37th Review Meeting of State Finance Controllers
29-30 April, 2013
Procurement Procedure-SSA
Technical Support Group, SSA
2
PROCUREMENTPROCUREMENT
3
Main Considerations of Proficient Procurement
(i) Economy: Give the purchaser best value for money.
(ii) Efficiency: Best procurement is simple and swift, producing positive results without protracted delays.
(iii) Fairness: Impartial, consistent, and therefore reliable.
(iv) Transparency: Maintains rules and procedures that are accessible and unambiguous. It is not only fair, but should be seen to be fair.
(v) Accountability and Ethical Standards: A key deterrent to collusion and corruption, and a key prerequisite for procurement credibility.
4
Why is Procurement Important?Why is Procurement Important?
• In procurement terms inputs are generally grouped into three categories:
(i) Civil Works – School Infrastructure and facilities like New PS, UPS, Residential Schools, Hostel, ACR, HM Room, BRC/URC, CRC, Drinking water, Toilets, Girls Toilet, Ramps, Handrail, Electrification, Retro-fitting, Boundary wall/ fencing, Major Repairs, etc.
(ii) Goods - Typically equipment, computers, furniture, textbooks, library books, uniforms, TLE, TLM, other materials, supplies, commodities, etc.
(iii) Services – Hiring of services including academic, technical and resource support provided by institutions/organizations in all areas, research studies, third party quality evaluation of civil works, auditors etc.
• The quality, timeliness, local appropriateness and affordability of those procured inputs can largely determine whether the public investments will succeed or fail.
5
Effective ProcurementEffective Procurement
ObjectivesObjectivesObjectivesObjectives
Right Qualit
y produc
t
Right Qualit
y produc
t
Right quantiti
es
Right quantiti
es
Lowest possible price
Lowest possible price
Meeting recogniz
ed standard
s
Meeting recogniz
ed standard
s
Timely Delivery as per schedul
e
Timely Delivery as per schedul
e
Reliable supplier
s
Reliable supplier
s
6
PROCUREMENT IN SSA
• Strictly follow procurement procedure prescribed in Chapter IX of the Manual on Financial Management and Procurement (FM&P).
• Mandatory to follow the Manual provisions for all procurements under SSA.
• Follow States’ financial ceilings except when not prescribed by MHRD.
7
• Identification of Needs.
• Ensure availability of specific budget provision.
• Assessment of bulk requirement at the beginning of the
financial year.
• Computer, equipment, furniture, books etc in economic
lots as per annual need.
• Procure miscellaneous items of stores not covered by
bulk requirement as per actual need.
• Make all purchases to the best advantage after
comparison of competitive prices.
• Strictly follow the level of procurement prescribed in
the Manual
• Encourage decentralized procurement
• Avoid centralized procurement of items prescribed at
lower level
Points to be kept in view Points to be kept in view
8
PROCUREMENTPROCUREMENT
Strictly follow the levels of procurement provided in Para 112 of the Manual on FM&P
9
School/KGBV levelSchool/KGBV level
All civil works, except buildings for Residential
Schools/Hostels and KGBV. Furniture to Govt. UPS Library Books for schools Teaching Learning Material School grant. Maintenance grant.
Teaching Learning EquipmentREMSLearning Enhancement Programme (LEP).Items required for KGBV.Uniform
Special Training related ItemsSpecial Training related Items
TLM, Contingency etc.
10
CRC/BRC levelCRC/BRC level
Furniture/ equipment/computer etc.
Office contingencies
Teaching Learning Material
Teacher Training
Community Training
Civil works for construction of BRC, augmentation of
BRC and CRC
Maintenance of BRC and CRC
Printing work
REMS
11
District levelDistrict level Office equipment for DPO Office furniture for DPO Textbooks/other books/supplementary materials Computers and accessories Aids and appliances for CWSN Office contingencies Hiring of vehicles Maintenance of equipment and vehicles District level training and workshops Printing work REMS ECCE Kit Educational Kits for girls Learning Enhancement Programme (LEP) Construction of Residential Schools/Hostel and KGBV
12
State levelState level Textbooks Computers and its accessories Office equipment for SPO Office furniture for SPO Equipment for distance education Aids and appliances for CWSN Office contingencies Hiring of vehicles Maintenance of equipment and vehicles State level training and workshops Printing work Engagement of consultancy firms (service contract) Engagement of Auditors for external and internal audit Engagement of experts/resource persons Engagement of NGOs REMS Learning Enhancement Programme (LEP).
13
Method of ProcurementMethod of Procurement
Method of Method of ProcurementProcurementMethod of Method of
ProcurementProcurement
Open Tende
r
Open Tende
r
Limited TenderLimited Tender
Single TenderSingle Tender
Procurement without tender /
quotation
Procurement without tender /
quotation
Procurement through
communities
Procurement through
communities
14
OPEN TENDEROPEN TENDERMeaning
• Competitive bidding procedure and is the most efficient and economic way of procuring goods or works.
• Provides for adequate competition in order to ensure reasonable prices.
• Ensures transparency and equal opportunity to all.
• The methods used in the evaluation and the award of contracts are made known to all bidders.
Items covered
Civil works construction of BRC, Residential schools / Hostel, KGBV, SIEMAT and any other civil works specifically approved by Project Approval Board through contractors.
Goods
15
Steps Preparation of tender documents
Notification / Advertisement;
Issue of tender documents;
Pre-bid Conference
Submission of tender documents;
Public opening of tender;
Evaluation;
Selection of lowest evaluated responsive bidder based on post qualification;
Negotiation with L-1 (if necessary)
Contract award; and
Contract performance
16
Tender documents:Tender documents: Should be user friendly, self contained, comprehensive,
unambiguous and relevant to the objective of purchase.
Use Standard State Government’s tender documents duly modified, if necessary, to cover the following sections:
Section - I – Invitation for Bids (IFB) Section - II – Instructions to Bidders (ITB) Section - III – General Conditions of Contract Section - IV – Special Conditions of Contract Section - V – Schedule of Requirements Section - VI – Technical Specifications Section - VI-A – Post Qualification Criteria Section - VII – Bid form and Price Schedule Section - VIII – Bid Security Form Section - IX – Contract Form
17
Section - X – Performance Security Form Section - XI – Performance Statement Section - XII – Manufacturers Authorization Form Section - XIII – Form for Bank Guarantee for Advance
Payment Section - XIV – Performa for Equipment and Quality
Control employed by the Manufacturer
Important Clauses: Notification of Tender Notice Sale of tender documents Schedule of requirement Bid Form Bid Prices Technical Specifications Post-Qualification Criteria Bid Validity Period
18
Earnest Money Pre-bid Conference Signing of Bids Submission of bids Opening of bids Evaluation criteria Negotiation with L1 Award of contract Security deposit Retention money Signing of agreement/contract Payment terms Adjudicator Force Majeure Liquidated damages Corrupt or Fraudulent Practices General Conditions of Contract (GCC) Special Conditions of Contract (SCC)
Repeat Orders
Quantity increase/decrease as per State procedure
Place order within one month from the date of last supply
Prices have since not reduced
Purchases not made on urgent basis
Right to Accept any Bid or Reject all Bids The purchaser has the right to accept or reject any bid and
to annul the bidding process and reject all bids at any time prior to award of contract.
Rejection of all bids Lack of competition
Tenders not substantially responsive
Review the causes justifying the rejection
Obtain the approval of competent authority
Procurement Steps Procurement Steps
Award of Contract
Award Criteria Award the contract within the bid validity period.
Award the contract to the successful lowest evaluated responsive bidder
The selected bidder need not undertake work not specified in bidding documents or to modify his bid.
Single offers received:
Consider if; publicity was adequate,
bid specifications / conditions were not restrictive or unclear and bid prices are considered reasonable.
Procurement Steps Procurement Steps
21
LIMITED TENDERLIMITED TENDER
Items covered:
Goods including books, uniforms
Teaching learning materials,
School equipment,
Hiring of vehicles, and
Operation and maintenance of equipment
Invitation for quotations –
• Based on comparing price quotations obtained from several suppliers, usually at least 3 to ensure competitive prices.
• Issue a letter to the supplier to furnish the quotations for the required goods/equipment.
22
Invitation for quotations – No need of publication of notification in the
newspaper/website.
Issue the request letters to suppliers on the approved list.
The request letter should indicate description, specifications and quantity of the goods as well as desired delivery time and place.
Only one quotation by each supplier.
Bid Price Quote for the full quantity as described in the invitation
letter.
Corrections, if any, made by crossing out, dated initialing and re-writing.
Include all duties, taxes and other levies payable by the Vendor/Supplier in the total price.
The rates quoted by the Vendor/Supplier be fixed for the duration of the contract and not subject to adjustment on any account.
The prices are quoted in Indian Rupee.
LIMITED TENDERLIMITED TENDER
23
LIMITED TENDERLIMITED TENDER
Steps Identifying items; Laying down specifications; Estimating total numbers and costs of items; Need not notify in newspaper/website Identifying likely agencies borne on the approved
list of contractors/ suppliers; (minimum 3, 8-10 for more competitive rates)
Obtaining approvals of competent authority; Issuing letters of invitation;
Processing quotations received;
24
Obtaining orders of competent authority for placing
orders for supply;
Issuing letters placing orders for supply and delivery
period;
Quoted price shall include all duties, taxes and other
levies;
Rates quoted be fixed and not subject to adjustment;
Ensuring inspection;
Ensuring timely supply: and
Making payments after delivery in satisfactory condition.
The financial ceiling prescribed for limited tender shall
be applicable for Rate contracts of DGS & D and Rate
contracts of State Governments.
25
SINGLE TENDERSINGLE TENDERFollowed in the case of Articles specifically certified as of propriety nature;
or Manufactured by a particular firm; Goods including books; Teaching materials; School grant; Hiring of vehicles; and Operation and maintenance of equipment etc
Appropriate for Extension of existing contracts Standard equipment/spare parts for existing
equipments from original supplier. Items obtainable from one source Early delivery In exceptional cases such as natural disaster.
26
WITHOUT TENDER / QUOTATIONWITHOUT TENDER / QUOTATION Procurement of goods or group of goods estimated to
cost the equivalent of the ceiling of State Govt.
Issue suitable guidelines by the SIS
THROUGH COMMUNITIESTHROUGH COMMUNITIES Construction of all civil works except, BRC, Hostel,
KGBV and SIEMAT
BRC construction if the community is technically capable
Purchase of materials as per ISI certification, if available;
SPD may provide simple procurement guidelines
27
Identify the committee locally operating in the area.
Keep the following points in view: Active involvement of community in
planning and implementation; Who will procure the materials or goods
used in works; Goods / works have to be executed as per
approved plans and specifications The name and designation of the Engineer
for technical supervision and certification.
28
Suggested advance payments based on the certificate issued by the Supervising Engineer
Advance (mobilisation advanceupon start up of the work andon reaching lintel level) : 75% of total cost
Plastering and completion of work : 25% of total cost
School toilet and other repair works
Advance (mobilisation advance upon start up of the work) cost : 75% of total
Plastering and completion of work cost : 25% of total
29
Considerations
30
Selection process Preparation of Terms of Reference Preparation of Cost Estimate and Budget Advertisement, seeking Expression of Interest (EOI) short listing of consultants/firms based on EOI Issue of Request for Proposal (RFP) to short listed
Consultants/firms. Receipt of RFP in two envelope system, technical and
financial proposals separately. Formation of Evaluation Committee Evaluation of Technical proposal and assign individual mark
by each member on the basis of responsiveness to the TOR Open the Financial proposals of the qualifying Consultants
publicly in the presence of the Consultants/representatives Final discussions including negotiations Award of contract
31
Terms of Reference (TOR) Prepare a well-defined TOR specifying the
services to be provided on the following lines: Background information; A precise statement of objectives; An outline of tasks to be carried out; A time schedule for completion of tasks; The support/inputs provided by the Client; Composition of Review Committee to monitor the
services; List of key personnel whose CV and experience
would be evaluated.
32
Preparation of Terms of Reference Preparation of Cost Estimate and Budget Advertisement, seeking Expression of Interest (EOI) short listing of consultants/firms based on EOI Issue of Request for Proposal (RFP) to short listed
Consultants/firms. Receipt of RFP in two envelope system, technical and
financial proposals separately. Formation of Evaluation Committee Evaluation of Technical proposal and assign individual mark
by each member on the basis of responsiveness to the TOR Open the Financial proposals of the qualifying Consultants
publicly in the presence of the Consultants/representatives Final discussions including negotiations Award of contract Performance of contract
33
Cost Estimate and Budget Based on the assessment of resources needed to carry out
the assignment, staff time, logistical support and physical inputs.
Costs divided into two broad categories (a) fee or remuneration and (b) reimbursable.
Ensure that the requested services are within the current financial budget.
Advertising Not necessary for short term consultancy services. Advertisement seeking Expression of Interest for other
services, is published in regional and national newspapers having wide circulation and uploaded in the web site of the Client.
Specify requisite qualifications, experience etc. in the notification.
34
Short list of Consultants Short list the Expression of Interest received based on
the relevant qualifications and experience specified in the notification.
Receipt of proposals Issue letter of Invitations along with the TOR to the
short listed consultants/firms. Seek proposals from the short listed consultants /
firms in two envelope system i.e, technical proposal in one envelope and financial proposal in another envelope.
Evaluation Committee Constitute evaluation committees separately for
technical and financial evaluation This committee will evaluate the proposals received
from the consultants / firms
35
Evaluation Carried out in two stages, first the quality and then the
cost Until the technical evaluation is concluded the evaluators
of technical proposals will not have access to the financial proposal
Evaluation of Technical Proposal Carried out on the basis of the responsiveness to the TOR. The technical evaluation committee will prepare an
evaluation report on the technical aspects of the proposal. The report shall substantiate the results of the evaluation
and describe the relative strength and weaknesses of the proposals.
Individual marks will be assigned by each member and a consolidated mark sheet is prepared.
Minimum qualifying marks should be provided in the Letter of Invitation and those who are not obtaining this will be disqualified
36
Evaluation of Financial Proposal On completion of technical evaluation, notify those
consultants whose proposals did not meet the minimum qualifying marks that their financial proposals will be returned after completing the selection process.
Simultaneously notify the consultants who have secured the minimum qualifying marks and intimate the date and time set for opening the financial proposal.
Allow sufficient time for attending the opening of financial proposals
The financial committee shall open the financial proposal publically in the presence of representatives of the consultants / firms who choose to attend.
Read aloud the name of the consultant / firm, the quality scores and the proposed prices when the financial proposals are opened
Prepare the minutes of the public opening.
37
Final discussions (negotiations) Held with the selected consultant /firm on the following
issues The selected consultant /firm shall not be allowed to
substitute key staff unless both parties agree that undue delay in the selection process makes such substitution unavoidable or that such changes are critical to meet the objectives of the assignment.
Financial discussions shall include in addition to fee / remuneration, clarification of the consultant’s / firm’s tax liability and how this tax liability shall be reflected in the contract.
In case these discussions fail to result in an acceptable contract, terminate the process and invite the next ranked consultant / firm for discussion
After the process is successfully completed, promptly notify other consultants /firms on the short list that they were unsuccessful
38
Award of Contract
Award the contract to the selected consultant / firm Use the prescribed contract agreement form for
signing the contract Indicate the fee/remuneration negotiated with the
selected consultant/firm to be paid for the services in the contract agreement and also the terms of payment
39
Preparation of Terms of Reference Publication of advertisement
Formation of Evaluation Committee
Short-listing of NGOs on the basis of specifications and scope of the work specified in the TOR.
Desk appraisal and if found suitable, field appraisal by the Evaluation Committee
Recommendation by the Evaluation Committee for the selection of NGOs to the Grant-in-Aid Committee.
Approval by Grant-in-Aid Committee based on the report of the Evaluation Committee on the desk and field appraisal.
40
Post Review Government of India or the funding agencies shall
undertake post review of the contracts awarded on
procurement of goods, works and services on a
random basis.
All procurement documents should be retained and
made available to the review team.
Mis-procurement Goods, works and services that have not been
procured as per the Manual shall be treated as mis-
procurement and SSA funds cannot be used for
such procurement.
41
Complaint Handling Mechanism Set up complaint handling mechanism at national as
well as State level to deal with complaint received
from contractors/suppliers.
Dealt with at a level higher than that of the level at
which the procurement process is being undertaken
Undertake a thorough enquiry of the allegations made
If found correct, take appropriate remedial measures
Initiate disciplinary proceedings against the
delinquent staff
Receipt of any illegal gratification by staff is
considered as misconduct and result in disciplinary
proceedings against such staff, in addition to imposing
penalties under the law.
42