Date post: | 08-Aug-2015 |
Category: |
Presentations & Public Speaking |
Upload: | etelae-karjalan-liitto-regional-council-of-south-karelia |
View: | 235 times |
Download: | 0 times |
Prospects of the development of international freight and passenger railway transportationbetween Russia and Finland
SEMINAR The development of railways between Luumäki and Imatrankoski (Imatra)
Head of October Railway Oleg ValinskiyMarch 23, 2015
CARGO TRAFFIC THROUGH THE BORDER CROSSINGS OFOCTOBER RAILWAY IN 2014
EXPORT (12 months 2014) IMPORT (12 months 2014)
ГРУЗЫ В КОНТЕЙНЕРАХ
21%OIL AND OIL
TIMBER CARGO30% OIL AND OIL
PRODUCTS
БУМАГА 35%
21%OIL AND OIL PRODUCTS
11%
IRON ORE AND MANGANESE
9%
CHEMICALS AND MINERAL
FERTILIZERS8%
CARS6%
BUILDINGGOODS
2%
IRON ORE AND MANGANESE
32%
PRODUCTS 18%
CHEMICALS AND SODA
9%
CHEMICAL AND MINERAL
FERTILIZERS9%
GOODS IN
1Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
GRAIN2%
REFRACTORIES2%
OTHERS3%
GOODS IN CONTAINERS
2%
COAL0,4%
OTHER FOODSTUFF
0,3%
FERROUS METALS
0,2%
CARGO TRAFFIC THROUGH THE BORDER CROSSINGS OFOCTOBER RAILWAY IN 2014
RUSSIA FINLAND FINLAND RUSSIA
5000
60005185,1
5475,7
2778,5
4284,1
ТЫ
СЯ
Ч
ТО
НН
600
700 665,4
524,6
0
1000
2000
3000
4000
Бусловская Светогорск Вяртсиля Кивиярви
2805,1 923,43551,2
2778,5
885,5
ТЫ
СЯ
Ч
ТО
НН
2013
+6%
-1%-4% +21%
0
100
200
300
400
500
Бусловская Вяртсиля Кивиярви
79,333,140,8 16,5
ТЫ
СЯ
Ч
ТО
НН
2013
-50%-21%-49%
22
2014
+8
%
2013
2014
- 25%
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
1200 1013,99
CARGO TRAFFIC THROUGH THE BORDER CROSSINGS OFOCTOBER RAILWAY (2 months 2015)
RUSSIA FINLAND FINLAND RUSSIA
8078,96
0
200
400
600
800
1000
Бусловская Светогорск Вяртсиля Кивиярви
1013,99
425,18
171,92
736,90
972,27
388,01
118,30
438,97
ТЫ
СЯ
Ч
ТО
НН
-3%-4%
-9%-4%
0
10
20
30
40
50
60
70
Бусловская Вяртсиля Кивиярви
10,153,74
54,87
4,270,00
ТЫ
СЯ
Ч Т
ОН
Н
-
100%-31%
-58%
Бусловская Светогорск Вяртсиля Кивиярви
2014
2015
-
18%
-
18%
3
2014
2015
-
35%
-
35%
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
Name of the integrated investment project –
«Organization of high-speed passenger train traffic on route between ST. PETERSBURG – BUSLOVSKAYA of October Railway»
О ХОДЕ СТРОИТЕЛЬСТВА НОВОЙ ЛИНИИ САНКТ-ПЕТЕРБУРГ – ЛОСЕВО – КАМЕННОГОРСК – ВЫБОРГ
ABOUT IMPLEMENTATION OF THE PROJECT“ST. PETERSBURG – LOSEVO – KAMENNOGORSK –VYBORG” OCTOBER RAILWAY
Name of the investment project comprised in the integrated investment project –
«Construction of a new route LOSEVO – KAMENNOGORSK in orderto move the freight traffic route towards the Gulf of Finland ports, to RUCHYI – PETÄJÄRVI – KAMENNOGORSK – VYBORG»
Goals of the integrated investment project –� Organization of high-speed passenger traffic on the route � Organization of high-speed passenger traffic on the route
ST.PETERSBURG - BUSLOVSKAYA at speed of up to 200 km/h;
� construction of a new route LOSEVO – KAMENNOGORSK in order to move the freight traffic route towards the Gulf of Finland ports,
to RUCHYI –PETÄJÄRVI – KAMENNOGORSK – VYBORG
4Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
MAIN CHARACTERISTICS OF THE INTEGRATED INVESTMENT PROJECT
The VYBORG-KAMENNOGORSK-LOSEVO railway line belongs to the «highly loaded» category and is intended for handling freight trains to the Finnish Gulf intended for handling freight trains to the Finnish Gulf ports bypassing the main Vyborg route.
The construction and development of the existing approaches to the new line serve to move freight traffic off the high-speed St. Petersburg - Vyborg line.
The total length of the area under construction is 84 km, of which 65 km is a new double-track railway extending across PRIOZERSK and VYBORG districts of Leningrad oblast, and 19 km is a second main track on the oblast, and 19 km is a second main track on the SOSNOVO-LOSEVO section. A crossing will be built in VYBORG for separation from the main route.
5Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
PROJECT IMPLEMENTATION
The implementation stages provided by the project :
I stage – Organization of high-speed traffic on
(2006-2010) St. Petersburg - Buslovskaya area
II stage –
(2010-2016) Freight traffic relocation
The Losevo-Kamennogorsk line will be ableto handle about 40 million tons of cargo a year.
The total scope of the freight traffic will be:�12 pairs of trains in the direction of the
port of Primorsk�15 pairs towards the Vysotsk-Lukoil
After completion of the line, it is intended to launch suburbanservice there: �15 pairs towards the Vysotsk-Lukoil
distribution - transshipment center� 7 pairs to the port of Vysotsk,� 9 pairs to the Buslovskaya border crossing,� 7 pairs to the Svetogorsk border crossing� 4 pairs to Hiitola Station
service there:By 2020 г. when the KAMENNOGORSK-SVETOGORSK line willbe electrified, it is intended to launch:• 5 electric trains between SVETOGORSK-KAMENNOGORSK-
LOSEVO-ST. PETERSBURG• 5 pairs between VYBORG-KAMENNOGORSK-LOSEVO-ST.
PETERSBURGIn total it will be 10 electric train pairs operating on the new line.
6Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
RECONSTRUCTION OF THE ST. PETERSBURG –LOSEVO – KAMENNOGORSK – VYBORG SECTION
Buslovskaya
Vainikkala
Petaarvi
VYBORG
After the completion of the
construction of the St. Petersburg-
Losevo-Kamennogorsk-Vyborg railway
section:
• the maximum permissible train length
KAMENNOGORSK
Vozrozhdeniye
LOSEVO-1
Tammisuo
Petaarvi
Popovo
Yermilovo
• the maximum permissible train length
value will be 71 conditional cars;
• train axle load: 23 tons;
• train weight: up to 6500 tons.Sosnovo
Ruchyi
Finland Station
Ladoga Station
- at the expense of RZD JSC
Construction and reconstruction of railway facilities:
- at the expense of Investment Fund of Russian
Federation
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland 7
FINANCIAL INVESTMENT OF INTEGRATED PROJECT
PLAN
Realized
в 2006-2014 гг.
Limit
2015 годаUsed in total/
% (01.03.2015)
fact % plan on the 01.03.2015 %
Comprehensive investment project "Organization of high-speed passenger trainsComprehensive investment project "Organization of high-speed passenger trainson the line St. Petersburg - Buslovskaya October Railway (mln. rubles.):
1. JSC “RZD” 59860,16 58299,96 97 762,7 0,058 1 58300,018 97
High speed traffic 27 669,7 27 669,7 100 - - - 27669,7 100
Removal of freight traffic
(reconstruction of Vyborg-
Kamenogorsk, Pine-Losevo-1)
30 283 30169,83 99 - - - 30169,83 99
Construction of a new park
station Kamennogorsk1907,46 460,432 24 762,7 0,058 1 460,49 24
2. ROSZHELDOR 23539,9 15490,0 66 0 0 0 15490,0 66
8
Construction of a new line Losevo-
Kamenogorsk22168,69 15170,0 68 0 0 0 15170,0 68
Construction viaduct 29, 66, 75 km of
St. Petersburg - Buslovskaya and
pedestrian tunnel
1371,18 320,0 23 0 0 0 320,0 23
3. TOTAL
by complex project:83400,06 73789,96 88 762,7 0,058 1 73790,018 88
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
Каменногорск
Возрождение
Таммисуо
RECONSTRUCTION SOSNOVO-LOSEV-1, VYBORG-KAMENOGORSK
ХиитолаКаменногорск-2
Сосново
Лосево - 1Выборг
Таммисуо
Санкт - Петербург
Ручьи
Infrastructure without changing
object RoszheldorWork carried out in 2011Work carried out in 2012
Work carried out in 2013
Work was carried out on 2014Work planned for the 2015-2016
9Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
PERFORMANCE OF WORK OF SOSNOVO-LOSEVO-1, KAMENNOGORSK-VYBORGDURING THE ENTIRE CONSTRUCTION PERIOD
name of workproject volumes
Performing volumes Plan
2015performance
01.03.15%
performance
the overall percentage of completion of the
project value%
COMMENTS
2010-2014гг.
Земляное полотно, тыс.м.куб. 3859,68 3918,1 8,5 0 100 С учетом мест просадок
ИССО выполнено 100ИССО 72 72 выполнено - - 100
ВСП:
Укладка РШР, км 127,8 127,6 0,2 0 - 99
Укладка плетей, км 114,7 107,7 6,93 0,8 12 92
Балластировка пути, тыс.м.куб 392,3 382,5 9,8 0 - 97
Укладка СП, компл. 123 118 6 0 - 96 1 СП переукладка №7
Контактная сеть, км 180,75 158,42 22,4 0 - 88
Устройства АБТЦ (кабель), км
118 101,5 16,50
- 100
Электрическая централизация
6 6 выполнено - - 100
10
централизация6 6 выполнено - - 100
Строительство зданий постов ЭЦ, модулей
10 10 выполнено - - 100
Реконструкция переездов 12 7 5 В работе - 67
Строительство платформ 28 21 7 В работе - 100
Завершаются работы по благоустройству,
проводятся рабочие комиссии
Строительство станций 1 1 выполнено - - 100
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
RECONSTRUCTION OF THE AREA BY INVESTMENT OF JSC "RUSSIAN RAILWAYS" - STATION LOSEVO 1
11Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
RECONSTRUCTION OF THE AREA BY INVESTMENT OF JSC "RUSSIAN RAILWAYS" - STATION KAMENNOGORSK
12Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
RECONSTRUCTION OF THE AREA BY INVESTMENT OF JSC "RUSSIAN RAILWAYS" - STATION VOZROZHDENIE
13Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
RECONSTRUCTION OF THE AREA BY INVESTMENT OF JSC "RUSSIAN RAILWAYS" - STATION TAMMISUO
14Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
Каменногорск
Возрождение
Таммисуо
Object by FAJT
crossing
viaductКаменногорск 2
ст. Озерское
ст. Дружное
9 км27 км
42 км
54 км
43 км
EXECUTION OF WORKS ON LINE LOSEV-KAMENOGORSK (ROSZHELDOR)
Выборг
Сосново
Лосево - 1
92 км
5 км15 км
9 км27 км25 км
Санкт - Петербург
Ручьи
15Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
MAIN AMOUNT OF DONE WORK(FEDERAL RAILWAY TRANSPORT AGENCY OF RUSSIA
Наименование работ Проектные
объемыВыполнение объемов на
01.03.2015
Процент выполненияот проекта
Землянное полотно, тыс.м.куб 7484 7373 99%
трубы 153 141 92%
ИССО
трубы 153 141 92%ж.д. мосты 5 В работе 5 97%
ж.д. путепроводы 5 В работе 595%
автопутепроводы 9В работе 8,
ПК911+80 – сдан 04.08.2014
ВСП, км 135 132 98%
Стрелочные переводы, комплект 34 33 97%
16
Стрелочные переводы, комплект 34 33 97%
Контактная сеть (опоры контактной сети, шт.)
2637 2599 99%
Устройства АБТЦ, км 617 502 81%
Строительство тяговых подстанций 3 В работе 75%
Строительство станций 2 В работе 80%
Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -BRIDGE OVER THE RIVER VUOKSA IN LOSEVO
17Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -BRIDGE OVER THE RIVER VUOKSA IN LOSEVO
18Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -BRIDGE OVER THE RIVER IN TOWNSHIP ROMASHKI
19Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -BRIDGE OVER THE RIVER SLAVYANKA
20Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -BRIDGE OVER THE RIVER STREL’
21Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -PLATFORMS OF STATION OZERSKOE
22Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
FEDERAL AREA -STATION DRUZHNOE
23Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
ЦЕЛЕВЫЕ ЗАДАЧИ КОМПЛЕКСНОГО ИНВЕСТИЦИОННОГО ПРОЕКТА НА 2015 и 2016 гг.� Completion of the electrification of the Vyborg-Kamennogorsk area and
Kamennogorsk station� Continued construction of a new yard in way of Kamennogorsk Station
The following must be constructed in the new yard of Kamennogorsk station in 2015-2016 :� 5 5 receiving and departure tracks at least 1050 m long, tracks in the locomotive storage� 5 5 receiving and departure tracks at least 1050 m long, tracks in the locomotive storage
yard (No. 20, 21, and 22 at least 150 m long), siding line ends No. 14 and 23, catenarysystem area duty station tracks, substation track junctions (total track length 15.8 km, 54sets of track switches)
� compressor station for brake charging and testing units,� 2 warming centers� standard fire station� service platforms� fire water supply pump station
The required investmentlimits by year are :
� 2015 – 762,712 mln.rubles� 2016 – 894,927 mln.rubles
� fire water supply pump station� water treatment plant building and sewage water pump station� transformer substation� electric interlocking station building� catenary system area duty station building� the yard's station tracks must be electrified
24Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
Оценка эффективности реализации проекта
In December 2010, it was finished I PROJECT STAGE, it was introduced high-speed traffic on the route ST. PETERSBURG - BUSLOVSKAYA with train “ALLEGRO”.The total length of the ST. PETERBSURG – BUSLOVSKAYA area being 157 km, the traffic speed started to be up to 200 km/h (from PARGOLOVO to BUSLOVSKAYA).
Before 2005 when the project started, speed of passenger trains on the route St. Petersburg - Buslovskaya(State border) was up 140 km/h, the travel time between St. Petersburg - Helsinki was 5 h 20 min
PERFORMANCE EVALUATION OF PROJECT
to 200 km/h (from PARGOLOVO to BUSLOVSKAYA).By Russian territory to State border travel time of the train is 1h 30min.Travel time from ST. PETERSBURG to HELSINKI (length 410 km, 157 km by Russian territory) is 3h 36min.
ST. PETERSBURG – LOSEVO – KAMENNOGORSK – VYBORGINDICATORS BEFORE RECONSTRUCTION AFTER RECONSTRUCTION
• THE LENGTH OF:
RUCHII – KUZNECHNOE
KAMENNOGORSK – VYBORG
45
46 71KAMENNOGORSK – VYBORG
HITOLA – KAMENOGORSK
LOAD PER AXLE OF TRAIN
TRAIN WEIGHT (EVEN/ODD):
RUCHII – KUZNECHNOE
KAMENNOGORSK – VYBORG
HITOLA – KAMENOGORSK
46
45
23
1800/3500
3000/3000
3000/3000
71
23
6500
25Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
DEVELOPMENT OF THE INTERNATIONAL RAILWAY BORDER
CROSSING SVETOGORSK
SVETOGORSK
Border station
Train pairs per day
(handled across the border)
TRAFFIC VIA SVETOGORSKIN 2012 AND FOLOWING YEARS
VYBORG
1
2
Border station (handled across the border)
2012 2020 2025
SVETOGORSK 3 5 5
PERSPECTIVE CARGO FLOW VIA SVETOGORSK INTERNATIONAL RAILWAY BORDER CROSSING
1Border station Export (millions of
tons/year)
2020 2025
SVETOGORSK 3.8 4.3
26Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
ST. PETERSBURG
DEVELOPMENT OF THE INTERNATIONAL BORDER CROSSING SVETOGORSK
In Finland is currently implementing the project
GENERAL PLAN OF RAILWAY ROUTE
IMATRA – IMATRANKOSKI – STATE BORDER
As a part of the general plan envisages the construction of a second main track
1
As a part of the general plan envisages the construction of a second main track
from Pelkola to the state border
In 2014, several meetings took place where were discussed technical and
technological synchronization of border railway infrastructure
Meetings were attended by representatives of the OCTOBER RAILWAY, the North-
West Territorial Administration ROSGRANITSA, as well as representatives from 1
FINNISH TRANSPORT AGENCY, «VR TRACK» and «VR TRANSPOINT»
October Railway have provided
all necessary information to Finnish colleagues
27Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
IMPROVING OF CUSTOMS ADMINISTRATION
ADVANTAGES:2011
EMPTY CARRIGES
LOADED CARRIGES
ELECTRONIC DOCUMENT MANAGEMENT
2011
2011
2013
2014
2014
Making easier the customs procedures at border crossing points
Reducing the time of the initial-end operations
2011
2011
2014
2014
28Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
MARKET ANALYSIS OF TRANSPORT SERVICES IN THE INTERNATIONAL PASSENGER TRAFFICJSC "RUSSIAN RAILWAYS"
432 271
350 101 345 625
442 900494 921
598 650
517 627
400 000
500 000
600 000
700 000
All trains between Russia and Finland
-13,5%
345 625
0
100 000
200 000
300 000
2 008 2009 2010 2011 2012 2013 2014
60000
70000
68598
51412
Passenger traffic (2 months 2015)
In rail transportation the volume of
passenger traffic between Russia
and Finland is 75,6%
In rail transportation the volume of
passenger traffic between Russia
and Finland is 75,6%0
10000
20000
30000
40000
50000
60000
АллегроЛев Толстой
14067
11088
2014
2015
- 46%- 46%- 8%- 8%
29Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
PREREQUISITES OF SERVICE DEVELOPMENT
ХельсинкиКюменлаак
Южное
Саво
5%
Северная
Карелия
4%
Северная
Остроботн
ия
3%
Северное
Саво
3%
Центральна
я
Финляндия
2%
DISTRIBUTION OF RUSSIANS ARRIVING TO FINLAND BY ITS REGION
DISTRIBUTION OF RUSSIANS' OVERNIGHT STOPS IN FINLAND BY ITS REGION
Хельсинки
36%
Южная
Карелия
23%
Другие
10%
Лапландия
8%
Кюменлаак
со
6%
30Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
NEW ROUTE BETWEEN IMATRA AND SVETOGORSK
Organization of international passenger trafficST. PETERSBURG – SVETOGORSK - IMATRA
SVETOGORSK
3 №Route / station of state control of
passengers and baggage
Approximate time
in the way
1 ST. PETERSBURG - VYBORG 3h - 40min
IMATRA
VYBORG
1
22 VYBORG - SVETOGORSK 3h - 40min
3 SVETOGORSK 4h -10min
Train will go on weekends, the number of passengers daily average of 700 people
Signing the agreement of international passenger trafficthrough Svetogorsk between Russian government andFinnish
11 Finnish
Issue of byelaw of Russian government about state control on the way (as on he train "Allegro")
Change of status of SVETOGORSK
1
2
3
31Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
ST. PETERSBURG
DEMAND FOR THE ST. PETERSBURG - IMATRA ROUTE
RELEVANCE OF THE PRESENCE OF RAIL CONNECTION BETWEEN ST. PETERSBURG - IMATRA
Yes, the service is needed – 91%No, I don't care about this route – 9%
Expected frequency of train journeys
Preferred week days for this train
13%
2%
78%
0% 20% 40% 60% 80% 100%
ежедневно
рабочие дни
выходные
33%
30%
31%
3%
2%
1%
0% 5% 10% 15% 20% 25% 30% 35%
более 1 раза в месяц
один раз в месяц
один раз в 2-3 месяца
один раз в 5-6 месяцев
один раз в год
реже одного раза в год
More than once a month
Once a month
Once in 2-3 months
Once in 5-6 months
6%
1%
случайным образом
другое
1%реже одного раза в год
32Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
The demand for the train service on the St. Petersburg - Imatra route will be 21,674 passengers a month on the average
PASSENGER TRAFFIC ON THE ROUTE ST. PETERSBURG – HELSINKI «ALLEGRO»
LAHTI10%
KOUVOLA8%
VAINIKKALA7%
The average percentage of passengers leaving the train ALLEGRO
ST.PETERSBURG - HELSINKI
About 12 passengers leaving “ALLEGRO”
on Vainikkala
Passengers leaving “ALLEGRO” (2013)
HELSINKIPASILA
HELSINKI68%
PASILA1%
TIKKURILA6%
HELSINKI – ST. PETERSBURG
LAHTI5%
KOUVOLA6%
VAINIKKALA7%
The average percentage of passengers leaving the train ALLEGRO
About 14 passengers leaving “ALLEGRO”
on Kouvola
Boarding of passengers “ALLEGRO”
PASILATIKKURILALAHTIKOUVOLAVAINIKKALA
HELSINKI80%
PASILA0%
TIKKURILA2%
5%
33Prospects of the development of international freight and passenger railway transportation
between Russia and Finland
HELSINKIPASILATIKKURILALAHTIKOUVOLAVAINIKKALA
«ALLEGRO»«ST. PETERSBURG -
IMATRA»
STRATEGIC DEVELOPMENT OF ST. PETERSBURG –IMATRA SERVICE BASED ON COMPETITION WITH AUTOMOBILE TRANSPORT
«ST. PETERSBURG -IMATRA»
34Prospects of the development of international freight and passenger railway transportation
between Russia and Finland