1 Muhammad Jabakhanji – Alpin Limited Perspectives on UK BIM Standards & Local Adoption Muhammad Jabakhanji Head of VDC + BIM ALPIN Limited
Transcript

1 Muhammad Jabakhanji – Alpin Limited

Perspectives on UK BIM Standards & Local Adoption

Muhammad Jabakhanji Head of VDC + BIM

ALPIN Limited

2 Muhammad Jabakhanji – Alpin Limited

Agenda... • Motivation for BIM policy and adoption • Approach • The Solution: BS1192 Suite of Standards • ISO19650 Key Concepts • Food for Thought

3 Muhammad Jabakhanji – Alpin Limited

Why Are We Here Today?

4 Muhammad Jabakhanji – Alpin Limited

Consistent Findings

Latham Report 1994

Egan Report 1998

Never Waste A Good Crisis

2009

Accelerating Change

2002

5 Muhammad Jabakhanji – Alpin Limited

Enough is enough !

There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.

Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.

Construction Strategy

2011

6 Muhammad Jabakhanji – Alpin Limited

Let’s set objectives… 0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism. 1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration. 2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements. 3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.

7 Muhammad Jabakhanji – Alpin Limited

Core Documents

PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2015

Soft Landings Classification Digital Plan of Work BIM Protocol

BS1192-2007

8 Muhammad Jabakhanji – Alpin Limited

Supporting Documentation

Post Contract Award BIM Execution Plan

CPIx BIM Assessment

CPIx IT Assessment

Pre-Contract BIM Execution Plan

9 Muhammad Jabakhanji – Alpin Limited

More Supporting Documentation

CIC Scope of Service CIC Indemnity Insurance Guide

BIM Task Group EIR Guide

10 Muhammad Jabakhanji – Alpin Limited

No more blockers for adoption!

– Need for Change – Resources for Change – Legal Implications

– Contractual Arrangements – Professional Indemnity – Ownership

– SMPs

11 Muhammad Jabakhanji – Alpin Limited

ISO19650 As a response to an International Drive for BIM level 2 ISO 19650 series is being developed “Organization of information about construction works - Information management using BIM”

12 Muhammad Jabakhanji – Alpin Limited

Standard Hierarchy ISO

EN

BS

PAS

Private

Corporate

13 Muhammad Jabakhanji – Alpin Limited

Standard Hierarchy

ISO

GCC

Qatar Standard

Private

Corporate

14 Muhammad Jabakhanji – Alpin Limited

Information Delivery Cycle

15 Muhammad Jabakhanji – Alpin Limited

Assessment and Need

Image from PAS 1192-2:2013

16 Muhammad Jabakhanji – Alpin Limited

Employer’s Information Requirements

17 Muhammad Jabakhanji – Alpin Limited

Image from PAS 1192-3:2014

Employer’s Information Requirements

18 Muhammad Jabakhanji – Alpin Limited

Image from PAS 1192-3:2014

Non-Graphical Model Graphical Model

What is a model?

19 Muhammad Jabakhanji – Alpin Limited

Employers Decision Points

• “When the Employer requires information to make decisions…”

• Suppliers information exchanges as required to provide information

20 Muhammad Jabakhanji – Alpin Limited

Procurement

Image from PAS 1192-2:2013

21 Muhammad Jabakhanji – Alpin Limited

Procurement: Prequalification

• Employers Prequalification Requirements

• Pre Tender BIM Assessment • Business Certification Scheme

22 Muhammad Jabakhanji – Alpin Limited

Procurement: BEP

Pre Contract BIM Execution Plan: Is prepared by the supplier to demonstrate his proposed approach, and the capability, capacity and competence of his firm and his supply chain to meet the Employers Information Requirements.

23 Muhammad Jabakhanji – Alpin Limited

Post Contract Award

Image from PAS 1192-2:2013

24 Muhammad Jabakhanji – Alpin Limited

Mobilization

Image from PAS 1192-2:2013

25 Muhammad Jabakhanji – Alpin Limited

Contract Management & Handover

Image from PAS 1192-2:2013

26 Muhammad Jabakhanji – Alpin Limited

Common Data Environment (CDE)

CDE Work in Progress

WIP

Non-verified data used by one team

only

Document

Published coordinated and

validated data

Share

Verified data that can be shared

between teams

Archive

Data maintained for knowledge and

legacy

Coordinated Private Published

Production Deliverable output

Stored

Project / programme control Local control

27 Muhammad Jabakhanji – Alpin Limited

Information Management Roles

• Project Delivery Manager • Project Information Manager • Lead Designer • Task Team Manager • Task Information Manager • Task Interface Manager

28 Muhammad Jabakhanji – Alpin Limited

29 Muhammad Jabakhanji – Alpin Limited

30 Muhammad Jabakhanji – Alpin Limited

BIM Education & Certification Pathway

BIM International Foundation Course

STAGE 1

EDUCATION EXAM AWARD

2 days

Information Management

STAGE 2

EDUCATION EXAM AWARD

2 days

Project Delivery Management

STAGE 3

EDUCATION EXAM AWARD

1 day

BIM Level 2 / ISO19650 Certificated Professional Project/Task Information Manager

BIM Level 2 / ISO19650 Certificated Professional Project Delivery Manager

Certificated Professionals

31 Muhammad Jabakhanji – Alpin Limited

Thank You!

BIM International Foundation Course

STAGE 1

EDUCATION EXAM AWARD

2 days

BIM International 2 Day Course DECEMBER 14-15, DOHA Register on : alpinme.com/courses/ OR bre.co.uk/academy/training.jsp Enter the following code for a 15% Discount:

“BIMInternational15”