+ All Categories
Home > Business > 4. municipality of dzierzoniow

4. municipality of dzierzoniow

Date post: 19-Jul-2015
Category:
Upload: 50001seaps-2nd-training-session
View: 209 times
Download: 0 times
Share this document with a friend
Popular Tags:
14
Energy Management System based on the PN-EN ISO 50001 - implementation in Dzierzoniów 50000 and 1 SEAPs Integrating energy action planning and energy management systems Barcelona, 1 st October 2014
Transcript
Page 1: 4. municipality of dzierzoniow

Energy Management System based on the PN-EN ISO 50001

- implementation in Dzierzoniów

50000 and 1 SEAPs Integrating energy action planning and energy management systems

Barcelona, 1st October 2014

Page 2: 4. municipality of dzierzoniow

Dzierzoniów’s vision: The city of initiatives, entrepreneurship, social development and sport. Dzierzoniów’s mission: Improving the quality of life through creating a climate for business and sport. The City Hall mission Implementation of the Strategy for Sustainable Local Development and friendly customer service

1999 - Implementation of the Quality Management System ISO 9002

2002 - Implementation of amended ISO:9001 standard

2006 - Implementation of Integrated Management System ISO:9001, ISO:14001, ISO:18001.

2013 – Implementation of Energy Management System according to the PN-EN ISO 50001

Dzierżoniów steps to succesful implementation of the Integrated Quality Management System

Page 3: 4. municipality of dzierzoniow
Page 4: 4. municipality of dzierzoniow
Page 5: 4. municipality of dzierzoniow

•  optimization of all processes for more energy saving; •  raising staff awareness of energy costs •  savings from more efficient energy use •  image of the organization as engaged in

environmental protection •  integration of the Energy Management System with

other existing systems •  reducing the risk associated with energy security

ISO 50001 - implementation benefits

Page 6: 4. municipality of dzierzoniow

The process of certification by an accredited certification body was held in June 2013 with a positive result!

Auditors comments

Strenghts:

•  system based on the risk analysis and assessment •  logical implementation of the requirements of the PN-EN

ISO 50001:2012 standard, taking into account the financial circumstances and the specificity of the city hall

•  indication of actions to raise energy awareness among the citizens (including pre-school children and students)

Page 7: 4. municipality of dzierzoniow

Areas for improvement: •  further integration of the Energy Management

System with the other modules of the Integrated Management System

The certificate of IQNet (International Certification Network) issued on July 2013

Page 8: 4. municipality of dzierzoniow

What does the documentation for the Energy Management System in Dzierżoniów consist of?

•  energy policy; •  system description and link to the IMS; •  the procedure of legal requirements; •  the register of legal requirements; •  energy management objectives and tasks; •  instructions for energy use and savings in municipal

buildings; •  review of the energy consumption and baseline emission

inventory •  the procedure for monitoring energy consumption

(electricity, heat and gas) Other important procedures are included in the IMS Book

Page 9: 4. municipality of dzierzoniow

Introduced, certified and supervised system ensures also compliance with local and national legal requirements and EU Directives on Energy Services and Greenhouse Gas Emission Reduction.

The system approach is the same as in other systems, based on the methodology of Plan-Do-Check-Act – Deming Cycle

Page 10: 4. municipality of dzierzoniow

§  PLAN: Identify and analyze the problem – plan a better way of acting, better method §  DO: Develope and test a potential solution §  CHECK: Analyze if the test solution really brings better results §  ACT: Implement the improved solution

Deming Cycle

Page 11: 4. municipality of dzierzoniow

The certificate is valid for three years, but every year the inspection audit is conducted.

The results of the audit confirm the validity of the certificate and check the use of adopted standards.

In case of significant deviations (non-compliance with the standard) certificate may be withdrawn.

Page 12: 4. municipality of dzierzoniow

EMS SEAP ?

The tasks of the SEAP are included in the plan of EMS energy tasks for the following years But: all activites depend on the capacity of the municipal budget

Page 13: 4. municipality of dzierzoniow

in the EMS implementation process in Dzierżoniów

1. Expansion of the system on all municipal units 2. Integration of the Energy Management System

with other management systems (already operating) in Dzierżoniów

The main challenges

Page 14: 4. municipality of dzierzoniow

Zygmunt Kuc the head of Department of Urban Engineering

[email protected]

Thank you for your attention!


Recommended