RashtriyaUchchatarShikshaAbhiyan (RUSA) Gujarat State
Component No: 9
Component Name: 12 Year From: 2011-12 to 2018-19
College Name: Government Commerce College
Address: C/0. DKV Arts & Science College, P. N. Marg, Jamnagar- 361008
Email id : [email protected]
Website: gccja mnagar.ac. in
Contact No: 9913301216
~~'* .: . ,~ ·. · ,: ..... ·
Prepared by : Dr. D. R. Solanki
Dr. D. R. Solanki Dr. C. B. Vadher Name of the RUSA Coordinator Name of the Principal
Sr. No. Part iculars Details
1 Name of the College Government Commerce College
2 Address of the College C/0. DKV Arts & Science College, P. N. Marg. Jamnagar- 361008
3 Taluka Jamnagar
4 Distr ict Jamnagar
5 Ema il ld [email protected]
6 Website gccj a mn agar .a c. in
7 Name of the Principal Dr. C. B. Vadher
8 Mobile No of Principal 9925819452
9 Email ld of Principal [email protected]
10 Name of the RUSA Coordinator Dr. Diptibala R. Solanki
11 Mobile No of RUSA Coordinator 9913301216
12 Email ld of RUSA Coordinator [email protected]
13 AISHE Code c- 45282 14 Location Urban
Non - Tribal
15 Alliation with University i.e Name of the University
Ad hoc Affiliation- Saurashtra University, Rajkot
16 UGC Recognisation 2(f) I 12 (B) - NO 18 Management Type Government
19 Year of Establishment 2010
20 Programmed offered UG
21 Course offered Commerce
22 Institute Category General
23 NAAC Status Cycle 1- In Progress 24 NIRF Stat us No
25 SIRF Status No
2
About College :
Details for the Year 2018-19
Post Total Sanctioned Post
Total Filled Post Regular
Tota l Filled post by
Contractual
Staff
Total Filled Post by Visiting
Faculty
Total Filled Post
Total Vacant
Post
1 2 3 4 5 = (2 +3 +4)
6 = (1)- (5)
Principal 1 0 0 0 0 1 Associate Professor
0 0 0 0 0 0
Assistant Professor
6 3 1 0 4 3
Librarian 1 1 0 0 1 0 PTI 1 1 0 0 1 0 Total 7 3 1 0 4 2
I
I
~' ~ Si~ Coordinator Pri nc ipal St~ -art81S.l.PITIQ
Govt. Cr ,., ..., ':I ~o11ege JaoM r
Post Total Total Filled
Sa nctioned Post Regular Post 1 2
Registarar I 0 0 Officer Superident
Head Clerk 1 1
Senior Clerk 2 1
Junior Clerk 0 0 Total 3 2
Detai ls of St aff :
SR POST Gen sc No. M F T M F T
1 Principal 0 0 0 0 0 0 2 Associate 0 0 0 0 0 0
Professor
3 Assistant 0 1 1 0 1 1 Professor
4 Librarian 0 0 0 0 0 0 5 PTI 0 0 0 0 0 0
6 * 7 Total (1 to 6) 0 1 1 0 1 1 8 Registarar I 0 0 0 0 0 0
Officer
Superintendent
9 Head Clerk 1 0 1 0 0 0
10 Senior Clerk 0 0 0 0 1 1
11 Junior Clerk 0 0 0 0 0 0 12 * 13 * 14 Total (8 to 13) 1 0 1 0 1 1
15 Total (7 + 14) 1 1 2 0 2 2
S i~C~ordinator
Total Filled post by Contractual Staff 3 0
0 0 0 0
ST
M F T
0 0 0 0 0 0
0 0 0
0 0 0 0 0 0
0 0 0
0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
3
Total Filled Total Vacant Post Post
4 =(2+3) 5 = (1) - (4) 0 0
1 0 1 1
0 0 2 1
SEBC TOTAL
M F
0 1 0 0
0 2
0 1 1 0
1 4
0 0
0 0 0 0 0 0
0 0
1 4
T M F T
1 0 0 1 0 0 0 0
2 0 4 4
1 0 1 1 1 1 0 1
5 1 5 7 0 0 0 0
0 1 0 1 0 0 1 1 0 0 0 0
0 1 1 2 5 2 6 9
~~ t -incipal
M~litp£~ -a~~ge ,.,,_. "1(1"r
"'
4
Students Details
Tota l No Gen sc ST I SEBC I M inority TOTAL of the M F T M F T M F T M F T M F T M F T
Student's
year
Wise
2011-12 247 44 291 12 4 16 2 0 2 99 15 114 0 0 0 360 63 423 2012-13 213 54 267 12 3 15 0 0 1 225 29 254 0 0 0 451 86 537 2013-14 179 39 218 10 2 12 1 1 2 196 22 218 0 0 0 386 64 425 2014-15 175 39 214 21 1 22 2 0 2 144 28 172 0 0 0 342 68 410 2015-16 104 42 146 22 6 28 3 0 3 173 31 204 0 0 0 302 79 381 2016-17 59 42 101 16 6 22 3 0 3 142 31 173 0 0 0 220 79 299 2017-18 96 44 140 27 6 33 0 0 0 160 35 195 0 0 0 283 85 368 2018-19 101 47 148 25 2 27 1 0 1 182 21 203 0 0 0 309 70 379
Student placement deta il :
YEAR Final year students Placement (No. of students) Further studies( No. of
2014-15 425 NIL 2015-16 381 NIL 2016-17 299 NIL 2017-18 368 NIL 2018-19 379 11
Students Progressio n · (Result)
Year Total No Dist inctio First
of n Class
Students
1 2 3 4 2011-12 169 4 37 2012-13 146 14 68 2013-14 155 21 84 2014-15 129 8 42 2015-16 103 13 so 2016-17 87 5 41 2017-18 92 5 39 2018-19 RESULT AWAITED
Student- Teacher Ratio :
Year Student - Teacher Ratio
2011-12 423:2 2012-13 537: 2 2013-14 425: 3 2014-15 410:3 2015-16 381: 4 2016-17 299: 4 2017-18 368: 4 2018-19 379: 5
Second Pass
Class Class
5 6 80 25 33 3 25 1 43 6 22 4 19 0 12 1
students)
NI L
NIL
NIL
NIL
NIL
Total Pass Total Result (in
Students %)
7 = (3 +4 +5 +6) 8 = (7 /2) *100 146 86.39 118 80.82 131 84.52 99 76.74 89 86.41 65 74.71 57 61.96
I
I
~ Principal Sigp,a.od tamp
Govt. Co ~ e ...e Co ege Ja a r
5
Best Pract ices ·
Year Best Practices in Academic, Examinations, Affiliat ions, Governance, students skill development
programme, vocat ionalization of higher education, teach ing learning methodology, student
support system, library development, co-curricular activities, Partic ipation in state Governmetn
Schem e like MYSY,CMMS, Nama-Tablet, NAMO Wifi, Fi n ishing School. Sapthdhara, UDISHA,
M ega Placement Fair, SANDHAN, AAA and others ( In Bullet Point)
2011-12 • EXAMI NATION • AFFILIATION • CO- CURRICULAR ACTIVITIES
2012-13 • EXAMINATION • AFFILIATION • CO- CURRICULAR ACTIVITIES
2013-14 • EXAMINATION • AFFILIATION • CO- CURR ICULAR ACTIVITIES • SAPTDHARA
2014·15 • EXAM INATION • AFFILIATION • CO- CURRICULAR ACTIVITIES • SAPTDHARA
2015·16 • EXAMINATION • AFFILIATION • CO- CURRICULAR ACTIVITIES • SAPTDHARA
2016-17 • EXAMINATION • AFFILIATION • CO - CURRICULAR ACTIVITIES • SAPTDHARA
2017-18 • EXAMINATIO N • AFFILIATION • CO- CURRICULAR ACTIVITIES • SAPTDHARA • NAMO Tablet • NAMOWi - Fi
2018-19 • MYSY • MEGA PLACEMENT FAIR • FINISHING SCHOOL • VOCATIONAL COURSE • SAPTDHARA • UDISHA • NAMO Tablet • NAMOWi-Fi • LIBRARY DEVELOPMENT
Recruitment Detai ls·
Year Details in bullet points
2011-12 • ASSISTANT PROF ESSOR- 1 2012-13 • NO RECRUITMENT 2013-14 • ASSISTANT PROFESSOR- 1 2014-15 • NO RECRUITMENT 2015-16 • ASSISTANT PROFESSOR -1
• PTI-1 2016-17 • NO RECRUITMENT 2017-18 • HEAD CLERK- 1 (Through Transfer) 2018-19 • PRINCIPAL- 1 (Through Transfer)
• ASSISTANT PROFESSOR- 1 • LIBRARIAN - 1 • SENIOR CLERK - 1
Faculty Development and Improvement : (In Total No. only)
Year Tota l Faculty Publ ished Published Book Participation Participating
No of with Paper in Paper in Published in in Faculty
Faculty Ph. D International UGC International Development Degree Journals Approved or National Programme
Journals Conferences and
Workshop
2011-12 0 0 0 0 0 0 0
2012-13 0 0 0 0 0 0 0
2013-14 3 2 8 8 5 0 2 2014-15 3 2 5 5 5 0 1 2015-16 4 3 4 4 0 0 2 2016-17 4 0 12 12 1 0 2
2017-18 4 0 2 2 2 3 1 2018-19 4 0 2 2 0 0 2
lnfrastructural Facilities:
Sr No. Particulars Detai ls
1 Total Area of the Building 14 Acer
2 Total No. of Classrooms 4
3 Tota l No. of ICT based 3 Classrooms
4 No and Details of Laboratory NO
5 No of Books and E -books • 998 Books • NO E- BOOKS
6 Play Ground and Sport • PLAYGROUND Equipment • Indoor games equipments
• Outdoor games equipments 7 Ladies Room 1
8 Computer Lab 0
9 Water Facilit ies (RO Plant) NO
10 Water Harvesting Facilities NO 11 Eco - Club NO 12 ISO Certification NO 13 WIFI Internet Facility BSNL Broadband & NAMO Wi-Fi 14 Adequat e Building or Shortage of Space
Shortage of Space
15 Infrastructure Development ~ ,..,...:---..,.~IL
~~"-'-="'"'~ .. ~rincipal Si Sign of Coordinator ~ ge;t ~ I.J.j ·-II'
.::::.. 7 (")
0 ~ ( 0
6
Research No of Project faculty Completed who have or Guideship Ongoing
0 0 0 0
0 0
0 0 0 0
0 0
0 0 0 0
n gn~~~~1np '(t-1~
t rin vi pal ~ ' c-: ~ J: 0 J;-.,Q I :-;- !;> Govt. Corn1 e ce College Jan nac"'r
7
due to RUSA Outcomes (New
Construct ion)
16 Infrastructure Development NIL due to RUSA Outcomes
(Renovation I Up-gradation ) 15 Infrastructure Development YES
due to RUSA Outcomes
(Equipment Facilities)
SR. No Particulars Details
1 RUSA FUND Tracker details Yes updated
2 Using PFMS Facilities Yes
RUSA Uti lization Details :
Component : 09
Financial Fund Received Total Fund Fund Total Fund Utilization (%)
Year Ava ilable Uti lized Unutilised
2014-15 32223 32223 0 32223 0
2015-16 177685.85 209908.85 32223 177685.85 15%
2016-17 0 177685 .85 19184 158501.85 10.80%
2017-18 0 158501.85 0 158501.85 0
2018-19 0 158501.85 158501.85 0 100%
Total 209908.85 0 209908 .85 0 100%
Details of Expenditure From 01/ 04/ 2014 to 31/03/2019 : It must t ally with above expenditure table
and RUSA Fund Tracker
Date of Amoun t Details of Expenditure
Expenditu re
6.9.2018 283 BANNER
20.8.2018 283 BANNER
17.8.2018 283 BANNER
25 .8.2018 283 BANNER
16.8 .2018 283 BANNER
30.8 .2018 84664.8 BOOKS
10.9.2018 1737 BOOKS
12.9.2018 400 COLOR PHOTOS
6.9.2018 3000 LECTURES
8.9.2018 1000 LECTURES
28.8.2018 1500 LECTURES
6.9.2018 400 LECTURES
1.9.2018 3000 LECTURES
8.9.2018 4000 LECTURES
12.9.2018 441.07 STATIONARY
AUGUST 2400 LECTURES
2018
AUGUST 2018
2400 LECTURES
AUGUST
2018 400 LECTURES
AUGUST 4500 LECTURES
2018
AUGUST 2000 LECTURES
2018
AUGUST 500 LECTURES
2018
Sign of R~nator ~M~~ _tamp ~ f( $( j-';
8
AUGUST 800 LECTURES AUGUST 2018
2018
AUGUST 400 LECTURES AUGUST 2018
2018 AUGUST
400 LECTURES AUGUST 2018 2018
AUGUST 1000 LECTURES AUGUST 2018
2018
AUGUST 1500 LECTURES AUGUST 2018
2018
AUGUST 800 LECTURES AUGUST 2018
2018
AUGUST 4000 LECTURES AUGUST 2018
2018
AUGUST 11667.59 LECTURES AUGUST 2018
2018
AUGUST 23827.5 BOOKS AUGUST 2018
2018
AUGUST 348.89 TONNER REFILLI NG AUGUST 2018
2018
10/09/2015 24278 CUPBOARDS AND
246/ 10.9.2015 CHAIRS
10/09/2015 480 COVERS 1232/10.09.2015
11/09/2015 216 STATIONERY 2312/ 11.09.2015
10/09/2015 6613 CHAIRS 24 7/ 10.09.2015
10/09/2015 240 COVERS 1233/10/ 09/2015
11/09/2015 156 STATIONERY 2311/ 11.09.2015
12/09/2015 240 COVER 2015
18/3/2017 5532 BOOKS 3425/18.03.2017
18/3/2017 2152 BOOKS 3426/18.03.2017
30.03 .2017 11500 LIBRARY CUPBOARD 106/ 30.03.2017
Total 209908.85
Work Done Under RUSA ·
Year Actual Work Done and On-going Work Benefits to the Student
2014-15 NIL NIL
2015-16 CHAIRS &CUPBOARDS WERE PURCHASED. CUPBOARDS WERE INSTALLED
2016-17 INSTITUTE PURCHASED BOOKS FOR SC, ST & OBC BOOKS ARE PURCHASED AND STUDENTS AND BOUGHT LIBRARY CUPBOARDS. STUDENTS WERE BENEFITIED.
2017-18 NIL NIL
2018-19 INSTITUTE ARRANGED EXPERT LECTURES AND THE STUDENTS WERE NECESSARY BOOKS WERE PURCHASED. BENEFITIED BY THE EXPERT
LECTURES AND WERE ALSO PROVIDED WITH NECESSARY BOOKS.
Action Plan For Next Year :
Year Work Done and On-going Work Benefits to the Student
2019-20 GRANT IS UTILIZED 100%
rsx;: . Sign o~rcoordinator Princ ipal Si~mp
t rinc1pa l Govt. Commerce College
Jamnag~r
~limpse of the RUSA Component 9
~ Sign o fRUSA Coord inator
9
t'\ ,rrrvl~.p Princ ipal g(&~Stamp
t-nncipal Govt. Commerce College
Jam nagar
10
RUSA Util ization Details :
Component : 12
Financial Fund Received Total Fund Fund Total Fund Utilizat ion (%)
Year Available Uti lized Unuti lised
2014-15 NIL NIL NIL NIL NIL
2015-16 NIL NIL NIL NIL NIL
2016-17 NIL NIL NIL NIL NIL
2017-18 1086956.52 1086956.52 0 1086956.52 0
2018-19 0 1086956.52 72270 1014686.52 6.64%
Total 1086956.52 1014686.52 72270 1014686 .52 6.64%
Details of Expenditure From 01/04/2014 to 31/03/2019 : It must tally with above expenditure table
and RUSA Fund Tracker
Date of Amount Details of Expenditure Details of the Bills
Expenditure
4/2/2019 72270 ICA EDUCATION
Total 72270
Work Done Under RUSA·
Year Actual Work Done and On-going Work
2014-15
2015-16 NIL
2016-17
2017-18
2018-19 THE INSTITUTE STARTED VOCATIONAL COURSE.
Action Plan For Next Year :
Year Work Done and On-going Work
2019-20 THE NEXT BATCH OF VOCATIONAL COURSE W ILL
BE ARRANGED.
THE STUDENTS WILL BE GIVEN BETTER
PLACEMENT OPPORTUINITIES AFTER PASSING THE
EXAM INATION.
Sign ~oordi~ator
ICA/RUSA/JAM/ICA/18-
19/AUG/01 DT.
30/01/2019
Benefits to the Student
STUDENTS ATTENDED THE
COURSE AND WERE
BEN EFITTED.
THEY WILL ALSO BE GIVEN
PLACEMENT AFTER PASSING
THE EXAMINATION.
Benefits to the Student
THE STUDENTS W ILL BE
BENEFITTED BY THE
VOCATIONAL TRAINING.
THE STUDENTS WILL GET
PLACEMENT.
Principal S i~~p r rincipal
Govt. Commer::e College J mna( ~r
Glimpse of the RUSA Component 12
Sign ofRUSA Coordinator
I I
~~ Principal S iQn@.~t)tamp Govt. Comm--rce College
Ja.,..,'lagar
12
Outcomes of RUSA (Pre and Post Time Period)
Year Outcome in the context of Faculty Improvement ,No of PHD Facu lty increased, NET/ SLET exam Cleared by Students, Competit ive Exam ination Clea red by Students, Teaching Learning Quality Improvement, lnfrastructural
Developm ent. Access, Equity and Excellent , Skill -based Development of
Students, Gender Equality, Placement Perspective, Leadership Development,
New courses offered, Start-up and Innovation in Higher Education, Patent and
IPR Increased, HACKATHON( In Bullet Point)
2011-12 • NIL 2012-13 • NIL 2013-14 • NIL 2014-15 • NIL 2014-15 • NIL 2015-16 • INFRASTRUCTU RE DEVELOPMENT 2016-17 • INFRASTRUCTUR E DEVELOPMENT 2017-18 • NIL 2018-19 • GENDER EQUITY PROGRAMS
• SKILL BASED DEVELOPMENT OF STUDENTS THROUGH VOCATIONAL COURSE
~ ' ~ Sign ofRUSA Coordinator Principal S ign tan~ cSfmilP
Govt. Commerce College Jamnag"'r
13
COMPONENT: (09) EQUITY INITIATIVES(RUSA 1.0) YEAR 2014-15
TARGETED WORK I
BENEFITS/ I UTILIZATION IN WORK COMPLETED OUTCOMES RS. PLEASE ANSWER EVERYTHING NIL IN BULLET POINTS
* PLF.ASE ,\NS\\'F.R F.\"F.RYTIIING I:\ Bl 'LLET POII'\TS
YEAR 2015-16 TARGETED WORK BENEFITS I UTILIZATION WORK COMPLETED OUTCOMES IN RS.
• The • The • Institutional 32,2231-institute institute infrastructural will developed facilities develop its its developed. infrastruct infrastruct ure by ure by purchasin purchasin g chairs, g chairs & cupboards cupboards and books.
* PLEASE ANSWER £ \ "ERYTIII:'IG IN Bl LLET I'OI:\TS YEAR 2016-17
TARGETED WORK BENEFITS I WORK COMPLETED OUTCOMES
• The • The • The books institute institute helped the will purchased students in purchase books for their books for SC,ST & educational SC, ST, & OBC progression OBC students. students and will buy library cupboard.
* PLEASE ANSWER £ \ "ERYTIIING IN Bl 'LLET I'O"TS
YEAR 2017-18 TARGETED
I WORK I BENEFITS I
WORK COMPLETED OUTCOMES
NIL
Sign of~rdinator
UTILIZATION IN RS.
19,1841-
I UTILIZATION IN RS.
Principal ~amp t-'rincipal
Govt. Commerce College Jamnag1r
14
* PLEASE .\:\'S\\'ER F:VERYTHI (';G I :'II BliLLET 1'01 :\'TS
YEAR 2018-19 TARGETED WORK BENEFITS I UTILIZATION WORK COMPLETED OUTCOMES IN RS.
• The • The • The I ,58,501.85/-institute students students will were received arrange benefitted expert expert by the advice on lectures expert various for the lectures. topics. students. • The • The books
• The institute helped the institute also students in will buy purchased their necessary necessary educational books. books. progression
* PLEASE ANSWER E\ 'ERYTIII'\'G IN Bl 'LU:T POL~TS
Sign ~oordinator ~~ Princi&cl ~i&Q arf~srm~ ov . l;Ommerc~ Co lege
Jamnagar
15
COMPONENT: (12) VOCATIONALIZATION OF HIGHER EDUCATION (RUSA 1.0)
YEAR 2016-17 TARGETED WORK COMPLETED OUTCOM ES RS. I
WORK I BENEFITS I I UTILIZATION IN ~------------~--------------~-----------------------------· -
NIL
* Pu: .\ SE A:'\SWER E\ "EIHTHI:\'G IN Ill LLET POI"\TS
YEAR 201 7-18 TARGETED
I WORK
I BENEFITS I
WORK COMPLETED OUTCOMES
NIL
* I' LEASE Ai'ISWER 1::\"ER\ TiliNG I;"\ BLILLET POINTS
YEAR 2018-19 TARGETED WORK BENEFITS I WORK COMPLETED OUTCOMES
• To start • The first • The the course batch of students of Inventory received Inventory Clerk is training of Clerk completed. Inventory under • The Clerk. vocational assessment • The course will be students
done by the will be end of this receiving month. good
• The placement. students will be given better placement.
* pu:.\ S E .\ . S\\ F. R F.n: nYTHI'\'G I. Bl'LLET POI"\TS
Sign ~or~inator
I UTILIZATION IN RS.
UTILIZATION IN RS.
722701-
-. ~... L{p Pti·~~ i p~l S~tamp
t--rine pa Govt. Comr1e·ce College
Jamnagar