3M3M is a Japanese concept derived for shopoor improvement
It contains 3 elimination activities
Since it starts with letter M it is called as3M
8/9/2019 3M NEW1
3/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Waste in Value System
8/9/2019 3M NEW1
4/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU!"W!S#$%MU! stands for eliminatin& 'on Value !ddedactivities
8/9/2019 3M NEW1
5/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
( #)*$S of MU!MUDA of Production (Over Production)
MUDA of Waiting
MUDA of Conveyance (Transport)MUDA of Over or Incorrect Processing
MUDA of Stock (Over Stock)
MUDA of Worken Moveent
MUDA of Defects
8/9/2019 3M NEW1
6/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of *+,U-#I,'*roduction more than re.uirement*roduction earlier than re.uirement
8/9/2019 3M NEW1
7/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of W!I#I'/Machine 0rea1down
ie 0rea1a&e or die pro0lem
*allet shorta&eie set up time "SM$%
8/9/2019 3M NEW1
8/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of -,'V$)!'-$*anel chan&in& from WI* pallets toespatch *allets
,peration pendin& production
Unnecessary movement of for1 lifts
Changingpanels from
WIP pallet toCC pallet
Operation
pendingproduction
8/9/2019 3M NEW1
9/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of -,'V$)!'-$
t size 4000 Nosty/trip 00 NosNo of trips !
Lot size 4000 NQty/trip "000 N
No of trips "
8/9/2019 3M NEW1
10/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of ,ver or Incorrect
*rocessin&*anels under&oes additional process tosatisfy the customer re.uirement
8/9/2019 3M NEW1
11/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of S#,-2,il sprayin& to avoid panel rust+ust cleanin& due to panel oil stain
*allet shorta&e for less stoc1 items
8/9/2019 3M NEW1
12/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of W,+2M$'
M,V$M$'#'on value added operator movement
No panel
di#erter
Paneldi#erter
a#aila$le
%i&cult to
pic' thepanel
(asy to pic'the panel
8/9/2019 3M NEW1
13/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU! of efects*roduction of defective parts
8/9/2019 3M NEW1
14/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU+I ",ver urden%MU+I stands for any activity that e4ceeds actualcapacity of $.uipment or ,perators
8/9/2019 3M NEW1
15/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Muri,ver0urdenin& people results in Safety and5uality pro0lems
,ver0urdenin& $.uipment causes rea1owns and efects6
8/9/2019 3M NEW1
16/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Use of 768 # for1 lift instead of 8 # for1 lift
9iftin& two dies at time with $,# crane
*ress over load due to dou0le panelloadin& in the die
ou0le sheet feedin& in shearin& machine
CORRECTWRONG
")*+" ,on-ith "),for'lift
")*+" ,on-ith ,for'lift
8/9/2019 3M NEW1
17/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
.train -hilemo#ing the
pallet
No .train-hile
mo#ing the
pallet
,-o dieslifted at time
One dielifted at time
8/9/2019 3M NEW1
18/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU+! "Unevenness%MU+! stands for any activity that containsinconsistency or ine:ective utili;ation
8/9/2019 3M NEW1
19/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
Unevenness results from an irre&ularproduction schedule or uctuatin& productionvolumes due to internal pro0lems< li1edowntime or missin& parts or defects6
Muda will 0e a result of Mura
MU!A (Unevenness)
8/9/2019 3M NEW1
20/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
MU+! "Unevenness%Une.ual allocation of wor1 to operators#he wor1 load for the last operator is not0alanced with other two operators
8/9/2019 3M NEW1
21/26
8/9/2019 3M NEW1
22/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
=ei>un1a "9evel out theWor1load%=ei>un1a is the levelin& of production 0y 0othvolume and product mi4
8/9/2019 3M NEW1
23/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
=ei>un1a "9evel out theWor1load%It does not 0uild products accordin& to theactual ow of customer orders< which can swin&up and down wildly6
It ta1es the total volume of orders in a periodand levels them out so the same amount andmi4 are 0ein& made each day6
8/9/2019 3M NEW1
24/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
#raditional"Unleveled%
Mi"ed Mode#Production($eve#ed)
8/9/2019 3M NEW1
25/26
8/9/2019 3M NEW1
26/26
ELIMINATE 3M
ACHIEVE WORLD CLASS MANUFACTURING
,o sustain Cost eduction eliminate these12 in shop 3oor)