657-1658; P37/7358-7360. [C204/1998]

E 3600624

Printed: 18/02/2019 02:28:38 PMPage 63 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 64: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHICHESTER METALS PTY LTD

ACCENT RESOURCES NL

ACCENT RESOURCES NL

PRODIGY GOLD NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

ACCENT RESOURCES NL

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

ENIGMA MINING LTDMESMERIC ENTERPRISES PTY LTD

ENIGMA MINING LTDMESMERIC ENTERPRISES PTY LTD

ENIGMA MINING LTDMESMERIC ENTERPRISES PTY LTD

ENIGMA MINING LTDMESMERIC ENTERPRISES PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

AGNEW GOLD MINING COMPANY PTY LIMITEDSARACEN METALS PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 64 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 65: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96858 CONFIDENTIAL 26/02/2013 01/2012 - 01/2013 Warrida Well Project, Annual Report for the period 10th January 2012 to 9th January 2013, M36/177; E36/434-435, 468, 477, 624-629; P36/1609-1642,1653-1654,1657-1658; P37/7358-7360. [C204/1998]

E 3600628

M 3600177

P 3601628

P 3601629

P 3601630

96860 CONFIDENTIAL 26/02/2013 01/2012 - 12/2012 Corunna Tin Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3413, 3438, 3469, 3711; P45/2748-2749. [C119/2011]

E 4503438

96861 CONFIDENTIAL 26/02/2013 01/2012 - 12/2012 Mount Brockman Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1533, 1679, 1690, 1762, 1808, 2055, 2056, 2138, 2143, 2160, 2331 & 2378; P47/1514, 1604-1605. [C125/2011]

E 4701533

E 4701762

E 4702160

E 4702331

E 4702378

96862 CONFIDENTIAL 26/02/2013 01/2012 - 12/2012 Kangan Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3191, 3270, 3650, 3764; E47/1652 & 2157. [C123/2011]

E 4503191

96863 CONFIDENTIAL 26/02/2013 01/2012 - 12/2012 Investigator Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1016, 1436, 1673-1674; M47-1433-1434. [C224/2008]

E 4701016

E 4701436

M 4701433

M 4701434

96867 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Breamore Project, Annual Report for the period 01/01/2012 to 31/12/2012, P37/7041-7042, 7055-7057, 7589, 7951 & 7952. [C9/2009]

P 3707951

P 3707952

96868 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Klondyke Gold Project, Annual Report for the period 01/01/2012 to 31/12/2012, M45/552, M45/668-670. [C30/2007]

M 4500552

M 4500668

M 4500669

M 4500670

96870 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Period 1 January 2012 – 31 December 2012 (C388/1993)

M 3800361

M 3800362

Printed: 18/02/2019 02:28:38 PMPage 65 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 66: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AGNEW GOLD MINING COMPANY PTY LIMITEDSARACEN METALS PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITEDSARACEN METALS PTY LIMITED

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

METALICITY ENERGY PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

GOLDEN MILE RESOURCES LTD

GOLDEN MILE RESOURCES LTD

KERAS (PILBARA) GOLD PTY LTD

KERAS (PILBARA) GOLD PTY LTD

KERAS (PILBARA) GOLD PTY LTD

KERAS (PILBARA) GOLD PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 66 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 67: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96870 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Period 1 January 2012 – 31 December 2012 (C388/1993)

M 3800483

96872 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Citadel Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/2874, 2876, 2877 & 2901. [C58/2007]

E 4502874

E 4502876

E 4502877

E 4502901

96873 CONFIDENTIAL 27/02/2013 01/2012 - 12/2012 Egerton Project, Annual Report for the period 01/01/2012 to 31/12/2012, M52/343 & M52/ 567. [C238/1995]

M 5200343

M 5200567

96877 CONFIDENTIAL 01/03/2013 12/2011 - 12/2012 Annual Report E63/811 (C188/2005) Fraser Range Project 30 December 2011 to 29 December 2012. [Petrography report for A100944]

E 6300811

96878 CONFIDENTIAL 05/03/2013 11/2011 - 11/2012 Annual Report Byro South Project C48/2011 for the period 23 November 2011 to 22 November 2012, E09/1508, E09/1781, E09/1657, E09/1656.

E 0901781

96879 CONFIDENTIAL 05/03/2013 11/2011 - 11/2012 Byro North Project 2012 Annual Report for the period 23 November 2011 to 22 November 2012, E09/1507, E09/1552, E09/1637, E09/1638

E 0901507

E 0901552

E 0901637

96880 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 Roy Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, M46/518, M46/519, M46/481 - 491& E46/586; E47/1326. [C52/1994]

E 4600586

M 4600481

M 4600482

M 4600483

M 4600484

M 4600485

M 4600486

M 4600487

M 4600488

M 4600489

M 4600490

M 4600491

M 4600518

M 4600519

Printed: 18/02/2019 02:28:38 PMPage 67 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 68: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GSM MINING COMPANY PTY LTD

ANTIPA RESOURCES PTY LTD

ANTIPA RESOURCES PTY LTD

ANTIPA RESOURCES PTY LTD

ANTIPA RESOURCES PTY LTD

EGERTON EXPLORATION PTY LTD

EGERTON EXPLORATION PTY LTD

FRASERX PTY LTDINDEPENDENCE NOVA PTY LTD

COMPLEX EXPLORATION PTY LTDBYRO EXPLORATION PTY LTD

BYRO EXPLORATION PTY LTDCOMPLEX EXPLORATION PTY LTD

BYRO EXPLORATION PTY LTDCOMPLEX EXPLORATION PTY LTD

COMPLEX EXPLORATION PTY LTDBYRO EXPLORATION PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

ROY HILL IRON ORE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 68 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 69: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96882 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 Annual Mineral Exploration Report for year ending 31st December 2011 Koolanooka South Project Combined Reporting Group No C187/2005, all tenements, Mining Leases 70/1164-I, 70/1190-I, Exploration Licence 70/2705-I, and 70/3848-I

E 7002705

M 7001164

M 7001190

96885 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 C204/2012 Annual Report 2012 Plumridge Project (E28/1475, E39/1084, E39/1117, E39/1118) for the period 1/01/2012 – 31/12/2012

E 2801475

E 3901084

96888 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104WEST KUNDANA Annual Report Period 1 January 2012 – 31 December 2012, C102/2004, E24/152....P26/3574

E 2400152

E 2400153

E 2600140

M 1500669

M 1500993

M 1501351

M 1501413

M 1600072

M 1600073

M 1600074

M 1600075

M 1600087

M 1600097

M 1600157

M 1600181

M 1600182

M 1600213

M 1600214

Printed: 18/02/2019 02:28:38 PMPage 69 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 70: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

SEGUE (PLUMRIDGE) PTY LTD

SEGUE (PLUMRIDGE) PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

RAND MINING LIMITEDGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

KUNDANA GOLD PTY LTD

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

GILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

GILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

Printed: 18/02/2019 02:28:38 PMPage 70 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 71: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96888 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104WEST KUNDANA Annual Report Period 1 January 2012 – 31 December 2012, C102/2004, E24/152....P26/3574

M 1600218

M 1600260

M 1600308

M 1600309

M 1600310

M 1600325

M 1600326

M 1600366

M 1600367

M 1600408

M 1600421

M 1600428

M 1600436

M 1600438

M 1600440

M 1600441

M 2400142

M 2400435

M 2400606

M 2400626

M 2400924

M 2600680

Printed: 18/02/2019 02:28:38 PMPage 71 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 72: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

KUNDANA GOLD PTY LTD

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

TRIBUNE RESOURCES NLGILT-EDGED MINING PTY LIMITED

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES LTD

RAND MINING LIMITEDGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

RAND EXPLORATION NLGILT-EDGED MINING PTY LIMITEDTRIBUNE RESOURCES NL

KUNDANA GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 72 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 73: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96888 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104WEST KUNDANA Annual Report Period 1 January 2012 – 31 December 2012, C102/2004, E24/152....P26/3574

M 2600681

M 2600687

M 2600688

P 1601531

P 1601532

96894 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Nullagine Gold Project C183/2012 Annual Report, from 1 January 2012 to 31 December 2012, G46/2...P46/1605

M 4600003

M 4600009

M 4600010

M 4600011

M 4600047

M 4600050

M 4600056

M 4600064

M 4600098

M 4600129

M 4600146

M 4600163

M 4600164

M 4600186

M 4600187

M 4600189

M 4600198

M 4600199

M 4600200

M 4600225

M 4600245

M 4600261

M 4600262

M 4600263

M 4600264

Printed: 18/02/2019 02:28:38 PMPage 73 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 74: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

HORIZON MINING LTDTRIBUNE RESOURCES NL

HORIZON MINING LTDTRIBUNE RESOURCES NL

MILLENNIUM MINERALS LIMITED

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

TAYLOR DAVID JOHN

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

TAYLOR DAVID JOHN

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 74 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 75: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96894 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Nullagine Gold Project C183/2012 Annual Report, from 1 January 2012 to 31 December 2012, G46/2...P46/1605

M 4600265

M 4600266

M 4600272

M 4600273

M 4600274

M 4600275

M 4600276

M 4600277

M 4600278

M 4600279

M 4600282

M 4600283

M 4600300

M 4600302

M 4600303

M 4600426

M 4600427

M 4600428

M 4600429

M 4600430

M 4600431

M 4600432

M 4600433

M 4600434

M 4600441

M 4600444

M 4600445

M 4600446

M 4600447

M 4600448

P 4601123

Printed: 18/02/2019 02:28:38 PMPage 75 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 76: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LTD

Printed: 18/02/2019 02:28:38 PMPage 76 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 77: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96895 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Jack Hills Project, Annual Report for the period 1st January 2012 to 31st December 2012, E20/627, 634, 458; E51/906; E52/1552-1554; P20/2179.[C150/2006]

E 2000458

E 2000627

E 2000634

E 5100906

E 5201552

E 5201553

E 5201554

P 2002179

96896 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Canegrass Project, Annual Report for the period 1st January 2012 to 31st December 2012, E58/232......359; P58/1174-1176.......P58/1445; P59/1851& 1865 -1866. [C137/2010].

E 5800232

E 5800236

E 5800282

96898 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Coogee Project Annual Report for the period 01/01/2012 to 31/12/2012, E26/97, C148/2001

M 2600477

96907 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Golden Grove Project, Annual Report for the period ending 31st December 2012, M59/3.......M59/543. [C294/1993]

M 5900003

M 5900088

M 5900089

M 5900090

M 5900091

M 5900092

M 5900093

M 5900094

M 5900095

M 5900143

M 5900195

M 5900227

M 5900361

M 5900362

M 5900363

M 5900480

M 5900543

Printed: 18/02/2019 02:28:38 PMPage 77 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 78: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

FLINDERS CANEGRASS PTY LTD

FLINDERS CANEGRASS PTY LTD

FLINDERS CANEGRASS PTY LTD

RAMELIUS RESOURCES LIMITED

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

EMR GOLDEN GROVE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 78 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 79: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96908 CONFIDENTIAL 28/02/2013 01/2012 - 12/2012 Yamarna Group 2 Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2427-2429, 2507; E39/1553-1555. [C73/2003]

E 3802427

E 3802507

96911 CONFIDENTIAL 01/03/2013 12/2011 - 12/2012 Vettersburg Project, Annual Report for the period 16th December 2011 to 15th December 2012, M24/37.

M 2400037

96912 CONFIDENTIAL 01/03/2013 12/2011 - 12/2012 Annual Report for the period 16 December 2011 to 15 December 2012, OBK Laterite Project, C76/1996, Report Period : 16 December 2011 – 15 December 2012 [M24/35 & M24/36]

M 2400035

M 2400036

96917 CONFIDENTIAL 05/03/2013 01/2012 - 12/2012 Combined Annual Technical Report for the period 1 January 2012 to 31 December 2012, Yalleen Project, C17/2007, E47/1169, E47/1170 and E47/1171

E 4701169

E 4701170

E 4701171

96921 CONFIDENTIAL 05/03/2013 11/2011 - 11/2012 DOOLGUNNA PROJECT E51/1322, E51/1323, E51/1324, 2012 COMBINED ANNUAL REPORT [C]196/2012.

E 5101324

96922 CONFIDENTIAL 05/03/2013 12/2011 - 12/2012 Ewington - Collie Basin Project, Annual Report for the period 23rd December 2011 to 22nd December 2012, CML12/844-845; M12/33-38. [C170/2011]

CML1200844

CML1200845

M 1200033

M 1200034

M 1200035

M 1200036

M 1200037

M 1200038

96923 CONFIDENTIAL 05/03/2013 12/2011 - 12/2012 Muja South - Collie Basin Project, Annual Report for the year ending 21st December 2012, CML128/774-775; E12/1; M12/39, 44; P12/14-15. C169/2011]

CML1200774

CML1200775

E 1200001

M 1200039

M 1200044

P 1200014

P 1200015

96925 CONFIDENTIAL 05/03/2013 01/2012 - 01/2013 ANNUAL REPORT FOR LAKE CHANDLER PROJECT MINING LEASE 77/22 YILGARN MINERAL FIELD - WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 17 JANUARY 2012 TO 16 JAUNARY 2013

M 7700022

Printed: 18/02/2019 02:28:38 PMPage 79 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 80: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SUMITOMO METAL MINING OCEANIA PTY LTDGOLD ROAD (SOUTH YAMARNA) PTY LTD

SUMITOMO METAL MINING OCEANIA PTY LTDGOLD ROAD (SOUTH YAMARNA) PTY LTD

GARDNER ROBERT CHARLES

GARDNER ROBERT CHARLES

GARDNER ROBERT CHARLES

HELIX RESOURCES LTD

HELIX RESOURCES LTD

HELIX RESOURCES LTD

GREAT WESTERN EXPLORATION LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

THE GRIFFIN COAL MINING COMPANY PTY LIMITED

ACTIVEX LIMITED

Printed: 18/02/2019 02:28:38 PMPage 80 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 81: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96927 CONFIDENTIAL 28/02/2013 02/2012 - 02/2013 Annual Technical Report E04/2026 Clara Hills; Period 7/02/2012 to 6/02/2013 E 0402026

96928 CONFIDENTIAL 28/02/2013 11/2011 - 11/2012 E38/2411 Annual Exploration Report for the period 30/11/2011 – 29/11/2012 E 3802411

96930 CONFIDENTIAL 28/02/2013 04/2011 - 04/2012 P38/3905 Annual Exploration Report for the Period 12/04/2011 – 11/04/2012 P 3803905

96934 CONFIDENTIAL 28/02/2013 01/2012 - 01/2013 E38/1958 Annual Exploration Report for the period 28/01/2012 - 27/01/2013 E 3801958

96935 CONFIDENTIAL 28/02/2013 11/2011 - 11/2012 Laverton Project, Annual Report for the period 23/11/2011 to 22/11/2012, E38/2233.

E 3802233

96938 CONFIDENTIAL 28/02/2013 01/2012 - 01/2013 Serpentine Lakes Project, Annual Report for the period 3rd January 2012 to 2nd January 2013, E69/2033-2035. [C71/2008]

E 6902034

96940 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Mount Kilkenny Project, Combined Annual Report C174/2005 2012 Annual Report [for the period 1st January 2012 to 31st December 2012, E37/878; E39/1266-1267; M39/845, 878-879; P39/4571 & 4827.]

M 3900878

M 3900879

96942 CONFIDENTIAL 06/03/2013 02/2012 - 02/2013 RAILWAY ANNUAL REPORT EXPLORATION LICENCE 47/753 West Pilbara Mineral Field Western Australia Annual Report for the Period 03 February 2012 to 02 February 2013

E 4700753

96943 CONFIDENTIAL 06/03/2013 04/2012 - 03/2013 PINARRA ANNUAL REPORT EXPLORATION LICENCE 47/1277 West Pilbara Mineral Field Western Australia Annual Report for the Period 31 March 2012 to 30 March 2013

E 4701277

96944 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Spearhole Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/2043-2044; P52/1186, 1188 & 1212. [C165/2005]

E 5202043

E 5202044

96945 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.

E 0800788

Printed: 18/02/2019 02:28:38 PMPage 81 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 82: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ALEXANDER CREEK PTY LTD

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

IMAGE RESOURCES NL

NIWEST LIMITED

NIWEST LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

Printed: 18/02/2019 02:28:38 PMPage 82 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 83: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96945 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.

E 0801196

96946 CONFIDENTIAL 06/03/2013 01/2012 - 01/2013 KOODAIDERI PROJECT AREA COMBINED ANNUAL REPORT (C20/1992) EXPLORATION LICENCES 47/328, 47/421, 47/487, 47/525, 47/1490 & 47/1491 West Pilbara Mineral Field Western Australia Annual Report for the Period 27 January 2012 to 26 January 2013.

E 4700328

E 4700421

E 4700487

E 4700525

E 4701490

E 4701491

96950 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Yalgoo Project, Annual Report for the period 1st January 2012 to 31st December 2012, M59/57, M59/282-285, M59/322-324, M59/329, M59/407-408 & M59/428-429. [C230/1998]

M 5900057

96951 CONFIDENTIAL 06/03/2013 02/2012 - 01/2013 Yandal Project, Annual Report for the period 1st February 2012 to 31st January 2013, E53/1223-1224; P53/1308-1323 (Ironstone Well & Flushing Meadows). [C139/2008]

E 5301223

E 5301224

96953 CONFIDENTIAL 06/03/2013 02/2012 - 02/2013 HICKMAN PROJECT Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 2 February 2013, E47/1615-I E47/2051-I & E47/2054-I (C147/2010)

E 4702052

E 4702053

E 4702054

96955 CONFIDENTIAL 06/03/2013 02/2012 - 02/2013 Wodgina Project E45/2175-I Annual Technical Report to the Department of Mines and Petroleum for the Period Ending13 February 2013

E 4502175

96956 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Killi Killi Project, Annual Report for the period 1st January 2012 to 31st January 2012, E80/4029 & 4197. [C201/2010]

E 8004029

E 8004197

96957 CONFIDENTIAL 06/03/2013 01/2012 - 01/2013 Mt Oscar Project, Annual Report for the period 8th January 2012 to 7th January 2013, E47/1217.

E 4701217

96960 CONFIDENTIAL 07/03/2013 11/2011 - 11/2012 Combined Annual Report GORDON SIRDAR PROJECT Combined Reporting Number C207/2010 For the Period 19th November 2011—18th November 2012, P27/1864....P27/1915

P 2701911

96961 CONFIDENTIAL 07/03/2013 01/2012 - 01/2013 Combined Annual Mineral Exploration Report South Laverton Area Yilgangi 2 Project C23/2010 For the Period 12th January 2012 to 11th January 2013

M 3100426

Printed: 18/02/2019 02:28:38 PMPage 83 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 84: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

ADDINK JOHANNES PETER

NEMEX PTY LTDOREX MINING PTY LTD

NEMEX PTY LTDOREX MINING PTY LTD

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

WODGINA LITHIUM PTY LTD

RICH RESOURCES INVESTMENTS PTY LTD

RICH RESOURCES INVESTMENTS PTY LTD

FOX RADIO HILL PTY LTD

KESLI CHEMICALS PTY LTD

LEGACY IRON ORE LTD

Printed: 18/02/2019 02:28:38 PMPage 84 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 85: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96961 CONFIDENTIAL 07/03/2013 01/2012 - 01/2013 Combined Annual Mineral Exploration Report South Laverton Area Yilgangi 2 Project C23/2010 For the Period 12th January 2012 to 11th January 2013

M 3100427

96962 CONFIDENTIAL 07/03/2013 01/2012 - 01/2013 2012/2013 Annual Report, Mulgabbie North Project, M28/240 for the period 6 January 2012-7 January 2013

M 2800240

96966 CONFIDENTIAL 12/03/2013 11/2011 - 11/2012 Wonganoo Project, Annual Report for the period 18th November 2011 to 17th November 2012, E53/1482.

E 5301482

96968 CONFIDENTIAL 01/03/2013 01/2012 - 01/2013 Annual report for the period 15 January 2012 to 14 January 2013, Anthill Project, C216/2010, P16/2336, P16/2337, P16/2338, P16/2339

P 1602336

P 1602337

P 1602338

P 1602339

96970 CONFIDENTIAL 06/03/2013 01/2012 - 12/2012 Jerdacuttup Project, Annual Report for theperiod 1st January 2012 to 31st December 2012, E74/439; M74/82, 84, 85 & 106. [C150/2012]

M 7400082

M 7400084

M 7400085

M 7400106

96972 CONFIDENTIAL 08/03/2013 11/2011 - 10/2012 Combined Annual Report for the Marda Project, C240/2011 for the period 1 November 2011 to 31 October 2012.

E 7701427

E 7701474

E 7701477

E 7701899

E 7701921

E 7701976

M 7700394

M 7700646

M 7700931

M 7700962

96973 CONFIDENTIAL 08/03/2013 11/2011 - 10/2012 Combined annual report for the Battler–Glendower Project, C103/2003 (M77/166, M77/1025, M77/1044 & P77/3645), Yilgarn Mineral Field, for the period 1 November 2011 to 31 October 2012.

M 7700166

M 7701025

M 7701044

P 7703645

96975 CONFIDENTIAL 08/03/2013 12/2011 - 12/2012 Combined Annual report for the Acra Project, C74/2004 (E27/273, E27/278, E28/1746, E28/2109 & P28/1120), North East Coolgardie Mineral Field, for the period 9 December 2011 to 8 December 2012.

E 2700278

E 2801746

Printed: 18/02/2019 02:28:38 PMPage 85 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 86: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CAZALY RESOURCES LTDLEGACY IRON ORE LTD

PUMPHREY ANDREW IAN

EGF NICKEL PTY LTD

METALIKO RESOURCES LIMITED

METALIKO RESOURCES LIMITED

METALIKO RESOURCES LIMITED

METALIKO RESOURCES LIMITED

AML (RAVENSTHORPE) PTY LTD

AML (RAVENSTHORPE) PTY LTD

AML (RAVENSTHORPE) PTY LTD

AML (RAVENSTHORPE) PTY LTD

SOUTHERN CROSS GOLDFIELDS LTD

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

PIONEER RESOURCES LIMITEDNORTHERN STAR RESOURCES LTD

PIONEER RESOURCES LIMITEDNORTHERN STAR RESOURCES LTD

Printed: 18/02/2019 02:28:38 PMPage 86 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 87: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96976 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 Annual report for the period 1st of January 2012 to 31st of December 2012 Windaroo Project, C144/2011

E 5202311

96978 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 DAVYHURST PROJECT C58/2008 Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 E30/320....P30/1086-1087

E 3000334

E 3000335

E 3000336

E 3000338

M 1600220

M 1600470

M 3000001

M 3000005

M 3000007

M 3000021

M 3000034

M 3000039

M 3000042

M 3000044

M 3000048

M 3000059

M 3000063

M 3000072

M 3000073

M 3000074

M 3000075

M 3000080

M 3000100

M 3000102

M 3000103

M 3000106

M 3000107

M 3000108

M 3000109

M 3000111

M 3000122

Printed: 18/02/2019 02:28:38 PMPage 87 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 88: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 88 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 89: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96978 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 DAVYHURST PROJECT C58/2008 Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 E30/320....P30/1086-1087

M 3000123

M 3000126

M 3000129

M 3000131

M 3000132

M 3000135

M 3000137

M 3000148

M 3000150

M 3000159

M 3000187

P 3001042

P 3001043

96982 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Nydinghyu Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1320, 1387, 1388, 2177, 2638; M47/1461. [C127/2011]

E 4701320

E 4701387

E 4701388

E 4702177

M 4701461

96983 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Hardey Project C122/2011Annual report for the period 1st of January 2012 to 31st of December 2012, E08/2034, E47/1396, E47/2236, E47/2237, P47/1237, P47/1513, P47/1606, P47/1607, P47/1608

E 4701396

E 4702236

P 4701237

96984 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Lynn Peak Project C124/2011 Annual report for the period 1 January 2012 – 31 December 2012, E46/728, E46/741, E46/776, E46/799, E46/832, E46/861, E46/862, E46/958

E 4600741

E 4600776

E 4600799

E 4600861

E 4600862

96985 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Dingo Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E46/517,703-704, 706, 711, 859 & 872. [C121/2011]

E 4600517

E 4600706

E 4600711

Printed: 18/02/2019 02:28:38 PMPage 89 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 90: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 90 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 91: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96985 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Dingo Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E46/517,703-704, 706, 711, 859 & 872. [C121/2011]

E 4600859

96986 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Owen Anchorage Combined Reporting C106/2005 Annual Report: 1 Jan 2012 – 31 Dec 2012 Cockburn Cement Exploration Licences 70/1136+WA-3-EOS, 70/1142, 70/1247+WA-1-EOS, 70/1298+WA-4-EOS, 70/1300+WA-5-EOS

E 7001136

E 7001247

E 7001298

E 7001300

96987 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Mount Padbury Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1560, 1581, 1862, 1976, 2278, 2279, 2432, 2437; P52/1330-1331 & 1342. [C161/2009]

E 5201862

E 5201976

E 5202279

96988 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, 1860-1861, 2118, 2236, 2368, 2396, 2436; P52/1329, 1332-1333. [C230/2007]

E 5201557

E 5201860

E 5202368

P 5201329

96990 CONFIDENTIAL 07/03/2013 01/2012 - 01/2013 Morelands Find Project, Annual Report for the period 04/01/2012 to 03/01/2013, M25/4.

M 2500004

96991 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 Claypan Dam Project, Annual Report for the period 1st January 2012 to 31st December 2012, M24/462, M24/640; M27/202. [C294/1996]

M 2400462

M 2400640

M 2700202

96993 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15......M16/527; P15/ 4658........P15/5025; P16/2223.....P16/2670. [C153/2006].

M 1500696

M 1600015

M 1600017

M 1600022

M 1600024

M 1600033

M 1600036

M 1600040

M 1600047

M 1600052

M 1600099

Printed: 18/02/2019 02:28:38 PMPage 91 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 92: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

DESERT RESOURCES PTY LTD

LINDSAY ROGER MICHAEL

BARRICK (AUSTRALIA PACIFIC) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 92 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 93: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96993 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15......M16/527; P15/ 4658........P15/5025; P16/2223.....P16/2670. [C153/2006].

M 1600139

M 1600140

M 1600141

M 1600152

M 1600178

M 1600179

M 1600183

M 1600189

M 1600195

M 1600198

M 1600199

M 1600200

M 1600217

M 1600236

M 1600248

M 1600306

M 1600335

M 1600354

M 1600451

M 1600526

M 1600527

P 1504658

P 1504659

P 1504892

P 1504894

P 1504895

P 1504896

P 1504897

P 1504898

P 1504899

P 1504900

P 1505022

Printed: 18/02/2019 02:28:38 PMPage 93 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 94: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

PHOENIX GOLD LIMITED

PHOENIX GOLD LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 94 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 95: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96993 CONFIDENTIAL 08/03/2013 01/2012 - 12/2012 Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15......M16/527; P15/ 4658........P15/5025; P16/2223.....P16/2670. [C153/2006].

P 1505023

P 1505024

P 1505025

P 1602417

P 1602419

P 1602426

P 1602428

P 1602429

P 1602430

P 1602448

P 1602449

P 1602604

P 1602605

P 1602607

P 1602669

P 1602670

96997 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 COMBINED ANNUAL TECHNICAL REPORT C16/2008 FORTNUM TENEMENT NUMBERS E52/1655, E52/1659 and E52/1671 PEAK HILL MINERAL FIELD, WESTERN AUSTRALIA ROBINSON RANGE SG50-07 1:250,000 MAPSHEET

E 5201659

E 5201671

96998 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 ANNUAL TECHNICAL REPORT FOR COMBINED REPORT C591/1994 FORTNUM PROJECT TENEMENT NUMBERS M52/5, M52/6, M52/93, M52/95, M52/96, M52/98, M52/99, M52/125, M52/132, M52/133, M52/338, P52/1147, P52/1148, P52/1149, P52/1150, P52/1151, P52/1152, P52/1153, P52/1154, P52/1155, P52/1156, P52/1157, P52/1158, P2/1159, P52/1160, P52/1169, P52/1170, P52/1171, P52/1172

M 5200005

M 5200006

M 5200093

M 5200095

M 5200096

M 5200098

M 5200099

M 5200125

Printed: 18/02/2019 02:28:38 PMPage 95 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 96: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

JACKSON MINERALS PTY LTDAURIS EXPLORATION PTY LTD

JACKSON MINERALS PTY LTDAURIS EXPLORATION PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 96 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 97: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

96998 CONFIDENTIAL 07/03/2013 01/2012 - 12/2012 ANNUAL TECHNICAL REPORT FOR COMBINED REPORT C591/1994 FORTNUM PROJECT TENEMENT NUMBERS M52/5, M52/6, M52/93, M52/95, M52/96, M52/98, M52/99, M52/125, M52/132, M52/133, M52/338, P52/1147, P52/1148, P52/1149, P52/1150, P52/1151, P52/1152, P52/1153, P52/1154, P52/1155, P52/1156, P52/1157, P52/1158, P2/1159, P52/1160, P52/1169, P52/1170, P52/1171, P52/1172

M 5200132

M 5200133

M 5200338

96999 CONFIDENTIAL 13/03/2013 11/2011 - 11/2012 Doolgunna (JV) Project, Annual Report for the period 6th November 2011 to 5th November 2012, E52/2402 ; M52/597. [C102/2010]

E 5202402

M 5200597

97005 CONFIDENTIAL 08/03/2013 10/2011 - 10/2012 Combined Annual Technical Report C52/2002 Reporting Period 24 December 2011 to 25 December 2012, M15/1515, M15/1519, M15/1520, M15/1521, M15/1522

M 1501515

M 1501519

M 1501520

M 1501521

M 1501522

97013 CONFIDENTIAL 08/03/2013 03/2012 - 03/2013 Abbotts Project, Annual Report for the period 2nd March 2012 to 1st March 2013, E51/913, 1043, 1277-1278; M51/390, 566-567, & M51/656-658. [C209/2008]

M 5100390

M 5100567

97019 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Speewah Project, Annual Report for the period 1st January 2012 to 31st December 2012, M80/267, 268 & 269; E80/2863, 3657 & 4468. [C308/1993

E 8002863

E 8003657

E 8004468

M 8000267

M 8000268

M 8000269

97023 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Annual report for the period 1 January 2012 to 31 December 2012 for the combined reporting group Opthalmia

E 4702172

E 4702173

97024 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Yanrey Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1489-1490, 1493, 1501, 2017, 2081 & 2205. [C77/2007]

E 0801489

E 0801490

E 0801493

E 0801501

E 0802017

Printed: 18/02/2019 02:28:38 PMPage 97 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 98: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

THUNDELARRA LIMITEDRICHMOND WILLIAM ROBERT

RICHMOND WILLIAM ROBERTTHUNDELARRA LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

DORAY MINERALS LIMITED

DORAY MINERALS LIMITED

SPEEWAH MINING PTY LTD

SPEEWAH MINING PTY LTD

SPEEWAH MINING PTY LTD

SPEEWAH MINING PTY LTD

SPEEWAH MINING PTY LTD

SPEEWAH MINING PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

CAULDRON ENERGY LTD

CAULDRON ENERGY LTD

CAULDRON ENERGY LTD

CAULDRON ENERGY LTD

CAULDRON ENERGY LTD

Printed: 18/02/2019 02:28:38 PMPage 98 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 99: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97024 CONFIDENTIAL 14/03/2013 01/2012 - 12/2012 Yanrey Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1489-1490, 1493, 1501, 2017, 2081 & 2205. [C77/2007]

E 0802081

E 0802205

97030 CONFIDENTIAL 11/03/2013 01/2012 - 12/2012 Gabbin Project, Annual Report for the period 01/01/2012 to 31/12/2012, M70/324 & M70/439. [C150/2005]

M 7000324

M 7000439

97032 CONFIDENTIAL 12/03/2013 01/2012 - 12/2012 Lanfranchi Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/473; ML15/346-347, 367-372, 375-389 & 482-493; P15/3752 (Tramways Tenements). [C185/2010]

M 1500473

ML 1500346

ML 1500347

ML 1500367

ML 1500368

ML 1500369

ML 1500370

ML 1500371

ML 1500372

ML 1500375

ML 1500376

ML 1500377

ML 1500378

ML 1500379

ML 1500380

ML 1500381

ML 1500382

ML 1500383

ML 1500384

ML 1500385

ML 1500386

ML 1500387

ML 1500388

ML 1500389

ML 1500482

ML 1500483

ML 1500484

Printed: 18/02/2019 02:28:38 PMPage 99 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 100: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CAULDRON ENERGY LTD

CAULDRON ENERGY LTD

WEST AUSTRALIAN KAOLIN COMPANY PTY LTD

WEST AUSTRALIAN KAOLIN COMPANY PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 100 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 101: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97032 CONFIDENTIAL 12/03/2013 01/2012 - 12/2012 Lanfranchi Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/473; ML15/346-347, 367-372, 375-389 & 482-493; P15/3752 (Tramways Tenements). [C185/2010]

ML 1500485

ML 1500486

ML 1500487

ML 1500488

ML 1500489

ML 1500490

ML 1500491

ML 1500492

ML 1500493

97047 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Murrin Murrin Project, Annual Report for the period 1st January 2012 to 31st December 2012, M37/630, 933, 1077 & 1103; M39/151........M39/1066; P37/7285........P37/7292; P39/4651......P39/4776. [C308/1997]

M 3700630

M 3700933

M 3701077

M 3701103

M 3900151

M 3900299

M 3900300

M 3900301

M 3900342

M 3900343

M 3900371

M 3900372

M 3900388

M 3900397

M 3900398

M 3900399

M 3900400

Printed: 18/02/2019 02:28:38 PMPage 101 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 102: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

CHERISH METALS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

CONNOR BRENDAN GABRIEL

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 102 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 103: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97047 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Murrin Murrin Project, Annual Report for the period 1st January 2012 to 31st December 2012, M37/630, 933, 1077 & 1103; M39/151........M39/1066; P37/7285........P37/7292; P39/4651......P39/4776. [C308/1997]

M 3900420

M 3900421

M 3900422

M 3900423

M 3900424

M 3900425

M 3900426

M 3900429

M 3900435

M 3900436

M 3900439

M 3900440

M 3900445

M 3900456

M 3900524

M 3900552

M 3900553

M 3900569

M 3900651

M 3900683

M 3900684

Printed: 18/02/2019 02:28:38 PMPage 103 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 104: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 104 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 105: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97047 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Murrin Murrin Project, Annual Report for the period 1st January 2012 to 31st December 2012, M37/630, 933, 1077 & 1103; M39/151........M39/1066; P37/7285........P37/7292; P39/4651......P39/4776. [C308/1997]

M 3900708

M 3900737

M 3900738

M 3900765

M 3900809

M 3900848

M 3901066

P 3707285

P 3707286

P 3707287

P 3707289

P 3707291

P 3707292

P 3904653

P 3904655

P 3904658

P 3904661

P 3904662

P 3904775

P 3904776

97049 CONFIDENTIAL 13/03/2013 12/2011 - 12/2012 Crest Yard Project, Annual Report for the period 15th december 2011 to 14th December 2012, P16/2722-2731& P16/2733-2736. [C188/2012]

P 1602722

Printed: 18/02/2019 02:28:38 PMPage 105 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 106: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

Printed: 18/02/2019 02:28:38 PMPage 106 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 107: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97049 CONFIDENTIAL 13/03/2013 12/2011 - 12/2012 Crest Yard Project, Annual Report for the period 15th december 2011 to 14th December 2012, P16/2722-2731& P16/2733-2736. [C188/2012]

P 1602726

P 1602728

P 1602729

P 1602730

P 1602731

97051 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 PORPHYRY NORTH PROJECT COMBINED ANNUAL TECHNICAL REPORT EXPLORATION LICENCES E31/910, 942, 954, 1001, and E39/1516 NORTH COOLGARDIE MINERAL FIELD WA 1 January 2012- 31 December 2012. [C115/2012]

E 3100910

E 3100942

97052 CONFIDENTIAL 18/03/2013 01/2012 - 12/2012 Telfer Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/975.......E45/3255; M45/6.....M45/633; P45/2596-2597, 2681 & 2698-2699. [C348/1995]

E 4500975

E 4501070

E 4501168

E 4501705

E 4501957

E 4502932

E 4502962

E 4503100

E 4503255

E 4503261

M 4500006

M 4500007

M 4500008

M 4500009

M 4500010

M 4500011

Printed: 18/02/2019 02:28:38 PMPage 107 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 108: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

CREST METALS PTY LTDNEWFIELD RESOURCES LTD

SALAZAR GOLD PTY LTD

SALAZAR GOLD PTY LTD

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITEDNEWCREST OPERATIONS LIMITED

NEWCREST MINING LIMITED

NEWCREST OPERATIONS LIMITED

NEWCREST OPERATIONS LIMITED

NEWCREST OPERATIONS LIMITED

NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 108 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 109: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97052 CONFIDENTIAL 18/03/2013 01/2012 - 12/2012 Telfer Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/975.......E45/3255; M45/6.....M45/633; P45/2596-2597, 2681 & 2698-2699. [C348/1995]

M 4500033

M 4500203

M 4500204

M 4500205

M 4500206

M 4500207

M 4500208

M 4500209

M 4500210

M 4500211

M 4500249

M 4500364

M 4500399

M 4500400

M 4500532

M 4500533

M 4500576

M 4500580

M 4500581

M 4500612

M 4500620

M 4500621

M 4500622

M 4500631

M 4500632

M 4500633

Printed: 18/02/2019 02:28:38 PMPage 109 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 110: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST USA, INC.NEWCREST OPERATIONS LIMITED

NEWCREST MINING LIMITEDNEWCREST OPERATIONS LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

NEWCREST MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 110 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 111: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97065 CONFIDENTIAL 15/02/2013 02/2012 - 02/2013 HORSE ROCK BORE PROJECT E31/887 ANNUAL REPORT 15 February 2012 to 14 February 2013

E 3100887

97068 CONFIDENTIAL 15/03/2013 12/2011 - 11/2012 Alicia Project, Annual Report for the period 1st December 2011 to 30th November 2012, M39/701. [C149/2009]

M 3900701

97069 CONFIDENTIAL 15/03/2013 11/2011 - 11/2012 Golden Virgin Project, Annual Report for the period 8th November 2011 to 7th November 2012, M77/405. [C129/2008]

M 7700405

97070 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Kundip Project, Annual Report for the period 01/01/2012 to 31/12/2012, M74/41.......M74/180; E74/245.............E74/498; P74/228............P74/341. [C115/1996]

E 7400245

E 7400311

E 7400391

E 7400413

E 7400462

E 7400486

E 7400498

M 7400041

M 7400051

M 7400053

M 7400135

M 7400176

M 7400180

P 7400337

97071 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Gunbarrel Project, Annual Report for theperuiod 1st January 2012 to 31st December 2012, E53/1299 & 1300. [C162/2009]

E 5301299

E 5301300

97073 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Kambalda West Project, Annual Report for the period 1st January 2012 to 31st December 2012, E15/972-974, 983-984 & 1069; M15/401,718-720, 841-843 & 1221-1224; P15/4968-4970, 5122-5129 & 5250. [C96/2008]

E 1500972

E 1500973

E 1500974

E 1500983

E 1500984

M 1500401

M 1500718

M 1500719

M 1500720

Printed: 18/02/2019 02:28:38 PMPage 111 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 112: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GLOBAL FORTUNE INVESTMENT LIMITED

WESTCAPE NOMINEES PTY LTD

DJO MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

ACH MINERALS PTY LTD

CULLEN EXPLORATION PTY LIMITED

CULLEN EXPLORATION PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

BHP BILLITON NICKEL WEST PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 112 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 113: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97073 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Kambalda West Project, Annual Report for the period 1st January 2012 to 31st December 2012, E15/972-974, 983-984 & 1069; M15/401,718-720, 841-843 & 1221-1224; P15/4968-4970, 5122-5129 & 5250. [C96/2008]

M 1500841

M 1500842

M 1500843

M 1501221

M 1501222

M 1501223

M 1501224

97080 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Combined Annual Report for Mining Licences M53/194 & M53/456 and Exploration Licences E53/1631 and E53/1632 - C316/1993 – Bogada Bore Project, for the period 1st January 2012 to 31st December 2012

E 5301391

E 5301392

M 5300194

M 5300456

97081 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 Annual Report for the period 1 January 2012 to 31 December 2012, Koolyanobbing Project C184/2005, E77/1004-I, E77/1307-I, E77/1407-I, E77/1481-I, E77/1722-I, M77/606-IM77/607-I, M77/611-I, M77/676-I, M77/737-I, M77/839-I, M77/988-I, M77/989-I, M77/990-I, P77/3807-I& P77/4026

E 7701004

M 7700606

M 7700607

M 7700611

M 7700988

M 7700989

M 7700990

97084 CONFIDENTIAL 15/03/2013 10/2011 - 10/2012 DEEP SOUTH (BELIZE)PROJECT Combined Report C122/2010 E39/1298 – 1302, E39/715, P39/4703-4707 and P39/4709 Annual Report for the period 24 October 2011 to 23 October 2012

E 3901298

E 3901299

P 3904703

P 3904704

97085 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 LADY IDA PROJECT Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 C59/2008, E16/252.....P16/2551

E 1600337

E 1600344

M 1600262

M 1600263

M 1600264

Printed: 18/02/2019 02:28:38 PMPage 113 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 114: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

BOGADA GOLD PTY LTD

BOGADA GOLD PTY LTD

BOGADA GOLD PTY LTD

BOGADA GOLD PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

AVOCA RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

HAWTHORN RESOURCES LIMITED

AVOCA RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

HAWTHORN RESOURCES LIMITED

CARNEGIE GOLD PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 114 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 115: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97085 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 LADY IDA PROJECT Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 C59/2008, E16/252.....P16/2551

M 1600268

97091 CONFIDENTIAL 18/03/2013 01/2012 - 12/2012 Combined Annual Report C315/1993 for Mining Lease M53/175 Exploration Licence E53/1086 – Mandilla Well Project, for the period 1st January 2012 to 31st December 2012.

M 5300175

97093 CONFIDENTIAL 18/03/2013 02/2012 - 02/2013 ANNUAL REPORT C40/2005–MARILLANA - YANDICOOGINA PROJECT FOR THE PERIOD 17 FEBRUARY 2012 to 16 FEBRUARY 2013

E 4701239

E 4701385

M 4701353

M 4701354

M 4701355

M 4701356

M 4701359

M 4701439

97094 CONFIDENTIAL 18/03/2013 01/2012 - 01/2013 Garnet Hills Project, M80/416 Annual report for the period ending 17th January 2013

M 8000416

97099 CONFIDENTIAL 18/03/2013 03/2012 - 03/2013 Glenburgh Project Combined-Annual Report (C194/2006) E09/1325, E09/1764, E09/1865, E09/1866, P099/0471, P09/0472, P09/0473, P09/0474 for the period 10th March 2012 – 9th March 2013

E 0901325

E 0901764

E 0901865

E 0901866

97102 CONFIDENTIAL 19/03/2013 01/2012 - 12/2012 Paterson Project, (Yeneena JV) Annual Report for the period 1st January 2012 to 31st December 2012, E45/2500-2503, 2561, 2657-2658 & E45/2805-2806. [C293/2011]

E 4502500

E 4502501

E 4502502

E 4502561

E 4502657

E 4502658

E 4502805

E 4502806

97109 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 C173/2005 Hepi Project Annual Report 2012 for the period 1st January 2012 to 31st December 2012, M39/427, 460, 717, 718, 758, 819, 825, P39/4496, 4572, 4729 – 4738, 4751, 4999, 5000 and 5090,5093, 5094 and 5149

M 3900427

Printed: 18/02/2019 02:28:38 PMPage 115 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 116: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CARNEGIE GOLD PTY LTD

CREASY MARK GARETH

BC PILBARA IRON ORE PTY LTD

IRON VALLEY PTY LTD

AUSTRALIAN ABORIGINAL MINING CORPORATION PTY LTD

AUSTRALIAN ABORIGINAL MINING CORPORATION PTY LTD

AUSTRALIAN ABORIGINAL MINING CORPORATION PTY LTD

AUSTRALIAN ABORIGINAL MINING CORPORATION PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

IRON VALLEY PTY LTD

GARNET HILLS PTY LTD

GASCOYNE RESOURCES (WA) PTY LTD

GASCOYNE RESOURCES LIMITED

GASCOYNE RESOURCES (WA) PTY LTD

GASCOYNE RESOURCES (WA) PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

ENCOUNTER OPERATIONS PTY LTD

GOLDEN CLIFFS NL

Printed: 18/02/2019 02:28:38 PMPage 116 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 117: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97109 CONFIDENTIAL 15/03/2013 01/2012 - 12/2012 C173/2005 Hepi Project Annual Report 2012 for the period 1st January 2012 to 31st December 2012, M39/427, 460, 717, 718, 758, 819, 825, P39/4496, 4572, 4729 – 4738, 4751, 4999, 5000 and 5090,5093, 5094 and 5149

M 3900460

M 3900717

M 3900718

M 3900758

M 3900819

M 3900825

97112 CONFIDENTIAL 19/03/2013 01/2012 - 12/2012 YANDICOOGINA PROJECT C185/2011 M45/368 and E45/3293 Annual Combined Report for the period 1 January 2012 to 31 Dec 2012

M 4500368

97125 CONFIDENTIAL 19/03/2013 01/2012 - 12/2012 Koolyanobbing (JV) Project, [Part B], Annual Report for the period 01/01/2012 to 31/12/2012, E77/1004, 1307, 1407 & 1481; M77/606-607, 611, 676, 737, 839 & 988-990; P77/3482 & 3807. [C184/2005]

E 7701004

M 7700606

M 7700607

M 7700611

M 7700988

M 7700989

M 7700990

97128 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/527....P52/1224

E 5200527

E 5202071

E 5202072

M 5200183

M 5200217

M 5200218

M 5200219

M 5200220

M 5200226

M 5200227

Printed: 18/02/2019 02:28:38 PMPage 117 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 118: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WANBANNA PTY LTDNIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

GOLDEN CLIFFS NL

MARSHALL WILLIAM JOHNMUSKETEER MINING LIMITEDFLETCHER JOY ANN

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

DAMPIER (PLUTONIC) PTY LTD

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 118 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 119: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97128 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/527....P52/1224

M 5200228

M 5200229

M 5200230

M 5200231

M 5200232

M 5200233

M 5200234

M 5200235

M 5200246

M 5200247

M 5200253

M 5200257

M 5200258

M 5200259

M 5200269

M 5200270

M 5200278

M 5200279

M 5200291

M 5200292

M 5200293

Printed: 18/02/2019 02:28:38 PMPage 119 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 120: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

NORTHERN STAR RESOURCES LTD

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 120 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 121: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97128 CONFIDENTIAL 13/03/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012 Plutonic Dome Project C226/2012, E52/527....P52/1224

M 5200299

M 5200303

M 5200304

M 5200305

M 5200306

M 5200320

M 5200321

M 5200323

M 5200366

M 5200367

M 5200369

M 5200370

M 5200395

M 5200396

M 5200478

M 5200572

M 5200590

M 5200593

M 5200654

M 5200670

M 5200671

M 5200672

Printed: 18/02/2019 02:28:38 PMPage 121 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 122: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

NORTHERN STAR RESOURCES LTD

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

NORTHERN STAR RESOURCES LTD

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

DAMPIER (PLUTONIC) PTY LTDVANGO MINING LIMITED

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

Printed: 18/02/2019 02:28:38 PMPage 122 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 123: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97129 CONFIDENTIAL 20/03/2013 01/2012 - 12/2012 Combined Annual Geological Report on the QUARTZ CREEK PROSPECT MINING LEASES 59/291, 59/346 & 59/347 (GSWA Ref: C37/2000) for the period 1st January 2012 to 31st December 2012

M 5900291

M 5900346

M 5900347

97131 CONFIDENTIAL 20/03/2013 02/2012 - 01/2013 Lake Cowan Project, Annual Report for the period 1st February 2012 to 31st January 2013, E15/810, 949, 951, 956, 1037-1038, 1094, 1115, 1117, 1203, 1223, & 1259-1260; M15/1132-1135; P15/5375-5376 & 5440. [C125/2000]

E 1500810

E 1501037

E 1501094

E 1501117

E 1501203

E 1501223

E 1501260

M 1501132

M 1501133

M 1501134

M 1501135

97132 CONFIDENTIAL 20/03/2013 01/2012 - 01/2013 Evanston Shear Project, Annual Report for the period 31st January 2012 to 30th January 2013, E77/1117, 1295, 1321-1322 & 1697-1698; P77/3980 & 3981. [C81/2005]

E 7701117

E 7701322

97133 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 Enterprise E47/1790, Annual Technical Report for Period 18/02/2012 to 17/02/2013

E 4701790

97134 CONFIDENTIAL 20/03/2013 12/2011 - 12/2012 ANNUAL TECHNICAL REPORT for the Period 28 December 2011 to 28 December 2012

M 3600204

97135 CONFIDENTIAL 20/03/2013 12/2011 - 11/2012 Yangibana Project, Annual Report for the period 1st December 2011 to 30th November 2012, E09/1043, 1049, & 1703-1706. [C265/2008]

E 0901043

E 0901049

E 0901703

E 0901704

E 0901705

E 0901706

Printed: 18/02/2019 02:28:38 PMPage 123 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 124: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

UCABS PTY LTD

UCABS PTY LTD

UCABS PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA MINING PTY LTD

HBJ MINERALS PTY LTD

HBJ MINERALS PTY LTD

HBJ MINERALS PTY LTD

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

HAMERSLEY IRON PTY LIMITED

HOGAN MINING & SAFETY SERVICES

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

GASCOYNE METALS PTY LTDMOJITO RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 124 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 125: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97137 CONFIDENTIAL 20/03/2013 01/2012 - 12/2012 2012 Annual Report MINJAR SOUTH PROJECT C232/2007 Combined Annual Report for the Period 1/1/2012 – 31/12/2012, E59/0887......P59/1915

E 5900887

E 5901023

E 5901169

E 5901327

E 5901329

E 5901330

E 5901331

E 5901332

E 5901333

E 5901445

M 5900219

M 5900406

M 5900420

M 5900421

M 5900431

M 5900457

M 5900458

M 5900497

M 5900731

M 5900732

P 5901706

P 5901707

P 5901768

P 5901794

97138 CONFIDENTIAL 20/03/2013 01/2012 - 12/2012 2012 Annual Report MINJAR NORTH PROJECT C233/2007 Combined Annual Report for the Period 1/1/2012 – 31/12/2012, E59/1012........P59/1845

E 5901199

E 5901328

M 5900268

M 5900279

M 5900357

M 5900591

Printed: 18/02/2019 02:28:38 PMPage 125 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 126: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

SHEPPARD ROBERT ERNST JOHNMINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 126 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 127: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97139 CONFIDENTIAL 20/03/2013 12/2011 - 12/2012 Annual Mineral Exploration Report for the period 23 December 2011 to 22 December 2012, Bitter Bore Project, Combined Group C209/2012, P24/4439, P24/4532 and P24/4571

P 2404532

P 2404571

97140 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 Worsley Alumina M70/110 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013

M 7000110

97141 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/111 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013.

M 7000111

97142 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/112Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013

M 7000112

97143 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/113 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013

M 7000113

97144 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/114 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013.

M 7000114

97145 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/115 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013

M 7000115

97146 CONFIDENTIAL 20/03/2013 02/2012 - 02/2013 M70/116 Mineral Exploration Report for the Period 3 February 2012 to 2 February 2013

M 7000116

97147 CONFIDENTIAL 21/03/2013 02/2012 - 02/2013 Exploration License – 37/1067 Banjawarn Project Annual Technical Report for the Period 04th February 2012 to 03rd February 2013

E 3701067

97150 CONFIDENTIAL 21/03/2013 09/2011 - 09/2012 EL 31/760 – Salmon Dam , Pinjin East Project Annual Report for the period 19 September 2011 TO 18 September 2012

E 3100760

97154 CONFIDENTIAL 21/03/2013 02/2012 - 02/2013 Egerton E52/2515 Annual Report Report from 11/02/2012 to 10/02/2013 E 5202515

97159 CONFIDENTIAL 20/03/2013 01/2012 - 12/2012 Yogi (Yalgoo Mine) Project, Annual Report for the period 1st January 2012 to 31st December 2012, E59/1097, 1348 & 1400; M59/525, 634-637 & 740. [C47/1999]

E 5901097

M 5900637

M 5900740

97160 CONFIDENTIAL 22/03/2013 01/2012 - 01/2013 The Annual Mineral Exploration Report E70/3279 Smokebush Hill Project for the period 25/01/2012 to 24/01/2013

E 7003279

Printed: 18/02/2019 02:28:38 PMPage 127 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 128: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTERN RESOURCES PTY LTD

WESTERN RESOURCES PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

BULLSEYE MINING LIMITED

HAWTHORN RESOURCES LIMITED

EGERTON EXPLORATION PTY LTD

FERROWEST LIMITED

FI JOINT VENTURE PTY LTD

FI JOINT VENTURE PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 128 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 129: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97162 CONFIDENTIAL 22/03/2013 02/2012 - 02/2013 Combined Annual Mineral Exploration Report C35/1998 Hopelands East – March 2013 Reporting Period: 21 February 2012 – 20 February 2013, M70/599, M70/600, M70/601, M70/602 and M70/603

M 7000599

M 7000600

M 7000601

M 7000602

M 7000603

97164 CONFIDENTIAL 22/03/2013 01/2012 - 01/2013 Andy Well Project, Annual Report for the period 22/01/2012 to 21/01/2013, E51/1217.

E 5101217

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

E 1500978

E 1500980

E 1501010

E 1501167

G 1500022

M 1500022

M 1500027

M 1500028

M 1500029

M 1500129

M 1500206

M 1500230

M 1500300

M 1500366

M 1500367

M 1500390

M 1500432

M 1500452

M 1500453

M 1500471

M 1500472

M 1500474

M 1500475

M 1500476

M 1500479

Printed: 18/02/2019 02:28:38 PMPage 129 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 130: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

ANDY WELL MINING PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

AUSTRAL PACIFIC PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 130 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 131: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1500480

M 1500481

M 1500482

M 1500493

M 1500494

M 1500495

M 1500496

M 1500497

M 1500498

M 1500537

M 1500538

M 1500570

M 1500575

M 1500759

M 1500882

M 1500883

M 1500884

M 1500925

M 1501065

M 1501175

M 1501226

M 1501227

M 1501379

M 1501488

M 1501489

M 1501490

M 1501491

M 1501492

M 1501493

M 1501494

M 1501495

M 1501496

Printed: 18/02/2019 02:28:38 PMPage 131 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 132: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AUSTRAL PACIFIC PTY LTD

AUSTRAL PACIFIC PTY LTD

AUSTRAL PACIFIC PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

AUSTRAL PACIFIC PTY LTD

AUSTRAL PACIFIC PTY LTD

AUSTRAL PACIFIC PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

AUSTRAL PACIFIC PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 132 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 133: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501497

M 1501498

M 1501499

M 1501500

M 1501501

M 1501502

M 1501503

M 1501504

M 1501505

M 1501506

M 1501507

M 1501508

M 1501509

M 1501510

M 1501511

M 1501512

M 1501513

M 1501514

M 1501515

M 1501516

M 1501517

M 1501518

M 1501519

M 1501520

M 1501521

M 1501522

M 1501523

M 1501524

M 1501525

M 1501526

M 1501527

M 1501528

Printed: 18/02/2019 02:28:38 PMPage 133 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 134: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 134 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 135: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501529

M 1501530

M 1501531

M 1501532

M 1501533

M 1501534

M 1501535

M 1501536

M 1501537

M 1501538

M 1501539

M 1501540

M 1501541

M 1501542

M 1501543

M 1501544

M 1501545

M 1501546

M 1501547

M 1501548

M 1501549

M 1501550

M 1501551

M 1501552

M 1501553

M 1501554

M 1501555

M 1501556

M 1501557

M 1501558

M 1501559

M 1501560

Printed: 18/02/2019 02:28:38 PMPage 135 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 136: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 136 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 137: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501561

M 1501562

M 1501563

M 1501564

M 1501565

M 1501566

M 1501567

M 1501568

M 1501569

M 1501570

M 1501571

M 1501572

M 1501573

M 1501574

M 1501575

M 1501576

M 1501577

M 1501578

M 1501579

M 1501580

M 1501581

M 1501582

M 1501583

M 1501584

M 1501585

M 1501586

M 1501587

M 1501588

M 1501589

M 1501590

M 1501591

M 1501592

Printed: 18/02/2019 02:28:38 PMPage 137 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 138: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 138 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 139: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501593

M 1501594

M 1501595

M 1501596

M 1501597

M 1501598

M 1501599

M 1501600

M 1501601

M 1501602

M 1501603

M 1501604

M 1501605

M 1501606

M 1501607

M 1501608

M 1501609

M 1501610

M 1501611

M 1501612

M 1501613

M 1501614

M 1501615

M 1501616

M 1501617

M 1501618

M 1501619

M 1501620

M 1501621

M 1501622

M 1501623

M 1501624

Printed: 18/02/2019 02:28:38 PMPage 139 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 140: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 140 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 141: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501625

M 1501626

M 1501627

M 1501628

M 1501629

M 1501630

M 1501631

M 1501632

M 1501633

M 1501634

M 1501635

M 1501636

M 1501637

M 1501638

M 1501639

M 1501640

M 1501641

M 1501642

M 1501643

M 1501644

M 1501645

M 1501646

M 1501647

M 1501648

M 1501649

M 1501650

M 1501651

M 1501652

M 1501653

M 1501654

M 1501655

M 1501656

Printed: 18/02/2019 02:28:38 PMPage 141 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 142: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 142 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 143: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501657

M 1501658

M 1501659

M 1501660

M 1501661

M 1501662

M 1501663

M 1501664

M 1501665

M 1501666

M 1501667

M 1501668

M 1501669

M 1501670

M 1501671

M 1501672

M 1501673

M 1501674

M 1501675

M 1501676

M 1501677

M 1501678

M 1501679

M 1501680

M 1501681

M 1501682

M 1501683

M 1501684

M 1501685

M 1501686

M 1501687

M 1501688

Printed: 18/02/2019 02:28:38 PMPage 143 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 144: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 144 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 145: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

M 1501689

M 1501690

M 1501691

M 1501692

M 1501693

M 1501694

M 1501695

M 1501696

M 1501697

M 1501698

M 1501699

M 1501700

M 1501701

M 1501702

M 1501703

M 1501704

M 1501705

M 1501706

M 1501707

M 1501708

M 1501709

M 1501710

M 1501711

M 1501712

M 1501713

M 1501714

M 1501715

M 1501716

M 1501717

M 1501718

M 1501719

M 2600514

Printed: 18/02/2019 02:28:38 PMPage 145 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 146: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

AUSTRAL PACIFIC PTY LTD

ST IVES GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 146 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 147: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97166 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 St Ives Project, Annual Report for the period 1st January 2012 to 31st December 2012, C52/2002.

ML 1500141

ML 1500142

ML 1500151

P 1504753

P 1504754

P 1505561

P 2603523

97170 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 West Musgrave Project, Annual Report for the period 1st January 2012 to 31st December2012, E69/1505, 1530, 2069-2070, 2201, 2313, & 2338; M69/72-75. [C333/1997]

E 6901505

E 6901530

E 6902201

E 6902313

M 6900072

M 6900073

M 6900074

M 6900075

97172 CONFIDENTIAL 21/03/2013 01/2012 - 12/2012 Lake Carey Project Annual Report To the Department of Mines and Petroleum For the period 01/01/2012 to 31/12/2012 E39/348, E39/1286, E39/1287, E39/1288, M39/1, M39/198, M39/286, M39/709, M39/710, M39/1065, P39/4645, C5/2003

E 3900348

E 3901287

M 3900001

M 3900198

M 3900286

M 3900709

M 3900710

M 3901065

97179 CONFIDENTIAL 22/03/2013 07/2011 - 06/2012 Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2011 – 30 June 2012 M16/164, M16/229, M16/257, M16/412, 413, M16/429, M16/491, 497, P16/2479-81

M 1600229

M 1600491

97180 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 De Courcy Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1393, 2000, 2003, 2065, 2067 & 2114; E47/1154.........E47/2292; P08/556; P47/1278, 1404-1406 & 1427. [C38/2013]

E 0801393

E 0802000

Printed: 18/02/2019 02:28:38 PMPage 147 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 148: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

ST IVES GOLD MINING COMPANY PTY LIMITED

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

WIRRAWAY METALS & MINING PTY LTD

FORTITUDE GOLD PTY LTD

MATSA GOLD PTY LTD

MATSA GOLD PTY LTD

MIDAS RESOURCES LTD

MATSA GOLD PTY LTD

MATSA GOLD PTY LTD

MATSA GOLD PTY LTD

MATSA GOLD PTY LTD

STRATEGIC PROJECTS MINING PTY LTD

MILLWARD JOHN STEPHEN BLADONSTRATEGIC PROJECTS MINING PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 148 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 149: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97180 CONFIDENTIAL 22/03/2013 01/2012 - 12/2012 De Courcy Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1393, 2000, 2003, 2065, 2067 & 2114; E47/1154.........E47/2292; P08/556; P47/1278, 1404-1406 & 1427. [C38/2013]

E 0802003

E 0802065

E 0802114

E 4701154

E 4701395

E 4701649

E 4701650

E 4701728

E 4701773

E 4702292

P 4701278

P 4701404

P 4701405

P 4701406

97185 CONFIDENTIAL 26/03/2013 01/2012 - 12/2012 BULGA DOWNS PROJECT 2012 Combined Annual Report for Mining Leases M29/257, M29/258, M29/314, M29/348, M29/349, M29/350 & M29/351, C27/2007 for the period 1st January to the 31st December 2012

M 2900257

M 2900258

M 2900314

M 2900348

M 2900349

M 2900350

M 2900351

97190 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 C054/2010 - RIDGES IRON ORE PROJECT ANNUAL REPORT FOR THE PERIOD 1ST JANUARY 2012 TO 31ST DECEMBER 2012 [E80/2389,4205, 4207, 4270, & 4309; M80/599-600; P80/1746-1750.]

E 8002389

E 8004207

E 8004270

E 8004309

M 8000599

M 8000600

P 8001748

P 8001749

Printed: 18/02/2019 02:28:38 PMPage 149 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 150: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

YILGIRON PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

KIMBERLEY METALS GROUP PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 150 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 151: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97190 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 C054/2010 - RIDGES IRON ORE PROJECT ANNUAL REPORT FOR THE PERIOD 1ST JANUARY 2012 TO 31ST DECEMBER 2012 [E80/2389,4205, 4207, 4270, & 4309; M80/599-600; P80/1746-1750.]

P 8001750

97195 CONFIDENTIAL 26/03/2013 11/2011 - 11/2012 Burbanks Project, Annual Report for the period 5th November 2011 to 4th November 2012, M15/161; P15/5211-5213, 5249, 5281-5282, 5412, 5559 & 5632-5633. [C117/2008]

M 1500161

P 1505249

P 1505412

97197 CONFIDENTIAL 26/03/2013 01/2012 - 12/2012 Plutonic / Marymia Project, Annual Report for the period 1st January2012 to 31st December 2012, M52/148-150,170-171, 222-223, 263-264, 289, 295-296,300-301, 308-309 & 591-592; P52/1394. [C94/1999]

M 5200148

M 5200149

M 5200150

M 5200170

M 5200171

M 5200222

M 5200223

M 5200263

M 5200264

M 5200289

M 5200295

M 5200296

M 5200300

M 5200301

M 5200308

M 5200309

M 5200591

M 5200592

P 5201394

97200 CONFIDENTIAL 26/03/2013 12/2011 - 12/2012 Marillana Project, Annual Report for the period ending 22nd December 2012, M47/1414; E47/1408. [C135/2010]

E 4701408

M 4701414

97202 CONFIDENTIAL 26/03/2013 12/2011 - 11/2012 C284/1997 ANNUAL EXPLORATION REPORT Reporting Period 01/12/11-30/11/12 [Nickol River Project, M47/87,127 & 577.]

M 4700087

M 4700127

M 4700577

Printed: 18/02/2019 02:28:38 PMPage 151 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 152: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KIMBERLEY METALS GROUP PTY LTD

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

BROCKMAN IRON PTY LTD

BROCKMAN IRON PTY LTD

D & K CORPS INVESTMENTS PTY LTD

D & K CORPS INVESTMENTS PTY LTD

D & K CORPS INVESTMENTS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 152 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 153: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97203 CONFIDENTIAL 26/03/2013 01/2012 - 12/2012 C56/2008 Annual Exploration Report Reporting period 01/01/2012 - 31/12/2012. [M47/257, M47/271, M47/272 ]

M 4700257

M 4700271

M 4700272

97204 CONFIDENTIAL 25/03/2013 01/2012 - 12/2012 Whitewood Project, Annual Report for the period 01/01/2012 to 31/12/2012, E46/699-702. [C146/2011]

E 4600699

97208 CONFIDENTIAL 25/03/2013 10/2011 - 10/2012 Annual Report Athenian Project P77/4034 Reporting Period: 14th October 2011 – 13th October 2012

P 7704034

97209 CONFIDENTIAL 25/03/2013 10/2011 - 10/2012 Annual Report Babylonia P77/4015 Reporting Period: 14th October 2011 – 13th October 2012

P 7704015

97215 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 01/01/2011 TO 31/12/2011 PROJECT Lake Viole, C121/1993

E 5301042

E 5301043

E 5301324

E 5301405

E 5301430

M 5300144

M 5300145

M 5300149

M 5300160

M 5300170

M 5300183

M 5300186

M 5300220

M 5300379

M 5300434

M 5300555

M 5300631

M 5300721

M 5301080

97220 CONFIDENTIAL 28/03/2013 01/2012 - 01/2013 Mummaloo Project, Annual Report for the period 31/01/2012 to 30/01/2013, E59/1694.

E 5901694

97222 CONFIDENTIAL 28/03/2013 02/2012 - 02/2013 Peak Hill -Harmony Project, Annual Report for the period 4th February 2012 to 3rd February 2013, M52/297.

M 5200297

Printed: 18/02/2019 02:28:38 PMPage 153 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 154: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PROJECT MANAGEMENT PTY LTD (AS TRUSTEE FOR THE DARRYL CORPS FAMILY TRUST)

CORPS DARRYL JOHN

PROJECT MANAGEMENT PTY LTD (AS TRUSTEE FOR THE DARRYL CORPS FAMILY TRUST)

FMG PILBARA PTY LTD

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

TOP IRON PTY LTD

ARAGON RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 154 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 155: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97223 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Duketon East Project, Annual Report for the period 01/01/2012 to 31/12/2012, E38/2231, 2397, 2614, 2666, 2699 & 2738; P38/3893, 3897 & 3984. [C188/2007]

E 3802231

E 3802666

E 3802699

P 3803984

97224 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Big Bell Project, Annual Report for the period 1st January 2012 to 31st December 2012, E20/638; E21/104, 122, 127 & 153; M20/21.......M20/354; M21/102 & 104; P20/1505.......P20/2158; P21/668........P21/714. [C304/1995]

M 2000021

M 2000022

M 2000078

M 2000102

M 2000103

M 2000104

M 2000105

M 2000171

M 2000202

M 2000218

M 2000252

M 2000256

M 2000297

M 2000299

M 2000301

M 2000354

M 2100102

P 2001505

P 2001506

P 2001735

P 2001737

97225 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Yandanooka Project, Annual Report for the period 1st January 2012 to 31st December 2012, E70/3761-3762 & 3813. [C105/2011]

E 7003762

E 7003813

97226 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Mogumber Project Annual Report for Combined Reporting Group C311/2012 Tenements E70/3929; E70/3931; E70/3967 For the Period 1 January 2012 to 31 December 2012

E 7003929

E 7003967

Printed: 18/02/2019 02:28:38 PMPage 155 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 156: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DUKETON MINING LTD

DUKETON MINING LTD

DUKETON MINING LTD

DUKETON MINING LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 156 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 157: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97227 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Eneabba Project, Annual Report for the period 1st January 2012 to 31st December 2012, E70/3763, 3930, 3812, 3814, 3898, 3970; R70/35; M70/872, 965 & 1153. [ C206/2011]

E 7003814

M 7000872

M 7000965

M 7001153

R 7000035

97228 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Woodie Woodie Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/2201.......E45/2987; E46/513.......E46/742; M45/429........M45/744; M46/92.........M46/384; P45/2474.....P45/2825; P46/1594....P46/1803. ]C62/2005]

E 4502201

E 4502470

E 4502697

E 4502698

E 4502985

E 4502986

E 4502987

E 4600513

E 4600525

E 4600530

E 4600535

E 4600571

E 4600649

E 4600691

E 4600739

M 4500107

M 4500429

M 4500430

M 4500431

M 4500432

M 4500433

M 4500434

M 4500435

M 4500517

M 4500600

Printed: 18/02/2019 02:28:38 PMPage 157 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 158: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 158 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 159: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97228 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Woodie Woodie Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/2201.......E45/2987; E46/513.......E46/742; M45/429........M45/744; M46/92.........M46/384; P45/2474.....P45/2825; P46/1594....P46/1803. ]C62/2005]

M 4500601

M 4500602

M 4500637

M 4500638

M 4500639

M 4500640

M 4500641

M 4500744

M 4501115

M 4501218

M 4600092

M 4600093

M 4600094

M 4600108

M 4600137

M 4600150

M 4600161

M 4600162

M 4600383

M 4600384

P 4502474

97230 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 SCADDAN ENERGY PROJECT ESPERANCE Combined Annual Report C275/1993 For The Period 1 January 2012 – 31 December 2012, E63/521.......P63/1700

E 6301145

E 6301146

E 6301202

M 6300194

97234 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Ilgarari Project C123/2012 Annual Report for the period 1st January 2012 to 31st December 2012, E52/2274, E52/2632, E52/2663

E 5202274

97235 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Murchison Project, Annual Report for the period 01/01/2012 to 31/12/2012, E20/530.....E20/799; E21/125,129,144 & 163; E58/335;M20/55..........M20/277; M21/8, 72, 106-107; M58/225; P20/2018.....P20/2094; P21/651...P21/665;P58/1372-1375. [C593/1994]

E 2000606

E 2000608

Printed: 18/02/2019 02:28:38 PMPage 159 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 160: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

CONSOLIDATED MINERALS PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

CONSOLIDATED MINERALS PTY LTD

PILBARA MANGANESE PTY LTD

PILBARA MANGANESE PTY LTD

CONSOLIDATED MINERALS PTY LTD

CONSOLIDATED MINERALS PTY LTD

PILBARA MANGANESE PTY LTD

SCADDAN ENERGY PTY LTD

SCADDAN ENERGY PTY LTD

SCADDAN ENERGY PTY LTD

SCADDAN ENERGY PTY LTD

KUMARINA RESOURCES LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 160 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 161: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97235 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Murchison Project, Annual Report for the period 01/01/2012 to 31/12/2012, E20/530.....E20/799; E21/125,129,144 & 163; E58/335;M20/55..........M20/277; M21/8, 72, 106-107; M58/225; P20/2018.....P20/2094; P21/651...P21/665;P58/1372-1375. [C593/1994]

E 2000616

E 2000629

E 2000630

E 2000659

E 2000698

E 2000699

E 2000700

E 2100129

E 2100144

E 5800335

M 2000055

M 2000108

M 2000111

M 2000176

M 2000183

M 2000195

M 2000208

M 2000225

M 2000245

M 2000247

M 2000277

M 2100008

M 2100072

M 2100106

M 2100107

M 5800224

M 5800225

97240 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL TENEMENT NUMBERS E51/1053, E51/1060, E51/1085, E51/1120, E51/1134, E52/1818, E52/1951, P52/1161 to 1165 [for the period 1st January 2012 to 31st December 2012].

E 5101053

E 5101120

Printed: 18/02/2019 02:28:38 PMPage 161 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 162: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

ELEMENT 25 LIMITEDMUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

BIG BELL GOLD OPERATIONS PTY LTD

MUSGRAVE MINERALS LIMITED

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

MUSGRAVE MINERALS LIMITED

AURIS EXPLORATION PTY LTD

AURIS EXPLORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 162 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 163: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97241 CONFIDENTIAL 28/03/2013 02/2012 - 01/2013 Wongan Project, Annual Report for the period 1st February 2012 to 31st January 2013, E70/2343, 2788-2789, 2796, 2996, 3430, 3431, 3547, 3674, 3680, 3755 & 3881; P70/1576 & 1593.

E 7002343

E 7002788

E 7002789

E 7003674

E 7003680

E 7003755

97243 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Ashburton Project, Annual Report for the period 1st January 2012 to 31st December 2012, M52/734-735, M52/639 & 640; M08/1650 & 1941. [C451/1996]

E 0801650

E 5201941

M 5200639

M 5200640

M 5200734

M 5200735

97244 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 TURNER RIVER PROJECT Annual Exploration Report for the tenement group C16/2013 including (E45/2655, E45/2995, E45/3390, E45/3391, E45/3392, E47/0891) for the period 6 January 2012 (approximately) to 31 December 2012

E 4502995

E 4503390

E 4503391

E 4503392

E 4700891

97245 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 TURNER RIVER PROJECT Annual Exploration Report for the tenement group C17/2013 including (E45/2364, E45/2533) for the period 6 January 2012 (approximately) to 31 December 2012

E 4502364

E 4502533

97250 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Flying Fish Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1155,1373,1500,1543,1675 & 2036; P47/1275 & 1610. [C164/2006]

E 4701373

E 4701500

E 4701675

P 4701275

97251 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Hedland Project, Annual Report for theperiod 01/01/2012 to 31/12/2012, E45/2858, 3360, 3402, 3448 & E45/3473. [C325/2011]

E 4503473

Printed: 18/02/2019 02:28:38 PMPage 163 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 164: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GEODEX RESOURCES PTY LTDQUADRIO RESOURCES PTY LTD

QUADRIO RESOURCES PTY LTD

QUADRIO RESOURCES PTY LTD

QUADRIO RESOURCES PTY LTD

QUADRIO RESOURCES PTY LTD

QUADRIO RESOURCES PTY LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

NORTHERN STAR RESOURCES LTD

DOMAIN MINING PTY LTD

LAST CRUSADE PTY LTD

LAST CRUSADE PTY LTD

LAST CRUSADE PTY LTD

DOMAIN MINING PTY LTD

DE GREY MINING LTD

DE GREY MINING LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

RYAN DAVID

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 164 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 165: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97252 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 East Kalgoorlie Project, Annual Report for the period 1st January 2012 to 31st December 2012, e25/268, 424, 447;E26/112, 117, 144, 151 & 152; P25/1953-1958.......P25/2207; P26/3213-3214,3488, 3640, 3705-3710 & 3736. [C44/2007]

E 2500268

E 2500424

E 2600144

P 2501954

P 2501955

P 2501956

97253 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Forrestania Project, Annual Report for the period 1st January 2012 to 31st December 2012, E74/470; E77/1865; M74/57........M74/92; M77/98...........M77/912. [C97/1994]

E 7400470

E 7701865

M 7400057

M 7400058

M 7400064

M 7400065

M 7400081

M 7400090

M 7400091

M 7400092

M 7700098

M 7700215

M 7700216

M 7700219

M 7700284

M 7700285

M 7700286

M 7700329

M 7700335

M 7700336

M 7700389

M 7700399

M 7700458

M 7700542

Printed: 18/02/2019 02:28:38 PMPage 165 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 166: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NORTHERN STAR (HBJ) PTY LTD

NORTHERN MINING LTD

NORTHERN MINING LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 166 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 167: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97253 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Forrestania Project, Annual Report for the period 1st January 2012 to 31st December 2012, E74/470; E77/1865; M74/57........M74/92; M77/98...........M77/912. [C97/1994]

M 7700543

M 7700545

M 7700550

M 7700568

M 7700574

M 7700582

M 7700583

M 7700584

M 7700585

M 7700586

M 7700587

M 7700588

M 7700589

M 7700911

M 7700912

97254 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 Bullfinch North (JV 1) Project, Annual Report for the period 1st January2012 to 31st December 2012, E77/1371, 1374, 1391, 1892 & 2017;M77/1253; P77/3624, 3630-3636 & 3970. [C20/2005]

E 7701374

M 7701253

P 7703636

97255 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 West Pilbara [ Red Hill ] Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1227, 1283, 1289, 1293-1295, 1430, 1473, 1516, & 1537; E47/1141 & 1693. [C84/2006]

E 0801227

E 0801283

E 0801289

E 0801293

E 0801294

E 0801295

E 0801430

E 0801516

Printed: 18/02/2019 02:28:38 PMPage 167 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 168: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

WESTERN AREAS LIMITED

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 168 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 169: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97255 CONFIDENTIAL 27/03/2013 01/2012 - 12/2012 West Pilbara [ Red Hill ] Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1227, 1283, 1289, 1293-1295, 1430, 1473, 1516, & 1537; E47/1141 & 1693. [C84/2006]

E 0801537

E 4701141

E 4701693

97257 CONFIDENTIAL 28/03/2013 01/2012 - 01/2013 Carbine- Zuleika Project, Annual Report for the period 10/01/2012 to 09/01/2013, E16/402 & 417; M16/29, 32,187 & 405. [c277/1997]

E 1600402

M 1600029

M 1600032

M 1600187

M 1600405

97258 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Comet Vale Project, Annual Report for the period ending 31st December 2012, E29/603, 727, 762; M29/35, 52, 85, 185-186, 197-201, 232-233, 235 & 321; L29/67. [C3/1999]

L 2900067

M 2900035

M 2900052

M 2900085

M 2900185

M 2900186

M 2900197

M 2900198

M 2900199

M 2900200

M 2900201

M 2900232

M 2900233

M 2900235

M 2900321

97266 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Gidji C90/2006 Project 2012 Annual Report for the period 1 January 2012 – 31 December 2012,E24/151, E27/343, P24/4146, P24/4149, P26/3766, P26/3767, P26/3768, P26/3770, P26/3801, P26/3802 & P27/1743

E 2400151

E 2700343

P 2701743

Printed: 18/02/2019 02:28:38 PMPage 169 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 170: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

RED HILL IRON LIMITEDAPI MANAGEMENT PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

HAYES MINING PTY LTD

HAYES MINING PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

HAYES MINING PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

SAND QUEEN GOLD MINES PTY LTD

ZEBINA MINERALS PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

ZEBINA MINERALS PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

ZEBINA MINERALS PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 170 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 171: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97269 CONFIDENTIAL 28/03/2013 01/2012 - 01/2013 Annual Report Leonora Mining Project M37/349 Reporting Period: 24th January 2012 – 23rd January 2013

M 3700349

97270 CONFIDENTIAL 28/03/2013 01/2012 - 12/2012 Lake Maitland Uranium Project East Murchison, Western Australia Combined Annual Report on Exploration for the Period 1 January – 31 December 2012 (C74/2006)

E 5300947

E 5301060

E 5301099

E 5301210

E 5301211

M 5300574

M 5300575

M 5300578

M 5300579

M 5301089

P 5301256

P 5301258

P 5301259

P 5301260

P 5301261

P 5301262

P 5301263

97279 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Annual Report - Kintyre Uranium Project 1 January 2012 to 31 December 2012 M45/264 (Yandagooge 1A), M45/266 (Yandagooge 5), M45/267 (Yandagooge 6), M45/420 (Yandagooge 4), P45/2632 (Kintyre 1), P45/2633 (Kintyre 2), P45/2634 (Kintyre 3), P45/2635 (Kintyre 4), P45/2636 (Kintyre 5), P45/2637 (Kintyre 6), P45/2638 (Kintyre 7), P45/2639 (Kintyre 8), P45/2640 (Kintyre 9), P45/2641 (Kintyre 10), P45/2642 (Kintyre 11), P45/2643 (Kintyre 12) and L45/66 (

M 4500264

M 4500266

M 4500267

M 4500420

P 4502632

P 4502633

Printed: 18/02/2019 02:28:38 PMPage 171 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 172: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BULLSEYE MINING LIMITED

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

MEGA GOLD HOLDINGS PTY LTD

MEGA GOLD HOLDINGS PTY LTD

MEGA GOLD HOLDINGS PTY LTD

MEGA GOLD HOLDINGS PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

REDPORT EXPLORATION PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 172 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 173: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97279 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Annual Report - Kintyre Uranium Project 1 January 2012 to 31 December 2012 M45/264 (Yandagooge 1A), M45/266 (Yandagooge 5), M45/267 (Yandagooge 6), M45/420 (Yandagooge 4), P45/2632 (Kintyre 1), P45/2633 (Kintyre 2), P45/2634 (Kintyre 3), P45/2635 (Kintyre 4), P45/2636 (Kintyre 5), P45/2637 (Kintyre 6), P45/2638 (Kintyre 7), P45/2639 (Kintyre 8), P45/2640 (Kintyre 9), P45/2641 (Kintyre 10), P45/2642 (Kintyre 11), P45/2643 (Kintyre 12) and L45/66 (

P 4502634

P 4502635

P 4502636

P 4502637

P 4502638

P 4502639

P 4502640

P 4502641

P 4502642

P 4502643

97283 CONFIDENTIAL 03/04/2013 02/2012 - 02/2013 Halloween West Joint Venture Project - Annual Exploration Report for the period 9 February 2012 to 8 February 2013

E 5202275

97285 CONFIDENTIAL 03/04/2013 01/2012 - 12/2012 Annual Mineral Exploration Report, Duchess Paradise Tenement Group C53/2008, 2012

E 0401386

E 0401519

E 0401770

97286 CONFIDENTIAL 03/04/2013 01/2011 - 11/2012 Annual Report for the period 23 January 2011 to 30 November 2012, Cape Lambert Project, E47/1248

E 4701248

97289 CONFIDENTIAL 03/04/2013 01/2012 - 12/2012 Annual report for the period 1 January 2012 to 31 December 2012 for the combined reporting group Horatio Project, C186/2007

E 4600621

E 4600743

E 4701392

E 4701393

E 4702085

E 4702119

97290 CONFIDENTIAL 03/04/2013 01/2012 - 12/2012 Annual Report for the period 1 January 2012 to 31 December 2012, Red Hill Project, C326/2011.

E 0801440

Printed: 18/02/2019 02:28:38 PMPage 173 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 174: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

MDP URANIUM PTY LTDCAMECO AUSTRALIA PTY LTD

SANDFIRE RESOURCES NLSANDFIRE A PTY LTD

BLACKFIN PTY LTD

BLACKFIN PTY LTD

BLACKFIN PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 174 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 175: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97292 CONFIDENTIAL 03/04/2013 03/2012 - 02/2013 Talc Lake Project, Annual Report for the period 1st March 2012 to 28th February 2013,E25/402; E28/1933, 1983 & 2117-2118. [C72/2011]

E 2801935

E 2802117

E 2802118

97295 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Sulphur Springs Project, Annual Report for the period 1st January 2012 to 31st December 2012, M45/494, 653 & 1001. [C139/2012]

M 4500494

M 4500653

M 4501001

97298 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Dongara Project, Annual Report for the period 01/01/2012 to 31/12/2012, M70/917.

M 7000917

97300 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Holleton Project, Annual Report for the period 1st January 2011 to 31st December 2012, E70/2570 & E70/2709; E77/1160-1162, 1215, 1428 & 1751; P77/3619. [C229/2008]

E 7701160

97301 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Opthalmia Project, Annual Report for the year ending 31st December 2012, E47/1598 & 1599. [C214/2010]

E 4701598

E 4701599

97302 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Moolart Well Project, Annual Report for the peiod 1st January 2012 to 31st December 2012, E38/1096.......E38/2006; M38/283........M38/1257; P38/3476.....P38/3944. [C82/2011]

E 3801914

E 3801988

E 3801989

E 3801990

E 3801991

E 3801992

E 3802001

E 3802005

M 3800283

M 3800302

M 3800303

M 3800316

M 3800317

M 3800352

Printed: 18/02/2019 02:28:38 PMPage 175 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 176: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTSIDE NICKEL PTY LTD

WESTSIDE NICKEL PTY LTD

WESTSIDE NICKEL PTY LTD

VENTUREX SULPHUR SPRINGS PTY LTD

VENTUREX SULPHUR SPRINGS PTY LTD

VENTUREX SULPHUR SPRINGS PTY LTD

COCKBURN CEMENT LIMITED

MOUNT HAMPTON GOLD MINING COMPANY PTY LTD

BROCKMAN EAST PTY LTD

BROCKMAN EAST PTY LTD

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITEDDUKETON RESOURCES PTY LTD

DUKETON RESOURCES PTY LTD

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 176 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 177: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97302 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Moolart Well Project, Annual Report for the peiod 1st January 2012 to 31st December 2012, E38/1096.......E38/2006; M38/283........M38/1257; P38/3476.....P38/3944. [C82/2011]

M 3800354

M 3800498

M 3800499

M 3800500

M 3800515

M 3800589

M 3800590

M 3800837

M 3800889

M 3800939

M 3800940

M 3800943

M 3801091

M 3801092

M 3801096

M 3801249

M 3801250

M 3801251

M 3801257

P 3803942

Printed: 18/02/2019 02:28:38 PMPage 177 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 178: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

CREASY MARK GARETHLEGENDRE BRUCE ROBERTWASSE BERNFRIED GUNTER FRANZARTANE MINERALS NL

CREASY MARK GARETHLEGENDRE BRUCE ROBERTWASSE BERNFRIED GUNTER FRANZARTANE MINERALS NL

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

CREASY MARK GARETHLEGENDRE BRUCE ROBERTWASSE BERNFRIED GUNTER FRANZARTANE MINERALS NL

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTD

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITEDDUKETON RESOURCES PTY LTD

REGIS RESOURCES LIMITEDDUKETON RESOURCES PTY LTD

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 178 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 179: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97302 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Moolart Well Project, Annual Report for the peiod 1st January 2012 to 31st December 2012, E38/1096.......E38/2006; M38/283........M38/1257; P38/3476.....P38/3944. [C82/2011]

P 3803943

97304 CONFIDENTIAL 02/04/2013 01/2012 - 01/2013 ANNUAL REPORT For C171/2001 Yandal North for the period 2nd January 2012 to 1st January 2013 Yandal North Project

M 5300155

M 5300156

M 5300182

M 5300191

M 5300192

M 5300193

M 5300196

M 5300197

M 5300198

M 5300199

M 5300221

M 5300226

M 5300228

M 5300229

M 5300230

M 5300235

M 5300236

M 5300237

M 5300245

M 5300246

M 5300247

M 5300248

M 5300249

M 5300250

M 5300326

M 5300347

M 5300372

M 5300412

M 5300413

M 5300414

Printed: 18/02/2019 02:28:38 PMPage 179 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 180: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

REGIS RESOURCES LIMITED

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

CREASY MARK GARETH

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 180 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 181: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97304 CONFIDENTIAL 02/04/2013 01/2012 - 01/2013 ANNUAL REPORT For C171/2001 Yandal North for the period 2nd January 2012 to 1st January 2013 Yandal North Project

M 5300441

M 5300446

M 5300451

M 5300452

M 5300461

M 5300477

M 5300478

M 5300479

M 5300480

M 5300492

M 5300535

M 5300536

M 5300537

M 5300538

M 5300539

M 5300540

M 5300541

M 5300552

M 5300588

M 5300589

M 5300611

M 5300707

M 5300708

M 5300711

M 5300712

M 5300836

M 5300874

M 5300895

M 5300911

M 5300929

M 5300935

M 5300940

Printed: 18/02/2019 02:28:38 PMPage 181 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 182: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

NEWMONT YANDAL OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 182 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 183: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97304 CONFIDENTIAL 02/04/2013 01/2012 - 01/2013 ANNUAL REPORT For C171/2001 Yandal North for the period 2nd January 2012 to 1st January 2013 Yandal North Project

M 5300966

97306 CONFIDENTIAL 02/04/2013 01/2012 - 12/2012 Mount Lucky Project, Annual Report for the period 1st January 2012 to 31st December 2012, M38/425, M38/505; E38/1866; P38/3957 & P38/3958. [C137/2011]

M 3800425

M 3800505

P 3803958

97315 CONFIDENTIAL 29/03/2013 01/2012 - 12/2012 Combined Annual Report, Mount Zephyr Project, C17/2000 for the period 1 January 2012 to 31 December 2012, E39/1239, 1240, M39/446, 671, 672, 723, 783, 784, 785, 786, 787, 788, 789, 820, 821, 827

M 3900446

M 3900671

M 3900672

M 3900723

M 3900783

M 3900784

M 3900785

M 3900786

M 3900787

M 3900788

M 3900789

M 3900820

M 3900821

M 3900827

97317 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Technical Report, Eureka Gold Project M24/189, M24/584, M24/585 and M24/586 (C42/2005)

M 2400189

M 2400584

M 2400585

Printed: 18/02/2019 02:28:38 PMPage 183 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 184: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NEWMONT YANDAL OPERATIONS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

CENTRAL IRON ORE LTD

CENTRAL IRON ORE LTD

CENTRAL IRON ORE LTD

Printed: 18/02/2019 02:28:38 PMPage 184 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 185: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97317 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Technical Report, Eureka Gold Project M24/189, M24/584, M24/585 and M24/586 (C42/2005)

M 2400586

97318 CONFIDENTIAL 04/04/2013 02/2012 - 02/2013 Annual Report To the Department of Mines and Petroleum For the period 28 March 2012 to 27 March 2013 Avalon Project Combined Reporting Number C156/2006, M25/75, M25/76, M25/77, M25/78, M27/189

M 2500075

M 2500076

M 2500077

M 2500078

M 2700189

97323 CONFIDENTIAL 04/04/2013 01/2012 - 12/2012 Combined Annual Report NULLAGINE PROJECT For the Period 1 January 2012 to 31 December 2012 Combined Reporting Number: C58/2006

E 4502717

E 4600522

E 4600523

E 4600651

E 4600652

E 4600655

E 4600928

M 4600515

97328 CONFIDENTIAL 04/04/2013 02/2012 - 02/2013 Sophie Downs Project, Annual Report for the period 5th February 2012 to 4th February 2013, E80/3673.

E 8003673

97329 CONFIDENTIAL 04/04/2013 02/2012 - 02/2013 Minjar Project, Annual Report for the 14/02/2012 to 13/02/2013, E59/985. E 5900985

97330 CONFIDENTIAL 04/04/2013 05/2012 - 04/2013 Capel Project, Annual Report for the period 01/05/2012 to 30/04/2013, E70/, 2414, 2603, 2699 & 4093; M70/4093..........M70/1261; P70/1553; R70/47; L70/119. [C105/2002]

E 7002414

E 7002603

E 7002699

L 7000119

M 7000063

M 7000064

M 7000084

M 7000093

M 7000105

M 7000257

M 7000278

M 7000279

M 7000295

Printed: 18/02/2019 02:28:38 PMPage 185 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 186: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTRAL IRON ORE LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

FMG NULLAGINE PTY LTD

THUNDELARRA LIMITED

MINJAR GOLD PTY LTD

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

ILMENITE PTY LTD

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 186 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 187: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97330 CONFIDENTIAL 04/04/2013 05/2012 - 04/2013 Capel Project, Annual Report for the period 01/05/2012 to 30/04/2013, E70/, 2414, 2603, 2699 & 4093; M70/4093..........M70/1261; P70/1553; R70/47; L70/119. [C105/2002]

M 7000359

M 7000386

M 7000401

M 7000410

M 7000453

M 7000467

M 7000478

M 7000493

M 7000494

M 7000513

M 7000514

M 7000535

M 7000536

M 7000609

M 7000611

M 7000612

M 7000651

M 7000659

M 7000670

M 7000672

M 7000726

M 7000766

M 7000767

M 7000866

M 7000880

M 7000914

M 7000920

M 7000928

M 7000959

M 7000962

M 7000970

M 7000978

Printed: 18/02/2019 02:28:38 PMPage 187 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 188: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILMENITE PTY LTD

ILMENITE PTY LTD

ILMENITE PTY LTD

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 188 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 189: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97330 CONFIDENTIAL 04/04/2013 05/2012 - 04/2013 Capel Project, Annual Report for the period 01/05/2012 to 30/04/2013, E70/, 2414, 2603, 2699 & 4093; M70/4093..........M70/1261; P70/1553; R70/47; L70/119. [C105/2002]

M 7000985

M 7000990

M 7000995

M 7001052

M 7001073

M 7001082

M 7001083

M 7001084

M 7001092

M 7001106

M 7001107

M 7001120

M 7001128

M 7001151

M 7001167

M 7001243

M 7001244

M 7001261

P 7001553

R 7000047

97331 CONFIDENTIAL 04/04/2013 03/2012 - 02/2013 Cataby Project, Annual Report for the period 01/03/2012 to 28/02/2013, E70/2459 & 4270; M70/194-196, 517-518, 696, 760, 791, 867-869, 1017-1018 & 1086; G70/243. [C107/2002]

E 7002459

E 7004270

G 7000243

M 7000194

M 7000195

M 7000196

M 7000517

M 7000518

M 7000696

M 7000760

M 7000791

Printed: 18/02/2019 02:28:38 PMPage 189 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 190: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA FINANCE LIMITED

ILUKA FINANCE LIMITED

RENISON LIMITED

Printed: 18/02/2019 02:28:38 PMPage 190 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 191: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97331 CONFIDENTIAL 04/04/2013 03/2012 - 02/2013 Cataby Project, Annual Report for the period 01/03/2012 to 28/02/2013, E70/2459 & 4270; M70/194-196, 517-518, 696, 760, 791, 867-869, 1017-1018 & 1086; G70/243. [C107/2002]

M 7000867

M 7000868

M 7000869

M 7001017

M 7001018

M 7001086

97332 CONFIDENTIAL 04/04/2013 01/2012 - 12/2012 Paulsens East Project, Annual Report for the period 01/01/2012 to 31/12/2012, E47/1328 & P47/1170. [C31/2007]

E 4701328

97335 CONFIDENTIAL 04/04/2013 01/2012 - 01/2013 Wonmunna Project, Annual Report for the period 17th January 2012 to 16th January 2013, E47/1423.

E 4701423

97338 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Manindi Project M57/227, M57/240 & M57/533 Combined Annual Report C135/2002 for the period 01/01/2012 to 31/12/2012

M 5700227

M 5700240

M 5700533

97339 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Report Western Tanami Project C119/2002 From 1 January 2012 to 31 December 2012, E80/1481, 1483, 1677, 1679, 1737, 2133, 3238 3388, 3389, 3665, 3844, 3845, 4006, 4305, 4307M80/ 559, 560, 561, P80/ 1675, 1676

E 8001481

E 8001483

E 8001679

E 8001737

E 8003388

E 8003389

E 8003665

M 8000559

M 8000560

M 8000561

97342 CONFIDENTIAL 05/04/2013 01/2012 - 01/2013 Combined Annual Report on Rowes Find Project – C270/1997 for period 23 January 2012 to 22 January 2013, E28/1482, M28/164, P28/1046, M28/370

M 2800164

M 2800370

P 2801046

97345 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Nyang Project C64/2007 Annual Report, E08/1644, E08/1645, E08/1646, E08/2154, for the period 1/01/2012 to 31/12/2012. Group Reporting C64/2007

E 0801645

E 0801646

Printed: 18/02/2019 02:28:38 PMPage 191 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 192: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ILUKA FINANCE LIMITED

ILUKA FINANCE LIMITED

ILUKA FINANCE LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA RESOURCES LIMITED

ORION EQUITIES LIMITED

FMG PILBARA PTY LTD

KARRILEA HOLDINGS PTY LTD

KARRILEA HOLDINGS PTY LTD

KARRILEA HOLDINGS PTY LTD

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

TANAMI EXPLORATION NL

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

NORTHERN STAR (WESTERN TANAMI) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

INTEGRA MINING LIMITED

PALADIN ENERGY MINERALS PTY LTD

PALADIN ENERGY MINERALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 192 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 193: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97346 CONFIDENTIAL 05/04/2013 02/2012 - 02/2013 Combined Annual Technical Report C125/2000 for the Rose Hill Project 16 February 2012 to 15 February 2013, M15/652, M15/1204, P15/4979, P15/4980, P15/4981, P15/4982, P15/4983 and P15/4984

M 1500652

M 1501204

P 1504979

P 1504980

P 1504981

P 1504982

P 1504983

P 1504984

97347 CONFIDENTIAL 05/04/2013 12/2011 - 12/2012 Nullagine Gold Project M46/138 Annual Report from 29th of December 2011 to 28th December 2012

M 4600138

97349 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Ashburton Downs Project Annual Report E08/2115 Year ended 3 November 2012

E 0802115

97353 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Annual report for the period 1st January 2012 to 31st December 2012, Serpentine C228/2008, E47/1194......P47/1545

E 4701194

E 4701351

E 4701448

E 4701449

E 4701809

E 4701832

E 4701846

E 4701861

E 4701988

E 4702285

E 4702333

E 4702465

P 4701545

97354 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012, Mt Morgans Project, E39/1310.....P39/4815

E 3901310

M 3800395

M 3800396

M 3800548

M 3800595

M 3800848

M 3900018

Printed: 18/02/2019 02:28:38 PMPage 193 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 194: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

NORTHERN STAR (SOUTH KALGOORLIE) PTY LTD

MILLENNIUM MINERALS LIMITED

AUSTRALIAN COPPER HOLDINGS PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

MT MORGANS WA MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 194 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 195: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97354 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012, Mt Morgans Project, E39/1310.....P39/4815

M 3900036

M 3900208

M 3900228

M 3900236

M 3900240

M 3900248

M 3900250

M 3900261

M 3900264

M 3900272

M 3900273

M 3900282

M 3900287

M 3900291

M 3900295

M 3900304

M 3900305

M 3900306

M 3900333

M 3900380

M 3900390

M 3900391

M 3900392

M 3900393

M 3900394

M 3900395

M 3900403

M 3900441

M 3900442

M 3900443

M 3900444

M 3900497

Printed: 18/02/2019 02:28:38 PMPage 195 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 196: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

MT MORGANS WA MINING PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

Printed: 18/02/2019 02:28:38 PMPage 196 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 197: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97354 CONFIDENTIAL 05/04/2013 01/2012 - 12/2012 Combined Annual Report for the period 1 January 2012 to 31 December 2012, Mt Morgans Project, E39/1310.....P39/4815

M 3900501

M 3900502

M 3900503

M 3900504

M 3900513

M 3900745

M 3900746

M 3900747

M 3900799

M 3900937

M 3900938

M 3900993

97356 CONFIDENTIAL 01/04/2013 03/2012 - 03/2013 Combined Annual Mineral Exploration Report C83/2010 Dardanup 11 March 2012 – 10 March 2013, M70/455, M70/456, M70/669, M70/673, M70/83 and M70/89

M 7000083

M 7000089

M 7000455

M 7000456

M 7000669

M 7000673

97357 CONFIDENTIAL 05/04/2013 01/2012 - 01/2013 Horseshoe Lights Project, Annual Report for the period 14th January 2012 to 13th January 2013, E52/2042; M52/743; P52/1203-1211. [C124/2009]

E 5202042

M 5200743

97358 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Browns Range Project, Annual Report for the period 1st January 2012 to 31st December 2012, E80/3547-3548, 4393 & 4479. [C134/2010]

E 8003547

E 8003548

E 8004393

E 8004479

97361 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Combined Annual Report WILUNA PROJECT For the Period 1 January 2012 to 31 December 2012, E53/1290, E53/1297, M53/24, M53/25, M53/34, M53/41, M53/52, M53/53, M53/54, M53/92, M53/129, M53/130, M53/131, M53/139, M53/188, M53/384, M53/415, M53/797, M53/798, M53/955

M 5300024

M 5300025

M 5300034

M 5300041

Printed: 18/02/2019 02:28:38 PMPage 197 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 198: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

MT MORGANS WA MINING PTY LTD

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

DACIAN GOLD LIMITED

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

MURCHISON COPPER MINES PTY LTD

MURCHISON COPPER MINES PTY LTD

NORTHERN MINERALS LIMITED

NORTHERN MINERALS LIMITED

NORTHERN MINERALS LIMITED

NORTHERN MINERALS LIMITED

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 198 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 199: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97361 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Combined Annual Report WILUNA PROJECT For the Period 1 January 2012 to 31 December 2012, E53/1290, E53/1297, M53/24, M53/25, M53/34, M53/41, M53/52, M53/53, M53/54, M53/92, M53/129, M53/130, M53/131, M53/139, M53/188, M53/384, M53/415, M53/797, M53/798, M53/955

M 5300052

M 5300053

M 5300054

M 5300092

M 5300129

M 5300130

M 5300131

M 5300139

M 5300188

M 5300415

M 5300797

M 5300798

M 5300955

97363 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Combined Annual Report for M25/59, M25/111, M25/134, M25/145, M25/161, M25/162, M25/171, M25/206-210, M25/220, M25/234, M25/260, M25/341, P25/1058, P25/1061-1063, P25/1175-1177, P25/1853, P25/2050, P25/2062, P25/2170 and P25/2171 C Number: 224/1995 ‘Bulong East Project’ For the period 1st January 2012 to 31st December 2012

M 2500059

M 2500134

M 2500145

M 2500161

M 2500171

M 2500209

97364 CONFIDENTIAL 08/04/2013 01/2012 - 01/2013 Annual Report (23.01.2012 � 22.01.2013) Mt Edith Dolomite Resources Exploration Licence E08/1279 EXPLORATION REPORT.

E 0801279

97366 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Marble Bar Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3674-3676, E45/3678 & E45/3717; P45/2818-2820.

E 4503674

E 4503675

E 4503717

P 4502818

P 4502819

Printed: 18/02/2019 02:28:38 PMPage 199 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 200: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

HAMPTON NICKEL PTY LTDSOUTHERN GOLD LIMITED

REGIONAL RESOURCES NW PTY LTD

WHIM CREEK MINING PTY LTD

WHIM CREEK MINING PTY LTD

WHIM CREEK MINING PTY LTD

WITX PTY LTD

WITX PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 200 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 201: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97366 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Marble Bar Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3674-3676, E45/3678 & E45/3717; P45/2818-2820.

P 4502820

97369 CONFIDENTIAL 08/04/2013 01/2012 - 12/2012 Gingin Project, Annual Report for the period 1st January 2012 to 31st December 2012, E70/2742, 3032, 3033, 3041, 3192, 3494 & 3551; M70/448 & 1193-1194. [C71/2010]

E 7003032

E 7003041

E 7003192

E 7003494

M 7000448

M 7001194

97371 CONFIDENTIAL 08/04/2013 01/2012 - 01/2013 Callie Soak Project, Annual Report for the period ending 8th January 2013, E20/669. [C593/1994]

E 2000699

97378 CONFIDENTIAL 11/04/2013 04/2012 - 04/2013 Annual Report To the Department of Mines and Petroleum For the period 10 April 2012 to 09 April 2013Menzies West (Julia) Nickel Project Combined Reporting Number C23/2001, M29/417 and M29/418

M 2900417

M 2900418

97379 CONFIDENTIAL 11/04/2013 02/2011 - 12/2012 Annual Report E51/1491 Mistletoe for the period 16 December 2011 to 15 December 2012

E 5101491

97385 CONFIDENTIAL 11/04/2013 05/2012 - 05/2013 Annual Report Ministers North E47/628 Reporting period 4 May 2012 - 3 May 2013

E 4700628

97386 CONFIDENTIAL 10/04/2013 01/2012 - 12/2012 Annual Report for the period 1 January 2012 to 31 December 2012, Solomon East Project C225/2008, E47/1011, 1319, 1333, 1334, 1398, 1399, 1532, 1447, 1611, M47/1409, 1410, 1411, 1413, 1431, 1466, P47/1309, 1286, 1279 & 1468

E 4701011

E 4701319

E 4701333

E 4701334

E 4701398

E 4701399

E 4701447

E 4701532

M 4701409

M 4701410

M 4701411

M 4701413

M 4701431

M 4701466

Printed: 18/02/2019 02:28:38 PMPage 201 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 202: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WITX PTY LTD

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

MUSGRAVE MINERALS LIMITED

WINGSTAR INVESTMENTS PTY LTD

WINGSTAR INVESTMENTS PTY LTD

MISTLETOE MINING PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 202 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 203: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97386 CONFIDENTIAL 10/04/2013 01/2012 - 12/2012 Annual Report for the period 1 January 2012 to 31 December 2012, Solomon East Project C225/2008, E47/1011, 1319, 1333, 1334, 1398, 1399, 1532, 1447, 1611, M47/1409, 1410, 1411, 1413, 1431, 1466, P47/1309, 1286, 1279 & 1468

P 4701279

P 4701286

97387 CONFIDENTIAL 10/04/2013 01/2012 - 12/2012 Annual Report C335/1992 For the period 01/01/2012 to 31/12/2012 Paroo Station Mine E53/1475, E53/1528, E53/644, E53/695, M53/501-504, M53/1002 and P53/1528 Western Australia

E 5300695

E 5301528

M 5300501

M 5300502

M 5300503

M 5300504

M 5301002

P 5301528

97389 CONFIDENTIAL 10/04/2013 01/2012 - 12/2012 Annual Combined Report Balla Balla C210/2008 for the period 1 January 2012 to 31 December 2012, E47/1829, M47/297, M47/298, M47/311, M47/312, M47/360, M47/361, M47/804, P47/1094, P47/1437, P47/1521 & P47/1522

E 4701829

M 4700297

M 4700298

M 4700311

M 4700312

M 4700360

M 4700361

M 4700804

P 4701094

P 4701437

P 4701521

P 4701522

97390 CONFIDENTIAL 10/04/2013 01/2012 - 12/2012 Combined Mineral Exploration Report Mt Weld Prospect C202/2008 for the period 1st January 2012 to 31st December 2012, M38/1039, 1040, 360, 463, 464, P38/3758, 3759, 3760, 3761,3762, 3763, 3764

M 3800360

97393 CONFIDENTIAL 10/04/2013 01/2012 - 01/2013 Annual Report for the period 18th January 2012 to 17th January 2013, Perishing Project C16/2009, E47/1613, E47/1614, E47/1927

E 4701927

97394 CONFIDENTIAL 10/04/2013 02/2012 - 02/2013 2013 Combined Annual Report Area 4 - Darkan E70/3573, E70/3624, E70/3643, E70/3644 & E70/3831, C179/2011 (for the period 15 February 2012 to 14 February 2013)

E 7003573

E 7003624

Printed: 18/02/2019 02:28:38 PMPage 203 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 204: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

ROSSLYN HILL MINING PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FERRO METALS AUSTRALIA PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

FORGE RESOURCES SWAN PTY LTD

UCABS PTY LTD

FMG PILBARA PTY LTD

YANKUANG RESOURCES PTY LTD

YANKUANG RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 204 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 205: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97396 CONFIDENTIAL 10/04/2013 02/2012 - 02/2013 Mount Iron Project, Annual Report for the period 11th Febraury 2012 to 10th February 2013, M74/63.

M 7400063

97403 CONFIDENTIAL 09/04/2013 01/2012 - 12/2012 Bullfinch Project Annual Technical Report Nickel 2012 C20/2005 2012A [for the period 1st January 2012 to 31st December 2012]

E 7701374

M 7701253

P 7703636

97405 CONFIDENTIAL 09/04/2013 11/2011 - 11/2012 Combined Annual Exploration Report - C16-2005 Sherlock Bay Nickel and Extended Projects 22nd November 2011 – 21st November 2012 M47/567, E47/1769, 1770, P47/1139, 1140, 1141, 1142, 1148, 1149, 1150, 1151, 1152, 1153, 1154, 1155.

E 4701769

E 4701770

M 4700567

97417 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 EVANSTON MINE PROJECT C47/2004 E77/1505, E77/1653–4, E77/1741–2, E77/1814, E77/1911, P77/4101 Yilgarn Mineral Field Combined Annual Report for the period 1 January 2012 to 31 December 2012.

E 7701741

E 7701911

P 7704101

97421 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 North Kookynie Project, Annual Report for the period 01/01/2012 to 31/12/2012, E40/229, 263, 291 & 306; M40/3............M40/293; P40/1144............P40/1277. [C130/2009]

E 4000229

E 4000263

E 4000291

E 4000306

M 4000003

M 4000020

M 4000094

M 4000101

M 4000107

M 4000110

M 4000120

M 4000137

M 4000148

M 4000151

M 4000174

M 4000209

M 4000288

Printed: 18/02/2019 02:28:38 PMPage 205 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 206: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ROSE IAN PHILIP

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

METALS AUSTRALIA LTDINTERNATIONAL EXPLORATION LIMITED

METALS AUSTRALIA LTDINTERNATIONAL EXPLORATION LIMITED

INTERNATIONAL EXPLORATION LIMITED

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

WEST AUSTRALIAN PROSPECTORS PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 206 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 207: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97421 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 North Kookynie Project, Annual Report for the period 01/01/2012 to 31/12/2012, E40/229, 263, 291 & 306; M40/3............M40/293; P40/1144............P40/1277. [C130/2009]

M 4000289

M 4000290

M 4000291

M 4000292

M 4000293

P 4001172

P 4001182

P 4001196

P 4001244

P 4001272

P 4001277

97422 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 Yundamindera Project, Annual Report for the period 1st January 2012 to 31st December 2012, E39/1323, 1329, 1353, 1584, & 1648; M39/84/274, 406-410, 839 & 840; P39/5014. [C349/1993]

M 3900084

M 3900274

M 3900406

M 3900407

M 3900408

M 3900409

M 3900410

M 3900839

M 3900840

97423 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 Apollo Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E31/800; E39/1198, 1236 & 1644; E40/296 & 303; P/1797, 4586-4592, 4677-4679 & 4789; M39/296. [C360/1996]

E 3901198

M 3900296

97428 CONFIDENTIAL 11/04/2013 02/2012 - 02/2013 Tenement: E08/1987 Ashburton Mineral Field, Nanutarra ANNUAL REPORT 2012 TECHNICAL REPORT FOR THE PERIOD 23rd February 2012 to 22nd February 2013 Mount Alexander Project

E 0801987

97434 CONFIDENTIAL 11/04/2013 02/2012 - 02/2013 Railway South Project, Annual Report for the period 07/02/2012 to 06/02/2013, E45/2708, 2841, 2843-2844, 2866, 3366, 3414, 3561, & 3739; M45/1177. [C53/2006]

M 4501177

97435 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 Jeerinah Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1195-1196, 1299-1302, 1682, 2037 & 2442; P47/1270, 1316-1318, 1398-1403, 1423 & 1552. [C134/2005]

E 4701195

E 4701196

Printed: 18/02/2019 02:28:38 PMPage 207 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 208: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

MACPHERSON TREVOR CHARLES

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

SATURN METALS LIMITED

SATURN METALS LIMITED

NANUTARRA MINERALS PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 208 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 209: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97435 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 Jeerinah Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1195-1196, 1299-1302, 1682, 2037 & 2442; P47/1270, 1316-1318, 1398-1403, 1423 & 1552. [C134/2005]

E 4701299

E 4701300

E 4701301

E 4701302

E 4702037

P 4701270

97439 CONFIDENTIAL 11/04/2013 01/2012 - 12/2012 Bronzewing Project, Annual Report for the period 1st January 2012 to 31st December 2012, M36/80-82..........M36/615; E36/604, 748-749 & 761; P36/1734..............P36/1768. [C120/2006]

E 3600749

M 3600107

M 3600146

M 3600200

M 3600201

M 3600202

M 3600203

M 3600244

M 3600263

M 3600295

M 3600615

97445 CONFIDENTIAL 12/04/2013 05/2012 - 12/2012 Ernest Giles Project, Annual Report for the period 13th May 2012 to 31st December 2012, E38/2204-2205 & E38/2467. {C120/2012]

E 3802205

97447 CONFIDENTIAL 12/04/2013 01/2012 - 01/2013 Carbine West Project, Annual Report for the period 14th January 2012 to 13th January 2013, P16/2445-2447, 2450-2453 & 2746. [C108/2009]

P 1602445

P 1602446

P 1602447

97448 CONFIDENTIAL 12/04/2013 03/2012 - 03/2013 Bohemia Project, Annual Report for theperiod 31st March 2012 to 30th March 2013, P77/4027.

P 7704027

97449 CONFIDENTIAL 15/04/2013 02/2012 - 02/2013 Annual Report M77/25 (Francis Furness) Geological Report for the Period February 15th 2012 - February 14th 2013

M 7700025

97450 CONFIDENTIAL 12/04/2013 03/2012 - 02/2013 Queen Bee Project, Annual Report for the period 1st March 2012 to 28th February 2013, M59/138.

M 5900138

97451 CONFIDENTIAL 12/04/2013 01/2012 - 01/2013 Avoca Project, Annual Report for the period 01/01/2012 to 31/12/2012, E15/934; P15/4540, 4821-4828 & P15/5173-5175. [C27/2002]

E 1500934

P 1504826

P 1505173

Printed: 18/02/2019 02:28:38 PMPage 209 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 210: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

GREATLAND PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

LITHOS EXPLORATION SERVICES PTY LTDDUSKY HOLDINGS PTY LTD

DUSKY HOLDINGS PTY LTDLITHOS EXPLORATION SERVICES PTY LTD

SEIVWRIGHT MARY ANNE PAULINE

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 210 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 211: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97451 CONFIDENTIAL 12/04/2013 01/2012 - 01/2013 Avoca Project, Annual Report for the period 01/01/2012 to 31/12/2012, E15/934; P15/4540, 4821-4828 & P15/5173-5175. [C27/2002]

P 1505174

P 1505175

97452 CONFIDENTIAL 12/04/2013 02/2012 - 02/2013 Lindsay East Project, Annual Report for the period 12th February 2012 to 11th February 2013, P27/2002.

P 2702002

97453 CONFIDENTIAL 12/04/2013 01/2012 - 12/2012 COMBINED ANNUAL REPORT FOR C36/2003 GREAT SOUTHERN PROJECT WESTERN AUSTRALIA Mining tenements M74/83 Exploration tenements E4/379, E74/408, E74/448 Prospecting tenements P74/262 – 275, P74/280, P74/281 and P74/295 - 298 [For period 1/01/2012 to 31/12/2012]

E 7400379

M 7400083

97454 CONFIDENTIAL 12/04/2013 01/2012 - 12/2012 COMBINED ANNUAL REPORT FOR C158/2012 GREAT SOUTHERN PROJECT WESTERN AUSTRALIA Exploration tenements E74/332, E74/378, E74/489

E 7400378

97455 CONFIDENTIAL 15/04/2013 03/2012 - 03/2013 Dalgaranga Project, Annual Report for the period 17th March 2012 to 16th March 2013, E59/1709.

E 5901709

97458 CONFIDENTIAL 10/04/2013 12/2011 - 12/2012 Cue Project, Annual Report for the period 16/12/2011 to 15/12/2012, P20/2175.

P 2002175

97460 CONFIDENTIAL 15/04/2013 03/2012 - 03/2013 Parker Range Project, Annual Report for the period 4th March 2012 to 3rd March 2013, E77/1362, 1396 & 1734;M77/52.............M77/1018; P77/3475.............P77/3800. [C128/2005]

E 7701734

M 7700052

M 7700089

M 7700561

M 7700562

M 7700567

M 7700657

M 7700762

M 7700893

97461 CONFIDENTIAL 15/04/2013 01/2012 - 01/2013 Gobbos & Cyclops Project, Annual Report for the period 21st January 2012 to 20th January 2013, E45/3326.

E 4503326

97466 CONFIDENTIAL 15/04/2013 01/2012 - 12/2012 MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007.

E 3901410

E 3901478

E 3901488

E 3901489

E 3901580

97473 CONFIDENTIAL 08/04/2013 02/2012 - 02/2013 Beatons Creek Project, Annual Report for the period 10/02/2012 to 09/02/2013, P46/1577.

P 4601577

Printed: 18/02/2019 02:28:38 PMPage 211 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 212: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

ABERDEEN MINING PTY LTD

GALAXY LITHIUM AUSTRALIA LIMITED

ACH MINERALS PTY LTD

TRAKA RESOURCES LIMITED

MCDOWELL JAIME ANTHONYGASCOYNE RESOURCES LIMITED

FICARRA RESOURCES PTY LTD

WESTERN AREAS LIMITED

GONDWANA RESOURCES LIMITEDTEXRISE PTY LTD

GONDWANA RESOURCES LIMITED

BARCLAY HOLDINGS LTD

BARCLAY HOLDINGS LTD

GONDWANA RESOURCES LIMITED

GONDWANA RESOURCES LIMITED

GONDWANA RESOURCES LIMITED

GONDWANA RESOURCES LIMITEDTEXRISE PTY LTD

LMTD NULLAGINE PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

CREASY MARK GARETH

Printed: 18/02/2019 02:28:38 PMPage 212 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 213: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97474 CONFIDENTIAL 15/04/2013 10/2011 - 10/2012 Beatons Creek Project, Annual Report for the period 07/10/2011 to 06/10/2012, P46/1643.

P 4601643

97484 CONFIDENTIAL 16/04/2013 04/2012 - 04/2013 Mineral Exploration Annual Tenement Report P45/2783 McPhees Gold Project FOR THE PERIOD 07/04/12 TO 06/04/13

P 4502783

97485 CONFIDENTIAL 16/04/2013 01/2012 - 12/2012 Paynes Find Project, Annual Report for the period 01/01/2012 to 31/12/2012, M59/2, 10, 253, 244, 396, 662-663 & 726; P59/1709, 1738, 1907-1909, 1924, 1933, 1941-1942 & 1956-1959. [C13/2012]

M 5900002

M 5900010

M 5900235

M 5900244

M 5900396

M 5900662

M 5900663

P 5901941

P 5901942

P 5901956

P 5901957

P 5901958

P 5901959

97489 CONFIDENTIAL 16/04/2013 01/2012 - 12/2012 Wallbrook Hill Project Annual Report 1 January 2012 to 31 December 2012, CR Group: C57/2008, Tenements: E31/793, E31/946, M31/172, M31/184, M31/188, M31/231, P31/1855 & P31/1856.

M 3100172

M 3100188

M 3100231

97490 CONFIDENTIAL 16/04/2013 02/2012 - 02/2013 Annual Technical Report for Exploration Licence 15/1197 for the period 7 February 2012 to 6 February 2013

E 1501197

97492 CONFIDENTIAL 16/04/2013 03/2012 - 03/2013 GILES SOUTH 2 ANNUAL REPORT EXPLORATION LICENCE 47/1924 West Pilbara Mineral Field Western Australia Annual Report for the Period 26 March 2012 to 25 March 2013

E 4701924

97493 CONFIDENTIAL 09/04/2013 03/2012 - 03/2013 HOWARDS WELL 2 ANNUAL REPORT EXPLORATION LICENCE 47/2141 West Pilbara Mineral Field Western Australia Annual Report for the Period 25 March 2012 to 24 March 2013

E 4702141

97494 CONFIDENTIAL 16/04/2013 02/2012 - 02/2013 Mertondale Project M37/591 Annual Report for the period 20th February 2012 to 19th February 2013

M 3700591

97503 CONFIDENTIAL 18/04/2013 01/2012 - 12/2012 C77/1998 Annual Technical Report for the period 1 January 2012 to December 2012, E15/911.......P15/5695-5701

M 1500049

Printed: 18/02/2019 02:28:38 PMPage 213 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 214: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WITX PTY LTD

PILGANGOORA OPERATIONS PTY LTD

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

EUROPEAN LITHIUM LIMITED

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

AVOCA RESOURCES PTY LTD

HAMERSLEY IRON PTY LIMITED

ROBE RIVER MINING CO. PTY LIMITEDMITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

NIWEST LIMITED

MINCOR RESOURCES NL

Printed: 18/02/2019 02:28:38 PMPage 214 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 215: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97503 CONFIDENTIAL 18/04/2013 01/2012 - 12/2012 C77/1998 Annual Technical Report for the period 1 January 2012 to December 2012, E15/911.......P15/5695-5701

M 1500063

ML 1500131

ML 1500140

ML 1500494

ML 1500495

ML 1500498

ML 1500499

ML 1500500

ML 1500501

ML 1500502

ML 1500504

ML 1500506

ML 1500507

ML 1500508

ML 1500509

ML 1500510

ML 1500511

ML 1500512

ML 1500513

ML 1500514

ML 1500515

ML 1500516

ML 1500517

ML 1500518

ML 1500519

ML 1500520

ML 1500521

ML 1500522

ML 1500523

ML 1500524

ML 1500525

97505 CONFIDENTIAL 19/04/2013 02/2012 - 01/2013 Mulgul Project, Annual Report for the period 1st February 2012 to 31st January 2013, E52/1455, 1887 & 2185; P52/1261-1263; M52/776. [C28/2009]

E 5201455

Printed: 18/02/2019 02:28:38 PMPage 215 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 216: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MINCOR RESOURCES NL

GOLDFIELDS MINE MANAGEMENT PTY LTD

GOLDFIELDS MINE MANAGEMENT PTY LTD

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

ABRA MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 216 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 217: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97505 CONFIDENTIAL 19/04/2013 02/2012 - 01/2013 Mulgul Project, Annual Report for the period 1st February 2012 to 31st January 2013, E52/1455, 1887 & 2185; P52/1261-1263; M52/776. [C28/2009]

M 5200776

97509 CONFIDENTIAL 18/04/2013 03/2012 - 03/2013 Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 2984 & 3703; M45/1197; P45/2561, 2702, 2706-2708 & 2739. [C71/2003]

E 4502186

E 4502922

M 4501197

97510 CONFIDENTIAL 18/04/2013 03/2012 - 03/2013 Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2312 & 2268; M45/1209. [C187/2012]

E 4502268

M 4501209

97511 CONFIDENTIAL 18/04/2013 04/2012 - 04/2013 FARREL WELL E45/3601-I P45/2775 & 2776 ANNUAL TECHNICAL REPORT To the Department of Mines and Petroleum For the Period Ending 7 April 2013. GSWA REF: C229/2011

E 4503601

97518 CONFIDENTIAL 17/04/2013 03/2012 - 02/2013 Eucalyptus Bore Project, Annual Report for the period 1st March 2012 to 28th February 2013, M39/289, 313, 344, 430, 568, 570, 616, 665-666, 674, 744, 802-804; E39/ 1419 ,1470, 1527 & 1552. [C89/2000]

M 3900289

M 3900313

M 3900344

M 3900430

M 3900568

M 3900666

M 3900674

M 3900744

M 3900802

M 3900803

97519 CONFIDENTIAL 17/04/2013 01/2012 - 12/2012 Blue Spec Shear- Camel Creek Project, Annual Report for the period 01/01/2012 to 31/12/2012, M46/57, 115, 165-167, 182, 244, & 442; P46/1607-1611, 1669-1684 & 1698-1702. [C154/2010]

M 4600057

M 4600115

M 4600165

M 4600166

M 4600167

M 4600182

M 4600244

M 4600442

P 4601669

P 4601670

Printed: 18/02/2019 02:28:38 PMPage 217 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 218: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ABRA MINING PTY LTD

GIRALIA RESOURCES PTY LTDHAOMA MINING NL

GIRALIA RESOURCES PTY LTDHAOMA MINING NL

GIRALIA RESOURCES PTY LTD

ALTURA EXPLORATION PTY LTD

ATLAS OPERATIONS PTY LTD

ATLAS IRON LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

NIWEST LIMITED

FRANCO-NEVADA AUSTRALIA PTY LTD

NIWEST LIMITED

NIWEST LIMITED

MILLENNIUM MINERALS LIMITED

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

BEATONS CREEK GOLD PTY LTD

MILLENNIUM MINERALS LIMITED

BEATONS CREEK GOLD PTY LTD

MILLENNIUM MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 218 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 219: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97519 CONFIDENTIAL 17/04/2013 01/2012 - 12/2012 Blue Spec Shear- Camel Creek Project, Annual Report for the period 01/01/2012 to 31/12/2012, M46/57, 115, 165-167, 182, 244, & 442; P46/1607-1611, 1669-1684 & 1698-1702. [C154/2010]

P 4601671

P 4601672

P 4601673

P 4601674

P 4601675

P 4601676

P 4601677

P 4601678

P 4601679

P 4601680

P 4601681

P 4601682

P 4601683

P 4601684

P 4601698

P 4601699

P 4601700

P 4601701

P 4601702

97521 CONFIDENTIAL 19/04/2013 01/2012 - 12/2012 Doolgunna Project 2012 Mineral Exploration Annual Report Combined Report Group C261/2011 E52/1698, E52/1699, E52/1715-I, E52/2208, E52/2209, E52/2358, E52/2401, M52/1046, Report Period 01/01/2012 to 31/12/2012.

E 5201698

E 5201699

E 5201715

E 5202208

E 5202209

E 5202358

E 5202401

M 5201046

97522 CONFIDENTIAL 19/04/2013 12/2011 - 12/2012 Edjudina Project, Annual Report for the period 23rd December 2011 to 22nd December 2012, E31/573.....E31/944; M31/3.............M31/381; P31/1740-1743, & P31/1749-1751. [C206/1995]

M 3100003

M 3100004

Printed: 18/02/2019 02:28:38 PMPage 219 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 220: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 220 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 221: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97522 CONFIDENTIAL 19/04/2013 12/2011 - 12/2012 Edjudina Project, Annual Report for the period 23rd December 2011 to 22nd December 2012, E31/573.....E31/944; M31/3.............M31/381; P31/1740-1743, & P31/1749-1751. [C206/1995]

M 3100005

M 3100006

M 3100030

M 3100076

M 3100157

M 3100190

M 3100191

M 3100251

M 3100380

M 3100381

97523 CONFIDENTIAL 19/04/2013 10/2011 - 10/2012 Annual Exploration Report for Mining Lease 59/714 for the period 27/10/2011 to 26/10/2012

M 5900714

97525 CONFIDENTIAL 19/04/2013 01/2012 - 12/2012 Bald Hill Project, Annual Report for the period 1st January 2012 to 31/12/2012, E15/1058, 1066-1067, 1161-1162, 1166, 1212 & 1353; G15/17; M15/400, 1305, 1308 & 1470; P15/4696-4700, 5465-5467; R15/1; L15/264-270.

E 1501058

E 1501066

E 1501067

E 1501161

E 1501162

E 1501166

E 1501212

E 1501353

G 1500017

L 1500264

L 1500265

L 1500266

L 1500267

L 1500268

L 1500269

L 1500270

M 1500400

M 1501305

M 1501308

Printed: 18/02/2019 02:28:38 PMPage 221 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 222: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 222 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 223: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97525 CONFIDENTIAL 19/04/2013 01/2012 - 12/2012 Bald Hill Project, Annual Report for the period 1st January 2012 to 31/12/2012, E15/1058, 1066-1067, 1161-1162, 1166, 1212 & 1353; G15/17; M15/400, 1305, 1308 & 1470; P15/4696-4700, 5465-5467; R15/1; L15/264-270.

M 1501470

P 1504696

P 1504697

P 1504698

P 1504699

R 1500001

97528 CONFIDENTIAL 19/04/2013 01/2012 - 01/2013 Annual Report for Mining Licence M53/193 - Plover Bore Project, for the period 2nd January 2012 to 1st January 2013

M 5300193

97529 CONFIDENTIAL 19/04/2013 04/2012 - 04/2013 ANNUAL REPORT EXPLORATION LICENCE 52/2581 for the period 28th April 2012 to 27th April 2013 PEAK HILL MINERAL FIELD WESTERN AUSTRALIA [Warrawanda Creek Project]

E 5202581

97530 CONFIDENTIAL 19/04/2013 02/2012 - 02/2013 Combined Annual Report for E25/349, E25/405, M25/182, M25/183, M25/333, P25/1896, P25/1990, P25/2143, P25/2181, P25/2182 and P25/2183 C Number 161/2001 ‘Bulong South Project’ For the period 8th February 2012 to 7th February 2013

E 2500349

M 2500182

M 2500333

97532 CONFIDENTIAL 18/04/2013 01/2012 - 12/2012 Bardoc Extended Project, Annual Report for the period 1st January 2012 to 31st December 2012, M24/96, 146, 395, 405, 420, 469, 487, 498, 510 & 512; P24/4060-4072 & P24/4150-4158. [C51/2003]

M 2400096

M 2400146

M 2400395

M 2400405

M 2400420

M 2400469

M 2400487

M 2400498

M 2400510

M 2400512

97542 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 3D Common Earth Modelling – Yindarlgooda Dome E 2500162

E 2500344

E 2500434

E 2500449

E 2500450

Printed: 18/02/2019 02:28:38 PMPage 223 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 224: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

ALLIANCE MINERAL ASSETS LIMITED

CREASY MARK GARETH

REDSTONE MINERALS PTY LTD

SOUTHERN GOLD LIMITED

INFERUS RESOURCES PTY LTD

SOUTHERN GOLD LIMITED

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 224 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 225: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97542 CONFIDENTIAL 01/03/2013 01/2012 - 12/2012 3D Common Earth Modelling – Yindarlgooda Dome E 2600153

E 2600154

M 2500071

M 2500125

M 2500133

M 2500236

M 2500307

M 2500347

P 2501922

P 2603819

P 2603820

P 2603821

97549 CONFIDENTIAL 22/04/2013 03/2012 - 03/2013 2013 Annual Report for E77/1535 The Gold City Prospect for the period 15th March 2012 to the 14th March 2013

E 7701535

97550 CONFIDENTIAL 22/04/2013 03/2012 - 03/2013 Annual Report on the Deserts Prospect E77/1361 for the period 15th March 2012 to the 14th March 2013

E 7701361

97551 CONFIDENTIAL 22/04/2013 02/2012 - 02/2013 Annual Report on E52/1529 Mt Padbury Prospect, For the period 23rd February 2012 to 22nd February 2013, .

E 5201529

97558 CONFIDENTIAL 22/04/2013 02/2012 - 02/2013 Annual Report for Exploration License E52/2438 for the Period 11 February 2012 to 10 February 2013 [Doolgunna Project (Cow Hole Bore)]

E 5202438

97560 CONFIDENTIAL 23/04/2013 02/2012 - 02/2013 NINDILBILLUP LATERITIC NICKEL-COBALT PROJECT ANNUAL REPORT 2013 M74/104 & M 74/107 C99/2005 27th February 2012 to 26th February 2013

M 7400104

M 7400107

97570 CONFIDENTIAL 23/04/2013 03/2012 - 03/2013 Deadman Hill Project Combined Annual Report Exploration Licences 52/1617 & E52/1690 (C117/2004) Peak Hill Mineral Field Western Australia Annual Report for the period 24 March 2012 to 23 March 2013.

E 5201617

E 5201690

97580 CONFIDENTIAL 23/04/2013 02/2012 - 02/2013 Doherty’s Annual Technical Report on - M57/619 for the period 26/2/2012 to 25/2/2013

M 5700619

97582 CONFIDENTIAL 24/04/2013 02/2012 - 02/2013 Combined Annual Report C24/1999, Mining Leases 70/307, 70/631 for the period 26 February 2012 to 25 February 2013

M 7000307

M 7000631

Printed: 18/02/2019 02:28:38 PMPage 225 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 226: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

ELEMENT 25 LIMITED

AURIS MINERALS LIMITED

PHANEROZOIC ENERGY PTY LTD

PHANEROZOIC ENERGY PTY LTD

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

CLASSIC MINERALS LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 226 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 227: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97583 CONFIDENTIAL 24/04/2013 02/2012 - 02/2013 Combined Annual Report C233/1998 Lake Cowcowing for the period 5 February 2012 to 4 February 2013, M70/171, 70/172, 70/173, 70/264, 70/559, 70/1078, P70/1323, E70/2222

M 7000171

M 7000172

M 7000173

M 7000264

M 7000559

M 7001078

97584 CONFIDENTIAL 24/04/2013 02/2012 - 02/2013 M37/96 Mineral Exploration Report For Period (25th February 2012 to 24th February 2013)

M 3700096

97585 CONFIDENTIAL 26/04/2013 01/2012 - 01/2013 Yamarna Project, Annual Report for the Period 19 January 2012 – 18 January 2013 for Tenements E38/361........P38/3896. Combined Reporting Group C267/1994.

E 3800361

E 3801083

E 3801386

E 3801388

E 3801858

E 3801931

E 3801932

E 3801964

E 3802178

E 3802235

E 3802236

E 3802250

E 3802319

E 3802320

E 3802325

E 3802326

E 3802327

E 3802362

E 3802415

E 3802446

E 3802447

Printed: 18/02/2019 02:28:38 PMPage 227 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 228: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

AUSTRALIAN MINES LIMITED

GOLD ROAD RESOURCES LIMITED

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

EASTERN GOLDFIELDS MINING COMPANY PTY LTDGREAT BOULDER RESOURCES LIMITED

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD RESOURCES LIMITED

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 228 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 229: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97585 CONFIDENTIAL 26/04/2013 01/2012 - 01/2013 Yamarna Project, Annual Report for the Period 19 January 2012 – 18 January 2013 for Tenements E38/361........P38/3896. Combined Reporting Group C267/1994.

M 3800435

M 3800436

M 3800437

M 3800438

M 3800439

M 3800788

M 3800814

M 3800841

P 3803869

P 3803870

P 3803887

P 3803896

97589 CONFIDENTIAL 26/04/2013 03/2012 - 03/2013 PROJECT 8529 NORTH ZULEIKA M16/188, M16/239, M16/27, M16/411, M16/5 P16/2508 ANNUAL REPORT Period 9 March 2012 – 8 March 2013 TECHNICAL REPORT No. 1561 C303/1997

M 1600005

M 1600027

M 1600188

M 1600239

M 1600411

P 1602508

97591 CONFIDENTIAL 26/04/2013 03/2012 - 03/2013 Annual Mineral Exploration Report for year ending 5th March 2013, Exploration Licence E59/1773 Extension Hill

E 5901773

97593 CONFIDENTIAL 26/04/2013 04/2012 - 04/2013 Paterson Project, Annual Report for the period 30th April 2012 to 29th April 2013, E45/3768. [C52/2013]

E 4503768

97596 CONFIDENTIAL 26/04/2013 02/2012 - 02/2013 Combined Annual Report for the Period 18 February 2012 to 17 February 2013, Fraser Range Project, C55/2010 - E63/1281, E63/1282, E63/1283 & E63/1448

E 6301281

E 6301282

97597 CONFIDENTIAL 24/04/2013 01/2012 - 01/2013 Lakeside Project E21/120 Annual Report for the period ending 22nd January 2013

E 2100120

Printed: 18/02/2019 02:28:38 PMPage 229 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 230: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GRUYERE MINING COMPANY PTY LTDGOLD ROAD (GRUYERE) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

KERLEY PETER JOHN

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

KUNDANA GOLD PTY LTD

EXTENSION HILL PTY LTD

ENCOUNTER YENEENA PTY LTD

ENTERPRISE METALS LIMITEDCONSTELLATION RESOURCES LIMITED

ENTERPRISE METALS LIMITEDCONSTELLATION RESOURCES LIMITED

ENERGY METALS LTD

Printed: 18/02/2019 02:28:38 PMPage 230 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 231: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97601 CONFIDENTIAL 24/04/2013 02/2012 - 02/2013 E57/405 Annual Report for the Period Ending Feb 2013 E 5700405

97605 CONFIDENTIAL 24/04/2013 02/2012 - 01/2013 Combined Annual Technical Report for the period 1 February 2012 to 31 January 2013, Mt Elvire North Project, C89/2011

E 4701256

97606 CONFIDENTIAL 24/04/2013 02/2012 - 01/2013 Combined Annual Technical Report for the period 1 February 2012 to 31 January 2013, Mt Elvire West Project, C61/2011, E47/1262, E47/1279, E47/1280, E47/1281, E47/1283

E 4701262

E 4701279

E 4701280

E 4701281

E 4701283

97608 CONFIDENTIAL 24/04/2013 01/2012 - 01/2013 MCPHEE CREEK PROJECT E46/732-I 733-I 802 & E45/3559-I Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 30 January 2013

E 4503559

E 4600732

E 4600733

E 4600802

97609 CONFIDENTIAL 26/04/2013 01/2012 - 12/2012 Annual Technical Report for the Period 1 January 2012 to 31 December 2012 for C77/2011

M 4701438

97610 CONFIDENTIAL 26/04/2013 02/2012 - 02/2013 Nimbus Project Reporting Group C148/2010, Combined Annual Report for year ending 26 February 2013, M26/490, M26/598

M 2600490

M 2600598

97611 CONFIDENTIAL 26/04/2013 02/2012 - 02/2013 Boorara Project, Annual Report for the period 27th February 2012 to 26th February 2013, M26/29,161, 277 & 318; P25/2003, 2030-2031, 2061, 2068-2069, 3420, 3664, 3699-3702 & 3704. [C89/2004]

M 2600029

M 2600161

M 2600277

M 2600318

P 2502030

P 2502031

P 2603420

P 2603664

P 2603701

P 2603702

97612 CONFIDENTIAL 26/04/2013 02/2012 - 01/2013 Kintore Project, Annual Report for the period 01/02/2012 to 31/01/2013, M16/16, 215, 444; P16/2573, 2574 & 2624. [C71/2009] [C153/2006]

M 1600016

Printed: 18/02/2019 02:28:38 PMPage 231 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 232: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GATEWAY MINING LIMITED

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

GIRALIA RESOURCES PTY LTD

GIRALIA RESOURCES PTY LTD

GIRALIA RESOURCES PTY LTD

GIRALIA RESOURCES PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

POLYMETALS (WA) PTY LTD

POLYMETALS (WA) PTY LTD

POLYMETALS (WA) PTY LTD

POLYMETALS (WA) PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 232 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 233: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97612 CONFIDENTIAL 26/04/2013 02/2012 - 01/2013 Kintore Project, Annual Report for the period 01/02/2012 to 31/01/2013, M16/16, 215, 444; P16/2573, 2574 & 2624. [C71/2009] [C153/2006]

M 1600215

M 1600444

P 1602624

97615 CONFIDENTIAL 29/04/2013 02/2012 - 01/2013 Bardoc Project, Annual Report for the period 1st February 2012 to 31st January 2013, P24/4444-4449, 4373-4375 & 4504. [C99/2010]

P 2404447

97617 CONFIDENTIAL 26/04/2013 01/2012 - 12/2012 Radio Hill Project, Annual Report for the period 1st January 2012 to 31st December 2013, M47/7,9,161, 207, 252-254, 275, 337, 344-350. [C93/2003]

M 4700007

M 4700009

M 4700161

M 4700337

97618 CONFIDENTIAL 29/04/2013 03/2012 - 03/2013 Mount Dimer Project, Annual Report for the period 31st March 2012 to 30th March 2013, M77/427-428, 957-958, 965; E77/1992; P77/4081 & 4086. [C42/2002]

E 7701992

M 7700427

M 7700428

M 7700957

M 7700958

M 7700965

P 7704081

P 7704086

97619 CONFIDENTIAL 26/04/2013 01/2012 - 01/2013 Balagundi Project, Annual Report for the period 7th January 2012 to 6th January 2013, M25/194.

M 2500194

97621 CONFIDENTIAL 29/04/2013 01/2012 - 12/2012 Wiluna Project, Annual Report for the period 1st January 2012 to 31st December 2012, E53/1132............E53/1598; M53/45.........M53/910; P53/1350....................P53/1397. [C170/2010]

E 5301132

E 5301136

E 5301287

E 5301288

E 5301593

M 5300045

M 5300049

M 5300113

M 5300121

M 5300122

M 5300123

Printed: 18/02/2019 02:28:38 PMPage 233 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 234: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

GPM RESOURCES PTY LTD

FOX RADIO HILL PTY LTD

FOX RADIO HILL PTY LTD

FOX RADIO HILL PTY LTD

FOX RADIO HILL PTY LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

EASTERN GOLDFIELDS MINING COMPANY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

KIMBA RESOURCES PTY LTD

TORO ENERGY LIMITED

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

NOVA ENERGY PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 234 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 235: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97621 CONFIDENTIAL 29/04/2013 01/2012 - 12/2012 Wiluna Project, Annual Report for the period 1st January 2012 to 31st December 2012, E53/1132............E53/1598; M53/45.........M53/910; P53/1350....................P53/1397. [C170/2010]

M 5300147

M 5300224

M 5300253

M 5300336

M 5300590

M 5300693

M 5300796

M 5300910

P 5301355

P 5301356

P 5301357

P 5301360

P 5301369

P 5301370

P 5301372

P 5301396

P 5301397

97622 CONFIDENTIAL 30/04/2013 02/2012 - 02/2013 Ghan Well Project, Annual Report for the period 2nd Febuary 2012 to 1st February 2013, E39/1479.

E 3901479

97624 CONFIDENTIAL 29/04/2013 01/2012 - 12/2012 Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; M39/118-120, M39/165-166, M39/230, 232, 411-413, 471, 599-600, 609-611, 652 & 721; P39/4585, 4674 & 5063. [C345/1993]

E 3901279

M 3900118

M 3900119

M 3900120

M 3900165

M 3900166

M 3900230

M 3900232

M 3900411

M 3900412

M 3900413

Printed: 18/02/2019 02:28:38 PMPage 235 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 236: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KIMBA RESOURCES PTY LTD

NOVA ENERGY PTY LTD

KIMBA RESOURCES PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

KIMBA RESOURCES PTY LTD

KIMBA RESOURCES PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

CHARGE COBALT PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 236 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 237: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97624 CONFIDENTIAL 29/04/2013 01/2012 - 12/2012 Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; M39/118-120, M39/165-166, M39/230, 232, 411-413, 471, 599-600, 609-611, 652 & 721; P39/4585, 4674 & 5063. [C345/1993]

M 3900471

M 3900599

M 3900600

M 3900609

M 3900610

M 3900611

M 3900652

M 3900721

97625 CONFIDENTIAL 29/04/2013 03/2012 - 02/2013 Dongara Project, Annual Report for the period 1st March 2012 to 28th February 2013, M70/1195-1200, 1203-1205, 1207-1215 & 1218-1219. [C30/2002]

M 7001195

M 7001196

M 7001197

M 7001198

M 7001199

M 7001200

M 7001207

M 7001210

M 7001212

M 7001213

M 7001214

M 7001215

M 7001218

M 7001219

97644 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Nullagine Gold Project P46/1707 Annual Report, from 7th of March 2012 to 6th of March 2013

P 4601707

97645 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 E16/415 Annual Exploration Report for the period 28/03/2012-27/03/2013 E 1600415

97646 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Wombola Project, Annual Report for the period 21/03/2012 to 20/03/2013, M26/771.

M 2600771

97654 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Mt Weld Project, Annual Report for the period 07/03/2012 to 06/03/2013, E38/2558. [C56/1999]

E 3802558

97666 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Gidgee Project, E57/888 Annual Report for the Period Ending March 2013. E 5700888

97667 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Gidgee Project, E57/875 Annual Report for the Period Ending March 2013. E 5700875

Printed: 18/02/2019 02:28:38 PMPage 237 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 238: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDSARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

MILLENNIUM MINERALS LIMITED

SANDHU TANVANTH SINGH

SANDHU TANVANTH SINGH

MT WELD MINING PTY LIMITED

GATEWAY MINING LIMITED

GATEWAY MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 238 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 239: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97668 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Gidgee Project, E57/874 Annual Report for the Period Ending March 2013. E 5700874

97671 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Kurrajong South Project E38/2531 for the period 7 March 2012 to 6 March 2013

E 3802531

97674 CONFIDENTIAL 01/05/2013 03/2012 - 03/2013 Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2012 to 01 March 2013

E 0802209

E 0802210

E 0802211

E 4702417

97679 CONFIDENTIAL 30/04/2013 01/2012 - 12/2012 CR252-2008 COMBINED ANNUAL EXPLORATION REPORT HAWKES NEST PROJECT Reporting Period 01/01/2012 – 31/12/2012 [M38/94, M38/95, M38/314, M38/381]

M 3800094

M 3800095

M 3800314

M 3800381

97680 CONFIDENTIAL 30/04/2013 01/2012 - 12/2012 CR209-2006 COMBINED ANNUAL EXPLORATION REPORT Reporting Period 1/01/2012 – 31/12/2012

E 3801936

E 3801937

E 3802234

E 3802332

M 3800160

M 3800339

M 3800346

M 3800917

M 3800918

M 3801241

P 3803937

P 3803951

P 3803952

97681 CONFIDENTIAL 30/04/2013 04/2012 - 04/2013 M25/92 ANNUAL EXPLORATION REPORT BALAGUNDI PROJECT Reporting Period 11/04/2012 – 10/04/2013

M 2500092

97682 CONFIDENTIAL 30/04/2013 01/2012 - 12/2012 Dulcie Project , Annual Report for the period 1st January 2011 to 31st December 2012, M77/581, M77/1246, M77/1250; P77/3657, P77/4032, P77/4102 & P77/4123; E771937. [C202/2012]

M 7700581

M 7701246

Printed: 18/02/2019 02:28:38 PMPage 239 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 240: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GATEWAY MINING LIMITED

SUMITOMO METAL MINING OCEANIA PTY LTDGOLD ROAD (SOUTH YAMARNA) PTY LTD

RIVA RESOURCES LIMITEDSHANDONG ENERGY AUSTRALIA PTY LTD

RIVA RESOURCES LIMITEDSHANDONG ENERGY AUSTRALIA PTY LTD

RIVA RESOURCES LIMITEDSHANDONG ENERGY AUSTRALIA PTY LTD

RIVA RESOURCES LIMITEDSHANDONG ENERGY AUSTRALIA PTY LTD

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

SANDHU TANVANTH SINGH

HIGHSCORE PTY LTDRICHARD READ & ASSOCIATES PTY LTD

HIGHSCORE PTY LTDRICHARD READ & ASSOCIATES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 240 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 241: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97682 CONFIDENTIAL 30/04/2013 01/2012 - 12/2012 Dulcie Project , Annual Report for the period 1st January 2011 to 31st December 2012, M77/581, M77/1246, M77/1250; P77/3657, P77/4032, P77/4102 & P77/4123; E771937. [C202/2012]

M 7701250

P 7704032

P 7704102

P 7704123

97683 CONFIDENTIAL 30/04/2013 04/2012 - 03/2013 OPHTHALMIA RANGE COMBINED ANNUAL TECHNICAL REPORT C156/1996 EXPLORATION LICENCES 47/280, 47/319, 47/623 and 47/624 West Pilbara Mineral Field Western Australia Annual Report for the Period 01 April 2012 to 31 March 2013

E 4700280

E 4700319

E 4700623

E 4700624

97685 CONFIDENTIAL 03/05/2013 02/2012 - 02/2013 Nanadie Well Exploration Licences E51/1040, 1270, 1285,1351 Annual Report for the period 05/02/2012 to 04/02/2013 (C41/2012)

E 5101040

97695 CONFIDENTIAL 02/05/2013 12/2011 - 12/2012 Mount Magnet Combined Annual Technical Report C203/2012 For the period 13th December 2011 to 12th December 2012

P 5801532

P 5801533

P 5801534

P 5801535

P 5801536

P 5801537

P 5801560

P 5801561

97696 CONFIDENTIAL 02/05/2013 03/2012 - 02/2013 REPORT ON ALL WORK UNDERTAKEN AT THE BEATONS CREEK PROJECT 1 March 2012 – 28 February 2013 NULLAGINE EAST PILBARA DISTRICT WESTERN AUSTRALIA [M46/09, M46/10 & M46/11]

M 4600009

M 4600010

M 4600011

97697 CONFIDENTIAL 02/05/2013 05/2012 - 05/2013 Annual Report for the Cheriton’s Find Project E77/1793 For the period 4-May-2012 to 3-May-2013

E 7701793

97698 CONFIDENTIAL 02/05/2013 04/2012 - 04/2013 Millrose Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E53/1304 & 1305. [C145/2010]

E 5301304

97699 CONFIDENTIAL 02/05/2013 01/2012 - 12/2012 Annual Report – Pillara Group Report C09/2011, M04/118, M04/205, M04/206 for the period 1st January 2012 – 31st December 2012

M 0400118

M 0400205

Printed: 18/02/2019 02:28:38 PMPage 241 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 242: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HIGHSCORE PTY LTDRICHARD READ & ASSOCIATES PTY LTD

RICHARD READ & ASSOCIATES PTY LTDHIGHSCORE PTY LTD

RICHARD READ & ASSOCIATES PTY LTDHIGHSCORE PTY LTD

HIGHSCORE PTY LTDRICHARD READ & ASSOCIATES PTY LTD

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

INTERMIN RESOURCES LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

IRON WHEAL PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

TIANYE SXO GOLD MINING PTY LTD

BOWLANE NOMINEES (WA) LIMITED

LENNARD SHELF PTY LTD

LENNARD SHELF PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 242 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 243: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97699 CONFIDENTIAL 02/05/2013 01/2012 - 12/2012 Annual Report – Pillara Group Report C09/2011, M04/118, M04/205, M04/206 for the period 1st January 2012 – 31st December 2012

M 0400206

97702 CONFIDENTIAL 02/05/2013 03/2012 - 02/2013 Combined Annual Report, Murrin Murrin East Project - C354/1997 for the period 1 March 2012 to 28 February 2013, M39/314.........M39/896

M 3900314

M 3900322

M 3900558

M 3900559

M 3900560

M 3900561

M 3900562

M 3900637

M 3900685

M 3900686

M 3900692

M 3900714

M 3900715

M 3900716

M 3900720

M 3900763

M 3900800

M 3900801

M 3900896

97707 CONFIDENTIAL 02/05/2013 02/2012 - 01/2013 Black Cat Project Combined Annual Technical Report C63/2004 M16/34 and M16/115 Period Ending 31 January 2013

M 1600034

M 1600115

97708 CONFIDENTIAL 02/05/2013 01/2012 - 12/2012 Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; M29/2 & 165; P29/1912-1913,1939-1950 & 2002; P30/1012- 1016.[C112/2001]

E 2900640

E 2900641

M 2900002

M 2900165

P 2901912

P 2901913

97709 CONFIDENTIAL 03/05/2013 02/2012 - 02/2013 Manyingee (E08/1480), Annual Report for Period ending 5 February 2013 E 0801480

Printed: 18/02/2019 02:28:38 PMPage 243 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 244: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

LENNARD SHELF PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

BEACON MINING PTY LTD

BEACON MINING PTY LTD

MT IDA GOLD PTY LTD

MT IDA GOLD PTY LTD

MT IDA GOLD PTY LTD

HOOPER STUART LESLIEMT IDA GOLD PTY LTD

INTERNATIONAL PETROLEUM LTD

INTERNATIONAL PETROLEUM LTD

ENERGY METALS LTD

Printed: 18/02/2019 02:28:38 PMPage 244 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 245: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97710 CONFIDENTIAL 03/05/2013 03/2012 - 03/2013 Annual Technical Report for M282SA (including former E47/427, E47/428, E47/429 & E47/430) for the period 31/03/2012 – 30/03/2013

AM 7000282

97711 CONFIDENTIAL 03/05/2013 03/2012 - 03/2013 Annual Technical Report for Turee South E47/1478 for the period 31 March 2012 – 30 March 2013

E 4701478

97713 CONFIDENTIAL 03/05/2013 02/2012 - 01/2013 Annual report for the period 1st February 2012 to 31st January 2013, Turee Creek Combined Reporting Group E47/1446, E47/1623, E52/1788, E52/1789 & E52/1790 (C282/2011)

E 4701446

E 5201788

E 5201789

E 5201790

97720 CONFIDENTIAL 03/05/2013 01/2012 - 01/2013 Irwin Hills Project (E39/1284, E39/1307, E39/1471, P39/4594–4595 and P39/4682) Annual Technical Report For the period ended 17th January 2013 (C112/1997)

E 3901284

E 3901307

E 3901471

97721 CONFIDENTIAL 03/05/2013 02/2012 - 02/2013 West Pilbara (C40/2010) E08/1997-I, E47/1893 Annual Report to the Department of Mines and Petroleum for the period 23/02/12 to 22/02/13

E 0801997

97729 CONFIDENTIAL 03/05/2013 02/2012 - 01/2013 Annual Report C125/1997, Indee Project, West Pilbara for the period 1 Feb 2012 – 31 Jan 2013

E 4701697

M 4700473

M 4700474

M 4700475

M 4700476

M 4700477

M 4700480

97733 CONFIDENTIAL 02/05/2013 02/2012 - 02/2013 Annual Combined Report, Fields Find Project M59/63, E59/1268, (C290/1995), Yalgoo Mineral Field for the period 1 March 2012 to 29 February 2013

E 5901268

M 5900063

97739 CONFIDENTIAL 06/05/2013 02/2012 - 01/2013 Combined Annual Technical Report for the period 1 February 2012 to 31 January 2013, Mt Elvire East Project, C65/2011, E47/1263, 1264, 1265, 1267, 1282, 1284, 1285, 1286, 1287, 1505

E 4701263

E 4701264

E 4701265

Printed: 18/02/2019 02:28:38 PMPage 245 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 246: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HOPE DOWNS IRON ORE PTY LTD

HAMERSLEY IRON PTY LIMITED

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

YILGARN MINING (WA) PTY LTDGLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTDYILGARN MINING (WA) PTY LTD

YILGARN MINING (WA) PTY LTDGLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MULGA MINERALS PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

INDEE GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 246 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 247: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97739 CONFIDENTIAL 06/05/2013 02/2012 - 01/2013 Combined Annual Technical Report for the period 1 February 2012 to 31 January 2013, Mt Elvire East Project, C65/2011, E47/1263, 1264, 1265, 1267, 1282, 1284, 1285, 1286, 1287, 1505

E 4701267

E 4701282

E 4701284

E 4701285

E 4701286

E 4701287

E 4701505

97746 CONFIDENTIAL 07/05/2013 04/2012 - 04/2013 GORDON SIRDAR GOLD PROJECT Annual Technical Report Reporting Period: 13 April 2012 to 12 April 2013 Combined Reporting Status C 31/1995

L 2700054

M 2700154

M 2700311

M 2700411

M 2700412

M 2700413

97747 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, E37/258.....P37/8058

E 3700258

E 3700496

E 3700789

E 3700829

E 3700899

E 3700902

E 3700981

E 3701032

E 3701044

E 3701080

M 3700044

M 3700439

M 3700440

M 3700479

Printed: 18/02/2019 02:28:38 PMPage 247 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 248: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

FMR INVESTMENTS PTY LIMITED

FMR INVESTMENTS PTY LIMITED

FMR INVESTMENTS PTY LIMITED

FMR INVESTMENTS PTY LIMITED

FMR INVESTMENTS PTY LIMITED

FMR INVESTMENTS PTY LIMITED

ROUND OAK JAGUAR PTY LTD

INDEPENDENCE JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

JABIRU METALS LTD

JABIRU METALS LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 248 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 249: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97747 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, E37/258.....P37/8058

M 3700506

M 3700515

M 3701129

M 3701132

M 3701153

M 3701170

M 3701227

M 3701228

M 3701230

M 3701231

M 3701257

M 3701290

97751 CONFIDENTIAL 08/05/2013 04/2012 - 04/2013 REPORT ON ALL WORK UNDERTAKEN ON EXPLORATION LICENCE E46/797 NULLAGINE EAST PILBARA DISTRICT WESTERN AUSTRALIA [Annual Report for the period 22/04/2012 to 21/04/2013]

E 4600797

97753 CONFIDENTIAL 08/05/2013 03/2012 - 03/2013 Combined annual report for the Bullant Project, C24/2011 (M16/44–45, P16/2689 & P16/2694-2701), Coolgardie Mineral Field, for the period 9 March 2012 to 8 March 2013

M 1600044

M 1600045

P 1602700

P 1602701

97755 CONFIDENTIAL 08/05/2013 01/2012 - 12/2012 Combined Annual Report Abbotshall and Norseman Project C5/1999 for the period 1st January 2012 – 31st December 2012

M 6300165

M 6300236

M 6300366

M 6300515

M 6300516

P 6301564

P 6301565

P 6301566

P 6301567

P 6301569

97759 CONFIDENTIAL 08/05/2013 05/2012 - 04/2013 Annual Report for the Period 1 May 2012 to 30 April 2013, Thatcher Soak Project, C201/2008: E38/1732

E 3801732

P 3803298

Printed: 18/02/2019 02:28:38 PMPage 249 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 250: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

WITX PTY LTD

KALGOORLIE MINING COMPANY (BULLANT) PTY LTD

KALGOORLIE MINING COMPANY (BULLANT) PTY LTD

KALGOORLIE MINING COMPANY (BULLANT) PTY LTD

KALGOORLIE MINING COMPANY (BULLANT) PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AFRICAN URANIUM LTD

AFRICAN URANIUM LTD

Printed: 18/02/2019 02:28:38 PMPage 250 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 251: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97762 CONFIDENTIAL 08/05/2013 01/2012 - 01/2013 Annual Combined Technical Report Warambie C76/2009 E47/1304-I, E47/1378-I, E47/1379-I for the period 20 January2012 to 19 January 2013

E 4701378

E 4701379

97764 CONFIDENTIAL 07/05/2013 02/2012 - 02/2013 Exploration Licence 28/1959 – Annual Report for the period 22 February 2012 to 21 February 2013, Zanthus Project, Albany-Fraser Orogen, WA

E 2801959

97767 CONFIDENTIAL 07/05/2013 02/2012 - 02/2013 WARRAWANDA PROJECT 2012 Combined Annual Report for Leases P52/1182-1183, P52/1242-1244, P52/1277-1278, P52/1281-1283, P52/1364 and E52/2372 Combined Reporting No: C14/2011 for the period 22nd February 2012 to the 21st February 2013

E 5202372

97768 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Cape Lambert Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1233, 1248, 1271 & 1462; P47/1302-1303 & 1383. [C19/2013]

E 4701233

E 4701248

E 4701271

E 4701462

P 4701302

P 4701303

97773 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 14 Mile Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, M39/977; P39/4335-4339, 4474, 5186-5202. [C134/2012]

M 3900977

P 3904335

P 3904336

P 3904337

P 3904338

P 3904474

P 3905192

P 3905198

P 3905199

97774 CONFIDENTIAL 07/05/2013 04/2012 - 03/2013 WONMUNNA EAST ANNUAL REPORT EXPLORATION LICENCE E47/622 West Pilbara Mineral Field Western Australia Annual Report for the Period 01 April 2012 to 31 March 2013 GDSR No. 5869

E 4700622

97780 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Gidgee Project, Annual Report for the period 1st January 2012 to 31st December 2012, Combined Reporting No: C104/2011.

E 5101144

E 5301215

E 5301216

Printed: 18/02/2019 02:28:38 PMPage 251 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 252: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

OSCAR RESOURCES NO 1 PTY LTD

OSCAR RESOURCES NO 1 PTY LTD

BUXTON RESOURCES LTDINDEPENDENCE NEWSEARCH PTY LTD

VENTNOR PILBARA PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

MCC AUSTRALIA SANJIN MINING PTY LTD

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

MICHELUTTI AARON

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

HAMERSLEY EXPLORATION PTY LIMITED

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 252 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 253: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97780 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Gidgee Project, Annual Report for the period 1st January 2012 to 31st December 2012, Combined Reporting No: C104/2011.

E 5301273

E 5301396

E 5700633

E 5700636

E 5700676

E 5700678

E 5700705

M 5100104

M 5100105

M 5100157

M 5100185

M 5100186

M 5100290

M 5100410

M 5100458

M 5300010

M 5300011

M 5300105

M 5300153

M 5300251

M 5300500

M 5300716

M 5300904

M 5300988

M 5700019

M 5700026

M 5700033

M 5700069

M 5700070

M 5700071

M 5700072

M 5700073

Printed: 18/02/2019 02:28:38 PMPage 253 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 254: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 254 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 255: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97780 CONFIDENTIAL 07/05/2013 01/2012 - 12/2012 Gidgee Project, Annual Report for the period 1st January 2012 to 31st December 2012, Combined Reporting No: C104/2011.

M 5700074

M 5700143

M 5700144

M 5700145

M 5700146

M 5700210

M 5700231

M 5700236

M 5700241

M 5700242

M 5700250

M 5700251

M 5700291

M 5700292

M 5700349

M 5700375

P 5301577

P 5301582

P 5701105

P 5701213

P 5701304

P 5701306

P 5701310

97782 CONFIDENTIAL 09/05/2013 03/2012 - 03/2013 Camel Hill Project, Annual Report for the period 16/03/2012 to 15/03/2013, M45/1022.

M 4501022

97783 CONFIDENTIAL 09/05/2013 03/2012 - 03/2013 Camel Hil Project, Annual Report for the period 16/03/2012 to 15/03/2013, M45/1023.

M 4501023

97787 CONFIDENTIAL 09/05/2013 02/2012 - 02/2013 Wongaburra Project, Annual Report for the period 16th February 2012 to 15th February 2013, M70/420.

M 7000420

97791 CONFIDENTIAL 09/05/2013 03/2012 - 03/2013 M45/847 Soansville Annual Report 2013 for the period 13 March 2012 to 12 March 2013

M 4500847

97792 CONFIDENTIAL 09/05/2013 01/2012 - 12/2012 Annual Mineral Exploration Report Nowthanna Uranium Project 2013 Combined Reporting C316/2011 January 1st to December 31st 2012, E51/1072, 1075

E 5101072

Printed: 18/02/2019 02:28:38 PMPage 255 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 256: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

PANORAMIC GOLD PTY LTD

BGC CONTRACTING PTY LTD

BGC CONTRACTING PTY LTD

GOYDER TIMOTHY RUPERT BARRHORTIN JANICE ANNHORTIN RAYMOND KENNETH

ELAZAC MINING PTY LTD

NOVA ENERGY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 256 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 257: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97792 CONFIDENTIAL 09/05/2013 01/2012 - 12/2012 Annual Mineral Exploration Report Nowthanna Uranium Project 2013 Combined Reporting C316/2011 January 1st to December 31st 2012, E51/1072, 1075

E 5101075

97793 CONFIDENTIAL 09/05/2013 03/2012 - 03/2013 M52/251 Mt Beasley Annual Report for the period 11th March 2012 to 10th March 2013

M 5200251

97795 CONFIDENTIAL 09/05/2013 01/2012 - 12/2012 Wildara Combined C37/2007 Annual Report C37/2007 for the period 1 Jan 2012 - 31 Dec 2012, E36/235...... P36/1656

E 3600235

97798 CONFIDENTIAL 09/05/2013 02/2012 - 02/2013 Irwin Bore Project E53/1209 P53/1264, 1265 Annual Technical ReportReporting Period 13th February 2012 to 12th February 2013

E 5301209

97799 CONFIDENTIAL 13/05/2013 03/2012 - 03/2013 Nimbus Project, Annual Report for the period 15th March 2012 to 14th March 2013, P25/2144.

P 2502144

97801 CONFIDENTIAL 10/05/2013 02/2012 - 01/2013 Pilgangoora Project, Annual Report for the period 1st February 2012 to 31st January 2013, E45/2287; P45/2758.

E 4502287

P 4502758

97803 CONFIDENTIAL 10/05/2013 09/2011 - 10/2012 Twenty Mile Sandy - Camel Creek Project, Annual Report for the period 30/09/2011 to 01/10/2012, P46/1703-1706.

P 4601703

P 4601704

P 4601705

P 4601706

97808 CONFIDENTIAL 10/05/2013 03/2012 - 03/2013 Carr Boyd Project, Annual Report for the period 03/03/2012 to 06/03/2013, E29/555; E31/726; M31/109 & 159; P31/1921. [C434/1995]

E 3100726

M 3100012

M 3100109

M 3100159

97821 CONFIDENTIAL 13/05/2013 04/2012 - 04/2013 Juna Downs Project Combined Annual Report Exploration Licences E47/584, E47/631 & E47/1943 (C602/1994) for the period 7 April 2012 – 6 April 2013

E 4700584

E 4700631

E 4701943

97822 CONFIDENTIAL 06/05/2013 03/2012 - 03/2013 Combined Annual Report for M80/532 Seppelt Diamond Project For the period 20th March 2012 to 19th March 2013

M 8000532

97824 CONFIDENTIAL 13/05/2013 01/2012 - 12/2012 Combined Annual Report for the BTZ Bardoc Project - C87/1994 for the period 1 January 2012 to 31 December 2012, M24/133, 134, 348, 471, 491, 532, 889, 890, 891, 892, P24/4073

M 2400133

M 2400134

M 2400348

M 2400471

M 2400491

M 2400532

M 2400889

Printed: 18/02/2019 02:28:38 PMPage 257 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 258: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NOVA ENERGY PTY LTD

PROSPEX RESOURCES PTY LTD

ALTIA RESOURCES PTY LTD

CULLEN EXPLORATION PTY LIMITED

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

ALTURA LITHIUM OPERATIONS PTY LTD

ALTURA LITHIUM OPERATIONS PTY LTD

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

CARR BOYD NICKEL PTY LTD

CARR BOYD NICKEL PTY LTD

CARR BOYD NICKEL PTY LTD

CARR BOYD NICKEL PTY LTD

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

MERLIN DIAMONDS LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 258 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 259: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97824 CONFIDENTIAL 13/05/2013 01/2012 - 12/2012 Combined Annual Report for the BTZ Bardoc Project - C87/1994 for the period 1 January 2012 to 31 December 2012, M24/133, 134, 348, 471, 491, 532, 889, 890, 891, 892, P24/4073

M 2400890

M 2400891

M 2400892

P 2404073

97825 CONFIDENTIAL 13/05/2013 03/2012 - 03/2013 Annual Report for the period 15 March 2012 to 14 March 2013, Port Gregory Exploration Project, E70/3055

E 7003055

97832 CONFIDENTIAL 14/05/2013 03/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 11 MARCH 2012 TO 10 MARCH 2013 P09/467 YANGIBANA PROSPECT

P 0900467

97835 CONFIDENTIAL 14/05/2013 04/2012 - 03/2013 Annual Report for C5/2012 - Glacier Extended for the period 1/4/2012 to 31/3/2013, E

E 4503641

E 4503697

E 4503698

97846 CONFIDENTIAL 15/05/2013 03/2012 - 03/2013 Tropicana West Project, Annual Report for the period 16/03/2012 to 15/03/2013, E38/1463-1465; E39/948-950, 953 & 1615. [C50/2012]

E 3801463

E 3801464

E 3801465

E 3900949

E 3900950

E 3900953

97848 CONFIDENTIAL 15/05/2013 03/2012 - 03/2013 Tropicana (JV) Project, Annual Report for the period 16/03/2012 to 15/03/2013, E39/1224, 1227, 1453 & 1454. [C48/2012]

E 3901454

97849 CONFIDENTIAL 14/05/2013 01/2012 - 12/2012 Bardoc Project, Annual Report for the period 1st January 2012 to 31st December 2012, M24/11, 43, 83, 99, 121, 122, 135, 244, 326, 854, 896, 870, 871, & 886-888. [C147/1996]

M 2400011

M 2400043

M 2400083

M 2400099

M 2400121

M 2400122

M 2400135

M 2400244

M 2400326

M 2400854

M 2400869

Printed: 18/02/2019 02:28:38 PMPage 259 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 260: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

YANGIBANA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 260 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 261: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97849 CONFIDENTIAL 14/05/2013 01/2012 - 12/2012 Bardoc Project, Annual Report for the period 1st January 2012 to 31st December 2012, M24/11, 43, 83, 99, 121, 122, 135, 244, 326, 854, 896, 870, 871, & 886-888. [C147/1996]

M 2400870

M 2400871

M 2400886

M 2400887

M 2400888

97857 CONFIDENTIAL 17/05/2013 03/2012 - 03/2013 Widgiemooltha Project, Annual Report for the period 07/03/2012 to 06/03/2013, P15/5645 (Dordie South). [C137/2004]

P 1505645

97860 CONFIDENTIAL 16/05/2013 03/2012 - 03/2013 Annual Report E 52/2591 Noddy Bore for the Period Ending 13 March 2013. E 5202591

97861 CONFIDENTIAL 14/05/2013 03/2012 - 03/2013 Ruby Well Combined Report C482/1994 Annual Report for the period 10th March 2012 to 9th March 2013 ( M51/411 & M51/420)

M 5100291

97877 CONFIDENTIAL 17/05/2013 01/2012 - 12/2012 Reidy Swamp Project, Annual Report for the period 1st January 2012 to 31st December 2012, E27/360 & E27/362; M26/735; M27/102, 221 & 255; P27/1861, 1875, 1876, 1886-1901 & 1916-1918.

M 2700102

97880 CONFIDENTIAL 17/05/2013 01/2012 - 12/2012 Beyondie Project, Annual Report for the period 02/02/2011 to 01/02/2012, E52/2215; E69/2625 & 2669. [C59/2011]

E 5202215

97889 CONFIDENTIAL 16/05/2013 08/2002 - 02/2013 Scott Coastal Plain Project, Final Surrender & Partial Surrender Report[s] for the period 01/08/2002 to 20/02/2013, E70/2372, 2464 & 3681-3682; P70/1583-1587. [C3/2003]

E 7002372

E 7002464

97891 CONFIDENTIAL 16/05/2013 04/2012 - 04/2013 Mt Alexander Project, Annual Report for the period 23rd April 2012 to 22nd April 2013, M08/286-287 & M08/314; E08/2207. [C30/2011]

M 0800287

M 0800314

97894 CONFIDENTIAL 02/05/2013 01/2012 - 12/2012 Siberia Project, Annual Report for the period 01/01/2012 to 31/12/2012, M24/39,51,115, 159, 208, 290, 352, 376, 427, 633, 754-755, 830, & 845-848; P24/4177-4180, 4182 & 4283. [C83/2008]

M 2400039

M 2400051

M 2400115

M 2400159

M 2400208

M 2400290

M 2400352

M 2400376

M 2400427

M 2400633

M 2400754

Printed: 18/02/2019 02:28:38 PMPage 261 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 262: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

MINCOR RESOURCES NL

BHP IRON ORE (JIMBLEBAR) PTY LTD

REEF MINING PTY LTD

STRATEGIC PROJECTS MINING PTY LTD

DE GREY MINING LTD

GOVERNOR BROOME SANDS PTY LTD

GOVERNOR BROOME SANDS PTY LTDILUKA RESOURCES LIMITED

MACDONALD JASON STANLEY

SM3-W PTY LTD

GARDNER ROBERT CHARLES

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 262 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 263: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97894 CONFIDENTIAL 02/05/2013 01/2012 - 12/2012 Siberia Project, Annual Report for the period 01/01/2012 to 31/12/2012, M24/39,51,115, 159, 208, 290, 352, 376, 427, 633, 754-755, 830, & 845-848; P24/4177-4180, 4182 & 4283. [C83/2008]

M 2400755

M 2400830

M 2400845

M 2400846

M 2400847

M 2400848

P 2404182

97902 CONFIDENTIAL 20/05/2013 03/2012 - 03/2013 Kojonup Project ,[Area 5], Annual Report for the period 24th March 2012 to 23rd March 2013, E70/3565, 3572, 3574, 3657, 3832, 3833 & 3834,

E 7003565

97906 CONFIDENTIAL 21/05/2013 02/2012 - 02/2013 Combined Report C176/2007 Whitby Project E70/323 & M70/660 27th February 2012 to 26th February 2013

E 7000323

M 7000660

97910 CONFIDENTIAL 21/05/2013 03/2012 - 03/2013 Austin Creek Project, Annual Report for the period 23rd March 2012 to 22nd March 2013, E47/1415.

E 4701415

97912 CONFIDENTIAL 21/05/2013 03/2012 - 03/2013 Hardey Project, Annual Report for the period 23rd March 2012 to 22nd March 2013, E47/1413.

E 4701413

97922 CONFIDENTIAL 03/04/2013 01/2012 - 12/2012 LETTER IN LEU OF ANNUAL REPORT FOR LAKEWOOD PROJECT WESTERN AUSTRALIA Reporting period: 01/01/2012–31/12/2012 Tenements in Reporting Group: M26/242 and M26/367. [C67/2008]

M 2600242

M 2600367

97926 CONFIDENTIAL 22/05/2013 02/2012 - 02/2013 Annual report for C125/2004 Central Chichester Ranges for the period 17th February 2012 to 16th February 2013.

E 4502497

E 4502498

E 4502499

E 4502593

E 4502651

E 4502652

E 4600566

E 4600567

E 4600590

E 4600610

E 4600611

E 4600612

E 4600664

E 4701434

Printed: 18/02/2019 02:28:38 PMPage 263 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 264: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

SIBERIA MINING CORPORATION PTY LTD

YANKUANG RESOURCES PTY LTD

GOLD FUSION PTY LTD

GOLD FUSION PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

GOLDEN MILE MILLING PTY LTD

GOLDEN MILE MILLING PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 264 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 265: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97926 CONFIDENTIAL 22/05/2013 02/2012 - 02/2013 Annual report for C125/2004 Central Chichester Ranges for the period 17th February 2012 to 16th February 2013.

M 4501082

M 4501083

M 4501084

M 4501085

M 4501086

M 4501087

M 4501088

M 4501089

M 4501090

M 4501091

M 4501092

M 4501093

M 4501094

M 4501102

M 4501103

M 4501104

M 4501105

M 4501106

M 4501107

M 4501124

M 4501125

M 4501126

M 4501127

M 4501128

M 4501138

M 4501139

M 4501140

M 4501141

M 4501142

M 4600320

M 4600321

M 4600322

Printed: 18/02/2019 02:28:38 PMPage 265 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 266: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 266 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 267: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97926 CONFIDENTIAL 22/05/2013 02/2012 - 02/2013 Annual report for C125/2004 Central Chichester Ranges for the period 17th February 2012 to 16th February 2013.

M 4600323

M 4600324

M 4600325

M 4600326

M 4600327

M 4600328

M 4600329

M 4600330

M 4600331

M 4600332

M 4600333

M 4600334

M 4600335

M 4600336

M 4600337

M 4600338

M 4600339

M 4600340

M 4600341

M 4600342

M 4600343

M 4600344

M 4600345

M 4600346

M 4600347

M 4600348

M 4600349

M 4600350

M 4600351

M 4600352

M 4600353

M 4600354

Printed: 18/02/2019 02:28:38 PMPage 267 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 268: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 268 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 269: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97926 CONFIDENTIAL 22/05/2013 02/2012 - 02/2013 Annual report for C125/2004 Central Chichester Ranges for the period 17th February 2012 to 16th February 2013.

M 4600355

M 4600356

M 4600357

M 4600401

M 4600402

M 4600403

M 4600404

M 4600405

M 4600406

M 4600407

M 4600408

M 4600409

M 4600410

M 4600411

M 4600412

M 4600413

M 4600414

M 4600415

M 4600416

M 4600417

M 4600418

M 4600419

M 4600420

M 4600421

M 4600422

M 4600423

M 4600424

M 4600449

M 4600450

M 4600451

M 4600452

M 4600453

Printed: 18/02/2019 02:28:38 PMPage 269 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 270: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

CHICHESTER METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 270 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 271: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97926 CONFIDENTIAL 22/05/2013 02/2012 - 02/2013 Annual report for C125/2004 Central Chichester Ranges for the period 17th February 2012 to 16th February 2013.

M 4600454

97930 CONFIDENTIAL 23/05/2013 02/2012 - 02/2013 Fortnum Project, Annual Report for the period 17/02/2012 to 16th February 2013, E52/2059.

E 5202059

97935 CONFIDENTIAL 23/05/2013 03/2012 - 03/2013 Golden Reef Project, Annual Report for the period 11th March 2012 to 9th March 2013, M47/288.

M 4700288

97938 CONFIDENTIAL 24/05/2013 03/2012 - 02/2013 Wonnerup Project, Annual Report for the period 1st March 2012 to 29th February 2013, M70/360,M70/569 & M70/785. [C186/2012]

M 7000360

M 7000569

M 7000785

97941 CONFIDENTIAL 24/05/2013 02/2012 - 02/2013 ANNUAL REPORT ON EXPLORATION FOR THE PERIOD ENDING 27 February 2013 E36/667, E36/708 & E36/715 Group Report C51/2011 [Yandal South Project]

E 3600667

E 3600715

97950 CONFIDENTIAL 24/05/2013 03/2012 - 03/2013 Annual Report (27.03.2012 - 26.03.2013) Broome Deep Creek Sand Resource Mining Lease M04/345 EXPLORATION REPORT

M 0400345

97966 CONFIDENTIAL 24/05/2013 04/2012 - 03/2013 Annual Report for the period 1st April 2012 to 31st March 2013, Solomon West Project C175/2007. [E47/1306, 1352, 1357, 1372, 1523-1524, 1579, 1821, 1944 & 2080; M47/1408; P47/1210-1211 & 1410-1412.]

E 4701306

E 4701352

E 4701357

E 4701372

E 4701523

E 4701524

E 4701579

E 4701821

E 4701944

M 4701408

P 4701410

P 4701411

P 4701412

97967 CONFIDENTIAL 24/05/2013 03/2012 - 03/2013 Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2648, 2664-2666, & 2705-2706. [C187/2009]

P 1602358

P 1602360

P 1602362

P 1602363

P 1602364

Printed: 18/02/2019 02:28:38 PMPage 271 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 272: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CHICHESTER METALS PTY LTD

ARAGON RESOURCES PTY LTD

WESTERN METALS PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

ECHO RESOURCES LIMITED

ECHO RESOURCES LIMITED

REGIONAL RESOURCES NW PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 272 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 273: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97967 CONFIDENTIAL 24/05/2013 03/2012 - 03/2013 Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2648, 2664-2666, & 2705-2706. [C187/2009]

P 1602366

P 1602367

P 1602368

P 1602369

P 1602370

P 1602371

P 1602372

P 1602373

P 1602664

P 1602705

P 1602706

97980 CONFIDENTIAL 27/05/2013 04/2012 - 03/2013 Mt Elvire North East Project, Annual Report for the period 1st April 2012 to 31st March 2013, E47/1257 & E47/1504. [C111/2011]

E 4701257

E 4701504

97981 CONFIDENTIAL 27/05/2013 04/2012 - 04/2013 Nullagine Project, Annual Report for the period 2nd April 2012 to 1st April 2013, P46/1757.

P 4601757

97982 CONFIDENTIAL 27/05/2013 04/2012 - 04/2013 Nullagine Project, Annual Report for the period 2nd April 2012 to 1st April 2013, P46/1758.

P 4601758

97983 CONFIDENTIAL 27/05/2013 03/2012 - 02/2013 HAWK NEST PROJECT C68/2010 2013 ANNUAL REPORT [1st March 2012 to 28th February 2013, M38/218]

M 3800218

97984 CONFIDENTIAL 20/05/2013 03/2012 - 02/2013 Laverton Downs Project, C248/2008, Annual Report 2013. Reporting Period: 1st March 2012 to 28th February 2013, E38/1876 & E38/2394.

E 3801876

97991 CONFIDENTIAL 27/05/2013 05/2012 - 05/2013 Annual Mineral Exploration Report Stakewell Tenement Group C140/2008 Meekatharra, Western Australia 2nd May 2012 – 1st May 2013

L 5100027

L 5100028

L 5100032

M 5100579

P 5101683

97992 CONFIDENTIAL 27/05/2013 05/2012 - 05/2013 Annual Mineral Exploration Report Quinns Tenement Group C180/2008 Meekatharra, Western Australia2nd May 2012 – 1st May 2013

E 5101157

M 5100019

M 5100072

M 5100532

M 5100533

Printed: 18/02/2019 02:28:38 PMPage 273 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 274: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

GOLDEN CLIFFS NL

GOLDEN CLIFFS NL

DIVERSIFIED ASSET HOLDINGS PTY LTD

DIVERSIFIED ASSET HOLDINGS PTY LTD

DIVERSIFIED ASSET HOLDINGS PTY LTD

DIVERSIFIED ASSET HOLDINGS PTY LTD

SILVER SWAN GROUP LIMITED

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 274 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 275: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

97992 CONFIDENTIAL 27/05/2013 05/2012 - 05/2013 Annual Mineral Exploration Report Quinns Tenement Group C180/2008 Meekatharra, Western Australia2nd May 2012 – 1st May 2013

M 5100534

M 5100642

M 5100648

M 5100776

97996 CONFIDENTIAL 29/05/2013 04/2012 - 04/2013 Cabbage Gum Bore Project, Annual Report for the period 24/04/2012 to 23/04/2013, E47/656.

E 4700656

E 4700733

P 4701301

97997 CONFIDENTIAL 29/05/2013 04/2012 - 04/2013 Kangeenarina Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E47/1781; P47/1337 & 1353-1359. [C21/2008]

E 4701781

98005 CONFIDENTIAL 30/05/2013 04/2012 - 04/2013 Symons Hill Project, Annual Report for the period 20th April 2012 to 21st December 2012, E28/1932.

E 2801932

98006 CONFIDENTIAL 30/05/2013 04/2012 - 03/2013 PROJECT 8124 Central Laverton Project, Annual Report for the period 1st April 2012 to 31st March 2013, M38//18..........M38/1146; E38/2221 & 2301; P38/3669 & 3840-3844. [C86/2002]

E 3802221

E 3802301

M 3800018

M 3800161

M 3800162

M 3800167

M 3800191

M 3800205

M 3800253

M 3800287

Printed: 18/02/2019 02:28:38 PMPage 275 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 276: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

CNN INVESTMENTS PTY LTD

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

HAMERSLEY EXPLORATION PTY LIMITED

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

BOADICEA RESOURCES LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 276 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 277: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98006 CONFIDENTIAL 30/05/2013 04/2012 - 03/2013 PROJECT 8124 Central Laverton Project, Annual Report for the period 1st April 2012 to 31st March 2013, M38//18..........M38/1146; E38/2221 & 2301; P38/3669 & 3840-3844. [C86/2002]

M 3800288

M 3800380

M 3800389

M 3800397

M 3800440

M 3800525

M 3800532

M 3800533

M 3801131

M 3801144

M 3801145

M 3801146

98009 CONFIDENTIAL 30/05/2013 02/2004 - 02/2013 Marillana - Yandicoogina Project, Final Surrender Report for the period 6th March 2012 to 15th February 2013, E47/1237. [Phil's Creek]

E 4701237

98013 CONFIDENTIAL 30/05/2013 03/2012 - 03/2013 Nickol River- Tozers Project, Annual Report for the period 31st March 2012 to 30th March 2013, P47/1518.

P 4701518

98017 CONFIDENTIAL 30/05/2013 04/2012 - 03/2013 Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/412; M37/21................M37/1165; M40/166; P37/6987.............P37/7775.

E 3700916

E 3700917

M 3700021

M 3700067

M 3700076

M 3700090

M 3700179

M 3700201

M 3700222

M 3700248

M 3700330

M 3700338

M 3700394

M 3700398

M 3700399

M 3700400

Printed: 18/02/2019 02:28:38 PMPage 277 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 278: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

KML NO 2 PTY LTD

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 278 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 279: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98017 CONFIDENTIAL 30/05/2013 04/2012 - 03/2013 Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/412; M37/21................M37/1165; M40/166; P37/6987.............P37/7775.

M 3700407

M 3700410

M 3700416

M 3700429

M 3700438

M 3700449

M 3700451

M 3700457

M 3700458

M 3700459

M 3700460

M 3700478

M 3700495

M 3700496

M 3700529

M 3700544

M 3700547

M 3700548

M 3700551

M 3700570

M 3700571

M 3700572

M 3700573

M 3700574

M 3700586

M 3700587

M 3700598

M 3700599

M 3700600

M 3700601

M 3700602

M 3700695

Printed: 18/02/2019 02:28:38 PMPage 279 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 280: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 280 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 281: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98017 CONFIDENTIAL 30/05/2013 04/2012 - 03/2013 Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/412; M37/21................M37/1165; M40/166; P37/6987.............P37/7775.

M 3700763

M 3700905

M 3700975

M 3700977

M 3701030

M 3701050

M 3701051

M 3701064

M 3701081

M 3701105

M 3701165

M 4000166

98026 CONFIDENTIAL 30/05/2013 04/2012 - 04/2013 ANNUAL REPORT FOR THE PERIOD 24th April 2012 to 23rd April 2013 Zelica M39/1082

M 3901082

98027 CONFIDENTIAL 29/05/2013 03/2012 - 02/2013 Millrose Project, Annual Report for the period 1st March 2012 to 28th February 2013, E53/1466 & 1471; E69/1772, 2492 & 2765; P53/1524-1526. [C25/2013]

E 5301466

E 5301471

E 6901772

E 6902492

E 6902765

98029 CONFIDENTIAL 28/05/2013 03/2012 - 02/2013 East Yandal Project, Annual Report for the period 1st March 2012 to 28th February 2013, E36/593,673 & 762; E37/846-848 & 1088; P371741, 6944-6945; P36/8061 . [C68/2005]

E 3600593

E 3600673

E 3700846

E 3700847

E 3700848

98030 CONFIDENTIAL 28/05/2013 03/2012 - 02/2013 Mount Joel Project, Annual Report for the period 1st March 2012 to 28th February 2013, M53/294-297 & M53/393. [C121/2006]

M 5300294

M 5300295

Printed: 18/02/2019 02:28:38 PMPage 281 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 282: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ULYSSES MINING PTY LTD

EXTERRA RESOURCES LIMITED

ALLOY RESOURCES LTDDORAY MINERALS LIMITED

ALLOY RESOURCES LTDDORAY MINERALS LIMITED

ESKAY RESOURCES PTY LTDDORAY MINERALS LIMITED

ALLOY RESOURCES LTDDORAY MINERALS LIMITED

ALLOY RESOURCES LTDDORAY MINERALS LIMITED

MKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 282 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 283: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98030 CONFIDENTIAL 28/05/2013 03/2012 - 02/2013 Mount Joel Project, Annual Report for the period 1st March 2012 to 28th February 2013, M53/294-297 & M53/393. [C121/2006]

M 5300296

M 5300297

M 5300393

98035 CONFIDENTIAL 04/06/2013 03/2012 - 03/2013 PILBARA IRON ORE PROJECT, MINING LICENCE M47/1451 COMBINED ANNUAL MINERAL EXPLORATION REPORT C159/2009 For the period 31st October 2011 to 25th March 2013

M 4701451

98041 CONFIDENTIAL 31/05/2013 04/2012 - 04/2013 Annual Report E28/2158 Buningonia Project 3 April 2012 to 4 April 2013 E 2802158

98044 CONFIDENTIAL 05/06/2013 01/2012 - 12/2012 Yandanooka Project, Annual Report for Combined Reporting Group C105/2012 Tenements E70/3761; E70/3762; E70/3813 For the Period 1 January 2012 to 31 December 2012

E 7003762

E 7003813

98050 CONFIDENTIAL 31/05/2013 01/2012 - 01/2013 Penny's Find Project, Annual Report for the period 17th January 2012 to 16th January 2013, M27/156; P27/1713-1731, 1814, 1922-1923, 1962 & 2007-2008; E27/410 & 420.

E 2700410

E 2700420

M 2700156

P 2701728

P 2701729

P 2701730

P 2702007

P 2702008

98051 CONFIDENTIAL 04/06/2013 04/2012 - 04/2013 Exploration License – 37/983 Banjawarn Project Annual Technical Report for the Period 14th April 2012 to 13th April 2013

E 3700983

98052 CONFIDENTIAL 04/06/2013 03/2012 - 03/2013 ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 28 MARCH 2013 PEAK HILL TENEMENT NUMBER E52/1613

E 5201613

98055 CONFIDENTIAL 04/06/2013 02/2012 - 02/2013 Mt Weld Project, Annual Report for the period 17th February 2012 to 16th February 2013, E38/2442.

E 3802442

98056 CONFIDENTIAL 04/06/2013 01/2012 - 12/2012 Coobina Project, Annual Report for the period 1st January 2012 to 31st December 2012, M52/10,791, 798 & 803-804; E52/2047; P52/1264.

E 5202047

M 5200010

M 5200791

M 5200798

M 5200803

Printed: 18/02/2019 02:28:38 PMPage 283 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 284: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CREASY MARK GARETHMKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

FLINDERS MINES LIMITED

INDEPENDENCE NOVA HOLDINGS PTY LTD

SHEFFIELD RESOURCES LIMITED

SHEFFIELD RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITEDBRIMSTONE RESOURCES LTD

EMPIRE RESOURCES LIMITEDBRIMSTONE RESOURCES LTD

EMPIRE RESOURCES LIMITEDBRIMSTONE RESOURCES LTD

EMPIRE RESOURCES LIMITEDBRIMSTONE RESOURCES LTD

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

BULLSEYE MINING LIMITED

JACKSON MINERALS PTY LTDAURIS EXPLORATION PTY LTD

GREAT SOUTHERN MINING LIMITED

PILBARA CHROMITE PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 284 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 285: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98056 CONFIDENTIAL 04/06/2013 01/2012 - 12/2012 Coobina Project, Annual Report for the period 1st January 2012 to 31st December 2012, M52/10,791, 798 & 803-804; E52/2047; P52/1264.

M 5200804

98058 CONFIDENTIAL 04/06/2013 02/2012 - 02/2013 Seven Seas Project, Annual Report for the period 22nd February 2012 to 21st February 2013, E24/148; P16/2461-2463, 2466-2470,2631-2637, 4291, 4397 & 4457-4459. [C218/2010]

E 2400148

98059 CONFIDENTIAL 04/06/2013 01/2012 - 01/2013 Windanya Project, Annual Report for the period 24th January 2012 to 23rd January 2013, M24/898 & M24/919, P24/3672...........P24/4525. [C220/2010]

M 2400919

P 2403777

P 2404199

98063 CONFIDENTIAL 04/06/2013 02/2012 - 02/2013 Cue General Project, Annual Report for the period 06/05/2012 to 05/05/2013, E20/134; p21/702, 2090-2092. [C38/2011]

P 2002090

P 2002091

98064 CONFIDENTIAL 04/06/2013 05/2012 - 04/2013 Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 3298, 3356, 3800-3801, & 3619; M45/1179. [C40/2007]

E 4502308

E 4502362

E 4502363

E 4502728

E 4503298

E 4503619

M 4501179

98065 CONFIDENTIAL 04/06/2013 05/2012 - 04/2013 Pilgangoor Project, Annual Report for the period 1st May 2012 to 30th April 2013, E45/2363. [C40/2007]

E 4502363

98066 CONFIDENTIAL 04/06/2013 05/2012 - 04/2013 Wodgina Project, Annual Report for the period ending 30th April 2013, E45/2404,2438 & 2765; P45/2598 & 2737; M45/932 & 1188.

M 4500932

M 4501188

98069 CONFIDENTIAL 29/05/2013 04/2012 - 04/2013 Nanutarra Project, Annual Report for the period 12th April 2012 to 11th April 2013, M08/139.

M 0800139

98071 CONFIDENTIAL 30/05/2013 03/2012 - 04/2013 Patricia Project, Annual Report for the period 31st March 2012 to 1st April 2013, P31/1796.

P 3101796

98081 CONFIDENTIAL 06/06/2013 04/2012 - 03/2013 Admiral Bay Project, Annual Report for the period 1st April 2012, to 31st March 2013, M04/244 & 249; E04/1610. [C402/1996]

E 0401610

M 0400244

M 0400249

98094 CONFIDENTIAL 05/06/2013 02/2012 - 02/2013 Triumph Project M31/481, Annual report for the period 25 February 2012 to 24 February 2013

M 3100481

98097 CONFIDENTIAL 05/06/2013 02/2012 - 02/2013 Bannockburn Project, Annual Report for the period 17th February 2012 to 16th February 2013, E36/581 & 650; E37/852-853, 903 & 1012; M36/444-446; M37/362...............M37/1275; P36/1714-1719; P37/6951, 7228-7229, 7233 & 7683. [C1/2006]

E 3700538

Printed: 18/02/2019 02:28:38 PMPage 285 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 286: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

PROCESS MINERALS INTERNATIONAL PTY LTD

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

HERON RESOURCES LIMITED

METALIKO RESOURCES LIMITED

MAVIA PTY LTD

MAVIA PTY LTD

WODGINA LITHIUM PTY LTD

ATLAS OPERATIONS PTY LTD

ALTURA LITHIUM OPERATIONS PTY LTD

DYNASTY RESOURCES LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS OPERATIONS PTY LTD

ALTURA LITHIUM OPERATIONS PTY LTD

ATLAS IRON LIMITED

ATLAS IRON LIMITED

NORTH WEST STONE PTY LTD

PUMPHREY ANDREW IAN

KIMBERLEY MINING AUSTRALIA PTY LTD

KIMBERLEY MINING AUSTRALIA PTY LTD

KIMBERLEY MINING AUSTRALIA PTY LTD

HAWTHORN RESOURCES LIMITED

XSTRATA NICKEL AUSTRALASIAN OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 286 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 287: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98097 CONFIDENTIAL 05/06/2013 02/2012 - 02/2013 Bannockburn Project, Annual Report for the period 17th February 2012 to 16th February 2013, E36/581 & 650; E37/852-853, 903 & 1012; M36/444-446; M37/362...............M37/1275; P36/1714-1719; P37/6951, 7228-7229, 7233 & 7683. [C1/2006]

E 3700903

M 3600444

M 3600445

M 3600446

M 3700362

M 3700383

M 3700384

M 3700385

M 3700386

M 3700424

M 3700426

M 3700427

M 3700590

M 3700692

M 3700735

M 3700816

M 3700818

M 3700819

M 3701063

M 3701089

M 3701090

M 3701126

M 3701127

M 3701136

M 3701137

M 3701148

M 3701168

M 3701223

M 3701275

98099 CONFIDENTIAL 05/06/2013 04/2012 - 04/2013 PLWA Quarry Project, Annual Mineral Exploration report for the period 8 April 2012 to 7 April,2013, E45/3612

E 4503612

Printed: 18/02/2019 02:28:38 PMPage 287 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 288: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

TALISMAN NICKEL PTY LTD

SWAN BAY HOLDINGS PTY LTDSTIRLING BAY HOLDINGS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 288 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 289: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98100 CONFIDENTIAL 05/06/2013 04/2012 - 03/2013 Gibber Project, Annual Report for the period 1st April 2012 to 31st March 2013, E45/2870 & 3318; E46/735. [C11/2013]

E 4502870

98103 CONFIDENTIAL 04/06/2013 04/2012 - 04/2013 M46/267 Annual Report, from 16th of April 2012 to 15th of April 2013, Nullagine Project.

M 4600267

98104 CONFIDENTIAL 04/06/2013 04/2012 - 04/2013 M46/436 Annual Report, from 16th of April 2012 to 15th of April 2013, Nullagine Gold Project.

M 4600436

98105 CONFIDENTIAL 04/06/2013 04/2012 - 04/2013 M46/443 Annual Report, from 16th of April 2012 to 15th of April 2013, Nullagine Project

M 4600443

98106 CONFIDENTIAL 04/06/2013 06/2012 - 06/2013 P46/1759 Annual Report from 22nd of June 2012 to 21st of June 2013, Nullagine Project.

P 4601759

98107 CONFIDENTIAL 04/06/2013 06/2012 - 06/2013 P46/1760 Annual Report from 22nd of June 2012 to 21st of June 2013, Nullagine Project.

P 4601760

98108 CONFIDENTIAL 04/06/2013 06/2012 - 06/2013 P46/1761 Annual Report from 22nd of June 2012 to 21st of June 2013, Nullagine Project

P 4601761

98119 CONFIDENTIAL 07/06/2013 11/2005 - 02/2013 Final Surrender Report for E70/2705, Koolanooka South Project. E 7002705

98121 CONFIDENTIAL 07/06/2013 04/2012 - 04/2013 Annual Report, Yarrie Project, M45/202, for the period 24/03/2012 - 23/03/2013.

M 4500202

98122 CONFIDENTIAL 07/06/2013 04/2012 - 04/2013 Panorama Project, Annual Report, Tenement E45/3662 For the Period 6 April 2012 to 5 April 2013

E 4503662

98124 CONFIDENTIAL 10/06/2013 01/2012 - 01/2013 SCORPION MINING PTY. LTD. ANNUAL REPORT ON MINING LEASE M24/488 VETTERSBURG PROJECT FOR THE PERIOD 2/1/2012 TO 1/1/2013

M 2400488

98125 CONFIDENTIAL 10/06/2013 01/2012 - 01/2013 ANNUAL REPORT ON MINING LEASE M24/493 VETTERSBURG PROJECT FOR THE PERIOD 2/1/2012 TO 1/1/2013 BROADARROW MINERAL FIELD

M 2400493

98128 CONFIDENTIAL 11/06/2013 04/2012 - 03/2013 South Darlot Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/1054.

E 3701054

98130 CONFIDENTIAL 10/06/2013 04/2012 - 04/2013 Exmouth Project, Annual Report for the period 12th April 2012 to 11th April 2013, M08/145.

M 0800145

98131 CONFIDENTIAL 10/06/2013 03/2012 - 03/2013 Spinifex Ridge Project, Annual Report for the period 15th March 2012 to 14th March 2013, M45/1095-1097 & 1164; E45/2744-2746. [C51/2007]

M 4501095

M 4501096

M 4501164

98139 CONFIDENTIAL 12/06/2013 04/2012 - 04/2013 Red Dam Project, Annual Report for the period 19th April 2012 to 18th April 2013, M16/344.

M 1600344

98143 CONFIDENTIAL 11/06/2013 03/2012 - 03/2013 E38/2452 ANNUAL EXPLORATION REPORT Reporting Period 28/03/2012 – 27/03/2013

E 3802452

98146 CONFIDENTIAL 12/06/2013 03/2012 - 03/2013 Bullabulling Project, Annual Report for the period 21st March 2012 to 20th March 2013, M15/552.

M 1500552

98149 CONFIDENTIAL 12/06/2013 05/2012 - 05/2013 Duck Creek Project, Annual Report for the period 13th May 2012 to 12th May 2013, E47/1218.

E 4701218

98157 CONFIDENTIAL 13/06/2013 04/2012 - 04/2013 ANNUAL TECHNICAL REPORT For the Period 19 April 2012 to 18 April 2013 Great Sandy Project Exploration Licence E45/3599

E 4503599

Printed: 18/02/2019 02:28:38 PMPage 289 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 290: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

MILLENNIUM MINERALS LIMITED

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

CREASY MARK GARETH

IRONBRIDGE RESOURCES PTY LTD

SCORPION MINING PTY LTD

SCORPION MINING PTY LTD

CENTRAL IRON ORE LTD

EXMOUTH LIMESTONE PTY LTD

MOLY METALS AUSTRALIA PTY LTD

MOLY METALS AUSTRALIA PTY LTD

MOLY METALS AUSTRALIA PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

STONE RESOURCES AUSTRALIA LIMITED

BULLABULLING OPERATIONS PTY LTD

HAMERSLEY IRON PTY LIMITED

MING GOLD PTY LTDSIPA EXPLORATION NL

Printed: 18/02/2019 02:28:38 PMPage 290 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 291: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98184 CONFIDENTIAL 17/06/2013 03/2012 - 03/2013 Warrawoona Project, Annual Report for the period 17/03/2012 to 16/03/2013, E45/3381; P45/2661-2662, 2736 & 2781. [C237/2011]

E 4503381

P 4502781

98185 CONFIDENTIAL 17/06/2013 03/2012 - 03/2013 Mosquito Creek Project, Annual Report for the period 02/03/2012 to 01/03/2013, E46/810, 823 & 925; P46/1628, 1632-1637, 1665, 1667 & 1668. [C238/2001]

P 4601634

P 4601636

P 4601667

P 4601668

98186 CONFIDENTIAL 29/05/2013 02/2012 - 02/2013 Annual Report 2012-13 M70/1085 [Wundowie Project, for the period 24/02/2012 to 23/02/2013]

M 7001085

98193 CONFIDENTIAL 17/06/2013 08/2012 - 08/2013 Annual Report for the period 13 August 2012 - 12 August 2013, Bullabulling Project, P 15/5673

P 1505673

98194 CONFIDENTIAL 17/06/2013 08/2012 - 08/2013 Bullabulling Project, Annual Report for the period 13th August 2012 to 12th August 2013, P15/5674.

P 1505674

98196 CONFIDENTIAL 17/06/2013 05/2012 - 04/2013 Lake Mackay Project, Annual Report for the period 1st May 2012 to 30th April 2013, E80/3483-3486, 3519, 3580-3589, 3837, 4449, 4498, 4606 & 4607. [C203/2008]

E 8003484

E 8003485

98202 CONFIDENTIAL 17/06/2013 04/2012 - 04/2013 Gillingarra [Area 1] Project, Annual Report for the period 23rd April 2012 to 22nd April 2013, E70/3007, 3405, 3629-3630, 3688, 3823-3825, 3854 & 3855. [C38/2010]

E 7003007

E 7003405

98209 CONFIDENTIAL 18/06/2013 03/2012 - 03/2013 Hastings Project, Annual Report for the period 20/03/2012 to 19/03/2013, P80/1626-1635. [C63/2009]

P 8001626

P 8001627

P 8001628

P 8001629

P 8001630

P 8001631

P 8001632

P 8001633

P 8001634

P 8001635

98211 CONFIDENTIAL 18/06/2013 05/2012 - 05/2013 Dandaragan Project, Annual Report for the period 4th May 2012 to 3rd May 2013, E70/3100.

E 7003100

98214 CONFIDENTIAL 18/06/2013 04/2012 - 04/2013 Miranda East Project, Annual Report for the period 23rd April 2012 to 22nd April 2013, M36/580.

M 3600580

Printed: 18/02/2019 02:28:38 PMPage 291 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 292: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

BEATONS CREEK GOLD PTY LTD

RENMORE PTY LTD

BULLABULLING OPERATIONS PTY LTD

BULLABULLING OPERATIONS PTY LTD

NOVA ENERGY PTY LTD

NOVA ENERGY PTY LTD

YANKUANG RESOURCES PTY LTD

BAUXITE RESOURCES LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

BROCKMAN PROJECT HOLDINGS PTY LIMITED

IMAGE RESOURCES NL

M 36-580 PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 292 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 293: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98224 CONFIDENTIAL 19/06/2013 06/2012 - 06/2013 COMBINED ANNUAL REPORT ON KALGOORLIE PROJECT No. C 109/2011. P26/3418, P26/3419, P26/3735, P26/3904, P26/3905, P26/3906, P26/3907, P26/3908, P26/3909, P26/3910. Somerville, Kalgoorlie-Boulder, WA. For the period 23rd. June 2012 to 22nd. June 2013.

P 2603904

P 2603905

P 2603906

P 2603907

P 2603908

P 2603910

98229 CONFIDENTIAL 19/06/2013 04/2012 - 03/2013 Bailup Project, Annual Report for the period 1st April 2012 to 30th March 2013, E70/3366 & 3730. [C49/2013]

E 7003366

98230 CONFIDENTIAL 19/06/2013 04/2012 - 04/2013 Annual Technical Report 4th March 2012 to 3rd June 2013 Murrin Murrin South Project E39/1641.

E 3901641

98238 CONFIDENTIAL 21/06/2013 03/2012 - 03/2013 Zanthus Energy Project, Annual Report for the period 13th March 2012 to 12th March 2013, E69/2506.

E 6902506

98244 CONFIDENTIAL 24/06/2013 04/2012 - 04/2013 North Parker Project, Annual Report for the period 4th March 2012 to 3rd March 2013, M77/671, 765 & 766. ['C128/2005]

M 7700765

M 7700766

98259 CONFIDENTIAL 21/06/2013 03/2012 - 03/2013 Windanya Project, Annual Report for the period 28th March 2012 to 27th March 2013, M24/364.

M 2400364

98262 CONFIDENTIAL 21/06/2013 04/2012 - 04/2013 Pipeline Tank- Blue Cap Project, Annual Report for the period 7th April 2012 to 6th April 2013, E59/1275.

E 5901275

98263 CONFIDENTIAL 21/06/2013 04/2012 - 04/2013 Pilgangoora Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E45/2232 & 2241; M45/78, 333 & 511. [C123/2002]

E 4502232

E 4502241

M 4500078

M 4500333

M 4500511

98267 CONFIDENTIAL 24/06/2013 03/2012 - 03/2013 Cervantes Project, Annual Report for the period 31st March 2012 to 30th March 2013, M70/308.

M 7000308

98268 CONFIDENTIAL 24/06/2013 03/2012 - 03/2013 Dongara Project, Annual Report for the period 31st March 2012 to 30th March 2013, M70/309 & 310. [C18/1999]

M 7000309

M 7000310

98284 CONFIDENTIAL 26/06/2013 04/2012 - 04/2013 Andy Well Project, Annual Report for the period 27/04/2012 to 26/04/2013, M51/870.

M 5100870

98289 CONFIDENTIAL 25/06/2013 03/2012 - 03/2013 ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 15 MARCH 2013 WILTHORPE TENEMENT NUMBER E52/1832 16th March 2012 to 15th March 2013, E52/1832.

E 5201832

98292 CONFIDENTIAL 27/06/2013 04/2012 - 04/2013 Gwindinup Project, Annual Report for the period 29th April 2012 to 28th April 2013, M70/479, 895, 899, 900 & 901. [C175/1994]

M 7000479

Printed: 18/02/2019 02:28:38 PMPage 293 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 294: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

REED DAVID JOHN

REED DAVID JOHN

REED DAVID JOHN

REED DAVID JOHN

REED DAVID JOHN

REED DAVID JOHN

YANKUANG BAUXITE RESOURCES PTY LTD

PHOTIOS MICHAEL JOHN

ZANTHUS ENERGY PTY LTD

TIANYE SXO GOLD MINING PTY LTD

TIANYE SXO GOLD MINING PTY LTD

GPM RESOURCES PTY LTD

DEFLECTOR MINING LIMITED

PILBARA MINERALS LIMITED

PILGANGOORA OPERATIONS PTY LTD

PILGANGOORA OPERATIONS PTY LTD

PILGANGOORA OPERATIONS PTY LTD

PILGANGOORA OPERATIONS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

WESTDEEN HOLDINGS PTY LTD

ANDY WELL MINING PTY LTD

ARAGON RESOURCES PTY LTD

CABLE SANDS (WA) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 294 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 295: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98292 CONFIDENTIAL 27/06/2013 04/2012 - 04/2013 Gwindinup Project, Annual Report for the period 29th April 2012 to 28th April 2013, M70/479, 895, 899, 900 & 901. [C175/1994]

M 7000895

M 7000899

M 7000900

M 7000901

98293 CONFIDENTIAL 27/06/2013 05/2012 - 04/2013 Vettersburg Project, Annual Report for the period 1st May 2012 to 30th April 2013, M24/400 & 429. [C86/2005]

M 2400400

M 2400429

98297 CONFIDENTIAL 25/06/2013 05/2012 - 04/2013 Yerilla Project, Annual Report for the period 1st May 2012 to 30th April 2013, E31/758-759; M31/107, 160-161, 229-230, 298-299, 335 & 379; P31/1799, 1933-1935 & 4817-4822. [C46/2000]

E 3100758

M 3100107

M 3100160

M 3100161

M 3100229

M 3100230

M 3100298

M 3100299

M 3100335

M 3100379

98300 CONFIDENTIAL 25/06/2013 12/2011 - 12/2012 Annual Mineral Exploration reports for the period 3 April, 2011 to 15 December June 2012, Britania Well-Grangers Project, Tenements M58/229, P58/1513, P58/1565, P58/1568, P581569 P58/1570 and P58/1571

M 5800229

98303 CONFIDENTIAL 25/06/2013 04/2012 - 04/2013 ANNUAL REPORT E52/2346 PEAK HILL Western Australia for the period 8th April 2012 to 7th April 2013 on behalf ofBlue Valley Pty Ltd

E 5202346

98307 CONFIDENTIAL 25/06/2013 04/2012 - 03/2013 Jack Hills Project, Annual Report for the period 1st April 2012 to 31st March 2013, E20/618; M20/506 & M20/513. [C19/2006]

E 2000618

M 2000506

M 2000513

98314 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 Mount Clifford Project, Annual Report for the period 01/04/2012 to 31/03/2013, P37/7169-7170 & 7370-7373;E37/761-762 & 909; M37/806. [C268/1994]

E 3700909

Printed: 18/02/2019 02:28:38 PMPage 295 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 296: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

GPM RESOURCES PTY LTD

GPM RESOURCES PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

GLENMURRIN PTY LTDMURRIN MURRIN HOLDINGS PTY LTD

EASTERN GOLDFIELDS EXPLORATION PTY LTD

BLUE VALLEY PTY LTD

CROSSLANDS RESOURCES PTY LTD

CROSSLANDS RESOURCES PTY LTD

CROSSLANDS RESOURCES PTY LTD

SCOTIA NICKEL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 296 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 297: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98315 CONFIDENTIAL 28/06/2013 05/2012 - 04/2013 Mount Monger South Project, Annual Report for the period 1st May 2012 to 30th April 2013, E25/332; M25/117; M26/148...............M26/635; P25/1890-1982, 1894 & 2106; P26/3423-3431, 3789 & 3879. [C127/2005]

M 2500117

M 2600148

M 2600197

M 2600248

M 2600249

M 2600357

M 2600364

M 2600391

M 2600401

M 2600406

M 2600409

M 2600417

M 2600635

P 2603431

P 2603789

98316 CONFIDENTIAL 28/06/2013 05/2012 - 05/2013 Dampier Project, Annual Report for the period 2nd May 2012 to 1st May 2013, E04/2081.

E 0402081

98317 CONFIDENTIAL 28/06/2013 03/2012 - 02/2013 Bronton Project, Annual Project for the period 1st March 2012 to 28th February 2013, E28/1900, 1901, 2086 & 2087. [C167/2012]

E 2801900

E 2801901

E 2802086

E 2802087

98326 CONFIDENTIAL 27/06/2013 05/2012 - 05/2013 Annual Report, Yamarna Project - E38/2356, for the period 4 May 2012 – 3 May 2013

E 3802356

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

E 2600124

M 2600027

M 2600039

M 2600040

M 2600046

M 2600054

Printed: 18/02/2019 02:28:38 PMPage 297 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 298: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

THUNDERBIRD OPERATIONS PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 298 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 299: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600056

M 2600058

M 2600060

M 2600061

M 2600078

M 2600081

M 2600083

M 2600086

M 2600087

M 2600095

M 2600096

M 2600113

M 2600120

M 2600131

M 2600150

M 2600155

M 2600233

M 2600261

M 2600264

M 2600266

M 2600267

Printed: 18/02/2019 02:28:38 PMPage 299 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 300: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 300 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 301: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600268

M 2600294

M 2600308

M 2600311

M 2600316

M 2600326

M 2600353

M 2600359

M 2600365

M 2600373

M 2600375

M 2600376

M 2600377

M 2600378

M 2600379

M 2600382

M 2600383

M 2600388

M 2600396

M 2600404

M 2600405

Printed: 18/02/2019 02:28:38 PMPage 301 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 302: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 302 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 303: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600416

M 2600418

M 2600432

M 2600451

M 2600454

M 2600459

M 2600489

M 2600495

M 2600496

M 2600503

M 2600504

M 2600505

M 2600511

M 2600518

M 2600519

M 2600520

M 2600521

M 2600522

M 2600523

M 2600524

M 2600525

Printed: 18/02/2019 02:28:38 PMPage 303 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 304: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

THORNANDER GLENN JOHNBARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 304 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 305: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600526

M 2600527

M 2600528

M 2600529

M 2600530

M 2600532

M 2600533

M 2600550

M 2600552

M 2600557

M 2600573

M 2600575

M 2600577

M 2600581

M 2600589

M 2600611

M 2600612

M 2600615

M 2600622

M 2600625

M 2600626

Printed: 18/02/2019 02:28:38 PMPage 305 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 306: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 306 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 307: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600630

M 2600645

M 2600646

M 2600648

M 2600661

M 2600662

M 2600708

M 2600713

M 2600715

M 2600724

M 2600725

M 2600738

M 2600744

M 2600745

M 2600746

M 2600747

M 2600748

M 2600760

M 2600761

M 2600778

M 2600784

Printed: 18/02/2019 02:28:38 PMPage 307 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 308: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 308 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 309: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

M 2600785

M 2600800

M 2600803

P 2601832

P 2601833

P 2601834

P 2601988

P 2602048

P 2602144

P 2602178

P 2602184

P 2602185

P 2602186

P 2602187

P 2602188

P 2602194

P 2602201

P 2602214

P 2602234

P 2602235

P 2602238

Printed: 18/02/2019 02:28:38 PMPage 309 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 310: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

MCALLISTER NORMAN ROBERTBARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 310 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 311: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

P 2602327

P 2602358

P 2602373

P 2602386

P 2602417

P 2602418

P 2602419

P 2602420

P 2602458

P 2602482

P 2602511

P 2602512

P 2602513

P 2602525

P 2602526

P 2602527

P 2602528

P 2602529

P 2602530

P 2602531

P 2602532

Printed: 18/02/2019 02:28:38 PMPage 311 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 312: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 312 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 313: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

P 2602533

P 2602537

P 2602540

P 2602576

P 2602577

P 2602654

P 2602707

P 2602777

P 2602784

P 2602789

P 2602790

P 2602823

P 2602925

P 2602936

P 2602937

P 2602960

P 2602970

P 2603087

P 2603088

P 2603089

P 2603312

Printed: 18/02/2019 02:28:38 PMPage 313 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 314: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

Printed: 18/02/2019 02:28:38 PMPage 314 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 315: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98327 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000

P 2603344

P 2603350

P 2603351

P 2603352

P 2603353

P 2603354

P 2603355

P 2603356

P 2603357

P 2603668

P 2603669

P 2603670

P 2603671

P 2603779

P 2603780

98329 CONFIDENTIAL 27/06/2013 05/2012 - 04/2013 Karara Project, Annual Report for the period 01/05/2012 to 30/04/2013, C82/2007.

E 5900817

E 5901068

E 5901170

E 5901533

E 5901534

E 5901607

E 5901690

M 5900379

M 5900380

Printed: 18/02/2019 02:28:38 PMPage 315 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 316: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

KALGOORLIE LAKE VIEW PTY LTDBARRICK (AUSTRALIA PACIFIC) PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

KARARA MINING LIMITED

DSO VENTURES PTY LTD

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 316 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 317: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98329 CONFIDENTIAL 27/06/2013 05/2012 - 04/2013 Karara Project, Annual Report for the period 01/05/2012 to 30/04/2013, C82/2007.

M 5900460

M 5900644

M 5900645

M 5900649

M 5900650

M 5900721

M 5900729

M 5900730

M 5900735

M 5900736

98330 CONFIDENTIAL 27/06/2013 02/2012 - 01/2013 Central Pilbara Project, Annual Report for the period 01/02/2012 to 31/01/2013, E47/1236, 1238 & 2366; M47/1359-1360 & 1421. [C04/2013]

E 4701238

M 4701359

M 4701360

M 4701421

98332 CONFIDENTIAL 01/07/2013 05/2012 - 05/2013 Dardanup Project, Annual Report for the period 26th May 2012 to 25th May 2013, E70/2979, 3005, 3587, 3873, 3891, 4020 & 4449; M70/94, 352, 343, 352, 720, 748, 812, 892-893, 1006 & 1033; R70/38. [C86/2000]

E 7003005

E 7003587

E 7004449

M 7000094

M 7000352

M 7000643

M 7000652

M 7000675

M 7000720

M 7000748

M 7000812

M 7000893

M 7001006

M 7001033

98333 CONFIDENTIAL 01/07/2013 05/2012 - 05/2013 Nepean (JV) Project, Annual Report for the periods 14th May 2012 to 13th May 2013, M15/576,709 & M15/1809;P15/5026-5029, 5030-5033, 5035, 5248, 5519, 5574-5576, 5626-5628, 5738-5743 & 5749-5750. [C5/2008]

M 1500576

M 1500709

Printed: 18/02/2019 02:28:38 PMPage 317 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 318: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MINJAR GOLD PTY LTD

KARARA MINING LIMITED

KARARA MINING LIMITED

DSO VENTURES PTY LTD

DSO VENTURES PTY LTD

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

PROCESS MINERALS INTERNATIONAL PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

Printed: 18/02/2019 02:28:38 PMPage 318 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 319: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98333 CONFIDENTIAL 01/07/2013 05/2012 - 05/2013 Nepean (JV) Project, Annual Report for the periods 14th May 2012 to 13th May 2013, M15/576,709 & M15/1809;P15/5026-5029, 5030-5033, 5035, 5248, 5519, 5574-5576, 5626-5628, 5738-5743 & 5749-5750. [C5/2008]

M 1501809

P 1505026

P 1505027

P 1505028

P 1505029

P 1505574

P 1505575

P 1505576

P 1505626

P 1505738

P 1505739

P 1505740

P 1505741

P 1505742

P 1505743

P 1505749

P 1505750

98339 CONFIDENTIAL 01/07/2013 05/2012 - 04/2013 Combined Annual Report on Butcherbird Project 38/2012 E52/2350, E52/2658 & E52/2727. For the Period 1/05/2012 to 30/04/2013

E 5202350

98340 CONFIDENTIAL 01/07/2013 04/2012 - 03/2013 Mopoke Well Project C136/2011 combined annual report for the period ending 31st March 2013 (covering E29/568 & E29/623)

E 2900568

98344 CONFIDENTIAL 01/07/2013 03/2012 - 03/2013 Annual Report for the period 30 March 2012 to 29 March 2013, Mt Palmer Project, M77/406

M 7700406

98345 CONFIDENTIAL 01/07/2013 04/2012 - 04/2013 Annual Technical Report 12th April 2012 to 11th April 2013 Golden Style Project (aka Pig Well West) Combined Reporting – C24/2012 P37/7942 P37/7943 P37/7944 P37/7945 P37/7946 P37/7947 P37/7948 P37/7647

P 3707948

98350 CONFIDENTIAL 28/06/2013 03/2012 - 03/2013 Combined Annual Report C162/1996 Tenements – M45/492, M45/314 – 315, M45/317 – 318, E45/1018 and E45/1839 for the period 10th March 2012 to 9th March 2013

E 4501018

E 4501839

M 4500314

M 4500315

M 4500317

M 4500318

M 4500492

Printed: 18/02/2019 02:28:38 PMPage 319 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 320: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

FOCUS MINERALS LTD

ELEMENT 25 LIMITED

ENERGY METALS LTD

MT PALMER GOLD PTY LTD

REDCLIFFE RESOURCES LIMITEDNTM GOLD LTD

MOUNT ISA MINES LIMITEDMAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

MAROOCHYDORE COPPER PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 320 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 321: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98351 CONFIDENTIAL 28/06/2013 05/2012 - 05/2013 Annual Report (06.05.2012 � 05.05.2013) Onslow Dune Sand Resources Exploration Licence E08/1995 Exploration Report (Report Number 675.10120.00100)

E 0801995

98352 CONFIDENTIAL 28/06/2013 05/2012 - 05/2013 Onslow Dune Sand Resources E08/2009 (M08/471, M08/488, M08/496) Annual Report for the Period 6/5/2012 to 5/5/2013

E 0802009

98353 CONFIDENTIAL 28/06/2013 04/2012 - 03/2013 TWIN HILLS, WESTERN AUSTRALIA M29/21 ANNUAL REPORT FOR THE PERIOD 1 April 2012 to 31 March 2013

M 2900021

98354 CONFIDENTIAL 02/07/2013 05/2012 - 05/2013 Annual Report For the reporting period 06/05/2012 –05/05/2013 Iroquois Project E69/2820

E 6902820

98355 CONFIDENTIAL 02/07/2013 04/2012 - 03/2013 M37/54, M37/350,M37/488, M37/513, M37/514 and M37/638 Annual Report for Celtic Project covering the period 01/04/2013 - 31/03/2013 (C28/2012)

M 3700054

M 3700350

M 3700488

M 3700513

M 3700514

M 3700638

98359 CONFIDENTIAL 02/07/2013 04/2012 - 04/2013 PENINSULAR PROJECT Annual Report E39/1653 Covering the period 20th April 2012 to 19th April 2013

E 3901653

98360 CONFIDENTIAL 02/07/2013 03/2012 - 03/2013 Macarthur Minerals Iron Ore Projects Central Area Combined Annual Report No. C141/2011 Period covered 31-03-2012 to 31-03-2013 Granted Exploration Licences E30/0321, E30/0349, E77/1299, M30/0213, M30/0214, M30/0215, M30/0216, M30/0217, M30/0218, M30/0219, M30/251, P30/1070, P30/1071 and P30/1083

E 3000321

M 3000213

M 3000214

M 3000215

M 3000216

M 3000217

M 3000251

P 3001070

P 3001083

98361 CONFIDENTIAL 02/07/2013 04/2012 - 04/2013 Musgraves Project Annual Technical Report Blackstone Range Project C110/2007, E69/2108, E69/2109, and E69/2450 for the period 28th April 2012 to 27th

E 6902450

98379 CONFIDENTIAL 04/07/2013 05/2012 - 05/2013 Redcliffe South/Golden Terrace 2013 Annual Report, E37/739, E37/961, E37/968, M37/1276, M37/1285, M37/1295, C69/2003 9th May 2012 to 8th May 2013

E 3700739

M 3701276

Printed: 18/02/2019 02:28:38 PMPage 321 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 322: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

YARRI MINING PTY LTD

YARRI MINING PTY LTD

MELROSE RESOURCES PTY LTD

GIBB RIVER DIAMONDS LIMITEDALLOY RESOURCES LTDDORAY MINERALS LIMITED

TERRAIN MINERALS LTD

SR MINING PTY LTD

SR MINING PTY LTD

SR MINING PTY LTD

SR MINING PTY LTD

SR MINING PTY LTD

GEOLOGICAL RESOURCES PTY LTDKAMAX RESOURCES LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

REDSTONE RESOURCES LIMITED

REDCLIFFE RESOURCES LIMITED

REDCLIFFE RESOURCES LIMITEDNTM GOLD LTD

Printed: 18/02/2019 02:28:38 PMPage 322 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 323: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98379 CONFIDENTIAL 04/07/2013 05/2012 - 05/2013 Redcliffe South/Golden Terrace 2013 Annual Report, E37/739, E37/961, E37/968, M37/1276, M37/1285, M37/1295, C69/2003 9th May 2012 to 8th May 2013

M 3701285

M 3701295

98380 CONFIDENTIAL 04/07/2013 04/2012 - 03/2013 Gabanintha Project,Annual Technical Report C93/2001 Report Period: April 1, 2012 – March 31, 2013

E 5100431

E 5100843

E 5101396

P 5102226

P 5102634

98382 CONFIDENTIAL 04/07/2013 05/2012 - 05/2013 Barwidgee Combined Reporting Group C95/2008 Annual Technical Report for the Period 10 May 2012 to 09 May 2013

E 3600578

E 3600693

E 3600698

E 5301373

M 5300015

M 5300544

M 5300547

P 3601740

P 3601754

P 3601755

98395 CONFIDENTIAL 03/07/2013 05/2012 - 05/2013 Dandaragan Potash Project, E70/4138, Annual report for the period 22 May 2012 to 21 May 2013

E 7004138

98396 CONFIDENTIAL 03/07/2013 05/2012 - 05/2013 Dandaragan Potash Project, E70/4137, Annual report for the period 22 May 2012 to 21 May 2013

E 7004137

98402 CONFIDENTIAL 05/07/2013 03/2012 - 03/2013 Pinjin South Project, Annual Report for the period 13th March 2012 to 12th March 2013,E31/7889. [A Tank]

E 3100789

98418 CONFIDENTIAL 08/07/2013 03/2012 - 03/2013 Gascoyne Project E09/1584 Annual Technical Report for the period 11th March 2012 to 10th March 2013

E 0901584

98420 CONFIDENTIAL 08/07/2013 07/2012 - 07/2013 Linden Project Combined Annual Report for the period 6th July 2012 to 5th July 2013, E39/1232, E39/1539, M39/255, M39/385, M39/386, M39/387, M39/629, M39/649, M39/650, M39/780, M39/781, M39/794, M39/795, P39/2974, P39/2975, P39/2976, C37/2009

E 3901232

Printed: 18/02/2019 02:28:38 PMPage 323 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 324: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

REDCLIFFE RESOURCES LIMITEDNTM GOLD LTD

REDCLIFFE RESOURCES LIMITEDNTM GOLD LTD

PADBURY MINING LTDYELLOW ROCK RESOURCES LTD

AUSTRALIAN VANADIUM LIMITED

AUSTRALIAN VANADIUM LIMITED

PADBURY MINING LTD

AUSTRALIAN VANADIUM LIMITED

CREASY MARK GARETHMKO MINES PTY LTD

LINGER AND DIE PTY LTDMKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

LINGER AND DIE PTY LTDMKO MINES PTY LTD

MKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

CREASY MARK GARETHMKO MINES PTY LTD

MKO MINES PTY LTD

MKO MINES PTY LTDCREASY MARK GARETH

MKO MINES PTY LTDCREASY MARK GARETH

DANDARAGAN TROUGH HOLDINGS PTY LTD

PARKWAY MINERALS NL

AVOCA RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

DRAGE RODNEY THOMASWILLIAMSON MARK DAVID

ANOVA METALS AUSTRALIA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 324 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 325: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98420 CONFIDENTIAL 08/07/2013 07/2012 - 07/2013 Linden Project Combined Annual Report for the period 6th July 2012 to 5th July 2013, E39/1232, E39/1539, M39/255, M39/385, M39/386, M39/387, M39/629, M39/649, M39/650, M39/780, M39/781, M39/794, M39/795, P39/2974, P39/2975, P39/2976, C37/2009

E 3901539

M 3900255

M 3900385

M 3900386

M 3900387

M 3900629

M 3900649

M 3900650

M 3900780

M 3900781

M 3900794

P 3902974

P 3902975

P 3902976

98424 CONFIDENTIAL 08/07/2013 05/2012 - 05/2013 Gwendolyn Annual Report M77/1263-I and E77/1580 (C154/2011) for the period 12th May 2012 to 11th May 2013

E 7701580

M 7701263

98425 CONFIDENTIAL 09/07/2013 06/2012 - 06/2013 Coburn Zircon Project C79/2000 Fourteenth Annual report for the period ended 17 June 2013, E09/939-941 & 1685, M09/102-106 & 111-112, Misc. Licence 09/21& 09/43

E 0900939

E 0900940

E 0900941

L 0900021

L 0900043

M 0900102

M 0900103

M 0900104

M 0900105

M 0900106

M 0900111

M 0900112

98430 CONFIDENTIAL 09/07/2013 05/2012 - 05/2013 Cue / Block 7 Project M20/470 Annual Report for the period 29th May 2012 to 28th May 2013

M 2000470

Printed: 18/02/2019 02:28:38 PMPage 325 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 326: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ANOVA METALS AUSTRALIA PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

EXTERRA RESOURCES LIMITED

ANOVA METALS AUSTRALIA PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

ANOVA METALS AUSTRALIA PTY LTD

EXTERRA RESOURCES LIMITED

EXTERRA RESOURCES LIMITED

ANOVA METALS AUSTRALIA PTY LTD

HAOMA MINING NL

HAOMA MINING NL

HAOMA MINING NL

GOLDEN IRON RESOURCES LTD

GOLDEN IRON RESOURCES LTD

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

GUNSON RESOURCES LTD

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

STRANDLINE RESOURCES LIMITED

SEARS HARLEY JAMES

Printed: 18/02/2019 02:28:38 PMPage 326 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 327: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98434 CONFIDENTIAL 10/07/2013 05/2012 - 05/2013 Annual Mineral Exploration Report – Hassell Beach Project M70/562 for the period 31 May 2012 – 30 May 2013

M 7000562

98437 CONFIDENTIAL 09/07/2013 05/2012 - 05/2013 Manyingee Uranium Project, Western Australia Mining Leases M08/86, M08/87 & M08/88 Mineral Exploration Report the Period 18 May 2012 to 17 May 2013

M 0800086

M 0800087

M 0800088

98443 CONFIDENTIAL 10/07/2013 04/2012 - 04/2013 Macarthur Minerals Iron Ore Projects Snark/North Area Combined Annual Report No. C139/2011 Period covered 30/04/2012 to 29/04/2013, E30/0240....P30/1089

E 3000240

M 3000248

M 3000249

98444 CONFIDENTIAL 10/07/2013 05/2012 - 05/2013 Annual Report for the period 31 May 2012 – 30 May 2013, C140/2011, E30/317.......P30/1085

E 3000392

M 3000206

M 3000207

M 3000227

M 3000228

M 3000229

P 3001085

98480 CONFIDENTIAL 10/07/2013 05/2012 - 06/2013 Holleton Project Tenements M77/643, ML77/898 part of combined Annual Report for the period 31 May, 2012 - 1 June, 2013

M 7700643

M 7700898

98487 CONFIDENTIAL 15/07/2013 04/2012 - 04/2013 Annual Report Strattons Project E45/3332 For the period 6 April 2012 to 5 April 2013

E 4503332

98490 CONFIDENTIAL 15/07/2013 05/2012 - 05/2013 Esperance Project Exploration Licences E63/1415, E63/1469, E63/1496, E69/2783, E69/2784, E69/2944 and E69/3010 Combined Annual Technical Report for the period 6 May 2012 to 5 May 2013

E 6301415

E 6301469

E 6301496

98491 CONFIDENTIAL 15/07/2013 07/2012 - 06/2013 Zuleika Project E30/391 Annual Technical Report for the period 1 July 2012 to 30 June 2013

E 3000391

98504 CONFIDENTIAL 12/07/2013 06/2012 - 06/2013 Duck Creek North Annual Report E47/778 Annual Report for the period 10 June 2012 to 9 June 2013

E 4700778

98509 CONFIDENTIAL 16/07/2013 06/2012 - 06/2013 Brockman West (Combined) Annual Report Exploration Licences 47/780, 47/472, 47/942 & 47/783 (C42/1997) for the period 9 June 2012 – 8 June 2013

E 4700472

E 4700780

E 4700783

E 4700942

Printed: 18/02/2019 02:28:38 PMPage 327 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 328: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CABLE SANDS (WA) PTY LTD

PALADIN ENERGY MINERALS PTY LTD

PALADIN ENERGY MINERALS PTY LTD

PALADIN ENERGY MINERALS PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

MACARTHUR IRON ORE PTY LTD

RICHARD READ & ASSOCIATES PTY LTD

RICHARD READ & ASSOCIATES PTY LTD

BOOKABURNA MINERALS PTY LTD

SALAZAR GOLD PTY LTD

SALAZAR GOLD PTY LTD

SALAZAR GOLD PTY LTD

SALAZAR GOLD PTY LTD

HAMERSLEY IRON PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 328 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 329: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98510 CONFIDENTIAL 16/07/2013 06/2012 - 06/2013 Metawandy Project Area Annual Report (C18/2004) E47/662 & 47/781 for the period 9 June 2012 to 8 June 2013

E 4700662

E 4700781

98511 CONFIDENTIAL 16/07/2013 05/2012 - 05/2013 M52/801 Peak Hill (Durack) Annual Technical Report 2013 for the period 19 May 2012 to 18 May 2013

M 5200801

98513 CONFIDENTIAL 09/07/2013 01/2011 - 02/2013 Summary Mineral Exploration Report E70/3275 (Tamega Rd) & E70/3276 (McKinley Rd) for the period ending 9/02/2013

E 7003275

E 7003276

98516 CONFIDENTIAL 16/07/2013 04/2012 - 03/2013 Annual Report East Menzies Goldfield Project – C163/2011 for the period 1 April 2012 – 31 March 2013, P29/2106.......P29/2150

P 2902106

98517 CONFIDENTIAL 16/07/2013 05/2012 - 05/2013 Scahill Sand E15/1148 Annual Technical Report for the period from 24th May 2012 to 23rd May 2013

E 1501148

98519 CONFIDENTIAL 16/07/2013 04/2012 - 04/2013 Collurabbie Project E38/1939, E38/2298, E38/2681, E38/2682, E38/2683 P38/3835 Annual Report for the period 30 April 2012 to 29 April 2013

E 3801939

98520 CONFIDENTIAL 16/07/2013 04/2012 - 04/2013 Annual Report E39/1654 Fraser Range North Project For the period 23/04/2012 – 22/04/2013

E 3901654

98522 CONFIDENTIAL 17/07/2013 04/2012 - 03/2013 ELIZABETH HILL PROJECT COMBINED ANNUAL MINERAL EXPLORATION REPORT C143/1996 TENEMENTS: [M47/340 – M47/343, E47/587] For The Period: 1st APRIL 2012 to 31st March 2013

M 4700342

98533 CONFIDENTIAL 19/07/2013 06/2012 - 06/2013 Poonda Project Area (Combined) Annual Report Exploration Licences 46/580 & 46/662 (C159/2007) Annual Report for the Period 16 June 2012 to 15 June 2013

E 4600580

E 4600662

98538 CONFIDENTIAL 18/07/2013 05/2012 - 05/2013 Hill River Project M70/381, M70/382, M70/383, M70/490, M70/491, M70/543, M70/639 (C71/1999) Combined Annual Report for the period 7 May 2012 – 6 May 2013

M 7000381

M 7000382

M 7000543

M 7000639

98544 CONFIDENTIAL 18/07/2013 04/2012 - 04/2013 Annual Technical Report E59/1775 for the period 10 April 2012 to 9 April 2013 E 5901775

98546 CONFIDENTIAL 18/07/2013 07/2012 - 07/2013 Annual Report for the Period 08/07/2012 to 07/07/2013 M 0800461

98547 CONFIDENTIAL 18/07/2013 07/2012 - 07/2013 Annual Report (08/07/2012 - 07/07/2013) Ashburton River Mining Lease M08/458

M 0800458

98549 CONFIDENTIAL 18/07/2013 05/2012 - 05/2013 Annual Report for the Period 20th May 2012 to 19th May 2013, Yangibana South, E09/1700

E 0901700

98563 CONFIDENTIAL 23/07/2013 06/2012 - 05/2013 Buldania Project Combined Annual Technical Report C16/2007 E63/856, E63/1051, E63/1060, E63/1165 and E63/1223 Report for the Period 1 June 2012 to 31 May 2013

E 6300856

E 6301051

E 6301165

Printed: 18/02/2019 02:28:38 PMPage 329 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 330: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HORSESHOE GOLD MINE PTY LTDARAGON RESOURCES PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

MENZIES GOLDFIELD LIMITED

NORVALE PTY LTDBROWN RONALD WILLIAM

DUKETON RESOURCES PTY LTD

NBX PTY LTDORION GOLD NL

KARRATHA METALS GROUP LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

AUSTRALIAN GOLD RESOURCES PTY LTD

AUSTRALIAN GOLD RESOURCES PTY LTD

AUSTRALIAN GOLD RESOURCES PTY LTD

AUSTRALIAN GOLD RESOURCES PTY LTD

MINJAR GOLD PTY LTD

ONSLOW RESOURCES LTD

ONSLOW RESOURCES LTD

YANGIBANA PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 330 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 331: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98568 CONFIDENTIAL 23/07/2013 07/2012 - 07/2013 Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2012 to 09/07/2013

E 5901350

98579 CONFIDENTIAL 24/07/2013 05/2012 - 05/2013 Parry Range E08/1408 Annual Report Mineral Exploration Reporting Period: 17 May 2012 – 16 May 2013

E 0801408

98580 CONFIDENTIAL 24/07/2013 06/2012 - 06/2013 Annual Report for Oakover Project E45/2638; E45/2640; E45/2641& E45/3547 Period 10/06/12 to 09/06/13 (C97/2009)

E 4502641

98583 CONFIDENTIAL 24/07/2013 06/2012 - 06/2013 Annual Mineral Exploration Report- DMP, Combined Reporting Group: C138/2012 Pinjin, Reporting Period: 28 June 2012-27 June 2013.

E 2802234

E 3100999

E 3101000

E 3101005

E 3101007

98584 CONFIDENTIAL 26/07/2013 04/2012 - 04/2013 Annual Technical Report for the Mundy Project, E37/1121 for the period 23rd April 2012 – 22nd April 2013

E 3701121

98602 CONFIDENTIAL 25/07/2013 05/2012 - 05/2013 Annual technical Report Jasper Hills E59/1569 Project for the period 5th May 2012 to 6th May 2013

E 5901569

98603 CONFIDENTIAL 25/07/2013 03/2012 - 03/2013 Annual Report White Well Project (C81_2013) for the period 23 March 2012 to 22 March 2013, M20/54 and P20/2190

M 2000054

P 2002190

98608 CONFIDENTIAL 25/07/2013 01/2012 - 12/2012 Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37/1080; M37/44..............M37/1290; P37/7209...........P37/8058. [C157/2002]

E 3700258

E 3700496

E 3700789

E 3700829

E 3700899

E 3700902

E 3700981

E 3701044

E 3701080

M 3700044

M 3700439

M 3700440

M 3700479

M 3700506

M 3700515

M 3701129

Printed: 18/02/2019 02:28:38 PMPage 331 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 332: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BUDDADOO METALS PTY LTDBUDF PTY LTD

PILBARA STONE PTY LTD

PILBARA MANGANESE PTY LTD

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

BULLSEYE MINING LIMITED

FRAKA INVESTMENTS PTY LTD

LAKE AUSTIN MINING PTY LTD

LAKE AUSTIN MINING PTY LTD

ROUND OAK JAGUAR PTY LTD

INDEPENDENCE JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

JABIRU METALS LTD

JABIRU METALS LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PROJECT PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 332 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 333: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98608 CONFIDENTIAL 25/07/2013 01/2012 - 12/2012 Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37/1080; M37/44..............M37/1290; P37/7209...........P37/8058. [C157/2002]

M 3701132

M 3701153

M 3701170

M 3701227

M 3701228

M 3701230

M 3701231

M 3701257

M 3701290

98611 CONFIDENTIAL 25/07/2013 07/2012 - 06/2013 Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2012 to 30 June 2013 Exploration Licence: E37/907, Mining Licences: M37/135, M37/339, M37/340, M37/356 – 361,M37/366 – 368, M37/465, Prospecting Licences: P37/7318, P37/7353 – 7357

E 3700907

M 3700135

M 3700339

M 3700340

M 3700356

M 3700357

M 3700358

M 3700359

M 3700360

M 3700361

M 3700366

M 3700367

M 3700368

M 3700465

98618 CONFIDENTIAL 29/07/2013 07/2012 - 07/2013 Annual Report M80/106 for the period 24th July 2012 to 23rd July 2013 M 8000106

98620 CONFIDENTIAL 29/07/2013 07/2012 - 06/2013 Hill End Project Mineral Exploration Report C115/2009 Reporting Period: 1 July 2012 to 30 June 2013 Tenements: M24/78, M24/876

M 2400078

M 2400876

98622 CONFIDENTIAL 29/07/2013 05/2012 - 05/2013 Mount Edith Project M08/455 Annual Report for the period 30/05/2012 to 29/05/2013

M 0800455

Printed: 18/02/2019 02:28:38 PMPage 333 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 334: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

ROUND OAK JAGUAR PTY LTD

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

METALS AUSTRALIA LTDKIMBERLY RESOURCES LTDYNEMA MARTEN HENDRICK

STRATEGIC PROJECTS MINING PTY LTD

STRATEGIC PROJECTS MINING PTY LTD

REGIONAL RESOURCES NW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 334 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 335: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98624 CONFIDENTIAL 29/07/2013 05/2012 - 05/2013 Annual Report on Exploration for the Period Ended 15 May 2013, Mortimer Hills E 09/1618, Gascoyne, Western Australia

E 0901618

98634 CONFIDENTIAL 30/07/2013 07/2012 - 06/2013 Annual Report for the period 1 July 2012 to 30 June 2013, Port Gregory Project, M70/203, 204, 259, 856, 926, 927, 968, P70/1371, 1372

M 7000203

M 7000204

M 7000259

M 7000856

M 7000926

M 7000927

M 7000968

P 7001371

P 7001372

98636 CONFIDENTIAL 30/07/2013 06/2012 - 05/2013 Combined Annual Report (C64-2011) for the period 1 June 2012 to 31 May 2013 Busselton ProjectTenements: M70/0458, M70/0459, M70/0460, M70/0461, M70/0641, M70/0796, E70/2573, E70/2650, E70/2976, E70/2977

E 7002573

E 7002650

M 7000458

M 7000459

M 7000641

98638 CONFIDENTIAL 30/07/2013 06/2012 - 06/2013 Tambina Project 2013 Annual Report For the period 4th June 2012 to 3rd June 2013 Combined Reporting Group C239/2011 M45/988, M45/990, M45/991, P45/2812

M 4500988

M 4500990

M 4500991

98645 CONFIDENTIAL 30/07/2013 04/2012 - 04/2013 Wonmunna Project M47/1423-I Annual Report for the period 29/04/2013 M 4701423

98646 CONFIDENTIAL 30/07/2013 04/2012 - 04/2013 Wonmunna Project M47/1424-I Annual Report for the period ended 29 April 2013

M 4701424

98647 CONFIDENTIAL 30/07/2013 04/2012 - 04/2013 M47/1425 Annual Report for the period ended 29 april 2013 M 4701425

98650 CONFIDENTIAL 30/07/2013 06/2012 - 06/2013 Annual report for the period 16/06/2012 to 15/06/2013, Yannarie Solar Project C134/2004, E08/1395, E08/1396, E08/1399, E08/1421

E 0801395

E 0801396

E 0801399

E 0801421

98653 CONFIDENTIAL 31/07/2013 06/2012 - 05/2013 North Dandalup Project M70/0803, R70/0039 Combined annual report (C63-2011) for the period 1 June 2012 to 31 May 2013

M 7000803

R 7000039

Printed: 18/02/2019 02:28:38 PMPage 335 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 336: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ZEUS RESOURCES LIMITEDARROW MINERALS LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

GARNET INTERNATIONAL RESOURCES PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

TAMBINA GOLD PTY LTD

TAMBINA GOLD PTY LTD

TAMBINA GOLD PTY LTD

WONMUNNA IRON ORE PTY LTD

WONMUNNA IRON ORE PTY LTD

WONMUNNA IRON ORE PTY LTD

K PLUS S SALT AUSTRALIA PTY LTD

K PLUS S SALT AUSTRALIA PTY LTD

K PLUS S SALT AUSTRALIA PTY LTD

K PLUS S SALT AUSTRALIA PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 336 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 337: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98659 CONFIDENTIAL 31/07/2013 05/2012 - 05/2013 Thaduna Project E52/1673, E52/1674, E52/1858, E52/2356, E52/2357 & E52/2405 Annual Report covering the report period 12 May 2012 to 11 May 2013

E 5201673

E 5201674

E 5201858

E 5202356

E 5202357

E 5202405

98660 CONFIDENTIAL 31/07/2013 04/2012 - 04/2013 Gum Creek East Project Combined Annual Mineral Exploration Report C287/2011 (P51/2572, E53/1398, E53/1495) for the period 7th April 2012 to 6th APril 2013

E 5301398

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

E 2000189

E 2000440

E 5100259

E 5100348

E 5100615

E 5100814

M 2000012

M 2000045

M 2000068

M 2000069

M 2000070

M 2000071

M 2000073

M 2000077

M 2000107

M 2000212

M 2000214

M 2000219

M 2000249

M 2000309

M 2000420

M 2000421

Printed: 18/02/2019 02:28:38 PMPage 337 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 338: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

SANDFIRE RESOURCES NL

ERIKSSON ARNE OLAVIWARREN PHILLIP WINTON

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 338 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 339: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

M 2000443

M 2000444

M 2000496

M 5100006

M 5100012

M 5100027

M 5100028

M 5100031

M 5100033

M 5100035

M 5100039

M 5100051

M 5100053

M 5100062

M 5100075

M 5100079

M 5100091

M 5100092

M 5100096

M 5100132

M 5100161

M 5100180

M 5100187

M 5100190

M 5100199

M 5100200

M 5100203

M 5100209

M 5100211

M 5100233

M 5100235

M 5100236

Printed: 18/02/2019 02:28:38 PMPage 339 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 340: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

AURIS EXPLORATION PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 340 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 341: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

M 5100237

M 5100254

M 5100256

M 5100257

M 5100280

M 5100281

M 5100320

M 5100321

M 5100325

M 5100334

M 5100374

M 5100381

M 5100385

M 5100386

M 5100393

M 5100409

M 5100418

M 5100419

M 5100427

M 5100433

M 5100437

M 5100438

M 5100439

M 5100440

M 5100441

M 5100445

M 5100446

M 5100447

M 5100459

M 5100471

M 5100472

M 5100477

Printed: 18/02/2019 02:28:38 PMPage 341 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 342: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 342 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 343: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

M 5100482

M 5100484

M 5100485

M 5100486

M 5100487

M 5100488

M 5100489

M 5100490

M 5100491

M 5100492

M 5100493

M 5100494

M 5100495

M 5100496

M 5100500

M 5100501

M 5100502

M 5100503

M 5100504

M 5100516

M 5100521

M 5100523

M 5100524

M 5100525

M 5100526

M 5100528

M 5100539

M 5100557

M 5100560

M 5100561

M 5100568

M 5100569

Printed: 18/02/2019 02:28:38 PMPage 343 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 344: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 344 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 345: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

M 5100570

M 5100571

M 5100573

M 5100575

M 5100576

M 5100581

M 5100582

M 5100584

M 5100586

M 5100587

M 5100605

M 5100611

M 5100613

M 5100628

M 5100637

M 5100640

M 5100643

M 5100644

M 5100645

M 5100649

M 5100674

M 5100675

M 5100677

M 5100678

M 5100679

M 5100680

M 5100688

M 5100718

M 5100737

M 5100738

M 5100740

M 5100746

Printed: 18/02/2019 02:28:38 PMPage 345 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 346: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 346 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 347: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

M 5100757

M 5100762

M 5100780

M 5100782

M 5100783

M 5100784

M 5100793

M 5100794

M 5100795

M 5100803

M 5100805

M 5100811

M 5100819

M 5100820

M 5100871

P 5101581

P 5101582

P 5101583

P 5101605

P 5101606

P 5101607

P 5101628

P 5101637

P 5101638

P 5101639

P 5101640

P 5101641

P 5101642

P 5101646

P 5101647

P 5101648

P 5101649

Printed: 18/02/2019 02:28:38 PMPage 347 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 348: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 348 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 349: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

P 5101650

P 5101656

P 5101657

P 5101658

P 5101717

P 5101718

P 5101719

P 5101720

P 5101721

P 5101723

P 5101732

P 5101750

P 5101755

P 5101760

P 5101764

P 5101788

P 5101789

P 5101801

P 5101808

P 5101809

P 5101818

P 5101820

P 5101836

P 5101859

P 5101860

P 5101861

P 5101862

P 5101863

P 5101865

P 5101867

P 5101869

P 5101871

Printed: 18/02/2019 02:28:38 PMPage 349 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 350: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 350 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 351: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

P 5101875

P 5101876

P 5101878

P 5101879

P 5101880

P 5101881

P 5101882

P 5101883

P 5101884

P 5101885

P 5101886

P 5101887

P 5101888

P 5101889

P 5101890

P 5101891

P 5101892

P 5101893

P 5101894

P 5101903

P 5101904

P 5101907

P 5101908

P 5101909

P 5101910

P 5101925

P 5101987

P 5101990

P 5101991

P 5101992

P 5102036

P 5102056

Printed: 18/02/2019 02:28:38 PMPage 351 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 352: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 352 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 353: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98670 CONFIDENTIAL 31/07/2013 04/2012 - 03/2013 Annual Mineral Exploration Report C44/2006 for the period 1stApril 2012 to 31st March 2013, E 20/189.........P 51/2327

P 5102057

P 5102058

P 5102059

P 5102061

P 5102062

P 5102081

P 5102082

P 5102185

P 5102186

P 5102189

P 5102326

P 5102327

98672 CONFIDENTIAL 01/08/2013 06/2012 - 06/2013 Mount Fisher Project Annual Mineral Exploration Report M53/127 6th June 2012 to 5th June 2013

M 5300127

98673 CONFIDENTIAL 01/08/2013 06/2012 - 06/2013 Shovelanna Project Area Combined Annual Technical Report Mining Leases 46/437, 46/438, 46/439 & 46/440 (C140/2010) for the period 30 June 2012 - 29 June 2013

M 4600437

M 4600438

M 4600439

M 4600440

98676 CONFIDENTIAL 01/08/2013 04/2012 - 04/2013 Mayday North Project M27/140 and M27/145 Annual Report 28/04/2012–27/04/2013 (C340/1996)

M 2700140

M 2700145

98678 CONFIDENTIAL 01/08/2013 05/2012 - 05/2013 Annual report for the period 6 May 2012 to 5 May 2013, Munni Munni Project, M47/123-126 & M47/141-144

M 4700123

M 4700124

M 4700125

M 4700126

98682 CONFIDENTIAL 01/08/2013 05/2012 - 05/2013 Cardinia/ Mertondale Project C284/1992 Annual Technical Report for the period 2 May 2012 to 1 May 2013

M 3700081

M 3700082

M 3700086

M 3700088

Printed: 18/02/2019 02:28:38 PMPage 353 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 354: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

MERCATOR GOLD AUSTRALIA PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

GMK EXPLORATION PTY LTD

HELIOS GOLD LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

STRATEGIC PROJECTS MINING PTY LTD

STRATEGIC PROJECTS MINING PTY LTD

PLATINA RESOURCES LTD

PLATINA RESOURCES LTD

PLATINA RESOURCES LTD

PLATINA RESOURCES LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 354 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 355: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98682 CONFIDENTIAL 01/08/2013 05/2012 - 05/2013 Cardinia/ Mertondale Project C284/1992 Annual Technical Report for the period 2 May 2012 to 1 May 2013

M 3700223

M 3700227

M 3700231

M 3700232

M 3700233

M 3700277

M 3700299

M 3700300

M 3700316

M 3700317

M 3700422

M 3700428

M 3700487

M 3700594

M 3700646

M 3700720

M 3701284

P 3707264

P 3707274

P 3707275

P 3707276

P 3707756

P 3707757

P 3707758

P 3707759

P 3707760

P 3707761

P 3707805

P 3707891

Printed: 18/02/2019 02:28:38 PMPage 355 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 356: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NIKOLAENKO VLADIMIRJINDALEE RESOURCES LIMITEDNAVIGATOR MINING PTY LTD

NIKOLAENKO VLADIMIRJINDALEE RESOURCES LIMITEDNAVIGATOR MINING PTY LTD

NIKOLAENKO VLADIMIRJINDALEE RESOURCES LIMITEDNAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 356 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 357: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98682 CONFIDENTIAL 01/08/2013 05/2012 - 05/2013 Cardinia/ Mertondale Project C284/1992 Annual Technical Report for the period 2 May 2012 to 1 May 2013

P 3707892

P 3707893

P 3707953

P 3707954

P 3707969

P 3707970

P 3707971

P 3707972

P 3707973

P 3707974

P 3707975

P 3707976

P 3707977

P 3707978

P 3707979

P 3708007

P 3708196

P 3708199

P 3708209

P 3708210

98685 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project P39/5231 Annual Report for the period 27th August 2012 – 26th August 2013

P 3905231

98686 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project 2013 Annual Report for P39/5232 Rewpoer period 27th August 2012 – 26th August 2013

P 3905232

98687 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project P39/5234 Annual Report for the period 27 August 2012 to 26/08/2013

P 3905234

98688 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project P39/5235 Annual Report for the period 27th August 2012 – 26th August 2013

P 3905235

98689 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project P39/5236 Annual Report for the period 27th August 2012 – 26th August 2013

P 3905236

98690 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 Murrin Murrin Project P39/5237 Annual Report for the period 27th August 2012 – 26th August 2013

P 3905237

98695 CONFIDENTIAL 01/08/2013 08/2012 - 08/2013 2013 Annual Report for P39/5238 for the period 27th August 2012 – 26th August 2013

P 3905238

98696 CONFIDENTIAL 01/08/2013 09/2012 - 09/2013 2013 Annual Report for P39/5233 for the period 27th August 2012 – 26th August 2013

P 3905233

Printed: 18/02/2019 02:28:38 PMPage 357 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 358: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

KUMARINA RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 358 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 359: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98701 CONFIDENTIAL 01/08/2013 09/2003 - 05/2013 Tropicana Group West Project, Final Surrender Report for the period 17/09/2003 to 31/05/2013, E39/949. [C50/2012]

E 3900949

98715 CONFIDENTIAL 31/07/2013 08/2012 - 07/2013 Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/744, E29/749, E29/750, E29/754, E29/761, E29/764, E29/790 & P29/2064

E 2900790

98716 CONFIDENTIAL 31/07/2013 03/2012 - 03/2013 Annual Report for the period 30 March 2012 to 29 March 2013, Windanya Project, Combined Reporting Group C164/2010 P24/4432, P24/4433, P24/4450, P24/4463 and P24/4464

P 2404450

98720 CONFIDENTIAL 02/08/2013 07/2012 - 06/2013 Leisker Project E47/1329 Annual Report for the Period 1 July 2012 to 30 June 2013

E 4701329

98721 CONFIDENTIAL 02/08/2013 05/2012 - 05/2013 Ravensthorpe Nickel Operation 2012/13 Annual Report for the period 07/05/12 to 06/05/13, C61/1999, E74/307, E74/340, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/145, M74/167 - M74/175, M74/179, M74/187, M74/203, M74/220, M74/235 - M74/237, P74/242, P74/243, P74/335

M 7400108

M 7400114

M 7400115

M 7400116

M 7400123

M 7400124

M 7400125

M 7400142

M 7400143

M 7400144

M 7400145

M 7400167

M 7400168

M 7400169

M 7400170

M 7400171

M 7400172

M 7400173

M 7400174

M 7400175

M 7400187

M 7400203

M 7400220

Printed: 18/02/2019 02:28:38 PMPage 359 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 360: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

INDEPENDENCE GROUP NL

MGK RESOURCES PTY LTD

ROCKLAND PTY LTD (ATF LB TRUST)

HAMERSLEY IRON PTY LIMITED

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 360 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 361: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98721 CONFIDENTIAL 02/08/2013 05/2012 - 05/2013 Ravensthorpe Nickel Operation 2012/13 Annual Report for the period 07/05/12 to 06/05/13, C61/1999, E74/307, E74/340, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/145, M74/167 - M74/175, M74/179, M74/187, M74/203, M74/220, M74/235 - M74/237, P74/242, P74/243, P74/335

M 7400235

M 7400236

M 7400237

98725 CONFIDENTIAL 02/08/2013 07/2012 - 07/2013 Annual Technical Report 02/07/2012 to 01/07/2013 : WA Eucla Basin Project (C149/2008) E69/1920 – Wanna Lakes E69/2408 – Wanna East E69/2425 – Wanna South E69/2427 – Marble Gum E69/2428 – Jungooner

E 6901920

98726 CONFIDENTIAL 02/08/2013 03/2012 - 03/2013 Annual Report for the period 9 March 2012 to 8 March 2013, Majestic North Project, Combined Reporting Group C295/2011, P25/2161 – P25/2169

P 2502161

P 2502162

P 2502163

P 2502164

P 2502165

P 2502166

P 2502167

P 2502168

P 2502169

98733 CONFIDENTIAL 05/08/2013 05/2012 - 05/2013 Annual Report on Exploration for the Period Ended 08 May 2013, E28/2097, Great Victoria Desert, North East Coolgardie, Western Australia.

E 2802097

98734 CONFIDENTIAL 05/08/2013 06/2012 - 06/2013 Annual Exploration Report E38/2361 for the period 07/06/2012 – 06/06/2013 E 3802361

98735 CONFIDENTIAL 05/08/2013 07/2012 - 07/2013 Annual Report (10.07.2012 - 09.07.2013) Onslow Dune Sand Resources Project Mining Lease M08/488 Exploration Report

M 0800488

98737 CONFIDENTIAL 05/08/2013 06/2012 - 05/2013 Mt Stirling P37/7949 Annual Report 2013 for the Period 1st June 2012 to 31st May 2013

P 3707949

98741 CONFIDENTIAL 05/08/2013 06/2012 - 06/2013 Annual Mineral Exploration Final Report for the year ended 10 June 2013. Irwin River Coal Project, Exploration Licence 70/3177

E 7003177

98742 CONFIDENTIAL 02/08/2013 06/2012 - 06/2013 Mining Lease 80/615 Turner River Gemstone Project Annual Report for the period 12 June 2012 - 11 June 2013

M 8000615

98743 CONFIDENTIAL 02/08/2013 07/2012 - 06/2013 Tuckabianna East E20/741 - I Annual Report to the Department of Mines and Petroleum, Western Australia Reporting Period 01/07/2012 - 31/06/2013

E 2000741

98745 CONFIDENTIAL 02/08/2013 06/2012 - 06/2013 The Mount Project – C37/2002 For the Period June 22nd, 2012 to June 21st, 2013, M15/30, M15/1423, M15/1431, P15/4906, P15/4907, P15/5495, P15/5500, P15/5501

M 1500030

M 1501423

M 1501431

Printed: 18/02/2019 02:28:38 PMPage 361 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 362: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

FQM AUSTRALIA NICKEL PTY LTD

LOST SANDS PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

FORTIFY MINING PTY LTD

ZEUS RESOURCES LIMITED

STONE RESOURCES AUSTRALIA LIMITED

YARRI MINING PTY LTD

MCKNIGHT RUSSELL GEOFFREYBIGGS GLEN NEILWILLIAMS THOMAS GEOFFREYCREW ROSS FREDERICK

AP MINING PTY LTD

ZHANG HUA

MORAWA MICHAEL

LUKAH MINING PTY LTD

LUKAH MINING PTY LTD

LUKAH MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 362 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 363: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98745 CONFIDENTIAL 02/08/2013 06/2012 - 06/2013 The Mount Project – C37/2002 For the Period June 22nd, 2012 to June 21st, 2013, M15/30, M15/1423, M15/1431, P15/4906, P15/4907, P15/5495, P15/5500, P15/5501

P 1504906

P 1504907

P 1505500

P 1505501

98746 CONFIDENTIAL 02/08/2013 05/2012 - 04/2013 Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2012 to 30 April 2013, E25/208....... P25/2120

M 2500350

P 2501899

P 2501900

P 2501901

P 2501902

P 2501903

P 2501904

P 2501905

P 2501906

P 2501907

P 2501908

P 2501909

P 2501911

P 2502120

98747 CONFIDENTIAL 02/08/2013 05/2012 - 04/2013 Combined Annual Report on Greater Randalls Project – C109/2001 for period 1 May 2012 to 30 April 2013, E25/162, 203, 336, 343, 344, 364, 427, M25/71, 125, 133, 236, 307, 347, P25/1865, 1919, 1922,P25/1970, P25/1971, P25/1972, P25/1973, P25/1974, P25/1975, P25/1976,P25/1977, P25/2060, P25/2107, P25/2114

E 2500162

E 2500344

M 2500071

M 2500125

M 2500133

M 2500236

M 2500307

M 2500347

P 2501922

Printed: 18/02/2019 02:28:38 PMPage 363 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 364: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

LUKAH MINING PTY LTD

LUKAH MINING PTY LTD

LUKAH MINING PTY LTD

LUKAH MINING PTY LTD

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 364 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 365: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98748 CONFIDENTIAL 02/08/2013 05/2012 - 05/2013 Annual Report Koolan Island Project E04/1266-I, M 04/416-I, M 04/417-I and introducing E04/1407-IWest Kimberley District WA For the period 29th May 2012 to 28th May 2013 Combined reporting No. 105/2004

E 0401266

M 0400416

M 0400417

98749 CONFIDENTIAL 02/08/2013 06/2012 - 05/2013 Kanowna Belle Project, Annual Report for the period 01/06/2012 to 31/05/2013, M27/18.........M27/438; P27/1126...........P27/1887. [C224/2007]

M 2700018

M 2700022

M 2700023

M 2700037

M 2700041

M 2700047

M 2700049

M 2700053

M 2700057

M 2700059

M 2700063

M 2700072

M 2700073

M 2700092

M 2700103

M 2700114

M 2700122

M 2700123

M 2700127

M 2700128

Printed: 18/02/2019 02:28:38 PMPage 365 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 366: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KOOLAN IRON ORE PTY LTD

KOOLAN IRON ORE PTY LTD

KOOLAN IRON ORE PTY LTD

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDPERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 366 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 367: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98749 CONFIDENTIAL 02/08/2013 06/2012 - 05/2013 Kanowna Belle Project, Annual Report for the period 01/06/2012 to 31/05/2013, M27/18.........M27/438; P27/1126...........P27/1887. [C224/2007]

M 2700133

M 2700157

M 2700159

M 2700164

M 2700175

M 2700181

M 2700182

M 2700191

M 2700196

M 2700197

M 2700198

M 2700228

M 2700232

M 2700245

M 2700272

M 2700287

M 2700378

M 2700406

M 2700414

M 2700415

M 2700420

M 2700438

P 2701126

P 2701127

P 2701128

P 2701132

P 2701133

P 2701134

Printed: 18/02/2019 02:28:38 PMPage 367 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 368: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KANOWNA MINES PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

COVE MINING PTY LTDNORTHERN STAR (SOUTH KALGOORLIE) PTY LTDPERILYA LIMITEDNORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTD

NORTHERN STAR (KANOWNA) PTY LIMITED

NORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITEDROBERTSON RESOURCES PTY LTD

NORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES PTY LIMITED

KANOWNA MINES LTD (ACN 053 530 037)

KANOWNA MINES LTD (ACN 053 530 037)

KANOWNA MINES LTD (ACN 053 530 037)

KANOWNA MINES LTD (ACN 053 530 037)

KANOWNA MINES LTD (ACN 053 530 037)

KANOWNA MINES LTD (ACN 053 530 037)

Printed: 18/02/2019 02:28:38 PMPage 368 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 369: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98749 CONFIDENTIAL 02/08/2013 06/2012 - 05/2013 Kanowna Belle Project, Annual Report for the period 01/06/2012 to 31/05/2013, M27/18.........M27/438; P27/1126...........P27/1887. [C224/2007]

P 2701336

P 2701826

P 2701827

P 2701828

P 2701829

P 2701830

P 2701831

P 2701832

P 2701833

P 2701834

P 2701835

P 2701836

P 2701837

P 2701838

P 2701839

P 2701840

P 2701841

P 2701842

P 2701847

98761 CONFIDENTIAL 06/08/2013 06/2012 - 06/2013 Marymia Project, Annual Report for the peiod 16th June 2012 to 15th June 2013, E52/2394 & 2395. [C144/2010]

E 5202394

Printed: 18/02/2019 02:28:38 PMPage 369 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 370: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KANOWNA MINES LTD (ACN 053 530 037)

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

PERILYA LTDCOVE MINING PTY LTDNORTHERN STAR (KANOWNA) PTY LIMITED

COVE MINING PTY LTDPERILYA LTDNORTHERN STAR (KANOWNA) PTY LIMITED

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

COVE MINING PTY LTDPERILYA LTD

NORTHERN STAR (KANOWNA) PTY LIMITED

AUDAX MINERALS PTY LTDAUSTRALIAN MINES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 370 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 371: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98761 CONFIDENTIAL 06/08/2013 06/2012 - 06/2013 Marymia Project, Annual Report for the peiod 16th June 2012 to 15th June 2013, E52/2394 & 2395. [C144/2010]

E 5202395

98776 CONFIDENTIAL 09/08/2013 06/2012 - 05/2013 Annual Report Bidaminna Project Combined Reporting Group C46/2009 (E70/2825, E70/2844, E70/3086 E70/3298, E70/3359, E70/3411, E70/4245) North Perth Basin, Western Australia Reporting period 1 June 2012 to 31 May 2013

E 7002844

E 7003298

E 7003411

E 7004245

98797 CONFIDENTIAL 09/08/2013 07/2012 - 07/2013 Koodaideri South Project Area C335/2011 Annual Report for the Period 9 July 2012 to 8 July 2013 E47/1539, 47/1620, 47/1644, 47/1645, 47/1646, 47/1647, 47/1648 & 47/2655

E 4701539

E 4701620

E 4701644

E 4701648

E 4702655

98799 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Gidgi Project P26/3876 Annual Report for the period 13 June 2012 – 12 June 2013

P 2603876

98803 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Beatons Creek P46/1748 Annual Report for the period 11/6/2012 to 10/6/2013 P 4601748

98804 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Beatons Creek P46/1749 Annual Report for the period 11/6/2012 to 10/6/2013 P 4601749

98806 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Fraser Range North Project E28/2064 Annual Report for the period 13 June 2012– 12 June 2013

E 2802064

98807 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Fraser Range South Project E28/2065 Annual Report for the period 13 June 2012– 12 June 2013

E 2802065

98809 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2012 to 10 June 2013, Peak Hill Mineral Field, Western Australia

E 5202402

98811 CONFIDENTIAL 09/08/2013 06/2012 - 06/2013 Annual report for the period July 2012 to June 2013 Yalgoo Iron Ore Project, E59/1508-I

E 5901508

98815 CONFIDENTIAL 05/08/2013 06/2012 - 06/2013 Mt Stewart Project P37/8073 Annual Report 2013 Period 13th June 2012 to 12th June 2013

P 3708073

98816 CONFIDENTIAL 12/08/2013 06/2012 - 06/2013 Mt Keith Project M53/491 Annual Report 2013 Period 11th June 2012 to 10th June 2013

M 5300491

98817 CONFIDENTIAL 12/08/2013 06/2012 - 06/2013 Mt Keith Project M53/490 Annual Report 2013 Period 11th June 2012 to 10th June 2013

M 5300490

98819 CONFIDENTIAL 12/08/2013 06/2012 - 06/2013 Talga Peak Project E45/3679 Western Australia Annual Report for the period 12 June 2012 to 11 June 2013

E 4503679

98822 CONFIDENTIAL 02/08/2013 07/2012 - 09/2012 Integra Mining Magnetotelluric Survey 30/11/2012 E 2500055

E 2500162

E 2500344

Printed: 18/02/2019 02:28:38 PMPage 371 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 372: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AUDAX MINERALS PTY LTDAUSTRALIAN MINES LIMITED

IMAGE RESOURCES NL

MASLIN ANTHONY ROBERT FREDERICKIMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

BARRICK (AUSTRALIA PACIFIC) PTY LIMITED

GRANT'S HILL GOLD PTY LTD

GRANT'S HILL GOLD PTY LTD

GREAT SOUTHERN NICKEL PTY LTDNSZ RESOURCES PTY LTD

GREAT SOUTHERN NICKEL PTY LTD

THUNDELARRA LIMITEDRICHMOND WILLIAM ROBERT

VENUS METALS CORPORATION LIMITED

SULLIVAN EMMA

PHOTIOS MICHAEL JOHN

PHOTIOS MICHAEL JOHN

GREAT SANDY PTY LTD

INTEGRA MINING LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 372 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 373: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98822 CONFIDENTIAL 02/08/2013 07/2012 - 09/2012 Integra Mining Magnetotelluric Survey 30/11/2012 E 2500434

E 2600153

E 2600154

M 2500071

M 2500117

M 2500125

M 2500133

M 2500236

M 2500307

M 2500347

M 2500350

M 2600148

M 2600197

M 2600248

M 2600249

M 2600357

M 2600364

M 2600391

M 2600401

M 2600406

M 2600409

M 2600417

M 2600635

P 2501899

P 2501900

P 2501901

P 2501902

P 2501903

P 2501904

P 2501905

P 2501906

Printed: 18/02/2019 02:28:38 PMPage 373 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 374: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 374 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 375: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98822 CONFIDENTIAL 02/08/2013 07/2012 - 09/2012 Integra Mining Magnetotelluric Survey 30/11/2012 P 2501907

P 2501908

P 2501909

P 2501911

P 2501922

P 2502120

P 2603431

P 2603789

P 2603819

P 2603820

P 2603821

98828 CONFIDENTIAL 13/08/2013 07/2012 - 06/2013 Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38/961.........P38/4027.

E 3801954

E 3801955

E 3801956

E 3801957

E 3801995

E 3801997

E 3801999

E 3802003

E 3802004

E 3802243

E 3802723

M 3800114

M 3800237

M 3800250

Printed: 18/02/2019 02:28:38 PMPage 375 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 376: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

NEWCREST OPERATIONS LIMITEDINTEGRA MINING LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

RUBICON RESOURCES LIMITEDSILVER LAKE (INTEGRA) PTY LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

CREASY MARK GARETHLEGENDRE BRUCE ROBERTREGIS RESOURCES LIMITED

CREASY MARK GARETHDUKETON RESOURCES PTY LTD

DUKETON RESOURCES PTY LTD

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 376 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 377: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98828 CONFIDENTIAL 13/08/2013 07/2012 - 06/2013 Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38/961.........P38/4027.

M 3800262

M 3800292

M 3800319

M 3800341

M 3800343

M 3800344

M 3800407

M 3800413

M 3800414

M 3800415

M 3800488

M 3800600

M 3800601

M 3800630

M 3800802

M 3801247

P 3803577

P 3803928

P 3803949

P 3803950

P 3803953

P 3803954

P 3803996

P 3803997

P 3803998

P 3804027

Printed: 18/02/2019 02:28:38 PMPage 377 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 378: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

CREASY MARK GARETHDUKETON RESOURCES PTY LTD

CREASY MARK GARETHDUKETON RESOURCES PTY LTD

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

DUKETON RESOURCES PTY LTDREGIS RESOURCES LIMITED

CREASY MARK GARETHDUKETON RESOURCES PTY LTD

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

REGIS RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 378 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 379: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98837 CONFIDENTIAL 14/08/2013 04/2012 - 04/2013 Combined annual report for the Mount Holland Project, C349/2011 (E77/1773 & E77/1775–1777), Yilgarn Mineral Field, for the period 30 April 2011 to 29 April 2012.

E 7701773

E 7701775

98845 CONFIDENTIAL 15/08/2013 07/2012 - 07/2013 Mt Gordon Prospect E63/1264-I Annual Report For the period 6th June 2012 to 5th June 2013

E 6301264

98855 CONFIDENTIAL 15/08/2013 06/2012 - 06/2013 Exploration License – 37/801 Banjawarn Project Annual Technical Report For the Period 16th June 2012 to 15th June 2013

E 3700801

98870 CONFIDENTIAL 16/08/2013 07/2012 - 06/2013 Annual Report To the Department of Mines and Petroleum For the period 1 July 2012 to 30 June 2013Lake Johnston Project Combined Reporting Number C16/1997 M63/163, M63/282, M63/283, M63/284, M63/292-294, M63/302, M63/522-524 E63/585, E63/625, E63/1067, E63/1133, E63/1134,E63/1137-1141 P63/1524-1533, P63/1559-1561

E 6301067

E 6301133

E 6301134

M 6300163

M 6300282

M 6300283

M 6300284

M 6300292

M 6300293

M 6300294

M 6300522

M 6300523

M 6300524

P 6301528

P 6301529

P 6301530

P 6301531

P 6301532

P 6301533

98874 CONFIDENTIAL 19/08/2013 05/2012 - 05/2013 2012 Combined Anuual Report For the Period 14 May 2012 to the 13 May 2013, M53/1093 Flushing Meadows Ironstone Well Project – C139/2008

M 5301093

98875 CONFIDENTIAL 19/08/2013 06/2012 - 06/2013 Mt Stirling Well P37/7172 Annual Report 2013 Period 20th June 2012 to 19th June 2013

P 3707172

98882 CONFIDENTIAL 19/08/2013 06/2012 - 06/2013 Wonganoo Project E 53/1611 Annual Report for the period 22nd June 2012 to 21st June 2013

E 5301611

Printed: 18/02/2019 02:28:38 PMPage 379 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 380: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MH GOLD PTY LTD

MH GOLD PTY LTD

WHITE CLIFF MINERALS LIMITED

BULLSEYE MINING LIMITED

POSEIDON NICKEL LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

AUDALIA RESOURCES LIMITED

YANDAL RESOURCES LIMITED

DIXON TREVOR JOHNSCARFE ROBERT WILLIAM

BULLSEYE MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 380 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 381: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98888 CONFIDENTIAL 20/08/2013 06/2012 - 06/2013 Annual report for the period 24/06/2012 to 23/06/2013, Bottle Creek Project, M 29\150 & M 29\151

M 2900150

M 2900151

98890 CONFIDENTIAL 20/08/2013 07/2012 - 07/2013 Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/1685, E08/1686, E08/1824, E08/1825, E08/1826, P08/529 & P08/530 (C132/2009)

E 0801060

E 0801684

E 0801685

E 0801686

E 0801824

E 0801825

E 0801826

98892 CONFIDENTIAL 20/08/2013 07/2012 - 06/2013 Annual Report for the Cue Project, C215/2011 (P20/2138-P20/2151) for the Period Ending 30th June, 2013

P 2002138

P 2002139

P 2002140

P 2002141

P 2002142

P 2002143

P 2002144

P 2002145

P 2002146

P 2002151

98896 CONFIDENTIAL 20/08/2013 07/2012 - 06/2013 Annual Report M80/179 – 80/183 (C26/1992) 1st July 2012 to 30th June 2013 Savannah Nickel Project

M 8000179

M 8000180

M 8000181

M 8000182

M 8000183

98897 CONFIDENTIAL 20/08/2013 08/2012 - 08/2013 Fisher Well Project - Annual Exploration Report on Exploration Licence 38/2376 for the period 3 August 2012 to 2 August 2013

E 3802376

98903 CONFIDENTIAL 21/08/2013 07/2012 - 07/2013 E45/3655 Fieldings Ridge Annual Report for the period 4 July 2012 to 3 July 2013

E 4503655

Printed: 18/02/2019 02:28:38 PMPage 381 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 382: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

LEHMANN RODNEY SCOTT

LEHMANN RODNEY SCOTT

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

ZANTHUS RESOURCES PTY LTDZANF PTY LTD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

BURNELL RYAN EDWARD

SAVANNAH NICKEL MINES PTY LTD

SAVANNAH NICKEL MINES PTY LTD

SAVANNAH NICKEL MINES PTY LTD

SAVANNAH NICKEL MINES PTY LTD

SAVANNAH NICKEL MINES PTY LTD

RICHMOND WILLIAM ROBERT

HAOMA MINING NL

Printed: 18/02/2019 02:28:38 PMPage 382 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 383: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98911 CONFIDENTIAL 21/08/2013 05/2012 - 05/2013 Annual Report Dongardoo Well Project E52/1830 Reporting Period 22"d May 2012 to 21'1 May 2013

E 5201830

98912 CONFIDENTIAL 21/08/2013 06/2012 - 06/2013 Combined Annual Report Area C / South E47/1432, E47/1767, E47/2500. Period 24 June 2012 – 23 June 2013

E 4701432

E 4701767

E 4702500

98913 CONFIDENTIAL 21/08/2013 06/2012 - 06/2013 Callawa Project Combined Annual Report E45/1072, M45/1015, M45/1016, M45/1017, M45/1018 & M45/1019 Reporting Period 14th June 2012 – 13th June 2013

E 4501072

M 4501015

M 4501016

M 4501017

M 4501018

M 4501019

98914 CONFIDENTIAL 21/08/2013 06/2012 - 06/2013 Annual Report – Upper Marillana Project Area E47/1222 Reporting Period 11 June 2012 – 10 June 2013

E 4701222

98917 CONFIDENTIAL 21/08/2013 08/2012 - 08/2013 Weld Range Project C218/2008 Annual Report to the Department of Mines and Petroleum for the Period Ending 6 August 2013, E51/916-I E51/933-I E20/649 & M20/118-I

E 5100933

M 2000118

Printed: 18/02/2019 02:28:38 PMPage 383 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 384: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

GIRALIA RESOURCES PTY LTD

PROMETHEUS MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 384 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 385: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98920 CONFIDENTIAL 21/08/2013 07/2012 - 07/2013 Annual Report on the Albion Downs South for the period 8 July 2012 to 7 July 2013, C36/2005, E53/1167, M53/238 - 242

E 5301167

M 5300238

M 5300239

M 5300240

M 5300241

M 5300242

98923 CONFIDENTIAL 21/08/2013 07/2012 - 07/2013 Mount Alexander Project E08/2139 Annual Report for the period 5 July 2012 to 4 July 2013

E 0802139

98924 CONFIDENTIAL 21/08/2013 07/2012 - 06/2013 Mining Leases 77/381, 77/382, 77/383, 77/971, 77/1079 Koolyanobbing Project (C65/2008) Annual Report for the period 1st July 2012 to 30th June 2013

M 7700381

M 7700382

M 7700383

M 7700971

M 7701079

98928 CONFIDENTIAL 22/08/2013 07/2012 - 06/2013 Kalgoorlie West 2 Project (C180/2009) Annual Technical Report for Period 1/7/2012 to 30/6/2013, E16/359...... P16/4039

E 1600359

E 1600360

E 1600364

E 1600371

P 1602540

P 1602542

P 1602543

P 1602544

P 1602687

P 1602688

98945 CONFIDENTIAL 22/08/2013 05/2012 - 05/2013 Annual report for the Kalpini Project, E27/438, North East Coolgardie Mineral Field, for the period 18 May 2012 to 17 May 2013

E 2700438

98963 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Yarri South Project, Annual Report for the period 15th July 2012 to 14th July 2013, E31/859.

E 3100859

98966 CONFIDENTIAL 26/08/2013 05/2012 - 05/2013 Londonderry Project, Annual Report for the period 25th May 2012 to 24th May 2013, M15/1362.

M 1501362

98967 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Nimbus Project Prospecting Licence 25/2192 Annual Technical Report for the Period 5 July 2012 to 4 July 2013

P 2502192

98968 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Nimbus Project Prospecting Licence 25/2193 Annual Technical Report for the Period 5 July 2012 to 4 July 2013

P 2502193

Printed: 18/02/2019 02:28:38 PMPage 385 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 386: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

MPI NICKEL PTY LTD

SM3-W PTY LTD

WA SALT KOOLYANOBBING PTY LTD

WA SALT KOOLYANOBBING PTY LTD

WA SALT KOOLYANOBBING PTY LTD

WA SALT KOOLYANOBBING PTY LTD

WA SALT KOOLYANOBBING PTY LTD

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

EVOLUTION MINING (PHOENIX) PTY LIMITED

PIONEER RESOURCES LIMITEDNORTHERN STAR RESOURCES LTD

GLOBAL FORTUNE INVESTMENT LIMITED

ARM MINING PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 386 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 387: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

98969 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Nimbus Project Prospecting Licence 25/2194 Annual Technical Report for the Period 5 July 2012 to 4 July 2013

P 2502194

98970 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Nimbus Project Prospecting Licence 25/2195 Annual Technical Report for the Period 5 July 2012 to 4 July 2013

P 2502195

98971 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Nimbus Project Prospecting Licence 25/2196 Annual Technical Report for the Period 5 July 2012 to 4 July 2013

P 2502196

98985 CONFIDENTIAL 26/08/2013 07/2012 - 07/2013 Cutters Ridge Project Annual Report to the Department of Mines and Petroleum for the period 28/07/2012 TO 27/07/2013 Cutters Ridge Project M15/692 & P15/4863-6 (C6/2009)

M 1500692

P 1504863

P 1504864

P 1504865

P 1504866

98986 CONFIDENTIAL 27/08/2013 05/2012 - 05/2013 Annual Report Red Gully Project Combined Reporting Group C151/2011 (M70/1192, E70/3720, E70/3966, E70/4077) North Perth Basin, Western Australia Reporting period 20 May 2012 to 19 May 2013

E 7003720

E 7004077

M 7001192

98987 CONFIDENTIAL 28/08/2013 07/2012 - 06/2013 E 63/1041 & P63/1693 Mount Thirsty Annual Technical Report for the Period 1/07/12 to 30/06/13 Combined Report No: C122/2001

E 6301041

98989 CONFIDENTIAL 28/08/2013 06/2012 - 06/2013 Annual report for the period 18 June 2012 to 17 June 2013, Horseshoe South, E52/2569

E 5202569

98992 CONFIDENTIAL 28/08/2013 08/2012 - 08/2013 Bardoc Project P24/4443 Annual Report for the period 09/08/2012 to 08/08/2013

P 2404443

98994 CONFIDENTIAL 28/08/2013 05/2012 - 05/2013 Annual report for the period 18th May 2012 to 17th May 2013, E47/1349 Mount Pyton

E 4701349

98997 CONFIDENTIAL 28/08/2013 06/2012 - 05/2013 Neds Creek Project 2013 Combined Annual Report C191/2012 [for the period 1 June 2012 – 31 May 2013, E51/1320, E51/1321, E51/1330, E51/1333, E51/1355]

E 5101330

99000 CONFIDENTIAL 28/08/2013 05/2012 - 05/2013 Cosmos Nickel Project C34/2000 Annual Report for the Period 26th May 2012 to 25th May 2013, E36/535 ............. M36/659-660

E 3600535

M 3600024

M 3600025

M 3600127

M 3600162

M 3600176

M 3600180

Printed: 18/02/2019 02:28:38 PMPage 387 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 388: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTDHAYES MINING PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTDHAYES MINING PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTDHAYES MINING PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTDHAYES MINING PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTDHAYES MINING PTY LTD

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

NORSEMAN RESOURCES PTY LTD

HARDEY RESOURCES LIMITED

GPM RESOURCES PTY LTD

FMG PILBARA PTY LTD

GREAT WESTERN EXPLORATION LIMITED

GOLDEN SPUR RESOURCES PTY LTD

GOLDEN SPUR RESOURCES PTY LTD

GOLDEN SPUR RESOURCES PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

GIARD PTY LTD

GIARD PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 388 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 389: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99000 CONFIDENTIAL 28/08/2013 05/2012 - 05/2013 Cosmos Nickel Project C34/2000 Annual Report for the Period 26th May 2012 to 25th May 2013, E36/535 ............. M36/659-660

M 3600264

M 3600265

M 3600266

M 3600299

M 3600302

M 3600303

M 3600305

M 3600328

M 3600329

M 3600330

M 3600332

M 3600342

M 3600349

M 3600365

M 3600371

M 3600375

M 3600376

M 3600377

M 3600441

M 3600459

M 3600460

M 3600467

M 3600603

M 3600632

M 3600633

M 3600659

M 3600660

99003 CONFIDENTIAL 28/08/2013 07/2012 - 07/2013 Annual Technical Report for Mt Samson East E47/1789 for the period 28 July 2012 – 27 July 2013

E 4701789

99004 CONFIDENTIAL 28/08/2013 07/2012 - 07/2013 Western Creek Project C179/2007Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 6 July 2013, E 47/2032-I........P52/1260-I

E 5201483

Printed: 18/02/2019 02:28:38 PMPage 389 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 390: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

LRL (AUST) PTY LTD

LRL (AUST) PTY LTD

GIARD PTY LTD

GOLDEN SPUR RESOURCES PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

ALKANE RESOURCES LTDAUSTRALIAN NICKEL INVESTMENTS PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

GIARD PTY LTD

ALKANE RESOURCES LTDAUSTRALIAN NICKEL INVESTMENTS PTY LTD

ALKANE RESOURCES LTDAUSTRALIAN NICKEL INVESTMENTS PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

GIARD PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

RAMELIUS RESOURCES LIMITED

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

RAMELIUS RESOURCES LIMITED

RAMELIUS RESOURCES LIMITED

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

RAMELIUS RESOURCES LIMITED

LRL (AUST) PTY LTD

LRL (AUST) PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

GIARD PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

AUSTRALIAN NICKEL INVESTMENTS PTY LTD

GIARD PTY LTD

HAMERSLEY IRON PTY LIMITED

GIRALIA RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 390 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 391: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99004 CONFIDENTIAL 28/08/2013 07/2012 - 07/2013 Western Creek Project C179/2007Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 6 July 2013, E 47/2032-I........P52/1260-I

E 5201604

E 5201912

E 5202160

E 5202300

99008 CONFIDENTIAL 28/08/2013 07/2012 - 06/2013 Lawlers Gold Project Annual Report for the period 1 July 2012 – 30 June 2013, M36/28.....P36/1545 (C14/2003)

M 3600028

M 3600091

M 3600171

M 3600172

M 3600174

M 3600208

M 3600273

M 3600274

M 3600275

M 3600276

M 3600277

M 3600278

M 3600293

M 3600313

M 3600314

M 3600366

M 3600367

M 3600368

M 3600369

M 3600380

M 3600381

M 3600382

M 3600383

M 3600384

M 3600391

M 3600401

M 3600407

Printed: 18/02/2019 02:28:38 PMPage 391 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 392: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GIRALIA RESOURCES PTY LTD

GIRALIA RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

WARWICK RESOURCES PTY LTD

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 392 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 393: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99008 CONFIDENTIAL 28/08/2013 07/2012 - 06/2013 Lawlers Gold Project Annual Report for the period 1 July 2012 – 30 June 2013, M36/28.....P36/1545 (C14/2003)

M 3600408

M 3600411

M 3600442

M 3600443

M 3600493

M 3600495

M 3600496

M 3600551

M 3600576

M 3600577

M 3600578

M 3600579

M 3600614

M 3600622

M 3600623

M 3600624

M 3600635

M 3600636

M 3600637

99009 CONFIDENTIAL 28/08/2013 06/2012 - 06/2013 Yilgarn Iron Ore Project Combined Annual Report for C83/2003 Reporting Period 24 June 2012 – 23 June 2013, E15/1196-I.......P77/3986-I

E 7700842

E 7700919

E 7700946

E 7701097

E 7701115

E 7701275

E 7701418

M 7700580

M 7701095

M 7701096

M 7701242

M 7701244

M 7701261

Printed: 18/02/2019 02:28:38 PMPage 393 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 394: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 394 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 395: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99018 CONFIDENTIAL 29/08/2013 05/2012 - 05/2013 The Cadoux Kaolin Deposit Combined Annual Report C2/2006 (M70/1141, M70/1169) for the period 25/05/2012 - 24/05/2013

M 7001141

M 7001169

99020 CONFIDENTIAL 29/08/2013 06/2012 - 06/2013 Anketell Project Combined Annual Technical Report C173/2007 E58/289 & E58/292 Combined Annual Technical Report for the period ending 28 June 2013

E 5800289

E 5800292

99021 CONFIDENTIAL 29/08/2013 07/2012 - 06/2013 Mount Fraser Project Group Annual Report Combined Reporting Group C91/2009 E52/1555, E52/2084, M52/244, M52/1054, & P52/1272 for the period 1 July 2012– 30 June 2013

E 5201555

E 5202084

M 5200244

M 5201054

99022 CONFIDENTIAL 29/08/2013 07/2012 - 06/2013 Annual Report Combined Reporting Group C92/2009 E52/1556, P52/1298 & P52/1302 for the period 1 July 2012 – 30 June 2013

E 5201556

99024 CONFIDENTIAL 29/08/2013 07/2012 - 07/2013 Annual Mineral Exploration Report Mt Bevan Iron Ore Project (C183/2010) E29/510 and E 29/713 For the Period 7th July 2012 to 6th July 2013

E 2900510

99025 CONFIDENTIAL 29/08/2013 07/2012 - 07/2013 Annual Report E51/1510 Gabanintha Vanadium For the Period 2nd July 2012—1st July 2013

E 5101510

99027 CONFIDENTIAL 29/08/2013 05/2012 - 04/2013 Combined annual report for the Die Hardy Project, C126/2009 (E77/1293, E77/1803, E77/1164, M77/576, M77/824, P77/3460–2, P77/3564–5 & P77/4077–8), Yilgarn Mineral Field, for the period 1 May 2012 to 30 April 2013

M 7700576

M 7700824

99032 CONFIDENTIAL 29/08/2013 07/2012 - 06/2013 C176/2001 - Boddington District Combined annual report for the period 1st July 2012 to 30th June 2013, E70/710....AM70/264

AM 7000264

E 7000710

E 7001148

M 7000021

M 7000022

M 7000023

Printed: 18/02/2019 02:28:38 PMPage 395 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 396: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FITZGERALD COLIN KINGSLEYFITZGERALD JACOMYNTJE JOHANNA ADRIANNA

FITZGERALD COLIN KINGSLEYFITZGERALD JACOMYNTJE JOHANNA ADRIANNA

ENERGY METALS LTD

ENERGY METALS LTD

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

HAWTHORN RESOURCES LIMITEDLEGACY IRON ORE LTD

THE KOP VENTURES PTY LTD

BLACK OAK MINERALS LIMITED

BLACK OAK MINERALS LIMITED

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

HEDGES GOLD PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 396 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 397: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99032 CONFIDENTIAL 29/08/2013 07/2012 - 06/2013 C176/2001 - Boddington District Combined annual report for the period 1st July 2012 to 30th June 2013, E70/710....AM70/264

M 7000024

M 7000025

M 7000462

M 7000463

M 7000464

M 7000465

M 7000466

M 7000564

M 7000588

M 7000589

M 7000590

M 7000591

M 7000731

M 7000799

M 7000944

M 7000945

M 7000946

M 7000947

Printed: 18/02/2019 02:28:38 PMPage 397 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 398: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

JAPAN ALUMINA ASSOCIATES (AUSTRALIA) PTY LTDSOJITZ ALUMINA PTY LTDSOUTH32 ALUMINIUM (WORSLEY) PTY LTDSOUTH32 ALUMINIUM (RAA) PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 398 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 399: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99032 CONFIDENTIAL 29/08/2013 07/2012 - 06/2013 C176/2001 - Boddington District Combined annual report for the period 1st July 2012 to 30th June 2013, E70/710....AM70/264

M 7000948

M 7000949

M 7000950

M 7000951

M 7000952

M 7000953

M 7000954

M 7000955

M 7000981

M 7001031

M 7001220

M 7001221

ML 7000662

ML 7000663

ML 7000751

ML 7000752

ML 7000753

99033 CONFIDENTIAL 29/08/2013 09/2012 - 09/2013 Annual Report Roy Hill E45/1073 and E45/1074 Reporting Period 27 September 2012 – 26 September 2013

E 4501073

E 4501074

99034 CONFIDENTIAL 27/08/2013 07/2012 - 06/2013 Widgiemooltha North C19/2002 Annual Report for the period 1 July 2012 to 30 June 2013, M15/74..........P15/4962

M 1500074

M 1500075

M 1500087

M 1500096

Printed: 18/02/2019 02:28:38 PMPage 399 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 400: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

SADDLEBACK INVESTMENTS PTY LTDNEWMONT BODDINGTON PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

NEWMONT BODDINGTON PTY LTDSADDLEBACK INVESTMENTS PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

WA NICKEL PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 400 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 401: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99034 CONFIDENTIAL 27/08/2013 07/2012 - 06/2013 Widgiemooltha North C19/2002 Annual Report for the period 1 July 2012 to 30 June 2013, M15/74..........P15/4962

M 1500097

M 1500099

M 1500100

M 1500101

M 1500102

M 1500653

M 1500698

M 1500699

M 1501271

99035 CONFIDENTIAL 27/08/2013 07/2012 - 06/2013 Mount Magnet C137/2006 Combined Annual Technical Report for the period 1 July 2012 – 31 June 2013 E58/285..........P58/1503

M 5800061

M 5800183

M 5800214

M 5800336

P 5801281

P 5801285

P 5801288

P 5801326

99041 CONFIDENTIAL 02/09/2013 06/2012 - 06/2013 2013 Annual Report E09/1938 Mt Narryar Project for the period 29 June 2012 to 28June2013

E 0901938

99045 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137

E 3801211

E 3801935

E 3901260

M 3800560

M 3800593

M 3800690

M 3800691

M 3800692

M 3800725

M 3800726

M 3800744

M 3800849

M 3801136

Printed: 18/02/2019 02:28:38 PMPage 401 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 402: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

APOLLO PHOENIX RESOURCES PTY LTD

KIRKALOCKA GOLD SPV PTY LTD

KIRKALOCKA GOLD SPV PTY LTD

KIRKALOCKA GOLD SPV PTY LTD

KIRKALOCKA GOLD SPV PTY LTD

MOUNT MAGNET SOUTH NL

MOUNT MAGNET SOUTH NL

MOUNT MAGNET SOUTH NL

MOUNT MAGNET SOUTH NL

COMPLEX EXPLORATION PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

GSM MINING COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 402 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 403: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99045 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137

M 3801137

99046 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2012 to 30 June 2013, E15/786.......P63/1788

E 1500786

E 1500787

E 1500808

E 1500828

E 1500838

E 1501199

M 1500031

M 1500225

M 1500231

M 1500289

M 1500325

M 1500338

M 1500348

M 1500351

M 1500352

M 1500375

M 1500506

M 1500507

M 1500512

M 1500528

M 1500580

M 1500581

M 1500597

M 1500610

M 1500616

M 1500620

M 1500629

M 1500639

M 1500640

M 1500642

Printed: 18/02/2019 02:28:38 PMPage 403 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 404: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GSM MINING COMPANY PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA RESOURCES PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

PAYNTER NOEL ARTHURAVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 404 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 405: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99046 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2012 to 30 June 2013, E15/786.......P63/1788

M 1500665

M 1500680

M 1500681

M 1500682

M 1500683

M 1500684

M 1500685

M 1500748

M 1500757

M 1500758

M 1500815

M 1500817

M 1500820

P 1504786

99048 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Mt Magnet - Lennonville - Lake Austin Annual Exploration Report Hill 50 Group Year Ending 30th June 2013, E21/112...........P58/1393

M 5800004

M 5800005

M 5800008

M 5800011

M 5800030

M 5800043

M 5800047

M 5800060

M 5800064

M 5800078

M 5800079

M 5800080

M 5800081

M 5800097

M 5800098

M 5800119

M 5800120

M 5800121

Printed: 18/02/2019 02:28:38 PMPage 405 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 406: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

AVOCA MINING PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 406 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 407: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99048 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Mt Magnet - Lennonville - Lake Austin Annual Exploration Report Hill 50 Group Year Ending 30th June 2013, E21/112...........P58/1393

M 5800122

M 5800130

M 5800136

M 5800140

M 5800143

M 5800146

M 5800147

M 5800157

M 5800161

M 5800163

M 5800172

M 5800173

M 5800174

M 5800179

M 5800180

M 5800181

M 5800182

M 5800185

M 5800186

M 5800187

M 5800188

M 5800189

M 5800191

M 5800192

M 5800193

M 5800194

M 5800195

M 5800198

M 5800201

M 5800202

M 5800205

M 5800208

Printed: 18/02/2019 02:28:38 PMPage 407 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 408: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 408 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 409: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99048 CONFIDENTIAL 30/08/2013 07/2012 - 06/2013 Mt Magnet - Lennonville - Lake Austin Annual Exploration Report Hill 50 Group Year Ending 30th June 2013, E21/112...........P58/1393

M 5800209

M 5800210

M 5800211

M 5800222

M 5800231

M 5800232

M 5800233

M 5800234

M 5800235

M 5800236

M 5800241

M 5800304

P 5800825

P 5800924

P 5800940

P 5800941

P 5801042

P 5801417

99050 CONFIDENTIAL 29/08/2013 05/2012 - 05/2013 Mulga Rock Project Annual Report for 2013 for the period 10th May 2012 – 9th May 2013, E39/876....L39/219

E 3900876

E 3900877

E 3901148

E 3901149

E 3901150

L 3900193

L 3900219

M 3901080

M 3901081

P 3904878

P 3904879

P 3904881

P 3904882

P 3904883

Printed: 18/02/2019 02:28:38 PMPage 409 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 410: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

MT MAGNET GOLD PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

NARNOO MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 410 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 411: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99050 CONFIDENTIAL 29/08/2013 05/2012 - 05/2013 Mulga Rock Project Annual Report for 2013 for the period 10th May 2012 – 9th May 2013, E39/876....L39/219

P 3904884

99051 CONFIDENTIAL 30/08/2013 06/2012 - 05/2013 Bullabulling North Project Combined Annual Mineral Exploration Report for the period 1 June 2012 to 31 May 2013, C20/2003, E15/794......P15/5618

M 1500059

M 1500826

M 1501035

M 1501083

M 1501454

P 1504269

P 1505508

P 1505577

P 1505578

P 1505579

P 1505580

P 1505581

P 1505582

P 1505583

P 1505584

P 1505585

P 1505586

P 1505587

P 1505588

P 1505589

P 1505590

P 1505591

P 1505592

P 1505593

P 1505594

P 1505595

P 1505596

P 1505597

P 1505598

P 1505599

P 1505600

Printed: 18/02/2019 02:28:38 PMPage 411 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 412: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NARNOO MINING PTY LTD

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

GRACE MINING LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 412 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 413: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99051 CONFIDENTIAL 30/08/2013 06/2012 - 05/2013 Bullabulling North Project Combined Annual Mineral Exploration Report for the period 1 June 2012 to 31 May 2013, C20/2003, E15/794......P15/5618

P 1505601

P 1505602

P 1505603

P 1505605

P 1505609

P 1505610

P 1505611

P 1505612

P 1505613

P 1505614

P 1505615

P 1505616

P 1505617

P 1505618

99052 CONFIDENTIAL 30/08/2013 05/2012 - 05/2013 Bullabulling South Project Combined Annual Mineral Exploration Report C167/2007 (M15/549, M15/1260, M15/901 & M15/1791) for the period 25th May 2012 – 24th May 2013

M 1500549

M 1500901

M 1501260

M 1501791

99058 CONFIDENTIAL 02/09/2013 07/2012 - 07/2013 Mt Fisher Project, Prospecting License P53/1496, Annual Report for the period 9th July 2012 to 8th July 2013

P 5301496

99060 CONFIDENTIAL 02/09/2013 07/2012 - 06/2013 Annual Report, Cooljarloo North Project, Combined Reporting Group C143/2008 (E70/2892, E70/3328, P70/1540), North Perth Basin, Western Australia, Reporting period 1 July 2012 to 30 June 2013

E 7002892

99065 CONFIDENTIAL 02/09/2013 06/2012 - 06/2013 Annual Mineral Exploration Report – Combined Reporting Group C73/2013 (AWAY FROM IT ALL DAM) for the period 30 June 2012 – 29 June 2013

E 2802218

E 2802245

E 2802250

E 2802264

99066 CONFIDENTIAL 02/09/2013 07/2012 - 07/2013 Annual Mineral Exploration Report on the Frome Rocks Gas and Salt Project E04/1998 for the period 4th July, 2012 to 3rd July, 2013

E 0401998

99067 CONFIDENTIAL 02/09/2013 05/2012 - 05/2013 South Leonora C274/2011 (E40/294, E40/295, P40/1282) Annual Report to the Department of Mines and Petroleum for the period 04/05/2012 to 03/05/2013

E 4000295

Printed: 18/02/2019 02:28:38 PMPage 413 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 414: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

COOLGARDIE MINERALS LIMITED

CHITTY CHARLES GEORGE

DEVANT PTY LTD

CHITTY CHARLES GEORGE

CHITTY CHARLES GEORGE

ROX RESOURCES LIMITED

IMAGE RESOURCES NL

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

RICHMOND WILLIAM ROBERT

ULYSSES MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 414 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 415: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99075 CONFIDENTIAL 03/09/2013 07/2012 - 06/2013 Katanning South Project C184/2011 Annual Report to the Department of Mines and Petroleum for the period 01/07/12 to 30/06/13, E70/2590, E70/2928, E70/3344, E70/3952, E70/3955, E70/3957, E70/3958, E70/4047, E70/4393, M70/210, M70/211, and M70/488

E 7002928

E 7003952

M 7000210

M 7000211

M 7000488

99080 CONFIDENTIAL 05/09/2013 07/2012 - 06/2013 Balagundi Project Reporting Group C142/2010, Combined Annual Report for Year Ending 30 June 2013, P25/2004.........P26/3638

P 2603637

P 2603638

99081 CONFIDENTIAL 05/09/2013 07/2012 - 06/2013 Report on Operations ML63/249 Lake Spencer (Pink Lake) Annual Report for the period 1st July 2012 to 30th June 2013

M 6300249

99082 CONFIDENTIAL 04/09/2013 07/2012 - 07/2013 Annual Report for EL63/1506 Bromus North for the Period 9 July 2012 to 8 July 2013

E 6301506

99084 CONFIDENTIAL 05/09/2013 07/2012 - 06/2013 Annual Environmental and Technical Reports Nerramyne Attapulgite Mine M70/128, M70/389, M70/483 and M70/606 for the period June 2012 – June 2013

M 7000128

M 7000389

M 7000483

M 7000606

99088 CONFIDENTIAL 05/09/2013 07/2012 - 06/2013 Combined Annual Technical Report C164/1995 Peak Hill Project for the period 1 July 2012 to 30 June 2013, E52/2237, E52/2413, E52/2471, E52/2472, M52/35, M52/56, M52/474, P52/1234, P52/1343, P52/1344, P52/1345, P52/1348, P52/1417, P52/1418, P52/1419

E 5202471

E 5202472

M 5200035

M 5200056

M 5200474

P 5201344

99090 CONFIDENTIAL 05/09/2013 07/2012 - 07/2013 Combined Report C68/2001 Denison Project E70/355, M70/311, M70/642, M70/711, M70/898, & M70/917 for the period 28th July 2012 to 27th July 2013

E 7000355

M 7000311

M 7000642

M 7000711

M 7000898

M 7000917

Printed: 18/02/2019 02:28:38 PMPage 415 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 416: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AUSGOLD EXPLORATION PTY LTD

AUSGOLD EXPLORATION PTY LTD

AUSGOLD EXPLORATION PTY LTD

AUSGOLD EXPLORATION PTY LTD

AUSGOLD EXPLORATION PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

WASS NOMINEES PTY LTD

GREATLAND PTY LTD

HUDSON ATTAPULGITE PTY LTD

HUDSON ATTAPULGITE PTY LTD

HUDSON ATTAPULGITE PTY LTD

HUDSON ATTAPULGITE PTY LTD

WILSON WALTER SCOTTARAGON RESOURCES PTY LTD

AURIS EXPLORATION PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

ARAGON RESOURCES PTY LTD

WILSON WALTER SCOTTARAGON RESOURCES PTY LTD

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

COCKBURN CEMENT LIMITED

Printed: 18/02/2019 02:28:38 PMPage 416 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 417: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99102 CONFIDENTIAL 06/09/2013 05/2012 - 05/2013 Picnic Project M37/1144 Annual Report for the period ended 13 May 2013 M 3701144

99109 CONFIDENTIAL 06/09/2013 07/2012 - 06/2013 Four Pools C312/2011 – Combined Annual Report for the year ended 30th June 2013, E47/2280 & E47/2291

E 4702280

E 4702291

99111 CONFIDENTIAL 06/09/2013 08/2012 - 08/2013 Kintore Project, Annual Report for the period 18/08/2012 to 17/08/2013, M16/298, & 351; P26/2626

M 1600289

M 1600351

99115 CONFIDENTIAL 06/09/2013 06/2012 - 06/2013 Annual Report for the period ending 28 June 2013, Lindsays Find Project, C306/1998, P27/2058, P27/2081, P27/2082, P27/2083, P27/2084, P27/2094, P27/2111, E27/370, E27/477, M27/34, M27/169, M27/486

M 2700034

M 2700169

M 2700486

99119 CONFIDENTIAL 06/09/2013 04/2012 - 04/2013 Junction Well Project Annual Exploration Report for C076/2011 (M45/1173, M45/1174, M45/1193) for the reporting period 30/04/2012 to 29/04/2013

M 4501173

M 4501174

M 4501193

99120 CONFIDENTIAL 06/09/2013 08/2012 - 08/2013 Montague Group Project (C232/1994) M57/48, 98, 99 and 217 for the Period Ending August 2013.

M 5700048

M 5700098

M 5700099

M 5700217

99132 CONFIDENTIAL 09/09/2013 07/2012 - 06/2013 Combined Annual Mineral Exploration Report C332/2011 Stratham for the period 1 July 2012 – 30 June 2013, M70/792 and M70/1117

M 7000792

M 7001117

99133 CONFIDENTIAL 09/09/2013 07/2012 - 07/2013 Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2013 to 22st July 2013

E 3701037

99136 CONFIDENTIAL 09/09/2013 07/2012 - 06/2013 Riverina Project C127/2008 Annual Mineral Exploration Report for the period 1/07/2012 – 30/06/2013, M30/98.......P30/1074

E 3000333

M 3000016

M 3000043

M 3000060

Printed: 18/02/2019 02:28:38 PMPage 417 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 418: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

COSTELLO PHILLIP GERARD

BROCKMAN EAST PTY LTD

BROCKMAN EAST PTY LTD

DEVANT PTY LTDSOS ENTERPRISES PTY LTDDUGGAN DEANNA MARJORIEDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

DEVANT PTY LTDDUGGAN DEANNA MARJORIESOS ENTERPRISES PTY LTDDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

KALNORTH GOLD MINES LIMITED

KALNORTH GOLD MINES LIMITED

KALNORTH GOLD MINES LIMITED

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

GOLDFAN LTDGATEWAY MINING LIMITED

GOLDFAN LTDGATEWAY MINING LIMITED

GOLDFAN LTDGATEWAY MINING LIMITED

GOLDFAN LTDGATEWAY MINING LIMITED

CABLE SANDS (WA) PTY LTD

CABLE SANDS (WA) PTY LTD

SAMMY RESOURCES PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 418 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 419: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99136 CONFIDENTIAL 09/09/2013 07/2012 - 06/2013 Riverina Project C127/2008 Annual Mineral Exploration Report for the period 1/07/2012 – 30/06/2013, M30/98.......P30/1074

M 3000084

M 3000091

M 3000097

M 3000098

M 3000099

M 3000157

M 3000178

99148 CONFIDENTIAL 11/09/2013 09/2012 - 08/2013 Mt Alexander Project, CR90/2010, E08/1410-I, E08/1972- I, E08/2046, Annual Report Year ending 31 August 2013

E 0801410

E 0801972

99153 CONFIDENTIAL 10/09/2013 01/2012 - 12/2012 14 Mile Well Project C134/2012 Annual Report for the period 1st January 2012 to 31st December 2012, P39/4335........M39/977

M 3900977

P 3904335

P 3904336

P 3904337

P 3904338

P 3904474

P 3905192

P 3905198

P 3905199

99160 CONFIDENTIAL 10/09/2013 07/2012 - 07/2013 Annual report for the period 7 July 2012 to 6th July 2013, P08/596 Balmoral Magnetite Iron Ore Project

P 0800596

99161 CONFIDENTIAL 10/09/2013 07/2012 - 07/2013 Lake Carnage Project, Annual Report for the period 12/07/2012 to 11/07/2013, E24/167, E16/445. [C72/2013]

E 1600445

E 2400167

99162 CONFIDENTIAL 11/09/2013 08/2012 - 08/2013 Annual Technical Report for the period 2 August 2012 to 1 Ausgust 2013, Balmoral Project E47/1255

E 4701255

99166 CONFIDENTIAL 11/09/2013 07/2012 - 06/2013 C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Reporting Period 01/07/2012 – 30/06/2013

E 1600365

E 1600393

Printed: 18/02/2019 02:28:38 PMPage 419 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 420: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CARNEGIE GOLD PTY LTD

WICKSTEED MARK EDWARD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

WICKSTEED MARK EDWARD

CARNEGIE GOLD PTY LTD

CARNEGIE GOLD PTY LTD

ZENITH MINERALS LIMITED

ZENITH MINERALS LIMITED

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

MICHELUTTI AARON

WILSON WALTER SCOTTCREW ROSS FREDERICK

WILSON WALTER SCOTTCREW ROSS FREDERICK

MINERALOGY PTY LTD

ST BARBARA LIMITEDEVOLUTION MINING (MUNGARI) PTY LTD

ST BARBARA LIMITEDEVOLUTION MINING (MUNGARI) PTY LTD

AQUILA STEEL PTY LTDAMCI (IO) PTY LTD

SANDHU TANVANTH SINGH

SANDHU TANVANTH SINGH

Printed: 18/02/2019 02:28:38 PMPage 420 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 421: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99166 CONFIDENTIAL 11/09/2013 07/2012 - 06/2013 C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Reporting Period 01/07/2012 – 30/06/2013

E 1600396

E 1600415

M 1600524

99172 CONFIDENTIAL 11/09/2013 08/2012 - 08/2013 Caramulla Creek Annual Report Exploration Licence 52/1905 for the period 8 August 2012 – 7 August 2013

E 5201905

99176 CONFIDENTIAL 12/09/2013 06/2012 - 06/2013 Grants Patch Project C292/1997 Annual Technical Report for Period 30/06/12 to 29/06/13, M16/0279.....P24/4510

M 2400067

M 2400100

M 2400195

M 2400196

M 2400366

M 2400367

M 2400391

M 2400404

M 2400463

M 2400558

M 2400603

M 2400604

M 2400644

M 2400707

M 2400713

P 2403599

P 2404123

P 2404124

P 2404125

P 2404126

P 2404132

P 2404133

P 2404134

P 2404168

99177 CONFIDENTIAL 12/09/2013 07/2012 - 07/2013 Annual Report M47/559 for the period 05/07/2012 – 04/07/2013 Nichol River Fill "Report onPreliminary Geotechnical Investigation Nickhol River Fill & Sherlock River Fill Shire of Roebourne, WA"

M 4700559

Printed: 18/02/2019 02:28:38 PMPage 421 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 422: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SANDHU TANVANTH SINGH

SANDHU TANVANTH SINGH

SANDHU TANVANTH SINGH

HAMERSLEY IRON PTY LIMITED

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

HAYES MINING PTY LTD

RINALDI LOUIS WILLIAM

Printed: 18/02/2019 02:28:38 PMPage 422 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 423: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99178 CONFIDENTIAL 11/09/2013 07/2012 - 07/2013 2013 Annual Report Andover Project E47/2481 for the period 2nd July 2012 to the 1st July 2013

E 4702481

99182 CONFIDENTIAL 12/09/2013 08/2012 - 08/2013 Texas East Project Area Combined Annual Technical Report Exploration Licences 47/1228, 47/1522 and 47/1922

E 4701228

E 4701522

E 4701922

99183 CONFIDENTIAL 12/09/2013 07/2012 - 06/2013 Combined Annual Report for the period 1 July 2012 to 30 June 2013 marshall Pool Project C116/1999, M 37/364 M37/405 M37/733 M37/1119 M37/1122 M37/403 M37/461 M37/997 M37/1120 M37/1130 M 37/404 M37/462 M37/1076 M37/1121 M37/1279

M 3700364

M 3700403

M 3700404

M 3700405

M 3700461

M 3700462

M 3700733

M 3700997

M 3701076

M 3701119

M 3701120

M 3701121

M 3701122

M 3701130

M 3701279

99186 CONFIDENTIAL 12/09/2013 09/2012 - 09/2013 Annual Report Two Creeks Project E46/816 & E46/831 (C208/2012) year to 12 July 2013

E 4600816

99188 CONFIDENTIAL 12/09/2013 07/2012 - 07/2013 Annual Report Tallering Peak Project; M70/0896-I, M70/1062-I, M70/1063-I, M70/1064-I For the period 10 July 2012 to 09 July 2013 Combined Reporting Number C18/2000

M 7000896

M 7001062

99196 CONFIDENTIAL 13/09/2013 07/2012 - 06/2013 Annual Mineral Exploration Report Killaloe Project C6/2008, E63/1018 E63/1199 P63/1331 P63/1332 P63/1333 P63/1672 for the period 1st July 2012 – 30th June 2013

E 6301018

99197 CONFIDENTIAL 13/09/2013 07/2012 - 07/2013 Annual Report Period 18 July 2012 – 17 July 2013, Project 6590 Darlot Gold Project M37/1217, M37/155, M37/252, M37/373, M37/417, M37/418, M37/419, M37/420, M37/421, M37/584, M37/592, M37/608, M37/632, M37/667, M37/774, M37/775, Project 6552 Darlot South ‘A’ JV M37/320 Project 6553 Darlot South ‘B’ JV M37/246, M37/265, M37/343, M37/345, M37/393, M37/776

M 3700155

Printed: 18/02/2019 02:28:38 PMPage 423 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 424: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CROYDON GOLD PTY LTD

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY IRON PTY LIMITED

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN HOLDINGS PTY LTDGLENMURRIN PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MURRIN MURRIN OPERATIONS PTY LTD

MESA MINERALS LIMITED

MOUNT GIBSON MINING LIMITED

MOUNT GIBSON MINING LIMITED

CULLEN EXPLORATION PTY LIMITEDLRL (AUST) PTY LTD

DARLOT MINING COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 424 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 425: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99197 CONFIDENTIAL 13/09/2013 07/2012 - 07/2013 Annual Report Period 18 July 2012 – 17 July 2013, Project 6590 Darlot Gold Project M37/1217, M37/155, M37/252, M37/373, M37/417, M37/418, M37/419, M37/420, M37/421, M37/584, M37/592, M37/608, M37/632, M37/667, M37/774, M37/775, Project 6552 Darlot South ‘A’ JV M37/320 Project 6553 Darlot South ‘B’ JV M37/246, M37/265, M37/343, M37/345, M37/393, M37/776

M 3700246

M 3700252

M 3700265

M 3700320

M 3700343

M 3700345

M 3700373

M 3700393

M 3700417

M 3700418

M 3700419

M 3700420

M 3700421

M 3700584

M 3700592

M 3700608

M 3700632

M 3700667

M 3700774

M 3700775

M 3700776

M 3701217

99203 CONFIDENTIAL 13/09/2013 08/2012 - 08/2013 Yuinmery Option Project (C87/2003) E57/514, E57/681, P57/1130, P57/1131 Annual Report for the period 8 August 2012 – 7 August 2013

E 5700681

Printed: 18/02/2019 02:28:38 PMPage 425 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 426: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

BAKER ROBERT ALBERT LAWRENCEPANAUST LIMITEDDARLOT MINING COMPANY PTY LTD

DARLOT MINING COMPANY PTY LTD

GIRALIA RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 426 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 427: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99223 CONFIDENTIAL 16/09/2013 07/2012 - 07/2013 Mt Gill Project (C62/2012) E38/2513; E38/2529 Annual Report for the period 21 July 2012 to 20 July 2013

E 3802513

E 3802529

99229 CONFIDENTIAL 16/09/2013 06/2012 - 06/2013 Annual Mineral Exploration Report: E52/1763 for the period 14 June 2012 to 13 June 2013

E 5201763

99232 CONFIDENTIAL 16/09/2013 08/2012 - 08/2013 Report on Boodarie Limestone Mining Lease M45/657 located on Boodarie Station near Port Headland (Annual Report for the period 7 August 2012 to 6 August 2013)

M 4500657

99234 CONFIDENTIAL 16/09/2013 07/2012 - 07/2013 Balfour Downs Project Combined Annual Report Reporting Group C194/1998 For the Year Ending 17 July 2013 M46/80 Nicholas Downs East M46/81 Mesa M46/121 Mill

M 4600080

M 4600081

M 4600121

99238 CONFIDENTIAL 16/09/2013 06/2012 - 06/2013 Annual Report, Mosquito Creek, E46/795 and E46/796 for the period 21/06/2012 to 20/06/2013

E 4600795

E 4600796

99239 CONFIDENTIAL 16/09/2013 07/2012 - 06/2013 Annual Technical Report for the Widgiemooltha Project C137/2004 for the period 01 July 2012 – 30 June 2013, E15/1059........P15/5684

E 1500625

E 1500989

E 1501130

M 1500044

M 1500045

M 1500046

M 1500048

M 1500076

M 1500077

M 1500078

M 1500079

M 1500080

M 1500081

M 1500082

M 1500083

M 1500085

M 1500086

M 1500088

M 1500089

Printed: 18/02/2019 02:28:38 PMPage 427 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 428: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GOLD ROAD (NORTH YAMARNA) PTY LTD

GOLD ROAD (NORTH YAMARNA) PTY LTD

FMG PILBARA PTY LTD

BGC CONTRACTING PTY LTD

NICHOLAS DOWNS PTY LTD

NICHOLAS DOWNS PTY LTD

NICHOLAS DOWNS PTY LTD

MT STEWART RESOURCES PTY LTD

MT STEWART RESOURCES PTY LTD

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

Printed: 18/02/2019 02:28:38 PMPage 428 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 429: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99239 CONFIDENTIAL 16/09/2013 07/2012 - 06/2013 Annual Technical Report for the Widgiemooltha Project C137/2004 for the period 01 July 2012 – 30 June 2013, E15/1059........P15/5684

M 1500090

M 1500091

M 1500092

M 1500093

M 1500094

M 1500103

M 1500105

M 1500462

M 1500478

M 1500543

M 1500601

M 1500609

M 1500611

M 1500634

M 1500635

M 1500667

M 1500668

M 1500693

M 1500734

M 1500745

M 1500907

M 1501457

M 1501458

M 1501459

M 1501476

M 1501481

P 1505543

P 1505645

99241 CONFIDENTIAL 18/09/2013 07/2012 - 06/2013 Moora Talc Project Annual Report for Combined Reporting Group C62/2011 Tenements E70/3776 – 3779; E70/3883 – 3884; E70/4003 – 4004; E70/4167; E70/4318 – 4320; E70/4378 For the Period 1 July 2012 to 30 June 2013

E 7003777

E 7004004

E 7004318

Printed: 18/02/2019 02:28:38 PMPage 429 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 430: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

ST IVES GOLD MINING COMPANY PTY LIMITED

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

MINCOR RESOURCES NL

CENTREX POTASH PTY LTD

CENTREX POTASH PTY LTD

CENTREX POTASH PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 430 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 431: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99241 CONFIDENTIAL 18/09/2013 07/2012 - 06/2013 Moora Talc Project Annual Report for Combined Reporting Group C62/2011 Tenements E70/3776 – 3779; E70/3883 – 3884; E70/4003 – 4004; E70/4167; E70/4318 – 4320; E70/4378 For the Period 1 July 2012 to 30 June 2013

E 7004319

E 7004320

E 7004378

99250 CONFIDENTIAL 18/09/2013 06/2012 - 06/2013 Range & Turtle M08/272 & M08/273 Combined Annual Report For the period 13th June 2012 to 12th June 2013

M 0800272

M 0800273

99251 CONFIDENTIAL 19/09/2013 07/2012 - 07/2013 Annual Report on Exploration for the period 23/07/2012 - 22/07/2013 (E53/1472)

E 5301472

99252 CONFIDENTIAL 18/09/2013 07/2012 - 07/2013 Annual Mineral Exploration Report for the year ended 20 July 2013 Yalgoo Project E59/1735

E 5901735

99257 CONFIDENTIAL 18/09/2013 07/2012 - 06/2013 Combined Annual Report for the year ending 39.06.2013; Webb Diamond JV Project; E80/4235, E80/4407 & E80/4506

E 8004235

E 8004407

E 8004506

99258 CONFIDENTIAL 18/09/2013 07/2012 - 07/2013 P25/2201 Clinker Hill Glandore Project Annual Report for the period ended 20 July 2013

P 2502201

99263 CONFIDENTIAL 19/09/2013 07/2012 - 06/2013 Annual Combined Report (C136/2004) for the period 1 July 2012 to 30 June 2013 (Agnew and Miranda), M36/27......P36/1756

E 3600609

E 3600610

E 3600614

E 3600616

E 3600690

E 3600782

M 3600027

M 3600032

M 3600034

M 3600053

M 3600055

M 3600061

M 3600062

M 3600063

M 3600064

Printed: 18/02/2019 02:28:38 PMPage 431 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 432: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTREX POTASH PTY LTD

CENTREX POTASH PTY LTD

CENTREX POTASH PTY LTD

ONSLOW METALS PTY LTD

ONSLOW METALS PTY LTD

ECHO RESOURCES LIMITED

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

METEORIC RESOURCES NLGEOCRYSTAL LIMITED

METEORIC RESOURCES NLGEOCRYSTAL LIMITED

MCINTYRE JANE MARYMCINTYRE JOHN RICHARDMETEORIC RESOURCES NLGEOCRYSTAL LIMITED

ARUMA EXPLORATION PTY LTD

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

RAMELIUS RESOURCES LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

RAMELIUS RESOURCES LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

RAMELIUS RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 432 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 433: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99263 CONFIDENTIAL 19/09/2013 07/2012 - 06/2013 Annual Combined Report (C136/2004) for the period 1 July 2012 to 30 June 2013 (Agnew and Miranda), M36/27......P36/1756

M 3600065

M 3600066

M 3600069

M 3600070

M 3600071

M 3600072

M 3600073

M 3600074

M 3600075

M 3600077

M 3600089

M 3600090

M 3600111

M 3600113

M 3600114

M 3600115

M 3600116

M 3600119

M 3600120

M 3600121

M 3600123

M 3600138

M 3600139

M 3600140

M 3600141

M 3600142

M 3600149

M 3600150

M 3600163

M 3600164

M 3600165

M 3600166

Printed: 18/02/2019 02:28:38 PMPage 433 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 434: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

RAMELIUS RESOURCES LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 434 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 435: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99263 CONFIDENTIAL 19/09/2013 07/2012 - 06/2013 Annual Combined Report (C136/2004) for the period 1 July 2012 to 30 June 2013 (Agnew and Miranda), M36/27......P36/1756

M 3600167

M 3600168

M 3600182

M 3600233

M 3600234

M 3600248

M 3600292

M 3600301

M 3600315

M 3600316

M 3600317

M 3600352

M 3600353

M 3600413

M 3600417

M 3600450

M 3600680

P 3601744

99269 CONFIDENTIAL 19/09/2013 07/2012 - 06/2013 Annual Technical Report Quinns Project C143/2005 for the period 01/07/2012 to 30/06/2013

E 2900649

E 2900748

M 2900036

M 2900037

M 2900065

99277 CONFIDENTIAL 19/09/2013 07/2012 - 07/2013 Mount Regal Project - Annual Report on E47/1202 For the Period 31st July 2012 to 30th July 2013

E 4701202

99278 CONFIDENTIAL 20/09/2013 08/2012 - 08/2013 Annual Technical Report for E47/1489 Hood Bore Project for the period 18th August 2012 to 17th August 2013

E 4701489

99291 CONFIDENTIAL 23/09/2013 07/2012 - 07/2013 Farrell Well/Gorge Creek C153/2005 Combined Annual Report for the period 24/07/2012 to 23/07/2013, E45/2174, E45/2996, E453427, E45/3450, E45/3451, E45/3452, E45/3633, E45/3635, E45/3856, P45/2754 – 2757

E 4503856

99292 CONFIDENTIAL 24/09/2013 09/2012 - 09/2013 Mercury Hill M45/538 Annual Report for the period 03/09/2012 to 02/09/2013 M 4500538

99293 CONFIDENTIAL 24/09/2013 08/2012 - 08/2013 McLarty Range E04/1441 Annual Report for the period 8/8/2012 to 07/08/2013 E 0401441

Printed: 18/02/2019 02:28:38 PMPage 435 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 436: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

RAMELIUS RESOURCES LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

AGNEW GOLD MINING COMPANY PTY LIMITED

MGK RESOURCES PTY LTD

MGK RESOURCES PTY LTD

MGK RESOURCES PTY LTD

MGK RESOURCES PTY LTD

MGK RESOURCES PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

RIO TINTO EXPLORATION PTY LIMITED

GREAT SANDY PTY LTD

GENERAL MINING CORPORATION LTD

KIMMINCO PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 436 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 437: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99295 CONFIDENTIAL 24/09/2013 08/2012 - 08/2013 Karlawinda Bore C113/2004 Annual Technical Report 5 August 2012 to 4 August 2013, E52/1710, 1711, 1721, 1820, 2172, 2246, 2247, 2248, 2398, 2409 & 2769

E 5201711

E 5202247

E 5202398

E 5202409

99296 CONFIDENTIAL 23/09/2013 07/2012 - 07/2013 Westonia Project (C82/1995) Annual Report for the period 21 July 2012 to 20 July 2013, M77/88, M77/110, M77/124, E77/516, E77/990, E77/1069, E77/1324, E77/1452, E77/1494, P77/3713 and P77/3714

E 7700516

E 7700990

E 7701324

M 7700088

M 7700110

M 7700124

99298 CONFIDENTIAL 25/09/2013 08/2012 - 08/2013 Annual Report M80/315 Halls Creek for the period 22nd August 2012 to 21st August 2013

M 8000315

99310 CONFIDENTIAL 24/09/2013 07/2012 - 07/2013 Annual Report – 5th July 2012 to 4th July 2013 Warriedar Project – E59/1696 E 5901696

99311 CONFIDENTIAL 24/09/2013 07/2012 - 06/2013 Annual Report – 1st July 2012 to 30th June 2013 Paynes Find Project – E59/1692

E 5901692

99318 CONFIDENTIAL 27/09/2013 07/2012 - 07/2013 MacPhersons Project Reporting Group C127/2010, Combined Annual Report for Year Ending 30 June 2013

M 1500040

M 1500128

M 1500133

M 1500147

M 1500148

M 1500731

P 1505261

P 1505275

99319 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Chesterfield Project, Annual Report for the period 01/07/2012 to 30/06/2013, M51/270, 353 & 451. [C70/1993]

M 5100270

M 5100353

M 5100451

99320 CONFIDENTIAL 25/09/2013 09/2012 - 09/2013 Wilga Granite Quarry Project, Annual Report for the period 08/09/2012 to 07/09/2013, E45/3551.

E 4503551

99321 CONFIDENTIAL 25/09/2013 07/2012 - 06/2013 Three Springs Project, Annual Report for the period ending 30th June 2013, M70/101, 243, 608, 918, 919 & 1139.

M 7000101

M 7000243

Printed: 18/02/2019 02:28:38 PMPage 437 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 438: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GREENMOUNT RESOURCES PTY LTD

GREENMOUNT RESOURCES PTY LTD

GREENMOUNT RESOURCES PTY LTD

GREENMOUNT RESOURCES PTY LTD

EDNA MAY OPERATIONS PTY LTD

EDNA MAY OPERATIONS PTY LTD

EDNA MAY OPERATIONS PTY LTD

EDNA MAY OPERATIONS PTY LTD

EDNA MAY OPERATIONS PTY LTD

EDNA MAY OPERATIONS PTY LTD

METALS AUSTRALIA LTDKIMBERLY RESOURCES LTDYNEMA MARTEN HENDRICK

NORWEST MINERALS LIMITED

NORWEST MINERALS LIMITED

MACPHERSONS REWARD PTY LTD

MACPHERSONS REWARD PTY LTD

MACPHERSONS REWARD PTY LTD

MACPHERSONS REWARD PTY LTD

MACPHERSONS REWARD PTY LTD

STEWART SUE-ANN

MACPHERSONS REWARD PTY LTD

MACPHERSONS REWARD PTY LTD

TANZI PTY LTD

TANZI PTY LTD

TANZI PTY LTD

STIRLING BAY HOLDINGS PTY LTDSWAN BAY HOLDINGS PTY LTD

IMERYS TALC AUSTRALIA PTY LTD

IMERYS TALC AUSTRALIA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 438 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 439: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99321 CONFIDENTIAL 25/09/2013 07/2012 - 06/2013 Three Springs Project, Annual Report for the period ending 30th June 2013, M70/101, 243, 608, 918, 919 & 1139.

M 7000608

M 7000918

M 7000919

M 7001139

99322 CONFIDENTIAL 25/09/2013 07/2012 - 06/2013 Collie Basin Project, Annual Report for the period 01/07/2012 to 30/06/2013, ML262SA, M12/8, 13-14, & 27; P12/13; E12/4. [C374/1996]

AM 7000262

M 1200008

M 1200013

M 1200014

M 1200027

P 1200013

99324 CONFIDENTIAL 25/09/2013 07/2012 - 06/2013 Wilga- McAlinden Project, Annual Report for the period 01/07/2012 to 30/06/2013, M70/781, 930-933; R70/25; P70/1515.,

M 7000781

M 7000930

M 7000931

P 7000932

P 7000933

P 7001515

R 7000025

99325 CONFIDENTIAL 25/09/2013 09/2012 - 09/2013 Mineral Exploration - Annual Report Exploration Licence: E45/3550 Report Period: 08.09.2012 - 07.09.2013

E 4503550

99329 CONFIDENTIAL 24/09/2013 07/2012 - 07/2013 Irvine Island Project, Annual Report for the period 06/07/2012 to 05/07/2013, M04/452.

M 0400452

99333 CONFIDENTIAL 25/09/2013 06/2012 - 06/2013 Lake Mason Project Annual Report for the period ending 28th June 2013 E 5700590

99335 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Phillips Find Project, Annual Report for the period 01/07/2012 to 30/06/2013, M16/130, 133, 168, 171, 242 & 258; P16/2390-2394, 2397-2401, 2403-2408, 2410, 2578 & 2702. [C163/2006]

M 1600130

M 1600133

M 1600168

M 1600171

M 1600242

M 1600258

P 1602407

P 1602702

99336 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Central Noresman Project Combined Annual Report C11/1995 for the period 1 July 2012 to 30 June 2013, E63/1042......P63/1956

E 6301042

Printed: 18/02/2019 02:28:38 PMPage 439 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 440: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

IMERYS TALC AUSTRALIA PTY LTD

IMERYS TALC AUSTRALIA PTY LTD

IMERYS TALC AUSTRALIA PTY LTD

IMERYS TALC AUSTRALIA PTY LTD

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

PREMIER COAL LIMITED

STIRLING BAY HOLDINGS PTY LTDSWAN BAY HOLDINGS PTY LTD

IRVINE ISLAND (AUS) PTY LTD

ENERGY METALS LTD

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

BARRA RESOURCES LIMITED

PANGOLIN RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 440 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 441: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99336 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Central Noresman Project Combined Annual Report C11/1995 for the period 1 July 2012 to 30 June 2013, E63/1042......P63/1956

M 6300009

M 6300011

M 6300013

M 6300014

M 6300015

M 6300026

M 6300029

M 6300035

M 6300036

M 6300040

M 6300041

M 6300042

M 6300043

M 6300044

M 6300045

M 6300046

M 6300047

M 6300048

M 6300049

M 6300050

M 6300051

M 6300052

M 6300053

M 6300054

M 6300055

M 6300056

M 6300057

M 6300058

M 6300059

M 6300060

M 6300061

M 6300062

Printed: 18/02/2019 02:28:38 PMPage 441 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 442: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 442 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 443: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99336 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Central Noresman Project Combined Annual Report C11/1995 for the period 1 July 2012 to 30 June 2013, E63/1042......P63/1956

M 6300063

M 6300064

M 6300065

M 6300066

M 6300067

M 6300068

M 6300069

M 6300088

M 6300096

M 6300099

M 6300100

M 6300105

M 6300108

M 6300110

M 6300112

M 6300114

M 6300115

M 6300116

M 6300118

M 6300119

M 6300120

M 6300122

M 6300125

M 6300126

M 6300127

M 6300128

M 6300129

M 6300130

M 6300133

M 6300134

M 6300136

M 6300137

Printed: 18/02/2019 02:28:38 PMPage 443 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 444: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 444 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 445: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99336 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Central Noresman Project Combined Annual Report C11/1995 for the period 1 July 2012 to 30 June 2013, E63/1042......P63/1956

M 6300138

M 6300140

M 6300141

M 6300142

M 6300145

M 6300152

M 6300155

M 6300156

M 6300160

M 6300164

M 6300173

M 6300174

M 6300178

M 6300180

M 6300182

M 6300184

M 6300187

M 6300189

M 6300190

M 6300204

M 6300207

M 6300213

M 6300214

M 6300218

M 6300219

M 6300220

M 6300224

M 6300231

M 6300232

M 6300233

M 6300257

Printed: 18/02/2019 02:28:38 PMPage 445 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 446: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

WEBSDALE ALLAN AUGUSTUSPASCOE DAVID RODNEYPANGOLIN RESOURCES PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

PANGOLIN RESOURCES PTY LTD

PANGOLIN RESOURCES PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 446 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 447: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99336 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Central Noresman Project Combined Annual Report C11/1995 for the period 1 July 2012 to 30 June 2013, E63/1042......P63/1956

M 6300258

M 6300259

M 6300265

M 6300272

M 6300273

M 6300274

M 6300275

M 6300315

M 6300316

M 6300325

M 6300326

M 6300327

M 6300526

P 6301779

P 6301835

P 6301836

P 6301837

P 6301890

99342 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Cooljarloo Project, Annual Report for the period 01/07/2012 to 30/07/2013, E70/2345, 2346, 2490, 2491, 2549 & 2604. [C2/2008]

E 7002345

E 7002346

E 7002549

E 7002604

99345 CONFIDENTIAL 01/10/2013 08/2012 - 08/2013 Griffins Find Project C57/2004 Annual Report for the period 2nd August 2012 to 1st August 2013, E70/1958, E70/2465, E70/3659

E 7001958

99350 CONFIDENTIAL 27/09/2013 06/2012 - 06/2013 Jigalong Project, Annual Report for the period 07/06/2012 to 06/06/2013, E52/1812-1813; E69/2235; E46/780; E45/3747. {C111/2007]

E 5201812

E 5201813

99352 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group C172/2007 Reporting Period 1 July 2012 – 30 June 2013, AML70.......M53/489

AML7000255

M 3600004

M 3600009

M 3600078

Printed: 18/02/2019 02:28:38 PMPage 447 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 448: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

CENTRAL NORSEMAN GOLD CORPORATION PTY LTD

AVOCA MINING PTY LTD

TRONOX WESTERN AUSTRALIA PTY LTDYALGOO MINERALS PTY LTD

TRONOX WESTERN AUSTRALIA PTY LTDYALGOO MINERALS PTY LTD

TRONOX WESTERN AUSTRALIA PTY LTDYALGOO MINERALS PTY LTD

TRONOX MANAGEMENT PTY LTD

MCNAB BRIAN ALEXANDER

SOUTH EAST PILBARA ASSETS PTY LTD

SOUTH EAST PILBARA ASSETS PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 448 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 449: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99352 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group C172/2007 Reporting Period 1 July 2012 – 30 June 2013, AML70.......M53/489

M 3600087

M 3600102

M 3600103

M 3600129

M 3600130

M 3600131

M 3600155

M 3600156

M 3600158

M 3600159

M 3600160

M 3600183

M 3600184

M 3600185

M 3600212

M 3600216

M 3600217

M 3600218

M 3600219

M 3600220

M 3600230

M 3600242

M 3600243

M 3600246

M 3600247

M 3600285

M 3600286

M 3600288

M 3600289

M 3600290

M 3600291

M 3600294

Printed: 18/02/2019 02:28:38 PMPage 449 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 450: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP YAKABINDIE NICKEL PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 450 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 451: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99352 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group C172/2007 Reporting Period 1 July 2012 – 30 June 2013, AML70.......M53/489

M 3600306

M 3600307

M 3600336

M 3600389

M 3600399

M 3600409

M 3600439

M 3600440

M 3600452

M 3600453

M 3600454

M 3600455

M 3600456

M 3600457

M 3600509

M 3600510

M 3600517

M 3600549

M 3600618

M 3600631

M 3600658

M 3600676

M 3600677

M 5300056

M 5300057

M 5300165

M 5300166

M 5300167

M 5300187

M 5300208

M 5300215

M 5300216

Printed: 18/02/2019 02:28:38 PMPage 451 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 452: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 452 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 453: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99352 CONFIDENTIAL 27/09/2013 07/2012 - 06/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group C172/2007 Reporting Period 1 July 2012 – 30 June 2013, AML70.......M53/489

M 5300217

M 5300218

M 5300327

M 5300328

M 5300410

M 5300411

M 5300462

M 5300463

M 5300466

M 5300467

M 5300475

M 5300486

M 5300487

M 5300488

M 5300489

99355 CONFIDENTIAL 27/09/2013 08/2012 - 08/2013 Marillana Project, Annual Report for the period 04/08/2012 to 03/08/2013, E47/1324, 1325 & 1327. [C158/2007]

E 4701327

99357 CONFIDENTIAL 27/09/2013 08/2012 - 08/2013 Scahill Project, Annual Report for the period 29/08/2012 to 28/08/2013, M15/1805.

M 1501805

99360 CONFIDENTIAL 26/09/2013 07/2012 - 06/2013 Mt Elsie Project, Annual Report for the period 01/07/2012 to 30/06/2013, E46/950 & 951. [C176/2012]

E 4600951

99365 CONFIDENTIAL 26/09/2013 08/2012 - 08/2013 Annual Combined Technical Report for Mt Farquhar Project Area for the period 22 August 2012 – 21 August 2013, E47/45, E47/468, E47/469, E47/470, E47/892, C86/1999

E 4700045

E 4700468

E 4700469

E 4700470

E 4700892

99366 CONFIDENTIAL 26/09/2013 08/2012 - 08/2013 Caliwingina Project Area Combined Annual Report Exploration Licences 47/54, 47/473, 47/474 and 47/1322 (C44/1997) for the period 21 August 2012 – 20 August 2013

E 4700054

E 4700473

E 4700474

E 4701322

Printed: 18/02/2019 02:28:38 PMPage 453 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 454: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

MPI NICKEL PTY LTDBHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

BHP BILLITON NICKEL WEST PTY LTD

HANCOCK PROSPECTING PTY LTD

BROWN RONALD WILLIAMNORVALE PTY LTD

WITX PTY LTD

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 454 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 455: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99367 CONFIDENTIAL 26/09/2013 08/2012 - 08/2013 Mt Margaret Project Area Combined Annual Technical Report Exploration Licences 47/475 and 47/585 for the period 21 August 2012 – 20 August 2013

E 4700475

E 4700585

99372 CONFIDENTIAL 25/09/2013 07/2012 - 07/2013 Irwin River Project, Annual Report for the period 29/07/2012 to 28/07/2013, E70/2766.

E 7002766

99382 CONFIDENTIAL 25/09/2013 08/2012 - 08/2013 Mount Dove Project M47/1449-I Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 8 August 2013

M 4701449

99384 CONFIDENTIAL 27/09/2013 08/2012 - 08/2013 Annual Combined Report for C251/2008, Ravensthorpe Joint Venture (currently part of the Great Southern Project) for the period 28/08/2012 to 27/08/2013 M74/163, E74/399, E74/406, P74/259, P74/260, P74/304, P74/305, P74/306

E 7400399

E 7400406

M 7400163

99386 CONFIDENTIAL 01/10/2013 07/2012 - 07/2013 Whim Creek Project, Annual Report for the period 27/07/2012 to 26/07/2013, E47/924, 976, 1088; M47/236-238, 323-324 & 443. [C384/1996]

E 4700924

M 4700236

M 4700237

M 4700238

M 4700323

M 4700324

M 4700443

99387 CONFIDENTIAL 01/10/2013 06/2012 - 06/2013 C 10/2000 – PINJIN JOINT ANNUAL REPORT FOR THE PERIOD 12 June 2012 TO 11 June 2013 General Purpose Licence 31/4, Miscellaneous Licence 31/32, Mining Leases 31/78, 31/79, 31/88, 31/113, 31/284

G 3100004

L 3100032

M 3100078

M 3100079

M 3100088

M 3100113

M 3100284

99393 CONFIDENTIAL 01/10/2013 07/2012 - 07/2013 Lucy Bore Project, Annual Report for the period 30/07/2012 to 29/07/2013, E46/847.

E 4600847

99394 CONFIDENTIAL 01/10/2013 07/2012 - 06/2013 Aphrodite Project, Annual Report for the period 01/07/2012 to 30/06/2013, M24/662, 720, 779, 649 & 681. [C24/2008]

M 2400649

Printed: 18/02/2019 02:28:38 PMPage 455 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 456: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

AP MINING PTY LTD

ATLAS OPERATIONS PTY LTD

GALAXY LITHIUM AUSTRALIA LIMITED

GALAXY LITHIUM AUSTRALIA LIMITED

ACH MINERALS PTY LTD

FORGE RESOURCES SWAN PTY LTD

VENTUREX PILBARA PTY LTD

VENTUREX PILBARA PTY LTD

VENTUREX PILBARA PTY LTD

VENTUREX PILBARA PTY LTD

VENTUREX PILBARA PTY LTD

VENTUREX PILBARA PTY LTD

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

GEL RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

MESA MINERALS LIMITED

APHRODITE GOLD PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 456 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 457: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99394 CONFIDENTIAL 01/10/2013 07/2012 - 06/2013 Aphrodite Project, Annual Report for the period 01/07/2012 to 30/06/2013, M24/662, 720, 779, 649 & 681. [C24/2008]

M 2400662

M 2400681

M 2400720

M 2400779

99397 CONFIDENTIAL 02/10/2013 07/2012 - 06/2013 Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2012 – 30 June 2013 M16/164, M16/229, M16/257, M16/412, 413, M16/429, M16/491, 497, P16/2479-81

M 1600229

M 1600491

99399 CONFIDENTIAL 02/10/2013 08/2012 - 08/2013 Bathurst Island Iron Prospect Annual Report Exploration Licence E04/1589 for the period 10 August 2012 – 9 August 2013

E 0401589

99402 CONFIDENTIAL 02/10/2013 08/2012 - 08/2013 M45/115 ANNUAL EXPLORATION REPORT Reporting Period 15/08/2012 to 14/08/2013

M 4500115

99406 CONFIDENTIAL 02/10/2013 07/2012 - 06/2013 Combined Annual Report Parker Range Project C106/2009 For the Period 1st July 2012 to 30th June 2013, E77/1011......P77/4047

E 7701403

M 7700741

M 7700742

M 7700764

99408 CONFIDENTIAL 02/10/2013 07/2012 - 06/2013 Annual Technical Report Kookynie South Project C131/2009 for the period 01 July 2012 – 30 June 2013, E 40/233.......P40/1276

E 4000281

E 4000292

E 4000316

M 4000002

M 4000008

M 4000022

M 4000026

M 4000027

M 4000056

M 4000061

M 4000077

M 4000117

M 4000136

M 4000163

M 4000164

M 4000192

Printed: 18/02/2019 02:28:38 PMPage 457 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 458: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

APHRODITE GOLD PTY LTD

APHRODITE GOLD PTY LTD

APHRODITE GOLD PTY LTD

APHRODITE GOLD PTY LTD

STRATEGIC PROJECTS MINING PTY LTD

MILLWARD JOHN STEPHEN BLADONSTRATEGIC PROJECTS MINING PTY LTD

REGAL MINING PTY LTD

GARDNER MINING PTY LTD

CAZALY IRON PTY LTD

CAZALY IRON PTY LTD

CAZALY IRON PTY LTD

CAZALY IRON PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

NEX METALS EXPLORATIONS LTD

A & C MINING INVESTMENT PTY LTD

NEX METALS EXPLORATIONS LTD

A & C MINING INVESTMENT PTY LTD

NEX METALS EXPLORATIONS LTD

NEX METALS EXPLORATIONS LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 458 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 459: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99408 CONFIDENTIAL 02/10/2013 07/2012 - 06/2013 Annual Technical Report Kookynie South Project C131/2009 for the period 01 July 2012 – 30 June 2013, E 40/233.......P40/1276

M 4000196

P 4001132

P 4001179

P 4001275

P 4001276

99410 CONFIDENTIAL 02/10/2013 07/2012 - 06/2013 Annual Report, Cooljarloo Project, Combined Reporting Group C97/2007 (E70/2636, E70/2898, E70/3292, E70/3997, P70/1516), North Perth Basin, Western Australia, Reporting period 1 July 2012 to 30 June 2013

E 7002636

E 7002898

E 7003997

E 7004129

E 7004130

E 7004244

P 7001516

99413 CONFIDENTIAL 04/10/2013 08/2012 - 07/2013 Annual Report for M80/526 Forrest River Diamond Project for the period 1st August 2012 to 31st July 2013

M 8000526

99432 CONFIDENTIAL 04/10/2013 07/2012 - 06/2013 Coolgardie North Project, Annual Report for the period 01/07/2012 to 30/06/2013, M15/26, 518, 637, 1272, & 1361; P15/4848, 4849, 4851, 4852, 5234 & 5235. [ C188/1997]

M 1500026

M 1500518

M 1500637

M 1501272

M 1501361

P 1504848

P 1504849

P 1504851

P 1504852

P 1505235

99434 CONFIDENTIAL 04/10/2013 08/2012 - 08/2013 Lake OGrady Project, Annual Report for the period 13/08/2012 to 12/08/2013, E70/4188.

E 7004188

99435 CONFIDENTIAL 04/10/2013 07/2012 - 06/2013 Windimurra Project, Annual Report for the period 01/07/2012 to 30/06/2013, e58/113, 117 & 198; M58/178, 279 & 280.

E 5800113

E 5800117

E 5800198

M 5800178

Printed: 18/02/2019 02:28:38 PMPage 459 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 460: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

COLEMAN SUSAN FRANCESA & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

A & C MINING INVESTMENT PTY LTD

IMAGE RESOURCES NL

IMAGE RESOURCES NL

IMAGE RESOURCES NL

TRONOX MANAGEMENT PTY LTD

TRONOX MANAGEMENT PTY LTD

IMAGE RESOURCES NL

IMAGE RESOURCES NL

MERLIN DIAMONDS LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

HBJ MINERALS PTY LTD

HBJ MINERALS PTY LTD

NORTHERN STAR (HBJ) PTY LTD

LAKE HILLMAN MINING PTY LTD

MIDWEST VANADIUM PTY LTD

MIDWEST VANADIUM PTY LTD

MIDWEST VANADIUM PTY LTD

MIDWEST VANADIUM PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 460 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 461: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99435 CONFIDENTIAL 04/10/2013 07/2012 - 06/2013 Windimurra Project, Annual Report for the period 01/07/2012 to 30/06/2013, e58/113, 117 & 198; M58/178, 279 & 280.

M 5800279

M 5800280

99436 CONFIDENTIAL 04/10/2013 07/2012 - 09/2013 7 Mile Hill Project, Annual Report for the period 26/07/2012 to 30/09/2013, M15/1233-1234, 1291, 1388, 1394 & 1409; M26/563; P26/3617; P15/5182-5184.

M 1501233

M 1501234

M 1501291

M 1501388

M 1501394

M 1501409

M 2600563

P 1505182

P 1505183

99437 CONFIDENTIAL 04/10/2013 10/2012 - 09/2013 Yuinmery Project, Annual Report for the period 01/10/2012 to 30/09/2013, P57/1214-1217; M57/265; E57/766 & 840. [C3/1998]

M 5700265

P 5701214

P 5701215

P 5701216

P 5701217

99438 CONFIDENTIAL 04/10/2013 08/2012 - 08/2013 Wonmunna Project, Annual Report for the period 29/08/2012 to 28/08/2013, e47/1137.

E 4701137

99440 CONFIDENTIAL 04/10/2013 07/2012 - 06/2013 Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009, M28/241, M28/243, M28/266, M28/269, M31/295, M31/311, P28/1185 and P31/2025

E 3101009

M 2800241

M 2800243

M 2800266

M 2800269

M 3100295

M 3100311

Printed: 18/02/2019 02:28:38 PMPage 461 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 462: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MIDWEST VANADIUM PTY LTD

MIDWEST VANADIUM PTY LTD

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

MOUNT MANNING RESOURCES LTD

RAND EXPLORATION NLTRIBUNE RESOURCES NL

RAND EXPLORATION NLTRIBUNE RESOURCES NL

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

EMPIRE RESOURCES LIMITED

WONMUNNA IRON ORE PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 462 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 463: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99441 CONFIDENTIAL 03/10/2013 07/2012 - 06/2013 Carosue Dam Project C64/2001Annual Report for the period 1 July 2012 to 30 June 2013 E28/828, E28/1747, M28/166, M28/167, M28/168, M28/245, M31/219, M31/220 and P28/1128

E 2801747

M 2800166

M 2800167

M 2800168

M 2800245

M 3100219

M 3100220

99447 CONFIDENTIAL 03/10/2013 08/2012 - 08/2013 Mount Stuart Project, Annual Report for the period 08/08/2012 to 07/08/2013, E08/1292, 1330 & 1341. [C207/1998]

E 0801292

E 0801330

E 0801341

99455 CONFIDENTIAL 03/10/2013 07/2012 - 06/2013 Annual Technical Report Kookynie Project For the period 01/07/2012 to 30/06/2013 Tenement: E 40/289

E 4000289

99456 CONFIDENTIAL 03/10/2013 09/2012 - 09/2013 Annual Report for R63/3 Salmon Gums Project for the period 4 September 2012 to 3 September 2013

R 6300003

99459 CONFIDENTIAL 03/10/2013 08/2012 - 08/2013 Annual Mineral Exploration Report for the Bullfinch - Newfield Project. Combined Reporting Group C118/2002, M77/422, M77/846 for the period August 2012 – 3 August 2013

M 7700422

M 7700846

99468 CONFIDENTIAL 07/10/2013 09/2012 - 09/2013 Zelica / Eucalyptus Project P39/4566 Annual Report 28th September 2012 to 27th September 2013

P 3904566

99470 CONFIDENTIAL 07/10/2013 07/2012 - 06/2013 Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M31/156, M31/208, M31/209, M31/210 M31/212, M31/213, M31/273, M31/274, M31/275, M31/285 AND P31/1764

M 3100156

M 3100208

M 3100209

M 3100210

M 3100212

M 3100213

M 3100273

M 3100274

M 3100275

M 3100285

99472 CONFIDENTIAL 07/10/2013 09/2012 - 09/2013 E27/457 Annual Report for the period 10 September 2012 – 9 September 2013 E 2700457

Printed: 18/02/2019 02:28:38 PMPage 463 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 464: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

API MANAGEMENT PTY LTD

CULLEN EXPLORATION PTY LIMITED

API MANAGEMENT PTY LTD

PARIS ENTERPRISES (WA) PTY LTD

SPITFIRE OIL PTY LTD

NEWFIELD RESOURCES LTD

NEWFIELD RESOURCES LTD

EXTERRA RESOURCES LIMITED

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

NORTHERN STAR (KANOWNA) PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 464 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 465: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99474 CONFIDENTIAL 07/10/2013 09/2012 - 08/2013 Lodestone Iron Ore Project C54/2009 Annual Technical Report for the period to 31/08/2013, E59/1002, E59/1180, E59/1421, E59/1422, E59/1584, E59/1585, E59/1798, P59/1847, P59/1881, P59/1882

E 5901002

99483 CONFIDENTIAL 08/10/2013 07/2012 - 07/2013 Annual Report Cooljarloo Mineral Sands Project E70/3065 for the period 16th July 2012 to 15th July 2013

E 7003065

99485 CONFIDENTIAL 08/10/2013 07/2012 - 07/2013 Weeriana Project Annual Report Exploration Licence 47/1272 for the period of 24th July 2012 to 23rd July 2013

E 4701272

99494 CONFIDENTIAL 08/10/2013 09/2012 - 09/2013 Annual Report M80/418 Halls Creek Project M80/418 for the period 6th September 2012 to 5th September 2013

M 8000418

99502 CONFIDENTIAL 09/10/2013 08/2012 - 08/2013 Minga Well Project E59/1151-I Annual Mineral Exploration Report For the year ended 10th August, 2013

E 5901151

99508 CONFIDENTIAL 09/10/2013 07/2012 - 06/2013 Mount Celia Project Annual Report 1 July 2012 to 30 June 2013 C139/2002 E 3901272

E 3901273

M 3900038

M 3900129

M 3900307

M 3900309

M 3900588

M 3900589

M 3900591

M 3900638

M 3900639

M 3900740

M 3900741

P 3904567

P 3904568

P 3904650

99512 CONFIDENTIAL 03/10/2013 04/2013 - 10/2013 Kalgoorlie Consolidated Gold Mines, Interim report for the period 1 April 2013 to 3 October 2013, Corsair Tenements, part of the Fimiston Project, C12/2000 M26/577, M26/625, P26/3087, P26/3088 & P26/3089

M 2600577

M 2600625

P 2603087

P 2603088

Printed: 18/02/2019 02:28:38 PMPage 465 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 466: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GINDALBIE METALS LTD

TRONOX MANAGEMENT PTY LTD

NORTH DONALD KIMBERLEY

KIMBERLY RESOURCES LTD

WESTRALIAN IRON PTY LTD (ACN 106 448 695)

ROYAL HARRY GOLD MINES NLSARACEN GOLD MINES PTY LTD

ROYAL HARRY GOLD MINES NLSARACEN GOLD MINES PTY LTD

MATSA GOLD PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

SARACEN GOLD MINES PTY LTD

HODGES MURRAY KENNETHHODGES RODNEY CHARLES

HODGES MURRAY KENNETHHODGES RODNEY CHARLES

WILSON WALTER SCOTT

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 466 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 467: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99512 CONFIDENTIAL 03/10/2013 04/2013 - 10/2013 Kalgoorlie Consolidated Gold Mines, Interim report for the period 1 April 2013 to 3 October 2013, Corsair Tenements, part of the Fimiston Project, C12/2000 M26/577, M26/625, P26/3087, P26/3088 & P26/3089

P 2603089

99514 CONFIDENTIAL 10/10/2013 08/2012 - 08/2013 Spinifex Abrasive Project E04/1026 Annual Report for the period ended 2 August 2013

E 0401026

99516 CONFIDENTIAL 10/10/2013 01/2012 - 12/2012 Annual Report Year Ending 31 December 2012 Group Number: C 65/1995 Group Name: Melrose Tenements: E 37/1015, E 37/1017, E 37/1050, E 37/1051, E 37/1052, M 37/108, M 37/519, M 37/1167 Projects: Melrose, Wonganoo

E 3701015

E 3701017

E 3701050

E 3701051

E 3701052

M 3700108

M 3700519

M 3701167

99518 CONFIDENTIAL 10/10/2013 07/2012 - 06/2013 2013 Annual Report on the Deflector Extended Project E59/1657 for the period 1 July 2012 – 30 June 2013

E 5901657

99528 CONFIDENTIAL 11/10/2013 09/2012 - 08/2013 Nabberu 01 Kimberlite Exploration licence 52/2517 Third Annual Technical Report Period ending 31 August 2013

E 5202517

99529 CONFIDENTIAL 11/10/2013 08/2012 - 08/2013 13 Mile Well Project, Annual Report on M47/442, for the period ended 15 August 2013.

M 4700442

99535 CONFIDENTIAL 11/10/2013 07/2012 - 07/2013 Annual Report Mining Lease M47/434 for the period of 31st July 2012 to 30th July 2013

M 4700434

99536 CONFIDENTIAL 11/10/2013 08/2012 - 08/2013 Annual Report (13.08.2012 - 12.08.2013) Duck Creek Bridge Mining Lease M08/468 Exploration Report

M 0800468

99538 CONFIDENTIAL 11/10/2013 09/2012 - 09/2013 Mungari East Joint Venture Combined Annual Report for the period 6 September 2012 to 5 September 2013, M15/688, M15/689, M15/1287, M15/836, M15/837, M15/1188 & M15/1408, C317/1993

M 1500688

M 1500689

M 1500836

M 1500837

M 1501188

M 1501287

M 1501408

99541 CONFIDENTIAL 11/10/2013 07/2012 - 07/2013 Annual report for the period 8 July 2012 to 7 July 2013 Lawson Gold Project, M27/262 - M27/265, E27/345, E27/432, E27/478, P27/2075 – P27/2078 (C107/2003)

E 2700345

M 2700263

Printed: 18/02/2019 02:28:38 PMPage 467 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 468: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BARRICK (AUSTRALIA PACIFIC) PTY LIMITEDKALGOORLIE LAKE VIEW PTY LTD

SPINIFEX ABRASIVES PTY LTD

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

MINREX RESOURCES LIMITED

AUS DIAMOND MINING GROUP PTY LTD

NORTH DONALD KIMBERLEY

NORTH DONALD KIMBERLEY

REGIONAL RESOURCES NW PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

ODIN METALS LIMITEDMOHO RESOURCES LIMITED

ODIN METALS LIMITEDMOHO RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 468 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 469: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99555 CONFIDENTIAL 15/10/2013 09/2012 - 09/2013 Ophthalmia Dam Annual Report Exploration Licence 52/1894 for the period 10 September 2012 – 9 September 2013

E 5201894

99557 CONFIDENTIAL 15/10/2013 08/2012 - 08/2013 Annual report for the period 18th. August 2012 to 17th August 2013, Barrambie Project, M57/173, E57/769, E57/770, E57/819 (C150/2009)

E 5700769

E 5700770

M 5700173

99558 CONFIDENTIAL 14/10/2013 09/2012 - 09/2013 Mineral Exploration Annual Tenement Report E45/3648 McPhees Gold Project for the period 06/09/12 - 05/09/13

E 4503648

99562 CONFIDENTIAL 16/10/2013 08/2012 - 08/2013 Reporting Information for the period 20 August 1998 to 19 August 2012 Up to and Including 20 August 2012 to 19 August 2013, 45 Mile - Mount Ida, M29/181 & 182 (C12/2006)

M 2900181

99563 CONFIDENTIAL 16/10/2013 09/2012 - 09/2013 Lady Bountiful Project M24/862 Annual Technical Report For The Twelve Months Ending 2 September 2013

M 2400862

99564 CONFIDENTIAL 14/10/2013 08/2012 - 08/2013 Tampia Project (C237/1998) Annual Report 2013 for the period 12 August 2012 – 11 August 2013, M70/815, M70/816, E70/2132, E70/4411, E70/4420, E70/4433 P70/1637, P70/1638 & P70/1645

E 7002132

E 7004411

E 7004420

E 7004433

M 7000815

M 7000816

99568 CONFIDENTIAL 14/10/2013 07/2012 - 07/2013 Kat Gap (C99/2011) E74/0422, E74/0467, P74/0339 Combined Annual report for period 23 July 2012 to 22 July 2013

E 7400422

E 7400467

99569 CONFIDENTIAL 14/10/2013 08/2012 - 07/2013 Annual Report East Menzies Goldfield Project – C42/2010, M29/0141, P29/1928, P29/1929, P29/1930 and P29/1931 for the period 1 August 2012 to 31 July 2013

M 2900141

99570 CONFIDENTIAL 14/10/2013 07/2012 - 07/2013 Balladonia Project E69/2755 and E69/2788 Combined Annual Technical Report 29 July 2012- 28 July 2013

E 6902788

99578 CONFIDENTIAL 17/10/2013 09/2012 - 09/2013 Annual Technical Report Eucla West Project E69/2386, E69/2388 and E69/2436 Period 18th September 2012 – 17th of September 2013 Combined Technical Reporting Number C93/2009

E 6902386

E 6902388

E 6902436

99579 CONFIDENTIAL 16/10/2013 09/2012 - 09/2013 Annual Mineral Exploration Report Mt Lucky Project M38/1256 (previously P38/3313) reporting period 03/09/2012 to 02/09/2013

M 3801256

Printed: 18/02/2019 02:28:38 PMPage 469 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 470: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAMERSLEY IRON PTY LIMITED

AUSTRALIAN TITANIUM PTY LTD

AUSTRALIAN TITANIUM PTY LTD

AUSTRALIAN TITANIUM PTY LTD

PILGANGOORA OPERATIONS PTY LTD

SPRIGG ANDREW BOYDTOWNSON HOLDINGS PTY LTD

PADDINGTON GOLD PTY LIMITED

GOLDORO PTY LTDEXPLAURUM OPERATIONS PTY LTD

EXPLAURUM OPERATIONS PTY LTD

EXPLAURUM OPERATIONS PTY LTD

EXPLAURUM OPERATIONS PTY LTD

TAMPIAGOLD PTY LTDEXPLAURUM OPERATIONS PTY LTD

TAMPIAGOLD PTY LTDEXPLAURUM OPERATIONS PTY LTD

SULPHIDE RESOURCES PTY LTD

SULPHIDE RESOURCES PTY LTD

MENZIES GOLDFIELD LIMITED

SALAZAR GOLD PTY LTD

WESTOVER HOLDINGS PTY LTDWILD SIDE (WA) PTY LTDFORGE RESOURCES CROWN PTY LTD

WESTOVER HOLDINGS PTY LTDWILD SIDE (WA) PTY LTDFORGE RESOURCES CROWN PTY LTD

WESTOVER HOLDINGS PTY LTDWILD SIDE (WA) PTY LTDFORGE RESOURCES CROWN PTY LTD

GREAT SOUTHERN MINING LIMITED

Printed: 18/02/2019 02:28:38 PMPage 470 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 471: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99582 CONFIDENTIAL 17/10/2013 07/2012 - 06/2013 2013 Annual Report, Stratton’s Project, C175/2012 (E45/3951 & E45/3952) for the period 1st July 2012 to the 30th June 2013

E 4503952

99584 CONFIDENTIAL 17/10/2013 07/2012 - 06/2013 Golden Ridge Project C89/1994 E26/139, M26/219–223, M26/225, M26/284–289, M26/384 Combined Annual Report for the period 1 July 2012 to 30 June 2013

E 2600139

M 2600220

M 2600222

M 2600284

M 2600285

99588 CONFIDENTIAL 17/10/2013 08/2012 - 08/2013 Annual Report to the Department of Mines and Petroleum for the Tropicana Group 2 project (C56/2005) for the period 21/8/2012 to 20/8/2013, E39/1012, E39/1013, E39/1037, E39/1038, E39/1040, E39/1041, E39/1042, E39/1043, E39/1044, E39/1212, E39/1214, E39/1238

E 3901012

E 3901013

99589 CONFIDENTIAL 17/10/2013 08/2012 - 08/2013 Annual Report to the Department of Mines and Petroleum for the Tropicana Group 1 Project (C154/2002) for the period 21/8/2012 to 20/8/2013, E39/952....M39/1052

E 3900952

E 3900956

E 3901009

E 3901010

E 3901306

M 3900978

M 3900979

M 3900980

M 3900981

M 3900982

M 3900983

M 3900984

M 3900985

Printed: 18/02/2019 02:28:38 PMPage 471 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 472: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WITX PTY LTD

NORTHERN STAR (HBJ) PTY LTD

GOLDEN RIDGE NORTH KAMBALDA PTY LTD

GOLDEN RIDGE NORTH KAMBALDA PTY LTD

GOLDEN RIDGE NORTH KAMBALDA PTY LTD

GOLDEN RIDGE NORTH KAMBALDA PTY LTD

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

INDEPENDENCE GROUP NLANGLOGOLD ASHANTI AUSTRALIA LIMITED

INDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

Printed: 18/02/2019 02:28:38 PMPage 472 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 473: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99589 CONFIDENTIAL 17/10/2013 08/2012 - 08/2013 Annual Report to the Department of Mines and Petroleum for the Tropicana Group 1 Project (C154/2002) for the period 21/8/2012 to 20/8/2013, E39/952....M39/1052

M 3900986

M 3900987

M 3900988

M 3901010

M 3901011

M 3901012

M 3901013

M 3901014

M 3901015

M 3901016

M 3901017

M 3901018

M 3901019

M 3901020

M 3901021

M 3901028

M 3901029

M 3901030

M 3901048

M 3901049

M 3901050

Printed: 18/02/2019 02:28:38 PMPage 473 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 474: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

Printed: 18/02/2019 02:28:38 PMPage 474 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 475: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99589 CONFIDENTIAL 17/10/2013 08/2012 - 08/2013 Annual Report to the Department of Mines and Petroleum for the Tropicana Group 1 Project (C154/2002) for the period 21/8/2012 to 20/8/2013, E39/952....M39/1052

M 3901051

M 3901052

99593 CONFIDENTIAL 18/10/2013 07/2012 - 07/2013 Annual Operations Report Jundee South Project Exploration Lease E53/1101 Reporting Period: 28th July 2012 to 27th July 2013

E 5301101

99600 CONFIDENTIAL 18/10/2013 08/2012 - 08/2013 Annual Report For the period 8th August 2012 to 7th August 2013 Sholl East Prospect (M47/177)

M 4700177

99604 CONFIDENTIAL 18/10/2013 07/2012 - 07/2013 Annual Report East Menzies Goldfield Project – P29/2220 for the period 31 July 2012 – 30 July 2013

P 2902220

99611 CONFIDENTIAL 18/10/2013 10/2012 - 10/2013 Pilbailey JV Annual Mineral Exploration Report - DMP Combined Reporting Group C238/2008 Reporting Period 3rd October 2012- 2nd October 2013, E15/975, P15/4972-4977

E 1500975

99612 CONFIDENTIAL 18/10/2013 08/2012 - 08/2013 Combined Annual Mineral Exploration Report C394/1995 E29/548, E29/638, E29/767, E29/768, E29/769, E29/770, E36/741 for the period 31 August 2012 to 30 August 2013

E 2900548

E 2900638

E 3600741

99618 CONFIDENTIAL 21/10/2013 05/2012 - 05/2013 Annual Report East Menzies Goldfield Project – P29/2175 for the period 31 May 2012 – 30 May 2013

P 2902175

99619 CONFIDENTIAL 21/10/2013 07/2012 - 07/2013 Annual Report East Menzies Goldfield Project – P29/2221 for the period 31 July 2012 – 30 July 2013

P 2902221

99624 CONFIDENTIAL 21/10/2013 08/2012 - 08/2013 Combined Annual Report on Mt. Marion C110/2011 for the period 21st. August 2012 to 20th. August 2013 for M15/999, M15/1000 and E15/1190

M 1500999

M 1501000

99630 CONFIDENTIAL 23/10/2013 06/2012 - 06/2013 Triple Eight Titanomagnetite Project Annual Mineral Exploration Report for the Period Ending 25 June 2013 M 70/888, Southwest mineral Field Western Australia

M 7000888

99632 CONFIDENTIAL 23/10/2013 07/2012 - 07/2013 Combined Annual Report for Exploration Licences 70/2509 and 70/2546 and Mining Lease 70/1280 27th July 2012 to 26th July 2013 C17/2010, E70/2509, E70/2546, M70/1280

E 7002509

M 7001280

99633 CONFIDENTIAL 23/10/2013 08/2012 - 08/2013 Mulga Downs Project Combined Annual Report Combined Reporting Group C114/2007 Mulga Downs Group 2 For the Year Ending 03 August 2013 E47/1314 Corboy E47/1315 Mulga West E47/2044 Hester Peak E47/2221 Boundary Bore

E 4701314

E 4701315

E 4702044

E 4702221

Printed: 18/02/2019 02:28:38 PMPage 475 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 476: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

ANGLOGOLD ASHANTI AUSTRALIA LIMITEDINDEPENDENCE GROUP NL

GREAT BOULDER RESOURCES LTD

WESTERN METALS PTY LTD

MENZIES GOLDFIELD LIMITED

BORDER RESOURCES NLST IVES GOLD MINING COMPANY PTY LIMITED

BLUE THUNDER RESOURCES PTY LTD

WESTERN AREAS LIMITEDBLUE THUNDER RESOURCES PTY LTD

BLUE THUNDER RESOURCES PTY LTD

MENZIES GOLDFIELD LIMITED

MENZIES GOLDFIELD LIMITED

REED INDUSTRIAL MINERALS PTY LTD

REED INDUSTRIAL MINERALS PTY LTD

WATTS-BUTLER DENISE ELAINE

AUSTRALIAN GARNET PTY LTD

AUSTRALIAN GARNET PTY LTD

HANCOCK PROSPECTING PTY LTD

HANCOCK PROSPECTING PTY LTD

CENTRAL PILBARA NORTH IRON ORE PTY LTD

MULGA DOWNS IRON ORE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 476 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 477: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99636 CONFIDENTIAL 23/10/2013 10/2012 - 10/2013 Mt Wall - Anthiby Well Project Annual Report to the Department of Mines and Petroleum for the Period Ending 7 October 2013, E08/1275 E08/1464 E08/1712 E08/1964 P08/534 and P08/535

E 0801712

99644 CONFIDENTIAL 24/10/2013 09/2012 - 09/2013 Annual Technical Report Yandicoogina ML274SA for the period 19 September 2012 – 18 September 2013

AM 7000274

99645 CONFIDENTIAL 24/10/2013 08/2012 - 08/2013 Combined annual report C 196/1994 for the period 26 August 2012 to 25 August 2013, Mt Mulgine Project, E59/1324, E59/1057 M59/386, M59/387, M59/425, P59/1785, P59/1786, P59/1788, P59/1789

E 5901324

M 5900386

M 5900387

M 5900425

99646 CONFIDENTIAL 25/10/2013 07/2012 - 06/2013 Poondano Project 2013, Annual Report - 01 July 2012 to 30 June 2013, E45/2723 – I, E 45/3114 – I, E 45/3115 – I, E45/3786, E45/3788, and M45/1189 – I, C148/2007

E 4502723

M 4501189

99649 CONFIDENTIAL 25/10/2013 06/2012 - 06/2013 Combined Annual Technical Report C280/2011 South Darlot Joint Venture for the Period from 29th June 2011 to 30th June 2013 covering M37/552, M37/631, M37/709, M37/1045, P37/7364, P37/7365, P37/7366 & P37/7367

M 3700552

M 3700631

M 3700709

M 3701045

99651 CONFIDENTIAL 25/10/2013 07/2012 - 06/2013 Combined Annual Technical Report C1/2009 for the period 4 July 2012 to 3 July 2013 South Darlot Gold Project E37/882, M37/030 & P37/7026

E 3700882

M 3700030

99658 CONFIDENTIAL 24/10/2013 08/2012 - 07/2013 Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2012 to 31/07/2013, E38/1958......P 38/3911

E 3801958

E 3802316

E 3802364

E 3802365

E 3802411

M 3800009

M 3800241

M 3800549

M 3800968

M 3800984

Printed: 18/02/2019 02:28:38 PMPage 477 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 478: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GIRALIA RESOURCES PTY LTD

HAMERSLEY IRON-YANDI PTY LIMITED

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

MINJAR GOLD PTY LTD

POLARIS METALS PTY LTD

POLARIS METALS PTY LTD

DARLOT MINING COMPANY PTY LTDSOUTH DARLOT MINES PTY LTD

DARLOT MINING COMPANY PTY LTDSOUTH DARLOT MINES PTY LTD

DARLOT MINING COMPANY PTY LTDSOUTH DARLOT MINES PTY LTD

DARLOT MINING COMPANY PTY LTDSOUTH DARLOT MINES PTY LTD

CENTRAL IRON ORE LTD

CENTRAL IRON ORE LTDBK GOLD MINES PTY LTD

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

DESERT EXPLORATION PTY LTD

STONE RESOURCES AUSTRALIA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 478 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 479: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99658 CONFIDENTIAL 24/10/2013 08/2012 - 07/2013 Annual Exploration Report for C101/2005 Brightstar Project for 01/08/2012 to 31/07/2013, E38/1958......P 38/3911

M 3801056

M 3801057

M 3801058

P 3803905

P 3803911

99659 CONFIDENTIAL 24/10/2013 06/2012 - 06/2013 Sorby Hills Project. Combined Annual Report for M80/196, 197, 285, 286 & 287 for the period ending 14 June 2013 (C9/2008)

M 8000196

M 8000197

M 8000285

M 8000286

M 8000287

99667 CONFIDENTIAL 29/10/2013 09/2012 - 08/2013 Annual Technical Report On Pinjarra Group Tenements Report Period: 1/9/2012 – 31/8/2013, C106/2002, E70/3977, E70/4040, E70/4039, E70/2495, M70/50, M70/735, M70/737, M70/797, M70/798, M70/1089, M70/1180, R70/9, R70/37

E 7002495

E 7004040

M 7000050

M 7000735

M 7000737

M 7000797

M 7001089

M 7001180

R 7000009

R 7000037

99668 CONFIDENTIAL 29/10/2013 09/2012 - 08/2013 Technical Report C109/2002 Annual Report for the period 01/09/2012 – 31/08/2013 Eneabba Project E70/953.....M70/1039

E 7000953

M 7000492

M 7000683

M 7000684

M 7000685

M 7000686

M 7000687

Printed: 18/02/2019 02:28:38 PMPage 479 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 480: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

STONE RESOURCES AUSTRALIA LIMITED

YUGUANG (AUSTRALIA) PTY LTDSORBY HILLS PTY LTD

YUGUANG (AUSTRALIA) PTY LTDSORBY HILLS PTY LTD

YUGUANG (AUSTRALIA) PTY LTDSORBY HILLS PTY LTD

YUGUANG (AUSTRALIA) PTY LTDSORBY HILLS PTY LTD

YUGUANG (AUSTRALIA) PTY LTDSORBY HILLS PTY LTD

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA RESOURCES LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

ILUKA MIDWEST LIMITED

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

Printed: 18/02/2019 02:28:38 PMPage 480 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 481: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99668 CONFIDENTIAL 29/10/2013 09/2012 - 08/2013 Technical Report C109/2002 Annual Report for the period 01/09/2012 – 31/08/2013 Eneabba Project E70/953.....M70/1039

M 7000688

M 7000689

M 7000821

M 7000870

M 7000879

M 7000984

M 7001039

99670 CONFIDENTIAL 29/10/2013 08/2012 - 07/2013 Pioneer Project Combined Annual Report for the period ended 31/07/2013 (C10/2002) E63/1117 M63/329, M63/368, P63/1429, P63/1468, P63/1413 and P63/1414

E 6301117

M 6300329

M 6300368

P 6301468

99671 CONFIDENTIAL 29/10/2013 07/2012 - 06/2013 Goongarrie Gold Project Combined Report for the period ending 30 June 2013 (P29/2152-2156)

P 2902153

P 2902154

P 2902155

P 2902156

99675 CONFIDENTIAL 29/10/2013 08/2012 - 08/2013 ANNUAL REPORT ON THE SNOW FOR THE PERIOD 30th August 2012 to the 29th August 2013 FORRESTANIA GREENSTONE BELT, WESTERN AUSTRALIA Reporting: P77/4115 AR 2013 Licence: P77 /4115

P 7704115

99676 CONFIDENTIAL 29/10/2013 08/2012 - 08/2013 East Laverton Project C171/2012 Annual Report for the period 2 August 2012 to 1 August 2013, E39/981.....E39/1667

E 3900981

E 3900982

E 3900985

E 3901066

E 3901229

E 3901461

E 3901467

E 3901472

E 3901473

E 3901474

E 3901475

Printed: 18/02/2019 02:28:38 PMPage 481 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 482: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

WESTERN TITANIUM LTD

WESTERN TITANIUM LTD

ILUKA MIDWEST LIMITED

RENISON LIMITED

ILUKA MIDWEST LIMITED

RENISON LIMITED

ILUKA MIDWEST LIMITED

STEHN TRENT PATERSONAVOCA RESOURCES PTY LTD

STEHN TRENT PATERSONAVOCA RESOURCES PTY LTD

STEHN TRENT PATERSONAVOCA RESOURCES PTY LTD

STEHN TRENT PATERSONAVOCA RESOURCES PTY LTD

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

BLACK MOUNTAIN GOLD LIMITED

MH GOLD PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 482 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 483: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99676 CONFIDENTIAL 29/10/2013 08/2012 - 08/2013 East Laverton Project C171/2012 Annual Report for the period 2 August 2012 to 1 August 2013, E39/981.....E39/1667

E 3901476

E 3901492

E 3901518

E 3901519

E 3901520

E 3901521

E 3901549

E 3901572

E 3901608

E 3901666

E 3901667

99679 CONFIDENTIAL 28/10/2013 08/2012 - 08/2013 Combined Annual Report C124/2007 Ponton Project for period 24 August 2012 to 23 August 2013 Exploration Licences E39/1140, 39/1141, 39/1142, 39/1143, 39/1144, 39/1542, 39/1543, 39/1544, 39/1545, 39/1593, 28/1523, 28/1979, 28/2047, 28/2048, E28/1898, E28/1893 and E28/2004

E 2801898

99691 CONFIDENTIAL 30/10/2013 07/2012 - 06/2013 Carnilya Hill Project C360/1993 Annual Technical Report for the period 1 July 2012 to 30 June 2013, M26/47, M26/48, M26/49, M26/453

M 2600047

M 2600048

M 2600049

M 2600453

99694 CONFIDENTIAL 30/10/2013 07/2012 - 07/2013 Annual Mineral Exploration Report for Gold Hill Project Mining Lease M37/220 for the period 10 July 2012 to 9 July 2013

M 3700220

99700 CONFIDENTIAL 30/10/2013 06/2008 - 08/2013 Final Surrender Report, Prospecting licence P59/1857 for the period ended 29 Ausgust 2013

P 5901857

99701 CONFIDENTIAL 30/10/2013 03/2012 - 08/2013 FINAL SURRENDER REPORT EXPLORATION LICENCE 59/1773 EXTENSION HILL 2012-13

E 5901773

99702 CONFIDENTIAL 30/10/2013 05/2012 - 08/2013 Final Surrender Report, Prospecting licence P59/1967 Extension Hill for the period ended 29 August 2013

P 5901967

99706 CONFIDENTIAL 30/10/2013 07/2012 - 06/2013 Pool Well Project - Combined Annual Report CR# C252/2007 M38/1243, M38/1244, M38/1245 for the period 1 July 2012 to 30 June 2013

M 3801244

M 3801245

99707 CONFIDENTIAL 30/10/2013 10/2012 - 10/2013 Brockman Valley Project Area Combined Annual Report for E47/661, E47/1054, E47/47 for the period 2 October 2012 to 1 October 2013

E 4700047

Printed: 18/02/2019 02:28:38 PMPage 483 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 484: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

DESERT FOX RESOURCES PTY LTD

MANHATTAN CORPORATION LIMITED

VIEW NICKEL PTY LTDMINCOR RESOURCES NL

VIEW NICKEL PTY LTDMINCOR RESOURCES NL

VIEW NICKEL PTY LTDMINCOR RESOURCES NL

VIEW NICKEL PTY LTDMINCOR RESOURCES NL

BOUVERIE ERWINLUCAS GOLD PTY LTDTRINDAL PTY LTDCENTRAL GOLD PTY LTDGABB ROBERT

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

POSEIDON NICKEL LIMITED

POSEIDON NICKEL LIMITED

HAMERSLEY EXPLORATION PTY LIMITED

Printed: 18/02/2019 02:28:38 PMPage 484 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 485: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99707 CONFIDENTIAL 30/10/2013 10/2012 - 10/2013 Brockman Valley Project Area Combined Annual Report for E47/661, E47/1054, E47/47 for the period 2 October 2012 to 1 October 2013

E 4700661

E 4701054

99710 CONFIDENTIAL 30/10/2013 08/2012 - 08/2013 Combined Annual Report C95/2007 (Maynard, Mt. Richardson, Perrinvale and Barlee) E29/564, E29/565, E29/571, E29/593, E29/653, E29/655, E29/682, E29/691, E29/694, E29/697, E29/698, E29/710, E29/736, E29/737, E30/291, E30/331, E30/350, E30/356, E57/746, E57/749, E57/792, E57/803, P29/1922, P29/1923, P29/1926, P29/1927, P29/2065, P29/2066, P29/2067, P29/2068 and P30/1011. For the period 11 August 2012 to 10 August 2013

E 2900571

99711 CONFIDENTIAL 30/10/2013 08/2012 - 08/2013 Annual Exploration Report: Kambalda West Project C443/1996 (11/08/2012 – 10/08/2013) E15/967, E15/968, M15/395, M15/703, P15/4299, P15/4884, P15/4885, P15/4963

M 1500395

M 1500703

99715 CONFIDENTIAL 31/10/2013 05/2012 - 05/2013 Annual Report on Mining Lease M15/1473 Coondarrie Project for the period 17/5/2012 to 16/5/2013

M 1501473

99717 CONFIDENTIAL 31/10/2013 09/2012 - 09/2013 Annual Report E38/2710 for the period 5th September 2012 to 4th September 2013 Lake Wells Project

E 3802710

99719 CONFIDENTIAL 31/10/2013 09/2012 - 09/2013 Anvil Project E47/1560 Annual Mineral Exploration Report For the period 6 September 2012 to 5 September 2013

E 4701560

99721 CONFIDENTIAL 31/10/2013 09/2012 - 09/2013 Annual Exploration Report for E45/3586 for the period 05/09/2012 to 04/09/2013

E 4503586

99722 CONFIDENTIAL 31/10/2013 09/2012 - 09/2013 Annual Report – Marillana Creek M270SA - Reporting Period 4 September 2012 – 3 September 2013

AM 7000270

99723 CONFIDENTIAL 01/11/2013 07/2012 - 07/2013 Annual Report E38/2552 Ironstone Range Project For the period 21st July 2012 to 20th July 2013

E 3802552

99724 CONFIDENTIAL 01/11/2013 07/2012 - 07/2013 E63/1222 Lake Johnston Project For the period 30th July 2012 to 29th July 2013

E 6301222

99725 CONFIDENTIAL 31/10/2013 08/2012 - 08/2013 Combined annual report for the period 31 August 2012 to 30 August 2013, Jump-up Dam Project, C168/2005, M31/475, M31/477, M31/479

M 3100475

M 3100477

M 3100479

99726 CONFIDENTIAL 31/10/2013 09/2012 - 08/2013 Combined Annual Report, McIntosh Project C191/2010, E80/3864, E80/3906-7, E80/3928, E80/4396 andE80/4688, for the period 1st September 2012 to 31st August 2013

E 8003864

E 8003906

E 8003907

E 8003928

E 8004688

Printed: 18/02/2019 02:28:38 PMPage 485 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 486: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

HAMERSLEY EXPLORATION PTY LIMITED

HAMERSLEY IRON PTY LIMITED

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

TYCHEAN RESOURCES LTD

TYCHEAN RESOURCES LTD

SCORPION MINING PTY LTD

PIPER PRESTON PTY LTD

FLINDERS MINES LIMITED

GARDNER MINING PTY LTD

BHP BILLITON MINERALS PTY LTDMITSUI IRON ORE CORPORATION PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTD

NORTHERN DRILLING PTY LTD

WHITE CLIFF MINERALS LIMITED

ARDEA EXPLORATION PTY LTD

ARDEA EXPLORATION PTY LTD

ARDEA EXPLORATION PTY LTD

MCINTOSH RESOURCES PTY LTD

MCINTOSH RESOURCES PTY LTD

MCINTOSH RESOURCES PTY LTD

MCINTOSH RESOURCES PTY LTD

MCINTOSH RESOURCES PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 486 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 487: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99728 CONFIDENTIAL 01/11/2013 09/2012 - 09/2013 Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases P59/1875, M59/595 & M59/596 for the period 10 September 2012 – 09 September 2013

M 5900595

M 5900596

99732 CONFIDENTIAL 01/11/2013 09/2012 - 08/2013 Annual Technical Report C93/2000 – Glandore Project for the period 01/09/2012 to 31/08/2013 (M25/327, 329, 330, P25/2073-2076 incl, P25/2089-2094 incl, P25/2103, P25/2117-2119 incl, P25/2153-2154, P25/2199 and P25/2202-2204 incl

M 2500327

M 2500329

M 2500330

P 2502153

P 2502154

P 2502202

P 2502203

P 2502204

99733 CONFIDENTIAL 01/11/2013 09/2012 - 09/2013 Annual Technical Report for the West Angelas Project Area E47/709, E47/797, E47/798 & E47/986 (C151/1999)

E 4700709

E 4700797

E 4700798

E 4700986

Printed: 18/02/2019 02:28:38 PMPage 487 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 488: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

ARUMA EXPLORATION PTY LTD

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

Printed: 18/02/2019 02:28:38 PMPage 488 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 489: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99757 CONFIDENTIAL 04/11/2013 08/2012 - 08/2013 Combined Annual Mineral Exploration report for the period 18 August, 2012 to 17 August, 2013, Kintore Partnership Project, C100/2012 (M16/289 and M16/351)

M 1600289

M 1600351

99768 CONFIDENTIAL 06/11/2013 06/2009 - 09/2013 Final Surrender Report E59/1533 [for period ended 18 September 2013] E 5901533

99769 CONFIDENTIAL 06/11/2013 06/2009 - 09/2013 Final Surrender Report E59/1534 [for the period ended 18 September 2013] E 5901534

99770 CONFIDENTIAL 06/11/2013 03/2010 - 09/2013 Final Surrender Report E59/1607 [for the period ended 18 September 2013] E 5901607

99771 CONFIDENTIAL 06/11/2013 07/2010 - 09/2013 Final Surrender Report M59/729 [for the period ended 18 September 2013] M 5900729

99783 CONFIDENTIAL 06/11/2013 07/2012 - 06/2013 Annual Report for Mount Monger Project C72/2004 E26/146.....P26/3874 for the period 1 July 2012 to 30 June 2013

E 2600146

M 2500136

M 2600038

M 2600059

M 2600094

M 2600129

M 2600250

M 2600251

M 2600271

M 2600278

M 2600280

M 2600282

M 2600325

M 2600352

M 2600389

M 2600393

M 2600402

M 2600410

M 2600411

M 2600415

M 2600437

M 2600440

Printed: 18/02/2019 02:28:38 PMPage 489 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 490: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DEVANT PTY LTDSOS ENTERPRISES PTY LTDDUGGAN DEANNA MARJORIEDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

DEVANT PTY LTDDUGGAN DEANNA MARJORIESOS ENTERPRISES PTY LTDDUGGAN DANIEL MAXWELLTOBIN PATRICK JOHN

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

KARARA MINING LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

Printed: 18/02/2019 02:28:38 PMPage 490 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 491: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99783 CONFIDENTIAL 06/11/2013 07/2012 - 06/2013 Annual Report for Mount Monger Project C72/2004 E26/146.....P26/3874 for the period 1 July 2012 to 30 June 2013

M 2600500

M 2600636

M 2600642

M 2600657

M 2600665

M 2600683

M 2600783

M 2600791

M 2600802

P 2603054

P 2603417

P 2603539

P 2603874

99784 CONFIDENTIAL 07/11/2013 09/2012 - 09/2013 Annual Mineral Exploration Report for the period 2nd Sept 2012 to 1st Sept 2013, C128/2010, M20/519.....P20/2177

M 2000519

M 2000520

M 2000522

P 2002026

P 2002027

P 2002035

P 2002044

P 2002067

P 2002074

P 2002118

P 2002134

P 2002135

P 2002136

P 2002160

P 2002162

P 2002174

P 2002177

99801 CONFIDENTIAL 07/11/2013 09/2012 - 09/2013 Annual report for the period 7th September 2012 to 6th September 2013 combined report C122/2002 Waroona E70/2407 and E70/2610

E 7002407

Printed: 18/02/2019 02:28:38 PMPage 491 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 492: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

SILVER LAKE RESOURCES LIMITED

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

WESTERN MINING PTY LTD

KEYSBROOK LEUCOXENE PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 492 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 493: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99802 CONFIDENTIAL 07/11/2013 07/2012 - 06/2013 Wiluna C25/2008 Annual Exploration Report for the period ended 30 June 2013 M53/6, M53/26, M53/27, M53/30, M53/32, M53/40, M53/43, M53/44, M53/50, M53/64, M53/69, M53/71, M53/95, M53/96, M53/173, M53/200, M53/205, M53/468

M 5300006

M 5300026

M 5300027

M 5300030

M 5300032

M 5300040

M 5300043

M 5300044

M 5300050

M 5300064

M 5300069

M 5300071

M 5300095

M 5300096

M 5300173

M 5300200

M 5300205

M 5300468

99822 CONFIDENTIAL 08/11/2013 09/2012 - 09/2013 Annual Report for the period 15 September 2012 to 14 September 2013, Royal Standard Project, M24/867

M 2400867

99829 CONFIDENTIAL 08/11/2013 08/2012 - 08/2013 Ironstone Range Project E38/2484 for the period 23/08/2011 to 22/08/2012 E 3802484

99831 CONFIDENTIAL 07/11/2013 09/2012 - 09/2013 Annual Report Fraser Range Project E69/2708 For the period 15/09/2012 to 14/09/2013

E 6902708

99832 CONFIDENTIAL 11/11/2013 09/2012 - 09/2013 2012/2013 Annual Report Mulgabbie Project P28/1078, P28/1079, P28/1080, P28/1081, P28/1082 and M28/364 for the period 22 September 2012 - 21 September 2013

M 2800364

99833 CONFIDENTIAL 07/11/2013 05/2012 - 05/2013 Annual Report M77/94 Lady Ellen for the period 23 May 2012 to 22 May 2013 M 7700094

99836 CONFIDENTIAL 12/11/2013 09/2012 - 09/2013 Corktree Project (C122/2012) Annual Report for the period 19/09/2012 to 18/09/2013, E52/2056 & E52/2057

E 5202056

E 5202057

99844 CONFIDENTIAL 11/11/2013 08/2012 - 08/2013 Otto Bore Project,Combined Annual Technical Report C249/2011,P36/1758, P36/1759, E36/770, For the period 12th August 2012 to 11th August 2013

E 3600770

Printed: 18/02/2019 02:28:38 PMPage 493 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 494: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

JACKSON JAMES MURRAYMATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

MATILDA OPERATIONS PTY LTD

ROYAL STANDARD GOLD MINES PTY LTD

WHITE CLIFF MINERALS LIMITED

PONTON MINERALS PTY LTD

PENDRAGON (WA) PTY LTDPUMPHREY ANDREW IAN

BOAL MICHAEL THOMAS

GIRALIA RESOURCES PTY LTD

GIRALIA RESOURCES PTY LTD

IRON WHEAL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 494 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 495: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99847 CONFIDENTIAL 12/11/2013 10/2012 - 10/2013 West Kundip Project, C173/2009 (M74/133, M74/238), Annual Report, 29 October 2012 to 28October 2013.

M 7400133

M 7400238

99848 CONFIDENTIAL 12/11/2013 09/2012 - 09/2013 Combined annual report for the period 27 September 2012 to 26 September 2013, Kalpini Nickel Project, C31/2002, E28/1224, M27/395, M28/199, M28/201, M28/205

E 2801224

M 2700395

M 2800199

M 2800201

M 2800205

99855 CONFIDENTIAL 12/11/2013 09/2012 - 09/2013 Southdown Magnetite Project Combined annual Report (C223/1998) tenements M70/1309, E70/2512 (period 12/09/2012 to 11/09/2013) and E70/3073 & E70/3896 (period 20/05/2012 to 11/09/2013)

E 7002512

E 7003073

M 7001309

99857 CONFIDENTIAL 15/11/2013 10/2012 - 10/2013 Weelumurra Project E47/1557-I Annual Report for the period 7 October 2012 to 6 October 2013

E 4701557

99863 CONFIDENTIAL 13/11/2013 09/2012 - 09/2013 Combined Annual Report M08/133 & M08/175 Sheela Bore Project Mineral Exploration Reporting Period: 14th September 2012 - 13th September 2013

M 0800133

M 0800175

99872 CONFIDENTIAL 14/11/2013 09/2012 - 08/2013 Black Flag Project Reporting Group C227/2011, Combined Annual Report for Year Ending 31 August 2013, P26/3791, P26/3792, P26/3793, P26/3794, P26/3795, P26/3796, P26/3797, P26/3798, P26/3799, P26/3800, P27/2041, P27/2042, P27/2043, P27/2044, P27/2045, P27/2050, P27/2051, P27/2052

P 2603791

P 2603792

P 2603793

P 2603794

P 2603795

P 2603796

P 2603797

P 2603798

P 2603799

P 2603800

P 2702041

P 2702042

Printed: 18/02/2019 02:28:38 PMPage 495 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 496: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GALAXY RESOURCES LIMITED

GALAXY RESOURCES LIMITED

KALGOORLIE NICKEL PTY LTD

KALGOORLIE NICKEL PTY LTD

KALGOORLIE NICKEL PTY LTD

KALGOORLIE NICKEL PTY LTD

KALGOORLIE NICKEL PTY LTD

GRANGE RESOURCES LTDSRT AUSTRALIA PTY LTD

GRANGE RESOURCES LTDSRT AUSTRALIA PTY LTD

GRANGE RESOURCES LTDSRT AUSTRALIA PTY LTD

POLARIS METALS PTY LTD

D & G SPRALJA PTY LTD

D & G SPRALJA PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 496 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 497: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99872 CONFIDENTIAL 14/11/2013 09/2012 - 08/2013 Black Flag Project Reporting Group C227/2011, Combined Annual Report for Year Ending 31 August 2013, P26/3791, P26/3792, P26/3793, P26/3794, P26/3795, P26/3796, P26/3797, P26/3798, P26/3799, P26/3800, P27/2041, P27/2042, P27/2043, P27/2044, P27/2045, P27/2050, P27/2051, P27/2052

P 2702043

P 2702044

P 2702045

P 2702050

P 2702051

P 2702052

99878 CONFIDENTIAL 13/11/2013 09/2012 - 09/2013 Peak Hill - Doolgunna - Marymia (C213/2010) E52/2492, E52/2493, E52/2505, E52/2734 Annual Report for the period 12th September 2012 to 11th September 2013

E 5202493

E 5202734

99884 CONFIDENTIAL 15/11/2013 09/2012 - 09/2013 Mt Fisher Project, Exploration License E53/1318, Annual Report for the period 21st September 2012 to 20th September 2013

E 5301318

99885 CONFIDENTIAL 15/11/2013 09/2012 - 09/2013 Mt Fisher Project Annual Mineral Exploration Report E53/1319. 21st September 2012 to 20th September 2013

E 5301319

99897 CONFIDENTIAL 15/11/2013 09/2012 - 08/2013 Spitfire Resources South Woodie Woodie Project Combined Annual Report Number C171/2007 31st August 2012 to 1st September 2013, E46/615, E46/616, E46/710, E46/787, E46/828, E46/829,E46/830, E46/834, E46/835, E46/875, E46/893, E46/902

E 4600616

E 4600787

E 4600835

99898 CONFIDENTIAL 15/11/2013 09/2012 - 09/2013 Annual Technical Report for the period ending 21 September 2013 Robinson Range Iron Ore ProjectTenement Number E52/1672

E 5201672

99899 CONFIDENTIAL 15/11/2013 09/2012 - 09/2013 Robinson Range Iron Ore JV Project E51/1033 Annual Technical Report for the period 22 September 2012 to 21 September 2013

E 5101033

99903 CONFIDENTIAL 15/11/2013 09/2012 - 09/2013 Annual Combined Report Boorabbin North Block C264/2011 including tenements E15/1272 and E15/1273 (E15/1247 now surrendered) Reporting Period: 1st June 2012 – 31st May 2013

M 7700834

99904 CONFIDENTIAL 15/11/2013 08/2012 - 07/2013 Penny West Project M57/180 & M57/196 Youanmi Area, WA 2012-2013 Annual Technical Report for the Period 1 August 2012 – 31 July 2013 Combined Reporting No C116/2001

M 5700180

M 5700196

99908 CONFIDENTIAL 18/11/2013 09/2012 - 09/2013 Annual Report Combined Mining and Exploration Activities on Christmas Island 25 September 2012 – 24 September 2013 (C169/2009) MCI70/01 and MCI70/10

MCI7000001

MCI7000010

99914 CONFIDENTIAL 18/11/2013 10/2012 - 09/2013 Van Uden Project (C161/2006) E77/1536, M77/477, 478, 522, 523 Annual Report for the period 1st October 2012 to 30th September 2013

M 7700477

Printed: 18/02/2019 02:28:38 PMPage 497 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 498: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

KALGOORLIE ORE TREATMENT COMPANY PTY LTD

AUDACIOUS RESOURCES PTY LIMITED

LODESTAR MINERALS LIMITED

ROX RESOURCES LIMITED

HELIOS GOLD LIMITED

PLANET MINING PTY LTDSPITFIRE AUSTRALIA (SWW) PTY LTD

SPITFIRE AUSTRALIA (SWW) PTY LTD

BELLPIPER PTY LTD

JACKSON MINERALS PTY LTDAURIS EXPLORATION PTY LTD

JACKSON MINERALS PTY LTDAURIS EXPLORATION PTY LTD

BROKEN HILL METALS PTY LTD

PLATEAUX RESOURCES PTY LTDPATINA RESOURCES PTY LTD

PLATEAUX RESOURCES PTY LTDPATINA RESOURCES PTY LTD

PHOSPHATE RESOURCES LTD

PHOSPHATE RESOURCES LTD

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 498 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 499: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99914 CONFIDENTIAL 18/11/2013 10/2012 - 09/2013 Van Uden Project (C161/2006) E77/1536, M77/477, 478, 522, 523 Annual Report for the period 1st October 2012 to 30th September 2013

M 7700478

M 7700522

M 7700523

99915 CONFIDENTIAL 18/11/2013 10/2012 - 10/2013 Coffee Project E77/2011 Annual Report for the period 8th October 2012 to the 7th October 2013

E 7702011

99916 CONFIDENTIAL 18/11/2013 09/2012 - 09/2013 Cashmere Iron and Gold Project Combined Reporting Number C19/2004 For Tenements E57/549i, E57/553i ML544, ML 545 and ML 546 Combined Annual Report 8th Sept 2012 to 7th Sept 2013

E 5700549

E 5700553

M 5700544

M 5700545

M 5700546

99917 CONFIDENTIAL 18/11/2013 10/2012 - 10/2013 Combined Annual Report Mulga Tank Project for the period 24 October 2012 to 23 October 2013, E39/988, E39/1072, E39/1439, E39/1440, E39/1441, E39/1442, E39/1513 (C123/2008)

E 3900988

E 3901072

E 3901439

E 3901441

E 3901513

99919 CONFIDENTIAL 19/11/2013 10/2012 - 10/2013 Annual Report M77/1257-I (Deception) For the period 13 October 2012 to 12 October 2013

M 7701257

99928 CONFIDENTIAL 20/11/2013 08/2012 - 08/2013 Halls Creek Project, Annual Report for the period ending 14th August 2013, E80/3496, 3370, 3517, & 3938; M80/247.

E 8003496

M 8000247

99931 CONFIDENTIAL 20/11/2013 10/2012 - 10/2013 Wonmunna Project Area Combined Annual Technical Report C58/1996, Exploration Licences 47/540, 47/541 and 47/542

E 4700540

E 4700541

E 4700542

99932 CONFIDENTIAL 20/11/2013 10/2012 - 10/2013 Annual Technical Report for E47/539 Giles Project for the period 16 October 2012 – 15 October 2013

E 4700539

99934 CONFIDENTIAL 20/11/2013 08/2006 - 08/2013 Final Surrender Report Mt Edith Dolomite Resources E08/1279 for the period ended 3 August 2013

E 0801279

Printed: 18/02/2019 02:28:38 PMPage 499 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 500: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

MONTAGUE RESOURCES AUSTRALIA PTY LTDTIANYE SXO GOLD MINING PTY LTD

MH GOLD PTY LTD

MABROUK MINERALS PTY LTD

MABROUK MINERALS PTY LTD

MABROUK MINERALS PTY LTD

MABROUK MINERALS PTY LTD

MABROUK MINERALS PTY LTD

AURIGEN PTY LTD

AURIGEN PTY LTD

AURIGEN PTY LTD

AURIGEN PTY LTD

AURIGEN PTY LTD

CLIFFS ASIA PACIFIC IRON ORE PTY LTD

PLATQUEST RESOURCES PTY LTDCAZALY RESOURCES LTD

3D RESOURCES LTDCAZALY RESOURCES LTD

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

WRIGHT PROSPECTING PTY LTDHAMERSLEY RESOURCES LIMITED

REGIONAL RESOURCES NW PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 500 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 501: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99937 CONFIDENTIAL 19/11/2013 09/2012 - 09/2013 Doolgunna Project, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049, P51/2516-2517, P51/2624-2427 Combined Annual Report C213/2008for the period 10th September 2012 to 9th September 2013

E 5101168

E 5101301

E 5101303

E 5101304

E 5202049

99938 CONFIDENTIAL 19/11/2013 09/2012 - 09/2013 Annual Report, Ponton Project, E28/2095 for the period 22/09/2012 to 21/09/2013

E 2802095

99939 CONFIDENTIAL 19/11/2013 09/2012 - 09/2013 Annual Report, Ponton Project, E28/2018 for the period 22/09/2012 to 21/09/2013

E 2802018

99945 CONFIDENTIAL 19/11/2013 09/2012 - 09/2013 Annual Mineral Exploration Report: P47/1649 28 September 2012 to 27 September 2013

P 4701649

99962 CONFIDENTIAL 21/11/2013 09/2012 - 09/2013 Combined Annual Report C-199/2008 Exploration Licences E28/1713 & 1715 Fraser Range Project, for the period 24/09/2012 to 23/09/2013

E 2801713

E 2801715

99963 CONFIDENTIAL 21/11/2013 09/2012 - 09/2013 Annual Technical Report C-198/2008 Exploration Licences E28/1710, E28/1711 & E28/1712 Fraser Range North Project for the period 24/09/2012 to 23/09/2013

E 2801711

E 2801712

99964 CONFIDENTIAL 21/11/2013 09/2012 - 09/2013 Annual Report Fraser Range E28/2017 For the period 22 September 2012 – 21 September 2013

E 2802017

99965 CONFIDENTIAL 21/11/2013 10/2012 - 10/2013 Combined Annual Technical Report for the Period 16/10/2012 to 15/10/2013, E47/537 and E47/538 for the period 16 October 2012 – 15 October 2013

E 4700537

E 4700538

99967 CONFIDENTIAL 21/11/2013 09/2012 - 09/2013 Lake Greta M15/1741 Annual Report to the Department of Mines and Petroleum for the period 12/09/12 to 11/09/13

M 1501741

99969 CONFIDENTIAL 21/11/2013 07/2012 - 07/2013 Combined Annual Report C46/2005: Gnaweeda Project, E51/926, E51/927, E51/1419, E51/1420, and P51/2652 for the period 31 July 2012 – 30 July 2013

E 5100926

E 5100927

P 5102652

99970 CONFIDENTIAL 21/11/2013 07/2012 - 08/2013 Forrestania Project, Annual Report for the year ending 31st August 2013, E77/1086, 1399, 1416; M77/99, 467-468 & 544; P77/3736-3738,3743, 3748-3752, 3758, 3862 & 3864-3865.

E 7701416

M 7700099

M 7700467

M 7700468

M 7700544

Printed: 18/02/2019 02:28:38 PMPage 501 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 502: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MURCHISON EXPLORATION PTY LTD

ENTERPRISE METALS LIMITED

ENTERPRISE METALS LIMITED

ENTERPRISE METALS LIMITED

MURCHISON EXPLORATION PTY LTD

PONTON MINERALS PTY LTD

PONTON MINERALS PTY LTD

FMG PILBARA PTY LTD

LAKE RIVERS GOLD PTY LTD

LAKE RIVERS GOLD PTY LTD

LAKE RIVERS GOLD PTY LTDINDEPENDENCE WINDWARD PTY LTD

LAKE RIVERS GOLD PTY LTDINDEPENDENCE WINDWARD PTY LTD

PONTON MINERALS PTY LTDINDEPENDENCE WINDWARD PTY LTD

HAMERSLEY IRON PTY LIMITEDHAMERSLEY RESOURCES LIMITED

HAMERSLEY IRON PTY LIMITEDHAMERSLEY RESOURCES LIMITED

EVOLUTION MINING (MUNGARI) PTY LTD

DORAY MINERALS LIMITED

DORAY MINERALS LIMITED

DORAY MINERALS LIMITED

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 502 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 503: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99971 CONFIDENTIAL 21/11/2013 09/2012 - 08/2013 Forrestania Project, Annual Report for the year ending 31st August 2013, E77/806, 1400, 1436, 1581; M77/324; P773735, 3836-3840 & 3846-3847 (C35/2010)

E 7701400

E 7701436

E 7701581

M 7700324

99972 CONFIDENTIAL 22/11/2013 09/2012 - 09/2013 Annual Report Balfour Downs Project E46/947 For the period 17/09/2012 to 16/09/2013

E 4600947

99974 CONFIDENTIAL 21/11/2013 12/2012 - 12/2013 Annual Report Mindy Project M47/710-M47/717; M47/725-M47/728 (C29/2013) for the period Period 10 December 2012 –9 December 2013

M 4700710

M 4700711

M 4700712

M 4700713

M 4700714

M 4700715

M 4700716

M 4700717

M 4700725

M 4700726

M 4700727

M 4700728

99975 CONFIDENTIAL 21/11/2013 12/2012 - 12/2013 Annual Report Coondiner Project M47/718-M47/724; M47/729-M47/731 (C28/2013) Reporting Period 10 December 2012 –9 December 2013

M 4700718

M 4700719

M 4700720

M 4700721

M 4700722

M 4700723

M 4700724

M 4700729

M 4700730

M 4700731

99984 CONFIDENTIAL 22/11/2013 12/2012 - 12/2013 Annual Report for the period 3 December 2012 to 2 December 2013, Brooking Joint Venture, E04/1936

E 0401936

Printed: 18/02/2019 02:28:38 PMPage 503 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 504: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MH GOLD PTY LTD

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

WESTERN AREAS NICKEL PTY LTD

WITX PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

BHP IRON ORE (JIMBLEBAR) PTY LTD

LEOPOLD DIAMOND COMPANY PTY LTDBROOKING DIAMONDS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 504 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 505: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

99996 CONFIDENTIAL 22/11/2013 09/2012 - 08/2013 Combined Annual Technical Report C70/1999 for the Golden Ridge Project. Tenements M26/41, M26/433, M26/494, M26/534. 1 September 2012 to 31 August 2013

M 2600041

M 2600433

M 2600534

99997 CONFIDENTIAL 22/11/2013 09/2012 - 08/2013 Chalice Project Combined Annual Technical Report C111/2004 E15/821, E15/822, E15/1168, E63/873, E63/1064, E63/1071, E63/1384, M15/786, P15/5414-28 For the period 1 September 2012 to 31 August 2013

M 1500786

99999 CONFIDENTIAL 22/11/2013 09/2012 - 09/2013 Combined Annual Report on Erayinia Project – C85/2011 for period 23 September 2012 to 22 September 2013 (E28/1895, E28/2071)

E 2801895

100000 CONFIDENTIAL 27/11/2013 11/2012 - 10/2013 Mt Fisher Project Combined Technical Report C145/2005 E53/1061, E53/1106, E53/1218, E53/1219, E53/1250, E53/1386 & M53/09 1 November 2012 to 31 October 2013

E 5301061

E 5301106

E 5301218

M 5300009

100001 CONFIDENTIAL 26/11/2013 10/2012 - 10/2013 FARRELL WELL/GORGE CREEK PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the Period 29/10/2012 to 28/10/2013 TENEMENT: E45/3858

E 4503858

100006 CONFIDENTIAL 25/11/2013 09/2012 - 09/2013 Annual Report Combined Report Nifty Project C155/2002 Tenements – M271 SA, E45/2152, E45/2280, E45/2392 and E45/2415 For the Period 6th September 2012 – 5th September 2013

AM 7000271

E 4502152

E 4502280

E 4502392

E 4502415

100010 CONFIDENTIAL 25/11/2013 08/2012 - 08/2013 Combined Mineral Exploration Report Buldania Project C78/2003 M63/177 P63/1503 for the period 24th August 2012 – 23rd August 2013

M 6300177

100012 CONFIDENTIAL 25/11/2013 09/2012 - 09/2013 Exploration Licence E28/1714 Fraser Range Project 24th September 2012 to 23rd September 2013

E 2801714

100013 CONFIDENTIAL 25/11/2013 10/2012 - 10/2013 Annual Report E28/1630 Fraser Range Project 2nd October 2012 to 1st October 2013

E 2801630

100015 CONFIDENTIAL 25/11/2013 10/2012 - 10/2013 “Dead Bullock” Annual Report Tenement E45/4029 For the Period 31 October 2012 to 30 October 2013

E 4504029

100034 CONFIDENTIAL 27/11/2013 10/2012 - 10/2013 Annual Technical Report for the period 7 October 2012 to 6 October 2013, Innawalley Pool, E52/1776

E 5201776

100038 CONFIDENTIAL 27/11/2013 09/2012 - 08/2013 Annual Mineral Exploration Report for the year ended 31st August 2013 Mt Gibson Iron Project Combined Reporting Group No C303/1995.

E 5901590

M 5900011

M 5900013

Printed: 18/02/2019 02:28:38 PMPage 505 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 506: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NORTHERN STAR (HBJ) PTY LTD

NORTHERN STAR (HBJ) PTY LTD

HAOMA MINING NL

AVOCA MINING PTY LTD

IMAGE RESOURCES NL

HELIOS GOLD LIMITED

HELIOS GOLD LIMITED

ROX RESOURCES LIMITED

HELIOS GOLD LIMITED

ATLAS IRON LIMITED

NIFTY COPPER PTY LTD

NIFTY COPPER PTY LTD

NIFTY COPPER PTY LTD

NIFTY COPPER PTY LTD

NIFTY COPPER PTY LTD

LRL (AUST) PTY LTD

LAKE RIVERS GOLD PTY LTDINDEPENDENCE NOVA PTY LTD

FRASERX PTY LTDINDEPENDENCE NOVA PTY LTD

SHEFFIELD RESOURCES LIMITED

BHP IRON ORE (JIMBLEBAR) PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 506 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 507: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100038 CONFIDENTIAL 27/11/2013 09/2012 - 08/2013 Annual Mineral Exploration Report for the year ended 31st August 2013 Mt Gibson Iron Project Combined Reporting Group No C303/1995.

M 5900014

M 5900015

M 5900016

M 5900017

M 5900217

M 5900304

M 5900305

M 5900308

M 5900309

M 5900328

M 5900338

M 5900339

M 5900402

M 5900403

M 5900404

M 5900454

M 5900455

M 5900526

M 5900550

M 5900609

P 5901701

P 5901702

P 5901703

P 5901704

100039 CONFIDENTIAL 28/11/2013 11/2012 - 11/2013 Annual Report for Charteris Creek E45/2763 For the period 08-Nov-2012 to 07-Nov-2013

E 4502763

100040 CONFIDENTIAL 27/11/2013 10/2012 - 09/2013 Raeside Project Annual Technical Report for the Period 1st October 2012 to 30th September 2013, E37/866, E37/868, M37/256, M37/369, M37/377, M37/379 and E37/1103 (C39/2005)

E 3700866

E 3700868

E 3701103

M 3700256

M 3700369

M 3700377

Printed: 18/02/2019 02:28:38 PMPage 507 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 508: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

EXTENSION HILL PTY LTD

LMTD WITS PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

NAVIGATOR MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 508 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 509: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100040 CONFIDENTIAL 27/11/2013 10/2012 - 09/2013 Raeside Project Annual Technical Report for the Period 1st October 2012 to 30th September 2013, E37/866, E37/868, M37/256, M37/369, M37/377, M37/379 and E37/1103 (C39/2005)

M 3700379

100045 CONFIDENTIAL 28/11/2013 07/2012 - 07/2013 Yilgangi Project Annual Report for the period 3 July 2012 to 2 July 2013, E31/721, E31/814, E31/958, E31/959, P31/1815, P31/1832, P31/1833 & P31/1834 (C162/2008)

E 3100814

100049 CONFIDENTIAL 28/11/2013 08/2012 - 08/2013 Annual Report for the period 15 August 2012 to 14 August 2013, Lake Grace (North) Gypsum Project, E70/3308.

E 7003308

100052 CONFIDENTIAL 28/11/2013 01/2009 - 11/2013 Final Report on Warrida Well P36/1630 for the period 30 January 2012 to 8 November 2013

P 3601630

100053 CONFIDENTIAL 28/11/2013 01/2009 - 11/2013 Final Report on Warrida Well P36/1629 for the period P 3601629

100054 CONFIDENTIAL 28/11/2013 01/2009 - 11/2013 Final Report on Warrida Well P36/1628 for the period 30 January 2009 to 8 November 2013

P 3601628

100064 CONFIDENTIAL 26/11/2013 09/2012 - 09/2013 Liberty–Indee Project C130/2007 Annual Report for the period 27 September 2012 to 26 September 2013, E47/1209, E47/1796 and M47/1455

E 4701209

M 4701455

100083 CONFIDENTIAL 29/11/2013 10/2012 - 10/2013 Combined Annual Report (C103/2010) for E59/875, E59/1732, M59/166, P59/1952 Magnetite Range Project for the Period Ending 4 October 2013.

E 5900875

M 5900166

100093 CONFIDENTIAL 29/11/2013 09/2012 - 08/2013 Combined Annual Report, Fraser Range Project, E63/1517, E69/2663, and E69/2664 (C247/2011)

E 6301517

E 6902663

E 6902664

100094 CONFIDENTIAL 29/11/2013 09/2012 - 09/2013 Exploration Licence 28/2201 – Annual Exploration Report, November 2013, Widowmaker Project, Albany-Fraser Orogen, WA

E 2802201

100097 CONFIDENTIAL 29/11/2013 09/2012 - 08/2013 Golden Crown / Austin C149/1998 Annual Exploration Report for the period 1 November 2012 to 30 October 2013

M 2000293

M 2100007

M 2100010

M 2100014

M 2100024

M 2100044

M 2100049

M 2100055

M 2100056

M 2100065

M 2100069

Printed: 18/02/2019 02:28:38 PMPage 509 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 510: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

NAVIGATOR MINING PTY LTD

SARACEN GOLD MINES PTY LTD

GREAT SOUTHERN GYPSUM LIMITED

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

BARRICK (PLUTONIC) LIMITEDNORILSK NICKEL WILDARA PTY LTD

JUTT RESOURCES PTY LTD

JUTT RESOURCES PTY LTD

ACCENT RESOURCES NL

ACCENT RESOURCES NL

FRASERX PTY LTDINDEPENDENCE NEWSEARCH PTY LTD

FRASERX PTY LTDINDEPENDENCE NEWSEARCH PTY LTD

FRASERX PTY LTDINDEPENDENCE NEWSEARCH PTY LTD

BUXTON RESOURCES LTDINDEPENDENCE NEWSEARCH PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 510 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 511: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100097 CONFIDENTIAL 29/11/2013 09/2012 - 08/2013 Golden Crown / Austin C149/1998 Annual Exploration Report for the period 1 November 2012 to 30 October 2013

M 2100074

M 2100075

M 2100083

M 2100089

M 2100105

P 2100458

P 2100459

P 2100543

P 2100544

P 2100546

P 2100584

100099 CONFIDENTIAL 29/11/2013 10/2012 - 10/2013 Annual Combined Report for the period 19 October 2012 to 18 October 2013, Mt Pleasant Project (C46/2010), PL 24/4406, 4418,4419,4420,4421,4422,4423,4424,4425,4426,4427,4428, 4429, 4430 and 4468

P 2404418

P 2404419

P 2404420

P 2404421

P 2404422

P 2404423

P 2404424

P 2404425

P 2404426

P 2404427

P 2404428

P 2404429

P 2404468

100110 CONFIDENTIAL 02/12/2013 10/2012 - 10/2013 Phillips Find Project Combined Reporting No. 190/2012 comprising PLs 16/2581, 2750, 2751, 2752, 2753, 2760, 2761, 2762, 2763, 2764, 2765 &2766 Annual Technical Report for the Period 29 Oct 2012 – 28 Oct 2013

P 1602760

P 1602761

P 1602762

P 1602763

Printed: 18/02/2019 02:28:38 PMPage 511 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 512: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

CASCADE RESOURCES PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 512 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 513: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100110 CONFIDENTIAL 02/12/2013 10/2012 - 10/2013 Phillips Find Project Combined Reporting No. 190/2012 comprising PLs 16/2581, 2750, 2751, 2752, 2753, 2760, 2761, 2762, 2763, 2764, 2765 &2766 Annual Technical Report for the Period 29 Oct 2012 – 28 Oct 2013

P 1602764

P 1602765

P 1602766

100115 CONFIDENTIAL 02/12/2013 10/2012 - 09/2013 Annual Report Mineral Exploration M08/114 Ballard Well Reporting Period 1st October 2012 to 30th September 2013

M 0800114

100116 CONFIDENTIAL 03/12/2013 10/2012 - 10/2013 Earaheedy Project C49/2009; Combined Annual Report for the Period 10 October 2012 to 9 October 2013, E69/1771-I, E69/1907-I, E69/2733-I, E69/2734, E69/2735, E69/2736, E69/2737, E69/2732

E 6901771

E 6902733

100119 CONFIDENTIAL 03/12/2013 08/2012 - 08/2013 Annual Technical Report for E37/1086 South Darlot Gold Project for the period 12/08/2012 to 11/08/2013

E 3701086

100121 CONFIDENTIAL 04/12/2013 11/2012 - 10/2013 Annual Report for the Period 01 November 2012 to 30 October 2013, Mount Thirsty Project, E63/373, E63/1113, E63/1267, 1268, 1303, 1304 & P63/1749 (C28/1997)

E 6300373

E 6301267

100142 CONFIDENTIAL 03/12/2013 09/2012 - 09/2013 Wiluna West Combined Annual Technical Report E53/1089, 1116, M53/971, 972, 1016, 1017, 1018, 1078, 1087 for the period 24 September 2012 to 23 September 2013 (C73/2006)

E 5301089

E 5301116

M 5300971

M 5300972

M 5301016

M 5301017

M 5301018

M 5301078

M 5301087

100146 CONFIDENTIAL 03/12/2013 09/2012 - 08/2013 Annual Report for the Period 01 September 2012 to 31 August 2013, C184/2007 Mount MacLeod, E47/1390.....P47/1634

E 4701390

E 4701391

E 4701419

E 4701455

E 4701761

E 4701763

Printed: 18/02/2019 02:28:38 PMPage 513 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 514: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

DORRIGO RESOURCES PTY LTDSCORPION MINING PTY LTD

D & G SPRALJA PTY LTD

ZENITH MINERALS LIMITED

ZENITH MINERALS LIMITED

CENTRAL IRON ORE LTD

METEORE METALS PTY LTD

BARRA RESOURCES LIMITEDMETEORE METALS PTY LTD

JINDALEE RESOURCES LIMITEDGWR GROUP LIMITED

GWR GROUP LIMITED

GWR GROUP LIMITED

GWR GROUP LIMITED

GWR GROUP LIMITED

GWR GROUP LIMITED

GWR GROUP LIMITED

JINDALEE RESOURCES LIMITEDGWR GROUP LIMITED

GWR GROUP LIMITED

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 514 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 515: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100146 CONFIDENTIAL 03/12/2013 09/2012 - 08/2013 Annual Report for the Period 01 September 2012 to 31 August 2013, C184/2007 Mount MacLeod, E47/1390.....P47/1634

E 4701764

P 4701257

P 4701306

P 4701407

P 4701408

P 4701409

P 4701469

P 4701470

P 4701633

100149 CONFIDENTIAL 03/12/2013 03/2012 - 03/2013 Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 to 14/03/13, E15/256.......M15/1347

E 1500256

E 1500960

E 1500961

E 1500964

E 1500965

E 1501182

E 1501268

E 1600340

E 1600418

E 1600419

M 1500829

M 1500830

M 1501346

M 1501347

M 1501407

P 1504997

P 1504998

P 1505007

P 1505014

P 1505016

P 1505150

P 1505151

Printed: 18/02/2019 02:28:38 PMPage 515 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 516: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

LA MANCHA RESOURCES AUSTRALIA PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 516 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 517: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100149 CONFIDENTIAL 03/12/2013 03/2012 - 03/2013 Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 to 14/03/13, E15/256.......M15/1347

P 1505152

P 1505266

P 1602703

P 1602704

P 1602707

P 1602708

P 1602709

P 1602710

100150 CONFIDENTIAL 03/12/2013 10/2012 - 10/2013 Annual Report Babylonia P77/4015 Reporting Period: 14th October 2012 – 13th October 2013

P 7704015

100151 CONFIDENTIAL 03/12/2013 10/2012 - 10/2013 Annual Report Athenian P77/4034 Reporting Period: 14th October 2012 – 13th October 2013

P 7704034

100152 CONFIDENTIAL 03/12/2013 10/2012 - 10/2013 Annual Report Bullfinch South P77/4129 Reporting Period: 05th October 2012 – 04th October 2013

P 7704129

100153 CONFIDENTIAL 03/12/2013 10/2012 - 10/2013 Annual Report Bullfinch North P77/4128 Reporting Period: 05th October 2012 – 04th October 2013

P 7704128

100170 CONFIDENTIAL 06/12/2013 08/2012 - 08/2013 Combined Report GSWA C104/2001 Annual Report E08/1051, E08/1780, E08/1781, E08/1782, P08/553, P08/554, P08/555 for the period 12 August 2012 - 11 August 2013

E 0801051

E 0801780

E 0801781

E 0801782

100177 CONFIDENTIAL 04/12/2013 10/2012 - 10/2013 Pardoo-Goldsworthy Project Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 1 October 2013 E45/2330.......M45/1194 (C170/2008)

E 4502330

E 4502380

M 4501157

M 4501158

M 4501159

M 4501170

M 4501190

M 4501191

M 4501194

100180 CONFIDENTIAL 04/12/2013 09/2012 - 09/2013 7 Mile Hill Project M15/1743 Annual Report 2013 Period 12th September 2012 to 11th September 2013

M 1501743

Printed: 18/02/2019 02:28:38 PMPage 517 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 518: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

EVOLUTION MINING (MUNGARI) PTY LTD

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

BULLSEYE MINING LIMITED

LEARMONTH LIMESTONE PTY LTD

LEARMONTH LIMESTONE PTY LTD

LEARMONTH LIMESTONE PTY LTD

LEARMONTH LIMESTONE PTY LTD

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

ATLAS IRON LIMITED

RAND EXPLORATION NLTRIBUNE RESOURCES NL

Printed: 18/02/2019 02:28:38 PMPage 518 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 519: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100185 CONFIDENTIAL 04/12/2013 09/2012 - 08/2013 East Kalgoorlie Project Kanowna Lights Prospect Annual Exploration Report for year ending 31st August 2013 Combined Reporting Group C171/1996 Mining Leases M27/177 and M27/236

M 2700177

M 2700236

100192 CONFIDENTIAL 06/12/2013 10/2012 - 10/2013 Combined Annual Report C20/2012 Southern Hills Reporting Group 12th October 2012 to 11th October 2013, E63/1319, E63/1320, E63/1371, E63/1372, P63/1802, P63/1803

E 6301319

E 6301320

E 6301371

E 6301372

P 6301802

P 6301803

100193 CONFIDENTIAL 06/12/2013 10/2012 - 10/2013 Annual Report E63/1103 Fraser Range Project 12th October 2012 to 11th October 2013

E 6301103

100195 CONFIDENTIAL 05/12/2013 11/2012 - 10/2013 Annual Technical Report for Exploration Licence 47/1311 for the Period 1 November 2012 to 31 October 2013

E 4701311

100198 CONFIDENTIAL 05/12/2013 10/2012 - 10/2013 Rocklea Project- Annual Report E47/16 for the period 4th October 2012 – 3rd October 2013

E 4700016

100199 CONFIDENTIAL 05/12/2013 10/2012 - 10/2013 Annual Report C417/1995 Mudlark Well E47/13, E47/14, E47/15, E47/17, E47/1540, E47/1431, E47/1871, E47/1875, E47/1911, P47/1611 for the reporting period 04 Oct 2012-03 Oct 2013

E 4700013

E 4700014

E 4700015

Printed: 18/02/2019 02:28:38 PMPage 519 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 520: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

BALAGUNDI GOLD PTY LTD

BALAGUNDI GOLD PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

FREE CI PTY LTDINDEPENDENCE NOVA PTY LTD

PONTON MINERALS PTY LTDINDEPENDENCE NOVA PTY LTD

MITSUI IRON ORE DEVELOPMENT PTY LTDNORTH MINING LIMITEDROBE RIVER MINING CO. PTY LIMITEDCAPE LAMBERT IRON ASSOCIATES (REGISTERED BUSINESS NAME)PANNAWONICA IRON ASSOCIATES (REGISTERED BUSINESS NAME)

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 520 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 521: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100199 CONFIDENTIAL 05/12/2013 10/2012 - 10/2013 Annual Report C417/1995 Mudlark Well E47/13, E47/14, E47/15, E47/17, E47/1540, E47/1431, E47/1871, E47/1875, E47/1911, P47/1611 for the reporting period 04 Oct 2012-03 Oct 2013

E 4700017

E 4701431

E 4701540

E 4701871

E 4701875

P 4701611

100201 CONFIDENTIAL 05/12/2013 08/2012 - 08/2013 Annual Report M51/322 Sabbath for the period 25th August 2012 to 24th August 2013

M 5100322

100203 CONFIDENTIAL 04/12/2013 08/2012 - 08/2013 Combined Annual Mineral Exploration Report – North 2 (M70/238, M70/1283, M70/1284, P70/974, P70/975, P70/1298, P70/1299, P70/1300) for the period 27/08/2012 - 26/08/2013

M 7000238

M 7001283

M 7001284

P 7000974

P 7000975

P 7001298

P 7001299

P 7001300

100210 CONFIDENTIAL 09/12/2013 08/2012 - 07/2013 Annual Technical Report for the Radio Project, C16/1995 (E77/1692, M77/633, P77/3614 & P77/3665–66), Yilgarn Mineral Field, for the period 1 August 2012 to 31 July 2013

M 7700633

100214 CONFIDENTIAL 09/12/2013 10/2012 - 10/2013 Annual Mineral Exploration Report Reedys/Pegasus M20/446 for the period ended 18/10/2013

M 2000446

Printed: 18/02/2019 02:28:38 PMPage 521 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 522: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

BHP BILLITON MINERALS PTY LTDMITSUI IRON ORE CORPORATION PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTD

ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTDBHP BILLITON MINERALS PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BHP BILLITON MINERALS PTY LTDITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTDMITSUI IRON ORE CORPORATION PTY LTD

BIG BELL GOLD OPERATIONS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

DUFFY WILLIAM DAVIDGRAINGER AARON MICHAEL

DUFFY WILLIAM DAVIDGRAINGER AARON MICHAEL

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

HANSON CONSTRUCTION MATERIALS PTY LTD

BRIGHTSUN ENTERPRISES PTY LTD

SEARS HARLEY JAMESWAKEFORD HOLDINGS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 522 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 523: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100217 CONFIDENTIAL 09/12/2013 09/2012 - 09/2013 Annual Geological Report on the Woodie Woodie Manganese Prospect for E45/3548 For the Period 12th September 2012 - 11th September 2013

E 4503548

100220 CONFIDENTIAL 09/12/2013 10/2012 - 10/2013 Weld Range Project, Annual Technical Report, C99/1995, 2013 for the period 16 October 2012 - 15 October 2013, M 20/246.......P 51/1579

M 2000246

M 5100434

M 5100442

M 5100443

M 5100457

M 5100481

M 5100498

M 5100719

P 5101564

P 5101565

P 5101566

P 5101567

P 5101568

P 5101569

P 5101570

P 5101571

P 5101572

P 5101573

P 5101574

P 5101575

P 5101576

P 5101577

P 5101578

P 5101579

100228 CONFIDENTIAL 10/12/2013 11/2012 - 11/2013 Maitland River Project E47/1537, E47/2372, E47/2505 & E47/2677 Annual Report. 11th November 2012 to 10th November 2013

E 4701537

E 4702372

100232 CONFIDENTIAL 10/12/2013 10/2012 - 10/2013 Annual Report for tenement M52/806 Horseshoe South Peak Hill for the period 16 October 2012 to15 October 2013

M 5200806

100238 CONFIDENTIAL 10/12/2013 10/2012 - 09/2013 Year 1 Combined Annual Report for the period 1 October 2012 to 30 September 2013, C57/2013, Spargos Reward

P 1504876

P 1504877

Printed: 18/02/2019 02:28:38 PMPage 523 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 524: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

UCABS PTY LTD

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

PODIUM MINERALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

WELD RANGE METALS LIMITED

MAITLAND RIVER PTY LTD

MAITLAND RIVER PTY LTD

PEAK HILL MANGANESE PTY LTD

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 524 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 525: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100238 CONFIDENTIAL 10/12/2013 10/2012 - 09/2013 Year 1 Combined Annual Report for the period 1 October 2012 to 30 September 2013, C57/2013, Spargos Reward

P 1504878

P 1504879

P 1504880

P 1504881

P 1504882

P 1504883

100245 CONFIDENTIAL 13/12/2013 09/2012 - 08/2013 Annual Report C181/2012 Ragged Rock Combined Reporting Group (E70/4243 & E70/4384) Western Australia Reporting period 1 September 2012 to 31 August 2013

E 7004243

100246 CONFIDENTIAL 12/12/2013 10/2012 - 10/2013 Annual Report for M80/532 Seppelt Diamond Project For the period 29th October 2012 to 28th October 2013

M 8000532

100251 CONFIDENTIAL 13/12/2013 09/2012 - 09/2013 Annual Technical Report C147/2009 – Yerilla Project M31/67 & P31/1816 to P31/1831 (inclusive) for the period 18th September 2012 to 17th September 2013

M 3100067

100252 CONFIDENTIAL 13/12/2013 11/2012 - 11/2013 Annual report for the period 7 November 2012 to 6 November 2013, Weld Range Tenement Group, E20/457.......TR70/3902 (C19/2000)

E 2000457

E 2000459

E 2000492

E 2000546

E 2000595

E 2000625

E 2000633

E 2000635

E 2000641

E 2000753

E 5100907

E 5101354

M 2000311

M 2000402

M 2000403

M 2000419

P 2002082

Printed: 18/02/2019 02:28:38 PMPage 525 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 526: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

MINEX (AUST) PTY LTDCORONA MINERALS LIMITED

NORTHAM IRON PTY LTD

MERLIN DIAMONDS LTD

GLOBAL GEM MINING PTY LTD

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

Printed: 18/02/2019 02:28:38 PMPage 526 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 527: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100252 CONFIDENTIAL 13/12/2013 11/2012 - 11/2013 Annual report for the period 7 November 2012 to 6 November 2013, Weld Range Tenement Group, E20/457.......TR70/3902 (C19/2000)

P 2002083

P 2002084

P 2002085

P 2002086

P 5102552

P 5102581

P 5102605

P 5102606

P 5102607

P 5102608

P 5102609

P 5102610

P 5102611

P 5102612

P 5102613

P 5102716

TR 7003902

100253 CONFIDENTIAL 13/12/2013 11/2012 - 11/2013 Annual Report M59/523 Maranalgo Gypsum Deposit Lake Moore Gypsum Project for the period 4 November 2012 to 3 November 2013

M 5900523

100259 CONFIDENTIAL 12/12/2013 09/2012 - 09/2013 Annual Report on E59/1695, Hong Kong Iron Project For the Period 28/09/2012 to 27/09/2013

E 5901695

100269 CONFIDENTIAL 12/12/2013 10/2012 - 10/2013 Combined Annual Technical Report C134/2013 Horseshoe West for the period 26 October 2012 to 25 October 2013

M 5200251

100270 CONFIDENTIAL 12/12/2013 10/2012 - 09/2013 Red Bull Project Annual Report for the Combined Reporting Group C2/2013 Tenements E69/3033; E69/3052 For the Period 01 October 2012 to 30 September 2013

E 6903033

E 6903052

100274 CONFIDENTIAL 17/12/2013 11/2012 - 11/2013 Combined Annual Report (C162-2012) for the period 10 November 2012 to 9 November 2013 Pinjarra Project M70/0803, E70/4462, R70/0039

E 7004462

R 7000008

100277 CONFIDENTIAL 16/12/2013 11/2012 - 11/2013 Annual Report for the period 22 November 2012 to 21 November 2013 Pilbara Project E47/1714

E 4701714

100278 CONFIDENTIAL 16/12/2013 09/2012 - 09/2013 Annual Mineral Exploration Report, Millrose Project, for the period 08/09/2012 to 07/09/203, E53/1548 Combined Reporting Group C13/2013 (E53/1547, E53/1548, E53/1549, and E53/1726)

E 5301547

E 5301548

Printed: 18/02/2019 02:28:38 PMPage 527 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 528: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

SINOSTEEL MIDWEST CORPORATION LIMITED

MINISTERIAL

GILES KIMBERLEY JOHN

TOP IRON PTY LTD

PROSPEX RESOURCES PTY LTD

CARAWINE RESOURCES LIMITEDINDEPENDENCE NEWSEARCH PTY LTD

CARAWINE RESOURCES LIMITEDINDEPENDENCE NEWSEARCH PTY LTD

DORAL MINERAL SANDS PTY LTD

DORAL MINERAL SANDS PTY LTD

FORGE RESOURCES SWAN PTY LTD

ZEBINA MINERALS PTY LTD

ZEBINA MINERALS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 528 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 529: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100278 CONFIDENTIAL 16/12/2013 09/2012 - 09/2013 Annual Mineral Exploration Report, Millrose Project, for the period 08/09/2012 to 07/09/203, E53/1548 Combined Reporting Group C13/2013 (E53/1547, E53/1548, E53/1549, and E53/1726)

E 5301726

100284 CONFIDENTIAL 11/12/2013 08/2012 - 08/2013 Yundamindera – Mt Howe E39/1674 Annual Report for the period 7 August 2012 to 6 August 2013

E 3901674

100285 CONFIDENTIAL 11/12/2013 08/2012 - 08/2013 Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2012 to 21 August 2013

E 3901295

100286 CONFIDENTIAL 11/12/2013 08/2012 - 08/2013 Yundamindera – Mt Hornett E39/1673 Annual Report for the period 7 August 2012 to 6 August 2013

E 3901673

100287 CONFIDENTIAL 11/12/2013 08/2012 - 08/2013 Yundamindera – Top Box Bore E39/1294 Annual Report for the period 22 August 2012 to 21 August 2013

E 3901294

100290 CONFIDENTIAL 11/12/2013 06/2009 - 08/2013 Surrender Report Lake Johnston Project C49/2005 E63/1206, 1207, E63/1354, E63/1429, E63/1449, E63/1365 & P63/1473-1479 for the period 2nd June 2009 to 5th November 2013

E 6301365

100292 CONFIDENTIAL 11/12/2013 08/2012 - 07/2013 Combined Annual Report, Silver King Project E08/1846, E08/2201, E08/2225 (C308/2011) for the period ending 31 July 2013

E 0802225

100296 CONFIDENTIAL 11/12/2013 10/2012 - 10/2013 Lake Disappointment C39/2007 Annual Report for the period 06/10/2012 to 05/10/2013, E45/2801,2802, 2803 E69/2156, 2157, 2158, 2159

E 4502801

E 4502802

E 4502803

E 6902156

E 6902157

E 6902158

E 6902159

100298 CONFIDENTIAL 13/12/2013 11/2012 - 11/2013 E52/2117 Mount Egerton Annual technical Report 20/11/2012 – 19/11/2013 E 5202117

100306 CONFIDENTIAL 17/12/2013 12/2012 - 12/2013 Annual Report Coolup Project M70/942 for the period 6 December 2012 – 5 December 2013

M 7000942

100312 CONFIDENTIAL 11/12/2013 07/2012 - 07/2013 Annual Activities Summary for the period 5 July 2012 to 4 July 2013 Yandeearra Project M47/561-I

M 4700561

100331 CONFIDENTIAL 17/12/2013 12/2012 - 12/2013 Technical report for the period 09 December 2012 to 08 December 2013, Victory Project P37/7087 and P37/7089 (C99/2009)

P 3707089

100336 CONFIDENTIAL 17/12/2013 09/2012 - 09/2013 Neds Creek Project, Annual Report for the period 12th September 2012 to 11th September 2013, E52/2440, 2444, 2456, 2468 & 2733. [C212/2010]

E 5202440

E 5202456

E 5202468

100340 CONFIDENTIAL 16/12/2013 11/2012 - 11/2013 Shovelanna South Project E52/2238 – annual report for the year ended 1st November 2013

E 5202238

100341 CONFIDENTIAL 16/12/2013 10/2012 - 06/2013 Combined Annual Report to the Department of Mines and Petroleum for the Viking 2 project, C110/2009 (E63/1078–79, E63/1085–87, E63/1172, E63/1196, E63/1198, E63/1389, & E63/1554), for the period 1/10/2012 to 30/9/2013

E 6301085

Printed: 18/02/2019 02:28:38 PMPage 529 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 530: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ZEBINA MINERALS PTY LTD

HAWTHORN RESOURCES LIMITED

AVOCA RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

HAWTHORN RESOURCES LIMITED

AVOCA RESOURCES PTY LTDHAWTHORN RESOURCES LIMITED

REED EXPLORATION PTY LTD

SQUADRON RESOURCES PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

EGERTON EXPLORATION PTY LTD

CABLE SANDS (WA) PTY LTD

FARNO-MCMAHON PTY LTD

VICTORY GOLD PTY LTD

AUDACIOUS RESOURCES PTY LIMITED

AUDACIOUS RESOURCES PTY LIMITED

AUDACIOUS RESOURCES PTY LIMITED

BHP IRON ORE (JIMBLEBAR) PTY LTD

GENESIS MINERALS LIMITED

Printed: 18/02/2019 02:28:38 PMPage 530 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 531: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100341 CONFIDENTIAL 16/12/2013 10/2012 - 06/2013 Combined Annual Report to the Department of Mines and Petroleum for the Viking 2 project, C110/2009 (E63/1078–79, E63/1085–87, E63/1172, E63/1196, E63/1198, E63/1389, & E63/1554), for the period 1/10/2012 to 30/9/2013

E 6301198

100342 CONFIDENTIAL 16/12/2013 10/2012 - 09/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group: C55/2004 Gwalia Project Reporting Period: 1 October 2012 to 30 September 2013

M 3700017

M 3700025

M 3700046

M 3700055

M 3700058

M 3700137

M 3700158

M 3700159

M 3700163

M 3700164

M 3700165

M 3700170

M 3700172

M 3700200

M 3700204

M 3700212

M 3700219

M 3700247

M 3700251

M 3700333

M 3700391

M 3700454

M 3700485

M 3700531

M 3700532

M 3700564

M 3700565

Printed: 18/02/2019 02:28:38 PMPage 531 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 532: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

GENESIS MINERALS LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITEDNEWMONT YANDAL OPERATIONS PTY LTD

ST BARBARA LIMITEDNEWMONT YANDAL OPERATIONS PTY LTD

ST BARBARA LIMITEDNEWMONT YANDAL OPERATIONS PTY LTD

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 532 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 533: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100342 CONFIDENTIAL 16/12/2013 10/2012 - 09/2013 Annual Mineral Exploration Report - DMP Combined Reporting Group: C55/2004 Gwalia Project Reporting Period: 1 October 2012 to 30 September 2013

M 3700622

M 3700626

M 3700689

M 3700849

M 3700902

M 3700903

M 3700955

M 3700986

M 3701026

M 3701027

M 3701128

M 3701150

M 3701185

P 3707126

P 3708123

100343 CONFIDENTIAL 18/12/2013 10/2012 - 10/2013 Annual Report for the period 02.10.2012 to 01.10.2013, Kurnalpi Project, C181/2008, E28/1561, E28/1687, E28/1748 – 1749 P28/1131, P28/1133, P28/1134, and P28/1135

E 2801749

100354 CONFIDENTIAL 18/12/2013 10/2012 - 10/2013 Geko Project M15/621 Combined Annual Report C135/1995 for the period 21/10/2012 to 20/10/2013

M 1500621

100355 CONFIDENTIAL 18/12/2013 12/2012 - 12/2013 Ora Banda Project Mineral Exploration Report C139/2004 Reporting Period: 04/12/2012 to 03/12/2013 Tenements: M24/29, M24/170, M24/194, M24/473, M24/711, M24/712, M24/809

M 2400029

M 2400170

M 2400194

M 2400473

M 2400711

M 2400712

M 2400809

100356 CONFIDENTIAL 18/12/2013 10/2012 - 10/2013 Mount Vetters Project, Annual Report for the period 24/10/2012 to 23/10/2013, P24/4090.

P 2404090

100358 CONFIDENTIAL 18/12/2013 07/2012 - 07/2013 Exploration Licence E39/1351 Yundamindera - White Quartz Bore Annual Report for the period 29 July 2012 to 28 July 2013

E 3901351

100360 CONFIDENTIAL 18/12/2013 11/2012 - 11/2013 Annual Technical Report on M52/597 (Red Bore Project) for the period 6 November 2012 to 5 November 2013, Peak Hill Mineral Field, Western Australia

M 5200597

Printed: 18/02/2019 02:28:38 PMPage 533 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 534: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

SARACEN METALS PTY LIMITED

SARACEN METALS PTY LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

ST BARBARA LIMITED

KURNALPI GOLD PTY LTD

COOLGARDIE MINERALS LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

PADDINGTON GOLD PTY LIMITED

GPM RESOURCES PTY LTD

HAWTHORN RESOURCES LIMITED

RICHMOND WILLIAM ROBERTTHUNDELARRA LIMITED

Printed: 18/02/2019 02:28:38 PMPage 534 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 535: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100362 CONFIDENTIAL 18/12/2013 10/2012 - 10/2013 Polar Bear Project, Annual Report for the period 02/10/2012 to 01/10/2013, E15/1298; E63/1142; M15/651, 710; M63/230, 255, 269 & 279; P15/5167-5168, 5171, 5638-5640; P63/1584-1585, 1587-1594. [C104/1995]

E 1501298

E 6301142

M 1500651

M 1500710

M 6300230

M 6300255

M 6300269

M 6300279

P 1505638

P 1505639

P 1505640

P 6301587

P 6301588

P 6301589

P 6301590

P 6301591

P 6301592

P 6301593

P 6301594

100377 CONFIDENTIAL 31/12/2013 11/2012 - 10/2013 Skeleton Creek Project C130/2011 Annual Report for the period 1 November 2012 to 31 October 2013, E52/1937, E52/1977, E52/2347, E52/2576, P52/1415, E52/2749, 2696

E 5201937

100378 CONFIDENTIAL 31/12/2013 10/2012 - 09/2013 Tunnel Creek C180/2007 Annual Report for the period 1 October 2012 to 30 September 2013, E52/2414, E52/2415, E52/2416, E52/2555, E52/1759, E52/1760, E52/1779, E52/2637

E 5201779

E 5202555

E 5202637

100387 CONFIDENTIAL 31/12/2013 10/2012 - 10/2013 Mt Cutmore P37/7239 Annual Report 2013 Period 30th October 2012 to 29th October 2013

P 3707239

100388 CONFIDENTIAL 31/12/2013 10/2012 - 10/2013 Mt Cutmore P37/7238 Annual Report 2013 Period 30th October 2012 to 29th October 2013

P 3707238

100393 CONFIDENTIAL 30/12/2013 11/2012 - 11/2013 Malcolm Project, Annual Report for the period 7th November 2012 to 6th November 2013, M37/475.

M 3700475

100398 CONFIDENTIAL 27/12/2013 11/2012 - 11/2013 Gindalbie Project, Annual Report for the period 4th November 2012 to 3rd November 2013, M27/158.

M 2700158

Printed: 18/02/2019 02:28:38 PMPage 535 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 536: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

POLAR METALS PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

CREW CHRISTOPHERCREW ROSS FREDERICK

CREW ROSS FREDERICK

DIXON TREVOR JOHN

MAHER MINING CONTRACTORS PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 536 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 537: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No

100409 CONFIDENTIAL 20/12/2013 11/2012 - 10/2013 Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, 430, 443 & 449; P27/1949. [C201/2007]

E 2700449

100411 CONFIDENTIAL 24/12/2013 12/2012 - 12/2013 Annual Report for the period 14 Dec 2012 to 13 Dec 2013 Pilbara Project E47/2502

E 4702502

100415 CONFIDENTIAL 23/12/2013 11/2012 - 10/2013 Mineral Exploration Report: C132/2011 Turner, 1st November 2012 to 31st October 2013. [E47/1136, 1355, 1370, 1420, 1703, 1772, 1843, 1855, 1920, 1921, 2137, 2234, 2235, 2506-2507 & 2538; P47/1315 & 1609.[C132/2011]

E 4701136

E 4701355

E 4701370

E 4701420

E 4701772

E 4701920

E 4701921

P 4701609

100423 CONFIDENTIAL 20/12/2013 10/2012 - 10/2013 Lake Johnston Project, Annual Report for the period 18/10/2012 to 17/10/2013, E63/1091, 1327, 1365, & 1429. [C49/2005]

E 6301365

100424 CONFIDENTIAL 20/12/2013 11/2012 - 11/2013 Ant Hill - Sunday Hill Project, Annual Report for the period 07/11/2012 to 06/11/2013, M46/237, 238; E46/771.

E 4600771

M 4600237

M 4600238

100432 CONFIDENTIAL 20/12/2013 09/2012 - 09/2013 Extension Hill East Project, Annual Report for the year ending 29/09/2013, E59/1713, 1714 & 1717. [C299/2011]

E 5901717

100433 CONFIDENTIAL 23/12/2013 09/2012 - 09/2013 Ives Find Project, Annual Report for the period 25/09/2012 to 24/09/2013, E53/1369.

E 5301369

100434 CONFIDENTIAL 23/12/2013 11/2012 - 11/2013 Exploration License – 37/1007 Banjawarn Project Annual Technical Report for the Period 13th November 2012 to 12th November 2013

E 3701007

100436 CONFIDENTIAL 19/12/2013 10/2012 - 10/2013 Combined Annual Report on Red Dale Project- C201/2006 for period 3 October 2012 to 2 October 2013 E25/280, E25/281, E25/449, E25/450

E 2500449

E 2500450

100439 CONFIDENTIAL 20/12/2013 10/2012 - 10/2013 Tuckanarra Project, Group Report C45/2013 Annual Report for the period ended 11/10/2013, E20/782, E20/783, P20/2180, P20/2181, P20/2182, P20/2183, P20/2184, P20/2185

E 2000782

E 2000783

P 2002180

P 2002181

P 2002182

P 2002183

Printed: 18/02/2019 02:28:38 PMPage 537 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 538: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

RUBICON RESOURCES LIMITED

FARNO-MCMAHON PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

FMG PILBARA PTY LTD

REED EXPLORATION PTY LTD

MESA MINERALS LIMITED

MESA MINERALS LIMITEDAUVEX RESOURCES PTY LTD

MESA MINERALS LIMITEDAUVEX RESOURCES PTY LTD

EXTENSION HILL PTY LTD

VANGUARD EXPLORATION LTD

BULLSEYE MINING LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

SILVER LAKE (INTEGRA) PTY LIMITED

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

Printed: 18/02/2019 02:28:38 PMPage 538 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 539: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

A-Number Status Submitted Period Title Tenement No Holder

100439 CONFIDENTIAL 20/12/2013 10/2012 - 10/2013 Tuckanarra Project, Group Report C45/2013 Annual Report for the period ended 11/10/2013, E20/782, E20/783, P20/2180, P20/2181, P20/2182, P20/2183, P20/2184, P20/2185

P 2002184 MONUMENT MURCHISON PTY LTD

P 2002185 MONUMENT MURCHISON PTY LTD

100440 CONFIDENTIAL 24/12/2013 10/2012 - 10/2013 Annual Report Scotia Goongarrie Project for the period 2 October 2012 to 1 October 2013

E 2900661 SHINE RESOURCES PTY LTD

M 2400336 SHINE RESOURCES PTY LTD

100443 CONFIDENTIAL 19/12/2013 10/2012 - 10/2013 Annual Technical Report for Mining Lease 29/410 Ballarat Project For the period: 2nd October 2012 to 1st October 2013

M 2900410 BLACK MOUNTAIN GOLD LIMITED

100451 CONFIDENTIAL 19/12/2013 10/2012 - 10/2013 Lake Disappointment Exploration Licence E45/3285 Annual Report for the period 29/10/2012 to 28/10/2013

E 4503285 HOLOCENE PTY LTD

100452 CONFIDENTIAL 19/12/2013 10/2012 - 10/2013 Lake Disappointment E45/3286 Annual Report for the period 29/10/2012 to 28/10/2013

E 4503286 HOLOCENE PTY LTD

100453 CONFIDENTIAL 19/12/2013 10/2012 - 10/2013 Annual Report for the Lake Disappointment project, M45/1227 for the period 09/10/2012 to 08/10/2013.

M 4501227 HOLOCENE PTY LTD

100458 CONFIDENTIAL 23/12/2013 10/2012 - 10/2013 Combined Annual Report lake Wells Project C142/2009 Explration Licences 38/1903, 2113, 2114 and 2505 For the period: 23/10/12 – 22/10/13

E 3801903 AUSTRALIAN POTASH LIMITED

E 3802113 AUSTRALIAN POTASH LIMITED

E 3802114 AUSTRALIAN POTASH LIMITED

E 3802505 AUSTRALIAN POTASH LIMITED

A Numbers listed: 1,208 Tenements Listed: 6,828

Printed: 18/02/2019 02:28:38 PMPage 539 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL

Page 540: 310 - Sunset Clause · 96217 CONFIDENTIAL 07/01/2013 10/2011 - 10/2012 Mount Vetters Project, Annual Report for the period 24th October 2011 to 23/10/2012, P24/4090. P 2404090 96220

Holder

MONUMENT MURCHISON PTY LTD

MONUMENT MURCHISON PTY LTD

SHINE RESOURCES PTY LTD

SHINE RESOURCES PTY LTD

BLACK MOUNTAIN GOLD LIMITED

HOLOCENE PTY LTD

HOLOCENE PTY LTD

HOLOCENE PTY LTD

AUSTRALIAN POTASH LIMITED

AUSTRALIAN POTASH LIMITED

AUSTRALIAN POTASH LIMITED

AUSTRALIAN POTASH LIMITED

A Numbers listed: 1,208 Tenements Listed: 6,828

Printed: 18/02/2019 02:28:38 PMPage 540 of 540INTERNAL\MIGSDFM

310 - Sunset Clause Report

Range of Submitted Dates: 01/01/2013 to 31/12/2013

Status: CONFIDENTIAL


Recommended