1

DOMESTIC WATER SUPPLY

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 2: 4- Plumbing MEP - Water-Rev

2

DEFINITION OF WATER SUPPLY

Water supply system means the water service pipe, the water distributing pipes, and the and the necessary connecting pipes, fittings, control valves and all appurtenances within the building or it may be outside the building, within the property boundary.

Water service pipe :-

"Water service pipe" means the pipe from the water main or other source of water supply to the water distributing system of the building served.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 3: 4- Plumbing MEP - Water-Rev

3

USAGE OF WATER

DOMESTIC :- The average daily domestic requirement of water like bathing, cooling, washing and toilet flushing for different type of building.

AIR CONDITIONING AND VENTILATION SYSTEM :- Large quantities of water are required for building equipped with evaporative cooled air conditioning/ refrigeration. In both cases the heat absorbed in the cooling equipment is exchanged with atmospheric air by spraying water on cooling tower.

SPECIAL REQUIREMENTS :- Water is required in buildings having laboratories, laundries, kitchens or other processes requiring water.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 4: 4- Plumbing MEP - Water-Rev

4

USAGE OF WATER

SWIMMING POOLS :- Large quantity water is required for ornamental pools, fountains, cascades for human comfort.

FIRE FIGHTING :-A small percentage of the gross storage of water is lost for fire fighting system provided in building for human safety.

GARDENING :- Building with gardens, internal landscape areas, plotted plants, and open courtyards require water for horticultural operations.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 5: 4- Plumbing MEP - Water-Rev

5

SOURCES OF WATER SUPPLY

• CITY SUPPLY.

• WELLS 1. TUBEWELLS

2. BOREWELLS 3. DUGWELLS

• OPENSTREAMS/REVERS/SPRINGS

• RAIN WATER HARVESTING

• RECYCLED WATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 6: 4- Plumbing MEP - Water-Rev

6

WATER STORAGE

SHED

PUMP

DELIVERY

SUCTION

MAINHOLE

OVERFLOW

UNDERGROUND WATER TANK

UNDERGROUND STORAGE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 7: 4- Plumbing MEP - Water-Rev

7

WATER STORAGE

OVERHEAD STORAGE

OVERFLOW

OVERHEAD TANK

WATER SUPPLY PIPE

WATER DISTRIBUTION PIPE

OVERHEAD TANK

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 8: 4- Plumbing MEP - Water-Rev

8

HOT WATER SYSTEM

INTRODUCTION :Hot water is needed for bathing and washing in domestic use. Higher temperature melt the sticky oil and grease from the human body, pot and pans, making the clean-up easy. Bathing with hot water opens the body pores, washing dirt and sweat easily and giving a sense of freshness. In other region at cold places hot water is necessary for daily life.

HOT WATER REQUIREMENT :Hot water is used in kitchens and bathrooms in residential areas. It is also required for laundries and industrial kitchens and in building like hotels, hospitals, schools, hostels, industrial canteens etc.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 9: 4- Plumbing MEP - Water-Rev

9

HOT WATER STORAGEAn ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 10: 4- Plumbing MEP - Water-Rev

10

TYPES OF ELECTRICAL WATER HEATER

FLOOR MOUNTED ELECTRICAL WATER HEATER

FLOOR MOUNTED ELECTRIC WATER HEATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 11: 4- Plumbing MEP - Water-Rev

11

TYPES OF ELECTRICAL WATER HEATER

WALL MOUNTED ELECTRICAL WATER HEATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 12: 4- Plumbing MEP - Water-Rev

12

TYPES OF ELECTRICAL WATER HEATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 13: 4- Plumbing MEP - Water-Rev

13

TYPES OF WATER HEATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 14: 4- Plumbing MEP - Water-Rev

14

TYPES OF ELECTRICAL WATER HEATER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 15: 4- Plumbing MEP - Water-Rev

15

CWS – COLD WATER SUPPLY

HWS – HOT WATER SUPPLY

IV – ISOLATING VALVE

SV – SOLENOID VALVE

AMR – AUTOMETIC WATER METER

ABBREVEATIONS & SYMBOLSAn ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 16: 4- Plumbing MEP - Water-Rev

16

EWH – ELECTRICAL WATER HEATER

HB – HOSS BIB

COP – CAP ON END OF PIPE

WHA – WATER HAMMER ARRESTER

STR – STRAINER

ABBREVEATIONS & SYMBOLS An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 17: 4- Plumbing MEP - Water-Rev

17

ABBREVEATION & SYMBOLS

AN – PIPE ANCHOR

PG – PIPE GUIDE

EJ – EXPANSION JOINT

FC – FLEXIBLE CONNECTOR

AAV – AUTOMATIC AIR VENT

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 18: 4- Plumbing MEP - Water-Rev

18

ABBREVEATION & SYMBOLS

BRANCH SIDE CONNECTION

BRANCH BOTTOM CONNECTION

BRANCH TOP CONNECTION

RISER OR DROP

RISER DOWN RISER UP

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 19: 4- Plumbing MEP - Water-Rev

19

ABBREVEATIONS An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 20: 4- Plumbing MEP - Water-Rev

20

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

• WC :- WATER CLOSET

The purpose of a WC is to carry out the soil waste to the stack. It is made up of ceramic material with an in-built trap with water seal which prevents the foul smell entering into the toilet. WC shall be provided with flush valve/cistern, seat and cover, connector. Only cold water is provided to WC with diameter 20mm to flush tank and 16mm for ablution hose and the standard height of WC is 370mm from the finish floor level.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 21: 4- Plumbing MEP - Water-Rev

21

FLUSH TANK DETAILS An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 22: 4- Plumbing MEP - Water-Rev

22

TYPES OF FLUSH TANK & STANDARD DIMENSION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 23: 4- Plumbing MEP - Water-Rev

23

• WB :- WASH BASIN(LAVATORY) It is called as “Wash basin”. The purpose of a WHB is to carry out the waste water to the stack. It is also made up of ceramic material. WB shall be provided drain with a trap, over flow passage, with or with out pop up waste coupling and hot and cold mixer. As per the standard both cold & and hot water pipe sizes are 16mm supply. The bottom of pipe of WB is 600mm from finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 24: 4- Plumbing MEP - Water-Rev

24

• UR :- URINAL

The purpose of urinal is for urination, which is associated with men. It is provided with waste coupling with dome type grating, trap with extension pipe, push on/off lever. It is made up of ceramic material and only cold water supply is provided to the UR. The standard pipe connection to the UR is 20mm & the bottom of pipe to the UR is 1050mm from finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 25: 4- Plumbing MEP - Water-Rev

25

TYPES OF URINAL & WATER SUPPLYDISTRIBUSION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 26: 4- Plumbing MEP - Water-Rev

26

TYPES OF URINAL & WATER SUPPLYDISTRIBUSION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 27: 4- Plumbing MEP - Water-Rev

27

• BT :- BATH TUB

The purpose of BT is to carry out the bath water to the stack. BT shall be provided with an in built over flow, drain with a trap, hot and cold mixer, overhead shower and hand shower. Diameter 16mm cold water and hot water supply to the mixture and the bottom of pipe connected to the bath tub is elevated 550mm from finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 28: 4- Plumbing MEP - Water-Rev

28

SOME TYPES OF BATH TUB WITH ITS STANDARD DIMENSION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 29: 4- Plumbing MEP - Water-Rev

29

SOME TYPES OF BATH TUB WITH ITS STANDARD DIMENSION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 30: 4- Plumbing MEP - Water-Rev

30

• BDT :- BIDET The purpose of bidet is for the external cleaning of body associated with women. A bidet shall be provided with a water spray, designed for external cleaning that directs the jet of water upward to the body. Both hot water and cold water pipes are connected to bidet. 16mm diameter pipes are connected to bidet having bottom of level 400mm from

finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 31: 4- Plumbing MEP - Water-Rev

31

BIDET WITH WATER CONNECTION An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 32: 4- Plumbing MEP - Water-Rev

32

• SH :- SHOWER

The purpose of the Shower is to carry out the bath water to the stack. Shower shall be provided with overhead shower, jets, hot and cold mixer, drain with trap, glass or synthetic enclosure to prevent water spillage to the dry area of the room. The standard sizes of hot water and cold water is 16mm & 16mm respectfully. Bottom of pipe connected to shower is 1000mm from finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 33: 4- Plumbing MEP - Water-Rev

33

• KS :- KITCHEN SINK

The purpose of kitchen sink is to carry out the domestic food waste generated to stack. Sink shall be provided with hot and cold mixer, drain with trap and overflow passage. The pipes size provided to kitchen sink is 16mm respectfully & the bottom of pipes are 600mm from finished floor level.

ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 34: 4- Plumbing MEP - Water-Rev

34

FLOW CHART FOR PREPARATION OF SHOP DRAWING OF WATER SUPPLY

WATER TENDER DRAWING(CONSULTANT DOCUMENT)

REMOVE UNWANTED ARCHITECTURAL DATA

AND PREPARE IT

INSERT ARCHITECHTURAL

DRAWING APPROVED BY CONSULTANT

PREPARE THE SHOP DRAWING BY FOLLOWING

THE STANDARDS GIVEN BY

CONSULATANT

FIXTURES(WC, WB, BT,KS ETC),EWH, WHA AND OTHER SCHEDULE APPROVED BY CONSULTANT

CHECK THE DRAWING AS PER CHECK LIST & TAKE CHECK PRINT

AFTER CHECKING EDIT THE MISTAKESON THE DRAWING

OUT PUT DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 35: 4- Plumbing MEP - Water-Rev

35

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

INPUT ARCHITECTURAL FILE OUTPUT ARCHITECTURAL FILE

1.Client is provided the architectural drawing for all floors or areas. It contains all information like room patrons, plumbing fixtures, walls, columns, beams etc., So create one arch. drawing for reference purpose.• Delete unwanted text and dimensions• Change text height as per shop drawing scale• Change grid bubbles as per shop drawing scale• Change all entities into AutoCAD colour 8 For example see below snap shots Input and Out put drawings.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 36: 4- Plumbing MEP - Water-Rev

36

2. AS PER CONSULTANT REQUREMENT, FOLLOWS THE CAD STANDARD MEANS (LINE WEIGHT, LINE TYPE, LINE COLOUR, TEXT HEIGHT ETC.)

3. PIPE LINE MORE THAN DIA 65 MM IS CONSIDERED AS A DOUBLE LINE DRAFTING & LESS THAN DIA 65 MM AS A SINGLE LINE DRAFTING. SEE THE BELOW DWG.

NOTE:-

OUTPUT SHOP DRAWING

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 37: 4- Plumbing MEP - Water-Rev

37

4. SUITABLE WATER FITTING BLOCKS SHOULD BE PLACED IN DOUBLE LINE PIPE WORK.

(SOME STANDARD WATER FITTINGS BLOCKS ARE AS SHOWN BELOW.)

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 38: 4- Plumbing MEP - Water-Rev

38

WATER FITTING BLOCKS & BLOCKS USE AT SHOP DRAWING.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

OUTPUT SHOP DRAWINGSTANDARD BLOCKS

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 39: 4- Plumbing MEP - Water-Rev

39

5. LINE DIAGRAM TEE & ELBOW MUST BE PLACED AT EVERY SINGLE LINE PIPE JUNCTION AND WHEREVER PIPE BENDS, FILLET ACCORDING TO STANDARD RADIUS.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

OUTPUT SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 40: 4- Plumbing MEP - Water-Rev

40

6. ALWAYS CONSIDERED ON DRAWING THAT HOT WATER MUST BE PLACED AT LEFT AND COLD WATER AT THE RIGHT POSITION OF THE USER FACING TOWARDS THE FIXTURES.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

OUTPUT SHOP DRAWING

OUTPUT SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 41: 4- Plumbing MEP - Water-Rev

41

7. GIVE PIPE SIZE & BOTTOM OF PIPE (BOP) ANNOTATION TO EVERY PIPES.

INPUT DRAWING

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

OUTPUT SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 42: 4- Plumbing MEP - Water-Rev

42

8. MENTIONED THE FLOW DIRECTION (ARROW) OF WATER THROUGH PIPE TO ALL THE PIPE LINE THAT IS HOT WATER AND COLD WATER PIPES.

•MEANS FOR COLD WATER ITS FROM RISER TO THE TILL END OF EVERY CONNECTIONS.

•FOR HOT WATER IT MAY BE FROM ELECTRICAL WATER HEATER OR FROM RISER TO THE TILL END OF EVERY CONNECTIONS.

INPUT DRAWING

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

OUTPUT SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 43: 4- Plumbing MEP - Water-Rev

43

9. ALL HIGH LEVEL PIPES ARE DROPPED IN WALL TO LOW LEVEL.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

INPUT DRAWING OUTPUT DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 44: 4- Plumbing MEP - Water-Rev

44

10. ANGLE VALVE MUST BE PLACED AT WALL WHEN WATER PIPES SUPPLIES FOR FIXTURE AT LOW LEVEL.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

INPUT DRAWING OUTPUT DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 45: 4- Plumbing MEP - Water-Rev

45

11. SUPPORTS AND HANGERS ARE PLACE AS PER CONSULTANT RECOMMENDATION.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

HANGERS PLACE ON HIGH LEVEL PIPE

PLAN

ELEVATION

SECTIONAL ELEVATION OF HANGER

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 46: 4- Plumbing MEP - Water-Rev

46

PIPE FIXING CLIP

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 47: 4- Plumbing MEP - Water-Rev

47

12. DIMENSIONED(AS PER STANDARD) BOTH DOUBLE LINE AND SINGLE LINE PIPE WORK FROM THE NEAREST WALL OR FROM GRID LINE.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

INPUT DRAWING OUTPUT DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 48: 4- Plumbing MEP - Water-Rev

48

13. PREPARE THE SECTION DRAWING AT TYPICAL TOILET AREAS AND COMPLICATED PIPE LINE AREAS.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

SECTIONAL ELEVATION OF TOILET

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 49: 4- Plumbing MEP - Water-Rev

49

14. PREPARE THE ISOMETRIC LINE DIAGRAM OF EVERY INDIVIDUAL APPARTMENT.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

REFERENCE OUTPUT SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 50: 4- Plumbing MEP - Water-Rev

50

14. PREPARE THE ISOMETRIC LINE DIAGRAM OF EVERY INDIVIDUAL APPARTMENT.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

PREPARED ISOMETRIC VIEW

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 51: 4- Plumbing MEP - Water-Rev

51

15. ATTACH THE ABOVE FLOOR STRUCTURAL XREF FILE OF THAT PARTICULAR FLOOR AND CHECK WHETHER THE PIPE LINES HITTING TO THE BEAM, CONSIDERING THE BEAM SCHEDULE FILE GIVEN BY CONSULTANT.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 52: 4- Plumbing MEP - Water-Rev

52

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

ABOVE FLOOR STRUCTURAL FILE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 53: 4- Plumbing MEP - Water-Rev

53

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

AFTER ATTACHED STRUCTER FILE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 54: 4- Plumbing MEP - Water-Rev

54

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

BEAMS SCHEDULE FILE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 55: 4- Plumbing MEP - Water-Rev

55

16. CO-ORDINATE WITH OTHER SERVICES WHETHER THE PIPES STRIKE TO OTHER SERVICES.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

7.TH

DFCU

OUTPUT CSD DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 56: 4- Plumbing MEP - Water-Rev

56

17. IF ANY FIND, CONSIDERING THE ABOVE TWO POINT THAN, POSIBLE REMAIDEIS MUST BE TAKEN BY THE OPPERATOR.

•EITHER POSSIBLE DISPLACEMENT OF PIPE.

•CHANGING THE BOTTOM OF PIPE HITTING TO THE OTHER SERVICES.

•18. IN CASE OF DOUBT OR DISCREPENCY RAISE QUERY.

19. CHECK PRESENTATION OF VIEWPORTS.

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 57: 4- Plumbing MEP - Water-Rev

57

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

VIEWPORTS SETTING

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 58: 4- Plumbing MEP - Water-Rev

58

STEPS FOLLOWED BY DRAUGHTS MAN

TO PREPARE A SHOP DRAWING

20. UPDATE THE TITLE BLOCK AND LOGO AS PER APPROVED CONSULTANT.

• UPDATE THE NOTES AS FOR CONSULTANT REQUIRMENTS.• PLACE EVERY LEGENDS AND ABBREVIATIONS USED ON

THAT PERTICULAR DRAWINGS ON TITLE BLOCK.• MENTION ALL REFERENCE DRAWINGS NUMBER AND NAMES

IN TITLE BLOCK.• PREPARE A SMALL KEY PLAN OF ARCITECTURAL DRAWING

AND HILIGHT THE AREA SHOWN ON VIEW PORT OF THE SHEET.• PLACE IF ANY CLIENT, PROJECT, CONSULTANT, PROJECT

MANAGEMENT, CONTRACTOR, SUB CONTRACTORS LOGO ON TITLIE BLOCK.

• AT LAST UPDATE THE TITLE BLOCK MENTION DRAWING TITLE, DATE, CHECKED BY, DRAWN BY,SCALE ACCORDING TO CONSULTANT REQUIREMENT ETC.

21. FILL THE CHECKLIST AND TAKE CHECK PRINT.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 59: 4- Plumbing MEP - Water-Rev

59

MEP CHECKLIST (ANNESURE-11c)

MEP (Plumbing) -Checklist (Annexure-11c)Project:Title:Drawing Number: Revision:

1. Check level 2. Check level 3. Check level

A Compliance to the Specifications1 Actual version of the Domestic water and Drainage drawing

2 Specific requirements, rules regarding the detailing

B Title Block1 Title / Dwg. No. / Rev. Index. / Scale

2 Complete revision block incl. corresponding dates, indications etc.

3 Keyplan with indication of the relevant part

4 General notes

5 Drawn by, checked by, appr. by, corresponding dates

C Depiction (Representation)1 Text Heights

2 Headings and scales written

3 standard Layers and Linetypes

4 Checked section names

5 General presentation and orientation correct

D Detailing1 Assigned the BOP

2 Setting out Dimensions

3 Representation of pipe fittings

4 Prepared sections at Critical areas

5 Add standard Details

6 Checked Pipe foulings with other services

7 Checked Pipe foulings with structure

8 Pipe sizes are shown as per schematic drawing

9 Prepared Isometric views for Domestic water

10 Add valves if necessary

11 Riser Sizes are shown

12 check representaion of view ports

Comments………………………………………………………………………………………………………

…………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………..

Checked in the 1. Level - Name: Sign: Date:

Checked in the 2. Level - Name: Sign: Date:

Checked in the 3. Level - Name: Sign: Date:

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 60: 4- Plumbing MEP - Water-Rev

60

PREPARING A SECTIONAL

VIEW

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 61: 4- Plumbing MEP - Water-Rev

61

• PREPARE THE PLAN (SHOP DRAWING) AS PER ABOVE MENTION POINTS.

• DRAW THE CUTTING PLANE LINE ON TYPICAL TOILET AREA OR LOCATING COMPLICATED PIPE AREA.

• THE DRAUGHFTS MAN SHOULD THOUGHT THAT HE STANDING FACING TOWARDS THE ARROW MARK OF CUTTING PLANE LINE.

• BEHIND THE CUTTING PLANE LINE NEED NOT TO BE CONSIDER ON SECTIONAL VIEW.

• CONSIDER UP TO 1.5 METER FROM THE CUTTING PLANE LINE MARKING THE DIRECTION OF ARROW MARK.

HOW THE SECTIONAL VIEWOBSERVED ?

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 62: 4- Plumbing MEP - Water-Rev

62

3D EXAMPLE FOROBSERVATION A SECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 63: 4- Plumbing MEP - Water-Rev

63

3D EXAMPLE FOROBSERVATION A SECTION

REMOVING THE SLAB

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 64: 4- Plumbing MEP - Water-Rev

64

3D EXAMPLE FOROBSERVATION A SECTION

OBSERVATION OF PLAN FROM ABOVE & PLACING THE SECTION LINE.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 65: 4- Plumbing MEP - Water-Rev

65

3D EXAMPLE FOROBSERVATION A SECTION

SECTIONAL PLANE CUT AT THE ABOVE MARKED POSITION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 66: 4- Plumbing MEP - Water-Rev

66

3D EXAMPLE FOROBSERVATION A SECTION

REMOVING THE BACK PORTION OF SECTIONAL PLANE.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 67: 4- Plumbing MEP - Water-Rev

67

3D EXAMPLE FOROBSERVATION A SECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 68: 4- Plumbing MEP - Water-Rev

68

3D EXAMPLE FOROBSERVATION A SECTION

OBSERVATION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 69: 4- Plumbing MEP - Water-Rev

69

GETTING A SECTIONAL VIEW

SECTIONAL VIEW OF ABOVE SLIDE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 70: 4- Plumbing MEP - Water-Rev

70

• MAKING THE AUTO CAD FILES IN TO TWO HORIZENTAL VIEW PORTS BY USING “VIEWPORTS COMMAND” AND SET PLAN ON UPPER VIEW PORTS AND DRAW THE SECTIONAL ELEVATION BELOW THE PLAN ON LOWER VIEW PORT. (SEE THE BELOW SNAP SHOT)

HOW THE SECTIONAL VIEW IS PREPARE ?

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 71: 4- Plumbing MEP - Water-Rev

71

• DRAW ARCHITECTURAL ELEVATION FROM PLAN BY DRAWNING X-LINE FROM THE WALL WITH CONSIDERING THE FALSE CEILING HIEGHT, SLAB THICKNESS, FINISHED FLOOR LEVEL AND BEAMS REFERING THE SRUCTURAL AND ARCHITECTURAL FILE GIVEN BY CONSULTANT. (SEE THE BELOW SNAP SHOTS)

HOW THE SECTIONAL VIEW IS PREPARE ?

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 72: 4- Plumbing MEP - Water-Rev

72

• DRAW ALL PIPES AT SECTIONAL VIEW IN DOUBLE LINE WHETHER IT APPEAR IN PLAN IN SINGLE LINE OR MAY BE IN DOUBLE LINE.

• SHOWING ALL PIPES WHETHER IT IS IN HIEGH LEVEL OR AT LOW LEVEL WITH ITS FITTINGS, CONSIDERING THE SHOP DRAWING AND MENTION THE BOTTOM OF PIPE AND PIPE DIAMETER AS FOLLOWS BY STANDARD RECOMMENDED BY CONSULTANT.

HOW THE SECTIONAL VIEW IS PREPARE ?

SINGLE LINE PLAN OUTPUT

PIPES IN DOUBLE LINE AT SECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 73: 4- Plumbing MEP - Water-Rev

73

• PLACING ALL THE ELEVATIONAL FIXTURES APPROVED BY CONSULTANT WITHIN THE SECTIONAL VIEW.

• MENTION THE TYPE OF PIPE AND BOTTOM OF EVERY PIPE FROM FINISHED FLOOR LEVEL

• DIMENTION THE HOT WATER AND COLD WATER PIPES SUPPLY TO THE FIXTURES AS PER STANDARDS GIVEN BY CONSULTANT

HOW THE SECTIONAL VIEW IS PREPARE ?

FIXTURE AND BOP SHOWN IN SECTION

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 74: 4- Plumbing MEP - Water-Rev

74

FIXTURES SHOWN IN SECTIONAL VIEW

HOW THE SECTIONAL VIEW IS PREPARE ?

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 75: 4- Plumbing MEP - Water-Rev

75

WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 76: 4- Plumbing MEP - Water-Rev

76

WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 77: 4- Plumbing MEP - Water-Rev

77

WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 78: 4- Plumbing MEP - Water-Rev

78

WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 79: 4- Plumbing MEP - Water-Rev

79

BOTTOM OF PIPE

THE DISTANCE FROM THE FINISHED FLOOR LEVEL(FFL) TO THE BOTTOM OF INSULATED PIPE IS BOP. THE WATER PIPES HANGS BETWEEN SLAB AND FALSE CEILING LEVEL WITH SUPPORTERS. IF IS INTERFERENCE & FOULING WITH DUCT OR OTHER EQUIPMENT, IN THAT CASE WE USE TO BEND THE PIPE AS UP & DOWN, THEN FOLLOWS THE ROUTING.

FOR CALCULATING THE BOP VALUE

FFL OF CURRENT FLOOR______________(FROM ARCH. LAYOUT) SSL & SLAB THICKNESS OF THE ABOVE FLOOR__________(FROM STRUCTURAL LAYOUT) FALSE CEILING LEVEL MUST BE GREATER THAN 2400MM FROM FFL.

• CONSIDERING THE FALSE CEILING LEVEL WATER PIPES RUNNING 100MM APPARTS.

• ALWAYS PREPARED HOT WATER RUNNING APPROXIMATELY 100MM DISTANCE ABOVE FROM THE COLD WATER PIPE LINES.

PROCEDURE FOR BOTTOM OF PIPE An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 80: 4- Plumbing MEP - Water-Rev

80

• BOTTOM OF PIPE MUST BE GIVEN FROM THE STARTING POINT THAT IS FROM RISER TO THE TILL END OF THE WATER SUPPLY TO FIXTURES AND SHOULD BE GIVEN TO ALL INDIVIDUAL PIPE LINES.

FOR EXAMPLE : LET Ø65 PIPE IS RUNNING TO THE APPARTMENT FROM RISER CONSIDERING THE BOTTOM OF LEVEL AT STARTING POINT FOR HOT WATER 2850 MM AND FOR COLD WATER 2750 MM FROM FINISHED FLOOR LEVEL.

• AFTER SOME DISTANCE IT REDUCES TO Ø42 MM

• CALCULATING THE BOP 65-42=23MM/2=11.5MM ROUNDING IT TO 12 MM APPX.

• MEANS Ø42 MM HOT WATER PIPES BOP 2850-12= 2838 MM FROM FINISHED FLOOR LEVEL.

• SIMILARLY FOR Ø12 MM COLD WATER 2750-12= 27385MM FROM FINISHED FLOOR LEVEL.

PROCEDURE FOR BOTTOM OF PIPE

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 81: 4- Plumbing MEP - Water-Rev

81

PREPARING A ISOMETRIC DRAWING

• SET THE DRAWING AREA INTO TWO HORIZONTAL VIEWPORTS BY USING “VIEWPORTS” COMMAND.

• ADJUST THE UPPER VIEWPORT IN SOUTH\WEST ISOMETRIC VIEW TO THE PLAN.

• ADJUST THE LOWER VIEWPORTS IN THE ISOPLANE ANGLE TO WORK IN 90 DEGREE AND 30 DEGREE ANGLE, BY USING “SNAP” COMMAND.

• Specify snap spacing or [ON/OFF/Aspect/Rotate/Style/Type] <0.5000>: S

• snap grid style [Standard/Isometric] <S>: I• Specify vertical spacing <0.5000>: Enter• THIS COMMAND PROMPT SET THE CROSSHAIR INTO ISOPLANE.• “F5” BUTTON IS USE TO CHANGE THE CROSSHAIR INTO

VARIOUS X AND Y DIRECTION.• REFERING THE ROUTING OF HOT WATER & COLD WATER AS

PER SHOWN IN PLAN STARTING FROM ELECTRICAL WATER HEATER TO TILL END OF THE WATER SUPPLY.

• GIVE ALL THE PIPES BOTTOM OF PIPE AND SIZES CONSIDERING A FINISH FLOOR LEVEL LINE.

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 82: 4- Plumbing MEP - Water-Rev

82

PREPARING A ISOMETRIC DRAWING

SETTING THE SHOP DTAWING IN SOUTH WEST ISOMETRIC VIEW

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 83: 4- Plumbing MEP - Water-Rev

83

PREPARING A ISOMETRIC DRAWING

PREPARED ISOMETRIC VIEW REFERING THE ROUTING OF PIPES

FROM SHOP DRAWING .

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 84: 4- Plumbing MEP - Water-Rev

84

PREPARING A ISOMETRIC DRAWING

ISOMETRIC DRAWING OF AN ANOTHER APARTMENT

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 85: 4- Plumbing MEP - Water-Rev

85

Output : Plumbing Layout 3D (ABS)An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 86: 4- Plumbing MEP - Water-Rev

86

Output : Plumbing Layout 3D (ABS)An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 87: 4- Plumbing MEP - Water-Rev

87

Output : Plumbing hot & cold water Layout 3D (ABS)

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com

Page 88: 4- Plumbing MEP - Water-Rev

88

Output : Cold & Hot water high level Connection 3D (ABS)

An ISO 9001:2000 Certified Organization

www.ramtech-corp.com