1. Introduction
Surveying Method chosen depends on:
by the purpose of the survey e.g. map making,location of specific points, definition of land
ownership etc.,
by the nature of the survey itself e.g. hydrographic,
terrestrial, astronomic,
according to the scale or accuracy of the survey,
the type of instrument or instruments used
e.g. prismatic compass,
level
theodolite,
photograph (terrestrial or aerial).
8/11/2019 3c16 Presentation
2/27
1. Introduction
Other factors:
Curvature of earth
over 5 km, vertical angle difference will approach 2.5 minutes which
can readily be detected even with most basic theodolite.
Errors
collimation errors in instruments need to be calibrated otherwise rivers
could flow uphill
Surveying involves
transfer of levels between two points
measurement of angles and lengths.
requires solution of triangular shapes using basic trigonometry
(or by graphical means).
If distances are large: planar geometry no longer applies.
8/11/2019 3c16 Presentation
3/27
Geodetic surveys allow for curvature of Earth 1:2500 scale maps actually vary in scale
On extreme east and west coasts, scale is approximately 1:2501
Reference is taken along 2 oW where scale is 1:2499
Along Greenwich Meridian and 4oW scale is 1:2500
1. Introduction
Surveying Instruments can be very accurate Instruments in ENV are capable of accuracies of 1 part in 20000 with ease if
used correctly.
Maps in UK are based on cartesian co-ordinates
North is represented by a bearing of 000.
East a bearing of 090,
South-west a bearing of 225 etc.
Referencing: True North: Grid North: Magnetic North
8/11/2019 3c16 Presentation
4/27
Point location - radial line and distance method..
2. Basic Surveying Methods
Difference in the Easting (E) is given by:-
sin.E
Northing difference (N)is given by:-
True co-ordinates of the second point:-
Easting =
Northing =
cos.N
sin.Eo
cos.No
where is the length of the line,
and is the bearing
where Eo is Easting
and Nois Northing
of the reference station.
N
O
This method can ONLYbe used if there is an INBUILT reference
direction in the instrument - e.g. magnetic north
8/11/2019 3c16 Presentation
5/27
Point location - radial line and distance method..
No inbuilt reference
2. Basic Surveying Methods
N
O
R
Two horizontal angles are
ALWAYS needed
i.e. a reading to R (a referenceobject) as well as object of interest
Applies to most instruments: Total Stations
Theodolites
Levels etc
8/11/2019 3c16 Presentation
6/27
Point location - Resection
2. Basic Surveying Methods
A
B
CN
Coordinates of A and B are known
Point C found from bearings at A
and B
or bearings from C to A and B
A
B
C
B
A
BA
C
C
P
D
ExternalTriangle of
Errors
Internal Triangle
of Errors
Methods to distribute errors are needed
8/11/2019 3c16 Presentation
7/27
2. Basic Surveying Methods
Point location - Traverse Methods
ba
cA1
ba
cA1
A2
ba
cA1
e
d
Open Traverse
Errors accumulate
Closed Traverse
Errors can be distributed
Closed Loop Traverse
Errors can be distributed
8/11/2019 3c16 Presentation
8/27
2. Basic Surveying Methods
Point location - Offset Methods
A B
2
1
D1
D2
d1
d2
Useful for mapping features
Not suitable where accuracy is required
8/11/2019 3c16 Presentation
9/27
2. Basic Surveying Methods
tandhH Ho
)(sin
sinsindhH
12
12Ho
Level Ground
Base Accessible
Level Ground
Base Not Accessible
Height Measurement
8/11/2019 3c16 Presentation
10/27
2. Basic Surveying Methods
sindH S
1So hsindhH
Height Measurement
H
H
Sloping Ground
Base Accessible
Observations to same heightabove ground
Sloping Ground
Base Accessible
Observations to different height
above ground
8/11/2019 3c16 Presentation
11/27
2. Basic Surveying Methods
)tantan(cosdH 122S2
2So1 sindhH
Height Measurement Sloping Ground
Base Accessible
Base and Top above and belowobserver
H1
H2
8/11/2019 3c16 Presentation
12/27
3. Planning a Survey
Careful Planning is needed
A single missed reading will make whole survey of novalue
Need to provide checks
Abstract raw data in field
Repeat readings if necessary before leaving site.
Remember an extra set of readings may take 15
minutes - but to remobilise and set up again may take
many hours
schedule breaks effectively.
8/11/2019 3c16 Presentation
13/27
3.2 Basic Requirements
A clear statement of purpose of survey is needed
e.g.
mapping vegetation boundaries; estimating river bank plan
shape or erosion rates;
determining flow characteristics in rivers;
establishing fixed reference stations for future use; locating the point at which a particular set of measurements
have been taken;
measurement of the profile of a slope;
assessment of regions liable to flooding.
scale of the map required (if relevant).
. The purpose of the survey will dictate the scale and
accuracy required and ultimately the methods to be used.
8/11/2019 3c16 Presentation
14/27
3.2 Basic Requirements
Secondary Planning Requirements include:-
what equipment is actually available what time is available
what man-power is available
what access and transport are available.
over what distance will the surveying party be spread duringthe surveying?
Will it be necessary to return to the same site at a later date
to take repeat measurements, and if so when (within a few
days, or several weeks or months later?). How will contact between members of the surveying team
be maintained at distance?
8/11/2019 3c16 Presentation
15/27
3.2 Basic Requirements
Mapping vegetation boundaries:
accuracy ~ 1:1000 (1 m is represented by 1 mm),
Suitable surveying methods:
compass and tape traverses,
chain and offset mapping,
point resection using a prismatic compass. height variations, Abney levels will often be adequate.
Alternative methods, if the equipment is available,
use of a surveyor's level and tachymetery,
use of electro-magnetic distance measurement.
8/11/2019 3c16 Presentation
16/27
3.2 Basic Requirements
Water Slope Measurement
Difference in water surface elevation in a riveris small,
Measurement requires accurate measurement of
height differences over distances which areusually between 10m and 500m apart.
A good surveying level for which the
collimation error is knownis required.
Otherwise river may appear to flow uphill!!
8/11/2019 3c16 Presentation
17/27
3.2 Basic Requirements
F ixed Control Points
Measurements will be needed to the nearest millimetre(centimetre) even if associated mapping detail is not
required at this level of accuracy.
Sometimes, such as in the vegetation survey, simple
methods can be used including prismatic compasses to
establish stations,
Control stations will be located more accurately using
a theodolite and associated equipment.
8/11/2019 3c16 Presentation
18/27
3.2 Basic Requirements
Surveying River Banks
Methods Radial Line Techniques using tachymetry for general plan
shape of meanders (general profile ~5m).
More accurate methods involving the establishment of shortpermanent base lines on the bank parallel to the long stream
direction of the river are needed for erosion studies.
accurate profiles of bank are determined using metre rule
offsets from this reference line to the edge of the river bank.
Decisions needed
what constitutes the edge of the channel?
~10 - 20 m
i i
8/11/2019 3c16 Presentation
19/27
3.2 Basic Requirements
Size of Survey Party:- what equipment is to be used for accuracy
access for vehicles
e.g.
a theodolite requires a tripod and targets
may also require targets mounted on tripodscould require a minimum of three tripods and ancillary
equipment.
Often makes sense to establish control stations separate
from detailed purpose of survey Communication
Radios
Flags?
Markers: Permanent: Temporary????
3 3 B ki f D
8/11/2019 3c16 Presentation
20/27
3.3 Booking of Data
in waterproof notebooks
should be logical should always be done in the field
if necessary it can be transcribed BUT the ORIGINAL
BOOKING MUST ALWAYS be accessible.
Cross checking should be booked in field Critical Information which should always be present
Purpose of Survey: (River Bank Mapping at Maes Mawr)
Date: Time: Weather:
Specific Location
Sketch of Area
BookersName:
ObserversName
3 4 P i ibl E
8/11/2019 3c16 Presentation
21/27
3.4 Permissible ErrorsSurveying Method Maximum Error
Prismatic Compass * 0.5o
Tripod Mounted Compass * 0.05o
Angular Measurement with a Level 0.1 - 1.0o
Angular Measurement using a theodolite
(depends on instrument). 1 - 20 seconds
Level transfer using a Surveyor's Level 20 mm per km
Distance measurement using tape1 part in 400+Distance measurement using catenary taping 1 part in 1500+
Distance measurement using a subtense bar -
depends on configuration 1 part in 2000 - 10000
Electro magnetic distance measurement * 5 mm irrespective of distance
Closing error in a compass and tape traverse 1 part in 400
Closing error in a theodolite and EDM traverse 1 part in 10000
Closing error on a set of angles at one station
(20 second instrument) * 20 seconds
Closing error in a triangle (20 second
instrument) * 30 seconds
3 5 T f E
8/11/2019 3c16 Presentation
22/27
3.5 Treatment of Errors
Systematic Errors
collimation errors in instrucments magnetic errors affecting all readings at a particular location
Systematic errors (unless large) can be compensated - will
always be present and calibration is important.
Random Errors observer variations in reading a scale
148.1 148.2 148.0 148.1 148.1
148.1 148.2 147.9 148.1 148.2Mean is 148.1 - standard deviation is 0.09
3 5 T t t f E
8/11/2019 3c16 Presentation
23/27
3.5 Treatment of Errors
SnedecorsRule
Number of
Observations
Approximation of
Standard Deviation
5 R / 2
10 R / 3
25 R / 4
50 R / 4.5
100 R / 5
Where R is range of readings
3 5 T t t f E
8/11/2019 3c16 Presentation
24/27
3.5 Treatment of Errors
Random Errors
148.1 148.2 148.0 148.1 148.1
148.1 148.2 147.9 149.3 148.2
Mean is 148.22 - should this value be used?
Exclude 149.3 and mean is 148.10
standard deviation is 0.10
value of 149.3 is 12 standard deviations from mean
and should be excluded.
Gross Errors should always be discarded
3 6 P i i f Ch k
8/11/2019 3c16 Presentation
25/27
3.6 Provision of Checks
Going to repeat a survey is time consuming
Always provide a checkpace out a distance
sight on three positions rather than basic two
if measuring three stations - take readings at all threestations- sum of angles should be 180o
For Level transfers
e.g. elevation profile of longstream of river
trace river from start to finish
transfer level back along back - differences should be same
if errors are unacceptable (e.g. 20 mm per 1 km) then repeat
until consistency is achieved
3 7 A l f B d Pl i
8/11/2019 3c16 Presentation
26/27
3.7 An example of Bad Planning
ENV students doing their third year project in 1992 in Derbyshire
needed to map meanders decided to use radial line method and tachymetry using level
measured A to RO
Lady
Bower
Reservoir
A
B
C
D
E
RO
moved to B
measured radial lines at A
measured radial lines at B
measured B to A
moved to C
etc
Despite careful planning points B, C, D and E
could not be located!
3 7 A l f B d Pl i
8/11/2019 3c16 Presentation
27/27
3.7 An example of Bad Planning
A
B
C
RO
What should have been done?
Before leaving Derbyshire, map
should have been plotted.
Before moving from A to B
measure A to B
When at B measure from B to A