09-02-09 347865 - MANUAL CHIEF42 CB34 TITAN 30< ROOF
TITAN CB34
COMMERCIAL BIN
30
ROOF
ERECTION MANUAL
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
2/100
Page 1 MANUAL CHIEF42 CB34 TITAN
INDEX
Section 1 – Grain Bin Specifications
Section 2 – Bin Erection
Section 3 – #34 Bin RoofA. Part Identification
B. Pre-Assembly
C. Roof Assembly
D. Roof Panel AssemblyE. Cap Flashing
Section 4 – Typical Roof AccessoriesA. Top Lid
B. Manhole Lid
C.
Working RingD. Roof Ladders
E. Roof Vents
Section 5 – Temperature Cable Supports InstallationA. General Consideration
B. Temperature Cable Supports
Section 6 – Sidewall and Stiffener Gauge Chart
Section 7 –
Sidewall Erection A. Sidewall Sheets and StiffenersB. Laminated Sheet Installation
C. Base Angle Detail
D. Titan One Ring DoorE. Bin Stiffener Anchor
F. Transition Stiffeners
G. Stiffener Upgrades for Goal Posts
Section 8 – Wind Rings
Section 9 –
MiscellaneousA. Maintenance Instructions
B. Comment Sheet
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
3/100
MANUAL CHIEF42 CB34 TITAN Page 2
Manual Revisions
Date: Revision Made
10-12-05 Dimension for blocking needed to compress stiffeners added
10-19-05 Changed that all rafters must be attached to a 2 ring top stiffener10-25-05 Changed temperature cable bracket installation
10-25-05 Changed roof ring connector
10-26-05 Changed door installation instructions
11-11-05 Changed 3 Stiffened Bins have Roof Ring brackets at every stiffener01-16-06 Changed to show holes added on horizontal seam of sidewall sheets between
stiffener holes
01-25-06 Updated gauge charts – Removed all 20ga stiffeners
02-17-06 Changed peak heights – 2” higher 03-28-06 Added Rafter Reinforcing Plates
03-28-06 Updated Temperature Cable Installation03-29-06 Changed Rafters “D” & “E” – Updated Manual09-20-06 Changed Standoff to 2 parts – Updated Manual
10-25-06 Updated Roof Weights
11-06-06 Changed Bins 25 rings and taller to show additional holes in roof panel ribs.02-06-07 Changed Working Ring Brackets.
03-13-07 Changed Door
03-22-07 Added Section for Goal Post Upgrades05-07-07 Added Additional Rafter Reinforcing Plate
02-28-08 Changed Wind Ring Couplers
05-13-08 Changed Anchor Bolt Radius and Chords
06-13-08 Changed Roof Rings to be Bolted to Eave Brackets07-18-08 Added Rafter Splice Plates
08-28-08 Changed Roof Ladder to bolt together ladder
09-15-08 Changed to Seismic A11-21-08 Changed Peak Ring Flashing
12-09-08 Changed top 2 ring stiffeners from 18ga to 16ga
04-07-09 Added wind ring placement for “Baby Bubba” Sidedraw systems.
04-10-09 Changed Temperature Cable Attachments07-17-09 Changed Sidewall Gauges
09-02-09 Changed Sidewall Sheet Caulking Detail
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
4/100
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
5/100
MANUAL CHIEF42 CB34 TITAN Page 4
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
6/100
Page 5 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
7/100
MANUAL CHIEF42 CB34 TITAN Page 6
Section 1 – Grain Bin Specifications
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
8/100
Page 7 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
9/100
MANUAL CHIEF42 CB34 TITAN Page 8
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
10/100
Page 9 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
11/100
MANUAL CHIEF42 CB34 TITAN Page 10
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
12/100
Page 11 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
13/100
MANUAL CHIEF42 CB34 TITAN Page 12
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
14/100
Page 13 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
15/100
MANUAL CHIEF42 CB34 TITAN Page 14
Section 2 – Bin Erection
Chief Industries, Inc. will not assume any responsibility for parts damaged due to faulty or
improper erection procedures.
Chief Industries, Inc. recommends that Bin Jacks be used for all bins taller than 8 rings
and all bins larger than 30’ in diameter.
WARNING:
The allowable lifting capacity of the BIN JACKS must never be exceeded. Always check Bin
weight to insure a safe and trouble free erection.
Grain Bin Color Codes
Chief Grain Bins are color coded based on bin diameter. Components such as Roof Rafters,
Wind Rings, and Base Angle will be marked with the following Color Codes to help identifythem.
Bin Size Color Code Bin Size Color Code
#12 Yellow/Black #22 Blue#13 Green/Black #24 Brown
#14 Orange/Black #26 Yellow
#16 Red #30 Green#18 Black #34 Orange
#20 Pink
A.
Suggested Erection Equipment
Impact Wrench & Sockets Wrenches Crescent Wrench
Vise Grips Alignment Punches Rubber Mallet
Level Drill and Drill Bits Extension CordsLadders Bin Jacks Screw Gun
7/16” bin bolts use 5/8” on the head of the bolt and 11/16” on the nut.
5/16” bin bolts use 1/2” on the head of the bolt and nut.
1/2” bolts in the roof structure use 3/4” on the head of the bolt and nut.
Bolt Buckets are Color Coded with a Dot as Shown Below.
Bolt Size Color Code
5/16” Blue7/16” Red
1/2” Green
5/8” Yellow
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
16/100
Page 15 MANUAL CHIEF42 CB34 TITAN
B. Checking Shipment
Check your shipment at the time of pickup and delivery against the packing list furnishedwith the shipment. If a shortage exists or if any damaged material is evident, note such
shortage or damage on the freight bill before you sign for the shipment.
Claims of shortages will not be honored after thirty days from receipt of shipment.Parts that are short or damaged are the responsibility of the delivering carrier, not the
manufacturer or dealer.
It is advisable to reorder damaged or missing parts immediately so that there will be nodelay in erecting the bin. After receiving the invoice for the reordered material, file a
claim with the delivering carrier at once.
The galvanized panels leave our plant in prime condition; store off the floor in a heatedroom if possible. If stored outside, place panels down, off the ground. Upon arrival of
shipment if you are not certain whether or not moisture is present, store panels on edge or
on end allowing 1/4“ air space between panels until dry. Exposure to trapped moisture
can cause white rust, which will void the warranty.
C. Stop and Study
Before beginning erection of the bin, take the time to thoroughly study the construction
methods in this manual. It will save you both time and money.
Important: The peak load capacities listed under Auxiliary Roof Loads must not be exceeded. If your
application will exceed the listed values, contact Chief Industries for recommendations.
Chief Industries makes no warranty concerning parts, accessories or equipment notmanufactured by Chief Industries.
D. Site Selection
Choose a site that has good drainage away from the bin so that water will not stand around
the bin. The soil should be firm and preferably without fill. If fill is required, water andcompact the fill material to avoid uneven settlement. A field investigation of the soil bearing conditions is recommended especially for larger grain bins where the foundation
loads and floor pressure become large. A licensed engineering firm should be employed to
take soil borings, determine the maximum allowable soil pressure and design the binfoundations and floor slab accordingly.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
17/100
MANUAL CHIEF42 CB34 TITAN Page 16
E. Bin Jack Erection
Position the structure you provided to hold the Inner Ring at its approximate height,centering the Inner Ring on the center of the Bin.
Use at least one Bin Jack per Sidewall Sheet. (For example, on the #18 Bin, use 18 BinJacks, etc.)
The application of one bin jack per sidewall sheet will minimize sidewall distortion duringerection. Failure to use the proper quantity of jacks may result in inward-outward lay of the bin
sidewall or even permanent distortion of the bin sidewall sheets.
The recommendation of at least one Bin Jack per sidewall sheet is based on keeping the bin
round, refer to the warning below, and make sure the lifting capacity of the jack is
sufficient for the weight of the bin. Note that all jacks may not shift equally, Therefore
make sure the lifting capacity rating by the jack manufacturing is met.
WARNING:
If it is necessary to leave the construction site for any length of time before the Bin is
completed and anchored to the concrete, the Bin must be securely tied down.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
18/100
Page 17 MANUAL CHIEF42 CB34 TITAN
F. Assembling Sidewall Sheets
All bolts are washer head bolts with sealing washers S.A.E. Grade 8, with whiz flangenuts. Grade 8 bolts are marked with six radial lines on the bolt head as shown. If these
descriptions do not correspond with the bolts shipped with the bin, please contact the
customer service department immediately. Do not substitute any other Bolts.
Bin bolts must be TIGHT. The following table contains recommended minimum and
maximum torque values.
BOLT DIA. TORQUE FT. LBS
(INCHES) MINIMUM MAXIMUM
5/16" 22 28
7/16" 60 75
Tighten the bin bolts from the inside of the bin (nut end of the bolt) to eliminate “spin
off” of the sealing washer.
USE ONLY THOSE BOLTS SUPPLIED BY CHIEF INDUSTRIES.
THE SUBSTITUTION OF BOLTS FROM OTHER SOURCES IS NOT PERMITTED.
NOTE: Proper bolting sequence MUST be followed at all times.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
19/100
MANUAL CHIEF42 CB34 TITAN Page 18
The Titan Sign Sheet must be installed in the second ring as shown in figures below.
(Shown installed on a 2 stiffened bin)
(Shown installed on a 3 stiffened bin)
Install the Titan Sign Sheet by field drilling (6) six ½” holes in the Titan Sign Sheet and
stiffeners as shown above. Bolt the Titan Sign Sheet to the stiffeners with (6) six 7/16” bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
20/100
Page 19 MANUAL CHIEF42 CB34 TITAN
Assembling top ring
Locate the proper gauge of sidewall sheets needed for the top ring from the gauge chart. Lap andcaulk sheets as shown below. Locate top stiffeners and install on top ring.
Note: Top Sheets have special punching on the top of the sheet at the stiffener holes for therafter to attach to. Leave bolts out of top (4) stiffener holes until eave brackets are
attached.
Wipe off the outside ends of all the Sidewall Sheets to remove excess oil so that the StripCaulking will adhere to the metal. Place the Strip Caulking as near to the vertical inside edge of
sheet at every vertical seam.
On Bins 12 gauge or heavier a horizontal strip of caulking is needed on the inside at the center
bottom of the Sidewall sheet located on the hill near to the bottom holes. This strip of caulking
should fit where the endlap of the next ring Sidewall Sheets bolts up to this location.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
21/100
MANUAL CHIEF42 CB34 TITAN Page 20
G. Roof Panel Location
The rafters need to be bolted directly behind a top 2 ring stiffener, the roof panel rib will line updirectly above the rafter from the peak to the eave. (There is 1 Rafter and 4 roof panels per
sidewall sheet.)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
22/100
Page 21 MANUAL CHIEF42 CB34 TITAN
H. Crane and Jack Capacities
Crane Capacity:
The total roof dead load for each of the respective bin roof sizes is shown in the table below.
This weight includes the roof panels and all structural members (roof beams, compression rings, bolts, ect.)
When determining the crane capacity necessary to erect the roof structure, the booming distancemust be considered. If the cane sizes available will not lift the roof structure (using one crane),
two cranes may be used, utilizing a spreader bar. The spreader bar must be adequately designed
to carry the entire roof dead weight.
Peak Heights
All peak heights listed below are to the bottom of the peak ring from the ground with (2) Titan
sidewall sheet rings installed. Deduct 42 1/2” from the peak heights when only one ring of
sidewall sheets are installed.
Model Peak Height
CB18 20’ - 8 7/8” CB20 22’ – 6 5/16”
CB22 24’ – 3 3/4”
CB24 26’ – 1 1/8”
CB26 27’ – 10 9/16”
CB30 31’ – 5 7/16” CB34 35’ – 0 5/16”
WARNING!! OVERLOADING CRANE CAPCITY CAN RESULT IN
SUBSTANCIAL PROPERTY DAMAGE OR SEVERE PERSONAL INJURY.ALWAYS CHECK CRANE CAPACITY PRIOR TO LIFTING ROOF
STRUCUTRE
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
23/100
MANUAL CHIEF42 CB34 TITAN Page 22
#34 #30 #26 #24 #22 #20 #18
Single Rafter 660 550 400 300 250 230 200
2 Rafter 1,450 1,200 850 700 600 550 450
3 Rafters 2,300 1,825 1,350 1,075 950 850 675
Total Roof w/o Roof Panels 31,250 23,650 15,350 11,925 9,900 8,525 5,750
Total Roof w/ Roof Panels 50,000 38,400 26,600 21,000 17,500 15,000 11,000
Weight in Pounds (lbs.)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
24/100
Page 23 MANUAL CHIEF42 CB34 TITAN
Section 3 - #34 Bin Roof
A. Part Identification
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
25/100
MANUAL CHIEF42 CB34 TITAN Page 24
B. Pre-Assembly
After the top two rings of the bin are built and stiffeners are added, brackets need attached to thesidewall and rafters, pre-assemble these brackets on the ground before raising the roof will speed
up erection time.
Top Angle
Attach top angle to inside of top ring as shown with 5/16” x 3/4” Bin Bolts.
Note: there is (1) piece of top angle per top sidewall sheet. Ex: CB34 = 34 top angle
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
26/100
Page 25 MANUAL CHIEF42 CB34 TITAN
Roof Ring Bracket
Attach roof ring brackets to inside of top sidewall sheet behind 1 ring top stiffeners with (4)7/16” x 1-1/2” bin bolts. (Place bolts with heads on inside of bin.)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
27/100
MANUAL CHIEF42 CB34 TITAN Page 26
C. Roof Assembly
Pre-assemble rafter sections together as shown on flat surface. Rafter to rafter connections
should be tightened before raising rafters into place. Raise the peak ring to the correct height as
shown and begin attaching rafter to the peak ring and eave brackets with 1/2” x 1-1/2” bolt with
washers on the brackets. Attach 4 sets of rafters equally spaced around the bin and check toinsure peak ring is level, and then install all other beams. Leave all ring segment and strut bolts
loose in the structure until all rafters and ring segments and struts are installed.
Refer to the drawing below for sequence of beams.
Refer to the part identification page at the beginning of this section to determine proper rafters.
All r after to rafter connections are 1/2” x 1-1/2” bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
28/100
Page 27 MANUAL CHIEF42 CB34 TITAN
Rafter Clips
Attach the long clips to every rafter as shown for ring segments; using 1/2” x 1-1/2” bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
29/100
MANUAL CHIEF42 CB34 TITAN Page 28
Rafter Reinforcing Plates
Bolt reinforcing plates to rafters as shown with 1/2” x 1-1/2” bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
30/100
Page 29 MANUAL CHIEF42 CB34 TITAN
Detail at Peak
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
31/100
MANUAL CHIEF42 CB34 TITAN Page 30
Detail at Eave
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
32/100
Page 31 MANUAL CHIEF42 CB34 TITAN
Cross Members
After all rafters are installed, begin installing cross members to the long clips that are bolted tothe rafters as shown. Install cross members with 1/2” x 1-1/2” bolts with washers against the
cross members.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
33/100
MANUAL CHIEF42 CB34 TITAN Page 32
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
34/100
Page 33 MANUAL CHIEF42 CB34 TITAN
Roof Struts
Attach upper Roof Strut with 1/2” x 1-1/2” bolts between center set of holes on Rafters “E” asshown. An Upper Roof Strut is placed between every rafter as shown below.
Attach Middle Roof Strut with 1/2” x 1-1/2” bolts to back side of upper ring segment and centerset of holes on Rafters “D” and “E” as shown. A Upper Roof Strut is placed on every upper ring
segment as shown below.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
35/100
MANUAL CHIEF42 CB34 TITAN Page 34
Attach Lower Roof Strut with 1/2” x 1-1/2” bolts to inside of lower ring segment and center set
of holes on Rafters “D” and “C” as shown. A lower roof strut is placed on every lower ring
segment as shown below.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
36/100
Page 35 MANUAL CHIEF42 CB34 TITAN
Eave Brackets
Attach Left Hand and Right Hand Eave Brackets to the inside of the top sidewall sheet behindthe 2 ring top stiffener, with 7/16” x 1-1/2” bin bolts with bolt head inside the bin, as shown.
(Note: one L.H. and one R.H. Eave Bracket per sidewall sheet equally spaced around the bin)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
37/100
MANUAL CHIEF42 CB34 TITAN Page 36
Roof Ring
After all the structure is assembled, attach roof rings to eave brackets between every rafter.Attach roof rings loosely to rafter clips with ½” x 2” bolts, add shims between plates on roof ring
and eave brackets as needed, so roof rings are tight against rafters all around bin. When
tightening roof rings to rafters, check that rafters are being held straight. Add additional shims asneeded to keep rafters straight.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
38/100
Page 37 MANUAL CHIEF42 CB34 TITAN
D. Roof Panel Assembly
Lower Roof Panel Assembly
Install bottom standoff angle centered on top side of ring segment as shown. Place row or strip
caulking on standoff angle where the lower roof sheets will be attached. Use 5/16” x 1-1/4” bin bolts (heads on outside of bin) to attach upper end of lower sheets to bottom standoff angle and
ring segment. Align roof sheet so that rib is inline with rafter. Bolt wide end of lower roof panel
to top angle
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
39/100
MANUAL CHIEF42 CB34 TITAN Page 38
Always working to the right around the bin, place strip caulking on right rib of the previously
installed roof panel (top only). Placing roof panel in a vertical position, lock the left rib of the
panel being installed over the right rib of the previously installed panel. Tip the roof panel down.As each roof panel is set into place, insert a lining punch through the hole in the rib at the bottom
of each roof panel. Temporarily clamp the two roof panels together with vise grips so that the
punch can be removed and a 5/16” x 3/4” bolt inserted and hand tightened. Continuedinstallation of roof panels as described in preceding steps.
All bins are equipped with one manhole and a roof ladder as standard. Extra manholes should bespaced evenly around the bin.
When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.
Align roof panel holes and insert 5/16” x 3/4” bolts in the same manner as previously described.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
40/100
Page 39 MANUAL CHIEF42 CB34 TITAN
Upper Roof Panel Installation
Attach flashing clips to peak ring with 7/16” x 1-1/4” bin bolts. Place plastic foam around peakring under flashing clips.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
41/100
MANUAL CHIEF42 CB34 TITAN Page 40
Roof Panel flashing extensions
The extensions come in 4 equal pieces install clockwise around the peak and attach with 7/16” x1-1/4” bin bolts. (Note: Flashing Extensions must be started as shown to properly align roof
panels, Center first extension on hole that is aligned with rafter and flashing hole in peak ring.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
42/100
Page 41 MANUAL CHIEF42 CB34 TITAN
Place Foam on edge of extension to seal between extensions.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
43/100
MANUAL CHIEF42 CB34 TITAN Page 42
Roof Panel Installation
1. Install strip caulking between top end of roof panels and roof panel flashing. Use 5/16” x3/4” bolts at top end of panel. Bolt roof panels standoff ring with 5/16” x 1-1/4” bin bolts.
Align upper roof panel so the rib is inline with the rafter.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
44/100
Page 43 MANUAL CHIEF42 CB34 TITAN
Install top standoff angle to inside of bottom standoff angle and attach angles together with 5/16”
x ¾” bin bolts as shown. Place strip caulking on top side of top standoff angle where upper
sheets will to attached to top standoff angle.
Place strip caulking around standoff splice and install to inside of top and bottom standoff angles
as shown. Attach to standoff with 5/16” x ¾” bin bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
45/100
MANUAL CHIEF42 CB34 TITAN Page 44
Proceed by installing additional roof panels in the following manner: Always working to the
right around the bin, place strip caulking on right rib of the previously installed roof panel
(top only). Placing roof panel in a vertical position, lock the left rib of the panel beinginstalled over the right rib of the previously installed panel. Tip the roof panel down. As each
roof panel is set into place, insert a lining punch through the hole in the rib at the bottom of
each roof panel. Temporarily clamp the two roof panels together with vise grips so that the punch can be removed and a 5/16” x 3/4” bolt inserted and hand tightened. Continued installation of roof panels as described in preceding steps.
When the last roof panel is placed, it will have to be interlocked by using a rubber mallet.Starting at the top and working down, tap the vertical rib until it is sealed to the other panel.
Align roof panel holes and insert 5/16” x 3/4” bolts in the same manner as previously
described.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
46/100
Page 45 MANUAL CHIEF42 CB34 TITAN
Special Note:
Bins 25 rings and taller will have roof panels with additional holes in the roof sheet ribs. Field
drill hole in ribs using pre-punched hole on adjacent rib as template, Attached roof panels ribstogether with 5/16” x 3/4” bin bolts and washer as shown.
Roof Panels installation for bins 25 rings and taller
.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
47/100
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
48/100
Page 47 MANUAL CHIEF42 CB34 TITAN
E. Cap Flashing
The cap flashing comes in 8 equal pieces; install the cap flashing to the peak ring with the 7/16”x 1” bin bolts. After cap flashing pieces are attached to the peak ring drill screw cap flashing
together where it overlaps with #12 x 1-1/4” self -drilling screws.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
49/100
MANUAL CHIEF42 CB34 TITAN Page 48
Section 4 – Typical Roof Accessories
A. Top Lid
(1)
Apply strip caulking around the top of the peak ring.
(2) Install top lid using twenty 7/16” x 1” bolts (bolt heads on top). Securely tighten bolts.
B.
Manhole Lid
(1) Install manhole lid as shown below. Note that manhole hinge should be installed toward
top of bin.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
50/100
Page 49 MANUAL CHIEF42 CB34 TITAN
NOTE: Leaf to lid and hinge to roof panel bolts are to be installed with heads inside.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
51/100
MANUAL CHIEF42 CB34 TITAN Page 50
C. Working Ring
Field locate and Install the working ring to the roof panels as shown, with 5/16” x 3/4” Bin bolts.The working ring clips are to be evenly spaces around the ring. Connect the working ring
segments together with the connectors as shown below. Expand the connector as needed.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
52/100
Page 51 MANUAL CHIEF42 CB34 TITAN
D. Roof Ladder
The roof ladder should be located adjacent to the manhole and next to a roof beam.
Roof Ladder are shipped broke down, and need assembled on the roof panels.
Refer to Chart for rails needed for roof size.
4.5' RAIL 6' RAIL 7.5' RAIL 9' RAIL
CB12 4CB13 2 2 2
CB14 2 2 2
CB16 2 4
CB18 6
CB20 2 4 2
CB22 UPR 2 2
CB22 LWR 2 4
CB24 UPR 4
CB24 LWR 2 4
CB26 UPR 2 2
CB26 LWR 2 4 2CB30 UPR 2 4
CB30 LWR 2 4
CB34 UPR 6
CB34 LWR 2 4 2
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
53/100
MANUAL CHIEF42 CB34 TITAN Page 52
Attached rails to roof panels by field drilling holes into roof panels and bolt rails to panels with5/16” x ¾” bin bolt. Attached rungs to rails with 5/16” x ¾” bin bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
54/100
Page 53 MANUAL CHIEF42 CB34 TITAN
Overlap rails as shown and attach together with 5/16” x ¾” bin bolts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
55/100
MANUAL CHIEF42 CB34 TITAN Page 54
E. Roof Vents
A. Goose Neck Vent Installation
1. Refer to the bulletin that comes with the vent for installation procedures
2. Locate Goose Neck Vent on the desired roof sheet. Typically slide Goose Neck Vent up theroof sheet (Toward the small end) until the corners of the base intersect the roof sheet ribs.
3. Using the base as a template, mark and drill the 11/32” diameter mounting holes.
4. Apply (2) two beads of butyl sealant or mastic sealant as shown, between the Goose Neck
Vent base and roof sheet. Leave a 1” gap at the lower side of the outside bead.
5. Assemble Goose Neck Vent to roof sheet using 5/16” x 3/4” hex bin bolts and nuts. Tightenall bolts and check sealant along upper end of Goose Neck vent base for any gaps or pockets.
Apply extra sealant as required.
6. Peen up edge on inside of Goose Neck Vent to make a water tight seal. The lip should beapproximately 1” all the way around.
7. Do Not Weld Goose neck vent to roof as rusting will result.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
56/100
Page 55 MANUAL CHIEF42 CB34 TITAN
B. Low Profile Roof Vents
1. Install the Screen and clips on the roof vent body using 5/16” x 3/4” bin bolts, nuts and flatwashers as shown below. The bolt heads should be on the outside of the vent with the
washers and nuts on the inside (against the screen).
2. Locate the roof vent assembly on the roof panel (over the manhole) by aligning the holes inthe clips with the corresponding holes in the lower end of the roof panel.
3. Mark the outline of the roof vent with a marking pencil so that the vent can be returned to the
same position after the caulking is applied.
4. Remove the vent from the roof panel, turn upside down, and apply caulking to the mounting
surface of the sides and top.
5. At this time, install and tighten three 5/16” x 3/4” bin bolts and nuts in the holes directly
above and below the manhole (in the roof panel to prevent leakage).
6. Locate the roof vent on the roof panel in its original position and attach with the #14 x 3/4”
self-drilling screws provided. If a screw gun is not available, use the holes in the vent as a
guide and drill 3/8” holes through the vent and roof panel, and attach with 5/16” x 3/4” bin bolts and nuts.
7. Install 5/16” x 3/4” bin bolts and nuts in the clips and bottom of screen as shown in detail on
previous page.
8. Tighten all bolts securely.
NOTE: Roofs with structural beams may require field installation of angles between beams at both top and bottom of manhole opening if 20 PSF or 30 PSF live loading is required.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
57/100
MANUAL CHIEF42 CB34 TITAN Page 56
C. Mushroom Vent Installation
1. Refer to the bulletin that comes with the vent for installation procedures
2. Mushroom vents are attached to pre-punched roof sheets with holes at the lower end of
the sheets.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
58/100
Page 57 MANUAL CHIEF42 CB34 TITAN
Section 5 – Temperature Cables
A.
General Considerations
Follow temperature cable manufacturer’s recommendations for installation of temperaturecables. Be sure to allow adequate clearance for sweep augers or other internal equipment.
All temperature cables should be stabilized at floor level, to prevent cables from drifting out
towards the sidewall as bin is being filled. The use of light twine or monofilament linedouble wrapped and secured to a recessed anchor, is a common practice.
Provide adequate sealant where temperature cable leads exit the bin.
Support of temperature cables by any means other than Chief Industries’ recommended
brackets may cause structural damage to the bin roof and will nullify the Chief Grain Bin
Warranty.
Note: Structured Roo fs are designed for a maximum load of 2,000 lbs. per
temperature cable. If this lo ad is exceeded, this may cause structural damage to
the bin ro of and wi l l nul l i fy the Chief Grain Bin Warranty.
#34 Temperature Cables
Bin
Size
Total #Temp.
Cables
Temp. Cables
#/Radius
#34 24 4/8'-10"
8/27'-2"
12/44'-3"
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
59/100
MANUAL CHIEF42 CB34 TITAN Page 58
B. Temperature Cable Brackets (15 Rings and Shorter)
(1) Install temperature cable bracket as shown below. Do not install more than onetemperature cable per roof beam.
(2)
Attach temperature cables to rafters per temperature cable manufacture’s instructions
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
60/100
Page 59 MANUAL CHIEF42 CB34 TITAN
#34 Bin Temperature Cable Layout (15 Rings and Shorter)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
61/100
MANUAL CHIEF42 CB34 TITAN Page 60
C. Temperature Cable Brackets (16 Rings and Taller)
(1) Install temperature cable brackets as shown below.
(2) Attach support beams to bottom of rafters
(3) Attach temperature cables to support beams per temperature cable manufacture’s
instructions
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
62/100
Page 61 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
63/100
MANUAL CHIEF42 CB34 TITAN Page 62
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
64/100
Page 63 MANUAL CHIEF42 CB34 TITAN
Section 6 – Sidewall Sheet and Stiffener Gauge Chart
Note: All Sidewall and Stiffener gauges in the charts below are for standard bins. If bins are
designed for High Load/Unload rates, concrete pits or Seismic Conditions, Contact Chief
Industries, Inc. for gauge chart needed.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
65/100
MANUAL CHIEF42 CB34 TITAN Page 64
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
66/100
Page 65 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
67/100
MANUAL CHIEF42 CB34 TITAN Page 66
Sidewall Sheet Gauge Color
20 White
18 Orange
17 Light Blue
16 Green
14 Yellow
14 Transition Yellow/Black
13 Brown
12 Dark Blue
11 Pink
10 Black
9 Light Green
8 Red
Note: Sidewall Sheets for Top Ring are also
color coded with GOLD
Section 7 – Sidewall Erection
A.
Sidewall Sheets and Stiffeners
NOTE: All sheets must be installed with color code right side down as shown below. Check theedges of the sheet for traces of the shop color code. The shop color code is always located on the
bottom edge of the sheet. The color codes and their corresponding gauges are listed in the table
below.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
68/100
Page 67 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
69/100
MANUAL CHIEF42 CB34 TITAN Page 68
NOTE: Proper Bolting Sequence Must Be Followed At All Times.
(1) Tighten bolts in top 2 rings and top stiffeners.
(2) Select sheets of the proper gauge for the 3rd ring of the bin. Select proper gauge and
length of stiffeners.
(3) Install stiffener splice plates, to both ends of stiffeners with (2) 7/16” x 1-1/4” Bin
Bolts and whiz flange nuts per splice before securing the stiffener to the bin. Note: On
top stiffeners, splice plate is only required on the bottom end of the stiffener.
(3) Wipe excess oil from ends of the sheets and apply caulking as shown below
(4) Loosely assemble 3rd
ring
(5) Loosely install stiffeners of the proper gauge to the exterior of the bin with 7/16” bin
bolts. Stiffener bolts are always placed with heads inside the bin. Using large
alignment punch, force stiffener up so that splices are tightly compressed. Tighten (4)four bolts in 3
rd ring to keep stiffeners compressed. Loosely install the (2) 7/16” x 1-
1/4” bolts connecting the stiffener splices to the stiffener splice plate above.
Note:
Blocks may be used to place under the stiffener splices to compress the stiffener splices.
Note:
Install bolts on sidewall sheets seam that are in the center of stiffener holes before installing
next stiffener.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
70/100
Page 69 MANUAL CHIEF42 CB34 TITAN
(6) Lower the bin on to the foundation. This will force the 2 ring stiffeners in 2nd
and 3rd
ring up to splices.
(7) Tighten stiffeners to sheets and stiffener splice to stiffener splice bolts.
(8) Tighten bolts in vertical seams in 3nd
ring.
(9) Tighten bolts in horizontal seams between 2nd
and 3rd
ring beginning at center of sheetand working both ways.
(10) Add ladder sections as required (See separate Ladder Manual)
(11) Repeat steps 1 thru 10 to add 4th
ring and each additional ring. Proper bolting
sequence must be followed at all times to assure proper assembly.
NOTE: Use 7/16”x1 1/4” bin bolts at bottom sidelap of transition sheets. Use 5/16”x3/4” bin bolts at the top sidelap at vertical seams of transition sheet.
NOTE: All bins have all 2 ring bottom stiffeners at the bottom, a 1 ring stiffener must be
placed at every other stiffener line in the 3rd
ring.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
71/100
MANUAL CHIEF42 CB34 TITAN Page 70
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
72/100
Page 71 MANUAL CHIEF42 CB34 TITAN
B. Laminated Sheet Installation
(1). All rings, which require laminated sheets (indicated in the sheet and stiffener charts)must be installed with the endlaps interlapped as shown in the endlap detail below.
(2). Select the proper sheet gauge for each ring of the bin as indicated in the stiffener andgauge chart.
Laminated Sheet Endlap
(3). Lap the bin sheets so that the outside ring of sheets follow this sequence: The right end of
each sheet is always on the outside of the bin and the left end is always on the inside
(looking from the outside). Refer to the endlap detail.
NOTE: This sequence is the same as the single sheet sequence.
(4). Lap the inner ring of the bin sheet so that they follow the same lapping sequence as theoutside ring of sheets. Refer to the endlap detail for lapping sequence.
(5). Follow the bolt installation procedure for bin sheet endlaps and sidelaps.
(6). Install stiffeners as outlined.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
73/100
MANUAL CHIEF42 CB34 TITAN Page 72
C. Base Angle Detail
(1) Bolt the base angle to the bottom of the bottom sheet as shown, with either 5/16” x 3/4“ with
a 3/8” flat washer between the whiz nut and the base angle or 7/16” bin bolts.
(2) Seal base angle to concrete, using plastic cement or tar sealant. (NOTE: Sealant not supplied
by Chief Industries, Inc.)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
74/100
Page 73 MANUAL CHIEF42 CB34 TITAN
D. Titan One Ring Door
1. Place expandable foam around edges of frames as shown below.
2. Bolt the inner and outer frame to the bin sidewall with 7/16” x 3” bin bolts, making sure toonly place bolts in the holes shown in the detail below. The top eyebrow on the outer frame is to be placed behind the sheet above the door. The bottom eyebrow is to be placed on the outside of
the sheet below the door. Bolt the inner and outer frames together with (10) 7/16 x 2” bin bolts
with whiz flange nuts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
75/100
MANUAL CHIEF42 CB34 TITAN Page 74
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
76/100
Page 75 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
77/100
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
78/100
Page 77 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
79/100
MANUAL CHIEF42 CB34 TITAN Page 78
2 Ring Door Installation (optional)
Place expandable foam around edges of frames as shown below.
1. Bolt the inner and outer frame to the bin sidewall with 7/16” x 3” bin bolts, making sure
to only place bolts in the holes shown. Bolt the inner and outer frames together with (10)
7/16 x 2” bin bolts with whiz flange nuts.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
80/100
Page 79 MANUAL CHIEF42 CB34 TITAN
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
81/100
MANUAL CHIEF42 CB34 TITAN Page 80
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
82/100
Page 81 MANUAL CHIEF42 CB34 TITAN
3 STIFFENED TANK
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
83/100
MANUAL CHIEF42 CB34 TITAN Page 82
2 STIFFENED TANK
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
84/100
Page 83 MANUAL CHIEF42 CB34 TITAN
IMPORTANT: All anchors
must be bearing firmly upon
concrete or shimmed to
develop full bearing contact
with concrete foundation
E. Heavy Bin Stiffener Anchor
(1) All bins will have ALL 2 ring bottom stiffeners. Stiffened bins may have two or threeStiffeners per sidewall sheet depending upon bin size and height.
(2) Bolt anchor brackets to 2-ring bottom stiffeners. DO NOT fully tighten, only finger
tighten at this time.
(3) After the bottom ring is attached, lower the bin carefully, placing all anchor bracketsover the anchor bolts.
(4) When full weight of the bin is on the concrete, shim the anchors as necessary bysliding shim plates between the concrete and anchor bracket. All anchors must be
bearing upon the concrete or shimmed so that full bearing of the anchor is developed.
NOTE: Anchors placed over aeration trenches must be supported from the bottom of the
trench.
After all anchors brackets are shimmed snuggly, place two square washers over theanchor bolt and tighten.
Plastic cement or tar sealant should be applied from inside the bin to seal the bottom ring
to concrete. (NOTE: Sealant is not furnished by Chief Industries, INC.)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
85/100
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
86/100
Page 85 MANUAL CHIEF42 CB34 TITAN
F. Transition Stiffeners
Aeration Trough Transition Stiffener Installations (for flush-floor aeration systems with two ormore fans)
(1)
The formed concrete dimensions and the anchor bolt placement are important for the correctinstallation of the transition stiffeners. When forming the concrete, the aeration troughs
should be located as specified in Chief’s aeration layout. The anchor bolt locations for the bin
need to be oriented to make sure that the number of anchors over the aeration trough isminimized. When installing the anchor bolts, the bolt radius and bolt chord must be correct
and they must also be placed according to the details below.
IMPORTANT NOTE: Do NOT install the anchor bolts inside the aeration trench at this
time.
2 Stiffener/Sheet Bins 3 Stiffener/Sheet Bins
(2) When the bin is erected and located correctly (as illustrated above), insert the transition in the
aeration trough. Using the hole in the anchor bracket as a guide, drill a 3/4” hole through the
top of the transition. Slide the transition stiffener inside the transition and line it up with the previously drilled hole. Loosely install the 5/8” x 1-1/2” A325 bolt. Rotate the transition
stiffener body so that it is centered under the bin wall anchor. See installation detail that
follows.
(3)
The transition stiffener must be attached to the foundation with two (2) 5/8” x 6” expansion-type anchor bolts. The holes for these anchor bolts should now be located. With an acetylene
torch, cut two holes in the bottom of the transition using the holes in the transition stiffener base plate as guides. (This would mark the location of the anchor bolts in the concrete as
well.)
(4) Remove the transition stiffener and the transition.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
87/100
MANUAL CHIEF42 CB34 TITAN Page 86
Aeration Trough Transition Stiffener Installation Detail
(5) Locate the two anchor bolt locations (from cutting the holes in the bottom of the transition).Set the transition stiffener over the locations to insure that the holes line up. Also, check to
insure that the transition stiffener is directly under and in line with the anchor. Make
adjustments if necessary. Drill the two holes for the 5/8” x 6” anchor bolts.
IMPORTANT NOTE: Do NOT install anchor bolts at this time.
(6) Enlarge the two holes in the bottom of the transition to 1” diameter.
(7) Reinstall the transition and slide the transition stiffener into position Loosely install the 5/8”
x 1-1/2” A325 bolt and rectangular washers at the anchor bracket location. The two 5/8” x 6”expansion-type anchor bolts should now be installed and securely tightened the 5/8” bolts at
the anchor bracket. Caulking should be applied to seal the transition.
IMPORTANT NOTE: Transition stiffeners support the bin anchors. The transition must also
be supported inside the bin. See Chief’s aeration layout for supporting the transition.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
88/100
Page 87 MANUAL CHIEF42 CB34 TITAN
G. Stiffener Upgrades for Goal Post (Optional)
When a goal post is being attached to bin, an extra layer of stiffeners are laminated over standardstiffeners at goal post location from eave to base, as been is being erected.
Chief recommends that goal post be uniformly attached to at least the top 2 rings of tank at thestiffeners from bottom of 2
nd ring to top of 1
st ring.
Note: Listed below are the maximum loads that can be applied to upgraded stiffener columns.16GA stiffener upgrade = 5,000 lbs. per column
14GA stiffener upgrade = 6,000 lbs. per column
2 stiffeners per sidewall
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
89/100
MANUAL CHIEF42 CB34 TITAN Page 88
2 stiffeners per sidewall sheet
3 stiffeners per sidewall sheet
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
90/100
Page 89 MANUAL CHIEF42 CB34 TITAN
Section 8 – Wind Rings
A. Wind Rings
Consult the Chief catalog for the quantity of wind rings required for your bin. The quantity ofwind rings depends on the size of the bin and the application of any accessories (such as a
sidedraw system). For quantities and placement of wind rings required when a Sidedraw System
is installed on the bin, refer to the charts in this manual. The wind rings will be attached to thesidewall using one bracket per stiffener spaced 58-5/16” apart (38-7/8” on 3 stiffened bins). The
brackets are specially formed and prepunched to bolt directly to the sidewall stiffener holes. The
wind ring segments will be joined together using a bolted coupler.
NOTE: All wind ring segments are 248” long, and may need field cut to keep couplers in
between brackets. Always cut segments on end opposite end with pre-punched hole.
(1)
Working from outside the bin, determine the proper location for installation of the first windring.
(2) Bolt the first wind ring bracket to the sidewall stiffener holes as shown in Detail below using(2) of the stiffener attachment bolts and nuts with bolt heads on the inside. (Note: Wind ring
brackets may be installed below the endcaps if desired to allow for clearance of ladders and
platforms.)
(3) Move right to the next stiffener and repeat step 2.
(4) When 4 wind ring brackets have been installed, slide the first ring segment through the four
brackets leaving approximately 29 inches of the segment projection past the last bracket.
Insert coupler over end of wind ring segment, and attach with 5/8” x 4” bolt.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
91/100
MANUAL CHIEF42 CB34 TITAN Page 90
(5) Repeat step 2 through 3 until four more brackets have been installed.
(6) Slide another connector into the end of the previously installed ring segment. Slide the nextring segment through the four brackets and butt it firmly against the previous segment.
(7) Repeat steps 5 and 6 until only one ring segment remains to be installed. Installing the
final ring segment requires special procedures.
(8) Attach coupler to end of last wind ring segment.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
92/100
Page 91 MANUAL CHIEF42 CB34 TITAN
(9) Slide coupler attach to segment over end of 1st segment so segments are bolted together.
(10) Field cut other end of segment so segments are flush.
(11) Slide last coupler and brackets over segments.
(12) Hold segments flush and slide coupler over joint and attach with 5/8” x 4” bolts. Attach
brackets to stiffeners
(15) Check to see that all bolts in the complete wind ring are tight
(16) Repeat steps 1 through 13 for the remaining wind rings.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
93/100
MANUAL CHIEF42 CB34 TITAN Page 92
Titan Commercial Bins 5 thru 15 Rings Tall
Drawing is for illustrative purpose only. The quantity and location of wind rings required
depends on the application of any accessories (EX: sidedraw system). On Standard Bins placewind rings as shown in figure above. Refer to chart on following page for qty. of wind rings
required on standard tanks. (Ex. If only one wind ring is required place on 2nd
ring from eave, if
2 req’d place on 2nd
and 5th
ring, if 3 req’d place on 2nd
, 5h, and 8
th and so on)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
94/100
Page 93 MANUAL CHIEF42 CB34 TITAN
Titan Commercial Bins 16 thru 30 Rings Tall
Drawing is for illustrative purpose only. The quantity and location of wind rings requireddepends on the application of any accessories (EX: sidedraw system). On Standard Bins place
wind rings as shown in figure above. Refer to chart on following page for qty. of wind rings on
standard tanks. (Ex. If only one wind ring is required place on 3rd
ring from eave, if 2 req’d placeon 3
rd and 6
th ring, if 3 req’d place on 3
rd, 6
th, and 9
th, and so on)
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
95/100
MANUAL CHIEF42 CB34 TITAN Page 94
BIN
HEIGHT 18 20 22 24 26 30 34
8 0 1 1 1 1 1 19 0 1 1 1 2 2 2
10 1 1 1 1 2 2 2
11 1 1 2 2 2 2 2
12 1 1 2 2 2 2 2
13 1 1 2 2 2 2 2
14 1 1 2 2 2 2 3
15 1 1 2 2 2 2 3
16 1 1 2 2 2 2 3
17 2 2 2 2 2 2 3
18 2 2 2 2 2 2 3
19 2 2 2 2 2 2 320 2 2 2 2 3 3 3
21 2 2 2 3 3 3 3
22 2 2 2 3 3 3 4
23 2 2 2 3 3 3 4
24 2 2 2 3 3 3 4
25 2 2 3 3 3 4 4
26 2 2 3 3 3 4 5
27 2 3 3 3 3 5 5
28 3 3 3 3 3 5 NA
29 3 3 3 4 3 5 NA
30 3 3 3 4 3 5 NA
BIN SERIES
Wind rings required on standard Commercial Titan Bins
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
96/100
Page 95 MANUAL CHIEF42 CB34 TITAN
Wind Ring Placement with Sidedraw Systems
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
97/100
MANUAL CHIEF42 CB34 TITAN Page 96
Standard Total
Bin Ring Wind Rings Wind
Size Height Quantities Rings
10 10 - 18 0 + 1 1
11 10 - 18 0 + 1 1
11 19 - 20 0 + 2 2
12 10 - 18 0 + 1 1
12 19 - 22 0 + 2 2
13 10 - 18 0 + 1 1
13 19 - 23 0 + 2 2
14 10 - 18 0 + 1 1
14 19 - 24 0 + 2 2
16 10 - 15 0 + 1 1
16 16 - 18 1 + 1 2
16 19 - 26 1 + 2 3
18 10 - 16 1 + 1 2
18 17 - 21 2 + 1 3
18 22 - 27 2 + 2 418 28 3 + 2 5
20 10 - 16 1 + 1 2
20 17 - 21 2 + 1 3
20 22 - 26 2 + 2 4
20 27 - 29 3 + 2 5
22 10 1 + 1 2
22 11 - 21 2 + 1 3
22 22 - 24 2 + 2 4
22 25 - 28 3 + 2 5
24 10 1 + 1 2
24 11 - 20 2 + 1 3
24 21 - 24 3 + 1 424 25 - 28 3 + 2 5
24 29 - 30 4 + 2 6
26 10 - 15 2 + 1 3
26 16 - 19 2 + 2 4
26 20 - 23 3 + 2 5
26 24 - 29 3 + 3 6
26 30 3 + 4 7
30 10 - 15 2 + 1 3
30 16 - 19 2 + 2 4
30 20 - 24 3 + 2 5
30 25 4 + 2 6
30 26 4 + 3 7
30 27 - 30 5 + 3 8
34 10 - 13 2 + 1 3
34 14 - 17 3 + 1 4
34 18 - 21 3 + 2 5
34 22 - 25 4 + 2 6
34 26 - 27 5 + 2 7
Additional
with
Sidedraw System
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
98/100
Page 97 MANUAL CHIEF42 CB34 TITAN
Section 9 – Miscellaneous
A. Maintenance Instructions
ROOF: Annual inspection of the roof structure should be made to be sure there is
no holes in the roof panels and all connections are water tight. If leaksshould occur apply weatherproof caulk in the area of concern.
SIDEWALL: Sidewall inspection must also be conducted at least annually. Should leaks
occur apply caulk to area of concern.
Should spoilage occur, thoroughly clean surfaces. If oxidation is present,
remove oxidation and apply corrosive resistance paint.
BASE: Inspect base as often as possible for spoilage, as this is a direct indication
of excess moisture. If spoilage is present, thoroughly clean surface. Ifoxidation is present, remove oxidation and apply corrosive resistance paint. After paint has dried, apply base sealer to effected area.
DOORS: Inspect doors and manholes as often as possible to be sure proper seal ismaintained.
DECALS: Be sure all warning decals are installed in proper locations. Replace alldamaged or unreadable warning decals.
8/20/2019 347865 CB34 Manual 30DG J RIB Manual
99/100
MANUAL CHIEF42 CB34 TITAN Page 98
B. Comment Sheet
Dear Erector:
In an effort to better serve and please you, list below any problems you may have encountered
with your product or the erection procedures in this manual. Also list any suggestions you mayhave for improvements.
Erection Manual Problems: ____________________________________________________________ _____________________________________________________________________________________
_____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ __________________________________________________
Recommended Solutions:
____________________________________________________________ _____________________________________________________________________________________
_____________________________________________________________________________________ _____________________________________________________________________________________
_____________________________________________________________________________________ __________________________________________________
Product Problems: ____________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ __________________________________________________
Product Improvements Suggestions:
____________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ __________________________________________________
Thank you for your time and reason. All responses will be reviewed by our engineering staff.
Please detach this page and send to: Agri Engineering DepartmentChief Industries, Inc.
P.O. Box 848
Kearney, NE 68848-0848