+ All Categories
Home > Documents > 41009NE9166 63.6357 HUFFMAN 010 REPORT PROJECT 3 · 2017. 1. 17. · and Esther, P2370 Jerome East...

41009NE9166 63.6357 HUFFMAN 010 REPORT PROJECT 3 · 2017. 1. 17. · and Esther, P2370 Jerome East...

Date post: 24-Oct-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
18
41009NE9166 6 3.6357 HUFFMAN 010 REPORT PROJECT 3 OP91-427 S 428 December, 1991 Project 3 of OPAP submissions of Earl J. Lalonde (OP91-428) and Fred Q. Barnes (OP91-427), covering the townships of Osway, Mallard and Huffman, Porcupine Mining Division was undertaken in the field between 16 June and 27 September, 1991. The southwest corner of contiguous Eric Township was covered as part of the Project 3 and a one day examination of iron formation and related base metal occurrences in Blamey and Cunningham townships, 30 km to the west was made as a guide to possible occurrences in Project 3 area . All work was of a prospecting nature. The expected targets were, firstly gold, and secondly base metals as found at the old Shunsby property in central north Cunningham township. Prospecting is hampered by heavy overburden over much of the area, and exceptionally thick moss cover on outcrops. These features favour the forest industry which is the main employer in the district. As a consequence of the thick moss cover, a good deal of outcrop stripping was required on traverse lines, and particularly to expose rusty and siliceous zones along strike, once found. Initially, prospecting was undertaken over outcrop areas adjacent to navigable water courses, motor roads and old roads which allowed easy access. The prospecting difficulties, as outlined above, however, finally altered our approach from primarly one of easy access to one of selecting potential trends and zones as interpreted from known showings and bedrock geology. This latter approach, adopted in September, was much more fruitful in the end by our discovery of a mineralized quartz- carbonate zone with significant auriferous sulphides. Unfortunately, the discovery was made in the final few days of our venture when we were forced to suspend operations. Staking and additional work along the discovery zone is warranted for 1992. The confidentiality of this information is therefore of prime importance in our 1992 prospecting plans. Location and Access The area covered was Project 3 of the 1991 OPAP submission and covered parts of Osway (G3243), Mallard (G1171), Huffman (G3232) and Eric townships, Porcupine Mining Division, Sudbury District. The all-weather road system is shown on the Provincial Topographical Series, at a scale of 1:100,000, on Gogama (41P/NE) Ridout (410/NE) covering Project 3, and Chapleau (410/NW). An east- west private (Eddy Co.) gravel road connects Highway 144 to Highway
Transcript
  • 41009NE9166 63.6357 HUFFMAN 010

    REPORT PROJECT 3

    OP91-427 S 428

    December, 1991

    Project 3 of OPAP submissions of Earl J. Lalonde (OP91-428) and Fred Q. Barnes (OP91-427), covering the townships of Osway, Mallard and Huffman, Porcupine Mining Division was undertaken in the field between 16 June and 27 September, 1991. The southwest corner of contiguous Eric Township was covered as part of the Project 3 and a one day examination of iron formation and related base metal occurrences in Blamey and Cunningham townships, 30 km to the west was made as a guide to possible occurrences in Project 3 area .

    All work was of a prospecting nature. The expected targets were, firstly gold, and secondly base metals as found at the old Shunsby property in central north Cunningham township.

    Prospecting is hampered by heavy overburden over much of the area, and exceptionally thick moss cover on outcrops. These features favour the forest industry which is the main employer in the district. As a consequence of the thick moss cover, a good deal of outcrop stripping was required on traverse lines, and particularly to expose rusty and siliceous zones along strike, once found.

    Initially, prospecting was undertaken over outcrop areas adjacent to navigable water courses, motor roads and old roads which allowed easy access. The prospecting difficulties, as outlined above, however, finally altered our approach from primarly one of easy access to one of selecting potential trends and zones as interpreted from known showings and bedrock geology.

    This latter approach, adopted in September, was much more fruitful in the end by our discovery of a mineralized quartz- carbonate zone with significant auriferous sulphides. Unfortunately, the discovery was made in the final few days of our venture when we were forced to suspend operations. Staking and additional work along the discovery zone is warranted for 1992. The confidentiality of this information is therefore of prime importance in our 1992 prospecting plans.

    Location and Access

    The area covered was Project 3 of the 1991 OPAP submission and covered parts of Osway (G3243), Mallard (G1171), Huffman (G3232) and Eric townships, Porcupine Mining Division, Sudbury District.

    The all-weather road system is shown on the Provincial Topographical Series, at a scale of 1:100,000, on Gogama (41P/NE) Ridout (410/NE) covering Project 3, and Chapleau (410/NW). An east- west private (Eddy Co.) gravel road connects Highway 144 to Highway

  • 667 at Sultan. It passes Project 3 to the south where two roads, in Edith Township trend northerly in the area. These are the Cordes Creek road which accesses Esther, northwestern Osway, and Mallard townships, ending at Rush Lake; and the Jerome Mine road which corsses Fingal and southern Osway townships, ending at the Jerome Mine on the south shore of Opeepeesway Lake. The Cordes Creek road has been upgraded by the Eddy Co. to a haul road for cutting in southeast Mallard, southwest Eric and northwest Huffman townships.

    Geology

    Five geological series maps are available for Project 3 area. Map 1949-2 of Osway by W.W. Moorhouse; P2369 Jerome west of Osway and Esther, P2370 Jerome East of Huffman and Arbutus both by G.M. Siragusa; Map 2503 Cunningham and Garnet, Map 2504 Benton and Mallard both by G.M. Siragusa. Although we would disagree with both authors as to rock types and contacts locally because of our more detailed examinations and strippings, we found the geological records of great value. The Moorhouse interpretation of contacts in Osway we found in general more accurate than that of the subsequent geological work. Access to much of Osway township and the number of active mining companies in the area were both greater at the time of the Moorhouse survey.

    We feel the geology, both lithologic and structural is much simpler and open than the recorded data suggest because of lateral facies changes and initial dips. In general however, Project 3 is underlain by mafic and intermediate volcanic rocks, trending northwest and steeply dipping to the southwest, a picture presented by both published authors. We would agree that there is far more waterlain material present in parts of the section than indicated and more now-volcanic detritus.

    Work Done

    All work done was of a prospecting nature with much moss stripping in general traversing along roads, trails, shorelines and inland from these access points. Trenching and pitting for samples was along mineralized zones which were located from blazed, chained and flagged compass lines. Thirty-three samples were taken as grabs and line chips described under Sample List. All assaying was done by Activation Laboratories Ltd., using neutron activation analysis. The package consisted of analyses for gold and thirty-four other elements. Certificates af analysis along with detection limits are attached to the Sample List.

    Trenching and pitting along, or measured from, chained compass lines are located on separate plans. A General Map of Project 3 shows the areas prospected, chained compass lines, and sample locations.

    A daily log of prospecting activities is attached as Prospecting Daily Log.

  • Expenditures

    Project 3 time estimate was 136 man days whereas approximately 70 man days were spent. A breakdown of costs as estimated and approximate actual is given in Table I

    The higher than estimated cost per man day is primarily the result of mileage costs. The extra mileage resulted from better than expected road access which meant few camp moves, and more frequent-than planned-returns home due to a decision to sell out in southern Ontario and move north.

    A breakdown of expenditures is given on the attached Detailed List of Expenditures by participant.

    Results and Recommendations

    Although numerous quartz-carbonate veins were found and some sampled, assay results were not significant although well above background levels. Some waterlain sediments within the basic volcanic section are carbonaceous and rusty weathering. At points where quartz stringers permeate these beds, higher gold values were returned from the samples, such as 26105 through 26107. These occurrences are local however, and are not believed to be part of any through-going structural system. The origin of the gold is unknown. An example of this stratified type of mineralization is that at Vichaw Lake within the intermediate volcanic suite and just below the clastic sediments, more accurately shown on the Moorhouse map. These occurrences would appear to have little economic significance (SEE detailed sample map Vichaw Lake).

    Of greater importance is mineralization associated with through-going structural features, although, again, apparently related to a specific volcanic unit and following the lithologic trend. More sulphide mineralization is found in this type, and quartz and carbonate veining is widespread and undoubtedly introduced. Gold values are much higher even though sub-economic in the samples we were able to recover from pits (SEE detailed sample plan Wiener Lake).

    This latter type of occurrence is similar to that of the Polfrog Explorations discovery, Denomme-Ross et al, of Foleyet. The Polfrog prospect is a kilometre east of the Opeepeesway River in south Mallard township on the south side of the Rush Lake road.

    Iron formation appears to be poorly developed in the Opeepeesway Lake area and no base metals were found related thereto (Shunsby type) .

    It is recommended that claims be staked at Wiener Lake and further work done. The Wiener Lake discovery was made two days prior to departure and pitting was only begun on the day of departure from the area. Work should consist of mapping, magnetometer and VLF surveys and prospecting, followed up with

  • ElO: READY

    A B C D E F G Hl o TABLEl

    3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    o Est i ma t e Total Man Day

    Time 1360O 100 Mileage 1020 7.5 Assay 2829 20.8 Suppl ies 1986 14.6 TOTAL 19435 142.9

    t

    yl

    Actual Total Man Day

    7000 100 1882 27.68 512 7.53 1450 21.32

    10844 156.53

    Samples/MD

    Est /Ac t 0. 88

    0.49

    lO:42 AM MUM

  • backhoe trenching where warranted, along with sampling.

    Further reconnaissance prospecting should also be undertaken in the general area to find other mineralized zones. Checking for iron formation should be made at the appropriate stratigraphic position in order to find base metals, giving due regard to the observations of Siragusa in his Garnet Lake report.

  • Ml:- READY

    Hl234567891011121314151617181920 26-

    M4O:

    2122232425262728293031323334353637383940

    0

    H

    I

    Sampl e2610526106261072610826 1 092611026 1 1 1261 12261132611426115261162611726118261192612026121

    : 20 AM

    I2612226123261242612526 1 262612726128261292613026131*~'C 1 '"'O ^1 0 1 O si-

    2613326134261352613626 1 37

    J

    TypeGr abGChiplFt1^1

    GGGGGGGGGGGCl.SFtG

    JGGGQGGGG13GGGGGGG

    KSAMPLE

    R d: kBedBc h i stSedTuffBIFBIFJeromeSedSchsamesamesamesameSchistSedSchSchistsamesame

    KsameSedSchTuffSchistsamesameGabbroSchistsamesamesamesamesamesamesamesame

    LLIST

    Mineralcarbqtzcar bcarbcarbnonenoneqtzcar b

    ist vqtznonevqtzFeFeBr ownqta

    i st car bcar bRustsamesame

    Lsame

    ist samenoneqtzRustsamePyqtzPysameCar bqtzqtzqt z car bPyqtzPbCuPyqtzcar bsamePyqtzPysame

    M N O

    PPBAu

    l l

    25721252566

    100

    u l O55 169

    M 14 5 5

    151 5

    685

    17505

    37174

    55

    385 4520

    NUM

    READY

    N O

    11:2O AM NUM

  • CTLABSACTIVATION LABORATORIES LTD

    -±TTVUJ-UO Nu.:

    Work Order: Invoice Date: Date Submitted: Your Reference: Account Number:

    ——————3226 3225

    15-OCT-91 30-SEP-91

    NONE 398

    E.J. LALONDEBOX 116CAPREOL, ONT.POM 1HOATTN: E.J. LALONDE

    CERTIFICATE OF ANALYSIS

    INAA package, elements and detection limits:

    AUBRCSIRRBSNUCETB

    5.1.2. 5.

    30. 0.01 0.5 3. 0.5

    PPBPPMPPMPPBPPM%PPMPPMPPM

    AGCAFEMOSBSRWNDYB

    5.1.0.025.0.20.054.5. 0.05

    PPM

    PPM PPM

    PPM PPM PPM

    AS 2.CO 5. HF 1. NA 500. SC 0.1TA ZN SM LU

    1. 50. 0.1 0.05

    PPM PPM PPM PPM PPM PPM PPM PPM PPM

    BA 100.CR 10.HGNISETHLAEU

    CERTIFIED BY :

    1. 50. 5. 0.5 1. 0.2

    PPM PPM PPM PPM PPM PPM PPM PPM

    OR. i?R.TC

    1336 SANDHILL DRIVE, ANCASTER. ONTARIO, CANADA L9G4V5 * TEL: 416-648-9611 * FAX: 416-648-9613

  • Activation Laboratories Ltd. Work Order: 2839 Report: 2837

    Sample description

    261052610626107

    AUPPB

    2572325

    ASPPM

    tttt(5

    ASPPM

    370 t.1

    5

    BAPPM

    440190360

    8RPPM

    (1^'1{l

    CAl

    4(1^

    COPPM

    277

    22

    CRPPM

    43081390

    CSPPM

    5(27

    FEl

    3.823.955.38

    HFPPM

    233

    mPPM

    u(3(1

    IRPPB

    tttt(5

    MO NAPPM PPM

    tt 9210tt 31300tt 21500

    NIPPM

    360100140

    RBPPM

    363733

    SBPPM

    0.60.71.1

    sePPM

    233.539

    SEPPH

    tttttt

    SNl

    (0.03tt. 01(0.01

    t

    t

  • Activation Laboratories Ltd. Work Order: 2839 Report: 2837

    Sample description SR TA TH U y ZN LA CE MD SM EU IB YB LU Massl PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM g

    261052610626107

    (0.*l'0.

    (0,

    .05 '05 ''05 '

    ii 1.6:i 8.3;i 4.3

    ffi.S3.71.8

    a(4{4

    67

  • KAc t-i vat-i on Laboratories Ltd. Work Order: 2951 Report: 2950

    iSafsple description

    26108 26103 26110 26111

    AU PPB

    25 6 6

    11100

    PPM

    {5{5 {5

    AS PPM

    4 Q 71 51

    BA PPM

    150{100

    {100510

    BR PPM

    {i\ i

    {1

    CA l

    3L

    \\ t

    CO PPM

    20 {510

    13

    CR PPM

    170 34 120 160

    CS FE PPM l

    i2 4 .09 {226.1 {2 14.6 3 2.64

    HP PPM

    4 {1 2 1

    H6 PPM

    {1 {1 {i {1

    IR PPB

    {5 {5 {5 {5

    MO NA PPM PPM

    {524800 {5 {500 {5 {500

    460 3730

    Nl PPH

    {SF

    {50 {50

    RB PPM

    oo•JU{30 {30 62

    SB PPM

    0.4 {0.2 {0.2 32

    sePPM

    IS 0.4 3.5 6,5

    SE SN PPM *

    {5 {0.01 .•r -f f. .'•i'.5 u'.t'i{5 {0.01

    {5 {0.01

  • Activation Laboratories Ltd Work Order.' 2951 Report.1 2350

    IIjSairspie description SR TA TH U V ZN LA CE NO SH EU IB YB LU foss

    t m PPH PPN PPM PPM PPH PPH PPH PPM PPM PPM PPM PPH g

    •26108J26109^26110.26131

    {0.05

    {0.05

    {0.05{0.05

    {1a{i{i

    2.6{0.5

    1.12.1

    {0.5{0.5{0.5••j fi -i .i

    {4{4{413

    Ofl-J

    5110178

    17•-t3

    18

    394

    2033

    14(56

    18

    3.30.31.42.4

    1.1 {0.5 1.84 6. 34 26.73S.2 {0.5 0,52 0.13 50.630.7 {0.5 1.10 0.19 36.340.7 {0,5 0.65 6.16 37.29

  • Activation Laboratories Ltd. Work Order.' 3225 Report: 3226

    Sample description SRr126112S261132611426115261 lo

    26117'26118261192612026121

    26122261232612426125-26126-

    26127261282612926130-26131

    2613226133261342613526136

    26137i

    5

    (0.05(0.05(0.05(0.05(O.OS

    (O.OS(O.OS(0.05(0.05M7.ro

    (0.05(0.05(0.05(0.05(O.OS

    (O.OS(O.OStt.OS(0.05(0.05

    (0.05(0.05(0.05(0.05(0.05

    (0.05

    TAPPM

    (1(1^1tt^

    tt1

    {1(1(1

    2(1(1tt(1

    tt(1(1(1(1/j(1(1(i^tt

    TH Urrn rrn

    0.7 (0.52.1 (0.51.9 (0.52.6 tt.5

    .1 w .o

    (0,5 (0.51.9 (0.52.1 1.61.9 tt.50.9 tt.5

    1.8 (0.52.1 (0.51.3 (0.51.3 (0.51.1 (0.5

    (0.5 (0.5tt.5 (0.5(0.5 (0.50.6 1.0

    (0.5 tt.5-

    1.2 (0.50.8 2.0

    (0.5 (0.58.8 3.3

    (0.5 tt.5

    tt.5 (0.5

    PPM

    tttttttttt

    tttttttttt

    8(4(4(4(4

    (4(4(4(4(4

    (447(4(4(4

    4

    2NrrT!

    (50129(50119t50

    (5075

    139116-(50

    142120

    7652

    167

    696(50(50(50

    76

    5168340

    308(50(50

    (50

    LA CE NDPPM PPM rm

    518191621

    2171821"7

    191916119

    8434i64

    (166.^...

    (1

    13414339•51-

    5414250

    16

    45524330

    ^23

    20101010.—5

    1814(3

    150-i

    (3

    51524142?

    (5172026.^

    21271636

    1010(55—- 6--

    15(5(566-~"*5"

    (5

    SNrrn

    1.23.32.72.6

    .z

    0.53.83.74.3

    174

    4.44.42.6i o i. j~2 ;5~~

    2.61.91.1l.Otrf

    2.72.20.1

    11-*3-

    0.3

    EUPPM

    0.40.80.70.61:4

    (0.21. 1l. 2l. 4fl.4

    l. 3l. 30.90.7

    0.9l. 50.60.3

    tt;2

    l. 50.9

    (0.23.2

    ^0:2

    (0.2

    TBPPM

    (0.5(0.5(0.5(0.5\tf.o

    (0,5tt.5tt.5tt.5(0.5

    (0.5tt.5tt.5(0.5-tt:5-

    (0.5(0.5tt.5tt.5

    -ttrr

    tt.5(0.5(0.5(0.5"^7t

    (0.5

    YB LUPPM PPM

    0.76 0.17l. 72 0.350.47 0.171.29 0.24L.iZ v.X'

    0.29 0.082.19 0.452.41 0.412.42 0.410.73 0.14

    2.38 0.442.33 0.510.64 0.081.03 0.23

    -2:24-t:49

    2.32 0.422.65 0.461.19 0.190.93 0.17

    3.90 0.753.21 0.560.18 tt.OS2.22 0.44

    -frl2"tt:*5

    0.91 0.19

    Mass3—

    28.3226.0724.9423.35tSrTT

    27.0831.7734.3533.3732-39

    23.1625.3326.3828.02--25-.-9S- —

    30.6831.8836.7434.31^.72 —

    29.1135.5830.9331.0233.08 —

    38.06

    J

  • Activation Laboratories Ltd. Work Order,1 3225 Report.1 3226

    Sample description AU AG AS BA BR CA CO CR CS FE HP H6 IR HO NA N! RB SB SC SE SNf

    2611226113261142611536116

    26117261182611926120Af-A rtt26121

    261222612326-1242612526126

    261272612826129

    (2613026131

    2613226133261342613536.136

    26137

    mj

    (5(5(5tt10

    tt(5169

    22

    14tt(5

    151tt

    68(51750tt

    37174(5tt

    385

    4520

    mi

    tt(5tttttt

    tt(5tt(5tt

    tttttttt(5

    tt(5tt(5tt

    tt(5(5(5tt

    tt

    mi9

    30132112

    39

    137

    89

    ISO130

    77126

    (2(26

    (2(2

    (279

    4(2(2

    3

    mi210270660370

    (100

    380(100

    140(100(100

    230200550290380

    (100250140

    (100(100

    (100(100(1001200(100

    (100

    mr

    (1(1(1(1(1

    (1(1(1(1(1

    (1(1(1(3(1

    (1(1(1(1

    1

    (1(1(1(1(1

    (1

    j t

    2(1(1(1-•-4

    (1434

    ^

    (1(1(1(1" 1 —

    i

    62

    (1(1

    2(1(16

    (1

    (1

    m10378

    3419

    tt201922T

    30328

    17-37-

    3338191319

    2652(524(5

    tt

    mr340680200810200

    260130150160180-

    36039012045028T

    190240160290•410-

    220130410130290

    140

    Tffl T 1

    (2 1.81(2 5.584 1.722 5.70

    t2 4:21

    (2 1.36(2 4.37(2 4.58(2 5.46(2 ?m

    3 6.273 6.652 2.073 3.29--T-T.SO--

    (2 18.3(2 9.30(2 3.99(2 2.79-X2--3.-49--

    2 9.453 6.27

    (2 0.716 6.04"•Q-0:36—

    (2 2.65

    TTT^F

    1333...j .

    (3344T

    5532-2 —

    1(1(1

    1

    23

    (15

    1

    •ffi—

    (1(1(1(1tl

    (1(1(1(1tr(idd(itrdddi

    d(id(i(id

    (5tt(5tt(5

    (5tttt(5- tt

    (5tttttt-^s—(5(5tt(5-xs- -

    tttttttt~^

    tt

    (5 7150tt 11600(520200tt 7720T5~2570?

    tt 4030(524900tt 23600(5 21100"T5"1900

    (5 18800(5 20500tt 40600tt 6900

    -ft" 3090

    (5 20-50(5 7150tt 4020tt 5100(S~42ir

    26 1940013 17300(5 1300(5 34300SI 1680

    ISO 8790

    mi

    (50320(50370(Se(50(50(SO260(50

    (50(SO(50140tsr(50(50(SO(SO(S0-

    (50(50(50(50(ST

    (SO

    mi

    (30(3058

    (30(30

    (.30(30(30(30(30

    43(3045

    (3064

    (30(30(30(SOX30

    (30(SO(3065

    (30

    (30

    mi0.61.50.81.30.6

    0.3(0.20.40.3"0.7

    1.71.70.60.9-3.9

    (0.2(0.2(0.2(0.2(0.2

    (0.22.30.2

    (0.2(0.2

    (0.2

    m?6.1

    216.8

    2117

    2.31516177.0

    19205.3

    12"35

    3237128.0

    16

    4733

    1.821

    1.1

    2.2

    mi s(5 (0.01tt (0.01tt (0.01tt (0.01(5 (0.01

    tt (0.01tt (0.01tt (O.Oltt (0.01(5(0.01

    tt (0.01tt (0.01tt (0.01tt (0.01

    - (5(0.02

    tt (0.01tt (0.01tt (0.01tt (0.01tt (0.03

    (5 (0.02tt (0.01tt (0.01tt (0.01tt (0.01

    tt (0.01

    t

  • S.J.S* J.

    ^ 3

    a o ***

    Se W.

    GEOLOGY 8 SAMPLE LOCATIONS

    SCALE

    I :400O or lin.:3333ft.

  • B

    V'S

    '99

  • \A

    *i* njri

    GEOLOGY a SAMPLE LOCATIONS

    SCALE

  • v\it ft

    Se*,.

    GEOLOGY 8 SAMPLE LOCATIONS

    SCALE

    l : 4000 or lin." 3333ft.

  • FR

    AT

    ER

    ER

    IC

    H

    U F

    FM

    AN

    y x,^

    .— ^

    OP

    EE

    PE

    ES

    WA

    Y -

    RIC

    E

    LAK

    ES

    AR

    EA

    GE

    OL

    OG

    Y

    a

    SA

    MP

    LE

    L

    OC

    AT

    ION

    S

    A R

    BU

    TU

    SF

    ING

    AL

    40

    OO

    5

    00

    0

    600O

    70

    00

    8000

    9000

    10,0

    00

    ^1 P

    .s t


Recommended