+ All Categories
Home > Business > 52517 product portfolio 28 01 14 france

52517 product portfolio 28 01 14 france

Date post: 22-Nov-2014
Category:
Upload: europages
View: 392 times
Download: 1 times
Share this document with a friend
Description:
 
23
LANDBANK PORTFOLIO – FRANCE 28.01.14
Transcript
Page 1: 52517 product portfolio   28 01 14 france

LANDBANK PORTFOLIO – FRANCE28.01.14

Page 2: 52517 product portfolio   28 01 14 france
Page 3: 52517 product portfolio   28 01 14 france

Introducing Gazeley

Gazeley is a global developer, owner and manager of logistics warehouses and distribution parks and is an expert in providing build to suit solutions. We have been operating since 1987 and are the longest running logistics developer in the world. We develop quality, cost‑effective warehouses and distribution parks for our customers and have operational platforms in the UK, Europe, the Middle East and China.

With a consistent way of working and a customer first ethos we deliver exceptional service and product in every region we operate. Gazeley has a flexible approach to development and can deliver build to suit solutions on a lease or ownership basis to suit our customer's needs.

Page 4: 52517 product portfolio   28 01 14 france

Fra

nC

e

Page 5: 52517 product portfolio   28 01 14 france

6

2

1

4

3

58

7

10

9

1 G.Park Tournan en Brie

2 Magna Park Fos

3 Magna Park Pagny

4 Magna Park Arras

5 Magna Park Vatry

6 Magna Park Grand Est

7 G.Park Beaulieu-Sur-Layon

8 G.Park Heudebouville

9 G.Park Marly La Ville

10 G.Park Moulins

Fra

nC

e

Current portfolio – France

Page 6: 52517 product portfolio   28 01 14 france

www.gazeley.comCOnTACT:

Vincent gourlin | +33 (0)1 44 43 49 53 | [email protected]

Build to suit: Tournan en Brie From 10,000 sq m

■■ Potential building size from 10,000 sq m

■■ Available as leasehold/freehold

■■ Located 35km from Paris, along the main road n4, directly linked to the A104 motorway

■■ Standard eco initiative features included

inDiCATiVE SiTE PLAn

■■ 300 car parking spaces■■ 20 HGV parking spaces■■ 80 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse49,200 sq mOffices1,340 sq mTotal giA (approx.)50,540 sq m

Page 7: 52517 product portfolio   28 01 14 france

www.gazeley.comCOnTACT:

Olivier Benois | +33 (0) 1 44 43 49 62 | [email protected]

From 10,000 sq m

■■ Located next to the Container Terminal of the Grand Port of Marseille‑Fos

■■ A Euro‑Mediterranean centre rail connected with riverway into Hinterland

■■ Site size: 28 hectares/69 acres

■■ Potential building size 10,000/66,000 sq m

■■ Occupiers already on site: Sicatec, Somaudex, Fly

■■ Available as leasehold/freehold

inDiCATiVE SiTE PLAn

Fos

■■ 105 car parking spaces■■ 6 HGV parking spaces■■ 34 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse34,395 sq mOffices911 sq mTotal giA (approx.)35,306 sq m

Page 8: 52517 product portfolio   28 01 14 france

www.gazeley.comCOnTACT:

Olivier Benois | +33 (0) 1 44 43 49 62 | [email protected]

Pagny From 10,000 sq m

inDiCATiVE SiTE PLAn

■■ Site size: 100 hectares/247 acres

■■ Potential building size from 10,000 sq m up to 120,000 sq m

■■ Available as leasehold/freehold

■■ Standard eco initiative features included; other environmental options available

■■ Multimodal

– Motorway A36 (exit 1) with direct access to A6‑A31‑A39– Rail connection with full train capacity– River port for container barges– Hinterland of Marseille, Fos sea port

■■ 183 car parking spaces■■ 28 HGV parking spaces■■ 70 Dock levellers■■ 6 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse39,780 sq mOffices1,330 sq mTotal giA (approx.)41,110 sq m

Page 9: 52517 product portfolio   28 01 14 france

From 10,000 sq m

www.gazeley.com

Arras

■■ Located along the main road RN50 directly linked to A1, the main Paris-Brussels-London motorway

■■ Site size: 152 hectares/375 acres

■■ Potential building size from 10,000 sq m

■■ Occupiers already on site: Unéal, Norauto

■■ Available as leasehold/freehold

■■ Standard eco initiative features included; other environmental options available

■■ Building permit for 42,000 sq m already approved

INDICATIVE SITE PLAN

■■ 152 car parking spaces■■ 12 HGV parking spaces■■ 42 Dock levellers■■ 3 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse41,528 sq mOffices1,298 sq mTotal GIA (approx.)42,826 sq m

CONTACT:

Vincent Gourlin | +33 (0)1 44 43 49 53 | [email protected]

Page 10: 52517 product portfolio   28 01 14 france

www.gazeley.comCOnTACT:

Estelle Vargas | +33 (0) 1 44 43 49 56 | [email protected]

Vatry From 10,000 sq m

■■ Situated on the airport of Paris‑Vatry at less than two hours from Paris and Brussels

■■ Site size: 120 hectares/296 acres

■■ Potential Building Size: from 10,000 sq m

■■ Available as leasehold/freehold

■■ Standard eco initiative features included; other environmental options available

■■ First Gazeley development of 52,500 sq m for nd Logistics

inDiCATiVE SiTE PLAn

■■ 105 car parking spaces■■ 6 HGV parking spaces■■ 34 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse34,395 sq mOffices911 sq mTotal giA (approx.)35,306 sq m

Page 11: 52517 product portfolio   28 01 14 france

Build to suit from 10,000 sq m

www.gazeley.com

Grand Est

COnTACT:

Estelle Vargas | +33 (0) 1 44 43 49 56 | [email protected]

■■ Available now: 6,000 sq m in an existing building

■■ Situated along the n4 mainroad and rail connected; directly linked to Paris, Germany and Benelux by the A31

■■ Site size: 55 hectares/190 acres

■■ Potential building size from 10,000 sq m

■■ Available as leasehold/freehold

■■ Standard eco initiative features included; other environmental options available

inDiCATiVE SiTE PLAn■■ 24 car parking spaces■■ 4 HGV parking spaces■■ 24 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Two cells immediately available (12 000 sq.m) within a multi user building

Warehouse23,580 sq mOffices653 sq mTotal giA (approx.)24,233 sq m

Page 12: 52517 product portfolio   28 01 14 france

From 10,000 sq m

www.gazeley.com

Beaulieu‑Sur‑Layon

COnTACT:

Vincent gourlin | +33 (0)1 44 43 49 53 | [email protected]

■■ Located 50 meters from the exit 24 of motorway A87 (Angers‑Cholet); 15 minutes to Angers 20 minutes to A11 (Paris, Angers, nantes)

■■ Site size: 12 hectares

■■ Potential building size from 10,000 sq m

■■ Available as leasehold/freehold

■■ Standard eco initiative features included; other environmental options available

■■ Occupiers already on the park: K + n (30,000 sq m)

■■ 75 car parking spaces■■ 4 HGV parking spaces■■ 24 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse24,338 sq mOffices724 sq mTotal giA (approx.)25,062 sq m

inDiCATiVE SiTE PLAn

Page 13: 52517 product portfolio   28 01 14 france

From 10,000 sq m

www.gazeley.com

Heudebouville

COnTACT:

Vincent gourlin | +33 (0) 1 44 43 49 53 | [email protected]

■■ Location: directly accessible from the A13 motorway (Junction 18)

■■ Site size: 70 hectares

■■ Potential building size from 10, 000 sq m

■■ Available 6 months after agreement

■■ A building permit of a 36,000 sq m build to suit (extendable to 48,000 sq m) has been obtained

■■ Standard eco initiative features included

■■ Occupiers already on the park: Fresenius Kabi France

inDiCATiVE SiTE PLAn

■■ 75 car parking spaces■■ 8 HGV parking spaces■■ 36 Dock levellers■■ 1 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse36,000 sq mOffices700 sq mTotal giA (approx.)36,700 sq m

Page 14: 52517 product portfolio   28 01 14 france

www.gazeley.comCOnTACT:

Estelle Vargas | +33 (0) 1 44 43 49 56 | [email protected]

Marly La Ville up to 18,000 sq m

■■ directly accessible from the A1 (Exit 7), 17km from the Paris CdG Airport

■■ Site size: 4 hectares

■■ Available now

■■ A building permit of 18,000 sq m obtained (delivery 4 months after agreement with client)

■■ Standard eco initiative features included

■■ 83 car parking spaces■■ 3 HGV parking spaces■■ 20 Dock levellers■■ 1 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse17,900 sq mOffices756 sq mTotal giA (approx.)18,666 sq m

inDiCATiVE SiTE PLAn

Page 15: 52517 product portfolio   28 01 14 france

Moulins Build to suit from 10,000 sq m

www.gazeley.comCOnTACT:

Olivier Benois | +33 (0) 1 44 43 49 62 | [email protected]

■■ Multimodal site

■■ Located next to the A77 motorway and the RCEA axis (France/Germany/Spain)

■■ Hinterland of Sete and nantes sea ports via rail

■■ Rail connection with full train capacity

■■ Functional freight airport

■■ Potential building size from 10,000 sq m

■■ Standard eco initiative features included, other environmental options available

inDiCATiVE SiTE PLAn

■■ 90 car parking spaces■■ 5 HGV parking spaces■■ 30 Dock levellers■■ 2 Level access doors■■ Uniform 50kN/sq m floor loading■■ Secure yard■■ Can be varied to suit individual requirements

Warehouse30,073 sq mOffices797 sq mTotal giA (approx.)30,870 sq m

Page 16: 52517 product portfolio   28 01 14 france
Page 17: 52517 product portfolio   28 01 14 france
Page 18: 52517 product portfolio   28 01 14 france

Gazeley’s developments restore and enhance the natural systems of our sites, and provide qualitative improvements for the communities within which we work.

Gazeley’s buildings provide valuable benefits for our customers:

■■ Cheaper to operate

■■ Cheaper to maintain

■■ Reduce energy usage

■■ Reduce water usage

■■ Optimise the use of natural light

■■ Use recycled and recyclable materials

Our actions and decisions are open and encourage informed collaboration with our customers.

It is our belief that environmentally responsible development is assisted by knowledgeable stakeholders, a sharing of learning and opportunity for review and reassessment.

Our Sustainable Approach

Page 19: 52517 product portfolio   28 01 14 france
Page 20: 52517 product portfolio   28 01 14 france

Our customers

Gazeley provides state of the art buildings to accommodate many of the world’s leading companies. Our customers come from across the retail, manufacturing, third party logistics (3PL), automotive and pharmaceutical sectors and include Adidas, Amazon, Carrefour, Ceva, DHL, Geodis, John Lewis, Lidl, Norbert Dentressangle, Procter & Gamble, Tesco, TNT, Toyota, Volkswagen and Walmart.

Gazeley has a flexible approach to development and can deliver build to suit solutions on a lease or ownership basis to suit our customer’s needs.

We have been delivering on our promises for over 25 years and the growth of our business is underpinned by commitment to customer service excellence, delivered by our colleagues across the world.

Page 21: 52517 product portfolio   28 01 14 france
Page 22: 52517 product portfolio   28 01 14 france

Why Gazeley?

OUR SOLUTIONS

Leasehold: We can provide Build to Suit developments on a lease basis which mitigates capital expenditure for our customers.

Freehold: Gazeley is equally happy to offer solutions whereby the customer is the ultimate owner of the completed facility.

Development Manager: Gazeley can also act in a management capacity providing strategic advice throughout all stages of the development process.

OUR APPROACH

Service: Committed to deliver value and quality for our customers. A service that is consistent in every region.

Partnership: We work closely with you and a dedicated Virtual Team to ensure continual learning and best service for our customers.

Flexibility: We work in a collaborative manner with all stakeholders to allow fl exibility throughout the process.

Financial strengths: We have a robust balance sheet, strong fi nancial backing and the ability to fi nance build to suit projects in all our markets.

Page 23: 52517 product portfolio   28 01 14 france

gazeley.comUK | Europe | China

28.01.14


Recommended