+ All Categories
Home > Documents > 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

Date post: 03-Jan-2016
Category:
Upload: kelley-ball
View: 298 times
Download: 18 times
Share this document with a friend
Popular Tags:
34
5-1 HANSEN & MOWEN HANSEN & MOWEN Cost Management Cost Management ACCOUNTING AND CONTROL ACCOUNTING AND CONTROL
Transcript
Page 1: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-1

HANSEN & MOWENHANSEN & MOWEN

Cost ManagementCost ManagementACCOUNTING AND CONTROLACCOUNTING AND CONTROL

Page 2: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-2

Product and Service Costing: Product and Service Costing: Job-Order SystemJob-Order System

5

Page 3: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-3

1Manufacturing Firms versus Service Manufacturing Firms versus Service FirmsFirms

Manufacturing involves joining together direct materials, direct labor, and overhead to produce a new product. The product is tangible and can be inventoried.

A service is intangible. It cannot be separated from the customer and cannot be inventoried.

Managers must be able to track the costs of services rendered just as precisely as they must track the costs of goods manufactured.

Page 4: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-4

1Manufacturing Firms versus Service Manufacturing Firms versus Service FirmsFirms

Features of Service Firms and Their Interface with the Cost Management System

Features of Service Firms and Their Interface with the Cost Management System

Page 5: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-5

1Manufacturing Firms versus Service Manufacturing Firms versus Service FirmsFirms

Unique versus Standardized Products and ServicesUnique versus Standardized Products and Services

Firms that produce unique products in small batches that incur different product costs must track the costs of each product or batch separately. This is called a job-order costing system.

Examples: Cabinet makers, home builders, dental and medical services

Page 6: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-6

1Manufacturing Firms versus Service Manufacturing Firms versus Service FirmsFirms

Unique versus Standardized Products and ServicesUnique versus Standardized Products and Services

Some firms produce identical units of the same product. The costs of each unit are also the same. This is called a process-costing costing system.

Examples: Food, cement, petroleum and chemicals

Page 7: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-7

Setting Up the Cost Accounting SystemSetting Up the Cost Accounting System 2

Relationship of Cost Accumulation, Cost Measure- ment, and Cost Assignment

Relationship of Cost Accumulation, Cost Measure- ment, and Cost Assignment

The cost accounting system must satisfy the needs for cost accumulation, cost measurement and cost assignment.

Page 8: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-8

Setting Up the Cost Accounting SystemSetting Up the Cost Accounting System 2

Cost accumulation refers to the recognition and recording of costs. Source documents can be designed to supply information that can be used for multiple purposes.

Cost measurement refers to classifying the costs and determining the dollar amounts for direct materials, direct labor and overhead.

Cost measurement methods:

Actual costing

Normal costing

Page 9: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-9

Setting Up the Cost Accounting SystemSetting Up the Cost Accounting System 2

Cost assignment occurs after costs have been accumulated and measured. Total product costs associated with the units is divided by the number of units produced to determine unit cost.

Unit costs in manufacturing firms are used for:

Valuing inventory

Determining income

Decision making

Unit costs in nonmanufacturing firms are used for:

Determining profitability

Determining feasibility of new services

Page 10: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-10

Setting Up the Cost Accounting SystemSetting Up the Cost Accounting System 2

Unit cost is made up of

direct materials

direct labor

overhead

Overhead is applied using a predetermined rate based on budgeted overhead costs and budgeted amount of driver. Commonly used drivers include:

1. Units produced

2. Direct labor hours

3. Direct labor dollars

4. Machine hours

5. Direct materials dollars or cost

traced directly to units

Page 11: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-11

Setting Up the Cost Accounting SystemSetting Up the Cost Accounting System 2

Activity level must be predicted for the coming year to calculate the predetermined overhead rate.

Four different measure of activity level:

Page 12: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-12

The Job-Order Costing System: The Job-Order Costing System: General DescriptionGeneral Description 3

Overview of the Job-Order Costing SystemOverview of the Job-Order Costing System

Job-order industries produce a wide variety of products or jobs that are distinct.

Costs are accumulated by job in a job-order costing system. Each job is documented on a job-order cost sheet.

Total manufacturing costs for the job are divided by the number of units produced to determine unit cost.

The work-in-process inventory is the collection of all job-order cost sheets.

Page 13: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-13

The Job-Order Costing System: The Job-Order Costing System: General DescriptionGeneral Description 3

The Job-Order Cost SheetThe Job-Order Cost Sheet

Page 14: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-14

The Job-Order Costing System: The Job-Order Costing System: General DescriptionGeneral Description 3

Materials Requisition FormMaterials Requisition Form

Page 15: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-15

The Job-Order Costing System: The Job-Order Costing System: General DescriptionGeneral Description 3

Time TicketTime Ticket

Page 16: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-16

The Job-Order Costing System: The Job-Order Costing System: General DescriptionGeneral Description 3

Overhead is assigned to jobs using a predetermined overhead rate. The actual amount of the driver used as a base must be collected and recorded.

Page 17: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-17

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Summary of Direct Materials Cost FlowsSummary of Direct Materials Cost Flows

+

=

Page 18: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-18

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Summary of Direct Labor Cost FlowsSummary of Direct Labor Cost Flows

+

=

Page 19: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-19

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Summary of Overhead Cost FlowsSummary of Overhead Cost Flows

+

=

Page 20: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-20

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Completed Job-Order Cost SheetCompleted Job-Order Cost Sheet

Page 21: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-21

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Summary of Finished Goods Cost FlowsSummary of Finished Goods Cost Flows

Page 22: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-22

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods ManufacturedStatement of Cost of Goods Manufactured

Page 23: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-23

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods ManufacturedStatement of Cost of Goods Manufactured

Page 24: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-24

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods ManufacturedStatement of Cost of Goods Manufactured

Page 25: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-25

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods ManufacturedStatement of Cost of Goods Manufactured

Page 26: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-26

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods ManufacturedStatement of Cost of Goods Manufactured

Page 27: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-27

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Statement of Cost of Goods SoldStatement of Cost of Goods Sold

Page 28: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-28

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

All Signs Company Summary of Manufacturing Cost FlowsAll Signs Company Summary of Manufacturing Cost Flows

Page 29: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-29

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 4

Income StatementIncome Statement

Page 30: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-30

5

Departmental Overhead Costs and ActivityDepartmental Overhead Costs and Activity

=Plantwide overhead

rate

$240,000 20,000

= $12 per direct labor hour

Department A overhead rate

=$60,000 15,000

= $4 per direct labor hour

Department B overhead rate

=$180,000

15,000= $12 per direct labor hour

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description

Page 31: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-31

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 5

Production Data for Jobs 23 and 24Production Data for Jobs 23 and 24

Job 23 overhead: $12 500 DLH = $6,000

Job 24 overhead: $12 1 DLH = $12

Page 32: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-32

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 5

Overhead assigned using multiple overhead rates

Department A Department B

Overhead cost $60,000 $180,000Cost driver 15,000 DLH 15,000 MHrDepartment overhead rate $4/DLH $12/MHrOverhead applied to Job 23 $2,000 —Overhead applied to Job 24 — $6,000

Page 33: 5-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.

5-33

Job-Order Costing: Specific Job-Order Costing: Specific Cost Flow DescriptionCost Flow Description 5

Overhead assigned using multiple overhead rates

Compare to overhead assigned using a single overhead rate:

Job 23 overhead: $12 500 DLH = $6,000

Job 24 overhead: $12 1 DLH = $12

Department A Department B

Overhead cost $60,000 $180,000Cost driver 15,000 DLH 15,000 MHrDepartment overhead rate $4/DLH $12/MHrOverhead applied to Job 23 $2,000 —Overhead applied to Job 24 — $6,000