+ All Categories
Home > Documents > 44962346 Heat Recovery Steam Generators

44962346 Heat Recovery Steam Generators

Date post: 12-Oct-2015
Category:
Upload: hoangpalestine
View: 81 times
Download: 5 times
Share this document with a friend
Description:
HRSG ppt
Popular Tags:

of 94

Transcript
  • 5/21/2018 44962346 Heat Recovery Steam Generators

    1/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Heat Recovery Steam Generators

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    2/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    What is HRSG / WHRB ?

    HRSG : Heat Recovery Steam Generator Recovers heat energy available in GT Exhaust and

    Generates Steam

    WHRB : Waste Heat Recovery Boiler Recovers heat energy available in the Waste

    Gases from various Processes

    Flue Gas out

    Steam out

    Feed water in

    HRSG

    or

    WHRBFlue Gas in

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    3/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Heat Recovery Steam Generatorsbehind Gas Turbines

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    4/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Gas turbine basedSimpleCycle

    CombinedCycle

    CogenCombined

    Cycle CogenConventionalBoiler & STG

    35-40 23-42 38

    60 75 - 90 50 - 70

    Why HRSG ?

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    5/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSG Applications

    HRSGs are used in:

    Combined Cycle Power Plantsto provide steam to a

    steam turbine

    Cogeneration Plantsto provide steam for industrial

    processes

    Combined Cycle Cogeneration Plantsto provide steam

    to a steam turbine and the extraction from steam

    turbine is used for industrial processes

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    6/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Efficiency Levels

    Gas turbine basedSimple

    Cycle

    Combined

    CycleCogen

    Combined

    Cycle Cogen

    Conventional

    Boiler & STG

    35-40 23-42 3860 75 - 90 50 - 70

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    7/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Combined Cycle Application

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    8/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Combined Cycle Plant

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    9/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Popular Gas TurbinesModel Power

    MW (ISO)

    GE

    G3142(J) Fr 3 10.45

    PG5371(PA) Fr 5 26.3PG6561(B) Fr 6 42.1

    PG6101(FA) Fr 6FA 70.14

    PG9171(E) Fr 9E 123.4

    PG9351 (FA) Fr 9FA 255.6

    Siemens

    V94.2 V94.2 157

    V94.2A V94.2A 190

    V94.3A V94.3A 265

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    10/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    No of HRSGs supplied to

    Combined cycle plants by BHEL

    Gas Turbines

    GE Fr5 GE Fr6 GE Fr6FA GE Fr 9E V94.2 Others

    2 14 5 7 7# 14*

    Total 49

    WH/W191(3 Nos); MES/SB30(1 No) ; MHI Fr 6 (4 Nos); ALST PG6541B(6 Nos)

    #4 HRSGs of Wagner Biro Design

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    11/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    MODEL GT Power (MW)HRSG Output

    (Approx.)

    ST Power

    (Approx.)

    CCP Power

    (Approx.)

    ISO Site (~) TPH MW MW

    G3142(J) Fr3 10.45 9 20 5 14

    PG5371(PA) Fr5 26.3 20 40 10 30

    PG6561(B) Fr6 42.1 33 58+14 22 55

    PG6101(FA) Fr6FA 70.14 65 110+8+8 35 100

    PG9171(E) Fr9E 123.4 105 185+35 60 165

    V94.2 V94.2 157 140 230+45 80 220

    PG9351(FA) Fr9FA 255.6 220 270+45+30 110 330

    Plant Configuration Options

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    12/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    100 MW Plant Configuration Options

    Fr6 GT 2P HRSG

    STG

    Fr6 GT 2P HRSG

    Fr6FA GT 3P HRSG STG

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    13/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    350 MW Plant Configuration Options

    Fr9E GT 2P HRSG

    STG

    Fr9E GT 2P HRSG

    Fr9FA GT 3PR HRSG STG

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    14/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    1300 MW Plant Configuration

    Fr9FA GT 3PR HRSG

    STG

    Fr9FA GT 3PR HRSG

    Fr9FA GT 3PR HRSG

    STG

    Fr9FA GT 3PR HRSG

    Bh t H El t i l Li it d

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    15/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Heat Recovery Steam Generators

    for

    Gas Turbines upto 60 MWe

    Bh t H El t i l Li it d

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    16/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind Fr 5 GT

    Parameters

    t/h kg/cm2 C

    32.5 MW

    1GT+1HRSG+1ST

    In operation

    from

    19991 HP 48.3 45.5 390PPCL, Karaikal

    Pressure

    LevelPower OutputCustomer No of units

    Bh t H El t i l Li it d

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    17/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind Fr 6 GT

    Parameters

    t/h kg/cm2 C

    98 MW HP 59.3 62 483

    2GTs+2HRSGs+1ST LP 10.8 5 SAT

    146 MW HP 58.4 62 483

    3GTs+3HRSGs+3ST LP 12.4 5 SAT

    97 MW HP 59.5 62 483

    2GTs+2HRSGs+1ST LP 11 5 SAT

    146 MW HP 57.5 62 483

    3GTs+3HRSGs+3ST LP 11.5 5 SAT103 MW

    2GTs+2HRSGs+1ST

    109 MW HP 60.1 80 520

    2GTs+2HRSGs+1ST LP 15.4 6 200

    In operation

    from

    1990

    1990

    2

    3

    AECO, Vatwa

    Pressure

    Level

    2

    Power OutputCustomer No of units

    GIPCL, Baroda

    APSEB, Vijjeswaram

    GEB, Utran

    NEEPCO, Kathalguri

    RVUNL, Ramgarh

    2 HP 59.7

    1990

    3 1991

    2 2003

    199441 473

    Bh t H El t i l Li it d

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    18/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Heat Recovery Steam Generators

    for

    Higher Capacity Gas Turbines

    (60160 MWe)

    Bh t H El t i l Li it d

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    19/94

    Bharat Heavy Electricals LimitedTIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Triple Pressure HRSGs behind Fr 6FA GTs

    Parameters

    t/h kg/cm2 C

    107.88 MW HP 110.6 107 537

    IP 9.6 30 260

    LP 8.1 6 200

    105 MW HP 105.4 107 537

    IP 8.6 30 260

    LP 7 6 200

    100 MW HP 113.1 107 537

    IP 8.7 30 260

    LP 7.5 6 200

    100 MW HP 110.7 107 542

    IP 8.2 27.5 317

    LP 8.2 4.87 227

    107 MW HP 118.2 107 542

    IP 8.3 30 260

    LP 6.6 6 200

    1GT+1HRSG+1ST

    1GT+1HRSG+1ST

    Customer No of unitsPressure

    Level

    In operation

    fromPower Output

    TNEB, Kovilkalappal 1 2001

    TNEB, Perungulam 1 2003

    1GT+1HRSG+1ST

    1GT+1HRSG+1ST

    GSECL, Dhuvaran

    Phase-II 1

    Under

    Execution

    GSECL, Dhuvaran 1 2003

    TNEB, Kuttalam 1 2004

    1GT+1HRSG+1ST

    Bharat Heavy Electricals Limited

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    20/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind Fr 6FA GTs (70.14 MW ISO)

    1 No HRSG for 107 MW CCPP

    at TNEB,Kovilkalappal,India.

    Tamilnadu

    Electricity

    Board

    Customer

    LP

    GT Fuels NG

    Commissioning February 2001

    Parameters

    Steam flow t/h

    Pressure kg/cm2(a)

    Temperature C

    HP

    110.6

    200

    107

    8.1

    537

    6.0

    Salient Features Top supported

    Module ht 12.1m

    Two width

    94 Modules

    IP

    9.6

    30

    260

    Tamil Nadu

    Electricity Board

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    21/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind Fr 9E GT

    Parameters

    t/h kg/cm2 C

    165 MW HP 176 80 520

    1GT+1HRSG+1ST LP 45.6 6 200

    350 MW HP 188.4 80 520

    2GTs+2HRSGs+1ST LP 39.8 6 200

    330 MW HP 180.2 76.6 520

    2GTs+2HRSGs+1ST LP 37.1 5.8 200330 MW HP 187.1 79.2 514

    2GTs+2HRSGs+1ST LP 39.8 6 200

    Power Output

    RVUNL-Dholpur 2 Under

    Execution

    Customer No of units In operation

    from

    GIPCL, Baroda

    Pressure

    Level

    NTPC, Kayamkulam

    DVB, Pragati

    1998

    1999

    2003

    1

    2

    2

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    22/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Salient Features Top supported

    Module ht 18.8m

    CPH re-circulation

    Two width

    102 Modules

    Customer National

    Thermal Power

    Corp. Ltd

    Commissioning

    Parameters

    Steam flow t/h

    Pressure kg/cm

    2

    (a)Temperature C

    HP

    39.5

    80 6.0

    LP

    Naptha/NG/HSD

    October 1999

    520

    HRSGs behind Fr 9E GTs (123.4 MW ISO)

    2 Nos HRSGs for 350MW CCPP

    at NTPC,Kayamkulam,India.

    GT Fuels

    188.4

    200

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    23/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind V94.2 GT

    Parameters

    t/h kg/cm2 C

    817 MW HP 225.9 65.3 530

    4GTs+4HRSGs+2ST LP 46.7 4.8 200

    200 MW HP 226.7 79 525

    1GT+1HRSG+1ST LP 46.1 6 200

    400 MW HP 231 80 5302GTs+2HRSGs+1ST LP 46.3 5 200

    Customer No of

    units

    Pressure

    Level

    In operation

    fromPower Output

    NTPC, Faridabad 2 2000

    NTPC, Dadri 4 1992

    TEC, Trombay 1 1994

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    24/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    226.7 46.1

    80

    Tata ElectricCompany, Trombay

    Parameters

    Steam flow t/h

    Pressure kg/cm2(a)

    Temperature C

    Commissioning October 1994

    7.0

    525

    Salient Feaures Bottom

    supported

    Module ht 16.3m

    Three width

    HRSG for 200 MW CCPP

    at TEC,Trombay,India.

    Customer

    LP

    GT Fuels NG/HSD/Naphtha

    HP

    200

    Dual Pressure HRSG

    behind V94.2 GT (157 MW ISO)

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    25/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Heat Recovery Steam Generators

    for

    Advanced Class Gas Turbines

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    26/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Triple Pressure Reheat HRSG

    For maximum heat recovery from GT exhaust & better Combined

    Cycle Heat Rate

    HP Steam to ST

    IP Steam to CRH or GT Injection ; HRH Steam to ST

    LP Steam to Deaerator / ST

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    27/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Arrangement of Reheat System

    HP IP LP

    HP

    Drum

    HP

    S

    H

    II

    R

    H

    II

    HP

    S

    H

    IB

    R

    H

    I

    HP

    S

    H

    IA

    H

    P

    E

    V

    HP

    E

    C

    II

    IP

    Drum

    I

    P

    E

    V

    I

    P

    E

    C

    LP

    Drum

    L

    P

    S

    H

    L

    P

    E

    V

    I

    P

    S

    H

    HP

    E

    C

    I

    C

    P

    H

    HP Main Steam

    Cold Reheat

    Hot Reheat

    IP Main Steam LP Main Steam

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    28/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Reheat System

    Ideally Suited for Advanced Class GTs due to the high level of GT

    exhaust flow and temperature

    Features

    Identical steam temperature for both HP Superheater / Reheater

    Sandwiching of Superheater and Reheater sections

    Optimum steam side pressure drop

    Cascaded Bypass system for Reheater for

    Normal Start up / Shut down

    Upset conditions like rapid load rejection and unit trip

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    29/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Reheater Arrangement

    HP

    Drum

    IP SteamHP

    Stea

    m

    Hot RH

    Steam

    Cold RH

    Steam

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    30/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Steam Parameters

    For Combined Cycle System, Optimum Steam Pressure andtemperature levels for Triple Pressure Reheat System are

    HP : 120-130 bar and 535-565C

    RH : 28-30 bar and 535-565C

    LP : 4-7 bar and 200-230 C

    Steam Flow rates for three Pressure levels are decided based on

    optimum pinch and approach temperatures

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    31/94

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Boiler Performance & ProposalsFBC & HRSG

    Co-generation Application

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    32/94

    Bharat Heavy Electricals Limited

    Boiler Performance & ProposalsFBC & HRSG

    Fired Cogeneration PlantWith FD Fan Mode Option

    Fuel

    HRSG

    Exhaust

    Air

    FD Fan

    Fresh Air

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    33/94

    Bharat Heavy Electricals Limited

    Boiler Performance & ProposalsFBC & HRSG

    Supplementary Fired HRSG

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    34/94

    y

    Boiler Performance & ProposalsFBC & HRSG

    Natural gas

    Naphtha

    HSD

    Kerosene

    Light Diesel Oil

    Intermediate Fuel Oil (Residual Oil)

    Other distillate fuel oils ( LSHS etc )

    Fuels For Supplementary Firing

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    35/94

    y

    Boiler Performance & ProposalsFBC & HRSG

    Duct Burner(Gas) Arrangement

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    36/94

    y

    Boiler Performance & ProposalsFBC & HRSG

    Duct Burner(Oil) Arrangement

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    37/94

    y

    Boiler Performance & ProposalsFBC & HRSG

    No of HRSGs supplied to

    Industrial customers by BHEL

    GE Fr3 GE Fr5 GE Fr6 Other GTs

    Unfired Fired Unfired Fired Unfired Fired Unfired Fired

    - 6 6 21 - 24 1* 5#

    HRSGs behind Gas Turbines 63

    HRSGs for other applications 9@

    ALST/MS 5001; # JBE/Fr5(2Nos); MES/SB60(3Nos) @ sponge iron plant

    Upto HPCL-Visakh

    Bharat Heavy Electricals Limited TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    38/94

    y

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs behind Fr 5 GTs (26.3 MW ISO)

    2 Nos HRSGs

    for IOCL, Barauni

    CustomerIndian Oil

    Corporation Ltd

    Plant Barauni

    Parameters

    Steam flow, t/h 48.2Pressure , kg/cm2(a) 40

    Temperature, C 440

    GT Fuel Naptha/Gas/HSD

    HRSG Fuel Unfired

    Commissioned in 2001

    Salient Features Module ht 10.4m

    Single width

    21 Modules

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    39/94

    Boiler Performance & ProposalsFBC & HRSG

    HRSG With FD Fan Mode

    HRSG behind Fr5 GT with FD Mode Option

    Customer

    Plant

    ParametersGT+SF

    Mode

    FD

    Mode

    Steam flow, t/h 62 64.8

    Pressure , kg/cm2(a) 46 46

    Temperature, C 443 443

    GT Fuel

    HRSG Fuel

    Commissioned in

    Salient Features

    Oil & Natural Gas

    Corporation LtdGandhar

    NG

    Fuel Gas

    1997

    Module ht 8.3m

    Single width

    27 Modules

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    40/94

    Boiler Performance & ProposalsFBC & HRSG

    13 Nos HRSG for RIL-Patalganga/

    Hazira / Jamnagar, India.

    Duct Fired HRSG behind Fr 6 GT (38.34 MW ISO)

    Steam Drum

    GT

    Exhaust

    E

    C

    O

    E

    V

    A

    P

    S

    H

    D

    BS

    H

    Customer

    Plant PG Hazira Jamnagar

    Parameters

    Steam flow, t/h 125 125 125

    Pressure , kg/cm2(a) 105 118 116

    Temperature, C 500 512 510

    GT Fuel

    HRSG Fuel

    Commissioned in 1995 1996-99 1999

    Salient Features

    (~3 times unfired output)

    66 Modules

    125 tph even at 20MW GT load

    Reliance Industries Ltd

    NG/Naptha/HSD

    NG/Naptha / HSD / Kerosene

    Module ht 8.3m

    Two width

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    41/94

    Boiler Performance & ProposalsFBC & HRSG

    Duct Fired HRSG behind Fr 6 GT (38.34 MW ISO)

    1 No HRSG behind Fr 6 GT

    for IPCL-Gandhar

    GT

    Exhaust

    ECOEVAPSH

    SteamDrum

    DB

    FD Fan

    Customer

    Plant

    GT+SF Mode FD Mode

    Parameters

    Steam flow, t/h 100 100

    Pressure , kg/cm2(a) 108 108

    Temperature, C 513 513GT Fuel

    HRSG Fuel

    Commissioned in

    Salient Features

    56 Modules

    MCR Steam Output Even in

    FD Mode

    Duct burner for 90Mkcal/h

    Indian Petrochemicals Ltd

    Naptha/HSD

    Naptha / HSD / LDO

    1997

    Module ht 8.3m

    Two width

    Gandhar

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    42/94

    Boiler Performance & ProposalsFBC & HRSG

    4 Nos HRSGs for IOCL-Panipat

    Integrated Power Plant, India.

    MUHECOEVAPSH

    Steam DrumMembrane Wall

    Water Cooled

    Furnace

    GT

    Exhaust

    Furnace Fired HRSGs behind Fr 6 GTs (39.62 MW ISO)

    CustomerIndian Oil

    Corporation Ltd

    Plant Panipat

    Parameters

    Steam flow, t/h 110

    Pressure , kg/cm2(a) 48Temperature, C 405

    GT Fuel Naptha/HSD

    HRSG Fuel IFO / HSD

    Commissioned in 2001

    Salient Features Module ht 12.1m

    Single width

    40 Modules

    Furnace Fired

    HRSG

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    43/94

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs Vs Conventional Boilers

    HRSGConventional

    Boilers

    Gas/Steam Ratio 3.5-7.0 1.0-1.2

    Gas Inlet Temp. C < 650 >1200

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    44/94

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs Vs Conventional Boilers

    In HRSGs

    GT exhaust is the main heat source - no need for a firing system(unlesssupplementary fired).

    Positive pressure of GT exhaust provides draft no need for fans (exceptFD Mode)

    Steam generation at multiple pressure levels

    Heat transfer is predominantly through convection

    HRSGs do not generally use membrane wall construction

    Finned tubes used for compactness and maximum heat transfer

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    45/94

    Boiler Performance & ProposalsFBC & HRSG

    HRSGs-Classification

    Firing Unfired Duct Fired Furnace Fired

    Circulation Natural Assisted / Forced Once -Through

    Gas flow direction Horizontal Vertical

    Construction Modular Coil Design

    Width

    Pressure Levels Single Multiple

    Single Double Triple

    Reheater Reheat Non-Reheat

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    46/94

    Boiler Performance & ProposalsFBC & HRSG

    BHEL HRSGs - Road Map

    1977:First HRSGfor Namrup, Assam - Based on In house Design

    1982:First Supplementary FiredHRSG for ONGC, Uran - In housedesign

    1986:First Furnace Fired, Dual Pressure HRSG with FD modefor ONGC-Hazira (Fr5 GT)

    1988*:Technical Collaboration with

    1989:Auto Trip Transferestablished within 1 minute at ONGC-Hazira

    1991:First Dual Pressure Triple width HRSG behind V94.2 GT for TEC-Trombay

    1999:First Triple PressureHRSG behind Fr 6FA GTfor TNEB-Kovilkalappal

    2003:First Furnace firedHRSG for firing Heavy Fuel Oilfor IOCL-Panipat

    * Extended upto 2010

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    47/94

    Boiler Performance & ProposalsFBC & HRSG

    3

    2

    6

    21

    24

    31

    4

    1

    6

    5

    7

    79

    8

    14

    0 2 4 6 8 10 12 14 16 18 20 22 24 26

    Westinghouse-W191MES-SB30

    MES-SB60

    MHI-Fr6

    JBE-Fr 5

    ALST-MS5001

    ALST-Fr 6GE/BHEL-Fr 3

    GE/BHEL-Fr 5

    GE/BHEL-Fr 6

    GE/BHEL-Fr 6FA

    GE/BHEL Fr 9E

    Siemens-V 94.2Sponge Iron Kiln

    Fired Unfired

    ALST-Alsthome Atlantique, France

    JBE-John Brown Engg, UK

    MHI-Mitsubishi Heavy Industries, Japan

    MES-Mitsui Engg & Shipbuilding, Japan

    WHRB (Sponge Iron) - 9

    Combined Cycle - 49

    Cogeneration

    Unfired - 7

    Supplementary Fired - 56

    Total - 121

    BHEL Experience - HRSGs & WHRBs

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    48/94

    Boiler Performance & ProposalsFBC & HRSG

    Features of BHEL HRSGs

    Triple Pressure Reheat

    Natural circulation

    Horizontal configuration

    Modular construction

    Fully drainable sections Top Supported

    Complete internal insulation

    Composite Angle Inlet Transition duct

    Despatched as Loose Modules

    Insulation at Site

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    49/94

    Boiler Performance & ProposalsFBC & HRSG

    Modular Construction

    Two Row Module

    Single Row Module

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    50/94

    Boiler Performance & ProposalsFBC & HRSG

    Arrangement of Modules

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    51/94

    Boiler Performance & ProposalsFBC & HRSG

    DESH

    SH Evaporator Economiser

    Arrangement of HRSG

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    52/94

    Boiler Performance & ProposalsFBC & HRSG

    Natural Circulation HRSG

    Horizontal Gas Flow

    Vertical Tubes

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    53/94

    Boiler Performance & ProposalsFBC & HRSG

    Internal Insulation

    Outer Duct Casing

    Internal Insulation

    Liner Plates

    Flue Gas Path

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    54/94

    Boiler Performance & ProposalsFBC & HRSG

    Manufacturing Facilities

    for

    HRSG

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    55/94

    Boiler Performance & ProposalsFBC & HRSG

    Shop facilities

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    56/94

    Boiler Performance & ProposalsFBC & HRSG

    Shop facilities

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    S i l f iliti

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    57/94

    Boiler Performance & ProposalsFBC & HRSG

    Facility createdfor larger size

    HRSG Module

    Fabrication

    Special facilities

    Module HeightUpto 26 m

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    58/94

    Boiler Performance & ProposalsFBC & HRSG

    Waste Heat Recovery BoilerFor Process Plants

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    59/94

    Boiler Performance & ProposalsFBC & HRSG

    Applications of WHRB

    Recovering Heat in Industrial Exhausts from

    Iron & Steel Plants

    Copper / Zink Smelter Plants

    Diesel Engines

    Cement Plants

    Chemical / Fertiliser Plants

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    60/94

    Boiler Performance & ProposalsFBC & HRSG

    SlNo

    CustomerContract

    YearUnits Steam Parameters Fuel Heat Source Status

    Flow (t/h)Pressure (ata)

    Temp(C)

    1Prakash Industries Ltd,

    Chamba., MP

    1991 1 46.8 53 410 UnfiredSponge Iron

    Kiln Exhaust

    In Operation

    since 1993

    2Prakash Industries Ltd,Chamba., MP

    1994 1 46.8 53 410 UnfiredSponge IronKiln Exhaust

    In Operationsince 1996

    3

    Sunflag Iron & Steel Co.,Bhandra, Nagpur

    Maharastra.

    1994 1 45.0 65 485 UnfiredSponge IronKiln Exhaust

    In Operationsince 1998

    4Bhushan Steel & StripsLtd, Meramandali,Orissa

    2004 4 55.4 105 540 Unfired Sponge IronKiln Exhaust

    UnderExecution

    5Jindal Stainless Ltd,Dubri Orissa

    2004 2 28.5 42 405 UnfiredFerro ChromeKiln Exhaust

    UnderExecution

    BHELs WHRBs

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    61/94

    Boiler Performance & ProposalsFBC & HRSG

    Typical General Arrangement of

    WHRB System for Sponge Iron Plant

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    62/94

    Boiler Performance & ProposalsFBC & HRSG

    Arrangement of WHRB

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    63/94

    Boiler Performance & ProposalsFBC & HRSG

    Salient Features of BHEL WHRBs

    Single Drum, Natural circulation & Top Supported design

    Fully drainable heat transfer sections with Horizontal / Inclined

    tubes

    Two stage Superheater with interstage spray type attemperator

    Non steaming Economiser

    Economiser recirculation system

    Induced Draft fan Electrostatic Precipitator (ESP)

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    64/94

    Boiler Performance & ProposalsFBC & HRSG

    Salient Features of BHEL WHRBs

    Features for handling sticky dust laden (~ 65 g/Nm3) kiln exhaust gas

    at high temperature (~1000C)

    Fusion / Fin welded membrane wall construction

    Radiation chamber at inlet for reducing the gas temperature

    Plain tube heat transfer sections

    Inline Tube Arrangement

    Inter-Bank Soot blowers for on-load cleaning

    Cassette baffles to protect economiser coil bends from erosion

    No convective sections in First pass & superheater, Evaporator

    and economiser located in second/third passes

    Single / Multipass vertical (Downward and Upward) gas flow

    passes to enable positive dust settlement through hoppers

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    65/94

    Boiler Performance & ProposalsFBC & HRSG

    Design

    &Operational Aspects

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    66/94

    Boiler Performance & ProposalsFBC & HRSG

    Superheater

    Evaporator

    Economiser

    Flue Gas

    Pinch Point

    Approach Point

    HRSG Inlet HRSG Outlet

    HRSG Temperature Profile

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    67/94

    Boiler Performance & ProposalsFBC & HRSG

    Optimum Pinch & Approach Temperatures

    Higher Pinch Point Lower Steam Qty - Less Material - Cheaper HRSG

    Lower Pinch Point

    Higher Steam Qty - More Material - Costlier HRSG

    Optimum Pinch Point (5 To 10 Deg.C)

    Higher Approach Point Lower Steam Qty - Less Material - Cheaper HRSG

    Steaming At Part Loads - Less likely Lower Approach Point

    Higher Steam Qty - More Material - Costlier HRSG Steaming At Part Loads - More likely

    Optimum Approach Point (5 to 10 Deg.C)

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    68/94

    Boiler Performance & ProposalsFBC & HRSG

    Pinch Point

    Pinch Point

    Steam Quantity

    Material

    HRSG Cost

    Pinch Point Values Adopted

    Optimum : 5 - 10 .C

    Normal : 8 - 10 .CLow : < 8 .C

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    69/94

    Boiler Performance & ProposalsFBC & HRSG

    Approach Point

    Approach Temp

    Steam Quantity

    Material

    HRSG Cost

    Eco Steaming Possibility

    Approach Temperature Values Adopted

    Optimum : 5 - 10CNormal : 8 - 10C

    Low : < 8 C

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    70/94

    Boiler Performance & ProposalsFBC & HRSG

    Optimisation of Heat Transfer Sections Arrangement

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Uniq e aspects in HRSG Design

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    71/94

    Boiler Performance & ProposalsFBC & HRSG

    Unique aspects in HRSG Design

    HRSG is a slave system No direct control over inputs

    More than one HRSG feeding a Single Steam Turbine (2-2-1)

    Multiple Pressure levels

    Sliding pressure operation

    Condensate / makeup water heating

    Protection against water / acid condensation

    Balancing the requirements at unfired / GT+SF / FD modes

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    GT Characteristics

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    72/94

    Boiler Performance & ProposalsFBC & HRSG

    GT Characteristics

    GT output / exhaust parametersdepend on

    Ambient Temperature

    RH

    Site Elevation

    Back Pressure

    Inlet Air cooling System

    Injection

    Combustor Type

    IGV position

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    73/94

    Boiler Performance & Proposals

    FBC & HRSG

    Multiple Pressure Levels & Reheat System

    Single Pressure Non Reheat % Efficiency : ~38-42

    Dual Pressure Non Reheat

    % Efficiency : ~42-50

    Widely Used

    Triple Pressure Non Reheat

    % Efficiency : ~50-52

    Triple Pressure Reheat

    % Efficiency : 55-58 (Single RH) / 60 (Double RH)

    For Advanced Class Gas Turbines

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    CPH / D t S t

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    74/94

    Boiler Performance & Proposals

    FBC & HRSG

    CPH / Deaerator System

    Condenser

    ST

    CPH

    CEP

    GSCHP BFP

    IP BFP

    LP BFP

    To HP Eco

    To IP Eco

    To LP Eco

    HRSG

    LP Steam

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    CPH ith R i l ti S t

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    75/94

    Boiler Performance & Proposals

    FBC & HRSG

    CPH with Recirculation Systemfor Protection of CPH against Dew Point Corrosion

    From Condenser

    To Deaerator

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    76/94

    Boiler Performance & Proposals

    FBC & HRSG

    HRSG Start-up Considerations

    Temperature difference across thick walled components

    Thermal stresses

    Pressure stresses

    Thermal stress plus pressure stress < Max. allowable stress

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    77/94

    Boiler Performance & Proposals

    FBC & HRSG

    HRSGs for CCPP - Present Trend

    Dual / triple pressure levels

    Very high pressure

    High superheat temperature

    Low pinch Point

    Close approach Temperature

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    78/94

    Boiler Performance & Proposals

    FBC & HRSG

    HRSGs for Co-gen Plants - Present Trend

    Increased steam demand / High supplementary firing

    Higher steam pressure and temperature

    Duct burner located between heat transfer surfaces

    SH steam temperature over a wide operating range

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    79/94

    Boiler Performance & Proposals

    FBC & HRSG

    HRSGs for Co-gen Plants - Present Trend

    MCR steam output even at GT Part load

    Introduction of SF at low GT loads

    MCR steam output even in forced draft fan mode

    Auto Trip Transfer

    Non steaming economiser for a wide operatingrange

    CPH to meet plant condensate requirements

    Heavy Fuel Oil / Blended Fuel Oil Firing

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Future Trends

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    80/94

    Boiler Performance & Proposals

    FBC & HRSG

    Future Trends

    Advanced Class GTs - 200 MW and above

    Reheat Cycle

    Stringent Environmental Regulations

    Nox : < 25 ppm with gas firing

    < 65 ppm with Liquid fuels

    Design for Two-shift operation / Cycling

    Auto Plant Startup / Auto Plant Regulation

    State - of - art C & I

    Two stage supplementary firing

    Supplementary firing in HRSGs behind large GTs

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    81/94

    Boiler Performance & Proposals

    FBC & HRSG

    Improvements

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    82/94

    Boiler Performance & Proposals

    FBC & HRSG

    Continuous Design Improvements

    In-house Developments & Analyses

    Joint Work with Educational Institutions (IIT)

    Seminars and International Conference

    Operational feedback from more than 100 HRSGs

    Feed back from manufacturing & Erection groups

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    In house Developments & Analyses

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    83/94

    Boiler Performance & Proposals

    FBC & HRSG

    In-house Developments & Analyses

    Scaled down model Study done In-house for

    Gas flow distribution in HRSGs

    Steam flow distribution in Superheater Modules

    CFD Modeling

    Design of Flow Distribution Grid

    Composite Angle Inlet Transition Ducting

    Steam Flow Distribution

    Increased No. of nozzles for better steam distribution in

    Superheater modules

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Scale Down Model for Analysis of

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    84/94

    Boiler Performance & Proposals

    FBC & HRSG

    y

    Gas Flow Distribution in HRSG Duct

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Optimisation of HRSG Inlet transition duct

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    85/94

    Boiler Performance & Proposals

    FBC & HRSG

    Preferential Flow Pattern in

    Straight Transition Duct

    Streamlined Flow patternin Composite Angle Duct

    Optimisation of HRSG Inlet transition duct

    Uniform Flow Pattern in Straight

    Transition Duct with Distribution Grid

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Grid Plate Constructed with Flat Strips

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Distribution%20Grid.avihttp://localhost/var/www/apps/conversion/tmp/scratch_7/Composite%20Duct.avihttp://localhost/var/www/apps/conversion/tmp/scratch_7/Straight%20Duct.avi
  • 5/21/2018 44962346 Heat Recovery Steam Generators

    86/94

    Boiler Performance & Proposals

    FBC & HRSG

    Grid Plate Constructed with Flat Strips

    Horizontal Strips

    Outer Duct Casing

    Internal Insulation

    SS Liner

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Cold Flow Study of

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    87/94

    Boiler Performance & Proposals

    FBC & HRSG

    y

    Steam Flow Distribution in Modules

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Results of Scaled down 3D Water flow model studies

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    88/94

    Boiler Performance & Proposals

    FBC & HRSG

    Results of Scaled down 3D Water flow model studies

    0.7

    0.8

    0.9

    1

    1.1

    1.2

    1.3

    0 5 10 15 20 25TUBE No.

    VARIAT

    ION

    Single pass - Top row

    Single pass - Bottom row

    Four pass -Top row

    Four pass -Bottom row

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Effect of number / location of nozzles

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    89/94

    Boiler Performance & Proposals

    FBC & HRSG

    on Steam Flow Distribution

    Low velocityregionHigh velocity

    region

    Uniform velocity

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Further Improvements implemented in current

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    90/94

    Boiler Performance & Proposals

    FBC & HRSG

    HRSGs

    Adoption of Single row module

    Adoption of smaller header for reduced thermal stress and fatigue

    damage

    Adoption of composite angle inlet transition duct and gas

    distribution grid constructed of flat strips

    Insulation of HRSG Casing done at site for reducing Erection Time

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Adoption of single row module

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    91/94

    Boiler Performance & Proposals

    FBC & HRSG

    Modules with single row tube will

    eliminate additional bending stressesdue to offset tube to header welds

    Adoption of single row module

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Site Feedback

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    92/94

    Boiler Performance & Proposals

    FBC & HRSG

    Site Feedback

    Strategy adopted at has

    considerably compressed the

    erection time Insulation of

    casings done in site

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

    Operational Flexibility of BHEL HRSGs

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    93/94

    Boiler Performance & Proposals

    FBC & HRSG

    Single row modules

    Better welding access & Ease of Manufacture

    Smaller headers

    Reduced header diameter & thickness, Reduced stress levels

    Increased number & proper location of inlet nozzles

    Uniform flow distribution/metal temperatures, reduced

    differential expansion between tubes in a module

    Flexible connecting piping

    Adequate flexibility in interconnecting piping to ensure

    unrestricted expansion of heat transfer modules

    Adequately sized drains & vents

    For quick draining/venting of all modules

    To minimise thermal shock in superheater

    Bharat Heavy Electricals Limited

    TIRUCHIRAPALLI

  • 5/21/2018 44962346 Heat Recovery Steam Generators

    94/94

    Thank You


Recommended