+ All Categories
Home > Documents > 5 NDK Biomass 4.pdf

5 NDK Biomass 4.pdf

Date post: 04-Jun-2018
Category:
Upload: muhammadnain
View: 226 times
Download: 0 times
Share this document with a friend

of 19

Transcript
  • 8/14/2019 5 NDK Biomass 4.pdf

    1/19

    BIOMASS IN THE COMMUNITY

    CHOICE&LOCALISATIONOFBIOMASS

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

  • 8/14/2019 5 NDK Biomass 4.pdf

    2/19

    CHP

    Combinedheat

    and

    power

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Doyou

    need

    electricity&

    heat?

    Fuelledby:

    Wasteoils(UCO,WVO)

    Pureplantoils(PPO)

    BiodieselDedicatedgeneratorfuels

  • 8/14/2019 5 NDK Biomass 4.pdf

    3/19

    CHP

    (combined

    heat

    and

    power)

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Doyou

    need

    electricity&

    heat?

    Doyou

    need

    heatonly?

    Biomassheating

    Fuelledby:

    Wasteoils(UCO,WVO)

    Pureplantoils(PPO)

    BiodieselDedicatedgeneratorfuels

    Fuelledby:

    Woodchip

    Woodpellets

    Grasspellets

    Strawpellets

    Exotic biomass

  • 8/14/2019 5 NDK Biomass 4.pdf

    4/19

    ADVANTAGES:

    Dieselgenerators tried&tested.

    Veryefficient upto85%energycapture.

    Usegridasbackup.

    Trigeneration cooling

    /chilling

    instead

    of

    heating.

    Biodiesel/GeneratorFuel/PPOtoENstandards.

    Smallfootprintofequipment idealforcommunityschemes.

    Easyfuelhandling/storage.

    ExcellentCarbonreductionfigures.

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    DieselengineCHP

    DISADVANTAGES:

    Fuelsupplychainissues&fluctuatingcommodityprices.

    Warrantyissues,althoughbecominglessofaproblem.

    Cost/payback

    competing

    with

    biodiesel

    industry

    for

    feedstock.

    Gridconnectiontime&cost.

    Availabilityoffinanceduetoallofaboveperceivedrisks.

  • 8/14/2019 5 NDK Biomass 4.pdf

    5/19

    ADVANTAGES:

    Largechoiceofbiomassboilers.

    Tried&testedinBaltics,Scandinavia,Germany&Austria.

    LowercapitalcostthanCHP.

    Capitalcostsfallinginagrowingmarket morecompetition.

    Canbeintegratedintoexistingbuildinginfrastructure.

    Heat

    in

    a

    box containerised

    systems

    ideal

    for

    community

    schemes.

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Biomassheating

    DISADVANTAGES:

    Stillfuelsupplychainissues&pricevolatility.

    Lowdensityfuel mustbelocalisedtobetrulysustainable.

    Carboncontentofheatonly25%thatofelectricity.

  • 8/14/2019 5 NDK Biomass 4.pdf

    6/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Typicalsystem

    Maincomponents:

    Boiler

    Fuelhopper

    /store

    Automatedfuelfeedto

    boiler

    Pipes/pumps/heat

    exchanger

    Automaticcontrol

    system

    Flue.

  • 8/14/2019 5 NDK Biomass 4.pdf

    7/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Sizeofsystem

    Typical councilofficebuildingwoulduse500,000 800,000

    kWhofheatperyear.

    Whichis

    about

    108

    mt

    175

    mt

    per

    annum

    of

    wood

    pellets.

    Trafficvolume6to11bulkdeliveriesperyear.

    Willrequirea300kWboilertocopewithpeakwinterdemand.

    Typicalcost

    installed

    150,000

    200,000

    RHIincomewouldbeabout30,00039,000perannum.

    Carbonsavingcouldbeexpectedtobe60+mtperannum.

    (Designoperatinglifeofatypicalboileris5000hrsperyearfor10years)

  • 8/14/2019 5 NDK Biomass 4.pdf

    8/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Hintsonchoiceofbiomassboiler

    Evenifaboilerismultifuel rememberyoumayhavetochangethefuelhandling

    system(egwoodchips/woodpelletsarephysicallyverydifferentfromeach

    other).

    Truemultifuelboilersarehardtofindduetoveryrealdifferencesinashand

    chlorinecontentoffuels(egstraw)requiringverydifferentcombustion

    parameters.

    Checktheclaimsofthemanufacturerandifpossiblegoseeaninstallation

    runningonthefuelyouintendtouse.

    Alwaysgoforautomaticignitionandautomatedcleaninginthebuilt

    environment.

    Qualityofpelletcanreallyaffecttheperformanceoftheboiler excessdustcan

    bearealproblem.Worthpayingextraforquality.Pelletcertificationschemenow

    comingin.

  • 8/14/2019 5 NDK Biomass 4.pdf

    9/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Biomassfuelchoice

    Woodchip Idealifyouhaveyourown.

    Woodpellets

    Waste

    wood

    /sawmill

    residue

    /dedicated

    biomass

    crops.

    Strawpellets UKsbiggestbiomasssource,local&sustainable?

    Grasspellets Miscanthus/Switchgrass/CanaryGrass

    haspotentialtobelocal&sustainable.

    Exotic biomass

    palmkernel

    shell

    /rice

    husk

    /

    sunflowerhusk

    /bagasse

    Reallyfortheindustrial powerstationseg.Drax

  • 8/14/2019 5 NDK Biomass 4.pdf

    10/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Biomasscharacteristics

    Typicalvalues Moisturecontent Netcalorificvalue Energydensity Bulkdensity Energybyvolume Energydensity

    % MJ/kg kWh/kg kg/m3 MJ/m3 kWh/m3

    Woodchip 20%30% 12.4 3.4 160250 3,100 850

    Woodpellet 8%12% 16.9 4.8 650 11,000 3,120

    Miscanthus 8%10% 17 4.8 500 8,500 2,400

    Wheatstrawpellet 8%10% 16 4.4 600 9,600 2,640

    RCGpellet 8%10% 16.2 4.5 650 10,530 2,925

    Typicalenergyvalues:

    Critical parameters:

    Ash important factor in maintenance frequency / cleaning intervals. Automated cleaning is

    desirable. Industrial grade wood pellets can have ash content up to 5%. Premium pellets are 0.5%to 1%.Ash = slag = cleaning & operating problems.

    Chlorides cause corrosion of equipment.

  • 8/14/2019 5 NDK Biomass 4.pdf

    11/19

    ADVANTAGES:

    Lowestcarbonfootprint.

    Canbelocallysourcedsustainable.

    Canbecheap.

    Createslocalemployment.

    Basicequipmentrequiredforproduction lowcapitalstartup.

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    WoodChip

    DISADVANTAGES:

    Variablequalityespeciallymoisturecontent.

    Sticky difficultto

    handle

    (who

    is

    &

    cleaning

    &

    maintaining

    equipment?).

    Lowenergyvalue largestorageareaormanydeliveriesrequired.

  • 8/14/2019 5 NDK Biomass 4.pdf

    12/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    WoodPellets

    ADVANTAGES:

    Consistentqualitytoaspecification.

    Easytohandle,freeflowingproduct betterforautomatedfeedingofboiler.

    Canbe

    bulk

    blown

    into

    hopper.

    Highenergyvalue lessdeliveries/smallerstoragearea.

    LowAsh=Easiermaintenanceofboiler.

    DISADVANTAGES:

    Highercarbonfootprintthanwoodchip(productionenergy)

    Requiresspecialpelletingequipment

    highercapitalcostifyouwanttodoityourself

  • 8/14/2019 5 NDK Biomass 4.pdf

    13/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Localisationofbiomass

    Reducefuelpoverty

    Supporttheruralcommunity

    Createemployment

    Createagreen

    hub

    Truesustainability/lowcarbonfuture

    Fuelsecurity(priceandvolume)

    Potentialcrops:

    1.Willow(shortrotationcoppice)

    2.Miscanthus(elephantgrass)

    3.Reedcanary

    grass

  • 8/14/2019 5 NDK Biomass 4.pdf

    14/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    SRCWillow

    ADVANTAGES:

    IdeallysuitedtoUKclimateandgrowsinavarietyofsoiltypes.

    DISADVANTAGES:

    Expensivetoestablish(although50%grantavailablefromNaturalEngland).

    Requires

    special

    harvesting

    equipment.Canbedifficulttodryadequatelyafterharvesting.

    Inflexible itstherefor30years.

    Plantfor

    20

    30

    years.

    Harvest

    every

    23years.

  • 8/14/2019 5 NDK Biomass 4.pdf

    15/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Miscanthus

    ADVANTAGES:

    HighyieldsperHa(15mt 18mt).

    DISADVANTAGES:

    NotnaturaltoUK nolongtermstudyonenvironmentaleffects.

    Expensivetoestablish(although50%grantavailablefromNaturalEngland).

    Requiresspecial

    planting

    equipment.

    Requiresspecialharvestingequipment.

    MixedresultsinUKfromlastfewyears.

  • 8/14/2019 5 NDK Biomass 4.pdf

    16/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    ReedCanaryGrass

    ADVANTAGES:

    NativetoUK.

    Easytoplant&harvest nospecialequipment.

    Afarm

    contractor

    can

    grow

    it

    ideal

    for

    absentee

    landowners

    or

    non

    farmers.

    Lowcapitalstartup(seed+fertilizeronly).

    Tried&testedinFinlandover30,000ha*

    Idealfornearwatercourses,gamecovercrop,conservationatfieldmargins.

    Growswellonmarginalsoil&brownfieldsites**.

    Pelletiseswell.

    DISADVANTAGES:

    LoweryieldperHathanMiscanthus(50%less).

    *Separatepresentationavailable **TeessideUniversityResearch2010

  • 8/14/2019 5 NDK Biomass 4.pdf

    17/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Pelletingplants

    Typicalpelletplantminimumviablesizeis5000mtperannum.

    5000mtofRCGisabout645hectares

    25farmersgrowing25Ha=1pelletplant

    30mileradiusofplanttoreducecarbonfootprint

    Costof

    plant

    about

    150,000

    bought

    in

    (less

    if

    own

    engineering).

    Typicalsmallscaleplant Typicallargerscaleplant

  • 8/14/2019 5 NDK Biomass 4.pdf

    18/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    Links&References

    BiomassEnergyCentre:

    http://www.biomassenergycentre.org.uk

    NationalNonFoodCropsCentre(NNFC):

    http://www.nnfcc.co.uk

    CarbonTrust/Siemensloanschemeforheatingsystems:

    http://www.energyefficiencyfinancing.co.uk

  • 8/14/2019 5 NDK Biomass 4.pdf

    19/19

    _____________________________________________________________________________________________________________________________________________

    www.ndkltd.co.uk

    THEEND

    THANK YOU!

    DOUGCHAPLIN

    NDKLIMITED

    [email protected]


Recommended