    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    ELIMINATE 3M

  • 8/9/2019 3M NEW1

    2/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    3M3M is a Japanese concept derived for shopoor improvement

    It contains 3 elimination activities

    Since it starts with letter M it is called as3M

  • 8/9/2019 3M NEW1

    3/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    Waste in Value System

  • 8/9/2019 3M NEW1

    4/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU!"W!S#$%MU! stands for eliminatin& 'on Value !ddedactivities

  • 8/9/2019 3M NEW1

    5/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    ( #)*$S of MU!MUDA of Production (Over Production)

    MUDA of Waiting

    MUDA of Conveyance (Transport)MUDA of Over or Incorrect Processing

    MUDA of Stock (Over Stock)

    MUDA of Worken Moveent

    MUDA of Defects

  • 8/9/2019 3M NEW1

    6/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of *+,U-#I,'*roduction more than re.uirement*roduction earlier than re.uirement

  • 8/9/2019 3M NEW1

    7/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of W!I#I'/Machine 0rea1down

    ie 0rea1a&e or die pro0lem

    *allet shorta&eie set up time "SM$%

  • 8/9/2019 3M NEW1

    8/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of -,'V$)!'-$*anel chan&in& from WI* pallets toespatch *allets

    ,peration pendin& production

    Unnecessary movement of for1 lifts

    Changingpanels from

    WIP pallet toCC pallet

    Operation

    pendingproduction

  • 8/9/2019 3M NEW1

    9/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of -,'V$)!'-$

    t size 4000 Nosty/trip 00 NosNo of trips !

    Lot size 4000 NQty/trip "000 N

    No of trips "

  • 8/9/2019 3M NEW1

    10/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of ,ver or Incorrect

    *rocessin&*anels under&oes additional process tosatisfy the customer re.uirement

  • 8/9/2019 3M NEW1

    11/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of S#,-2,il sprayin& to avoid panel rust+ust cleanin& due to panel oil stain

    *allet shorta&e for less stoc1 items

  • 8/9/2019 3M NEW1

    12/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of W,+2M$'

    M,V$M$'#'on value added operator movement

    No panel

    di#erter

    Paneldi#erter

    a#aila$le

    %i&cult to

    pic' thepanel

    (asy to pic'the panel

  • 8/9/2019 3M NEW1

    13/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU! of efects*roduction of defective parts

  • 8/9/2019 3M NEW1

    14/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU+I ",ver urden%MU+I stands for any activity that e4ceeds actualcapacity of $.uipment or ,perators

  • 8/9/2019 3M NEW1

    15/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    Muri,ver0urdenin& people results in Safety and5uality pro0lems

    ,ver0urdenin& $.uipment causes rea1owns and efects6

  • 8/9/2019 3M NEW1

    16/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    Use of 768 # for1 lift instead of 8 # for1 lift

    9iftin& two dies at time with $,# crane

    *ress over load due to dou0le panelloadin& in the die

    ou0le sheet feedin& in shearin& machine

    CORRECTWRONG

    ")*+" ,on-ith "),for'lift

    ")*+" ,on-ith ,for'lift

  • 8/9/2019 3M NEW1

    17/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    .train -hilemo#ing the

    pallet

    No .train-hile

    mo#ing the

    pallet

    ,-o dieslifted at time

    One dielifted at time

  • 8/9/2019 3M NEW1

    18/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU+! "Unevenness%MU+! stands for any activity that containsinconsistency or ine:ective utili;ation

  • 8/9/2019 3M NEW1

    19/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    Unevenness results from an irre&ularproduction schedule or uctuatin& productionvolumes due to internal pro0lems< li1edowntime or missin& parts or defects6

    Muda will 0e a result of Mura

    MU!A (Unevenness)

  • 8/9/2019 3M NEW1

    20/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    MU+! "Unevenness%Une.ual allocation of wor1 to operators#he wor1 load for the last operator is not0alanced with other two operators

  • 8/9/2019 3M NEW1

    21/26

  • 8/9/2019 3M NEW1

    22/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    =ei>un1a "9evel out theWor1load%=ei>un1a is the levelin& of production 0y 0othvolume and product mi4

  • 8/9/2019 3M NEW1

    23/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    =ei>un1a "9evel out theWor1load%It does not 0uild products accordin& to theactual ow of customer orders< which can swin&up and down wildly6

    It ta1es the total volume of orders in a periodand levels them out so the same amount andmi4 are 0ein& made each day6

  • 8/9/2019 3M NEW1

    24/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    #raditional"Unleveled%

    Mi"ed Mode#Production($eve#ed)

  • 8/9/2019 3M NEW1

    25/26

  • 8/9/2019 3M NEW1

    26/26

    ELIMINATE 3M

    ACHIEVE WORLD CLASS MANUFACTURING

    ,o sustain Cost eduction eliminate these12 in shop 3oor)