Date post: | 22-Jan-2018 |
Category: |
Leadership & Management |
Upload: | continuity-and-resilience |
View: | 165 times |
Download: | 0 times |
ANB Confidential
Continuity and Resilience (CORE)
ISO 22301 BCM Consulting Firm
Presentations by speakers at the
5th Middle East Business & IT Resilience Summit
20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower
Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033
Fax: ++91 11 41055535
Email: [email protected]
Continuity and Resilience
P. O. Box 127557
Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530
Tel: +971 2 8152831
Fax: +971 2 8152888
Email: [email protected]
Please write to us if you would like to get in touch with the Speaker
ANB Confidential
Business Impact Analysis – How To
Derive Maximum Benefit From The
Process?
Abdulrahman Alonaizan
Manager – Business Continuity Division
Arab National Bank
Saudi Arabia
2
ANB Confidential
3
Maintain and
Improve
(Act)
Implement and
Operate
(Do)
Establish
(Plan)
Monitor and
Review
(Check)
The BCM Cycle
I. Plan
a. Determining BCM Strategy
b. Embedding BCM in ANB Culture
II. Do
a. Continuity Level Agreement
(CLA)
b. Understanding the Organization
(BIA/Risk Analysis )
c. Developing & Implementing BCM
Response
d. Business Continuity Plan ( BCP )
e. Exercising , Maintenance and
Review (Scenarios)
III. Check
a. Management review
b. Auditing (External/Internal)
c) Act
Corrective Actions and
Preventions
ANB Confidential
The Business Impact Analysis (BIA) process
Information Collection
Impact Analysis
Measuring of disruptions
Deriving BC Strategies
Developing BC Plans
4
ANB Confidential
Information Collection
Sample BIA Survey Page
5
Service Code RGCAC01 RGCAC02 RGCAC03
Service Name Credit Document
Custody
Credit Limits
Maintenance
Credit Admin
Description Keep the Original copies
of documents from
Clients
Enter clients credit limit,
check loans against
limits.
- Update Credit
Information.
- Credit Reporting.
- Credit checking with
ANB and Others Banks.
- Enter treasury related
limits.
Is this service critical? Yes Yes Yes
Is there a workaround for the service /
process? If yes, please describe briefly
Yes, Manual Procedures No (Needs applications) No (Needs applications)
Minimum level at which the service needs to
be performed upon resumption
60% 60% 60%
Are there any seasonal features / aspects of
this service / process
Every last week of the
Month
Every last week of the
Month
Every last week of the Month
ANB Confidential
Information Analysis
Understand business processes
Define resource requirements
Determine business impact
Determine dependencies
Identify vital records
6
ANB Confidential
Disruption Timeline
7 7 7
Business As Usual
Time
Target time to recover the
service or product after an
incident
Service / product could not be
recovered. Organization’s
viability unresolved threatened.
RTO MTPD
Crisis
Management
BCMS
Plan
DO
Check
Act
Business
Continuity
Plan
ANB Confidential
Financial Impact
Methodology to link the RTO with the financial
loss due to the disruption of a service
If average daily net income of Organization is: SR 1,000,000
2% of average daily net income of Organization: SR 20,000
Average hourly lost revenue due to service disruption : SR 2,500
The RTO will be reached at (20,000/2500) = 8 hours 8
ANB Confidential
9
ANB Confidential
Using BIA results for Business Continuity Plans
Information update
o Resource requirements
Technology
Staff
Workplace
Dependencies
Workarounds / Manual Procedures
Vital Records
10
ANB Confidential
BC Strategy Elements Derived from BIA
Services RTO / MTPoD
Sequence of recovery
Seating capacity requirements
DRC capabilities
11
ANB Confidential
Corporate BIA
The Corporate BIA focuses on the business impact of a
disruption at the corporate level.
The objectives of the Corporate BIA Report are to:
Analyze continuity resource requirements from the
corporate viewpoint
Highlight the key items which need to be addressed at
the corporate level
12
ANB Confidential
key Resources
The Corporate BIA reviews the key resources of the
organization which have to be available for the business to
continue its operations and provide services to its
customers:
Technology
Workplace
People
13
ANB Confidential
Technology
DRC technical capacity
to provide continuity for
all services in the
Business Continuity
Plans
DRC technical
sustainability
Data replication
Sequence of recovery
14
ANB Confidential
Workplace
Review with Group managers’
about workspace requirements
o Up to three months’ time
from the disruption
o Up to 6 months’ time
o Up to one year time
Alternate arrangements
(e.g. shifts, work from home)
Summarized recommendations
15
ANB Confidential
People
Options to be considered to address unavailability
of staff (e.g. pandemic):
Working from home
Outsourcing
Skills matrix
16
ANB Confidential
Thank You
Any questions?
17
ANB Confidential
18
Continuity and Resilience (CORE)
ISO 22301 BCM Consulting Firm
Presentations by speakers at the
5th Middle East Business & IT Resilience Summit
20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower
Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033
Fax: ++91 11 41055535
Email: [email protected]
Continuity and Resilience
P. O. Box 127557
Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530
Tel: +971 2 8152831
Fax: +971 2 8152888
Email: [email protected]
Please write to us if you would like to get in touch with the Speaker