Concept of Project Arrow
Present scenario
70% of people live in
rural areas
Most villages & small
town do not have
connectivity tomainstream economy
Potential of India Post
Dept has over 1.55 lakh
POs across the country
with more than 1.25 lakhin rural area
This network provides a
huge opportunity toconnect remote areas
7/29/2019 4.3A Project Arrow
3/43
3
Concept of Project Arrow
Make Post office the window to the
world for aam aadmi
This is conceived in April 2008
Focus on improving the core operations of
Post offices
Enhancement of look and feel to create a
unique identity
7/29/2019 4.3A Project Arrow
4/43
4
Scope
Get the core right
Modernize the look and feel
7/29/2019 4.3A Project Arrow
5/43
5
Scope
Focused efforts to significantly improve
four core areas of the postal service
Mail delivery
Savings Bank
Remittances
Office service levels
7/29/2019 4.3A Project Arrow
6/43
6
Scope.
Broad approach to upgrade, enhance
capacity and quality in
Branding
Technology
Human resource
Infrastructure
7/29/2019 4.3A Project Arrow
7/43
7
Objectives
Make a visible, tangible, and noteworthydifference in post offices that matters tothe common man
Verify and certify progress on ongoingbasis using clearly defined KeyPerformance Indicators (KPIs) for eachimprovement area
Set the foundation for a comprehensivetransformation of India Post
7/29/2019 4.3A Project Arrow
8/43
8
Covers 8 silos
1. Mail delivery
Ensure same day delivery and same day
dispatch
2. Savings bank
Reduce transaction time
Counter transactions
Account transfer
Closure
Settlement of claim cases
7/29/2019 4.3A Project Arrow
9/43
9
Covers 8 silos
3. Office service level
Improve customer satisfaction in all
parameters from appearance to operation
4. Remittance
Payment of MOs on the day of receipt
Provide web enabled remittance service
7/29/2019 4.3A Project Arrow
10/43
10
Covers 8 silos
5. Human resources
Identifying roles and job descriptions for all
Designing suitable training to enhance
operational and soft skills of staff6. Infrastructure
Standardize and consistent interior and exterior
blueprint and ensure uniform implementation
7/29/2019 4.3A Project Arrow
11/43
11
Covers 8 silos
7. Technology
To enable POs to provide all IT enabled
services decide required
Hardware
Software
Connectivity
8.Branding Ensure uniform brand hierarchy as well as
consistency for all products and services
7/29/2019 4.3A Project Arrow
12/43
12
A unique approach
Key elements
Holistic & integrated view
Equal focus on both core areas and look & feel
Standardized approach Standardized targets & improvement measures
Effective measurement
Central programme office & IT-enabled tools for reliable
measurement
Capability building
Training, workshops and professional consultancy
7/29/2019 4.3A Project Arrow
13/43
13
7/29/2019 4.3A Project Arrow
14/43
14
7/29/2019 4.3A Project Arrow
15/43
15
Mails- activities for improvement
Revision of mail arrangements- alternate
transport
Mentoring of Mails arrival and taking
corrective steps
Assessment of required man power
Ensuring postman multi-skilling Implementation of beat sorting at Mail
Offices
7/29/2019 4.3A Project Arrow
16/43
16
Mails- activities for improvement
Examining and arranging bulk mail
delivery from Mail Offices
Streamlining pre-delivery processes
Ensuring availability of Equipment and
accessories
Carrying out beat revision Developing beat backup
7/29/2019 4.3A Project Arrow
17/43
17
Mails- activities for improvement
Strengthening monitoring of postmen
performance
Strengthening monitoring of Letter Box
clearance and dispatch of mail
Popularizing PIN codes
7/29/2019 4.3A Project Arrow
18/43
18
http://www.photos.com/en/search/close-up?eqvc=926218&oid=4936861&a=p&pt=&k_mode=any&k_exc=&t_plus=1&cid=&date=&ct_search=&k_var=banking&first=26&ofirst=&srch=Y&hoid=7d567bca0d1a78882b76fbd7ccacffd7&bl=%2Fen%2Fsearch%2Findex%3Fa%3Dp%26k_var%3Dbanking%26k_mode%3Dany%26f_plus%3D1%26first%3D26%267/29/2019 4.3A Project Arrow
19/43
19
SB- activities for improvement
Revision of cash balances and withdrawal
limits
Digitizing all manual records
Re-engineering Savings Bank operatingprocesses
Streamlining account transfer procedure
Popularizing nomination facility Expeditious settlement of death claim cases
7/29/2019 4.3A Project Arrow
20/43
20
http://www.photos.com/en/search/close-up?eqvc=1225618&oid=2826875&a=p&pt=&k_mode=any&k_exc=&t_plus=1&cid=&date=&ct_search=&k_var=money%20order&first=1&ofirst=&srch=Y&hoid=8b3d4399feb86ad25a4781a33f0665ab&bl=%2Fen%2Fsearch%2Findex%3Fa%3Dp%26k_var%3Dmoney%20order%26k_mode%3Dany%26f_plus%3D1%26first%3D1%267/29/2019 4.3A Project Arrow
21/43
21
Remittance- activities for
improvement
Revision of cash balances and revision of linelimits
Effective supervision and monitoring of
postmen performance Providing system back-up and monitoring of
Network
Installation of required software for eMO
facility High level monitoring of eMO and iMO
services and popularizing eMO byadvertisements
7/29/2019 4.3A Project Arrow
22/43
22
http://www.photos.com/en/search/close-up?eqvc=1746433&oid=9413547&a=p&pt=&k_mode=any&k_exc=&t_plus=1&cid=&date=&ct_search=&k_var=customer%20service&first=76&ofirst=&srch=Y&hoid=e6b91fe3942cfa0a6fbf7f580b379133&bl=%2Fen%2Fsearch%2Findex%3Fa%3Dp%26k_var%3Dcustomer%20service%26k_mode%3Dany%26f_plus%3D1%26first%3D76%267/29/2019 4.3A Project Arrow
23/43
23
Office Service Level- activities
for improvement
Taking action for thorough cleaning of
Post Office
Codifying the duties and responsibilities
of the Postmaster and tracking
compliance for effective supervision
and administration
Formulating and implementing local
citizens charter
Offi S i L l i i i
7/29/2019 4.3A Project Arrow
24/43
24
Office Service Level- activities
for improvement
Ensuring adequate infrastructure & supportsystems
Ensuring better queue management
Standardizing the duties & responsibilities ofPO staff
Organizing professional/Soft skills/troubleshooting training
To sustain and improve overall level of servicequality- implementation of customersatisfaction survey process
7/29/2019 4.3A Project Arrow
25/43
25
7/29/2019 4.3A Project Arrow
26/43
26
Branding
The following PO objects need to be re-
branded as per new India Post
Corporate Manual
New India Post logo
Internal branding
External branding
7/29/2019 4.3A Project Arrow
27/43
27
Branding.
Internal branding
Display
Counter signage
Information boards
Materials
Stationery
Uniforms Postman bags
7/29/2019 4.3A Project Arrow
28/43
28
Branding.
External branding
PO signage (name board,standee etc)
Letter boxes
Vans
E t l i b d (PO
7/29/2019 4.3A Project Arrow
29/43
29
External sign board (PO name
board)
Technical description
Size: 1:3 (Height x Width)
Colour combination
Red
Yellow
Name of office in two/three languages will
be on the strip provided for the purpose
E t l i b d (PO
7/29/2019 4.3A Project Arrow
30/43
30
External sign board (PO name
board)
Technical description
Order for languages
For two, Hindi First and English next
For three, Regional, Hindi and English
Postal Index Number will be added on the
signboard of delivery PO
7/29/2019 4.3A Project Arrow
31/43
31
Sign board, Example
7/29/2019 4.3A Project Arrow
32/43
32
Information board
There are four types of information
boards
Citizens charter
Hours of business
Public notice board
Advertisement
7/29/2019 4.3A Project Arrow
33/43
33
Information board
Technical description
Size: 4 x 3 (Height x Width) should
contain Corporate Symbol and text
The wings of the corporate symbol ispainted in post office yellow over a post
office red stripe on the top with relevant
text on the right side
Another stripe containing three shades of
red will run across the bottom portion
7/29/2019 4.3A Project Arrow
34/43
34
Uniform materials
Jacket for counter (front office) staff
Front office staff is expected to wear a
post office red jacket on top of their dress
Colour; Post office Red
India Post logo should be visible around
the left pocket
7/29/2019 4.3A Project Arrow
35/43
35
Jacket, Example
7/29/2019 4.3A Project Arrow
36/43
36
Uniform materials
Postman delivery bag
Colour: Post office red
India post logo should be stencilled on the
front of the bag in corporate colours
7/29/2019 4.3A Project Arrow
37/43
37
Postman delivery bag , Example
7/29/2019 4.3A Project Arrow
38/43
38
Standee
Two variants of standee (services
boards)
HPO Taller
Other PO Shorter
Size:
Taller 16ft by 4 ft (H x W)
Shorter 8 ft by 2 ft (H x W)
7/29/2019 4.3A Project Arrow
39/43
39
Standee
Other technical description
Material: Aluminium Composite Panel
Colour: Post office Red and Yellow
Important services available in PO should
be highlighted in the order of priority
7/29/2019 4.3A Project Arrow
40/43
40
Standee Example
Shorter Longer
7/29/2019 4.3A Project Arrow
41/43
41
Letter boxes
Four variants of letter boxes
Three standing
One hanging
All should have Post office red colour
Exceptions Green and Blue meant for local
and metro city letters
7/29/2019 4.3A Project Arrow
42/43
42
Letter boxes
Hour plate to show time of clearance
should be in the front. No other text
appear. Name of PO/Mail Office should
be at back of standing letter box and atback/bottom of hanging letter box
ID number of letterbox appear on both
sides of box