3.7 USC Steam Turbine Experience (2 Flow)
Owner: Electric Power Development Co.Power Station: Isogo Unit No.2Rated Output: 600 MWTurbine Type: TCDFRevolution: 3 000 rpmRevolution: 3,000 rpmMain Steam Press.: 25.0 MPa.aMain & Reheat Steam Temp.: 600 / 620°C
Initial Operation: 2009.7Date of Photography: 2009
17 Copyright © 2012, Hitachi, Ltd., All rights reserved. 17
3.8 Design Features of 400-600MW Steam Turbine
1-LP Casing (2 Flow)with various size of last stage blade Advanced Vortex Nozzle to
improve the stage efficiencyimprove the stage efficiency
HP/IP Combined Casing
Continuous Covered Blade to improve the seal performance
18 Copyright © 2012, Hitachi, Ltd., All rights reserved. 18
Tandem Compound Type 400 ~ 600 MW Class Steam Turbine
3.9 USC Steam Turbine Experience (4 Flow)
O GDF SUEZ E i N d l d N VOwner: GDF SUEZ Energie Nederland N.V.Power Station: RotterdamRated Output: 790.1 MWTurbine Type: TC4FRevolution: 3,000 rpmM i St P 26 3 MPMain Steam Press.: 26.3 MPaMain & Reheat Steam Temp.: 600 / 620CInitial Operation: 2013Date of Photography: February 2012
19 Copyright © 2012, Hitachi, Ltd., All rights reserved. 19
3.10 3.10 Design Features of 600-800MW Steam Turbine
2-LP Casings (4 Flow) with various size of last stage blade
Continuous Cover Blade to improve the seal performance
HP/IP Combined Casingg
Advanced Vortex Nozzle to
Tandem Compound Type 600 800 MW Class Steam Turbine
improve the stage efficiency
20 Copyright © 2012, Hitachi, Ltd., All rights reserved. 20
Tandem Compound Type 600~800 MW Class Steam Turbine
3.11 Supercritical Coal Fired Power Plant (EPC)
First sliding pressure supercritical power plant in CanadaAwarded best coal-fired project at Power-Gen International 2005
<Leading Specification><Leading Specification>
Owner: EPCOROwner: EPCOROwner: EPCOROwner: EPCOR
Site: Genesee Site: Genesee Phase3Phase3
Type: SupercriticalType: SupercriticalType: Supercritical Type: Supercritical
Fuel: SubFuel: Sub--bituminous Coalbituminous Coal
Output: 450MW (NET)Output: 450MW (NET)Output: 450MW (NET)Output: 450MW (NET)
Steam ConditionSteam Condition::
24.1MPa / 56624.1MPa / 566℃℃ / 566/ 566℃℃
Commercial Operation: Commercial Operation:
20052005
21 Copyright © 2012, Hitachi, Ltd., All rights reserved. 21
3.12 Supercritical Coal Fired Power Plant (EPC)
Awarded 2007 Plant of the Year by Power Magazine(1)First US supercritical plants in 16 years(2)High efficiency and low emission(3)On time delivery and start-up
<Leading Specification><Leading Specification>
Owner: MidOwner: Mid--American EnergyAmerican Energy
Site: Walter Scott Jr. Energy Center 4Site: Walter Scott Jr. Energy Center 4
Type: Supercritical Type: Supercritical
Fuel: SubFuel: Sub--bituminous Coal (PRB)bituminous Coal (PRB)
Output: 790MW (NET)Output: 790MW (NET)
Steam ConditionSteam Condition::
25.3MPa / 56625.3MPa / 566℃℃ / 593/ 593℃℃
C i l O ti 2007C i l O ti 2007
22 Copyright © 2012, Hitachi, Ltd., All rights reserved. 22
Commercial Operation: 2007Commercial Operation: 2007
3.13 Supercritical Coal Fired Power Plant (EPC)
<<Leading Specification>Leading Specification>
OwnerOwner: : EvonikEvonik/EVN/EVN
SitSit W l U it 10 (G )W l U it 10 (G ) Site: Site: Walsum Unit 10 (Germany)Walsum Unit 10 (Germany)
Type: Type: Ultra Supercritical Ultra Supercritical
Fuel: Fuel: Hard CoalHard Coal
Output: 790MW Output: 790MW (Gross)(Gross)
Steam ConditionSteam Condition::
26.4MPa 26.4MPa / / 600600℃℃ / / 620620℃℃
Turbine: HitachiTurbine: Hitachi
Boiler HPEBoiler HPE Boiler: HPEBoiler: HPE
23 Copyright © 2012, Hitachi, Ltd., All rights reserved. 23
4. IGCC & CCS Technologies
24 Copyright © 2012, Hitachi, Ltd., All rights reserved. 24
4.1 IGCC(EAGLE Pilot Plant in Japan)
GasifierO2-blown entrained flow gasifier
(2-stage spiral flow type)Coal Feed Rate 150 t/day
Gasification Pressure 2.5 MPa
Gasifier andChar Recycle
Syngas Volume 14,800m3N/h
Gas Clean-up Absorption with MDEASulfur Recovery Limestone-gypsum
CO2 Capture Unit Capacity 1,000m3N/h
Unit
Air Separation
2 N
GT Output 8,000kW
Gas Clean-up
Unit
Gas Clean up Unit
Gas TurbineSulfur RecoverySulfur Recovery Unit
CO2 Capture Unit(Sweet shift + Chemical
25 Copyright © 2012, Hitachi, Ltd., All rights reserved. 25
absorption)
4.2 FeaturesFeatures of EAGLE* Gasifier
EAGLE ifi i bl t t i l fl t t i d b d ifi EAGLE gasifier is oxygen blown two stage spiral flow type entrained bed gasifier. Two stage spiral flow enables high efficiency for various type of coal.
Two stage concept enables optimum O2/coal ratio operation. Two stage concept enables optimum O2/coal ratio operation. Increasing residence time by spiral down flow, particle scattering is prevented. Oxygen feed flow quantity of upper burners of the gasifier is selected as little as possible in the range that does not let carbon losses increase.
Prevention of particle scattering by Spiral
down flow
Syngas (CO, H2)
Seal GasBlow Gas
down flow
CoalOxygen
Upper Stage BurnerLow
O Ratio
Ash Melting Temp.
High efficiency gasification with less
Oxygen
Oxygen
CoalLower Stage Burner
High
O2 Ratio
Optimized O ratio for
CoalOxygen
Temp.
gO2 Ratio
26 Copyright © 2012, Hitachi, Ltd., All rights reserved. 26
Optimized O2 ratio for various coalsSlag
*Coal Energy Application for Gas,Liquid & Electricity
4.3 Development of IGCC with CO2 Capture
EAGLE
Year ’05 ’10 ’15 ’20 ’25’00
Operation
Design, Manufacturing,Installation
EAGLE
Step2
Operation
・Reliability Improvement・1000m3
N/h CO2 Capture Pilot Plant/Sweet Shift + Chemical AbsorptionOperation
Design, Manufacturing,Installation
Step2
EAGLE
Step3
Feasibility Study, Design, Manufacturing, Installation ・1000m3
N/h CO2 Capture Pilot Plant/Sour Shift + Physical Absorption
Demonstration Operation of
Design, Manufacturing, Installation
Osaki Cool
Gen Project
(Demonstration)DemonstrationOperation of IGCC
CO2 Capture UnitDesign, Manufacturing, Installation
Operation of Oxygen blown IGCC
(Demonstration)
Supported byMETI
Operation of IGCCwith CO2 Capture
Installation
FC Unit Design, Manufacturing, Installation
27 Copyright © 2012, Hitachi, Ltd., All rights reserved. 27
DemonstrationOperation of IGCC/IGFCwith CO2 Capture
METI:Ministry of Economy, Trade and Industry
4.4 Process Flow of OSAKI Cool Gen Project
IGCC IGCC : 170MW class (Coal feed rate:1,100t/d)Gasifier :Oxygen-Blown Entrained-flow
AirFuel Gas(H2,CO etc.)
AirStack
GT
Gas Turbine : Demo Class
O2ガス化
Air SeparationUnit
ST GT
GeneratorCoal
HRSGGasifier
化 Generator
H2
CO HCO2 Capture
FC
CO Shift CO2Capture
CO2,H2 CO2Transport
and Storage
Shift Reaction : Shift catalyst is under consideration.
CO Capture Unit: CaptureIGCC/IGFCwith
FC
28 Copyright © 2012, Hitachi, Ltd., All rights reserved. 28
Reactor CaptureUnitCO2 Capture Unit: Capture
process is under consideration.CO2 Capture
4.4 CCS(Chemical Absorption Process)
ESPESPBoilerBoiler
SCRSCR FGDFGD
STACKSTACK
Absorb CO2 in Flue Gas by Amine, CO2 Release by Heat
CO2
Storage
Flue Gas
Treated Gas■Principle
and Storage
Absorption40~50℃
Storagep
R NH2+CO2+H2O R NH3++HCO3-→
Heated,Regenerate100~120℃
RegeneratorAbsorberR-NH2+CO2+H2O R-NH3++HCO3-→←
Amine
100 120℃
Ab b t
■Process1) CO2 i fl b b d b A i
R: Alkyl
Chemical Absorption Process
Heat ExchangerReboilerAbsorbent1) CO2 in flue gas absorbed by Amine
2) Regenerate CO2 in regenerator by heat3) Amine re-circulate to absorber
29 Copyright © 2012, Hitachi, Ltd., All rights reserved. 29
)
4.5 Development Road Map
2006 2008 201420122010 20161995
Absorption Basic Bench Test
B h T t
Scale-Up Technology/Improve EfficiencyScale-Up Technology/Improve Efficiency
Bench Test
1MWt Pilot
CO2 Capture for 1000MWel
System 1MWt Pilot FS 5MWt pilot (HPE)5MWt pilot (HPE)
TEPCO/ Yokosuka
System20MWt pilot20MWt pilot
5MWt pilot
30 Copyright © 2012, Hitachi, Ltd., All rights reserved. 30
4.6 CO2 Scubber Testing Plant (Gelderland/Netherlands)
• up to 5000 Nm3/h flue gas, equals to 5 MWth• CO2 removal > 90 %, Purity of CO2: 95%2 , y 2• Removal capacity up to 1 ton CO2 / hour• Two trains arrangement• Ready for operation by end of 2011y p y
31 Copyright © 2012, Hitachi, Ltd., All rights reserved. 31
4.7 Example of CO2 Capture for 1000MWel
3 000 000m3 /hG1,000MWUnitItem
3 000 000m3 /hFlue GasValueValueUnitItem
Recovery6,300m3 /hL90%CO2 Rec.
3,000,000m /hG
300t/hCoal90%CO2 Rec.
3,000,000m /hFlue Gas
Inlet Flue Gas
CO2
Regenerator
AmineTank
200mAbsorber100m
Absorber
32 Copyright © 2012, Hitachi, Ltd., All rights reserved. 32