INSTALLATION DETAILS 120/240 VOLT SINGLE-PHASE UNDERGROUND
SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 2-WIRE
RESIDENTIAL SERVICE AND METER SOCKET CONNECTIONS
SECONDARY SELF-CONTAINED METER WIRING DIAGRAM, SINGLE-PHASE, 3-WIRE
HIGH PHASE LOCATION ON DELTA SERVICE AND STANDARD PHASE ROTATION
34.02-08
34.03-08
34.02-14
34.02-12
SECTION 34 - METERING - OH
TABLE OF CONTENTSADCOCK
11/5/13
KATIGBAK GUINN
SECONDARY SELF-CONTAINED 4-WIRE DELTA WIRING DIAGRAM 34.03-06
FOR SELF-CONTAINED METER BASES ONLY
34.03-12SECONDARY SELF-CONTAINED 4-WIRE WYE METER WIRING DIAGRAMS
34.04-02120/208 VOLT 3-WIRE NETWORK SELF-CONTAINED METERING WIRING DIAGRAM
34.07-08
CT CABINET INSTALLATION ON SERVICE RISER, THREE-PHASE,
4-WIRE OR SINGLE-PHASE, 3-WIRE SERVICE
CURRENT TRANSFORMER INSTALLATION FOR SECONDARY METERING 34.07-10
CT CABINET INSTALLATION ON THREE-PHASE, 4-WIRE WALL MOUNTED 34.07-12
34.08-04SINGLE-PHASE PRIMARY METERING INSTALLATION - 15 KV OVERHEAD CLUSTER
34.09-06
POLYPHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT,
OVERHEAD VERTICAL CLUSTER
34.09-12
34.09-10OVERHEAD VERTICAL CLUSTER
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT,
34.09-18
34.09-20
34.09-16
34.09-14OVERHEAD HORIZONTAL CLUSTER (FMO)
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 200 AMP,
OVERHEAD HORIZONTAL CLUSTER
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 3 ELEMENT,
2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 600 AMP,
2-1/2 ELEMENT, OVERHEAD HORIZONTAL CLUSTER
THREE-PHASE PRIMARY METERING INSTALLATION - 15 KV, 2-1/2 ELEMENT,
SECONDARY SELF-CONTAINED METER WIRING CONNECTIONS, 120/208 VOLT
34.04-033-WIRE - NETWORK
LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 34.00-04
0
3
2
1
APPR.REVISED BY CK'D
THE FOR MAINTENANCE ONLY DRAWINGS LISTED BELOW ARE NOT CONTAINED
IN THE PRINTED SPEC BOOK, BUT ARE AVAILABLE ONLINE
FOR MAINTENANCE ONLY DRAWINGS
34.00 METERING GENERAL
34.02 SELF-CONTAINED METERING, SINGE-PHASE
34.03 SELF-CONTAINED METERING, THREE-PHASE
34.04 SELF-CONTAINED METERING, NETWORK (OPEN WYE)
34.07 TRANSFORMER-RATED METERING, SECONDARY, THREE-PHASE
34.08 TRANSFORMER-RATED METERING, PRIMARY, SINGLE-PHASE
34.09 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE
34.11-01THREE-PHASE PRIMARY METERING ENCLOSURE FRONT VIEW AND FOOTPRINT
34.11-05THREE-PHASE PRIMARY METERING ENCLOSURE
34.11 TRANSFORMER-RATED METERING, PRIMARY, THREE-PHASE - UG
34.11-03THREE-PHASE PRIMARY METERING ENCLOSURE BUSHING AND CT/PT LAYOUT
34.00-00A
DEF
X
DEPDEMDEC
ADCOCK
7/18/14
KATIGBAK DANNA
ADCOCK
10/29/13
GUINN GUINN
LABELING MULTIPLE METER ENCLOSURES
ON A SINGLE PREMISE0
3
2
1
APPR.REVISED BY CK'D
1-1/2" MINIMUM
3/4" MINIMUM
MINIMUM 1/16" THICK
MINIMUM 1/4" HIGH LETTERS
NOTES:
1. ON INSTALLATIONS, REPAIRS, REPLACEMENTS OR UPGRADES OF ENCLOSURES INVOLVING MORE THAN ONE
THE OUTSIDE BY A NONFERROUS METAL OR PLASTIC PLATE ENGRAVED OR STAMPED WITH THE APARTMENT
NUMBER, OFFICE SUITE, LOT NUMBER, ETC.
3. THE INSIDE OF EACH METER ENCLOSURE SHALL BE CORRECTLY IDENTIFIED WITH A PLATE DESCRIBED ABOVE
OR WITH A PERMANENT MARKER.
METER ON A SINGLE PREMISE, THE CUSTOMER SHALL CORRECTLY IDENTIFY EACH METER ENCLOSURE ON
4. CONDUCTOR LABELING FOR MULTI-TENANT METERING APPLICATIONS: WHERE ONE SERVICE IS C.T. METERED
CUSTOMER CABLES MUST BE CLEARLY AND SPECIFICALLY MARKED FOR PHASE AND LABELED WITH A TAG
TO IDENTIFY THE LOCATION OF THE SOURCE AND LOAD ENDS OF THE CONDUCTOR. THE LOAD END OF EACH
CABLE SHALL BE LABELED TO IDENTIFY THE SOURCE (TRANSFORMER LOCID NUMBER). EACH SOURCE END
SHALL BE LABELED TO IDENTIFY THE LOCATION OF THE LOAD END OF THE CABLE (TROUGH NUMBER, SWITCH
PANEL NUMBER, ETC.).
TRANSFORMER BUT ARE METERED ELSEWHERE (BUILDING WALL OR METER ROOM), BOTH ENDS OF ALL
ON THE PAD-MOUNTED TRANSFORMER AND OTHER CUSTOMER OWNED SERVICES ARE RUN TO THE SAME
ADCOCK
9/12/14
SIMPSON SIMPSON
34.00-04
DEFDEP
X
DEMDEC
X
2. THE PLATE SHALL BE PERMANENTLY ATTACHED TO THE METER ENCLOSURE UTILIZING AN INDUSTRIAL-STRENGTH
ADHESIVE SUITABLE FOR EXTERIOR USE. TWO-SIDED TAPE IS NOT ACCEPTABLE.
ADCOCK
11/5/13
GUINN GUINN
34.02-08
DWG.
LINE LOAD
NEUTRAL
LOCKOUT
MALE ADAPTER
ATTACH CONDUIT
THROUGH LEFT
KNOCKOUT ON
BOTTOM SIDE OF
METER SOCKET
INSTALLED BY COMPANY
WIRE BRUSH
INHIBITOR ON
AND USE
ALL 3 LUGS
NEUTRAL
METER SOCKET INSTALLED
BY CONTRACTOR
THIS ILLUSTRATION IS FOR DE-ENERGIZED CONDITIONS. IF
METER IS ENERGIZED USE PROPER SAFETY PROCEDURES
AS OUTLINED IN THE ACCIDENT AND PREVENTION MANUAL.
METER BASE MAY BE ENERGIZED FROM CUSTOMER LOAD
SIDE.
INSTALLATION DETAILS 120/240 VOLT SINGLE-PHASE
UNDERGROUND RESIDENTIAL SERVICE
INSTALLED BY
METER GROUND
CUSTOMER
2" PRE-BENT
PVC CONDUIT
2" PVC TO KEEP SAND OUT OF CONDUIT
INSERT 1-1/2" CIC AT LEAST 6" INTO
METER SOCKET CONNECTIONS
C
L
INSTALLATION DETAILS 120/240 VOLT
SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE
AND METER SOCKET CONNECTIONS
36" MIN
DETAIL A
SEE DETAIL "A"
BUSHING
0
3
2
1
APPR.REVISED BY CK'D
NOTE: CABLE SHOULD BE FED THROUGH CONDUIT BEFORE IT IS INSTALLED BELOW GRADE AND ATTACHED TO
METER SOCKET.
5'-6" MAX.
4'-0" MIN.
ADCOCK
11/5/13
GUINN GUINN
34.02-12
DWG.
SECONDARY SELF-CONTAINED
METER WIRING DIAGRAM,
SINGLE-PHASE, 2-WIRE
120V
LOAD
LINE
LOOP WIRE
DO NOT CUT
3-1/4" (TYP.)
8" (TYP.)
10" (TYP.)
0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
34.02-14
DWG.
SECONDARY SELF-CONTAINED
METER WIRING DIAGRAM,
SINGLE-PHASE, 3-WIRE
120V
240V
120V
4-1/2" (TYP.)
13" (TYP.)
15" (TYP.)
0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
34.03-06
DWG.
THREE-PHASE, FOUR WIRE, DELTA
"S" BASE
321
21
3
208V
2
4
0
V
2
4
0
V
HIGH PHASE
N
1
2
3
SECONDARY SELF-CONTAINED 4-WIRE
DELTA WIRING DIAGRAM
240V
120V 120V
0
3
2
1
APPR.REVISED BY CK'D
34.03-08
DWG.
C
LEADS
METER BASE
AND K-6 PHASE
SEQUENCE INDICATOR
HIGH PHASE LOCATION ON
DELTA SECONDARY SERVICE
HIGH PHASE LOCATION ON DELTA SECONDARY SERVICE
FOR SELF-CONTAINED METER BASES ONLY
STANDARD PHASE ROTATION IDENTIFICATION PROCEDURE
METER BASE
WATT HOUR
METER
HIGH PHASE LOCATION ON DELTA SERVICE
AND STANDARD PHASE ROTATION
FOR SELF-CONTAINED METER BASES ONLY
IS NOT AN INDICATION OF SOURCE PHASE IDENTIFICATION.
NOTE: CONNECT ON LINE SIDE OF METER BASE WITH LEADS A, B, C (LEFT TO RIGHT) TO IDENTIFY CLOCKWISE
SEE DWGS. 23.04-03A, 23.04-03B AND 23.04-03C FOR STANDARD CABLE TAGGING.
OR COUNTER-CLOCKWISE ROTATION TO THIS SERVICE. THIS WILL IDENTIFY PHASE ROTATION ONLY: IT
INSTALL APPROPRIATE PHASE ROTATION
INDICATION STICKER ON THE FACE OF
THE METER BASE BELOW METER GLASS
AND ALSO INSIDE THE METER BASE:
CLOCKWISE: CN 440302
COUNTERCLOCKWISE: CN 440303
N
LOAD
1 2 3
N
LINE
1 2 3
B
A
0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
KNOPP MODEL K-3
NOTE: PGN GENERATORS TURN COUNTER
CLOCKWISE TO PROVIDE ABC POSITIVE
SEQUENCE ROTATION. THE KNOPP METER
IS CONNECTED INTERNALLY SUCH THAT
THE MECHANICAL ROTATION OF THE DISC
WILL BE CLOCKWISE IF THE RED/WHITE/BLUE
LEADS ARE CONNECTED TO A/B/C PHASE,
RESPECTIVELY, WHICH INDICATES POSITIVE
SEQUENCE ABC ROTATION.
ADCOCK
11/5/13
GUINN GUINN
34.03-12
DWG.
1
2 3
N
120V
1
2
0
V
1
2
0
V
2
0
8
V
2
3
1
N
THREE-PHASE, FOUR WIRE, WYE 120/208 VOLTS
"S" BASE
THREE-PHASE, FOUR WIRE, WYE 277/480 VOLTS
"S" BASE
N
2
2
7
7
V
4
8
0
V
3
2
7
7
V
277V
1
3
2
1
N
SECONDARY SELF-CONTAINED 4-WIRE
WYE METER WIRING DIAGRAMS0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
34.04-02
DWG.
1
1
2
0
V
2
0
8
V
1
2
0
V
3
N
120V
2
THREE WIRE NETWORK
1
3
N
"S" BASE
120/208 VOLT 3-WIRE NETWORK
SELF-CONTAINED METERING WIRING DIAGRAM0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
34.04-03
DWG.
SECONDARY SELF-CONTAINED
METER WIRING CONNECTIONS,
120/208 VOLT, 3-WIRE - NETWORK
120V
208V
120V
4-1/2" (TYP.)
13" (TYP.)
FIFTH JAW LOCATION
(9 O'CLOCK POSITION
PREFERRED) FOR
120/208V. SERVICE
INSTALLED BY THE
CUSTOMER WHEN
REQUIRED (BONDED
TO NEUTRAL LUG)
15" (TYP.)
0
3
2
1
APPR.REVISED BY CK'D
ADCOCK
11/5/13
GUINN GUINN
34.07-08
DWG.
HIGH PHASE TO BE MARKED
ORANGE FOR 120/240V
DELTA SERVICE. OMIT
BOTTOM C.T. FOR SINGLE
PHASE SERVICE.
FINISHED GRADE
RIGID SCHEDULE 40 1-1/2" CONDUIT MINIMUM
SUPPLIED AND INSTALLED BY CUSTOMER.
DO NOT USE CONDULETS. SECURE WITH
BEND CONDUIT INTO METER SOCKET.
CONDUIT STRAPS A MAXIMUM OF 2' APART.
MINIMUM CAN BE SECURED TO
SO THAT 1-1/2" CONDUIT
AND INSTALLED BY CUSTOMER
SUPPLIED BY THE COMPANY
SMALL AERIAL C.T. BOX
OUTSIDE BUILDING WALL.
18" H X 8-3/8" W X 6" D
DIMENSION
C.T. BOX MINIMUM
BY THE COMPANY
RISER ATTACHMENT
SERVICE DROP
BY THE COMPANY
OF BUILDING
OUTSIDE WALL
NOTE: ALL METER CONTROL WIRE CONNECTIONS TO BE MADE INSIDE CURRENT TRANSFORMER ENCLOSURE.
1-1/2" CONDUIT CAN BE SECURED
MOUNT C.T. CABINET SO THAT
TO OUTSIDE WALL OF BUILDING
ONE CONNECTOR PER PHASE
TO BE FURNISHED AND INSTALLED
BY THE COMPANY
OF BUILDING
OUTSIDE WALL
OR CONNECTION BLOCK BY
CUSTOMER (REFER TO FIGURE
SINGLE SET OF CONDUCTORS
DETAILS).
47 OF THE METER BOOK FOR
TOP VIEW
PARALLEL SERVICE
CT CABINET INSTALLATION ON SERVICE RISER,
THREE-PHASE, 4-WIRE OR
SINGLE-PHASE, 3-WIRE SERVICE
3' MAX
SEE FIGURE 2
FOR CLEARANCE
ABOVE ROOF
6" MIN
0
3
2
1
APPR.REVISED BY CK'D
5'-6" MAX.
4'-0" MIN.
ADCOCK
11/5/13
GUINN GUINN
34.07-10
DWG.
PLAN VIEW
OWNED POLE
CUSTOMER
METER
TO
CURRENT TRANSFORMER INSTALLATION
FOR SECONDARY METERING
FRONT VIEW
0
3
2
1
APPR.REVISED BY CK'D
ADCOCK11/5/13
GUINN GUINN
34.07-12
DWG.
AUTHORITY HAVING JURISDICTION, AND THE COMPANY.
FINISHED GRADE
COMPANY OWNED
CUSTOMER OWNED AND INSTALLED
BY THE COMPANY
PHASE TO BE FURNISHED AND INSTALLED
SERVICE DROP AND ONE CONNECTOR PER
SECURE WITH CONDUIT STRAPS MAXIMUM OF 2' APART.
RIGID SCHED. 40 1-1/2" CONDUIT MINIMUM WITH NO CONDULETS.
METERING EQUIPMENT EXCEPT 1-1/2" CONDUIT AND
CONDUIT FITTINGS TO BE WIRED BY THE COMPANY
AND MOUNTED BY THE CUSTOMER.
MINIMUM DIMENSION
C.T. METER SOCKET
20" H X 12" W X
4-1/4" D
CT
CT
CT
HIGH PHASE
TO BE MARKED
120/240V
ORANGE FOR
DELTA SERVICE.
34-1/2" H X
9-1/4" W X
C.T. BOX
11-1/2" D
LARGE AERIAL
NOTES:
1. CUSTOMER MUST PROVIDE ADEQUATE GROUNDING OF FACILITIES IN ACCORDANCE WITH THE N.E.C. AND
2. ALL METER CONTROL WIRE CONNECTIONS TO BE MADE INSIDE CURRENT TRANSFORMER ENCLOSURE.
TO BE INSTALLED
BY CUSTOMER
SERVICE ATTACHMENT
WALL MOUNTED
CONNECTION TO THE SERVICE DROP BY THE
CONDUCTORS OR CONNECTION BLOCK FOR
BEHIND THE C.T.'S TO A SINGLE SET OF
CUSTOMER SHALL CONNECT MULTIPLE RISERS
COMPANY. (REFER TO FIG. 47 OF THE METER
BOOK FOR CONNECTION BLOCK DETAILS)
CT CABINET INSTALLATION ON THREE-PHASE,
4-WIRE WALL MOUNTED
3' MAX3' MAX
18" MIN
3' MAX
9"
3"
15"
0
3
2
1
APPR.REVISED BY CK'D
5'-6" MAX.
4'-0" MIN.
ADCOCK11/5/13
GUINN GUINN
34.08-04
DWG.
LOAD SOURCE
SINGLE-PHASE PRIMARY METERING INSTALLATION -
15 KV OVERHEAD CLUSTER
46"
18"
FRONT VIEW
PLAN VIEW
SIDE VIEW
13"
0
2
1
APPR.REVISED BY CK'D
#2 SD BC
#6 SD BC
#2 SD BC
#6 SD BC
NOTES:
1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
5"
72"
3
MP1501F
ADCOCK
11/5/13
GUINN GUINN
34.09-06
DWG.
BY METER DEPT.
METER BOX FURNISHED
BRACKET FOR INSTALLING
CONNECTED ON COMMON BUS
SYSTEM NEUTRAL TO BE
NEUTRAL
LOAD SOURCE
NEUTRAL
POLYPHASE PRIMARY METERING INSTALLATION -
15 KV, 2 ELEMENT, OVERHEAD VERTICAL CLUSTER
36"
96"
METER BOX
9'-4"
2"
18"
FRONT VIEW SIDE VIEW
PLAN VIEW
NOTES:
1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
0
3
2
1
APPR.REVISED BY CK'D
#2 SD BC
#6 SD BC
MP1502F
5'-6" MAX.
4'-0" MIN.
ADCOCK
11/5/13
GUINN GUINN
34.09-10
DWG.
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 3 ELEMENT,
OVERHEAD VERTICAL CLUSTER
0
1
APPR.REVISED BY CK'D
NOTES:
1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
2
3
MP1503F
BY METER DEPT.
METER BOX FURNISHED
BRACKET FOR INSTALLING
CONNECTED ON COMMON BUS
SYSTEM NEUTRAL TO BE
NEUTRAL
SOURCELOAD
LIFTING EYE
NEUTRAL
72"
36"
36"
9'-4"
2"
18"
METER BOX
5'-6" MAX.
4'-0" MIN.
FRONT VIEW SIDE VIEW
PLAN VIEW
#6 SD BC
#2 SD BC
4"
4"
4"
KHLC40N6F
KHLC7933F
OR
2. LINE FUSES MAY BE PLACED ON POLE UPSTREAM OF METER CLUSTER IF CIRCUIT CONFIGURATION PERMITS
AND APPROVED BY PLANNER.
ADCOCK
11/5/13
GUINN GUINN
34.09-12
DWG.
BE CONNECTED ON
SYSTEM NEUTRAL TO
ON COMMON BUS
NEUTRAL
LOADSOURCE
C.T. TERMINALS
CONNECTIONS TO
MAKE PRIMARY
LOAD
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 2 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER
FRONT VIEW
PLAN VIEW
0
3
2
1
APPR.REVISED BY CK'D
NOTES:
1. METER DEPARTMENT TO SPECIFY LOCATION FOR USE OF THIRD POTENTIAL TRANSFORMER.
2. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
#6 SD BC
#6 SD BC
40"
12"
20"
SIDE VIEW
72"
SOURCE
MP1502F
ADCOCK
11/5/13
GUINN GUINN
34.09-16
DWG.
TO BE CONNECTED
TO COMMON BUS.
SYSTEM NEUTRAL
METER BOX AND
BRACKET FURNISHED
BY METER DEPT.
#6 SD BC
G
U
Y
A
T
T
A
C
H
M
E
N
T
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 600 AMP, 2-1/2 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER
54"
CT'S AND PT'S
COMPLETE WITH
MOUNTING FURNISHED
BY METER DEPT.
12"
54"
24"
28"
36"
36"
12"
4"
12"
36"
17'-4"
5"
6"
FRONT VIEW SIDE VIEW
4"
4"
0
1
APPR.REVISED BY CK'D
NOTES:
1. GUYS MUST BE BONDED TO POLE GROUND, NOT SHOWN HERE FOR CLARITY. REFER TO
DWG. 02.04-04.
4"
#2 SD BC
2
3
METER BOX
4'-0" MIN.
5'-0" MAX.
ADCOCK
11/5/13
GUINN GUINN
34.09-18
DWG.
TO COMMON BUS.
TO BE CONNECTED
SYSTEM NEUTRAL
METER BOX AND
BRACKET FURNISHED
BY METER DEPT.
#6 SD BC
C
B
A
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 200 AMP, 2-1/2 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER
36"
36"
36"
12"
4"
15"
30"
12"
54"
CT'S AND PT'S
COMPLETE WITH
MOUNTING FURNISHED
BY METER DEPT.
6"
METER BOX
FRONT VIEW SIDE VIEW
0
1
APPR.REVISED BY CK'D
4"
4"
7
8
"
F
I
B
E
R
G
L
A
S
S
L
I
N
K
NOTES:
5"
#6 SD BC
#6 SD BC
2
3
1. GUYS MUST BE BONDED TO POLE GROUND, NOT SHOWN HERE FOR CLARITY. REFER TO DWG. 02.04-04.
KHLC40N6F
KHLC7933F
OR
4'-0" MIN.
5'-6" MAX.
ADCOCK
11/5/13
GUINN GUINN
34.09-20
DWG.
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 3 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER
0
3
2
1
APPR.REVISED BY CK'D
BE CONNECTED ON
SYSTEM NEUTRAL TO
ON COMMON BUS
CONNECTIONS TO
NOTES:
C.T. TERMINALS
MAKE PRIMARY
1. METER DEPARTMENT TO SPECIFY LOCATION FOR USE OF THIRD POTENTIAL TRANSFORMER.
FRONT VIEW SIDE VIEW
PLAN VIEW
SOURCE LOAD
40"
12"
SOURCE
LOAD
2. CUTOUTS MAY BE INSTALLED ON ADJACENT SERVICE POLE IF SPECIFIED BY ENGINEER.
3. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
#6 SD BC
#6 SD BC
72"
20"
MP1503F
ADCOCK
11/5/13
GUINN GUINN
THREE-PHASE PRIMARY METERING ENCLOSURE
FRONT VIEW AND FOOTPRINT0
3
2
1
APPR.REVISED BY CK'D
ENCLOSURE FOOTPRINT
5/8" ANCHOR BOLTS
FRONT VIEW
(6) PLACES
2"
4"86"
24"
4"
80"3"
56"
18-1/2"
STAINLESS STEEL
CARRIAGE BOLTS
"ELBOWS" LABEL
EXTERIOR
DURHAM LABEL
CATALOG NUMBER AND
ELECTRICAL RATING
(ON INSIDE OF DOOR)
PRIMARY CABLE SIDE
METERING PT/CT SIDE
2
1 ENCMTRCTPTSF
BILL OF MATERIALS
CATALOG
001466 PAD-MOUNTED METER ENCLOSURE
82" X 87" CONCRETE PAD
DESCRIPTION
PAD3P82X87CF 3277121
1
QTY
1
1
PER
CU
NUMBER
MACRO UNIT
-
CU
ITEM
NO.
COMPATIBLE
UNIT
QTY
REQ'D
3 WARNING LABEL- 92201113141 1
EQUIPMENT ID
NUMBER
WARNING LABEL
CN 9220111314
4 - 2112980414 1
NOTES:
1. ISSUE GROUNDS SEPARATELY.
DANGER LABEL (SEE NOTE 2)
2. INSTALL DANGER LABEL ON INSIDE OF EACH DOOR: TOTAL (4) LABELS.
34.11-01
DEF
X
DEPDEMDEC
ADCOCK
7/25/14
DANNA DANNA
3. INSTALL 1 WARNING LABEL ON EACH SET OF DOORS (ONE PER SIDE).
ADCOCK
11/5/13
GUINN GUINN
34.11-03
DWG.
THREE-PHASE PRIMARY METERING ENCLOSURE
BUSHING AND CT/PT LAYOUT
NOTES:
1. REAR SIDE ACCESS FOR METER DEPARTMENT ONLY.
FRONT VIEW (DOORS REMOVED)
BACK VIEW (DOORS REMOVED)
38"
15"12"
54"
86"
"CT/PT" LABEL ON
EXTERIOR OF DOOR
25KV 600 AMP
BUSHING (6) PLACES
AØ LOAD LABEL
PARKING STAND
(9) PLACES
1/2"-13 THREAD
GROUND NUT
2. CONTACT METERING WHEN THERE IS AN APPLICATION FOR THIS ENCLOSURE.
0
3
2
1
APPR.REVISED BY CK'D
3. INSTALL ELBOW ARRESTERS ON BACK OF T-BODY.
BØ LINE LABEL BØ LOAD LABEL
CØ LINE LABEL
CØ LOAD LABELAØ LINE LABEL
(4) 5' GROUND
RODS
#2 SD BC
GROUND LOOP
ADCOCK
11/5/13
GUINN GUINN
34.11-05
DWG.
THREE-PHASE PRIMARY METERING ENCLOSURE
NOTES:
0
3
2
1
APPR.REVISED BY CK'D
1. DEADFRONT CONSTRUCTION 600 AMP BOLTED ELBOW (T-BODY).
2. T-BODY IS NON-LOADBREAK (NO VOLTAGE AND CURRENT).
3. IT IS ACCEPTABLE TO CONNECT BOTH GROUND DRAIN LEADS TO THE GROUNDING BUSS USING SEPARATE
CONNECTORS AS A METHOD OF CROSS BONDING.
4. CONNECT DRAIN WIRE FROM INSULATED CAP TO GROUND LOOP.
5. VERIFY LINE AND LOAD SIDE CABLES ARE CONNECTED PROPERLY (I.E. LINE TO LINE, LOAD TO LOAD, CORRECT
PHASE).
IMPROPER CONNECTION WILL RESULT IN INCORRECT METER READINGS!
7. MARK ALL CABLES USING WHITE PLASTIC CABLE IDENTIFICATION TAG. TAG MUST INCLUDE LINE OR LOAD
6. SEE DWG. 22.06-10 FOR CABLE AND CONDUIT PLACEMENT.
DESIGNATION. SEE DWG. 27.00-03 FOR ADDITIONAL DETAIL.
ADCOCK
11/5/13
GUINN GUINN
34.09-14
DWG.
SYSTEM NEUTRAL
TO COMMON BUS.
TO BE CONNECTED
BY METER DEPT.
BRACKET FURNISHED
METER BOX AND
#6 SD BC
THREE-PHASE PRIMARY METERING INSTALLATION -
15 KV, 2-1/2 ELEMENT,
OVERHEAD HORIZONTAL CLUSTER (FMO)
5'-6" MAX.
4'-0" MIN.
6"
54"
CT'S AND PT'S
COMPLETE WITH
MOUNTING FURNISHED
BY METER DEPT.
30"
15"
6"
28"
10"
METER BOX
FRONT VIEW SIDE VIEW
0
3
2
1
APPR.REVISED BY CK'D
NOTES:
1. SEE SECTION 01 FOR ADDITIONAL GROUNDING DETAILS.
#6 SD BC
#6 SD BC
KHLC40N6F
KHLC7933F
OR