+ All Categories
Home > Documents > 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express...

395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express...

Date post: 14-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
17
395 Express Lanes Project Update
Transcript
Page 1: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Project Update

Page 2: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

2

Key Dates

Milestone Date

Limited Notice to Proceed February 2017

Early Works March-June 2017

Full Notice to Proceed July 2017

Preparatory Work Summer 2017

Draft Noise Abatement Decision Report

(NADR) Submitted for VDOT review

Summer 2017

Sound Wall Designs Available Late 2017 and Early 2018

Community Voting on Sound Wall Installation Late 2017 and Early 2018

Start Eastern HOV Shoulder Work Late 2017

Start Western HOV Shoulder Work Fall 2018

Pentagon Parking Improvements Completion March 2019

Service Commencement Fall 2019

Final Completion Summer 2020

Page 3: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

3

Project Overview

Project includes:

➢ Expansion and conversion of two High Occupancy Vehicle

(HOV) lanes to three Express Lanes

➢ Addition of third reversible lane from Edsall Road to just south

of Eads Street near the Pentagon

➢ Addition of a fourth regular southbound lane on 395 between

Duke Street and Edsall Road

➢ Improvements in traffic flow at the Eads Street Interchange

and carpool access at the Pentagon

➢ Installation and modification of sound walls

➢ Rehabilitation of bridges over 395

Extends 8 miles between Turkeycock Run and 14th Street Bridge

Portions of project in Arlington County, City of Alexandria, and

Fairfax County

Some project elements will be located in Washington, DC and on

Pentagon Reservation

Project will generate revenue for transit projects, like improved bus

services

Page 4: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

4

Project Scope

➢ Reconfiguration and reconstruction of two existing HOV Lanes to three HOT lanes, including traffic control, pavement

modifications, structures, signage, pavement markings and lighting

➢ Modifications and operational improvements to the Eads Street interchange and the northern terminus transition area

➢ No modifications to most interchanges

➢ New or modified sound walls at approved locations along the corridor

Typical Project Cross Sections

Page 5: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

5

Pentagon parking and Eads Street interchange improvements

Reconstruction and reconfiguration of a portion of the South Parking Area to enhance circulation for transit buses and

carpools

Map of Eads Street Interchange and Pentagon Multimodal Improvements

Page 6: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

6

Transit Benefits

The project includes a

long-term investment in

transit for the corridor,

through a yearly payment

of $15 million (to be

escalated annually) that

will be paid by Transurban

to the Commonwealth.

This annual transit

payment will support

transit and multimodal

initiatives benefitting the

corridor.

Page 7: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

7

Initial Signing Development

Rules of the Road are same as the 95 Express Lanes.

Signing concept consistent with 395 Express Lanes

extension of 95 Express Lanes.

Initial signing layout similar to typical 95 Express lanes

signing.

Held numerous meetings with VDOT and FHWA project

representatives during signing development process to

gain signing approval.

Goal - Provide signing for efficient and safe movement of

vehicular traffic while balancing sign density and size

requirements with the urban environment.

Page 8: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

8

Signing Area Focus

Army Navy Drive and Eads Street

Ea

ds S

tre

et

Page 9: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

9

Coordination with Arlington County

Met with Arlington County representatives 3 times since September 2017 to discuss

Arlington Co. concerns, requests and comments about signing.

Changes made due to Arlington Co. reviews and further design development:

✓ Reduced number of sign structures, reduced sizes of Dynamic Message Signs

(DMS), and overall reduction of sign panel area

✓ Use overhead cantilever structure to improve visibility and limit impacts to trees

along Army Navy Drive

✓ Create a new vertical rules of the road sign instead of using two signs

✓ Revised locations to adjust for future development plans

✓ Sign structures to be black powder coated

✓ Sign panels to have a black backing

✓ DMS to have post mounted cabinets to avoid an additional concrete pad in the

ground

Page 10: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

10

Comparison: Initial Design vs. Revised Design

Sign Group / Location

Original Layout Proposed Layout Net Change

# of Overhead

Structures

# of Ground-

Mounted

Structures

Total Sign

Panel Area

(SF)

# of Overhead

Structures

# of Ground-

Mounted

Structures

Total Sign

Panel

Area (SF)

# of StructuresTotal Sign Panel

Area (SF)

Army-Navy Drive - West Approach 1 3 394 1 1 251 -2 -143

Army-Navy Drive - East Approach 1 3 403 1 2 253 -1 -150

Eads Street - South Approach 1 2 337 1 1 178 -1 -159

Eads Street - North of Army-Navy Drive - 1 77 - 1 81 0 4

Totals 3 9 1,211 3 5 763 -4 -448

Summary

= 4 Fewer Structures

33% Reduction

448

SF Reduced

SIGN PANEL

AREA

37% Reduction

Page 11: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

11

Initial Design vs. Revised Design

Initial Design Revised Design

Page 12: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

12

Layout of Proposed Signing

Page 13: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

13

Revised Signing along Eads Street - Looking North to Army Navy Drive

Page 15: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

15

Keeping the Public Informed

For more information please visit

www.395expresslanes.com

or find us on Facebook at

www.facebook.com/395expresslanes

Questions or concerns should be directed to:

Brent McKenzie, 95 Express Lanes/Transurban, [email protected], 571-326-5609

Geoffrey Vetter, Lane/AECOM , [email protected], 815-245-7800

Please contact us if you would like additional information or would like

to be invited to briefings we host in your community.

Page 16: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

16

Page 17: 395 Express Lanes - Crystal City Civic Association Express Lanes_Arl Co Signing.pdf · 395 Express Lanes Signing Design 7 Initial Signing Development Rules of the Road are same as

395 Express Lanes Signing Design

17


Recommended