5. Ana lysis of Costs to Achieve Ed Specs At Buildings in the
10 Year Plan
g.. •
Cost Model Remodeling Key
The following key identifies three categories of general remodeling scope used to generate conceptual cost estimates for areas within existing buildings.
The cost categories are not calculated in direct response to carefully completed design work. They are used as "quantifiers" to establish basic assumptions for probable scope.
Cost factors are generated based on the assumption of competitive local bidding that would follow more carefully detailed design work in year 20152016.
Level Onet'Finishes Onl
8 Flooring !Includes demo) 5 Wall Finishes 3 Board • pin up suriaces, finishes 6 counter tops, refinish cabinets
10% contingency 24.2
Level Two "L-l plus" 24.2 Level One
7 New lighting 5 New ceilings 5 upgraded power distribution 6 minor adjustments HVAC distribution 4 minor door and hardware chang 5
10% contingency 56.32
Level Three- total" gut job"
56.32 level Two remodeling 20 major remodeling to accommodate 10 reconfigurations I doors and hardware 6 new cabinets, counters
10% contingency 101.552
...--- --- -- - S/(, C; M--g.
LA .r
Davenport Community School District Master Planning revised 7123/2015 Adams Elementary RDGIA # 2015.418 Area of Existing School: 82,282
Estimated
Units Unit Cost Cost
rpose Room (Kitchen, Cafeteria, restrooms) SF $235 0 $ new Gym (5000) plu kitchen(1000) SF $180 6,000 $ 1,080,000
SF $27 6.000 $ 162,000
SF $115 0 $
SF $200 0 $
$
SF $24 41.141 $ 995.612 SF $44 20.571 $ 911,685
SF $102 0 $ SF $56 3.600 $ 202,752
$ $
~ $ S $ $
lump sum $ SF $250 750 $
SF 115.00% 125,451 I ~
SF $6 0 per stall $3,500 0
lump Sum
lump Sum
8%
Design Fees 10.00%
Owners Costs (prints/surveysllegal/inslmove mgmt) 2.00%
or Specialty Equipment
(assumes partial re-use of extg.) 5.00% ______--~~------------_L--------~------I--------'-~----~~~~ ~.' .. ,.
g. Davenport Community School District Master Planning revised 7/2312015 Buchanan Elementary RDGIA # 2015.418 Area of Existing School: 56,103
Estimated
Units Unit Cost Qu Cost
It i-Purpose Room (Kitchen, Cafeteria, restrooms) SF $23 5 6.000 $ 1,410,000
Shelter Enhancements (add to new addit ion) SF $71 6,000 $ 423,000
ical Mezzanine (assumes roof top AHU only) SF $115 $° ional Pre-K Classrooms SF $200 $° Construction Sub Total $
One Remodeling SF $15 56,103 $ 814,616 Two Remodeling SF $56 ° $ Three Remodeling SF $102 ° $
220,000 10,000 40,000 l:S,QOO
SF $250 1,500 375,000 I SF 115.00% 100.112 115,129
744
Improvements pgraded Parking and Drives SF $6
Parking per sta ll $3,500 ° Grading/Detention/Utility Lump Sum ° 50,000 Amenities/Signage/Plantings Lump Sum SO,OOO SubTotal 100,000
8%
ees Owners Costs (prints/surveys/legal/ins/move mgmt) 2.00%
or Specialty Equipment (assumes partial re-use of 5.00%
~~----~~--------------~--------'--------~-------
Davenport Community School District Master Planning revised 7/23/2015 RDGIA # 2015.418
Iti-Purpose Room (Kitchen, Cafeteria, restrooms)
Shelter Enhancements (add to new addition)
One Remodeling Two Remodeling Three Remodeling
see DefJcf~ 1fSt) Inmlls.,.,n fer systtm replace water heater insulate pip.ng In tunnel update flre afarm system
Room Remodeling echnology (district budget x 15%)
Remodeling Sub Total
ded Parking and Drives Parking
Grading/Detention/Utility Amenities/Signage/Plantings Sub Total
Eisenhower Elementary Area of Existing School : 57,811
Estimated
Units Unit Cost Quant Cost
SF $235 6,000 $ 1,410,000
SF $71 6,000 $ 423,000
SF $115 0 $
SF $200 0 $
$ 1,833,000
SF $15 57.811 $ 839,416 SF $56 0 $ SF $102 0 $
S 225,000 $ 10,000
$ 5,000 $ 15,000
SF $250 1,500 $ 375,000 SF 115.00% 109,729 $ 126,188
$ 1,595,604
SF $6 0 per stall $3,500 0
lump Sum 50,000 lump Sum 50,000
100,000
8% 282,288
10.00% 2.00%
5.00%
g. --~---- - ~-
s (; (; ~
Davenport Community School District Master Planning revised 712312015 Jackson Elementary RDGIA # 2015.418 Area of Existing School: 53,632
Estimated
Units Unit Cost Quant Cost
i-Purpose Room (Kitchen, Cafeteria, rest rooms) SF $23~ 6,000 $ 1,410,000 rm Shelter Enhancements (add to new addition) SF $71 6,000 $ 423,000
chanical Mezzanine (assumes roof top AHU only) SF $115 0 $ itional Pre-K Classrooms SF $200 0 $
Construction Sub Total $ 1,833,000
ing
One Remodeling SF $15 53.632 $ 778,737 Two Remodeling SF $56 0 $ Three Remodeling SF $102 0 $
Budaat see Daftciency.IJstl addspilnkJair ¥tem ~__beat8r
$ $
225,000 10,000
rework tunnel ffQor drains $ 7,000 upgrade fire.aJarm system $ 15,000
st Room Remodeling SF $250 1,500 $ 375,000 (district budget x 15%) SF 115.00% 93,230 $ 107,215
Sub Total 1,517,951
pgraded Parking and Drives SF $6 0 $ Parking per stall $3,500 0 $
Grading/Detention/Utility Lump Sum $ 50,000 Amenities/Signage/Plantings lump Sum $ 50,000 Sub Total $ 100,000
2.00%
5.00%
----~ - -s//-(; (, M. Dg··
~
Davenport Community School District Master Planning revised 7123/2015 Jefferson Elementary RDGIA # 2015.418 Area of existing School : 64,514
Unit Estimated Units Cost Qu Cost
ulti-Purpose Room (Kitchen, Cafeteria, restrooms) S $235 0 $ new Gym (5000) plus kitchen(lOOO) SF $180 6,000 $ 1,080,000
Shelter Enhancements (add to new addition) SF $27 6,000 S 162,000
nical Mezzanine (assumes roof top AHU only) SF $115 0 $ SF $200 0 $
$ 1,242,000
SF $24 32.257 $ 780,619 SF $44 16,129 $ 714,815 SF $102 0 $ SF $56 3,000 $ 168,960
25GAQp 10.000 45 000
21.500 ~
l~:OOO SOOQO 3O.fOOO 10,000
S 20,000 lump sum $ 30,000
SF $250 750 . $ 187,500
SF 115.00% 101,645 $ 116,892
raded Parking and Drives SF $6 o Parking per stall $3,500 o
Grading/Detention/Utility Lump Sum 50,000 AmenitiesiSignage/Plantings lump Sum 50,000 Sub Total 100,000
8%
10.00% 2.00%
10.00%
--g. -s/~i:~ (; M
Davenport Community School District Master Planning revised 7/23/2015 Madison Elementary RDGIA # 2015.418 Area of Existing School: 64,614
Room (Kitchen, Cafeteria, restrooms)
Mezzanine (assumes roof top AHU only)
it ional Pre-K Classrooms Construction Sub Total
One Remodeling Two Remodeling Three Remodeling
pgraded Parking and Drives Parking
Grading/Detention/Utility AmenitiesiSlgnageJPlantings Sub Total
Owners Costs (prints/surveys/legallins/move mgmt) or Specialty Equipment
E (assumes partial re-use of extg.)
Units
SF
SF SF
SF SF SF
SF
SF per stalJ
l ump Sum lump Sum
8%
2.00%
5.00%
Unit Cost
$235
$115 $200
$24
$56 $102
$6 $3,500
Quant
0
0 0
64,614
0 0
o o
Estimated
Cost
$
$ $ $
$ $ $
1,563,659
--------------'.--------_~~----.~----~~--------~~~
g. ------ -
S,/(; c. M
Davenport Community School District Master Planning revised 7/2312015 RDGIA# 2015.418
ulti-Purpose Room (Kitchen, Cafeteria, rest rooms)
Shelter Enhancements (add to new addition)
nical Mezzanine (assumes roof top AHU only)
itional Pre-K Classrooms (includes hallway) Construction Sub Total
One Remodeling Two Remodeling Three Remodeling
Budget (see Deficiency list)
replace AHU's in Gym and Aud replace sewage ejector pump replace water service replace water heater exhaust fan upgrade chimney liner upgrade fire alarm system
Improvements re Protection and Security
Room Remodeling (district budget x 15%)
9 Sub Total
Innr"'rl"'tf Parking and Drives Parking
Grading/Detentio n/Utility Amenities/Signage/Plantings
ite Sub Total
Units
SF
SF
SF
SF
SF SF SF
lump sum SF SF SF
SF
per stall
lump Sum
lump Sum
10.00% 2.00%
5.00%
Monroe Elementary Area of Existing School: 68,835
Estimated
Unit Cost Qu Cost
$235 6,000 $ 1,410,000
$71 6,000 $ 423,000
$115 0 $ $200 1,800 $ 360,000
$
$24 34,418 $ 832,904 $56 34,418 $ 1,938,394
$102 0 S
$ 75,000 $ 15,000 $ 40,000 $ 8,000 $ 16,000 $ 35,000 $ 20,000 $ 30,000
$4 68,835 $ 275,340 $250 1,500 $ 375,000
115.00% 97,307 $ 111,903
$6 o $3,500 o
g .. Davenport Community SchoollOistrict Master Planning revised 7123/2015 Wilson Elementary RDGIA# 2015.418
Description
New Construction
Multi-Purpose Room (Kitchen, Cafeteria, restrooms)
Storm Shelter Enhancements (add to new addition)
Mechanical Mezzanine (assumes roof top AHU only)
f4dditional Pre-K Classrooms (remodel old cafe area) New Construction Sub Total
Remodeling
Level One Remodeling Level Two Remodeling Level Three Remodeling -Maintenance Budget (see Deficiency list) Renovate existing Cafe for new program spaces(P-K) ADA Improvements Fire Protection and Security (determine water main cap)
Roof Piping Replacement Boiler Domestic hot water heater Exterior Upgrades (windows, masonry tuck point) Rest Room Remodeling Kitchen Remodeling HVAC Controls Communication Systems Technology (district budget x 15%) Remodeling Sub Total
I tsUnamI l.onslructlon l.OSt ::'UD lotal
Site Improvements Upgraded Parking and Drives New Parking Site Grading/Detention/Utility Site Amenities/Signage/Plantings Site Sub Total Total Construction Allocation
Contingency Reserve (Design/Bid/Construction)
Total Construction + Contingency
IAE/C/PMIIT Design Fees Other Owners Costs (prints/surveys/legaVins/move mgmt) Kitchen or Specialty Equipment FFE (assumes partial re-use of extg.)
a!
Area of Existing School:
Units Unit Cost Quantity
SF $235 6,000 $ SF $71 6,000 $
I
SF $115 0 $
SF $200 0 $ $
SF $15 73.501 $ -SF $56 0 $ SF $102 0 $-
$, SF $102 3,065 $
lump sum $ SF $4 73,501 $ SF $10 0 $
lump sum
1
1$ lump sum $ lump sum $ lump sum $
SF $250 1,500 $ SF $250 0 ! $ SF $4 0 $ SF $3 0 $ SF 115.00% 140,943 $
$ .zg2,51 0 i
SF $6 0 $ per stall $3,500 0 $
Lump Sum $ ILump Sum $
$ $
8% $
S 10.00% $ 2.00% $
$ 5.00% $
S
73,501
Estimated
Cost
1,410,000 423,000
-
-
1,833,000
1,067,235 --
50,000 311,257
-294,004
. ----
375,000 --
-162,084
2,259,580 4,uv2,580
--
50,000 50,000
100,000 4,192,580
335,406
4,527,986 452,799
90,560 125,000 226,399 .~fC]
--- ---/~
S/ c; (. ,V\ --g. Davenport Community School District Master Planning revised 712312015 JB Young Intermediate RDGIA # 2015.418 Area of Existing School : 108,018
Estimated
Description Units Unit Cost Quantity Cost
New Construction
New Gym, Stage, Support (Similar to Smart-Sudlow) SF $235 15,500 $ 3,642,500 ~torm Shelter Enhancements (add to new addition) SF $35 6,000 $ 211,500 Mechanical Mezzanine (assumes roof top AHU only) SF $115 2,400 $ 276,000 Additional Pre-K Classrooms SF $200 0 S New Construction Sub Total $ 4,130,000
Remodeling 1· -
level One Remodeling I ~
SF - $24 97,758 $ 2,365,744 Level Two Remodeling SF $56 0 $ Level Three Remodeling (convert old gym : 2 floors) SF $102 10,260 $ 1,041,924 ic" ..="'_ ""'" '.'.:.C:-~ " ...,.
.~ ~ $ 5AOO $ 10,000 S 40,000 $ 12;f1OO $
, Sf. 250,000 $ i.i1~60_ ~ $ 4,394,167
ISUllGlnll.OnSlrUalOn l.OSt:WD IOtal 380.418 , 8.524,187 Site Improvements Upgraded Parking and Drives (parking-green issue not resolved) SF $6 0 $ 50,000 New Parking per stall $3,500 0 S Site Grading/Detention/ Utility Lump Sum S 75,000 Site Amenities/Signage/Plantings Lump Sum $ 25,000 Site Sub Total $ 150,000 Total Construction Allocation S 8,674,167 Contingency Reserve 8% $ 693,933
(Design/Bid/Construction) Total Construction + Contingency 9,368,100~ AE/C/PM/IT Design Fees 10.00% $ 936,810 Other Owners Costs (printslsurveysllegal/ins/move mgmt) 2.00% $ 187,362 Kitchen or Specialty Equipment $ FFE (assumes partial re-use of extg.) 5.00% $ 468,405
--~--------------------~--------~----~'--------
Davenport Community School District Master Planning r vised 7/23/2015 RDGIA # 2015.418
...",n'TI,nnal Pre-K Classrooms
Construction Sub Total
One Remodeling Two Remodeling
Three Remodeling (existing Science)
mprovements
pgraded Parking and Drives SF $6 o Parking per stall $3,500 o
Grading/Detention/Utility Lump Sum 50,000 Amenities/Signage/Plantings Lump Sum 25,000
ite Sub Total 75,000
8% 319,510
10.00% 2.00%
2.00%
Science Labs (new construction)
Chem
Bio
Bio
Lab Support
Lab Storage
Sub total
Internal circulation
Science Classrooms (Remodel Existing Science area)
Classrooms
Storage
Teacher Support
Sub Total
Internal circulation
Total Science
7 1100 2 350 2 500
1,450
1,450
1,450
600
400
5,350
944
6,294
7,700
700
1,000
9,400
1,659
11,059
17,353
g. Davenport Community School District Master Planning revised 7/23/2015 RDGIA # 2015.418
Competition Gym
Shelter Enhancements
itional Pre-K Classrooms Construction Sub Total
Improvements pgraded Parking and Drives
Parking Grading/Detention/Utility Amenities/Signage/Plantings Sub Total
Design Fees Owners Costs (prints/surveysllegallins/move mgmt)
or Specialty Equipment assumes partial re-use of extg.}
lTaiiilPniiliet Costs - ::::....:.....-----
West High School Area of Existing School : 242,151
Estimated
Units Unit Cost Qua Cost
SF $275 6,300 $ 1,732,500
$ 500,000
SF $200 0 $
SF $24 0 SF $56 0 SF $24 336.380
SF $3 o
SF $6 o per stall $3.500 o
lump Sum 50,000 lump Sum 25,000
75,000
8% 319,510
10.00% 2.00%
2.00%
Science Labs (new construction)
Chem
Bio
Bio
Lab Support
Lab Storage
Sub total
Internal circulation
Science Classrooms (Remodel Existing Science area)
Classrooms
Storage
Teacher Support
Sub Total
Internal circulation
Total Science
7 1100
2 350
2 500
1,450
1,450
1,450
600
400
5,350
944
6,294
7,700
700
1,000
9,400
1,659
11,059
17,353
Davenport Community School District 25-Jun-15 Mult i Purpose Gym and Support RDGIA # 2015.418
Jx Cuurt-500 bleacllers witl114 feet lJetweell main courts
Units
R nning Track anical Mezzanine (assumes HU only)
Sub Total allways/toilets/Connect to Exist . HS
Varsity Lockers
Exitisting (Major scope) Exitisting (Minor Scope)
Spaces (storage,general restrooms,offices)
SF NIC SF
SF SF SF SF SF
per stall
Lump Sum
Lump Sum
8%
10.00% 2.00% 2.50%
Unit Cost Estimated
Cost
$185
$115
$175 $185 $125 $75
$150
21.424
000
4,200 0 0
°4,000
$
$
3,963,440
345,000
735,000
600,000
$4,000 0
•••
g.. JlIR BASKETBALL COURTS
~~__________~~________~~________~=~ __________________~______________ --t2W -O" __
ot..-l-oi 54Y-o' t ' . ' -0" t "'--0' 1(·0' i ",'· cr r,or O"t b
l!
I
'".::50'
TRIPLE "MULTl-PURPOSE" GYM 3 REGULATION IAHS BASKETBAll COURTS 10' PERIMETER 14' BETWEEN COURTS 500 BLEACHERS
21,'U4SF 8,217 SF (hallway. wall:;, re::otrooms. offici:. slDl'itgc)
29,660 GROSS SF
TRIPLE WITH 10' PERIMETER Q3'()1I12