PP End User Training – SAP (Level – 3) 16 th December - 2013
Transcript

PP End User Training – SAP (Level – 3) 16th December - 2013

Page 2 An HCC Group companyCTM Training - ATEPresentation Title

This presentation contains certain forward looking statements concerning future business prospects and profitability of Highbar

Technologies Limited, which are subject to a number of risks and uncertainties and actual results could materially differ from those

in such forward looking statements, important developments that could affect the company's operations include a downtrend in

the information technology and infrastructure sectors, significant changes in political and economic environment in India, tax laws,

labor relations, litigation etc. The company does not undertake to make any announcement in case any of these forward looking

statements become materially incorrect in future or update any forward looking statements made from time to time by or on

behalf of the company.

All rights reserved. Copyright with Highbar Technologies Limited. Highbar is a trademark of Highbar Technologies Limited & other

names, logos are trademarks of their respective owners.

DISCLAIMER

Page 3 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 4 An HCC Group companyCTM Training - ATE

Objective

• Should be able to execute the Steps of process in the system

• Understand end to end process with integration with Processes

• Understand the process integration with other systems

• Understand the validations & controls in system.

Page 5 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 6 An HCC Group companyCTM Training - ATE

General Information

• Current Stage of the project

• Landscape details for testing

• Other information

• Schedule of Training

Page 7 An HCC Group companyCTM Training - ATE

General Inforn.– Road Map Of ATE SAP Implementation

Project Preparation Business Blueprint RealizationFinal

PreparationGo-live & Support

Training-Level1

Workshop

System design

BPD

System handing over

On going support

Prepare Project Plan

Receive hardware

Receive software

Mobilize project team

‘Business Projects’ scope

AS-IS Study/Clarificatio

n

1 23

4 5

O n g o i n g k n o w l e g d e t r a n s f e r b e t w e e n H I G H B A R a n d A T E C o r e t e a m

Enabled project TeamSystem

understanding & Gap identification

Understanding and concept s Buy In

Documentation and end user

comfort

Ongoing support and continuous

improvement

End user training

Finalize cutover data

Finalize master data

Developments

Internal System testing – SIT - 1

CTM Training

18/11/201209/02/2013

08/05/201305/07/2013 06/07/2013

Stabilization & BI-BO Impl.

6

System Config

18/11/201210/03/2013

30/11/201331/12/2013 09/01/2014

Completed

In process

Planned date

Revised Date

LEGEND

16.12.2013

UAT

Page 8 An HCC Group companyCTM Training - ATE

Stores

Unrestricted stock at Storage Location

General Information – Landscape details for Testing

Contractor

Client No

100

Configuration

-----------------------

Client No

120/150

ABAP development

Development Server

Client No

200

CTM Training&

SIT - Testing

-----------------------

Client No

210

End User

Quality Server

Client No

300

ProductionServer

Page 9 An HCC Group companyCTM Training - ATE

General Information – Other

• Attend the full sessions of the training

• Please make this sessions interactive

• Carry out the testing by the way of exercises given in training

• Appraise process owners about change processes if required.

• Practice in system by executing the transaction in system post training

• We should discourage the discussions around the process mapped in system

• Process observations if any shall be recorded separately for clarification later

Page 10 An HCC Group companyCTM Training - ATE

General Information – Schedule of Training

Page 11 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 12 An HCC Group companyCTM Training - ATE

PP Organization Structure

Page 13 An HCC Group companyCTM Training - ATE

PP Organization Structure - Plant

Page 14 An HCC Group companyCTM Training - ATE

PP Organization Structure – Storage Location

Page 15 An HCC Group companyCTM Training - ATE

Organizational Structure - Plant

Page 16 An HCC Group companyCTM Training - ATE

Organizational Structure - Plant

Page 17 An HCC Group companyCTM Training - ATE

Organizational Structure – Storage Location

Page 18 An HCC Group companyCTM Training - ATE

Organizational Structure – Storage Location

Page 19 An HCC Group companyCTM Training - ATE

Organizational Structure – Storage Location

Page 20 An HCC Group companyCTM Training - ATE

Organizational Structure – Storage Location

Page 21 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 22 An HCC Group companyCTM Training - ATE

PP Master Data

Long Term Planning ( Block,Interlock,Kerbstone,Crusher)

Make To Stock production planning & execution (Block,Interlock,Kerbstone,Crusher)

Make To Order production planning & execution – Sales Order MRP ( Pre-casting )

List of Processes

Page 23 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 24 An HCC Group companyCTM Training - ATE

PP Master Data – Sub Processes

Production Planning & Control –

Master Data

Maintain Bill Of Material

Maintain Work center

Maintain Routing

Interdepartmental – Master Data

Activity Master

Cost Center

Page 25 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 26 An HCC Group companyCTM Training - ATE

PP Master Data – Key Terms & Concepts

Material Master:

• Material Master contains all the information, for all the material‘s, that company Procures,

Produces, Stores and Sales.

• Material Type (Similar Basic Attributes) - Raw Material (ZRAW) and FG (ZFIN).

• Production Area related Information – Basic Data1, MRP1, MRP2, MRP3, MRP4 & Work

Scheduling

Page 27 An HCC Group companyCTM Training - ATE

PP Master Data – Key Terms & Concepts

Bill Of Material:• The Bill Of Material is a complete formally structured list of the components that make up a

product.

• Different BOM can be used – Company Usage Area wise e.g. Costing, Production etc.

• BOM Header: Base Quantity, Active/Inactive Status

• BOM Item Details: Material No, Quantity, UOM, Item Category, Production plant.

• BOM Data is used by activities MRP, Work Scheduling, Procurement, Product Costing.

• Multi-Level Explosion: MRP, Product Cost and Production Order

Page 28 An HCC Group companyCTM Training - ATE

PP Master Data – Key Terms & Concepts

Work Center:

• Work center is the place where an operation or activity is carried out within a plant

• Work center: Represents as general as geographical location or as specific as a particular

M/C/Production Line within a department or Person or Group of Persons performing a job.

• Based on Usage Selection: Decides different Task Lists e.g. Routing, Rate Routing & Insp Plan

• Work Center: SAP Plant Level

• Work Center View: Basic data, Default values, Capacities, Scheduling and Costing

Page 29 An HCC Group companyCTM Training - ATE

PP Master Data – Key Terms & Concepts

Routing:

• A routing contains the operations to be performed, their sequence and the various work

centers involved to manufacture an item.

• Routing: Standard Values (Times) for activities such as setup and processing.

• Control Key for Internal or External Operations

• Material Operation Components Assignment

• Production resources / tools.

• Inspection Characteristics (Inspection Specification)

Page 30 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 31 An HCC Group companyCTM Training - ATE

PP Master Data – Process Flow

Page 32 An HCC Group companyCTM Training - ATE

PP Master Data - Process Flow

Page 33 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 34 An HCC Group companyCTM Training - ATE

PP Master Data - ScenariosBill Of Material (BOM):

• Standard Bill Of Material

Sales Order Bill Of Material (BOM):

• Sales Order BOM

Work center

• Work Center

Routing

• Standard Routing

Page 35 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 36 An HCC Group companyCTM Training - ATE

PP Master Data - Highlights

Material Master:Material Types: ZRAW, ZFIN

Price Control ZRAW: ‘V’ Moving Average Price

Price Control ZFIN: ‘S’ Standard Price

Material BOM:Material BOM Usage: 1 i.e. Production

Page 37 An HCC Group companyCTM Training - ATE

PP Master Data - Highlights

Sales Order BOM:

Material BOM Usage: 3 i.e. Universal

Work center:Work Center Category: 0001 i.e. Machine

Routing:Task List Type: N i.e. Routing

Page 38 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 39 An HCC Group companyCTM Training - ATE

‘MTS PP’ Master Data – Process Change

1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance

with MRP Parameters

2. Cross Plant Planning: Special Procurement Key Maintenance in

‘ZFIN’ material type material master at receiving plant.

3. Joint Production: Co-Product setting and Cost Apportion

Structure Maintenance in ‘ZFIN’ material type material master.

4. Work center creation with available capacity requirements for

representing total Batching Plant Production Capacity.

5. Work center creation with cost center & activity master details

6. Routing creation with Planned Activity Values

Page 40 An HCC Group companyCTM Training - ATE

‘MTO PP’ Master Data – Process Change

1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance

with MRP Parameters

2. ‘ZRAW’ Material Type Maintenance with Procurement details

i.e. Individual and Collective.

3. Work center creation with available capacity requirements for

representing total Batching Plant Production Capacity.

4. Work center creation with cost center & activity master details

5. Routing creation with Planned Activity Values

Page 41 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process - PP Master Data

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 42 An HCC Group companyCTM Training - ATE

PP Master Data - Transaction Codes

Page 43 An HCC Group companyCTM Training - ATE

PP Master Data - Transaction Codes

Page 44 An HCC Group companyCTM Training - ATE

PP Master Data - Transaction Codes

Page 45 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 46 An HCC Group companyCTM Training - ATE

Long Term Planning – Key Terms & Concepts

Long Term Planning: • Long term planning is used to analyse the production capacity load situation and material

dependent requirements required for the production. Duration of LTP analysis can be from a

one month to the years, subject to the realistic sales and production projections availability.

Planning Scenario: • Planning scenario to determines the control parameters for long-term planning. This includes

the plant where long-term planning is to be carried out, the planning period, and the

independent requirements versions to be planned. Planning Scenario represents a particular

division or a particular business area.

Inactive Planned Independent Requirements Version :

• LTP is carried out with inactive Planned Independent Requirements version.

• Version ‘02’ is used for this purpose.

Page 47 An HCC Group companyCTM Training - ATE

Long Term Planning – Key Terms & Concepts

LTP MRP Run (MS02 or MSBT): • Long term planning MRP Run is carried out separately i.e. It is not part of operative planning.

LTP MRP run can be carried out in foreground MS02 or background MSBT. Frequency of

background MRP Run can be monthly or multiple months.

LTP Evaluation (MS05 or MS04): • Long term planning MRP evaluation is carried out separately i.e. It is not part of operative

planning. LTP evaluation is done once MRP Run takes place or it can be dynamically done as

required.

LTP Material Analysis (MCEC/MCEB): • Long term planning Material Analysis is possible only if material master is created with

procurement type ‘F’.

Page 48 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 49 An HCC Group companyCTM Training - ATE

Long Term Planning - Process Flow

Page 50 An HCC Group companyCTM Training - ATE

Long Term Planning – Steps & Reports

Page 51 An HCC Group companyCTM Training - ATE

Long Term Planning – Steps & Reports

Page 52 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 53 An HCC Group companyCTM Training - ATE

Long Term Planning - Scenarios

• LTP With Capacity Planning & Material Analysis

Page 54 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 55 An HCC Group companyCTM Training - ATE

Long Term Planning - Highlights

Current Stock:

• LTP Considers current material stock during planning.

Firm Receipts:

• LTP Considers current firm receipts e.g. purchase orders, production orders from operative

planning.

• Firm Purchase Requisitions and firm planned orders are also considered during LTP planning

Customer Receipts:

• LTP Considers current customer orders from operative planning

LTP Capacity Analysis (CM38):

• LTP Capacity Analysis is done to analyze any future bottlenecks in terms of machine capacity

availability.

Page 56 An HCC Group companyCTM Training - ATE

Long Term Planning - Highlights

LTP Material Analysis (MCEC & MCEB):

• LTP Material Analysis is done for a particular material or for a particular material group.

• As per material forecasting PO Value, Order Quantity and PO Price is possible to analyze.

Page 57 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 58 An HCC Group companyCTM Training - ATE

Long Term Planning – Process Change

1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance

with MRP Parameters

2. Cross Plant Planning: Special Procurement Key Maintenance in

‘ZFIN’ material type material master at receiving plant.

3. Work center creation with LTP Setting

4. Work center creation with available capacity requirements for

representing total available Production Capacity.

5. Routing creation with Planned Activity Values – Capacity

Planning

6. LTP – Planning Scenario Creation and Maintenance

(MS31/MS32/MS3)

7. LTP – Inactive Version Planned Independent Creation (MD61)

Page 59 An HCC Group companyCTM Training - ATE

Long Term Planning – Process Change

8. LTP – MRP Run (MS02)

9. LTP – Stock Requirement List (MS04)

10. LTP – MRP List (MS05)

11. LTP – Setting Purchase Info Records

12. LTP Material Analysis (MCEC/MCEB)

13. LTP Work center Capacity Planning (CM38)

Operative Planning:

14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to

Operative Planning (MS66)

15. ‘ZFIN’ Material Type – LTP Planned Independent Requirements

Copy to Operative Planning (MD61)

Page 60 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Long Term Planning

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 61 An HCC Group companyCTM Training - ATE

Long Term Planning - Transaction Codes

Page 62 An HCC Group companyCTM Training - ATE

Long Term Planning – Master Data

1. Material Master – (Finish Good’s, Raw Materials)

2. Bill Of Material – Material BOM

3. Work Center

4. Routing

Page 63 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 64 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Sub Processes

1. Make To Stock Planning & Execution with Planning Strategy 10

2. Make To Stock Planning & Execution with Joint Production ( Crusher )

Page 65 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 66 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Make To Stock: • Make To Stock production environment produces good’s, products based on sales or

production forecast. The production planning and execution activities takes place before

receipt of firm customer orders. With this production environment it is possible to respond to

customer orders fast with short lead time.

Demand Management:• Demand Management consists of creation of planned independent requirements based on

sales or production forecast. PIR are transferred to production planning & execution once

MRP run takes place.

MRP Run:• MRP i.e. Material Requirement Planning ensures material availability for in-house and

external procurements. It transfers MTS requirements from demand management as well as

a particular sales order requirements to production planning and execution. MRP Run also

takes care of special procurement e.g. cross plant planning.

Page 67 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – key Terms & Concepts

Cross Plant Planning: • Cross plant planning insures stock transfer reservations across production plant. During MRP

Run at receiver plant, stock transfer reservations are created in sender plant. The stock

transfer can be done from available stock or if shortage is there, then production is done

against stock transfer reservations. Special procurement key 40, 41 and 42 is used for this

purpose.

Planned Order:• Planned Order is generated after MRP Run for in-house production as well as for external

procurements. Capacity planning (finite scheduling) is done for in-house production on the

basis of Planned order. Material availability is checked on the basis of planned order. Planned

Orders are further converted to production orders for in-house production and to purchased

orders for external procurements.

• Planned Orders are changed or deleted during MRP run

• Planned Order can be manually generated if MRP run is not applicable in process.

• Firm planned orders are not changed or deleted during MRP run.

Page 68 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Planned Order

Page 69 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Joint Production (Crusher Only): • Joint Production SAP functionality is applicable when there is requirement to simultaneously

produce multiple finish good’s materials. Total cost of production is distributed on all

valuated finish good’s produced.

Co-Product: • Co-Product are valuated materials produced along with main finish good. Total Cost of

production is apportioned on co-product.

Cost Apportion Structure:

• Cost Apportion structure is created in main finish good material master. Total cost of

production is apportioned on main production material and co-products as per this cost-

apportion structure. Total of equivalence numbers for all FG materials in cost apportion

structure is equal to 1000. Bill of material is the basis for defining cost-apportion structure.

Page 70 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Co-Product

Page 71 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Cost Apportion Structure

Page 72 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order: • Production order is created, to start the production of a material within a plant and to specify

the material and quantity that will be produced. It decides the work location (capacity) that is

used, which operations are required and the date on which production takes place. It also

defines the Planned/Target production cost for the given production quantity.

• Production Orders are considered as firm requirements.

• Production order is released for production as per production plan.

Production Order Type:• Production Order type decides control parameters for a particular production order.

• Production Order types are configured in background.

• Production Order Type defined at a particular division level.

• Production Order type decides number range. Internal number range is followed at client

level.

Page 73 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order System Status• Production Order system status is automatically updated once a particular business

transaction is carried out.

• It is not possible to modify any of the production order system status.

Production Order User Status• Production Order user status is automatically updated once a particular business transaction

is carried out.

• It is possible to modify any of the production order user status.

• User status is activated based on business transaction

• Authorization is required to modify any of the production order user status.

Page 74 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – System Status/User

Status

Page 75 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Production Order

Page 76 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Production Order Types

Page 77 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order Good’s Issue (GI): • Raw Materials are issued against production order. Actual material consumption is booked

during Good’s Issue against production order as and when material is physically issued.

• Production Order GI is integrated with Store and Account departments.

• Raw Material can be handled in batches.

Production Order GI Transactions: • MIGO: Store person issue Good’s Issue through normal MM transaction.

Page 78 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order Operation Confirmation:• Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against

production order. Machine and Manpower confirmation is done on daily basis.

• Planned Production Overhead confirmation can be done on daily basis. Difference between

plan and actual is posted at the end of the month once actual data is available by production

order confirmation.

• Yield, Scrap and Rework is booked during production execution. Scrap declared during

production confirmation is not placed in stock.

Page 79 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Production Ord.

Confirmation

Page 80 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order Good’s Receipt (GR):• Production Order Good’s Receipt is done (TCode MIGO) to declare production and to place

finish good’s in to stock.

• Production Order GR is integrated with Store and Account departments.

• Target Cost is updated in a production order for GR Quantity delivered.

• With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches.

• Marble Tiles Line (TCode COWBHUWE): GR Posting with Handling Unit

Page 81 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Material Document

Page 82 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order Locking:• Production Order is temporary restricted for transactions by locking production order.

• Once decision is to continue production, production order is un-locked

Production Order Technical Completion (TECO): • Production Order is logistically completed at the end of the production activities.

• TECO system status is updated once production order is technically completed.

• GI, Production Confirmation and GR is not possible once production order is technically

completed.

• ‘DAC’ (Disallow Cost) user status is updated once technical completion is done.

Authorization is required to revert this user status.

Page 83 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Key Terms & Concepts

Production Order Settlement: • Technical completion is prerequisite to settle production order.

• Production Order CO settlement is done at the end of period i.e. at the end of month by

costing person. Production order balance becomes zero after production order settlement.

Production Order Business Completion (CLSD): • Production Order business completion is done once production order is settled. Business

completion is possible only if Production order balance becomes zero.

• This activity is normally carried out by Costing person.

Page 84 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 85 An HCC Group companyCTM Training - ATE

ATE Group – Process Matrix

Page 86 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Process Flow

Page 87 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Process Flow

Page 88 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Steps & Reports

Page 89 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Steps & Reports

Page 90 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Steps & Reports

Page 91 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 92 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Scenarios

MTS Planning:

A. MTS Planning

• MTS Demand Management – Copy PIR from LTP Planning

• MTS Manual Planned Order

B. MTS Execution

• MTS

• MTS with Joint Production

Page 93 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 94 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Highlights

Planned Independent Creation:• Copy from LTP

MRP Group:• MRP Group: Z004 - MTS (10) Manufacturing

MRP Strategy:

• MRP Strategy: 10

Page 95 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Highlights

Planned Order Profile:

• Planned Order Profile: LA

Production Order GI:

• Production Order is Debited at the time of Good’s Issue

Production Order Confirmation:• Production Order is Debited at the time of Production Operation Confirmation

Page 96 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Highlights

Production Order GR:

• Production Order is Credited at the time of Production Good’s Receipt

Production Order Variance:

• Production Order variance is calculated on the basis of Target Cost.

• Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed

• Difference between Target cost and Actual Cost is settled as per production order settlement

rule, on production variance account and cost center.

Page 97 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 98 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Process Change

1. Planned Dependent Requirement (MD61) - ‘ZFIN’ Material Type

– LTP Planned Independent Requirements Copy to Operative

Planning (MD61)

2. MRP Run (MD03/MDBT)

3. MRP List (MD05)

4. Stock Requirement List (MD04)

5. Planned Order Maintenance

6. Capacity Planning

7. Capacity Leveling

8. Planned Order Conversion to Production Order (Partial /

Complete)

9. Production Order Capacity Planning

10. Production Order Capacity Evaluation

11. Production Order Release

Page 99 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Process Change

12. Raw Material Availability Check – For a particular production

order (lot).

13. Good’s Issue – Actual Qty for a particular production order (lot).

14. Activity Confirmation – Actual Machine/Manpower Hrs for a

particular production order (lot).

15. Target Cost Run – ‘ZFIN’ material type.

16. Good’s Receipt – Good’s Receipt to declare Stock of Finish

Good for a particular production order (lot).

17. Activity Confirmation – Actual Overheads for a particular

production order (lot).

18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis

19. Production Order Technical Completion

20. Production Order Settlement

Page 100 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Process Change

Operative Planning:

14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to

Operative Planning (MS66)

15. ‘ZRAW’ Material Type – Planning on the basis of Production

Order Reservations.

Page 101 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Stock Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 102 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Transaction Codes

Page 103 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Transaction Codes

Page 104 An HCC Group companyCTM Training - ATE

MTS Planning & Execution - Transaction Codes

Page 105 An HCC Group companyCTM Training - ATE

MTS Planning & Execution – Master Data

1. Material Master – (Finish Good’s, Raw Materials)

2. Bill Of Material – (Material BOM)

3. Work Center

4. Routing

Page 106 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 107 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Sub Processes

1. Make To Order Planning & Execution with Sales Order MRP

Page 108 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 109 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Make To Order: • Make To Order production environment produces good’s, products based on sales orders. The

production planning and execution activities takes place only after receipt of firm customer

orders. With this production environment it is possible to respond to minimize production

inventory as well as this process caters effectively to deliver finish good’s with short shelf

life e.g. Ready Mix Concrete etc.

Sales Order:• Sales Order is created against contract based on customer delivery Schedule and delivery

confirmation. System treats each schedule line as a separate procurement item. Production

is done separately against each schedule line.

Page 110 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Sales Order MRP Run:• MRP i.e. Material Requirement Planning ensures material availability for in-house and

external procurements. It transfers customer requirements from a sales order requirements

to production planning and execution. MRP Run also takes care of in-house production as well

as external procurements.

Planned Order:• Planned Order is generated after MRP Run for in-house production as well as for external

procurements. Capacity planning (finite scheduling) is done for in-house production on the

basis of Planned order. Material availability is checked on the basis of planned order. Planned

Orders are further converted to production orders for in-house production and to purchased

orders for external procurements.

• Planned Orders are changed or deleted during MRP run

• Planned Order can be manually generated if MRP run is not applicable in process.

• Firm planned orders are not changed or deleted during MRP run.

Page 111 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Planned Order

Page 112 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Planned Order

Page 113 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order: • Production order is created, to start the production of a material within a plant and to specify

the material and quantity that will be produced. It decides the work location (capacity) that is

used, which operations are required and the date on which production takes place. It also

defines the Planned/Target production cost for the given production quantity.

• Production Orders are considered as firm requirements.

• Production order is released for production as per production plan.

Production Order Type:• Production Order type decides control parameters for a particular production order.

• Production Order types are configured in background.

• Production Order Type defined at a particular division level.

• Production Order type decides number range. Internal number range is followed at client

level.

Page 114 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order System Status• Production Order system status is automatically updated once a particular business

transaction is carried out.

• It is not possible to modify any of the production order system status.

Production Order User Status• Production Order user status is automatically updated once a particular business transaction

is carried out.

• It is possible to modify any of the production order user status.

• User status is activated based on business transaction

• Authorization is required to modify any of the production order user status.

Page 115 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – System Status/User

Status

Page 116 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Production Order

Page 117 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Production Order Types

Page 118 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order Good’s Issue (GI): • Raw Materials are issued against production order. Actual material consumption is booked

during Good’s Issue against production order as and when material is physically issued.

• Production Order GI is integrated with Store and Account departments.

• System handles individual or collective procurements as per the setting in raw material,

material master

• Raw Material can be handled in batches.

Production Order GI Transactions: 1. MIGO: Store person issue Good’s Issue through normal MM transaction.

2. CO11N (Sohar Marble Slab Line only): Material is issued through production order

confirmation transaction. Here the input batches are linked with production order.

Page 119 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order Operation Confirmation:• Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against

production order. Machine and Manpower confirmation is done on daily basis.

• Planned Production Overhead confirmation can be done on daily basis. Difference between

plan and actual is posted at the end of the month once actual data is available by production

order confirmation.

• Yield, Scrap and Rework is booked during production execution. Scrap declared during

production confirmation is not placed in stock.

Page 120 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Production Ord.

Confirmation

Page 121 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order Good’s Receipt (GR):• Production Order Good’s Receipt is done to declare production and to place finish good’s in to

stock.

• Here production good’s are places in special stock with reference to a particular sales order.

• Production Order GR is integrated with Store and Account departments.

• Target Cost is updated in a production order for GR Quantity delivered.

• With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches.

Page 122 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Material Document

Page 123 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Sales Order Stock Transfer:• Sales Order stock can be transferred from one sales order to another, by a separate

transaction.

• Unrestricted stock can be transferred to Sales Order stock, by a separate transaction.

• Sales Order stock can be transferred to Unrestricted stock, by a separate transaction.

Page 124 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order Locking:• Production Order is temporary restricted for transactions by locking production order.

• Once decision is to continue production, production order is un-locked

Production Order Technical Completion (TECO): • Production Order is logistically completed at the end of the production activities.

• TECO system status is updated once production order is technically completed.

• GI, Production Confirmation and GR is not possible once production order

• ‘DAC’ (Disallow Cost) user status is updated once technical completion is done.

Authorization is required to revert this user status.

Page 125 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Key Terms & Concepts

Production Order Settlement: • Technical completion is prerequisite to settle production order.

• Production Order CO settlement is done at the end of period i.e. at the end of month by

costing person. Production order balance becomes zero after production order settlement.

Production Order Business Completion (CLSD): • Production Order business completion is done once production order is settled. Business

completion is possible only if Production order balance becomes zero.

• This activity is normally carried out by Costing person.

Page 126 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 127 An HCC Group companyCTM Training - ATE

ATE Group – Process Matrix

Page 128 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Process Flow

Page 129 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Process Flow

Page 130 An HCC Group companyCTM Training - ATE

MTO-ATO Planning & Execution – Steps & Reports

Page 131 An HCC Group companyCTM Training - ATE

MTO-ATO Planning & Execution – Steps & Reports

Page 132 An HCC Group companyCTM Training - ATE

MTO Sales Ord. MRP Planning & Execution – Steps &

Reports

Page 133 An HCC Group companyCTM Training - ATE

MTO Sales Ord. MRP Planning & Execution – Steps &

Reports

Page 134 An HCC Group companyCTM Training - ATE

MTO Sales Ord. MRP Planning & Execution – Steps &

Reports

Page 135 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 136 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Scenarios

MTO Planning:

A. MTO Planning

• MTO Planning – With Individual and Collective Procurement

• MTO Planning – With Collective Procurement

B. MTO Execution

• MTO

Page 137 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 138 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Highlights

MRP Group:

• MRP group: Z002 - MTO (20)

MRP Strategy:

• MRPP Strategy: 20

Page 139 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Highlights

Planned Order Profile:

• Planned Order Profile: KD

Production Order GI:

• Production Order is Debited at the time of Good’s Issue

Production Order Confirmation:• Production Order is Debited at the time of Production Operation Confirmation

Page 140 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Highlights

Production Order GR:

• Production Order is Credited at the time of Production Good’s Receipt

Production Order Variance:

• Production Order variance is calculated on the basis of Target Cost.

• Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed

• Difference between Target cost and Actual Cost is settled as per production order settlement

rule, on production variance account and cost center.

Page 141 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 142 An HCC Group companyCTM Training - ATE

‘MTO – Sales Order MRP’ Planning & Execution – Process

Change1. Sales Order MRP Run (MD50)

2. MRP List (MD05)

3. Stock Requirement List (MD04)

4. Planned Order Maintenance

5. Capacity Planning

6. Capacity Leveling

7. Planned Order Conversion to Production Order (Partial /

Complete)

8. Planned Order Conversion to Purchase Requisition – External

Procurement

9. Production Order Capacity Planning

10. Production Order Capacity Evaluation

11. Production Order Release

Page 143 An HCC Group companyCTM Training - ATE

‘MTO – Sales Order MRP’ Planning & Execution – Process

Change12. Raw Material Availability Check – For a particular production

order (lot).

13. Good’s Issue – Actual Qty for a particular production order (lot).

14. Activity Confirmation – Actual Machine/Manpower Hrs for a

particular production order (lot).

15. Sales Order Cost Run – ‘ZFIN’ material type.

16. Good’s Receipt – Good’s Receipt to declare Stock of Finish

Good for a particular production order (lot).

17. Activity Confirmation – Actual Overheads for a particular

production order (lot).

18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis

19. Production Order Technical Completion

20. Production Order Settlement

Page 144 An HCC Group companyCTM Training - ATE

Agenda Objective

General Information

PP SAP Org. Structure

List of Processes

Process – Make To Order Planning & Execution

Sub Processes

Key Terms & Concepts

Process flow with steps & Reports

Scenarios in Process

Highlights of process

Process Change

SAP T-codes & Master data to be used

DMS documents to be attached

Exercise

Assessment Questionnaire

Page 145 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Transaction Codes

Page 146 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Transaction Codes

Page 147 An HCC Group companyCTM Training - ATE

MTO Planning & Execution - Transaction Codes

Page 148 An HCC Group companyCTM Training - ATE

MTO Planning & Execution – Master Data

1. Material Master – (Finish Good’s, Raw Materials)

2. Bill Of Material – (Material BOM, Sales Order BOM)

3. Work Center

4. Routing


Recommended