Environmental and Social Monitoring Report (Part 2) Project Number: 50156-001 January 2020 INO: Muara Laboh Geothermal Power Project (Republic of Indonesia) Semi-Annual Report (January to June 2018) Prepared by PT Supreme Energy Muara Laboh for the Asian Development Bank The Environment and Social Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Transcript
Page 1: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

Environmental and Social Monitoring Report (Part 2)

Project Number: 50156-001

January 2020

INO: Muara Laboh Geothermal Power Project (Republic of Indonesia) Semi-Annual Report (January to June 2018)

Prepared by PT Supreme Energy Muara Laboh for the Asian Development Bank

The Environment and Social Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

1

DAFTAR LOKASI PEMANTAUAN LINGKUNGAN

PT SUPREME ENERGY MUARA LABOH (PT SEML)

No Code Sampling Garis Bujur (BT) Garis Lintang (LS)

Location Standard/ Keterangan Derajad Menit Detik Derajad Menit Detik

A KUALITAS AIR PERMUKAAN &

BIOTA AIR PERMUKAAN

1 SW-1 Air permukaan dan biota air 101 7 37.06 1 37 31.79 STA-200 access WP-H, 105 meter dari access road

Baku Mutu Air Kualitas Air

Permukaan : PerGub Sumbar

No. 5 Th.2008 Baku Mutu Air

Kelas II & PP 82 Tahun 2001

Baku Mutu Air Kelas II

Tidak Ada Baku Mutu .

Indikator: Analisis Laboratorium

komposisi biota air)

2 SW-2 Air permukaan dan biota air 101 7 31.79 1 36 59.07 121 Meter from access D- Sungai

3 SW-3 Air permukaan dan biota air 101 8 7.08 1 38 5.40 115 meter dar WP-H

4 SW-4 Air permukaan dan biota air 101 8 1.95 1 36 52.44 100 meter dari jembatan bangko putih

5 SW-5 Air permukaan dan biota air 101 7 46.42 1 36 22.01 110 meter dari Access road WP-D-Sunga I 600 meter dari akses road

taratak Tinggi

6 SW-6 Air permukaan dan biota air 101 8 32.18 1 37 58.27 900 meter ke Intake -1 WP-B

7 SW-7 Air permukaan dan biota air 101 8 51.64 1 37 2.40 900 meter dari Admin Building

8 SW-8 Air permukaan dan biota air 101 9 3.3 1 36 0.61 153 meter dari STA-900

9 AP.1 Air permukaan dan biota air 101 8 1.60 1 38 57.30 Tengah Sungai Batang Bangko Jernih 1

10 AP.2 Air permukaan dan biota air 101 8 20.29 1 39 18.6 Hulu Sungai Batang Liki

11 AP.3 Air permukaan dan biota air 101 7 44.30 1 39 35.8 Hulu Sungai Batang Bangko Jernih 2

12 AP.4 Air permukaan dan biota air 101 8 0.52 1 38 17.00 Hilir Sungai Batang Bangko Jernih 3

B. AIR TERPRODUKSI Permen LH No. 19 tahun 2010

Lampiran II

Dan

Ditambah Paremeter:

Minyak dan

Lemak

Salinitas

TDS

TOC

COD

BOD

Boron

1 Water Pond dan Mudpond Wellpad A 2 kolam di area Wellpad A

2 Water Pond dan Mudpond Wellpad B 2 kolam di area Wellpad B

3 Water Pond dan Mudpond Wellpad C 2 kolam di area Wellpad C

4 Water Pond dan Mudpond Wellpad D 2 kolam di area Wellpad D

6 Water Pond dan Mudpond Wellpad E 2 kolam di area Wellpad E

7 Water Pond dan Mudpond Wellpad F 2 kolam di area Wellpad F

8 Water Pond dan Mudpond Wellpad H 2 kolam di area Wellpad H

C. KUALITAS SUMUR MASYARAKAT

1 GW-1 Sumur Masyarakat 101 8 27.34 1 35 44.76 75 meter dari STA-200 Taratak Tinggi Permenkes 492 tahun 2010 tentang

Persyaratan Kualitas Air Minum

(Parameter Wajib)

2 GW-2 Sumur Masyarakat 101 8 0.25 1 34 44.43 250 meter dari akses jalan Pinang Awan

3 GW-3 Sumur Masyarakat 101 8 37.12 1 35 0.69 300 meter dari akses jalan Sapan Sari

D KUALITAS AIR BAKU SANITASI

1. Inlet Air Sanitasi di Water Treatment Plant Inlet Water Treatment Plant Di Yard 1 Permenkes 32 Tahun 2017 Standard

Baku Mutu Kesehatan Air

Keperluan Sanitasi (Bab II Bagian

A: Seluruh parameter wajib pada

Tabel 1, Tabel 2 dan Tabel 3 2.

Outlet Air Sanitasi di Water Treatment

Plant Outlet Water Treatment Plant Di Yard 1

E KUALITAS AIR LIMBAH

DOMESTIC

Page 3: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

2

No Code Sampling Garis Bujur (BT) Garis Lintang (LS)

Location Standard/ Keterangan Derajad Menit Detik Derajad Menit Detik

1 Outlet Limbah Cair Domestik Outlet Limbah Cair Domestik di Akommodation Blok PT SEML Permen LHK P68 Tahun 2016

F KUALITAS UDARA AMBIEN

1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H

Baku Mutu Kualiats Udara

Ambien PP 41 Tahun 1999

2 AQ-2 Kualitas Udara Ambient 101 8 27.38 1 37 56.19 251 meter dari WP-B

3 AQ-3 Kualitas Udara Ambient 101 7 56.51 1 37 44.93 204 meter dari WP-A

4 AQ-4 Kualitas Udara Ambient 101 8 16.94 1 36 45.94 250 meter ke arah jurang WP-B

5 AQ-5 Kualitas Udara Ambient 101 8 56.01 1 36 21.53 492 meter dari power station

6 AQ-6 Kualitas Udara Ambient 101 8 24.3 1 35 45.55 154 meter dari STA-100 Taratak Tinggi

7 AQ-7 Kualitas Udara Ambient 101 8 33.95 1 35 1.26 200 meter dari akses jalan Sapan Sari

U.1 Kualitas Udara Ambien 101 7 41.7 1 39 8.37 Area ML-01

U.2 Kualitas Udara Ambien 101 8 17.1 1 39 28.44 Area ML-02

U.3 Kualitas Udara Ambien 101 7 36.7 1 39 36.6 Area ML-03

U.4 Kualitas Udara Ambien 101 7 56.4 1 38 23.9 Area rencana Power Plant (Di dekat Wellpad A)

G PENGUKURAN KEBISINGAN

1 AQ-1 Pengukuran Kebisingan 101 7 50.29 1 38 1.64 605 meter dariWP-H

Baku Mutu Kebisingan Kepmen

LH No. 48 Tahun 1996

2 AQ-2 Pengukuran Kebisingan 101 8 27.38 1 37 56.19 251 meter dari WP-B

3 AQ-3 Pengukuran Kebisingan 101 7 56.51 1 37 44.93 204 meter dari WP-A

4 AQ-4 Pengukuran Kebisingan 101 8 16.94 1 36 45.94 250 meter ke arah jurang WP-B

5 AQ-5 Pengukuran Kebisingan 101 8 56.01 1 36 21.53 492 meter dari power station

6 AQ-6 Pengukuran Kebisingan 101 8 24.3 1 35 45.55 154 meter dari STA-100 Taratak Tinggi

7 AQ-7 Pengukuran Kebisingan 101 8 33.95 1 35 1.26 200 meter dari akses jalan Sapan Sari

Add-1 Pengukuran Kebisingan Pengukuran Kebisingan Genset di Accommodation Blok SEML

Add-2 Pengukuran Kebisingan Rumah terdekat dengan Wellpad D IFC Standard (48 Jam)

Add 3 Pengukuran Kebisingan Rumah terdekat dengan Wellpad E IFC Standard (48 Jam)

KB.1 Pengukuran Kebisingan 101 7 41.7 1 39 8.37 Area ML-01

KB.2 Pengukuran Kebisingan 101 8 17.1 1 39 28.44 Area ML-02

KB.3 Pengukuran Kebisingan 101 7 36.7 1 39 36.6 Area ML-03

KB.4 Pengukuran Kebisingan 101 7 56.4 1 38 23.9 Area rencana Power Plant (Di dekat Wellpad A)

H PENGUKURAN KEBAUAN

1 AQ-1 Pengukuran Kebauan 101 7 50.29 1 38 1.64 605 meter dariWP-H

KepMenLH Nomor KEP

50/MENLH/XI/1996 Baku

Tingkat Kebauan

2 AQ-2 Pengukuran Kebauan 101 8 27.38 1 37 56.19 251 meter dari WP-B

3 AQ-3 Pengukuran Kebauan 101 7 56.51 1 37 44.93 204 meter dari WP-A

4 AQ-4 Pengukuran Kebauan 101 8 16.94 1 36 45.94 250 meter ke arah jurang WP-B

5 AQ-5 Pengukuran Kebauan 101 8 56.01 1 36 21.53 492 meter dari power station

Page 4: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

3

No Code Sampling Garis Bujur (BT) Garis Lintang (LS)

Location Standard/ Keterangan Derajad Menit Detik Derajad Menit Detik

6 AQ-6 Pengukuran Kebauan 101 8 24.3 1 35 45.55 154 meter dari STA-100 Taratak Tinggi

7 AQ-7 Pengukuran Kebauan 101 8 33.95 1 35 1.26 200 meter dari akses jalan Sapan Sari

H2S-1 Pengukuran H2S Rumah Terdekat dengan Wellpad D Pengukuran H2S 24 Jam (WHO

Standard) H2S-2 Pengukuran H2S Rumah Terdekat dengan Wellpad E

KB.1 Kualitas Kebauan 101 7 41.7 1 39 8.37 Area ML-01 KepMenLH Nomor KEP

50/MENLH/XI/1996 Baku

Tingkat Kebauan

IFC (Pengukuran Selama 24 Jam)

KB.2 Kualitas Kebauan 101 8 17.1 1 39 28.44 Area ML-02

KB.3 Kualitas Kebauan 101 7 36.7 1 39 36.6 Area ML-03

KB.4 Kualitas Kebauan 101 7 56.4 1 38 23.9 Area rencana Power Plant

I PEMANTAUAN FLORA DAN FAUNA

1 FF-1 Flora dan Fauna 101 9 0.35 1 36 19.90 623 meter dari Power Station

Identifikasi pemantauan terhadap

keberadaan flora dan fauna

2 FF-2 Flora dan Fauna 101 8 42.53 1 37 48.08 500 meter dari WP-B

3 FF-3 Flora dan Fauna 101 7 45.43 1 38 4.49 204 meter dari Wp-H

4 FF-4 Flora dan Fauna 101 7 30.93 1 36 49.37 100 meterdari access road WP-E

J PEMANTAUAN TANAH

1 S-1 Tanah 101 7 50.24 1 38 0.29 65 meter dari akses jalan WP-H

Mengambil sampel dan menguji

pada laboratorium tanah

2 S-2 Tanah 101 8 24.77 1 35 55.16 150 meter dari STA + 1.800

3 S-3 Tanah 101 8 57.87 1 35 57.56 175 meter dari akses jalan Ampalu

4 S-4 Tanah 101 8 33.42 1 37 49.75 300 meter dari akses masuk WP-B

K PEMANTAUAN SOSIAL

1 SE-1 Sosial 101 8 49.81 1 35 22.57 111 meter dari akses jalan Pekonina

Pemantauan dan mengumpulan data

mengenai keadaan sosial, ekonomi,

budaya, pendidikan, kesehatan

masyarakat

(Dilakukan Pada Senmester Genap)

2 SE-2 Sosial 101 8 16.75 1 35 49.94 15 meter dari STA-800 Taratak Tinggi

3 SE-3 Sosial 101 7 16.26 1 34 27.47 98 meter dari STA-900

4 SE-4 Sosial 101 6 57.33 1 32 46.22 175 meter dari akses jalan Ampalu

5 SE-5 Sosial 101 8 29.11 1 34 48.43 150meter dariakses jalan Sapan Sari

6 SE-6 Sosial 101 7 55.56 1 36 13.85 600 meter dari akses jalan Taratak Tinggi

7 SE-7 Sosial 101 9 33.56 1 35 29.50 1000 meter dari akses jalan Liki

L PEMANTAUAN TRANSPORTASI

1 TR-1 Transport 101 8 38.26 1 36 2.17 9meter dari STA-1.800 Lalu lintas kendaraan

2 TR-2 Transport 101 9 0.49 1 35 31.91 27 meter dari Blok Nol

Page 5: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

4

No Code Sampling Garis Bujur (BT) Garis Lintang (LS)

Location Standard/ Keterangan Derajad Menit Detik Derajad Menit Detik

M PEMANTAUAN EMISI GENSET

1 EG Emisi GenSet Accommodation Blok SEML

Permen LH Nomor 21 tahun 2008 -

Lampiran IV B

Page 6: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

5

Page 7: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

6

Page 8: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 9: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 10: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 11: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 12: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 13: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 14: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 15: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 16: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 17: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 18: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 19: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 20: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 21: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 22: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 23: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 24: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 25: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 26: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 27: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 28: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 29: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 30: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 31: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 32: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 33: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 34: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 35: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 36: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 37: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 38: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 39: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 40: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 41: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 42: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 43: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 44: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 45: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 46: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 47: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 48: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 49: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 50: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 51: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 52: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 53: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41
Page 54: 50156-001: Muara Laboh Geothermal Power ProjectF KUALITAS UDARA AMBIEN 1 AQ-1 Kualitas Udara Ambient 101 7 50.29 1 38 1.64 605 meter dariWP-H Baku Mutu Kualiats Udara Ambien PP 41

Recommended