The proposed project as seen from San Pablo Avenue.
Berkeley, California l Issued: December 1, 2017, April 16, 2018 for ZAB
Premier Nutrition Planning Application: Revision 2
3100San Pablo Ave
C I T Y O F B E R K E L E Y
P L A N N I N G D E PA R T M E N T
ATTACHMENT 2 ZAB 04-26-18 Page 1 of 10
the West Berkeley Plan goal 2B. “Create a mixed manufacturing district as a general industrial
district, where both heavy and light manufacturing can function along with “biotech” industries
and office users which can recycle the upper stories of the building”. The second floor of
Premier Nutrition Headquarters meets the-is recycling criteria.
The building location, covering the entire block, will provide Premier Nutrition with access to
existing public transit services, bicycle (parking and storage) and pedestrian infrastructure that
includes the Greenway to the west linking Emeryville. The building also provides adequate
transportation alternates including AC Transit, shuttles and BART to and from the site as
documented and certified in the 2017 BayHealth Traffic study by Fehr & Peers. That traffic
Study anticipated the mix of uses that Premier Nutrition is proposing. The existing building is a
legal non-conforming use that will not increase in size, lot coverage or height with the addition of
Premier Nutrition’s occupancy.
There are clear and appropriate mixed use distinctions from adjacent medical and fitness
facilities located on the second floor facing San Pablo Ave. and 67th St as well as the tower
portion of the building. These separations are consistent with City of Berkeley Planning Code
23E.80.090.
Unique to the building and relevant to the Premier Nutrition project is Berkeley’s role as lead
agency and administrator of land use approval under the Memorandum of Understanding
(MOU) between Berkeley Oakland and Emeryville. Pursuant to the lead agency position the City
of Berkeley will process the Premier Nutrition Headquarters project in the MU-LI Zone taking
into account the City of Oakland’s similar Zoning for the building.
deTienne Associates, 3435 Cesar Chavez #312, San Francisco, CA 94110 415.821.9091
Premier Nutrition Applicant Statement
The applicant proposes an adaptive reuse at 3100 San Pablo for Premier Nutrition Corporation
(PNC) a manufacturer and distributor of nutritional food products. The location of the adaptive
re-use is the second floor space of approximately 39,000 USF or 49,000 RSF in the 403,000
square foot mixed use building known as Foundry 31(Formerly “Marchant on the Greenway”).
The PNC tenant improvements for their headquarters will be on the second floor of the building
96% in the City of Oakland part of the building and 6% in the Emeryville part of the building.
The last occupant of that space was Marchant Calculator Inc. (City of Berkeley Use Permit
resolution no. 3729, dated September 6, 1956). Operations were discontinued in the early
1990’s and the space has been vacant since.
Premier Nutrition Corporation proposes to relocate their existing operations from Emeryville
where they have been since 1997 to larger expandable space in the building. The large
contiguous floorplate will be used as PNC’s corporate headquarters to produce, market and sell
products such as PowerBar, Premier Protein Shakes, Supreme Bars and Joint Juice and other
glucosamine supplement drinks and concentrates. The proposed facility will be comprised of
management and administrative operations as well as research & development. There will be
no retail sales or public access at the site. The move- in population is approximately 110-120
employees scheduled for June of 2018. The number of employees at this site is expected to
grow to 150-200 over a number of years..
There project will allocate up to 150 parking spaces for this use, and will be accommodated
within existing parking areas and supply at the site.
Typical operations will be from 8 am to 5 pm Monday through Friday with reduced operation
after 5 pm.. PNC encourages flex hours and telecommuting.
Timeline
If the project receives the necessary entitlements in a timely manner, construction could begin
first quarter of 2018 with the facility open the end of the second quarter 2018. Premier desires
to move into the space by June 1, 2018.
Project Consistency with West Berkeley Area Plan, the Berkeley Zoning Ordinance and the North American Industry Classification System( NAICS) 2007 adopted by the City Council 2009.
ATTACHMENT 2 ZAB 04-26-18 Page 2 of 10
la nd use Planning, 2120 Milvia Street, Berkeley, Ca 94704 Tel: 510.981.7410 TDD: 510.981.6903 f ax: 510.981.7420 email: [email protected]
TaB ul a TIo n f o r MProject Address: Date:
Applicant’s Name:
Zoning District
Please print in ink the following numerical information for your Administrative Use Permit, Use Permit, or Variance application:
Existing Proposed Permitted/Required
Units, Parking Spaces & BedroomsNumber of Dwelling Units (#)
Number of Parking Spaces (#)
Number of Bedrooms (#)(R-1, R-1A, R-2, R-2A, and R-3 only)
Yards and HeightFront Yard Setback (Feet)Side Yard Setbacks:(facing property) Left: (Feet)
Right: (Feet)
Rear Yard Setback (Feet)
Building Height* (# Stories)
Average* (Feet)
Maximum* (Feet)
AreasLot Area (Square-Feet)
Gross Floor Area* (Square-Feet)Total Area Covered by All Floors
Building Footprint* (Square-Feet)Total of All Structures
Lot Coverage* (%)(Footprint/Lot Area)
Useable Open Space* (Square-Feet)
Floor Area Ratio*Non-Residential only (Except ES-R)
*See Definitions – Zoning Ordinance Title 23F. Revised: 05/15
g:\forms & instructions\land use planning forms\tabulation_form_05-15.docla nd use Planning, 2120 Milvia Street, Berkeley, Ca 94704
Tel: 510.981.7410 TDD: 510.981.6903 f ax: 510.981.7420 email: [email protected]
177,455 f t ²
492,706 f t ² 492,706 f t ²
4
0
815 815
7ft to 17 ’ -1” 7ft to17 ’ -1”
0
0
0ft to 15 ’ -3” 0ft to 15 ’ -3”
41 ’ -5”
66 ’ -6”
41 ’ -5”
66 ’ -6”
4
0
0
0
0
171,552 f t ²
5 ,861 f t ²
2 .772.77
96.67% 96.67%
171,552 f t ²
5 ,861 f t ²
177,455 f t ²
Darre l l deTienne
3100 San pablo avenue, Berkeley, Ca 94702 July 01 , 2016
0 0
B e r ke l ey : MU-li Mixed Use light industryCurrent Zoning : C-W(West Berkeley Commercia l ) Oa k l a n d : CC-2 (Community Commercia l ) ; HBX-2 (Housing and Business Mix2)Em e r y v i l l e : nD
l and use Planning, 2120 Milvia Street, Berkeley, Ca 94704Tel: 510.981.7410 TDD: 510.981.6903 Fax: 510.981.7420Email: [email protected]
Updated January 2015 g:\landuse\forms & instructions\land use planning forms\word files\forms_zc\zc_building permit app_jan 2015.docx
Zo nIng CerTIf ICa Te a PPlI Ca TIon – Building PermitsZCBP # 20 - BP #
a ddress: Suite/unit #:
Project Description:
use of Building/Property:
Existing: Proposed:
r elated Permits: Have any of the following been approved or requested for this project?
AUP Use Permit Design Review Landmarks
Project Details (check all that apply):
In-kind repair/replacement (includes windows, decks, siding, etc.) New building or enclosed structure (gross floor area: ___________ sq. ft.) Addition to existing building or enclosed structure (gross floor area: ___________ sq. ft.) Conversion of garage, basement, or attic to habitable space (gross floor area: ___________ sq. ft.) Demolition (includes removal/replacement of exterior wall or roof framing: ____% walls; ____% roof) Removal or pruning of coast live oak tree – indicate circumference at 4’ above ground: _____ in.
Exterior changes: Addition or removal of:Windows (new/enlarged openings) Bedrooms (as defined on reverse) Decks (expanded or new) Interior walls separating commercial spaces?Water heater Parking spaces Other: Residential kitchens
Impervious Surfaces:
Does the project create or replace 2,500 square feet or more of impervious surface area?(See reverse for further details)
No Yes: ____________ sq. ft. (submit required stormwater checklist to PSC)
a pplicant Information:
Name: ___________________________ Address: ____________________________________
Phone: City/State/Zip:
I hereby certify that the above information is true and complete to the best of my knowledge.a pplicant's Signature: ____________________________________________ Date: _____/_____/_____
STAFF USE ONLYIntake Planner: ____________ Zone: _________Zoning Fee: $60 $180 $360Route to: DR LM PW (C.3)Intake notes: ____________________________
Approved by: ___________________ Date: ____/____/____Ordinance Section(s): ____________________________________Approval comments: ___________________________________________________________________________________________
DARRELL WILL CALLIN THESE NUMBERS WHENHE GETS THEM. THEY ARE CURRENTLY BEING CONFIGURED
3100 The Greenway as part of 3100 San Pablo Avenue Base Building
Berkeley California 94702
New Western Lobby
Vacate building services space for
old, now abandoned, incinerator
de Tienne Associates 3435 Cesar Chavez St. Loft 312
(415)-821-9091 San Francisco, California 94110
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702 | July 01, 2016 6
PROPOSED CHANGESTABULATION FORM
SURPLUS*OF PARKING150781 TOTAL SITE
November 15, 2017
0 ft. to 15'-3"0 ft. to 15'-3"
41'-5 41'-5
66'-666'-6
7 ft. to 17'-1" 7 ft. to 17'-1"
MU-LI (Mixed-Use Light Industrial)
L.I. (Light Industrial) and P.O. (Park Open Space)
*As of 11/1/17
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702 6
For Premier NutritionDarrell de Tienne
3100 San Pablo Avenue, Berkeley, CA 947021200 67th Street, Emeryville, CA "The Greenway"
HBX-2 (Housing and Business Mix-2)
BASEMENT
FLOOR 1
FLOOR 3
FLOOR 4
AMAZON
CLIFBAR
UNEXCAVATED
C-W
MU-LI
FOLGER AVENUE
67TH STREET
SAN PABLO AVENUE
THE GREENWAY
TCHO
REVISED 02/19/18
MU-LI
C-W
THEGREENWAYSHAREDLOBBY
C-W
MU-LI
MU-LI
C-W
EXPLODED VIEW- FROM SAN PABLO AVENUE AND 67TH STREETScale: 1:1700
CITY SPORTS
CITY SPORTS
ASHBY AVENUE
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF OAKLAND
CITY OF EMERYVILLE
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF OAKLAND
CITY OF EMERYVILLE
CITY OF BERKELEY
CITY OF OAKLAND
MU-LI
C-W
MU-LI
C-W
ADMINISTRATION,STORAGE,CONFERENCE,AND TRAINING24,027 S.F.
CLINICAL SERVICES31,966 S.F.
CLINICAL SERVICES 31,966 S.F.
ROOF PARKING 374BayHealth RESERVED SPACES: 100 (24HR.)BayHealth RESERVED SPACES: 100 (8 A.M.-5 P.M.)BayHealth/CITY SPORTS SHARED SPACES: 67 (24 HR.)CITY SPORTS RESERVED SPACES: 107 (24 HR.)TOTAL ROOF PARKING: 374
BayHealth
BASEMENT PARKING 103BayHealth DEDICATED SPACES 30
WEST SATELLITE LOT
BayHealth
BayHealth
BayHealth LOADING DOCK BAYHEALTHBASE BUILDINGTRASH, AND STORAGE6,986 S.F.
FOLGER PARKING LOT 34
CITY OF EMERYVILLE
CITY OF OAKLAND
CITY OF EMERYVILLE
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF OAKLANDHBX-2 ZONING
PARKING 198
VACANTVACANTVACANTVACANTVACANTVACANTVACANTVACANT
VACANT
VACANT
LOT(SITE 3)
CITY SPORTSCITY SPORTS
VACANTVACANTVACANTVACANTVACANTVACANT
BayHealthBayHealth
BayHealth
PREMIER NUTRITION
CITY OF OAKLANDHBX-2 ZONING
PREMIER NUTRITIONPARKING 27 SPACES
ADA PREMIERNUTRITIONENTRANCE
MAIN PREMIERNUTRITIONENTRANCE
PREMIERNUTRITIONPARKING 71
ATTACHMENT 2 ZAB 04-26-18 Page 3 of 10
6 7 0 ’ - 6 ”
7 7 0 ’ - 2 ”
24
9’-
0”
CONTEXTSITE PLAN0SCALE 1/64” = 1’-0”
44’-8”18’-0”
16’-0”
7’-8”
22’-6”
15’-0”
pEDESTRiAn BRiDgE
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702 | April 25, 2016 3
HEALTH CLUB ENTRY PORTAL
MAIN BUILDING LOBBY
san
pa
blo
a
ven
ue
CONSTRUCTION TYPE: 1B
OCCUPANCY TYPE: C-W(PER WEST BERKELEY AREA PLAN ZONING
DESIGNATION) CONSTRUCTION TYPE: 1B
67TH STree T
folger a venue
(E) BUilDing FOOTpRinT
nEigHBORing BUilDingS
pROpERTY linE
LEGEND
BiO-FilTRATiOn AREA FOR C-3 CiTY OF BERKElEY
gREEnWAY & BiKEpATH AREA
LOADING DOCKS (4 BAYS)
LOADING DOCK (1 BAY)
•
RAMP WITH ACCESS TO ENCLOSED 200 BIKE PARKING BELOW
10 (N) BIKE PARKINGRACKS-20 BIKES
SHARED ENTRYBayHealth
SHARED LOADING DOCKBASE BUILDING/BayHealth
WEST LOBBYENTRANCE OFFGREENWAY
ADA 67TH STREETENTRANCE
BIO
SWAL
E
1019 FOLGERAVENUE
1004
MU
RR
AY
AV
EN
UE
1000 MURRAYSTREET
900 MURRAYSTREET
1033/ 1041/1041A/1045/1047/1049/ FOLGERAVENUE
3020 SANPABLO AVENUE
1188 CARRISONSTREET
3030 SAN PABLOAVENUE
3037 SAN PABLOAVENUE
1201HASKELLSTREET
3043/3045 SAN PABLOAVENUE
3131 SAN PABLOAVENUE
1301/1305HASKELLSTREET
6716 SAN PABLOAVENUE
23/24/25/2667TH STREET
1195/1197/199/12101/1205/1207/1209/1211/1213/1215/1219/1217/1221 67TH STREET
1155 67TH STREET
1143
67T
H S
TRE
ET
1139
67T
H S
TRE
ET
1135
67T
H S
TRE
ET
1125 67TH STREET
OCCUPANCY TYPE: C-W(PER WEST BERKELEY AREA PLAN ZONING DESIGNATION)
ZONING EMERYVILLEP.O. PARK OPEN SPACE
ZONING EMERYVILLEI.N.L.-LIGHT INDUSTRIAL.
20'-0"
8'-2" HEIGHT CLEARANCE-POSTED
CIT
Y O
F E
ME
RY
VIL
LE
CIT
Y O
F O
AK
LAN
D
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702
Gensler
CONTEXT SITE PLANConstruction Type:1B
SITE PLANScale: 1:800
7
ATTACHMENT 2 ZAB 04-26-18 Page 4 of 10
DN
+4'
+/-7'-6"
CLR
8%
ELEV 2
ELEV 1
8%21'-0"
DN
FEC
+4'
+5.59'
+/-7'-6"
CLR
2%
8%13.73% (15%
MAX)+6.39'
8%
8%
4%
XFMR XFMRFUTURE
TRANSFORMER VAULT 3 HR RATEDALL DOORS TO HAVE PANIC HARDWARE
ALIGN
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
UPUP
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
DN
103B
DN
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
UPUP
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
UPUP
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
DN
103B103B
DN
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
UPUP
UN-OCCUPIED
SPACE
ADJACENT
TO
HOISTWAY
R 4
6'-0
"
R 42'-3"
R 13'-5"
R 1
3'-4
"
UPUP
UN
ITP
UM
P
CN
TR
L.
SELEV. P1
155155B
155
103B
112
151
150
155
152
155155155155
102LOBBY
104ELEV VEST
C3A 2
C3A 2
J2A 2
165B
165BTELECOM
175TRANSFORMER RM
165
180A
180B
175A 175B
D3A3
ELEV 3
180UCB
TCHO
TENANT C
STAIR 2ST-108STAIR 8
ELEV 5
150LOADING DOCK 1
160LOADING DOCK 2
ST-111STAIR 11
ST-110STAIR 10
ST-101STAIR 1
ST-105STAIR 5
ELEV 4
J2A 2
C3A 2
ST-109STAIR 9
ST-110ASTAIR 10A
ST-105ASTAIR 5A
D2A D2A
155ELEC
155
155B
TELECOM
155
165ELEC
156
UPUP
1:12RAMP UP
157
CLIF BAR
TENANT B
CR
OSS
WAL
K
DRIVEWAY
DRIVEWAY
15.3'
11.5
'
DRIVEWAY
DRIVEWAY
PSPSPSPS
PS PSPSPSPSPSPSPSPSPSPSPSPS PSPS
SIDEWALK
PS
PUBLIC PARKING
PUBLIC PARKING
PUBLIC PARKING
PUBLIC PARKING
DRIVEWAY
DN
UP
UP
UP
UP
DN
DN
DN
DN
UP
DN
UP
DN DN
UP
DN
DN UP
DN
DN
UP
DN DNDN
UP
DN
T.O. DOCK+3'-10 1/2"
T.O. DRIVE+0'-0"
ELEV 2
ELEV 1
MECH
61'-9 3/4"
TELEPHONE POLEWITH STREETLIGHT
STEELBOLLARDS
8.
14
26
15
27
16
28
17
29
18
30
19
31
20
34
21 22 23
33
24
35
25
69
68
70
67
71
66
72
65
73
64
74
63
75
62 61
76
60 59
93 94 95 96 97 98
48
46
49
45 44 43 42 41 40 39 38
55
37
50 51 52
85 84
86
83
87
82 81
88
80
89
79
90
78
91
77
92
32
4736
53 54 56 57 58
123456789101112131213141516171819202122232425
12
34
56
78
910
11
2627
2829
3031
3233
3435
3637
3839
4041
4243
4445
4647
4849
108 109 110 111 112 113
50
59
51
60
52
61
53
62
54
63
55
64
56
65
57
66
58
67
68
77
69
78
70
79
71
80
72
81
73
82
74
83
75
84
76
85
107106104INOU
T
86
95
87
96
88
97
89
98
90
99
91
100
92
101
93
102
94
103
105
2627
2829
3031
3233
3435
3637
3839
4041
23
45
67
89
1011
1213
1415
1617
1819
2021
2223
2425
78 79 80 81 82 83 84 85
42434445464748495051
52
63
53
64
54
65
55
66
56
67
57
68
58
69
59
70
60
71
61
72
62
73
IN
OU
T
7674 75
1
IN
OU
T 77
3132
3334
1
24'-0" R
24'-0" R
2 3 4 5 6 7 8 9 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
EMERYVILLE
BERKELEY
OA
KLA
ND
OAKLAND
BERKELEY
EMER
YVIL
LE
EMER
YVIL
LE
EMER
YVIL
LE
SAN
PA
BLO
AVE
NU
E
67TH STREET67TH STREET
FOLGER AVENUE
GR
EEN
WA
Y
GR
EEN
WA
Y
GRE
ENW
AY
BIO
SWA
LE
FOLGER AVENUEGREENWAY (GRW)LOT 98 SPACES
1039 FOLGER AVENUE LOT34 SPACES
SATTELITE (SATT)LOT-198 SPACES
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702
Gensler
SURFACE PARKINGPLAN SUMMARYAT GRADE PLANConstruction Type:1B
8
Scale: 1"= 100 ft1
BASE BUILDING: 3100 SAN PABLO AVENUE
PLAN VIEW-SURFACE PARKING LOTS
277'-7"
300'-0" REF.
BERKELEY
EMERYVILLE CITY OF BERKELEY
OAK
LAN
D Z
ON
EH
BX
-2
OAK
LAN
D Z
ON
EC
C-2
CITY OF OAKLAND
OAKLAND ZONEHBX-2
OAK
LAN
D Z
ON
EH
BX
-2
OAK
LAN
D Z
ON
EC
C-2
Totals-Square FootagePkg Req
Floor 2
Pkg.Avail.Status Parking Uses
Typical Standard Space
8'-6" (W) x 18'-0" (L)Building and Surface lots
Office and R&DApplication 49,000 RSF/39,000 USF 150 150Tenant
Premier Nutrition
18'-0
"
8'-6"
BERKELEY
OAKLAND
ATTACHMENT 2 ZAB 04-26-18 Page 5 of 10
EN
TRY
EX
IT
EL.D
ND
ND
ND
N
amazon.com TCHO CitySports
ClifbarBase
BuildingWest Lobby
open tobelow
Tenant Suite (occupied)Occupancy: Manufacturing/warehouse
20,000 sf(500 sf/person) 40 occupants
Office 3,500 sf(200 sf/person) 17 occupants
Total 23,500 sfTotal occupants 57
NOT PART OF USE PERMITREQUEST: FOR REFERENCE ONLY
Tenant Suite (occupied)Occupancy: Manufacturing/Warehouse
34,122 sf(500 sf/person) 68 occupants
NOT PART OF USE PERMIT REQUEST:FOR REFERENCE ONLY
Tenant Suite (unoccupied)Occupancy: Manufacturing/R&D
17,695 sf(500 sf/person) 34 occupantsNOT PART OF USE PERMIT
REQUEST:FOR REFERENCE ONLY
Tenant Suite (occupied)Occupancy: Manufacturing/Commercial/Kitchen15,900 sf(500 sf/person) 31occupantsNOT PART OF USE PERMITREQUEST: FOR REFERENCE ONLY
Tenant Suite (unoccupied)Occupancy: Manufacturing/R&D8,600 sf(500 sf/person) 17 occupantsNOT PART OF USE PERMITREQUEST: FOR REFERENCE ONLY
Tenant Suite BayHealth Sharedwith Base Building (occupied)Loading dock for trash/ recycling/storage 8,425 sf 0 occupantsNOT PART OF USE PERMITREQUEST: FOR REFERENCE ONLY
BayHealth entranceshared with base building
CITY OF OAKLAND
CITY OF BERKELEY
CIT
Y O
F O
AK
LAN
D
CIT
Y O
F E
ME
RY
VIL
LE
MU-LI C-WFolger Avenue
San
Pab
lo A
venu
e
67th Street
RAMP DN.TO LOWERLEVEL PKNG.
LOADINGDOCK.
RAMP UPTO ROOF
LEVELPKNG.
LOADINGDOCK.
Tenant Suite (occupied)Occupancy: Health Club18,357 sf(mixed Group) 250 occupantsNote: includes first and second floor spacesNOT PART OF USE PERMITREQUEST:FOR REFERENCE ONLY
EXITEXIT
EX
IT
EXIT
EXIT
EXIT
EX
IT
EX
IT
EL. EL.
EL.
EL.
EXIT
EXIT EXIT EXIT EXIT
Reception
ENTRY
EXIT
ENTRY
EXIT EXIT EXIT EXIT
EXIT
EXIT
ENTRY
EXIT
EN
TRY
EX
IT
EN
TRY
EX
IT
EN
TRY
EX
IT
ENTRY
BayHealth Loading Dock
7,695 SF 10,000 SF
vacant
AMBULANCE
SIDEWALKDRIVEWAY
SIDEWALKDRIVEWAY
DRIVEWAY
Tenant Suite (occupied)Occupancy:Buisiness
5,500 sf(100 sf/person55 occupants
NOT PARTOF USE PERMIT REQUEST :
FOR REFERENCE ONLY
CITY OF EMERYVILLE
CITY OF BERKELEYMU-LI
124'-0"
74'-0
"
8,425 SF
FutureStairwell
8,600 SF
39'-7"
22'-1
0"
GE
NE
RA
TOR
*vacant
* Pursuant to Berkeley’s role as administering land use approvals under the MOU, the City of Berkeley will process the project under C-W zoning provisions, as a logical extension of Berkeley’s adjacent zoning designations and taking into account the City of Oakland’s similar zoning for the building.
ZONING EMERYVILLEI.N.L.-LIGHT INDUSTRIAL.
THE
GR
EEN
WAY
ZONING EMERYVILLEP.O. PARK OPEN SPACE
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702
Gensler
BUILDING PLANSAT GRADE PLANConstruction Type:1B
SITE PLANScale: 1:700
10
ATTACHMENT 2 ZAB 04-26-18 Page 7 of 10
DN
DN
DN
DN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
17 18 19 20 21 22 23 24 25 26 27 28 29
38 39 40 41 42 43 44 45 46
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85
16
30 31 32 33 34 35 36 37
4748
4950
51
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
98 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2517 18 19 20 21 22 23 24 1 2 3
49 50 51 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
8889
9091
9293
9495
9697
9899
100
106
9 10 11
1011
0210
3104
105
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
99 100
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
56
69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97
87
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
107
86
84 5 6 7
484745 46
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
17 18 19 20 21 22 23 24 25 26 27 28 29
38 39 40 41 42 43 44 45 46
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85
16
30 31 32 33 34 35 36 37
4748
4950
51
98 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2517 18 19 20 21 22 23 24
49 50 51
8889
9091
9293
9495
9697
9899
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
99 100
52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
56
69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97
87
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
86
48
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
47
SECONDARYEXIT
PRIMARYEXIT
RAMP UP
100 Reserved BayHealth24 hours
Note: Parking on roof shared for BayHealth and City Sports
107 Dedicated City Sports Use Permit
EXITEXIT
EX
IT
EXIT
EXIT
EX
IT
EL.EL.
BayHealth (8:00 A.M.- 5:00 P.M.)
CITY OF EMERYVILLE
CITY OF BERKELEY
CITY OF OAKLAND
CITY OF BERKELEY
CIT
Y O
F O
AK
LAN
D
CIT
Y O
F E
ME
RY
VIL
LE
Folger Avenue
San
Pab
lo A
venu
e
67th Street
ELEC HK
Tenant Suite: (unoccupied/permitted)Occupancy: Medical 33,052 sf(100 sf/person) 331 occupantsNOT PART OF USE PERMITREQUEST
BayHealth- Reserved (24 hour) Parking100 Spaces
BayHealth- Peak (8am-5pm)- Reserved Parking100 Spaces
Flex67 Spaces
P a r k i n g L e g e n d
Dec
k
EL.
EL.
Total BayHealth parking spaces roof 200
SIDEWALKDRIVEWAY
SIDEWALKDRIVEWAY
MU-LI C-W
BayHealthMedical Use
Typical Standard Space8'-6" (W) x 18'-0" (L)ROOF, SURFACE, ANDBASEMENT PARKING
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702
Gensler
BUILDING PLANSTHIRD FLOOR PLANConstruction Type:1B
SITE PLANScale: Actual Size
12
100
STANDARD ADA-EV 1 SPACES
STANDARD ADA-EV 1 SPACES
REVISED 02-19-18
ATTACHMENT 2 ZAB 04-26-18 Page 9 of 10
DN
DN
DN
DN
SIDEWALKDRIVEWAY
SIDEWALKDRIVEWAY
Parking below on Third Floor Roof
CITY OF OAKLAND
CITY OF BERKELEY
CIT
Y O
F O
AK
LAN
D
CIT
Y O
F E
ME
RY
VIL
LE
Folger Avenue
San
Pab
lo A
venu
e
67th Street
Tenant Suite: (unoccupied/permitted)Occupancy: Medical 31,966 sf(100 sf/person) 320 occupantsNOT PART OF USE PERMITREQUEST
MU-LI C-W
A r e a L e g e n d
RAMP UP
EL.
EL.
Dec
k
Men
WomenCITY OF EMERYVILLE
CITY OF BERKELEY
BayHealthMedical Use
MU-LI
Common Corridor
BayHealth Medical Use
3100 SAN PABLO AVENUE BERKELEY, CALIFORNIA 94702
Gensler
BUILDING PLANSFOURTH FLOOR PLANConstruction Type:1B
SITE PLANScale: Actual Size
13
ATTACHMENT 2 ZAB 04-26-18 Page 10 of 10