+ All Categories
Home > Documents > 447_ERP606_BPD_EN_CN

447_ERP606_BPD_EN_CN

Date post: 11-Sep-2015
Category:
Upload: islam-el-shamy
View: 4 times
Download: 1 times
Share this document with a friend
Description:
447_ERP606_BPD_EN_CN
Popular Tags:
54
EHP6 for SAP ERP 6.0 October 2013 English Contract Billing for Engineering and Construction (447) SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany Business Process Documentation
Transcript
  • EHP6 for SAP ERP 6.0

    October 2013

    English

    Contract Billing for Engineering and Construction (447)

    SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany

    Business Process Documentation

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 2 of 54

    Copyright

    2013 SAP AG or an SAP affiliate company. All rights reserved.

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

    National product specifications may vary.

    These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

    SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries. Please see http://www.sap.com/corporate-en/legal/copyright/index.epx#trademark for additional trademark information and notices.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 3 of 54

    Icons

    Icon Meaning

    Caution

    Example

    Note

    Recommendation

    Syntax

    External Process

    Business Process Alternative/Decision Choice

    Typographic Conventions

    Type Style Description

    Example text Words or characters that appear on the screen. These include Field names, screen titles, pushbuttons as well as menu names, paths and options.

    Cross-references to other documentation.

    Example text Emphasized words or phrases in body text, titles of graphics and tables.

    EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

    Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

    EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the

    ENTER key.

    Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

    Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 4 of 54

    Contents

    1 Purpose ................................................................................................................................... 6

    1.1 Lump-Sum Contract with Milestone Billing ...................................................................... 6

    1.2 Bill of Services Unit Price Contract with Service Entry Sheet ....................................... 6

    1.3 Cost Plus and Time and Material Billing (RRB) ............................................................... 7

    2 Prerequisites............................................................................................................................ 7

    2.1 Master Data and Organizational Data .............................................................................. 7

    2.2 Business Conditions ......................................................................................................... 8

    2.3 Preliminary Steps ............................................................................................................. 8

    2.3.1 Creating User Settings for Requirement Planning .................................................... 8

    2.4 Roles ................................................................................................................................ 9

    2.4.1 Defining Queries for Personal Object Worklist (POWL) ......................................... 11

    3 Process Overview Table ....................................................................................................... 11

    3.1 Lump-Sum Contract with Milestone Billing .................................................................... 11

    3.2 Bill of Services Unit Price Contract with Service Entry Sheet ..................................... 12

    3.3 Cost Plus and Time and Material Billing (RRB) ............................................................. 13

    4 Process Steps Lump-Sum Contract with Milestone Billing ................................................ 14

    4.1 Creating Inquiry .............................................................................................................. 14

    4.2 Creating Quotation ......................................................................................................... 16

    4.3 Creating Project ............................................................................................................. 18

    4.3.1 Assigning Milestone to the Project .......................................................................... 19

    4.3.2 Creating Document for Designed Drawings ........................................................... 21

    4.4 Creating Sales Order ..................................................................................................... 23

    4.4.1 Assigning Billing Plan to Sales Order ..................................................................... 24

    4.5 Creating Down Payment Request and Down Payment ................................................. 25

    4.5.1 Posting of the Down Payment ................................................................................ 26

    4.6 Confirming Milestone ..................................................................................................... 27

    4.7 Creating Billing Document .............................................................................................. 28

    5 Process Steps Bill of Services Unit Price Contract with Service Entry Sheet ................. 29

    5.1 Creating Inquiry .............................................................................................................. 29

    5.2 Creating Quotation ......................................................................................................... 30

    5.3 Creating Project ............................................................................................................. 32

    5.4 Creating Sales Order ..................................................................................................... 34

    5.5 Creating Service Entry Sheet ......................................................................................... 35

    5.6 Creating Debit Memo ..................................................................................................... 36

    5.6.1 Posting Incoming Payment from Customer Manually ............................................. 36

    5.7 Creating Service Entry Sheet for Subsequent Billing .................................................... 37

    5.8 Creating Debit Memo ..................................................................................................... 38

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 5 of 54

    6 Process Steps Cost Plus or Time and Material Billing (RRB) ............................................ 39

    6.1 Creating a Project Structure (Ref: 439) .......................................................................... 39

    6.2 Posting Procurement Costs to Project ........................................................................... 40

    6.3 Detail the Project Structure (Ref: 441) ........................................................................... 41

    6.4 Creating Document for Designed Drawings ................................................................... 42

    6.5 Creating Order ............................................................................................................... 43

    6.6 Approving and Releasing the Project (Ref: 441)............................................................ 44

    6.7 Confirming Activity (Ref: 441) ........................................................................................ 45

    6.8 Confirming Labor through CATS (Ref: Time Entry BPD) ............................................... 46

    6.9 CATS Approval (Ref: Time Entry BPD) ......................................................................... 47

    6.10 Time Sheet: Transferring to Target Components ....................................................... 48

    6.11 Time and Material Billing ............................................................................................ 50

    6.11.1 Creating Billing Request ......................................................................................... 50

    6.11.2 Creating Billing Document ...................................................................................... 51

    7 Appendix ................................................................................................................................ 52

    7.1 Reversal of Process Steps ............................................................................................. 52

    7.2 Used Forms .................................................................................................................... 53

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 6 of 54

    Contract Billing for Engineering and Construction

    1 Purpose

    1.1 Lump-Sum Contract with Milestone Billing

    This scenario deals with selling services where owner and general contractor have agreed on a lump sum for the execution of the contract on a billing plan with dates depending on the progress of the work.

    A lump sum contract is more and more used in the construction industry. Owner and general contractor agree on a lump sum for the execution of the contract. Aside from the lump sum, the owner and general contractor agree on a billing plan with dates depending on the progress of the work. For example, this means that 10% of the lump sum is paid when the contract is signed, 40% when the building shell is finished, and 40% when the interior fittings have finally been performed. The remaining 10% is paid once the entire work is done, that means after the acceptance procedure.

    A Bill of Services is a quantitative and qualitative description of the services to be performed for example, to build a new building. In case of lump sum contracts, it is used only for internal purposes, as a tool to do the internal cost estimation and to measure the progress of the construction site. But nevertheless it is also the communication structure for all business partners involved in the process (general contractor, subcontractors, and so on). But in contrast to the unit price contract the settlement is done using a billing plan and not with the service entry sheets. Service entry sheets are the internal measure to valuate the constructions site and to determine its progress.

    The scenario focuses on the following activities:

    Creating a Customer Inquiry (optional)

    Creating a Customer Quotation (optional)

    Creating a Project from a predefined template and assign milestone

    Creating a Customer Order with Billing Plan

    Confirmation of Milestones

    Creating Billing Document and Accounting Document

    Post Payment

    Final Invoice and Technical closure of Project

    1.2 Bill of Services Unit Price Contract with Service Entry Sheet

    This scenario deals with selling services to a customer where owner and the general contractor agree on a price for one unit of the service to be performed. A unit price contract can be used in the construction industry. A Bill of Services is a quantitative and qualitative description of the services to be performed for example, to build a new building. It is the communication structure for all business partners involved in the process (owner, general contractor, subcontractors, and so on) and used, for example, to measure the progress and bill the services performed so far.

    Unit price means that the owner and the general contractor agree on a price for one unit of the service to be performed. The price is determined by means of cost estimation and the sales pricing, a subcontractor quotation or entered manually. To measure the progress for the services to be performed a service entry sheet is created. A service entry sheet is a quantitative confirmation for the services performed so far. The billing (down payment request or invoice) is based on the service entry sheet (quantities performed) and the bill of services (prices).

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 7 of 54

    The scenario focuses on the following activities:

    Creating a Customer Inquiry (optional)

    Creating a Customer Quotation (optional)

    Creating a Customer Order

    Create a Service Entry Sheet

    Create Debit Memo

    Posting Incoming Payment from Customer Manually

    Create Debit Memo and Accounting Document

    Post Payment

    Final Invoice and Technical closure of Project

    1.3 Cost Plus and Time and Material Billing (RRB)

    This scenario deals with resource-related billing for customer-specific services. You invoice your customers for specific materials, internal services, and costs incurred here. The billing request is used as the basis for creating the billing document. Prices for customer-specific services are not always defined in a contract as fixed prices, or determined using standard pricing. This is for instance the case if no empirical values are available for specific services, and services cannot therefore be calculated accurately before the contract conclusion.

    The scenario focuses on the following activities:

    Creating and detail a project structure

    Create order

    Approve and release the project

    Confirm activity and labor

    Approve CATS

    Transfer data to controlling

    Create billing request

    Creating billing document and accounting document

    2 Prerequisites

    2.1 Master Data and Organizational Data

    Default Values

    Essential master and organizational data was created in your ERP system in the implementation phase, such as the data that reflects the organizational structure of your company and master data that suits its operational focus, such as master data for materials, vendors, and customers.

    The business process is enabled with this organization-specific master data, examples are provided in the next section.

    Operational Focus

    SAP Best Practices delivers standard values for more than one operational focus area. This means that you may find more than one master data table below. Use the master data that matches the operational focus of your company.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 8 of 54

    Additional Default Values

    You can test the scenario with other SAP Best Practices default values that have the same characteristics.

    Check your SAP ECC system to find out which other material master data exists.

    Using Your Own Master Data

    You can also use customized values for any material or organizational data for which you have created master data. For more information on how to create master data, see the Master Data Procedures documentation.

    Use the following master data in the process steps described in this document:

    Org. Structure Value Comment

    Controlling area Controlling area (1000) Controlling Area 1000

    Company Code Company Code (1000) Company Code 1000

    Plant Plant 1 (1000) Production Plant 1000

    Standard WBS E00000 ECO: Tank Extension EPC project

    Standard Network E0070000 Std Network for EPC Project -A

    Sales organization Sales Org. 1 (1000) Sales Org. 1000

    Distribution channel 10 Direct Sales

    Division 10 Product Division 01

    Purchase organization Purchasing Org 1 (1000) Purchasing Org. 1000

    Storage Loc 1050 Standard Warehouse

    Storage Loc 1030 Production

    Storage Loc 1040 Finished Products

    2.2 Business Conditions

    The business process described in this Business Process Documentation is part of a bigger chain of integrated business processes or scenarios. As a result, you must have completed the following processes and fulfilled the following business conditions before you can start any activities in this scenario:

    Business Condition Scenario

    You have completed all steps described in the Business Process Documentation Prerequisite Process Steps (154). These process steps include the step Roll MM Period to Current Period. Perform this activity if the MM period in the system is not set to the current period. This activity is performed once a month.

    Prerequisite Process Steps (154)

    2.3 Preliminary Steps

    2.3.1 Creating User Settings for Requirement Planning

    Use

    In this step, you set up user settings that are necessary for requirement planning.

    Procedure

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 9 of 54

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Production MRP Evaluation Stock / Requirement List

    Transaction code MD04

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Production Planner

    (SAP_NBPR_PRODPLANNER_S)

    Business role menu Production Evaluations Reports Display Stock/ Requirement Situations

    2. On the Stock/Requirements List: Initial Screen, make the following entries:

    Field name Description User action and values Comment

    Material number ECO_BOS

    Plant Plant 1 (1000)

    3. Choose Enter.

    4. Confirm the information message.

    5. Navigate to Environment Navigation Profile Assign.

    6. Select the General Settings tab.

    7. In the Navigation Profile field, choose the navigation design SAPPPMRP00 MRP Controller.

    8. Choose Save.

    9. Confirm the information message.

    10. Go back to the SAP Access screen.

    Result

    You have created the user settings necessary for the requirements planning.

    2.4 Roles

    Use

    The following roles must have already been installed to test this scenario in the SAP NetWeaver Business Client (NWBC). The roles in this Business Process Documentation must be assigned to the user or users testing this scenario. You only need these roles if you are using the NWBC interface. You do not need these roles if you are using the standard SAP GUI.

    Prerequisites

    The Business roles have been assigned to the user who is testing this scenario.

    Business role Technical Name Process Step

    Sales SAP_NBPR_SALESPERSON_M Sales Manager

    SAP_NBPR_SALESPERSON_S Sales Administrator

    SAP_NBPR_SERVAGENT_S Service Agent

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 10 of 54

    Business role Technical Name Process Step

    SAP_NBPR_SERVEMPLOYEE_S Service Employee

    Billing Administrator

    SAP_NBPR_BILLING_S Creating Down Payment Request and Down Payment

    Creating Billing Document

    Purchaser SAP_NBPR_PURCHASER_S Convert Requisition to PO

    Change PO for Equipment

    Down Payment monitoring for PO

    Create PO for Materials w/o Material master record

    Create Blanket PO

    Evaluating vendors

    Compare vendor evaluation

    Print vendor evaluation sheet

    Project Manager

    SAP_NBPR_PROJECTMANAGER_M Create Project

    Create Reservation for Material, Equipment and Subcontracted services

    Display Project oriented PR

    Progress tracking PO selection

    Display Project oriented delivery commitments

    Display project related procurement cost

    Project Manager ECO

    SAP_NBPR_PROJECTMANAGER_ECO_M Create Inquiry;

    Deferred Tax Transfer

    Account Receivable Accountant

    SAP_NBPR_AR_CLERK_S Posting of the Down Payment

    Account Payable Accountant

    SAP_NBPR_AP_CLERK_S Enter Invoice with retention payment terms

    Enter Invoice for Blanket PO

    Execute Payment run

    Warehouse Clerk

    SAP_NBPR_WAREHOUSECLERK_S GR for PO with materials and equipment

    Record hours via service entry sheet

    Time Administrator

    SAP_NBPR_TMADMIN_HCM_M Enter Time Sheet

    Time Processor (HCM)

    SAP_NBPR_TMPROCESSOR_HCM_S Time Sheet: Transferring to Target Components

    Production Planner

    SAP_NBPR_PRODPLANNER_S Creating User Settings

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 11 of 54

    Business role Technical Name Process Step

    Engineering Specialist

    SAP_NBPR_ENGINEER_S Creating Document for Designed Drawings

    2.4.1 Defining Queries for Personal Object Worklist (POWL)

    The following queries must be defined to test this scenario in the SAP NetWeaver Business Client (NWBC). You only need these queries if you are using the NWBC interface. You do not need these queries if you are using the standard SAP GUI.

    The queries are necessary to access role specific worklists in the SAP NetWeaver Business Client (NWBC).

    For more information about the creation of queries, see the section Creation of Queries in Personal Object Worklists (POWLs) in the Quick Guide to Implementing the SAP Best Practices Baseline Package (CN) document.

    Business role

    Application Object Type

    Variant Name

    Variant Selections

    Selection Criteria

    Query Name

    Sales Administrator

    Sales- Customer Cockpit

    Open Quotation

    For example, Open Quotation

    Sales Administrator

    Sales- Customer Cockpit

    Sales Document Search

    For example: Sales Document Search

    3 Process Overview Table

    3.1 Lump-Sum Contract with Milestone Billing

    Process step External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code

    Expected results

    Create Customer Inquiry

    Sales Administrator

    VA11

    Create Customer Quotation

    Sales Administrator

    VA21

    Create Project from template

    Project Manager

    CJ20N

    Assign Milestone to Project

    Project Manager

    CJ20N

    Create document

    Engineering Specialist

    CV01N Create a SAP Document for drawings and assign drawings to the

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 12 of 54

    Process step External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code

    Expected results

    project

    Create Sales Order

    Sales Administrator

    VA01

    Assign Billing Plan to Sales Order

    Sales Administrator

    VA02

    Create Down Payment Request and Down Payment

    Sales Administrator

    VF01

    Post Down Payment

    Sales Administrator

    F-29

    Confirm Milestones

    Project Manager

    CNS41

    CN25

    Create Billing Document

    Sales Administrator

    VF01

    3.2 Bill of Services Unit Price Contract with Service Entry Sheet

    Process step External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code

    Expected results

    Create Customer Inquiry

    Sales Administrator

    VA11 Inquiry created.

    Create Customer Quotation

    Sales Administrator

    VA21 Quotation created.

    Create Customer Order

    Sales Administrator

    VA01 Customer order created.

    Create Service Entry Sheet

    Sales Administrator

    VA01 Service Entry Sheet created.

    Create Debit Memo

    Sales Administrator

    VF01 Debit

    Memo created.

    Posting Incoming Payment from Customer Manually

    Sales Administrator

    F-28 Down Payment posted.

    Create Service Entry Sheet for Subsequent

    Sales Administrator

    VA01 Service entry sheet created.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 13 of 54

    Process step External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code

    Expected results

    Billing

    Create Debit Memo and Accounting document

    Sales Administrator

    VF01 Debit Memo created.

    3.3 Cost Plus and Time and Material Billing (RRB)

    Process step

    External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code Expected results

    Create the Project Structure

    Project Manager

    CJ20N

    Detail the Project Structure

    Project Manager

    CJ20N

    Create document

    Engineering Specialist

    CV01N Create a SAP Document for drawings and assign drawings to the project

    Create Customer Order

    Sales Administrator

    VA01

    Approve and Release the Project

    Project Manager

    CJ20N

    Confirm Activity

    Project Manager

    CJ20N

    Confirm Labor through CATS

    Time Administrator

    CAT2

    CATS Approval

    Time Administrator

    CATS_APPR_LITE

    Transfer Data to Controlling

    Time Administrator

    CAT7

    Create Billing request

    Service Employee

    DP90

    Change Debit Memo Request

    Sales Administrator

    VA02

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 14 of 54

    Process step

    External process reference

    Business condition

    Business role (not technical role for BP)

    Transaction code Expected results

    Create Billing document

    Sales Administrator

    VF01

    4 Process Steps Lump-Sum Contract with Milestone Billing

    If you want to continue this process after BPD 756 tender processing, you can use the tender project as your project; you can skip inquiry and quotation. Change the tender project to continue from 4.3.

    4.1 Creating Inquiry

    Use

    The process starts with an inquiry from a prospect. If you want to bid, an inquiry is created containing the most important data concerning the customer and first documents but also a Bill of Services (BOS). The customer provides the BOS and later on - the contractor has to bid in the format of the BOS.

    For lump sum contracts, the prospect describes the building project without much detail. For example, the prospect may not provide a bill of services. In these cases, the general contractor creates the Bill of Services to:

    Perform the cost estimation

    Manage the communication with subcontractors

    Measure

    Valuate the progress of the construction site.

    In this case, an inquiry is not created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Inquiry Create

    Transaction code VA11

    2. On the Create Inquiry screen, make the following entries:

    Field name Description User action and values Comment

    Inquiry Type YEI1

    Sales organization 1000

    Distribution channel 10

    Division 10

    Choose Enter.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 15 of 54

    3. On the ECO Inquiry-MS+CPRR: New screen, make the following entries:

    Field name Description User action and values Comment

    Sold-to-party E-YE0060

    PO Number Enter any purchase order number

    Material ECO_BOS

    Order Quantity 1

    Valid to Todays Date + 1 Month

    4. Choose Enter. Confirm the information message.

    5. Select the item and choose Item Condition at the bottom of the screen.

    6. On the Create ECO Inquiry-MS+CPRR: Item Data screen, make the following entries:

    Field name Description User action and values Comment

    Condition Type ZPR1

    Amount 1,000,000.00 CNY

    7. Choose menu path Goto Header.

    8. On the Create ECO Inquiry-MS+CPRR: Header Data screen, make the following entries:

    Field name Description User action and values Comment

    Pricing Date Todays Date

    9. Save your entries. Make a note of the inquiry number : _________

    10. Choose Back to leave the screen and return to the main screen of the inquiry.

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Inquiry Create Inquiry

    1. On the Create Inquiry screen, make the following entries:

    Field name Description User action and values Comment

    Sold to Party E-YE0060

    Inquiry Type YEI1

    Sales organization 1000

    Distribution channel 10

    Division 10

    2. Choose Continue.

    3. On the Select Ship-To Party screen, choose the Ship-to party same as Sold-to party.

    4. On the ECO Inquiry-MS+CPRR: New screen, make the following entries:

    Field name Description User action and values Comment

    PO Number Enter any purchase order number

    Material ECO_BOS

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 16 of 54

    Order Quantity 1

    Valid to Todays Date + 1 Month

    5. Select your line item and choose the Item Details tab.

    6. On the Item details screen, choose the Pricing tab.

    7. Make the following entries:

    Field name Description User action and values Comment

    Condition Type ZPR1

    Condition rate 1,000,000.00 CNY

    8. Choose Incompletion Log tab and click Header, choose Pricing date and make the following entries:

    Field name Description User action and values Comment

    Pricing Date Todays Date

    9. Choose Save Document. Make a note of the inquiry number: _________

    Result

    An inquiry is created.

    4.2 Creating Quotation

    Use

    The quotation is created if you want to bid for the contract. Based on the quotation, cost estimation is carried out and prices are determined. The quotation, once finished, is sent to the prospect. The prospect in turn may return the quotation to you in case of questions or additional negotiations.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Quotation Create

    Transaction code VA21

    2. Make the following entries:

    Field name Description User action and values Comment

    Quotation Type YEQ1

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Create with reference.

    4. To copy information from the inquiry, enter the inquiry number created in the previous step and choose Copy.

    5. Confirm the information message.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 17 of 54

    6. Choose the Sales tab.

    7. Make the following entries:

    Field name Description User action and values Comment

    Valid from Todays date

    Valid to Todays Date + 60 days

    8. Select the quotation item and choose Item conditions.

    9. Make the following entries:

    Field name Description User action and values Comment

    Condition ZPR1

    Amount

    for example, 1,000,000.00 CNY

    10. Save the quotation and make a note of the quotation number: __________

    The quotation is sent to the customer now. For a unit price contract, the quotation is printed with the Bill of Services and the prices of the service lines.

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Customer Cockpit

    1. On the Customer Cockpit screen, enter the following data:

    Field name Description User action and values Comment

    Customer Number E-YE0060

    2. Choose Display Customer.

    3. On the Customer Cockpit: Yangzi Petrochemical Company (E-YE0060) screen, choose active query Sales Document Search tab and maintain the quick criteria if required.

    4. Select your Inquiry line and choose Create with Reference.

    5. On the Create Sales Document screen, make the following entries:

    Field name Description User action and values Comment

    Sold-to party E-YE0060 Defaults from the Inquiry selected

    Sales Document Type

    YEQ1 ECO Quote MS

    Reference Document

    Created in previous step, should default on this screen

    6. Choose Continue.

    7. On the Select Ship-To Party screen, choose the Ship-to party same as Sold-to party.

    8. On the ECO Quote MS: New screen, choose the Main view tab.

    9. Make the following entries:

    Field name Description Data Comment

    Valid from Todays date

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 18 of 54

    Valid to Todays Date + 60 days

    10. Select your line item and choose the Item Details tab.

    11. On the Item details screen, choose the Pricing tab.

    12. Make the following entries:

    Field name Description User Value and Data Comment

    Condition type ZPR1

    Condition rate For example: 1,000,000.00 CNY

    13. Choose Save Document.

    Result

    A quotation is created.

    4.3 Creating Project

    Use

    You have received the contract. The external view to the customer is represented by a sales order. Internally the controlling and management is done by means of a project. If a project has been created already as described in Scenarios 439 and 441, then create your own project by copying an existing project as described below.

    The WBS element EXXXXX is the billing WBS element. In addition to WBS elements, the project contains a network with milestones. The Sales document date checkbox is set with a percentage for the billing plan. This flag Sales document date is the precondition to link milestones to billing plan items in a sales document. The percentage value is taken as the default for the billing plan item.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project Systems Project Project Builder

    Transaction code CJ20N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Planning Project Project Builder

    2. On the Project Builder screen, from the menu, choose (NWBC: More) Project New Copy project.

    3. In the Create Project dialog box, make the following entries:

    Field name Description User action and values Comment

    Project Def. New Project definition

    Enter a project definition number that has not yet been used

    For example, EXXXXX

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 19 of 54

    Field name Description User action and values Comment

    Description Description Enter a description of the project you are creating

    For Example: Construction Project for Lump Sum

    Project def. Source Project Definition

    Enter the project definition number that was created in scenarios 439 and 441

    For example, EXXXXX

    Start

    Project Profile YECO001 ECO Engineering Procurement and Construc

    4. Choose Enter

    5. On the Easy cost Planning pop-up screen, choose Yes.

    6. On the Number Assignment pop-up screen, enter the network number to correspond to the project def. number you are creating. If your Project Def. number is E00010 then enter E00010.

    7. Ignore the warning messages displayed in the Project Builder Log screen by choosing Back.

    8. On the left side of the screen under Project Structure: Description, choose the top level WBS Element Tank Extension project EXXXXX.

    9. On the right side in the Identification and view selection screen, the WBS element is displayed.

    10. Choose the Basic data tab.

    11. In the Operative Indicators section, make the following entries:

    Field name Description User action and values Comment

    Acct asst element Select

    Billing element Select

    12. To release your project, select the project definition of your project (the first row with the description of the project). In the Basic Data tab, choose System/User Status on the right of System Status and mark the user status APPD.

    13. Choose Back.

    14. From the menu bar, choose (NWBC: More) Edit Status Release. The system displays the message Status was set.

    15. Save your entries.

    Result

    You have created a project by referencing an existing project EXXXXX

    4.3.1 Assigning Milestone to the Project

    Use

    In this activity, you assign milestones to the project.

    Procedure

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 20 of 54

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project Systems Project Project Builder

    Transaction code CJ20N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Planning Project Project Builder

    2. On the Project Builder screen, choose Open.

    3. In the Open Project dialog box, enter the Project Definition EXXXXX created in the previous step and choose Enter.

    4. On the Project Builder: Project EXXXXX screen, choose the project definition on the left hand side of the screen under Project Structure: Description and choose Expand All.

    5. Under WBS element Site Preparation, choose Network activity Mobilize/ Demobilize.

    6. On the right side of the screen, choose Milestone Overview.

    7. On the Milestone screen, make the following entries and choose Enter:

    Field name Description User action and values Comment

    Usage 00009

    Description Down Payment

    8. The Milestone is assigned to the Network Activity on the left side of the screen. Choose Milestone Down Payment.

    9. On the right side, choose the Basic data tab.

    10. Make the following entries:

    Field name Description User action and values Comment

    Usage: Sales Document Dates Select

    Billing Plan: Invoice percentage 15

    11. On the left side of the Project Structure: Description screen, under WBS element Earthwork, choose Network activity Erosion Control.

    12. Network Activity opens. Choose Milestone Overview.

    13. On the Milestone screen, make the following entries and choose Enter:

    Field name Description User action and values Comment

    Usage 00003

    Description Complete Excavation

    14. The Milestone is assigned to the Network Activity on the left side of the screen. Choose the Milestone Complete Excavation on the left side of the screen.

    15. On the right side, choose the Basic data tab.

    16. Make the following entries:

    Field name Description User action and values Comment

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 21 of 54

    Field name Description User action and values Comment

    Usage: Sales Document Dates Select

    Billing Plan: Invoice percentage 25

    17. On the left side of the Project Structure: Description screen, under WBS element Structural, choose Network activity Metal Grating.

    18. On the right side of the screen, in Network Activity, choose Milestone Overview.

    19. On the Milestone screen, make the following entries and choose Enter:

    Field name Description User action and values Comment

    Usage 00005

    Description Complete Structure

    20. The Milestone is assigned to the Network Activity on the left side of the screen.

    21. Choose the Milestone Complete Structure on the left side of the screen.

    22. On the right side, choose the Basic data tab.

    23. Make the following entries:

    Field name Description User action and values Comment

    Usage: Sales Document Dates Select

    Billing Plan: Invoice percentage 40

    24. On the left side of the Project Structure: Description screen, under WBS element Commissioning and Handover, choose Network activity Commissioning&Handover.

    25. On the right side of the screen, in Network Activity, choose Milestone Overview.

    26. On the Milestone screen, make the following entries and choose Enter:

    Field name Description User action and values Comment

    Usage 00008

    Description Complete Project Closeout

    27. The Milestone is assigned to the Network Activity on the left side of the screen.

    28. Choose the Milestone Complete Project Closeout on the left side of the screen.

    29. On the right side, choose the Basic data tab.

    30. Make the following entries:

    Field name Description User action and values Comment

    Usage: Sales Document Dates Select

    Billing Plan: Invoice percentage 35

    31. Save your entries.

    4.3.2 Creating Document for Designed Drawings

    Use

    You now create a system document to store link with the designed drawings.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 22 of 54

    Prerequisites

    The designed drawing has been input in C:\SAP BP\.

    You can find the designed drawing in the SAP Best Practices Documentation Package in the folder ..\ SAP_BP\Misc\ECO\China\ and copy it to C:\SAP BP\.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project System Documents Document

    Management System Document Management System

    Document Create

    Transaction code CV01N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Engineering Specialist

    (SAP_NBPR_ENGINEER_S)

    Business role menu Engineering Document Management Create Document

    2. On the Create Document: Initial Screen, enter the document type KPR and the name YE_ECO_DRW_XX.

    3. Choose Enter.

    4. On the Create Document: Basic Data Engin/ Des.Drawing (KPR) screen, enter the following description: Drawing for Construction project XXX.

    5. Choose Create Original.

    6. Choose Continue (Enter) in the dialog box.

    7. In the Create Document: Basic Data Engin/Des. Drawing (KPR) dialog box, enter the following data:

    Field name Description User action and values Comment

    Applic. LIM

    Description Drawing for Construction project XXX

    Data Carrier PC

    Original C:\SAP BP\DRAWING1.JPG Select the file from the C:\SAP BP\

    8. Choose Continue (Enter).

    9. Choose Check In Orig.

    10. In the Check in Document: KPro dialog box, choose DMS_C1_ST and confirm your selection by choosing Enter.

    11. Choose Object Links tab page, choose WBS Element, enter EXXXXX on WBS element field.

    12. Choose Save (Shift+S).

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 23 of 54

    13. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)

    Or

    Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).

    Result

    A document has been created in the system.

    4.4 Creating Sales Order

    Use

    In this activity, you create the sales order.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Orders Create

    Transaction code VA01

    2. Enter the following data

    Field name Description User action and values Comment

    Order Type YEC1

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Create with reference.

    4. In the dialog box, enter the quotation number created in previous step and choose Copy.

    5. Confirm the information message.

    6. Enter the purchase order number and the purchase order date in the main screen of the sales order.

    7. The sales order item is linked to the project (billing WBS element) by the account assignment of the sales order item. Hence, the billing WBS element is debited with all revenues and down payments created due to the settlement (billing) of the sales order. Select the sales order item and choose Item details (icon with the reading-glass or follow

    menu path Go to Item Account Assignment). Enter the billing WBS element EXXXXX in the WBS Element field.

    8. Save the order and note the order number: __________

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Customer Cockpit Customer Cockpit

    1. On the Customer Cockpit screen, enter the following data and choose Display Customer

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 24 of 54

    Field name Description User action and values Comment

    Customer Number E-YE0060

    2. In the Customer Cockpit dialog box, choose active query Open Quotation.

    3. Select your Quotation number and choose Create with Reference.

    4. On the Create Sales Document screen, make the following entries:

    Field name Description User action and values Comment

    Sold-to party E-YE0060 Defaults from the Inquiry selected

    Sales Document Type

    YEC1 ECO Order MS

    Reference Document

    Created in previous step, should default on this screen

    5. Choose the Continue button.

    6. On the Choose Ship-To Party screen, choose the Ship-to party same as Sold-to party.

    7. On the ECO Order MS: New screen, choose the Main View tab.

    8. Enter the purchase order number and the purchase order date.

    The sales order item is linked to the project (billing WBS element) by the account assignment of the sales order item. Hence, the billing WBS element is debited with all revenues and down payments created due to the settlement (billing) of the sales order.

    9. Select the sales order item and choose the Item details tab.

    10. On the Item details screen, choose the Item details tab.

    11. Under field Assignment, in the WBS Element field, enter the billing WBS element EXXXXX.

    12. Choose Save Document. Note down the sales order number created: _________

    Result

    A sales order is created.

    4.4.1 Assigning Billing Plan to Sales Order

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Orders Change

    Transaction code VA02

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Sales Order Sales Order Processing Change Sales

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 25 of 54

    Order

    2. In the Order field, enter the sales order number from the previous step then choose Enter.

    3. On the Change ECO Order MS XXX: Overview screen, choose (NWBC: More) Goto

    Item Billing Plan.

    4. If HeadBillPlan checkbox has been chosen, remove the tick and choose Enter.(NWBC only)

    5. Choose Milestones.(NWBC only)

    6. In the Selection Criteria dialog box, in the Network number field, enter EXXXXX and choose Enter.

    7. In the Milestone selection dialog box, choose all four milestones created and choose Copy.

    8. The system generates the Billing Plan and adjusts the data based on the Milestone information.

    9. Make the following changes for the item (item for Down Payment):

    Field name New Values

    BR(Billing rule) 4

    Billing Type YEZ1

    Block Delete 02 and make it empty

    10. Choose Back and save your entries.

    4.5 Creating Down Payment Request and Down Payment

    Use

    A construction project can have a duration of several months or even years. To fund the beginning of the construction project customer and general contractor agreed on a down payment at the beginning of the project work. The down payment request is generated based on percentage in the first billing plan item.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

    Transaction code VF01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Billing Administrator

    (SAP_NBPR_BILLING_S)

    Business role menu Sales Billing Create Billing Document

    2. On the Create Billing Document screen, make the following entries:

    Field name Description User action and values Comment

    Document Sales order number

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 26 of 54

    3. Choose Enter

    4. The system processes the data from the sales order and creates a down payment request. The down payment request is sent to the customer.

    5. Mark the item of the down payment request and press button Item pricing conditions. Make a note of the net amount value: __________

    6. Save the down payment request and note the document number

    7. A down payment request or a down payment does not represent revenue. Strictly spoken the money still belongs to the customer. However, the value of the down payment request or the down payment later on is visible in the project reporting under the condition that the PS cash management is activated.

    4.5.1 Posting of the Down Payment

    Use

    In this activity, you post the down payment.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Accounting Accounts Receivable Document Entry Down

    payment Down payment

    Transaction code F-29

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Accounts Receivable

    (SAP_NBPR_AR_CLERK_S)

    Business role menu Accounts Receivable Posting Payment Post Customer Down Payment

    2. You have received the down payment from the customer. To enter the down payment in the system, on the Post Customer Down Payment: Header screen, make the following entries:

    Field name Description User action and values Comment

    Document date Todays date

    Posting Date Todays date

    Type DZ

    Company Code 1000

    Currency CNY

    Account E-YE0060

    Special G/L ind A

    Bank account 10020109

    Amount

    xxxxxx(the amount from the

    down payment request)

    Value Date Todays date

    3. Choose Requests.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 27 of 54

    4. Select the row with your down payment request number and choose Create down payments.

    5. Choose Post (Ctrl+ S). Message Correct the marked line items appears at the bottom.

    6. Double-click the marked line (with bank account), on the Post Customer Down Payment Correct G/L account item screen, choose More data. On the screen that follows, make the following entry, and then choose Back.

    Field name Description User action and values Comment

    Reason code 062

    7. Double-click the line (with customer E-YE0060), on the Post Customer Down Payment Correct Customer item screen, make the following enrties:

    Field name Description User action and values Comment

    Tax Amount Clear the amount

    Tax code X0

    Calculate tax X

    8. Choose Post.

    9. The system displays the message Document XXXXXXXXXX was posted in company code

    1000. Check the posted document using (NWBC: More)Document Display.

    10. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)

    Or

    Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).

    Result

    A down payment request is created and a down payment is posted.

    FI document:

    Debited Accounts Credited Accounts

    10020109 BOC-Cust. Incoming Paymnt 22030101 Advances from customers

    4.6 Confirming Milestone

    Use

    The first part of the construction project is finished. We can create a first partial invoice. Finishing a part of the construction project is documented by confirming a network activity with an attached billing milestone. Due to the confirmation of the network activity, the milestone is reached and the block in the assigned billing plan item is removed.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project System Progress Confirmation

    Individual Confirmation Enter

    Transaction code CN25

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 28 of 54

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Execution Time Management Confirm Completion in Networks

    2. On the Enter Network Confirmation: Initial Screen, enter the network number EXXXXX and choose Enter.

    3. Select network activity 0080 Erosion Control and choose Actual Data.

    4. On the Enter Network Confirmation: Actual Data screen, make the following entries

    Field name Description User action and values Comment

    Processing % 100%

    Final Conf Select

    Confirm: Actual Start Date Todays date

    Confirm: Actual Finish Date Todays date

    5. Choose Save.

    6. In the Enter actual date dialog box, choose Yes.

    7. In the Enter Actual Date dialog box, choose Back.

    8. Use transaction code VA02 and enter your sales order number

    9. From the menu, choose Goto Item Billing plan.

    10. The second billing plan item (item for Complete Excavation) is now unlocked.

    11. Choose Back to return to the SAP Easy access screen.

    Result

    The milestone is confirmed and the billing block is released.

    4.7 Creating Billing Document

    Use

    Due to the confirmation of the network activity, the milestone is reached and the block in the assigned billing plan item is removed. The item can be billed.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Billing Billing Document

    Create

    Transaction code VF01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Billing Administrator

    (SAP_NBPR_BILLING_S)

    Business role menu Sales Billing Create Billing Document

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 29 of 54

    2. Enter the number of your sales order and choose Enter.

    3. On the Debit Memo (Y2) Create: Overview of Billing Items screen, review the billing document. Save the billing document and note the document number.

    4. Revenue is posted to the billing WBS element. Review the accounting document in VF03 Display Billing Document. Enter the number of the billing document and choose the Accounting button.

    5. A dialog box displays all financial documents that have been created. Double-click Cost accounting doc and review the posting document

    You can also partially clear a down payment against the invoice. The clearing of the down payment is distributed over several invoices.

    Result

    The billing document is posted.

    FI document:

    Debited Accounts Credited Accounts

    11220101 AR-Domestic 60010303 Revenue Expenses (Service Provider)

    22210105 Output tax

    22030101 Advances from customers 11220101 AR-Domestic

    5 Process Steps Bill of Services Unit Price Contract with Service Entry Sheet

    5.1 Creating Inquiry

    Use

    The process starts with an inquiry from a prospect. For bids, an inquiry is created containing the most important data concerning the customer and first documents but also a Bill of Services (BOS). The BOS is provided by the customer and. Later, the contractor bids in the format of the BOS.

    Prerequisites

    The Business Function DIMP_SDUD Discrete Industries of the Business Function Set Discrete Industries is active.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Inquiry Create

    Transaction code VA11

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager ECO

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 30 of 54

    (SAP_NBPR_PROJECTMANAGER_ECO_M)

    Business role menu Project Management Sales Create Inquiry

    2. Make the following entries:

    Field name Description User action and values Comment

    Inquiry Type YEI2

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Enter.

    4. On the Create ECO Inquiry-UnitPric: Overview screen, make the following entries:

    Field name Description User action and values Comment

    Sold-to-party E-YE0060

    Purchase Order Enter any purchase order number

    Valid to Todays Date + 1 Month

    Material ECO_BOS

    Order Quantity 1

    5. Choose Enter. Confirm the information message.

    6. Select item number 10 and choose menu path (NWBC: More ) Goto Item More

    functions Performances.

    7. The screen area for BOS is displayed. To copy a template BOS, choose Service sel. (Service Selection (Shift+F1)). In the dialog box, make the following entries and set the radio button in front of the line Model Service Specs:

    Field name Description User action and values Comment

    Model Service Specs C0000001EN

    8. Choose Enter.

    9. Select the outline level Structural in the template BOS.

    10. Choose Select all to select lines 10 40 then choose Adopt Services.

    11. For the line 50 Enter Seal walls, ceiling shaft in the short text field and in the Quantity, enter 800, and M3 in UoM.

    12. Choose Back to leave the screen with the BOS and return to the main screen of the inquiry.

    13. Save your entries. Make a note of the inquiry number: _________

    Result

    An inquiry with a BOS is created. This inquiry is the first document in the process flow.

    5.2 Creating Quotation

    Use

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 31 of 54

    The quotation is created if you want to bid for the contract. Based on the quotation, a cost estimation is carried out and prices are determined. Once the quotation is finished, it is sent to the prospect. The prospect in turn may return the quotation to you in case of questions or additional negotiations.

    Prerequisites

    The Business Function DIMP_SDUD Discrete Industries of the Business Function Set Discrete Industries is active.

    An inquiry is created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Quotation Create

    Transaction code VA21

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager ECO

    (SAP_NBPR_PROJECTMANAGER_ECO_M)

    Business role menu Project Management Sales Create Quotation

    2. Enter the following data:

    Field name Description User action and values Comment

    Quotation Type YEQ2

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Create with reference.

    4. To copy the BOS and all other information from the inquiry, enter the inquiry number created in the previous step and choose Copy.

    5. Confirm the information message.

    6. Select item number 10 and choose menu path (NWBC: More) Goto Item More

    functions Performances.

    Prices and cost estimation: You can determine the price for a given service line in a few different ways:

    Enter the price manually. This is only possible if the price is known (for example, simple services).

    Cost estimation. This is useful for more complex services (including labor, material, equipment, and subcontractor work)

    Easy Cost Planning. This is available for the BOS.

    The different cost elements determined with the cost estimation are transferred to the SD pricing procedure where additional surcharges or discounts can be

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 32 of 54

    calculated for different cost components (for example, a 10% surcharge is added for labor work, 0% for equipment and a discount of 5% for materials)

    7. Choose line 10 Structural Heavy and enter a price of 200 CNY for the first service line. Repeat the same price for the lines 20 to 50.

    8. Choose Back.

    9. Make the following entries:

    Field name Description User action and values Comment

    Valid to Todays date + one month

    10. Save the quotation and note the quotation number: __________

    11. The quotation can be sent to the customer. If you want to print the quotation with the BOS and the prices, run transaction VA22. Enter the quotation number. Go to the menu Sales

    document Issue output to. To view the document, use the print preview. The system is set up (it prints a header page with the prospect address, the main information, and the BOS with the prices for the service lines).

    Result

    A quotation is created.

    5.3 Creating Project

    Use

    You have received the contract. The external view to the customer is represented by a sales order. Internally the controlling and management is done by means of a project (PS = project System). If a project has been created already as described in Scenarios 439 and 441, then create your own project by copying an existing project as described below.

    The WBS element EXXXXX is the billing WBS element. In addition to WBS elements, the project contains a network with milestones.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project Systems Project Project Builder

    Transaction code CJ20N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Planning Project Project Builder

    2. On the Project Builder screen, from the menu, choose (NWBC: More ) Project New

    Copy project.

    3. In the Create Project dialog box, make the following entries:

    Field name Description User action and values Comment

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 33 of 54

    Field name Description User action and values Comment

    Project Def. New Project definition

    Enter a project definition number that has not yet been used

    For example, EXXXXX

    Description Description Enter a description of the project you are creating

    For Example: Construction Project with BOS

    Project Profile

    Enter the project profile YECO001

    Start

    Template

    Project def. Source Project Definition

    Enter the project definition number that was created in scenarios 439 and 441

    For example, EXXXXX

    4. Choose Enter

    5. If there is Project Profile pop-up screen, choose Yes.

    6. If there is Easy Cost Planning pop-up screen, choose No.

    7. On the Number Assignment pop-up screen, enter the network number to correspond to the project def. number you are creating. If you Project Def. number is E00010 then enter E00010.

    8. Ignore the warning messages displayed in the Project Builder Log screen by choosing Back.

    9. On the left side of the screen under Project Structure: Description, choose the top level WBS Element Tank Extension project EXXXXX.

    10. On the right side in the Identification and view selection screen, the WBS element is displayed.

    11. Choose the Basic data tab.

    12. In the Operative Indicators section, make the following entries:

    Field name Description User action and values Comment

    Acct asst element Select

    Billing element Select

    13. To release your project, select the project definition of your project (the first row with the description of the project). In the Basic Data tab, choose System/User Status on the right of System Status and mark the user status APPD.

    14. Choose Back.

    15. From the menu bar, choose (NWBC: More) Edit Status Release. The system displays the message Status was set.

    16. Save your entries.

    Result

    You have created a project by referencing an existing project EXXXXX

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 34 of 54

    5.4 Creating Sales Order

    Use

    You have received the contract. The external view to the customer is represented by a sales order. Internally the controlling and management is done by means of a project (PS = Project System).

    Prerequisites

    The Business Function DIMP_SDUD Discrete Industries of the Business Function Set Discrete Industries is active.

    Create a project with a billing WBS element.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Order Create

    Transaction code VA01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Sales Order Sales Order Processing Create Sales Order

    2. Make the following entries:

    Field name Description User action and values Comment

    Order Type YEC2

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Create with reference.

    4. In the dialog box, enter the quotation number and choose Copy.

    5. Confirm the information message.

    6. Enter the purchase order number and the purchase order date (for example, today's date) in the main screen of the sales order.

    7. The sales order item is linked to the project (billing WBS element) by the account assignment of the sales order item. The billing WBS element is debited with all revenues and down payments created due to the settlement (billing) of the sales order.

    8. Select the sales order item and choose the Display Item details button.

    9. Choose the Account Assignment tab (or from the menu, choose (NWBC: More) Goto

    Item Account Assignment).

    10. In the WBS Element field, enter the billing WBS element (for example, EXXXXX created at 5.3).

    11. Save the sales order and note the order number.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 35 of 54

    Result

    A Sales Order is created.

    5.5 Creating Service Entry Sheet

    Use

    The service entry sheet is a sales document like the quotation or the sales order. It documents the progress for a number of services (which quantity is performed so far) and is the base for the settlement of the services to the customer.

    Prerequisites

    The Business Function DIMP_SDUD Discrete Industries of the Business Function Set Discrete Industries is active.

    A sales order is created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Bill of Service

    Service Entry Sheet Create

    Transaction code VA01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Sales Order Sales Order Processing Create Sales Order

    2. Enter the following data

    Field name Description User action and values Comment

    Order Type YED2

    Sales organization 1000

    Distribution channel 10

    Division 10

    3. Choose Create with reference and enter the number of your sales order to create the link between the sales order and the service entry sheet.

    4. Choose Copy.

    5. Select item number 10 and choose menu path (NWBC: More) Goto Item More

    functions Performances.

    6. Choose Service Sel. to select the relevant services where you have a quantity. Confirm the information displayed in the dialog box.

    7. Select all the line items except for item 50 and choose the Adopt Services button.

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 36 of 54

    8. The planned quantity is suggested as quantity performed. If necessary, you can reduce this quantity to document that not the entire quantity is performed so far. In this demo script, we assume that the entire planned quantity is performed.

    9. Choose Back and change Billing block to empty.

    10. Save the service entry sheet and note the document number: _________

    Result

    A Service Entry Sheet is created.

    5.6 Creating Debit Memo

    Use

    In this activity, you create the debit memo.

    Prerequisites

    The service entry sheet is created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Billing Billing Document

    Create

    Transaction code VF01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Billing Administrator

    (SAP_NBPR_BILLING_S)

    Business role menu Sales Billing Create Billing Document

    2. Make the following entries:

    Field name Description User action and values Comment

    Document Document number of the service entry sheet

    3. Choose Execute. The system processes the data from the service entry sheet and creates a debit memo.

    4. Save the billing document and note the document number: _________

    Result

    A billing document is created.

    5.6.1 Posting Incoming Payment from Customer Manually

    External Process

    Use

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 37 of 54

    This activity posts the incoming payments from the customer.

    Prerequisites

    Open items have been posted.

    Procedure

    To perform this activity, you must execute the following sections described in the scenario Accounts Receivable (157) and use the master data from this scenario.

    Section Description

    4.10 in 157 Posting Incoming Payment from Customer Manually

    Result

    FI document:

    Debited Accounts Credited Accounts

    10020109 BOC-Cust. Incoming Paymnt 11220101 AR-Domestic

    5.7 Creating Service Entry Sheet for Subsequent Billing

    Use

    The service entry sheet is a sales document like the quotation or the sales order. It documents the progress for a number of services (which quantity is performed so far) and is the base for the settlement of the services to the customer.

    Prerequisites

    The Business Function DIMP_SDUD Discrete Industries of the Business Function Set Discrete Industries is active.

    A sales order is created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Bill of Service

    Service Entry Sheet Create

    Transaction code VA01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Sales Order Sales Order Processing Create Sales Order

    2. Make the following entries:

    Field name Description User action and values Comment

    Order Type YED2

    Sales organization 1000

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 38 of 54

    Distribution channel 10

    Division 10

    3. Choose Create with reference.

    4. Enter your sales order number to create the link between the sales order and the service entry sheet, and then choose Copy.

    5. Select item number 10 and choose menu path (NWBC: More) Goto Item More

    functions Performances.

    6. Choose Service Selection. Choose Service Sel. to select the From SD Order XXX where you have a quantity. Confirm the information displayed in the dialog box.

    7. Select the line item 50 and choose Adopt Services.

    The planned quantity is suggested for the quantity performed. If necessary, you can reduce this quantity to document that not the entire quantity is performed. In this document, we assume that the entire planned quantity is performed.

    8. Choose Back and change Billing block to empty.

    9. Save the service entry sheet and note the document number: _________

    Result

    A Service Entry Sheet is created.

    5.8 Creating Debit Memo

    Use

    In this activity, you create the debit memo.

    Prerequisites

    The service entry sheet is created.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Billing Billing Document

    Create

    Transaction code VF01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Billing Administrator

    (SAP_NBPR_BILLING_S)

    Business role menu Sales Billing Create Billing Document

    2. Make the following entries:

    Field name Description User action and values Comment

    Billing Type Y2 Debit Memo

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 39 of 54

    Document Document number of the service entry sheet

    3. Choose Execute.

    4. Choose Save to create the Billing Document.

    Result

    A Billing Document is created.

    FI document:

    Debited Accounts Credited Accounts

    11220101 AR-Domestic 60010101 Revenue from main operation-domestic

    22210105 Output tax

    6 Process Steps Cost Plus or Time and Material Billing (RRB)

    6.1 Creating a Project Structure (Ref: 439)

    Use

    In this activity, you create a project structure. If a project has been created already as described in Scenarios 439 and 441, then create your own project by copying an existing project as described below.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project System Project Project Builder

    Transaction code CJ20N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Planning Project Project Builder

    2. Choose Enter to skip the informational message if it displays.

    3. On the Project Builder screen, choose Create and select Copy Project.

    4. In the Create Project dialog box, make the following entries:

    Field name Description User action and values Comment

    Project Def. New Project definition

    Enter a project definition number that has not yet been used

    For example, EXXXXX

    Description Description Enter a description of the project you are creating

    For Example: Construction Project for Unit price contract

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 40 of 54

    Field name Description User action and values Comment

    Project Profile

    Enter the project profile YECO001

    Start

    Template

    Project def. Source Project Definition

    Enter the project definition number that was created in scenarios 439 and 441

    For example, EXXXXX

    5. Choose Enter.

    6. If there is Project Profile pop-up screen, choose Yes.

    7. If there is Easy Cost Planning pop-up screen, choose No.

    8. On the Number Assignment pop-up screen, enter the network number to correspond to the project def. number you are creating. If you Project Def. number is E00010 then enter E00010.

    9. Ignore the warning messages displayed in the Project Builder Log screen by choosing Back.

    10. On the left side of the screen under Project Structure: Description, choose the top level WBS Element Tank Extension project EXXXXX.

    11. On the right side in the Identification and view selection screen, the WBS element is displayed.

    12. Choose the Basic data tab.

    13. In the Operative Indicators section, make the following entries:

    Field name Description User action and values Comment

    Acct asst element Select

    Billing element Select

    14. Repeat step 11-14 for WBS element EXXXXX-02.

    15. Save your entries.

    Result

    The project structure is created.

    6.2 Posting Procurement Costs to Project

    External Process

    Use

    To accurately test the following sections of this scenario some procurement costs need to be posted to the newly created project. This activity provides guidance on how to post some procurement costs to a newly created project.

    Prerequisites

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 41 of 54

    A project was created as described in scenarios 439.

    Procedure

    To perform this activity, you must execute the following sections described in the scenario Project Planning for Engineering and Construction (441) and Purchase Order for Project-based Procurement (443).

    Section Description

    4.6 in 441 Releasing Purchase Requirements

    For material ECO-D-03-30-00.

    4.6.1 4.6.2 4.6.4 in 443 Converting Assigned Requisitions to Purchase Orders

    For material ECO-D-03-30-00.

    6.3 Detail the Project Structure (Ref: 441)

    Use

    In this step, the project plan is detailed via adding network activities and assigning these network activities to the WBS elements. In terms of planning the project manager also adds information about the planned hours and quantities to the activities and specifies information about the rates and the group that is supposed to execute the activities.

    Prerequisites

    The project definition and the WBS project structure are created and the project specific master data are set up.

    Procedure Creating Network Activities

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project System Project Project Builder

    Transaction code CJ20N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Project Manager

    (SAP_NBPR_PROJECTMANAGER_M)

    Business role menu Project Management Project Planning Project Project Builder

    2. To open the project you created in the previous step, double-click the corresponding entry in the Last Projects Processed List in the lower left hand side of the window.

    3. Choose Expand All to see the complete project structure.

    4. Right-click the WBS Element Management and choose Create Activity (Internal).

    5. On the right side of the screen of the Internal Tab, enter the following details:

    Field name Description User action and values Comment

    Activity Description

    Project Manager

    Work Center YE5410

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 42 of 54

    Work 100 H

    Activity Type YE04

    Control Key PS01 Cost is not calculated for this activity.

    6. Save your entries.

    Result

    Network activities EXXXXX-XXXX are created.

    6.4 Creating Document for Designed Drawings

    Use

    You now create a system document to store link with the designed drawings.

    Prerequisites

    The designed drawing has been input in C:\SAP BP\.

    You can find the designed drawing in the SAP Best Practices Documentation Package in the folder ..\ SAP_BP\Misc\ECO\China\ and copy it to C:\SAP BP\.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Project System Documents Document

    Management System Document Management System

    Document Create

    Transaction code CV01N

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Engineering Specialist

    (SAP_NBPR_ENGINEER-S)

    Business role menu Engineering Document Management Create Document

    2. On the Create Document: Initial Screen, enter the document type KPR and the name YE_ECO_DRW_0X.

    3. Choose Enter.

    4. On the Create Document: Basic Data Office-Documents (KPR) screen, enter the following description: Drawing for Construction project XXX.

    5. Choose Create Original.

    6. Choose Continue (Enter) in the dialog box.

    7. In the Create Document: Basic Data Engin/Des. Drawing (KPR) dialog box, enter the following data:

    Field name Description User action and values Comment

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 43 of 54

    Applic. LIM

    Description Drawing for Construction project XXX

    Data Carrier PC

    Original C:\SAP BP\DRAWING2.JPG Select the file from C:\SAP BP\

    8. Choose Continue (Enter).

    9. Choose Check In Orig.

    10. In the Check in Document: KPro dialog box, choose DMS_C1_ST and confirm your selection by choosing Enter.

    11. Choose Object Links tab page, choose WBS Element, enter EXXXXX on WBS element field.

    12. Choose Save (Shift+S).

    13. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)

    Or

    Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to SAP Home (SAP NetWeaver Business Client).

    Result

    A document has been created in the system.

    6.5 Creating Order

    Use

    The contract (sales order) is created when the Project is approved and released.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    Option 1: SAP Graphical User Interface (SAP GUI)

    SAP ECC menu Logistics Sales and Distribution Sales Order Create

    Transaction code VA01

    Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

    Business role Sales Administrator

    (SAP_NBPR_SALESPERSON_S)

    Business role menu Sales Sales Order Sales Order Processing Create Sales Order

    2. Make the following entries:

    Field name Description User action and values Comment

    Order Type YEC3

    Sales Organization 1000

    Distribution. Channel 10

  • SAP Best Practices Contract Billing for Engineering and Construction (447): BPD

    SAP AG Page 44 of 54

    Division 10

    3. Choose Enter. Make the following entries:

    Field name Description User action and values Comment

    Sold to Party E-YE0060

    PO Number Purchase Order Number Test Cost Plus or TM Billing

    PO Date Purchase Order Date Enter the current date

    Req Delivery date Enter todays date

    Delivery Plant 1000

    Payment Term 0001

    Item 1

    Material Time and Material ECO_TIME_MATERIAL

    Qty 1

    4. Choose Enter and confirm followed information.

    5. For item 10 (a cost plus billing material), double-click the item and enter the following

    information:

    Tab name Field name User action and values Comment