Utopia East Pipeline Project Fact Sheet Kinder Morgan Utopia LLC proposes to develop, construct, own and operate a new pipeline system through its Utopia East project, subject to receipt of applicable permits and approvals. The new pipeline system will transport previously refined or fractionated products across Ohio and Michigan, ending at Windsor, Ontario. As previously announced by NOVA Chemicals Corporation (NOVA), NOVA has executed a long- term transportation agreement with Kinder Morgan to support the approximately $500 million Utopia East system, which will include a new approximately 215-mile, 12-inch diameter pipeline constructed entirely within the state of Ohio from Harrison County to Fulton County. The new pipeline facilities will then connect with and utilize Kinder Morgan’s existing pipeline and facilities to move ethane and ethane-propane mixtures eastward to Windsor, Ontario. These ethane and ethane-propane mixtures are initially planned to be used primarily as a feedstock for producing plastics. The Utopia East pipeline system will have an initial capacity of 50,000 barrels per day (bpd). The pipeline capacity can be expanded to more than 75,000 bpd with the construction of additional pump stations. The construction of the new build portion of the pipeline will generate approximately 900 local union construction jobs and an estimated five full-time permanent positions in Ohio. The economic impact of construction will be significant as workers will reside locally and rely upon local businesses, contractors and support services during the construction period. A number of federal and state agencies will be involved in the approval and oversight of the project, including the Pipeline and Hazardous Materials Safety Administration, U.S. Army Corp of Engineers, U.S. Fish and Wildlife Service, Ohio Department of Natural Resources and Ohio Environmental Protection Agency. The rates, terms and conditions for transportation of the products by pipeline will be governed by Federal Energy Regulatory Commission tariffs for product movements in the U.S. and by National Energy Board tariffs for product movements in Canada. Estimated timeline: Outreach meetings – Ongoing Survey activities– Ongoing Pipeline construction start date – November 2016 Proposed full in-service date – January 2018
Transcript
Page 1: 6-3-16 Utopia Eact Fact Sheet - Kinder Morgan · Utopia East Pipeline Project Fact Sheet • Kinder Morgan Utopia LLC proposes to develop, construct, own and operate a new pipeline

Utopia East Pipeline Project

Fact Sheet

• Kinder Morgan Utopia LLC proposes to develop, construct, own and operate a new pipeline system through its Utopia East project, subject to receipt of applicable permits and approvals. The new pipeline system will transport previously refined or fractionated products across Ohio and Michigan, ending at Windsor, Ontario.

• As previously announced by NOVA Chemicals Corporation (NOVA), NOVA has executed a long-term transportation agreement with Kinder Morgan to support the approximately $500 million Utopia East system, which will include a new approximately 215-mile, 12-inch diameter pipeline constructed entirely within the state of Ohio from Harrison County to Fulton County. The new pipeline facilities will then connect with and utilize Kinder Morgan’s existing pipeline and facilities to move ethane and ethane-propane mixtures eastward to Windsor, Ontario. These ethane and ethane-propane mixtures are initially planned to be used primarily as a feedstock for producing plastics.

• The Utopia East pipeline system will have an initial capacity of 50,000 barrels per day (bpd). The

pipeline capacity can be expanded to more than 75,000 bpd with the construction of additional pump stations.

• The construction of the new build portion of the pipeline will generate approximately 900 local union

construction jobs and an estimated five full-time permanent positions in Ohio. The economic impact of construction will be significant as workers will reside locally and rely upon local businesses, contractors and support services during the construction period.

• A number of federal and state agencies will be involved in the approval and oversight of the project, including the Pipeline and Hazardous Materials Safety Administration, U.S. Army Corp of Engineers, U.S. Fish and Wildlife Service, Ohio Department of Natural Resources and Ohio Environmental Protection Agency. The rates, terms and conditions for transportation of the products by pipeline will be governed by Federal Energy Regulatory Commission tariffs for product movements in the U.S. and by National Energy Board tariffs for product movements in Canada.

Estimated timeline: • Outreach meetings – Ongoing

• Survey activities– Ongoing

• Pipeline construction start date – November 2016

• Proposed full in-service date – January 2018

Page 2: 6-3-16 Utopia Eact Fact Sheet - Kinder Morgan · Utopia East Pipeline Project Fact Sheet • Kinder Morgan Utopia LLC proposes to develop, construct, own and operate a new pipeline

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*

#*

#* #*

")

!(

")

!(M

etamora

Jun

ction

Cadiz

Metering

Station

Flat Rock

Metering S

tation

Windsor

Termin

al

Win

dso

r, ON

Win

dso

r, ON

SENECA

LUCAS

FULTO

N

HENRY

WOOD

SANDUSKY

ASHLAND

STARK

TUSCARAWAS

WAYNE

CARROLL

HARRISON

HURONRICHLAND

I N D I A N AO H I O

MIC

HIG

AN

OH

IO

O H I OP E N N S Y LVA N I AP E N N S Y LVA N I A

W E S T V I R G I N I A

£¤ 20

£¤ 322

£¤ 19

£¤ 20

£¤ 19

£¤ 19

£¤ 20

£¤6

£¤ 12

£¤ 20

£¤ 250

£¤ 40

£¤ 23

£¤6

£¤ 12

£¤ 250

£¤ 20

£¤ 30

£¤ 30

£¤ 33

£¤ 20

£¤ 127

£¤ 127

£¤ 20

£¤6

£¤ 42

£¤ 127

£¤ 42

£¤ 62

£¤ 224£¤ 224

£¤ 224

£¤ 22

£¤ 27

£¤ 33

£¤ 30

£¤ 224

£¤ 422

£¤ 19

£¤ 20

£¤ 42

£¤ 36

£¤6

£¤6

£¤ 33

£¤ 36

£¤ 62

£¤ 33

£¤ 422

£¤ 6N

£¤ 36

£¤ 62

£¤ 223

£¤ 250

£¤ 68

£¤ 422

£¤ 62£¤ 224

£¤ 30

£¤ 42

£¤ 422

£¤ 36£¤ 19

£¤ 36

£¤ 224

£¤ 36

£¤ 62

£¤6

£¤ 20A

£¤ 250

£¤ 24

£¤ 127

£¤6

£¤ 42

£¤6

£¤ 223

£¤ 127

£¤ 68

£¤ 24

£¤ 224

£¤ 20

£¤ 27

£¤ 68

£¤ 27

£¤ 24

£¤ 224

£¤ 24

£¤ 12

£¤ 62

£¤ 127

£¤ 23

£¤ 22

£¤ 322

£¤ 23

£¤ 23

£¤ 322

£¤ 12

£¤ 30

£¤ 30

£¤ 36

£¤ 22

UN

I T ED

S

TATE

S

CA

NA

DA

Fo

rt Wayn

eF

ort W

ayne

Akro

nA

kron

Erie

Erie

Dearborn

Dearborn

TaylorTaylor

Westland

Westland

Canton

Canton

Elyria

Elyria

LorainLorain

Parm

aP

arma

Youngstown

Youngstown

§̈¦ 94

§̈¦ 469

§̈¦ 280

§̈¦ 79

§̈¦ 94

§̈¦ 76

§̈¦ 94

§̈¦ 79

§̈¦ 76

§̈¦ 75

§̈¦ 80

§̈¦ 77

§̈¦ 90

§̈¦ 80

§̈¦ 80

§̈¦ 490§̈¦ 77

§̈¦ 375

§̈¦ 376

§̈¦ 70

§̈¦ 270

§̈¦ 271

§̈¦ 277

§̈¦ 194

§̈¦ 94

§̈¦ 271

§̈¦ 480

§̈¦ 96

§̈¦ 475

§̈¦ 680

§̈¦ 279

§̈¦ 80

§̈¦ 480

§̈¦ 275

§̈¦ 90

§̈¦ 90

§̈¦ 69

§̈¦ 94

§̈¦ 71

JacksonJackson

Lincoln ParkLincoln Park

Ashland

Ashland

Boardm

anB

oardman

Bow

ling Green

Bow

ling Green

Brunsw

ickB

runswick C

leveland Heights

Cleveland H

eights

Cuyahoga Falls

Cuyahoga Falls

Delaw

areD

elaware

Dover

Dover

Dublin

Dublin

EuclidEuclid

FindlayFindlay

FostoriaFostoria

Fremont

Fremont

Lima

Lima

Mansfield

Mansfield

Marion

Marion

Massillon

Massillon

Mentor

Mentor

New

PhiladelphiaN

ew Philadelphia

North O

lmsted

North O

lmsted

North R

idgevilleN

orth Ridgeville

North R

oyaltonN

orth Royalton

Norw

alkN

orwalk

Oregon

Oregon

PerrysburgPerrysburg

SteubenvilleSteubenville

StowStow

StrongsvilleStrongsville

TiffinTiffin

Warren

Warren

Westerville

Westerville

Westlake

Westlake

Bethel Park

Bethel Park

MP 10

MP 20

MP 30

MP 40

MP 50

MP 60

MP 70

MP 80

MP 90

MP 100

MP 110

MP 120

MP 130

MP 140

MP 150

MP 160

MP 170

MP 180

MP 190

MP 200

MP 210

²LE

GE

ND

NO

TES

07.5

1522.5

30 Miles

NA

D 1983 U

TM Zone 17N

US

FEET

LOC

ATION

MA

P

PRO

POSED

UTO

PIA PIPELINE

PRELIM

INA

RY OVER

VIEW M

AP

CEN

TERLIN

E REV 10

OV

ER

VIE

WD

RAW

N BY

ISSU

E D

ATEJP 5/25/2016

OH

IO

Utopia East N

ew B

uild - 213.6 Miles

Existing Kinder M

organ Pipeline

#*M

ilepost

")M

etering Station

!(Junction/Term

inal

THIS

MA

P RE

FLEC

TS P

RE

LIMIN

AR

Y D

ATA FOR

PLA

NN

ING

PU

RP

OS

ES

ON

LY.

THIS

MA

P IS A LIV

ING

DO

CU

MEN

T AND

WILL B

E

UP

DATE

D C

ON

TINU

OU

SLY TH

RO

UG

HO

UT

THE

PRO

JEC

T.

Service Layer C

redits: Copyright:©

2014 Esri


Recommended