24
INSTALLATION DETAILS 120/240 VOLT SINGLE-PHASE UNDERGROUND SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 2-WIRE RESIDENTIAL SERVICE AND METER SOCKET CONNECTIONS SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 3-WIRE HIGH PHASE LOCATION ON DELTA SERVICE AND STANDARD PHASE ROTATION 34.02-08 34.03-08 34.02-14 34.02-12 SECTION 34 - METERING - OH TABLE OF CONTENTS ADCOCK 11/5/13 KATIGBAK GUINN SECONDARY SELF-CONTAINED 4-WIRE DELTA WIRING DIAGRAM 34.03-06 FOR SELF-CONTAINED METER BASES ONLY 34.03-12 SECONDARY SELF-CONTAINED 4-WIRE WYE METER WIRING DIAGRAMS 34.04-02 120/208 VOLT 3-WIRE NETWORK SELF-CONTAINED METERING WIRING DIAGRAM 34.07-08 CT CABINET INSTALLATION ON SERVICE RISER, THREE-PHASE, 4-WIRE OR SINGLE-PHASE, 3-WIRE SERVICE CURRENT TRANSFORMER INSTALLATION FOR SECONDARY METERING 34.07-10 CT CABINET INSTALLATION ON THREE-PHASE, 4-WIRE WALL MOUNTED 34.07-12 34.08-04 SINGLE-PHASE PRIMARY METERING INSTALLATION - 15 KV OVERHEAD CLUSTER 34.09-06 POLYPHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT, OVERHEAD VERTICAL CLUSTER 34.09-12 34.09-10 OVERHEAD VERTICAL CLUSTER THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT, 34.09-18 34.09-20 34.09-16 34.09-14 OVERHEAD HORIZONTAL CLUSTER (FMO) THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 200 AMP, OVERHEAD HORIZONTAL CLUSTER THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT, 2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 600 AMP, 2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2-1/2 ELEMENT, SECONDARY SELF-CONTAINED METER WIRING CONNECTIONS, 120/208 VOLT 34.04-03 3-WIRE - NETWORK LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 34.00-04 0 3 2 1 APPR. REVISED BY CK'D THE FOR MAINTENANCE ONLY DRAWINGS LISTED BELOW ARE NOT CONTAINED IN THE PRINTED SPEC BOOK, BUT ARE AVAILABLE ONLINE FOR MAINTENANCE ONLY DRAWINGS 34.00 METERING GENERAL 34.02 SELF-CONTAINED METERING, SINGE-PHASE 34.03 SELF-CONTAINED METERING, THREE-PHASE 34.04 SELF-CONTAINED METERING, NETWORK (OPEN WYE) 34.07 TRANSFORMER-RATED METERING, SECONDARY, THREE-PHASE 34.08 TRANSFORMER-RATED METERING, PRIMARY, SINGLE-PHASE 34.09 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE 34.11-01 THREE-PHASE PRIMARY METERING ENCLOSURE FRONT VIEW AND FOOTPRINT 34.11-05 THREE-PHASE PRIMARY METERING ENCLOSURE 34.11 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE - UG 34.11-03 THREE-PHASE PRIMARY METERING ENCLOSURE BUSHING AND CT/PT LAYOUT 34.00-00A DEF X DEP DEM DEC ADCOCK 7/18/14 KATIGBAK DANNA
Transcript

INSTALLATION DETAILS 120/240 VOLT SINGLE-PHASE UNDERGROUND

SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 2-WIRE

RESIDENTIAL SERVICE AND METER SOCKET CONNECTIONS

SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 3-WIRE

HIGH PHASE LOCATION ON DELTA SERVICE AND STANDARD PHASE ROTATION

34.02-08

34.03-08

34.02-14

34.02-12

SECTION 34 - METERING - OH

TABLE OF CONTENTSADCOCK

11/5/13

KATIGBAK GUINN

SECONDARY SELF-CONTAINED 4-WIRE DELTA WIRING DIAGRAM 34.03-06

FOR SELF-CONTAINED METER BASES ONLY

34.03-12SECONDARY SELF-CONTAINED 4-WIRE WYE METER WIRING DIAGRAMS

34.04-02120/208 VOLT 3-WIRE NETWORK SELF-CONTAINED METERING WIRING DIAGRAM

34.07-08

CT CABINET INSTALLATION ON SERVICE RISER, THREE-PHASE,

4-WIRE OR SINGLE-PHASE, 3-WIRE SERVICE

CURRENT TRANSFORMER INSTALLATION FOR SECONDARY METERING 34.07-10

CT CABINET INSTALLATION ON THREE-PHASE, 4-WIRE WALL MOUNTED 34.07-12

34.08-04SINGLE-PHASE PRIMARY METERING INSTALLATION - 15 KV OVERHEAD CLUSTER

34.09-06

POLYPHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT,

OVERHEAD VERTICAL CLUSTER

34.09-12

34.09-10OVERHEAD VERTICAL CLUSTER

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT,

34.09-18

34.09-20

34.09-16

34.09-14OVERHEAD HORIZONTAL CLUSTER (FMO)

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 200 AMP,

OVERHEAD HORIZONTAL CLUSTER

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT,

2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 600 AMP,

2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER

THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2-1/2 ELEMENT,

SECONDARY SELF-CONTAINED METER WIRING CONNECTIONS, 120/208 VOLT

34.04-033-WIRE - NETWORK

LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 34.00-04

0

3

2

1

APPR.REVISED BY CK'D

THE FOR MAINTENANCE ONLY DRAWINGS LISTED BELOW ARE NOT CONTAINED

IN THE PRINTED SPEC BOOK, BUT ARE AVAILABLE ONLINE

FOR MAINTENANCE ONLY DRAWINGS

34.00 METERING GENERAL

34.02 SELF-CONTAINED METERING, SINGE-PHASE

34.03 SELF-CONTAINED METERING, THREE-PHASE

34.04 SELF-CONTAINED METERING, NETWORK (OPEN WYE)

34.07 TRANSFORMER-RATED METERING, SECONDARY, THREE-PHASE

34.08 TRANSFORMER-RATED METERING, PRIMARY, SINGLE-PHASE

34.09 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE

34.11-01THREE-PHASE PRIMARY METERING ENCLOSURE FRONT VIEW AND FOOTPRINT

34.11-05THREE-PHASE PRIMARY METERING ENCLOSURE

34.11 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE - UG

34.11-03THREE-PHASE PRIMARY METERING ENCLOSURE BUSHING AND CT/PT LAYOUT

34.00-00A

DEF

X

DEPDEMDEC

ADCOCK

7/18/14

KATIGBAK DANNA

ADCOCK

10/29/13

GUINN GUINN

LABELING MULTIPLE METER ENCLOSURES

ON A SINGLE PREMISE0

3

2

1

APPR.REVISED BY CK'D

1-1/2" MINIMUM

3/4" MINIMUM

MINIMUM 1/16" THICK

MINIMUM 1/4" HIGH LETTERS

NOTES:

1. ON INSTALLATIONS, REPAIRS, REPLACEMENTS OR UPGRADES OF ENCLOSURES INVOLVING MORE THAN ONE

THE OUTSIDE BY A NONFERROUS METAL OR PLASTIC PLATE ENGRAVED OR STAMPED WITH THE APARTMENT

NUMBER, OFFICE SUITE, LOT NUMBER, ETC.

3. THE INSIDE OF EACH METER ENCLOSURE SHALL BE CORRECTLY IDENTIFIED WITH A PLATE DESCRIBED ABOVE

OR WITH A PERMANENT MARKER.

METER ON A SINGLE PREMISE, THE CUSTOMER SHALL CORRECTLY IDENTIFY EACH METER ENCLOSURE ON

4. CONDUCTOR LABELING FOR MULTI-TENANT METERING APPLICATIONS: WHERE ONE SERVICE IS C.T. METERED

CUSTOMER CABLES MUST BE CLEARLY AND SPECIFICALLY MARKED FOR PHASE AND LABELED WITH A TAG

TO IDENTIFY THE LOCATION OF THE SOURCE AND LOAD ENDS OF THE CONDUCTOR. THE LOAD END OF EACH

CABLE SHALL BE LABELED TO IDENTIFY THE SOURCE (TRANSFORMER LOCID NUMBER). EACH SOURCE END

SHALL BE LABELED TO IDENTIFY THE LOCATION OF THE LOAD END OF THE CABLE (TROUGH NUMBER, SWITCH

PANEL NUMBER, ETC.).

TRANSFORMER BUT ARE METERED ELSEWHERE (BUILDING WALL OR METER ROOM), BOTH ENDS OF ALL

ON THE PAD-MOUNTED TRANSFORMER AND OTHER CUSTOMER OWNED SERVICES ARE RUN TO THE SAME

ADCOCK

9/12/14

SIMPSON SIMPSON

34.00-04

DEFDEP

X

DEMDEC

X

2. THE PLATE SHALL BE PERMANENTLY ATTACHED TO THE METER ENCLOSURE UTILIZING AN INDUSTRIAL-STRENGTH

ADHESIVE SUITABLE FOR EXTERIOR USE. TWO-SIDED TAPE IS NOT ACCEPTABLE.

ADCOCK

11/5/13

GUINN GUINN

34.02-08

DWG.

LINE LOAD

NEUTRAL

LOCKOUT

MALE ADAPTER

ATTACH CONDUIT

THROUGH LEFT

KNOCKOUT ON

BOTTOM SIDE OF

METER SOCKET

INSTALLED BY COMPANY

WIRE BRUSH

INHIBITOR ON

AND USE

ALL 3 LUGS

NEUTRAL

METER SOCKET INSTALLED

BY CONTRACTOR

THIS ILLUSTRATION IS FOR DE-ENERGIZED CONDITIONS. IF

METER IS ENERGIZED USE PROPER SAFETY PROCEDURES

AS OUTLINED IN THE ACCIDENT AND PREVENTION MANUAL.

METER BASE MAY BE ENERGIZED FROM CUSTOMER LOAD

SIDE.

INSTALLATION DETAILS 120/240 VOLT SINGLE-PHASE

UNDERGROUND RESIDENTIAL SERVICE

INSTALLED BY

METER GROUND

CUSTOMER

2" PRE-BENT

PVC CONDUIT

2" PVC TO KEEP SAND OUT OF CONDUIT

INSERT 1-1/2" CIC AT LEAST 6" INTO

METER SOCKET CONNECTIONS

C

L

INSTALLATION DETAILS 120/240 VOLT

SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE

AND METER SOCKET CONNECTIONS

36" MIN

DETAIL A

SEE DETAIL "A"

BUSHING

0

3

2

1

APPR.REVISED BY CK'D

NOTE: CABLE SHOULD BE FED THROUGH CONDUIT BEFORE IT IS INSTALLED BELOW GRADE AND ATTACHED TO

METER SOCKET.

5'-6" MAX.

4'-0" MIN.

ADCOCK

11/5/13

GUINN GUINN

34.02-12

DWG.

SECONDARY SELF-CONTAINED

METER WIRING DIAGRAM,

SINGLE-PHASE, 2-WIRE

120V

LOAD

LINE

LOOP WIRE

DO NOT CUT

3-1/4" (TYP.)

8" (TYP.)

10" (TYP.)

0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

34.02-14

DWG.

SECONDARY SELF-CONTAINED

METER WIRING DIAGRAM,

SINGLE-PHASE, 3-WIRE

120V

240V

120V

4-1/2" (TYP.)

13" (TYP.)

15" (TYP.)

0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

34.03-06

DWG.

THREE-PHASE, FOUR WIRE, DELTA

"S" BASE

321

21

3

208V

2

4

0

V

2

4

0

V

HIGH PHASE

N

1

2

3

SECONDARY SELF-CONTAINED 4-WIRE

DELTA WIRING DIAGRAM

240V

120V 120V

0

3

2

1

APPR.REVISED BY CK'D

34.03-08

DWG.

C

LEADS

METER BASE

AND K-6 PHASE

SEQUENCE INDICATOR

HIGH PHASE LOCATION ON

DELTA SECONDARY SERVICE

HIGH PHASE LOCATION ON DELTA SECONDARY SERVICE

FOR SELF-CONTAINED METER BASES ONLY

STANDARD PHASE ROTATION IDENTIFICATION PROCEDURE

METER BASE

WATT HOUR

METER

HIGH PHASE LOCATION ON DELTA SERVICE

AND STANDARD PHASE ROTATION

FOR SELF-CONTAINED METER BASES ONLY

IS NOT AN INDICATION OF SOURCE PHASE IDENTIFICATION.

NOTE: CONNECT ON LINE SIDE OF METER BASE WITH LEADS A, B, C (LEFT TO RIGHT) TO IDENTIFY CLOCKWISE

SEE DWGS. 23.04-03A, 23.04-03B AND 23.04-03C FOR STANDARD CABLE TAGGING.

OR COUNTER-CLOCKWISE ROTATION TO THIS SERVICE. THIS WILL IDENTIFY PHASE ROTATION ONLY: IT

INSTALL APPROPRIATE PHASE ROTATION

INDICATION STICKER ON THE FACE OF

THE METER BASE BELOW METER GLASS

AND ALSO INSIDE THE METER BASE:

CLOCKWISE: CN 440302

COUNTERCLOCKWISE: CN 440303

N

LOAD

1 2 3

N

LINE

1 2 3

B

A

0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

KNOPP MODEL K-3

NOTE: PGN GENERATORS TURN COUNTER

CLOCKWISE TO PROVIDE ABC POSITIVE

SEQUENCE ROTATION. THE KNOPP METER

IS CONNECTED INTERNALLY SUCH THAT

THE MECHANICAL ROTATION OF THE DISC

WILL BE CLOCKWISE IF THE RED/WHITE/BLUE

LEADS ARE CONNECTED TO A/B/C PHASE,

RESPECTIVELY, WHICH INDICATES POSITIVE

SEQUENCE ABC ROTATION.

ADCOCK

11/5/13

GUINN GUINN

34.03-12

DWG.

1

2 3

N

120V

1

2

0

V

1

2

0

V

2

0

8

V

2

3

1

N

THREE-PHASE, FOUR WIRE, WYE 120/208 VOLTS

"S" BASE

THREE-PHASE, FOUR WIRE, WYE 277/480 VOLTS

"S" BASE

N

2

2

7

7

V

4

8

0

V

3

2

7

7

V

277V

1

3

2

1

N

SECONDARY SELF-CONTAINED 4-WIRE

WYE METER WIRING DIAGRAMS0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

34.04-02

DWG.

1

1

2

0

V

2

0

8

V

1

2

0

V

3

N

120V

2

THREE WIRE NETWORK

1

3

N

"S" BASE

120/208 VOLT 3-WIRE NETWORK

SELF-CONTAINED METERING WIRING DIAGRAM0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

34.04-03

DWG.

SECONDARY SELF-CONTAINED

METER WIRING CONNECTIONS,

120/208 VOLT, 3-WIRE - NETWORK

120V

208V

120V

4-1/2" (TYP.)

13" (TYP.)

FIFTH JAW LOCATION

(9 O'CLOCK POSITION

PREFERRED) FOR

120/208V. SERVICE

INSTALLED BY THE

CUSTOMER WHEN

REQUIRED (BONDED

TO NEUTRAL LUG)

15" (TYP.)

0

3

2

1

APPR.REVISED BY CK'D

ADCOCK

11/5/13

GUINN GUINN

34.07-08

DWG.

HIGH PHASE TO BE MARKED

ORANGE FOR 120/240V

DELTA SERVICE. OMIT

BOTTOM C.T. FOR SINGLE

PHASE SERVICE.

FINISHED GRADE

RIGID SCHEDULE 40 1-1/2" CONDUIT MINIMUM

SUPPLIED AND INSTALLED BY CUSTOMER.

DO NOT USE CONDULETS. SECURE WITH

BEND CONDUIT INTO METER SOCKET.

CONDUIT STRAPS A MAXIMUM OF 2' APART.

MINIMUM CAN BE SECURED TO

SO THAT 1-1/2" CONDUIT

AND INSTALLED BY CUSTOMER

SUPPLIED BY THE COMPANY

SMALL AERIAL C.T. BOX

OUTSIDE BUILDING WALL.

18" H X 8-3/8" W X 6" D

DIMENSION

C.T. BOX MINIMUM

BY THE COMPANY

RISER ATTACHMENT

SERVICE DROP

BY THE COMPANY

OF BUILDING

OUTSIDE WALL

NOTE: ALL METER CONTROL WIRE CONNECTIONS TO BE MADE INSIDE CURRENT TRANSFORMER ENCLOSURE.

1-1/2" CONDUIT CAN BE SECURED

MOUNT C.T. CABINET SO THAT

TO OUTSIDE WALL OF BUILDING

ONE CONNECTOR PER PHASE

TO BE FURNISHED AND INSTALLED

BY THE COMPANY

OF BUILDING

OUTSIDE WALL

OR CONNECTION BLOCK BY

CUSTOMER (REFER TO FIGURE

SINGLE SET OF CONDUCTORS

DETAILS).

47 OF THE METER BOOK FOR

TOP VIEW

PARALLEL SERVICE

CT CABINET INSTALLATION ON SERVICE RISER,

THREE-PHASE, 4-WIRE OR

SINGLE-PHASE, 3-WIRE SERVICE

3' MAX

SEE FIGURE 2

FOR CLEARANCE

ABOVE ROOF

6" MIN

0

3

2

1

APPR.REVISED BY CK'D

5'-6" MAX.

4'-0" MIN.

ADCOCK

11/5/13

GUINN GUINN

34.07-10

DWG.

PLAN VIEW

OWNED POLE

CUSTOMER

METER

TO

CURRENT TRANSFORMER INSTALLATION

FOR SECONDARY METERING

FRONT VIEW

0

3

2

1

APPR.REVISED BY CK'D

ADCOCK11/5/13

GUINN GUINN

34.07-12

DWG.

AUTHORITY HAVING JURISDICTION, AND THE COMPANY.

FINISHED GRADE

COMPANY OWNED

CUSTOMER OWNED AND INSTALLED

BY THE COMPANY

PHASE TO BE FURNISHED AND INSTALLED

SERVICE DROP AND ONE CONNECTOR PER

SECURE WITH CONDUIT STRAPS MAXIMUM OF 2' APART.

RIGID SCHED. 40 1-1/2" CONDUIT MINIMUM WITH NO CONDULETS.

METERING EQUIPMENT EXCEPT 1-1/2" CONDUIT AND

CONDUIT FITTINGS TO BE WIRED BY THE COMPANY

AND MOUNTED BY THE CUSTOMER.

MINIMUM DIMENSION

C.T. METER SOCKET

20" H X 12" W X

4-1/4" D

CT

CT

CT

HIGH PHASE

TO BE MARKED

120/240V

ORANGE FOR

DELTA SERVICE.

34-1/2" H X

9-1/4" W X

C.T. BOX

11-1/2" D

LARGE AERIAL

NOTES:

1. CUSTOMER MUST PROVIDE ADEQUATE GROUNDING OF FACILITIES IN ACCORDANCE WITH THE N.E.C. AND

2. ALL METER CONTROL WIRE CONNECTIONS TO BE MADE INSIDE CURRENT TRANSFORMER ENCLOSURE.

TO BE INSTALLED

BY CUSTOMER

SERVICE ATTACHMENT

WALL MOUNTED

CONNECTION TO THE SERVICE DROP BY THE

CONDUCTORS OR CONNECTION BLOCK FOR

BEHIND THE C.T.'S TO A SINGLE SET OF

CUSTOMER SHALL CONNECT MULTIPLE RISERS

COMPANY. (REFER TO FIG. 47 OF THE METER

BOOK FOR CONNECTION BLOCK DETAILS)

CT CABINET INSTALLATION ON THREE-PHASE,

4-WIRE WALL MOUNTED

3' MAX3' MAX

18" MIN

3' MAX

9"

3"

15"

0

3

2

1

APPR.REVISED BY CK'D

5'-6" MAX.

4'-0" MIN.

ADCOCK11/5/13

GUINN GUINN

34.08-04

DWG.

LOAD SOURCE

SINGLE-PHASE PRIMARY METERING INSTALLATION -

15 KV OVERHEAD CLUSTER

46"

18"

FRONT VIEW

PLAN VIEW

SIDE VIEW

13"

0

2

1

APPR.REVISED BY CK'D

#2 SD BC

#6 SD BC

#2 SD BC

#6 SD BC

NOTES:

1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

5"

72"

3

MP1501F

ADCOCK

11/5/13

GUINN GUINN

34.09-06

DWG.

BY METER DEPT.

METER BOX FURNISHED

BRACKET FOR INSTALLING

CONNECTED ON COMMON BUS

SYSTEM NEUTRAL TO BE

NEUTRAL

LOAD SOURCE

NEUTRAL

POLYPHASE PRIMARY METERING INSTALLATION -

15 KV, 2 ELEMENT, OVERHEAD VERTICAL CLUSTER

36"

96"

METER BOX

9'-4"

2"

18"

FRONT VIEW SIDE VIEW

PLAN VIEW

NOTES:

1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

0

3

2

1

APPR.REVISED BY CK'D

#2 SD BC

#6 SD BC

MP1502F

5'-6" MAX.

4'-0" MIN.

ADCOCK

11/5/13

GUINN GUINN

34.09-10

DWG.

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 3 ELEMENT,

OVERHEAD VERTICAL CLUSTER

0

1

APPR.REVISED BY CK'D

NOTES:

1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

2

3

MP1503F

BY METER DEPT.

METER BOX FURNISHED

BRACKET FOR INSTALLING

CONNECTED ON COMMON BUS

SYSTEM NEUTRAL TO BE

NEUTRAL

SOURCELOAD

LIFTING EYE

NEUTRAL

72"

36"

36"

9'-4"

2"

18"

METER BOX

5'-6" MAX.

4'-0" MIN.

FRONT VIEW SIDE VIEW

PLAN VIEW

#6 SD BC

#2 SD BC

4"

4"

4"

KHLC40N6F

KHLC7933F

OR

2. LINE FUSES MAY BE PLACED ON POLE UPSTREAM OF METER CLUSTER IF CIRCUIT CONFIGURATION PERMITS

AND APPROVED BY PLANNER.

ADCOCK

11/5/13

GUINN GUINN

34.09-12

DWG.

BE CONNECTED ON

SYSTEM NEUTRAL TO

ON COMMON BUS

NEUTRAL

LOADSOURCE

C.T. TERMINALS

CONNECTIONS TO

MAKE PRIMARY

LOAD

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 2 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER

FRONT VIEW

PLAN VIEW

0

3

2

1

APPR.REVISED BY CK'D

NOTES:

1. METER DEPARTMENT TO SPECIFY LOCATION FOR USE OF THIRD POTENTIAL TRANSFORMER.

2. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

#6 SD BC

#6 SD BC

40"

12"

20"

SIDE VIEW

72"

SOURCE

MP1502F

ADCOCK

11/5/13

GUINN GUINN

34.09-16

DWG.

TO BE CONNECTED

TO COMMON BUS.

SYSTEM NEUTRAL

METER BOX AND

BRACKET FURNISHED

BY METER DEPT.

#6 SD BC

G

U

Y

A

T

T

A

C

H

M

E

N

T

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 600 AMP, 2-1/2 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER

54"

CT'S AND PT'S

COMPLETE WITH

MOUNTING FURNISHED

BY METER DEPT.

12"

54"

24"

28"

36"

36"

12"

4"

12"

36"

17'-4"

5"

6"

FRONT VIEW SIDE VIEW

4"

4"

0

1

APPR.REVISED BY CK'D

NOTES:

1. GUYS MUST BE BONDED TO POLE GROUND, NOT SHOWN HERE FOR CLARITY. REFER TO

DWG. 02.04-04.

4"

#2 SD BC

2

3

METER BOX

4'-0" MIN.

5'-0" MAX.

ADCOCK

11/5/13

GUINN GUINN

34.09-18

DWG.

TO COMMON BUS.

TO BE CONNECTED

SYSTEM NEUTRAL

METER BOX AND

BRACKET FURNISHED

BY METER DEPT.

#6 SD BC

C

B

A

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 200 AMP, 2-1/2 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER

36"

36"

36"

12"

4"

15"

30"

12"

54"

CT'S AND PT'S

COMPLETE WITH

MOUNTING FURNISHED

BY METER DEPT.

6"

METER BOX

FRONT VIEW SIDE VIEW

0

1

APPR.REVISED BY CK'D

4"

4"

7

8

"

F

I

B

E

R

G

L

A

S

S

L

I

N

K

NOTES:

5"

#6 SD BC

#6 SD BC

2

3

1. GUYS MUST BE BONDED TO POLE GROUND, NOT SHOWN HERE FOR CLARITY. REFER TO DWG. 02.04-04.

KHLC40N6F

KHLC7933F

OR

4'-0" MIN.

5'-6" MAX.

ADCOCK

11/5/13

GUINN GUINN

34.09-20

DWG.

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 3 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER

0

3

2

1

APPR.REVISED BY CK'D

BE CONNECTED ON

SYSTEM NEUTRAL TO

ON COMMON BUS

CONNECTIONS TO

NOTES:

C.T. TERMINALS

MAKE PRIMARY

1. METER DEPARTMENT TO SPECIFY LOCATION FOR USE OF THIRD POTENTIAL TRANSFORMER.

FRONT VIEW SIDE VIEW

PLAN VIEW

SOURCE LOAD

40"

12"

SOURCE

LOAD

2. CUTOUTS MAY BE INSTALLED ON ADJACENT SERVICE POLE IF SPECIFIED BY ENGINEER.

3. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

#6 SD BC

#6 SD BC

72"

20"

MP1503F

ADCOCK

11/5/13

GUINN GUINN

THREE-PHASE PRIMARY METERING ENCLOSURE

FRONT VIEW AND FOOTPRINT0

3

2

1

APPR.REVISED BY CK'D

ENCLOSURE FOOTPRINT

5/8" ANCHOR BOLTS

FRONT VIEW

(6) PLACES

2"

4"86"

24"

4"

80"3"

56"

18-1/2"

STAINLESS STEEL

CARRIAGE BOLTS

"ELBOWS" LABEL

EXTERIOR

DURHAM LABEL

CATALOG NUMBER AND

ELECTRICAL RATING

(ON INSIDE OF DOOR)

PRIMARY CABLE SIDE

METERING PT/CT SIDE

2

1 ENCMTRCTPTSF

BILL OF MATERIALS

CATALOG

001466 PAD-MOUNTED METER ENCLOSURE

82" X 87" CONCRETE PAD

DESCRIPTION

PAD3P82X87CF 3277121

1

QTY

1

1

PER

CU

NUMBER

MACRO UNIT

-

CU

ITEM

NO.

COMPATIBLE

UNIT

QTY

REQ'D

3 WARNING LABEL- 92201113141 1

EQUIPMENT ID

NUMBER

WARNING LABEL

CN 9220111314

4 - 2112980414 1

NOTES:

1. ISSUE GROUNDS SEPARATELY.

DANGER LABEL (SEE NOTE 2)

2. INSTALL DANGER LABEL ON INSIDE OF EACH DOOR: TOTAL (4) LABELS.

34.11-01

DEF

X

DEPDEMDEC

ADCOCK

7/25/14

DANNA DANNA

3. INSTALL 1 WARNING LABEL ON EACH SET OF DOORS (ONE PER SIDE).

ADCOCK

11/5/13

GUINN GUINN

34.11-03

DWG.

THREE-PHASE PRIMARY METERING ENCLOSURE

BUSHING AND CT/PT LAYOUT

NOTES:

1. REAR SIDE ACCESS FOR METER DEPARTMENT ONLY.

FRONT VIEW (DOORS REMOVED)

BACK VIEW (DOORS REMOVED)

38"

15"12"

54"

86"

"CT/PT" LABEL ON

EXTERIOR OF DOOR

25KV 600 AMP

BUSHING (6) PLACES

AØ LOAD LABEL

PARKING STAND

(9) PLACES

1/2"-13 THREAD

GROUND NUT

2. CONTACT METERING WHEN THERE IS AN APPLICATION FOR THIS ENCLOSURE.

0

3

2

1

APPR.REVISED BY CK'D

3. INSTALL ELBOW ARRESTERS ON BACK OF T-BODY.

BØ LINE LABEL BØ LOAD LABEL

CØ LINE LABEL

CØ LOAD LABELAØ LINE LABEL

(4) 5' GROUND

RODS

#2 SD BC

GROUND LOOP

ADCOCK

11/5/13

GUINN GUINN

34.11-05

DWG.

THREE-PHASE PRIMARY METERING ENCLOSURE

NOTES:

0

3

2

1

APPR.REVISED BY CK'D

1. DEADFRONT CONSTRUCTION 600 AMP BOLTED ELBOW (T-BODY).

2. T-BODY IS NON-LOADBREAK (NO VOLTAGE AND CURRENT).

3. IT IS ACCEPTABLE TO CONNECT BOTH GROUND DRAIN LEADS TO THE GROUNDING BUSS USING SEPARATE

CONNECTORS AS A METHOD OF CROSS BONDING.

4. CONNECT DRAIN WIRE FROM INSULATED CAP TO GROUND LOOP.

5. VERIFY LINE AND LOAD SIDE CABLES ARE CONNECTED PROPERLY (I.E. LINE TO LINE, LOAD TO LOAD, CORRECT

PHASE).

IMPROPER CONNECTION WILL RESULT IN INCORRECT METER READINGS!

7. MARK ALL CABLES USING WHITE PLASTIC CABLE IDENTIFICATION TAG. TAG MUST INCLUDE LINE OR LOAD

6. SEE DWG. 22.06-10 FOR CABLE AND CONDUIT PLACEMENT.

DESIGNATION. SEE DWG. 27.00-03 FOR ADDITIONAL DETAIL.

ADCOCK

11/5/13

GUINN GUINN

34.09-14

DWG.

SYSTEM NEUTRAL

TO COMMON BUS.

TO BE CONNECTED

BY METER DEPT.

BRACKET FURNISHED

METER BOX AND

#6 SD BC

THREE-PHASE PRIMARY METERING INSTALLATION -

15 KV, 2-1/2 ELEMENT,

OVERHEAD HORIZONTAL CLUSTER (FMO)

5'-6" MAX.

4'-0" MIN.

6"

54"

CT'S AND PT'S

COMPLETE WITH

MOUNTING FURNISHED

BY METER DEPT.

30"

15"

6"

28"

10"

METER BOX

FRONT VIEW SIDE VIEW

0

3

2

1

APPR.REVISED BY CK'D

NOTES:

1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.

#6 SD BC

#6 SD BC

KHLC40N6F

KHLC7933F

OR


Recommended