+ All Categories
Home > Documents > 38th and Holly Detention Pond - denvergov.org

38th and Holly Detention Pond - denvergov.org

Date post: 08-Nov-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
2
EXISTING CONDITIONS HOLLY ST. GRAPE ST. E 38TH AVE. N 0 20 40 80 160 FT SCALE 1”=40’ A A B C C G F D E B DETENTION POND IMPROVEMENTS 38TH AVE & HOLLY ST. Public Meeting April 12, 2018 D E F G
Transcript
Page 1: 38th and Holly Detention Pond - denvergov.org

EXISTING CONDITIONS

HOLLY ST.

GRAPE ST.

E 3

8TH

AV

E.

N 0 20 40 80 160 FT

SCALE 1”=40’

A

A B C

C

G

F

D

E

B

DETENTION POND IMPROVEMENTS 38TH AVE & HOLLY ST. Public Meeting April 12, 2018

D E F G

Page 2: 38th and Holly Detention Pond - denvergov.org

DETENTION POND IMPROVEMENTS

box culvert crossing

forebay

maintenance access drive

deciduous trees

evergreen trees

pedestrian and maintenance access from E. 38th Ave.

pedestrian access

maintenance access

vegetated trickle channel

pedestrian access

drop structure

pedestrian trail through drop strutctrue

HOLLY ST.

GRAPE ST.

E 3

8TH

AV

E.

1

2

SCALE 1”=40’ N 0 20 40 80 160 FT

VIEW 1: Bird’s-eye rendering of drop structure design VIEW 2: Rendering of drop structure design showing showing gabion walls, paving pattern, box culvert box culvert crossing, gabion walls, paving pattern, crossing, forebay, and vegetation. and trickle channel beyond.

DETENTION POND IMPROVEMENTS 38TH AVE & HOLLY ST. Public Meeting April 12, 2018


Recommended