+ All Categories
Home > Documents > 6- 3&1035 · MR Market Rules MVA Megavolt Ampere MW Megawatt NQ No Qualification NTC Net Transfer...

6- 3&1035 · MR Market Rules MVA Megavolt Ampere MW Megawatt NQ No Qualification NTC Net Transfer...

Date post: 15-Oct-2018
Category:
Upload: lamkhue
View: 213 times
Download: 0 times
Share this document with a friend
66
Transcript

Table of contentsList of abbreviations and acronyms 6

CHAPTER I General information about the company 8Foreword from the Chairman of the Board of Directors 11Foreword from the KOSTT Chief Executive Officer 12Transmission System of the Republic of Kosovo 14Corporate Governance 16Legal and regulatory aspects 18

CHAPTER IIOperation of the Transmission System of the Republic of Kosovo and Investments 20System performance 22Losses in transmission network 24Consumption and maximal load (peak) 26Transmission System of the Republic of Kosovo 26Environmental policies and KOSTT environment impact 34Transmission infrastructure development during 2013, and relevant investments 35Development of transmission system capacities during 2013 36Investments implemented during 2013 37

CHAPTER IIIKosovo Electricity Market Operation 40Implementation of a market operation (IT) information technology platform 43System imbalances 43KOSTT Cooperation and Integration in Regional Associations and Mechanisms 44

CHAPTER IVManagement of Human Resources 46Staff Development and Training 49Implementation of the Quality Management System and plans for an integrated system 49

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

4

CHAPTER VAudited Financial Statements and Audit Report 50Significant Events During 2013 59

List of Tables 62List of Figures 63

WWW.kOsTT.cOm

5

List of abbreviations and acronymsAT Automatic TransformerBoD Board of Directors CAO Coordinated Auction OfficeCCTV Closed Circuit Television CEO Chief Executive Officer CMMI Congestion Management and Market IntegrationEBRD European Bank for Reconstruction and Development ECS Energy Community SecretariatEMS Elektromreza Srbije EMS Environment Management SystemERO Energy Regulatory Office GWh Gigawatt hourHPP Hydro Power PlantHQ Higher QualificationHV High Voltage IT Information Technology KEDS Kosovo Electricity Distribution and Supply Company KEK Kosovo Energy Corporation KfW German Development BankKm KilometerKOSTT Kosovo Electricity Transmission, System and Market OperatorkV KilovoltLFC Load Frequency Control LQ Low QualificationMO Market Operator

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

6

MR Market Rules MVA Megavolt AmpereMW MegawattNQ No QualificationNTC Net Transfer Capacity OHL Overhead LinePOE Publicly Owned EnterprisePOEPMU Publicly-Owned Enterprises Policy and Monitoring UnitQMS Quality Management System RG SEE Regional Group under Market Committee auspices/the ENTSO-E Market Com-

mittee in charge of SEE market matersSCADA/EMS Supervisory Control and Data Acquisition/Energy Management SystemSECI Southeast Europe Cooperation Initiative Transmission System Planning ProjectSEE CAO Coordinated Auction Office in SEE SEE South-East Europe SG CMMI Subgroup for Congestion Management and Market Integration Sn Visible Nominal Power SS SubstationSVQ Secondary Vocational Qualification SVQ Superior Vocational Qualification TNOUS Transmission Use of System Charges TPP Thermal Power PlantTR TransformersTSO Transmission System Operator

WWW.kOsTT.cOm

7

chAPTER iGeneral information aboutthe company

Registered name: Transmission, System and Market Operator - KOSTT J.S.C.Registered address St. Iljaz Kodra. n.n., 10000 Prishtina, Republic of KosovoData e themelimit: 1 July 2006Business registration number: 70325350Shareholder: Republic of Kosovo, through the Ministry of Economic DevelopmentLicenses issued by the Energy Regulator’s Office::

License for Transmission System OperationLicense for Electricity Market Operation

Chief Executive Officer: • Naim Bejtullahu, from 21 May 2013• Fadil Ismajli, until 21 May 2013

Chairman of the Board of Directors: Ramadan Paçarada actingBoard of Directors:

• Nazmi Mikullovci• Lutfi Maxhuni• Fatos Ukaj• Faton Deda

missiONMission of KOSTT is to provide:

• Quality services through implementation of technical and technological achieve-ments in the transmission system development;

• Transparency and non-discrimination for transmission system users in the competitiveelectricity market;

• Promotion of the company’s position internationally through increased number ofactivities in this regard.

VisiON“To provide secure and reliable services for the transmission system users, socially and envi-ronmentally responsible, integrated in European electricity transmission mechanismsand con-currently profitable”.

WWW.kOsTT.cOm

9

WWW.kOsTT.cOm

11

In 2013, KOSTT continued itspositive business perform-ance, characterized by nu-merous developments, bothin terms of development aswell as regional integration.

In terms of transmissioninfra-structure development, KOSTThas already shifted to a com-pletely financially self-sustain-able mode, and in 2013signed a second loan withthe German developmentbank KfW, to ensure financ-ing of network projects.Moreover, discussions havebeen initiated with the Euro-pean Bank for Reconstructionand Development (EBRD) forthe financing of investmentprojects in the coming pe-riod.

On the other hand, KOSTThas continued its commitmentto seek integration in re-gional mechanisms andprocesses, such as the com-

mitment for the establishmentof the Coordinated AuctionOffice in South-East Europe,and developing infrastructureto meet the criteria for mem-bership in ENTSO-E.

One of the projects worthhighlighting is the 400 kV in-terconnection line betweenthe Republic of Kosovo andAlbania; a project of high im-portance for both countries,and the Frequency –PowerRegulation project, which willboth allow for a higher ex-change of energy with the Re-public of Albania and theregion, and optimizes thesystem operation.

KOSTT Board of Directors, inorder to fulfill its duties, hascontinuously monitored thedevelopments in the com-pany by comparing themwith the objectives set out inthe Business Plan and otherdocuments. Significant contri-

butions were also providedby functional committees ofthe Board of Directors, whichhave closely followed the de-velopments in certain areasand provided recommenda-tions and support to theseprocesses.

In conclusion, the financialaspect of the business hasshown satisfactory results in2013, and it is worth notingthat KOSTT has declared andpaid dividends to the share-holder in the amount of 3 mil-lion euros.

The Board of Directors re-mains committed and stronglybelieve that the success ofKOSTT will will be presentalso in 2014 and expressesits gratitude to all employeesand management of KOSTTj.s.c.

FOREWORd FROm ThE chAiRmAN OF ThE BOARd OF diREcTORs

Ramadan PaçaradaActing Chairman of the Board of Directors of KOSTT j.s.c.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

12

In 2013, KOSTT continued its journey in fur-ther consolidation of the transmission infra-structure, and its engagement in developinga platform to enable integration with regionaland European mechanisms, thereby imple-menting projects and initiatives in ensuringsecurity of supply and quality services for thetransmission system users.

In the past, numerous activities have been un-dertaken in completing ongoing projects,and to begin the implementation of the 400kV Interconnection Line Kosovo-Albania proj-ect, and the Frequency-Load Regulation proj-ect, both to contribute sensibly in optimizingthe systems and economic development ofboth countries. Both the projects were con-tracted for implementation in 2013.

A successful implementation of capital proj-ects shall facilitate the fulfilment of key objec-tives set forth by the KOSTT, in full compliance

with technical requirements deriving from theENTSO-E acts.

Operation Agreements with Serbia andMacedonia were negotiated in 2013, andthey are to be signed in the first quarter of2014, thereby completing interconnectionagreements with all neighbouring countries(agreements with Albania and Montenegrowere already signed earlier). The Kosovo-Ser-bia Energy Agreement signed by the PrimeMinisters of Kosovo and Serbia has pro-moted the KOSTT as an internationally recog-nized operator, as regulated by theOperation Agreement.

The Transmission System Operation Perform-ance has been proven good in 2013, withcontinued improvement in comparison to thepast year. Lines and sub-stations were main-tained as per plan, check-ups/inspections ofsub-stations and lines were completed, and

Naim BejtullahuChief Executive Officer

FOREWORd FROm ThE kOsTT chiEF ExEcUTiVE OFFicER

WWW.kOsTT.cOm

13

regular overhauls were made in SS fields,and also new SSs were commissioned intofunction, thereby including commissioningand testing of relay protections, and the im-plementation of many other important proj-ects.

Operational functions in monitoring, andspecifically operating the real-time systemhave advanced, while the Telecom and Com-mercial Metering Infrastructure SystemSCADA\EMS already offers highly ad-vanced possibilities for high-security opera-tions.

In 2013, KOSTT has worked in developinga strategy for entry into telecommunicationsmarket, thereby offering the surplus opticalfibre capacities. In this regard, the KOSTTBoard of Directors rendered a decision initi-ating activities for application for authoriza-tion/license for Telecommunications Market

Service operator, an application approvedby the Electronic and Postal Telecommunica-tions Regulatory Authority (ARKEP) of Kosovo.

For the seventh time in a row, the year of2012 marked the seventh report of the exter-nal auditor without any qualification, whichis a clear reflection of professional work andthe commitment of KOSTT in implementingthe highest standards in work processes andsuccessful completion of and utilization of allresources available to KOSTT.

The focus of KOSTT in the coming periodshall be on ensuring commercial sustainabil-ity and capacity development of KOSTT em-ployees, the driving engine of thedevelopment of the company and the coun-try.

TRANsmissiON sysTEm OF ThE REPUBLic OF kOsOVO

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

14

Fig 1 Map of the Kosovo Transmission System, 31.12.2013

cORPORATE GOVERNANcE During the period January – December 2013, KOSTT has undertaken various corporate gov-ernance activities, based on the Law No. 03/L-087 on Publicly-Owned Enterprises. Mainactivities in this aspect, include activities of the Board of Directors, Audit Committee andother committees that the Board established for KOSTT’s needs. On March 13, 2013, the Government of the Republic of Kosovo issued a Decision No.01/119 whereby KOSTT is defined as a first category Publicly Owned Company.

Minutes of meetings of the Board, Audit Committee and other committees, reporting and de-livery of information to the Publicly Owned Enterprises Monitoring Unit (POEMU), as requiredunder Article 31, 32 and 37 of the Law on POEs, was prepared regularly and in accordanceand in respect to the deadlines. In 2013, KOSTT Board of Directors held a total of 12 regularmeetings and two extraordinary meetings, as well as the annual general shareholders’ meet-ing.

Each regular meeting of the Board covered basic issues, including, confirmation of quorumand approval of the agenda, approval of minutes from previous meetings of the Board of Di-rectors, review of the report of the Audit Committee and other committees, and update onactivities of the Office of the Chief Executive Officer (CEO) of KOSTT.

At each meeting, the Board reviewed and approved the Audit Committee report and recom-mendations, as well as the interim committee reports such as Capital Investment Committee,Committee for the review of the operations, and the Committee for legislation and monitoringof legal disputes.Reports of the meetings of the Audit Committee and other committees established by theBoard are presented as materials at Board meetings and sent to the POEMU.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

16

The table below shows the maindecisions approved by the Boardof Directors in 2013, excludingmeetings and consultations ofCompany Officials, respectivelyChief Executive Officer, Chief Fi-nancial Officer, Secretary Gen-eral and Internal Auditor with theBoard and officers of the POEPolicy and Monitoring Unit, re-porting and similar corporate ac-tivities

WWW.kOsTT.cOm

17

No. Decisions of the Board for the approval of the following documents:

1

Quarterly report for the period October – December 2012, Quarterly report for the period January – March 2013, Quarterly report for the period April – June 2013, and Quarterly report for the period July – September 2013 (based on article 31 of the Law on POE)

2 Report of the Committee for the registration of KOSTT assets for 2012 (asset registration)3 Business plan 2013-20174 Investment plan 2013-20175 Transmission Development Plan 2013-20226 Work plan of the Board of Directors (BoD) and the Audit Commission for 2013 7 Annual report of KOSTT for 2012 8 Loan Agreement with KfW9 Loan Agreement with EBRD 10 Archives policy 11 Report of the External Auditor on the Regulatory Financial Statements for 201212 Revised Business Plan for 2013 13 Manual for Risk Assessment in the workplace 14 Procurement Plan for 201415 Decision on the Appointment of the CEO

Tab 1 Decisions of the Board of Directors in 2013

LEGAL ANd REGULATORy AsPEcTs KOSTT operates in accordance with the primary legal framework (Law on Energy, Law onElectricity and Law on the Energy Regulator) and secondary legislation (Licenses, TechnicalCodes, Rules, Administrative Instructions, etc.).During 2013, KOSTT continued to work and contribute to the development of regulatoryframework, in line with the South East Europe Energy Community and the third energy pack-age of the European Union.

Activities for amendment and finalization of the Electricity Market Rules continued also in2013, developed on the basis of the Electricity Market Design in Kosovo and the BalancingMechanism. For completionof the Market Rules, KOSTT consulted stakeholders, including theSecretariat of the Energy Community for the South East Europe.

After the decision of the Government No. 10/29 under which 400/220/110 kV assetswere declared as ownership of KOSTT, including transformers 220/35/10 (20) kV and110/x kV and the respective fields of 35 kV and 10 (20) kV transformer breakers, the GridCode, Electrical Equipment Code, Safety Operation Standards and the Transmission SystemPlanning were all harmonized.

Given that the implementation of certain provisions of the TSO License, the Grid Code andthe provisions of the Metering Code was not possible, KOSST requested ERO to allow forthe derogation of the implementation of the respective provisions for specific periods of time.

Documents prepared and amended by KOSTT, and approved by ERO, in 2013, are:

1) Design of Energy Electricity Market of Kosovo2) Market Rules (ver. 2.0)3) Transmission Use of System Charging Methodology (TNUOS)4) System Operator Charging Methodology 5) Market Operator Charging Methodology 6) Transmission Network Connection Charging Methodology (ver 2.7)7) Grid Code (ver. 2.2)8) Electrical Equipment Code (ver. 2.2)

The following documents were also approved:

1) Transmission Development Plan 2014-20232) Annual Electricity Balance 2014

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

18

WWW.kOsTT.cOm

19

20

chAPTER ii Operation of the Transmissionsystem of the Republic ofkosovo and investments

WWW.kOsTT.cOm

21

KOSTT j.s.c. operates the Transmission System of the Republic of Kosovo, creating the con-ditions for a safe and reliable transmission of electricity from generating units to the distribu-tion system, 24 hours a day, 365 days a year.KOSTT manages the Transmission System through operating the high voltage levels of 400kV, 220 kV and 110 kV, and medium voltage levels of 35 kV, 20 (10) kV. Kosovo has inter-connection with all neighboring countries:

• Macedonia - 1 line 400 kV• Montenegro - 1 line 400 kV• Serbia - 1 line of 400 kV, 1 line of 220 kV and 2 lines of 110 kV• Albania - 1 line of 220 kV

The construction of the 400 kV interconnection line with Albania is under development.The table below shows the data according to the realized balance.

Generation of HPP Lumbardhi doesn’t include total generation, as it is not connected in thetransmission network.

MWh 2012 2013 2013/2012 (%)

Gen

era

tion

Hydro Generation (Net) (H) 64 873 99 387 153.20

HPP Lumbardhi 22 901 29 707 129.72

HPP UJMANI 64 873 99 387 153.20

Thermal Generation (Net) (T) 5 383 975 5 877 485 109.17

TC Kosova A 1 948 517 2 014 046 103.36

TC Kosova B 3 435 458 3 863 439 112.46

Total Generation (Net) 2 = (H) + (T) 5 448 848 5 976 872 109.69

Ex-

cha

ng

e (D) 2 619 466 2 893 304 110.45

( M) 2 773 062 2 551 216 92.00

Total net exchange balance 3 = (D) - ( M) - 153 596 342 089

KO

STT

4=(2+M) 8 221 910 8 528 088 103.72

Losses in transmission 5 108 512 110 336 101.68

Losses in transmission (%) 5/ 4 *100 1.32 1.29 98.03

Energy delivered from Transmission (1) 6=(2-3-5) 5 493 931 5 524 447 100.56

Energy delivered from Interconnection (D) 2 619 466 2 893 304 110.45

Energy delivered to Distribution ( a ) 4 593 409 4 606 524 100.29

Mining, external consumers, and generation costs from transmission

( b )( c )

426 668 430 232 100.84

Delivered energy to eligible consumers ( d ) 473 853 487 691 102.92

New Co Ferronikeli 407 480 403 704 99.07

Sharri 42 881 59 439 138.62

Trepça 23 493 24 549 104.49

Settlements in delivery 7=(a+b+c+d) 5 493 931 5 524 447 100.56

Total delivered energy from Transmission 8=7+D 8 113 398 8 417 752 103.75

Maximal load (MW) 1 168 1 101 94.26

Demand (gross consumption) of Kosovo10=(2-3) 5 602 443 5 634 784 100.58

Tab 2 Data according to the realized balance

sysTEm PERFORmANcEUndelivered energy In 2013 there was a slight increase of undelivered energy to the Transmission of Kosovo incomparison to 2012. About 75% of undelivered energy to the transmission system in 2013was planned, in order to enable works under KOSTT projects, and also as a result of the im-plementation of the project of the Government of Kosovo for the construction of Morinë –Merdare Motorway.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

22

No Indicator2012 2013

2013/2012 (%) January -

December January - December

T1Transmitted energy

(GWh)8221.91 8528.09 103.72

T2 Coincidental peak (MW)with transit 1168 1101 94.26

without transit

T3Total length of lines (km)

400 kV 188.49 188.49 100.00

220 kV 231.83 231.83 100.00

110 kV 764.94 776.336 101.49

Length of 110kV lines is paved for 11,39km connection of SS Lipjan in 110kV line, No. 112, through the dual 110kV line.

T4 MVA-km

400 kV 248249 248249 100.00

220 kV 77506 77506 100.00

110 kV 83209 86592 104.07

T5Transformer

Capacity

400/220 kV400/110 kV

1800 1800 100.00

220-110 kV 1350 1350 100.00

*(220/X,110/X/X)kV

1788.5 1788.5 100.00

T6Average available

import/export capacity (AATC)

Not Applicable

T7Maximal available

import/export capacity (MATC)

Not Applicable

T8 Congestion charge Not Applicable

T9Average downtime (AIT

minuted/quarter)

304.00 670.79 220.65

AIT was greater for the period January-December. Around 75% of undeliv-ered energy was planned due to cuts as a result of the implementation of KOSTT projects and works in the motorway.

T10 Number of complaints

per voltage1 3

T11Complaints resolved

for voltage

Less than a week 1 3

Less than a month

More than a month

T

Undelivered energy and availability of the transmission network for several years is shownin Figure. 2.

WWW.kOsTT.cOm

23

J December

J

T12Number of complaints

for metering0 0

T13Complaints resolved for

metering

Less than a week 0 0

Less than a month

More than a month

T14Average absolute value

for deviations from schedule (MWh/hour)

Import 33.94 28.94 85.25

Export 30.71 30.25 98.50

T15Losses in transmission

(GWh)

108.51 110.34 101.68

Losses of electricity in transmission were 1.68% higher in 2013 compared to 2012.

0.300

0.250

0.200

0.150

0.100

0.050

0.0002007 2008 2009 2010 2011 2012 2013

0.245

0.222 0.211

0.0680.044

0.085

0.166

100.00

99.95

99.90

99.85

99.80

99.75

99.70

99.652007 2008 2009 2010 2011 2012 2013

99.7699.78 99.79

99.9399.96

99.92

99.83

Tab 3 Performance indicators

Fig 2. Undelivered energy and availability of the transmission network

Undelivered energy (%) 2007-2013

Availability of the transmission network 2007-2013

LOssEs iN TRANsmissiON NETWORk Since its establishment in 2006, KOSST has steadily invested in transmission network devel-opment and asset maintenance, factors which, among others, have contributed to halve theelectricity losses of the network. While in 2006 losses were 3.78%, in 2013 they were at1.30%. Since the establishment of KOSTT in 2006, the measures implemented for the trans-mission network development, operation with optimal methods and effective network main-tenance, have all increased the performance of the transmission system, and reducedtechnical losses in the system. Losses in 2013 have recorded a slight increase, by 1.8 GWh,while there is a reduction in percentage compared to the previous year. This comes as aresult of the government’s modification of transmission boundaries with the distributionthrough its Decision No. 10/29. However, losses are back under the limit allowed by theERO, at 0.78%. The percentage of losses is calculated in relation to the whole energy whichenters the transmission network, data which are presented in Fig.3.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

24

losses in transmission (MWh)

losses in transmission (%)

300,000

250,000

200,000

150,000

100,000

50,000

4

3.5

3

2.5

2

1.5

1

0.5

020072006 2008 2009 2010 2011 2012 2013

%MWh

3.78

279,964

246,000

210,508

174,573

131,043115,316 108,512

110,336

2.94

2.43

2.05

1.501.37

1.32 1.29

Fig 3. Losses in Transmission 2006-2013

cONsUmPTiON ANd mAximAL LOAd (PEAk) Maximal load has increased over the years, including the consumption, but in 2012 and2013 there is a visible decrease in consumption due to higher temperatures during the winterseason compared to 2011. This trend is shown in Fig. 4.

Figure 5 shows the monthly consumption of Kosovo for the years 2011-2013

WWW.kOsTT.cOm

25

Consumption GWh

Load MW

6,000

5,000

4,000

3,000

2,000

1,000

0

1,600

1,400

1,200

1,000

800

600

400

200

020072006200520042003200220012000 2008 2009 2010 2011 2012 2013

MWGWh

653763 723 759

811898 916 933

9671072

1158 1150 11681101

2,9563,348 3,546

3,7464,001 4,028 4,086

4,4094,802

5,2465,463 5,611 5,493 5,524

700,000

600,000

500,000

400,000

300,000

200,000

100,000

0January February March April May June July August September October November December

2011 2012 2013

Fig 4 Consumption and peak 2000-2013

Fig 5 Gross consumption of Kosovo for 2011-2013

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

26

Figure 6 shows the values of loads, ranking them from the highest to the lowest value of theload, presented in MW for all hours of the year.

TRANsmissiON sysTEm OF ThE REPUBLic OF kOsOVO KOSTT, in 2013, in order ensure a more reliable, safe and efficient system operation, con-tinued with best and new practices of transmission network maintenance. This ensures thatassets and network infrastructure is preserved and their performance increased.

Kosovo Transmission System maintenance is realized based on the maintenance policy andprocedures for specific equipment, based on the recommendations of manufacturers and theconditions of assets, estimated during inspections or overhauls.

Table 4 shows the total length of high voltage lines 110kV, 220kV and 400kV for 2013 inthe Republic of Kosovo and the transformative capacity of these lines.

1,200

1,000

800

600

400

200

0

1205

409

613

817

1021

1225

1429

1633

1837

2041

2245

2449

2653

2857

3061

3265

3469

3673

3877

4081

4285

4489

4693

4897

5101

5305

5509

5713

5917

6121

6325

6529

6733

6937

7141

7345

7549

7753

7957

8161

8365

8569

hours

MW

Overhead lines Total length in Kosovo (km)

Transmission capacity Ct=Sn*L

[MVA km]

400 kV 188.497 248249

220 kV 231.882 77506

110 kV 791.3 88391

Fig 6 Load duration curve 2013

Tab 4 Length of transmission lines and their transmission capacity

WWW.kOsTT.cOm

27

Table 5 shows the age of KOSTT overhead lines, and it is clear that 400kV and 110kV linesare older

Figure 7 shows the age of transmission lines in percentage, depending on the voltage level.This figure indicates that we only have new transmission lines for the 110 level, where about18% of transmission lines of this level are younger than 25 years. 220kV voltage lines aremostly aged 25-35 years, while the largest number of 400kV transmission lines are 35-50years old.

27

Number Age (years) 400kV 220kV 110kV

1 0-25 0 0 18%2 25-35 28% 77% 22%3 35-50 72% 23% 60%

0% 0%

18%

28%

22%

72%

23%

60%

77%

400kV 220kV 110kV

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

0-25 25-35 35-50

Tab 5 Age of KOSTT network lines in 2013

Fig 7 Age of lines in percentage

Table 6 shows the number of substations, by voltage levels. This table indicates that the num-ber of substations in KOSTT is.

Table 7 shows the locations of auto-transformers and substations. SS Kosova B is the mainsubstation with the highest transformation power

Table 8 shows the transformation capacities of transformers owned by KOSTT in 2013. Thetransformation capacity remains unchanged from 2012.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

28

Voltage Total

110/10(20)kV 7110/10kV 8

110/35/10kV 3110/35kV 9220/110kV 3220/35/10kV 1

220kV 1400/110kV 2400/220kV 1

Total 35

Tab 6 Number of substations based on auto-transformers of KOSTT for 2013

Auto transformers Nr. of Auto transformers Total capacity (MVA)

400/220/110kV 5 Total 1800MVASS Kosova B 400/220kV 3 3x400=1200MVA

SS Peja 3 400/110kV 1 1x300=300MVASS Ferizaj 2 400/110kV 1 1x300=300MVA

220/110kV 9 Total 1350MVASS Kosova A 3 3x150=450MVASS Prishtina 4 3 3x150=450MVASS Prizreni 2 3 3x150=450MVA

Tab 7 Transformation capacities of auto transformers of KOSTT in 2013

Transformers Number of transformers Total capacity (MVA)

110/10.5(21)kV 26 877.4110/36.75kV 2 63

110/36.75/10.5kV 22 341110/36.75/6.6 1 63220/10.5(21)kV 1 40

220/36.75/10.5(21)kV 1 40Total 53 1824.4

Tab 8 Installed transformation capacities of KOSTT transformers in 2013

Table 9 shows the interconnection lines with neighboring countries and their transmissionpower. KOSTT owns a total of 7 interconnection lines of which 3 in the 400 kV, 2 – 220 kVand 2 of the 110 kV level.

Figure 8 shows KOSTT assets in 2013 based on the voltage level. Autotransformers andtransformers are classified based on the voltage level in the primary side.

WWW.kOsTT.cOm

29

lINE Voltage (kV)

Natural power (MVA) NTC Sn (MVA)

OHL 407 NS Kosova B SS Nish 400 500 500 1317

OHL 437/2 NS Peja 3SS Ribarevina 400 500 400 1317

OHL 420/2 NS Ferizaj 2SS Shkupi 5 400 500 400 1317

OHL 2303 NS Prizreni 2SS Fierza 220 120 210 300

OHL 205/2 NS Poduje a SS Krushevci 220 120 100 300

OHL 155/2 NS VallaçSS Novi Pazar 110 31 N/A 83

OHL 1140/2 NS BerivojcëSS Bujanovc 110 31 N/A 83

Tab 9 Interconnection capacities in 2013

OHL Fields ATR TR

200180160140120100806040200

400 400 400

7 185

013

44

9 2

48

186

0

51

Fig 8 Number of assets according to the voltage level for 2013

Changes in the number of fields shown in Figure 3 at the 220 kV level from 2012 to 2013occurred from the commissioning of AT3 in SS Prizren 2 and the inclusion of generator fieldsin SS Kosovo A.

Changes in the number of fields at the 110 kV level were done with investments carried outin the network, including SS Gjilan 5 with 5 fields, SS Prishtina 7 with 2, changes in thescheme in SS Gjakova 1 from 3 fields to 7, the addition of 2 fields in SS Lipjan and 2 fieldsin SS Prizren 2.

On the 35kV and 10kV side, only fields in the secondary side of transformers are included.Figures 10 and 11 show the implementation of the plan for the maintenance of power lines(OHL) and Substations (SS). It is clear from the figures that activities which do not require dis-connection are realized completely, whereas repairs and revisions of fields in some caseshave not been implemented due to the inability to disconnect.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

30

OHL Fields ATR TR

200180160140120100806040200

2012 2013

400 220 110 35 10 400 220 110 35 10

718

5 013

0 07 13

48

0 0

4839

170

2332

18

44

185

2332

90 0 0 5 9 0 0 00 2

51

0 02

51

0 0

Fig 9 Comparison of the number of assets of KOSTT network for 2012 and 2013

160

140

120

100

80

60

40

20

0control via

thermalvision (OHL)land control

(OHL)overhauls

(OHL)

plannedimplemented

28 28

141 141

19 14

Fig 10 Comparison between planning and implementation of line maintenance in 2013

Figure 12 shows the number of emergency interventions in KOSTT substations from 2009 to2013. A decrease in the number of interventions from year to year is visible. There was anincrease in the number of interventions only in the 110kV substation level, due to problemsin high voltage equipment.

WWW.kOsTT.cOm

31

plannedimplemented

35

30

25

20

15

10

5

0

32 32

10

29

2 2

32 32

8

28

control via thermalvision(substations)

overall control (substations)

overhaul(fields)

commissioning overall inspections

(fields)

Fig 11 Comparison between planning and implementation of maintenance for substations in 2013

2009 2010 2011 2012 2013

16

14

12

10

8

6

4

2

00

9

1514

3

10

1

43

0 0 0

4

0 0

400 220 110

Fig 12 Comparison of emergency interventions in substations in 2009-2013

Figure 13 shows a comparison of interventions in OHL from 2009 to 2013. This figure indi-cates that the number of emergency interventions has declined from year to year. 400kVpower lines have had no need for intervention during the past two years. 220kV and 110kVlines saw a decline in the need for interventions. The main problems faced by KOSTT in2013 in terms of power lines were the downtimes in towers OHL 1806 and OHL 2298.

Even transitional faults in LPs and transformers (TR) during the last three years have mainlydecreased as a result of ongoing maintenance and investment.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

32

2009 2010 2011 2012 2013

20

18

16

14

12

10

8

6

4

2

00 1

19

9 98

1 1 20 1 2

5

0 0

400 220 110

Fig 13 Comparison of interventions in lines in the period 2009-2013

2013 2012 2011

50

45

40

35

30

25

20

15

10

5

0January February March April May June July August September October November December

8

4 53

69 10

6 6

11 11

3

10

43

10 10 1012

3 4

9

4 5 4

12 13 14 13

18

22

74 4

9

3

10

Fig 14 Comparison of interruptions in OHL in 2011-2013

In 2013, 400kV OHL were available about 97.14% of the time, 220 kV lines were availableat about 94.89% of the time, as a result of the collapse of towers LP2298.110kV voltage OHL had an availability of 91.97%, as a result of projects that were devel-oped during 2013 and the collapse of the three towers of LP1806.

WWW.kOsTT.cOm

33

2013 2012 2011

25

20

15

10

5

0January February March April May June July August September October November December

7

11

5

11

4

9

5

2

8

4

78

17

4

13

6

3

14

9

4

7

1

6 67 7

16

89

22

9

4 4

14

19

16

Fig 15 Comparison of interruptions of ATR and TR in 2011-2013

100%

98%

96%

94%

92%

90%

88%

86%

97.14%

94.89%

91.97%

400kV 220kV 110kV

Fig 16 Availability of OHL for 2013

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

34

Figure 17 shows the availability of transformers at all voltage levels. Autotransformers400/220 kV were available 88.31%. AT3 in SS Kosovo B was out of operation for most ofthe year due to the need for more detailed maintenance, reducing the total availability ofthese autotransformers. Transformers of 110/35/10kV level had an availability of 80.77%as a result of projects that have been developed as well as the activation of two transformersat SS Palaj as a result of the energy balance.

ENViRONmENTAL POLiciEs ANd kOsTT ENViRONmENT imPAcT One of the KOSTT objectives is the responsibility to ensure environmental protection fromoperational activities of KOSTT. To support a sustainable development, in 2013 KOSST hastaken necessary actions towards the advancement of this objective. The current goal is cer-tification with international standards ISO 14001:2004 for the Environmental ManagementSystem (EMS). For this purpose, relevant documentation is under development.

The following supporting documents were drafted in 2013:

• Project for the Recycling of KOSTT waste (initially paper, plastic, glass). Coop-eration with municipal level.

• Project for the management and identification of PCBs and PCTs in oils of trans-formers in KOSTT power facilities.

• Assessment of oils in SS 110 kV transformers, including sampling, testing ofsamples, environmental aspects and test reporting.

• Establishment and application of the procedure for the removal of eternit fromthe roof of the central building of KOSTT (which includes asbestos).

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

88.31%

100% 100% 100%

80.77%

88.10%

96.13%

400/

220

kV

400/

110

kV

220/

110

kV

220/

35/1

0 kV

110/

35/1

0 kV

110/

35 kV

110/

10 kV

Fig 17 Availability of ATR and TR in 2013

WWW.kOsTT.cOm

35

TRANsmissiON iNFRAsTRUcTURE dEVELOPmENT dURiNG2013, ANd RELEVANT iNVEsTmENTs The development of the electricity sector in Kosovo is based on the national strategy on en-ergy and the strategic objectives of the European Union, part of which Kosovo strives to be-come. Transmission system development, as one of the main pillars of Kosovo's electricitysystem, is supported by the 10-year development and investment plan, which sets a list ofprojects and dynamics of their implementation, by priority.

Appropriate transmission system planning and development, in compliance with technicalrequirements deriving from ENTSO-E, is crucial for the development of Kosovo's electricitysystem. The main objectives of transmission system planning and development are as follows:

• National security of long-term electricity supply through the transmission system; • Promotion of energy market integration at national and regional level, as well as

enhancement of competition and transparency. • Promotion of the development of new conventional and renewable energy genera-

tion capacities; • The country's economic development.

Adequate transmission system development and planning is related with the determinationof optimal configuration of the grid and ancillary systems, always in correlation with in-creased consumption and generation planning for the planning period, so as to fulfill con-sumer supply demand in a safe and economically feasible manner. The transmission systemis considered a rather complex and dynamic system, with ever increasing and variable elec-tricity demand, and ever changing generation, and interconnection flows at national and re-gional level. In order to accommodate such changes, the transmission grid requiresappropriate reinforcements in, which in the long-term provide for an enhanced performanceand operational reliability of the transmission system.

As a continuation of core activities in the enhancement of transmission system capacities, re-liability and safety, conducted by KOSTT during the period 2009-2012, 2013 also showeda high dynamic in the implementation of projects initiated in 2011-2012, and other projectsas envisaged in the Transmission Development Plan (2012-2022), approved by ERO.

Transmission System infrastructure planning and development is focused on four differentproject development categories:

• Enhancement of transmission grid capacities; • Revitalization of high voltage substations and equipment; • Grid operation support systems (SCADA/EMS, metering groups, ancillary services,

modernization of relay protection, etc.)• Load and generation support (transmission grid connection applications).

Investments implemented in 2013 reach an amount of 8 million euro, mostly funded throughKOSTT's own budget.

dEVELOPmENT OF TRANsmissiON sysTEmcAPAciTiEs dURiNG 2013 Infrastructure development project implementation in 2013 was characterized with a highdynamic of activities, without posing any threats to the reliability of the transmission system,owing to the implementation of key projects finalized between 2009 and 2012, such asPackage Project 3, Package Project Ferizaj 2, the third 150 MVA automatic transformer inSS Kosova A, SS Prishtina 4 and SS Prizreni 2, etc.

By the end of 2013, transmission grid capacities for internal consumption were increasedby 1.35% in comparison to the beginning of 2012, whereas criteria related to N-1 remainedunchanged. However, in 2013, a radial supply problem for SS Lipjan, now supplied throughthree 110kV lines, is now eliminated. During peak load system operation, unplanned outageof the sole automatic transformer of SS Peja 3 400/110 kV is considered critical as it causesoverload of a number of 110kV lines and critical voltage decreases in a number of 110kVnods in the system. This problem will be overcome after the installation of a second 300MVA transformer in SS Peja 3, which is expected to become operational in 2016.

Establishment of strong 400kV nods in SS Peja 3 and SS Ferizaj 2, and construction of 110kVlines and their reinforcement, provided for system operation within the frequencies allowedby the Grid Code during 2013 (in normal transmission system operation conditions in peakload).

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

36

maximal yearly loadinternal grid capacity N

capacity N-1MW

1023

930

645

1156 12

70

850

1175

1450

1050 11

68

1480

1080 1101

1500

1080

1600

1400

1200

1000

800

600

400

200

02009 2010 2011 2012 2013

Fig 18 Development of internal transmission system capacities 2009-2013

WWW.kOsTT.cOm

37

iNVEsTmENTs imPLEmENTEd dURiNG 2013 2013 is characterized as a year in which capital investments were implemented fromKOSTT's own budget, whereas donor-funded investments from the investment plan are stillnot under way.

In 2013, KOSTT invested in a number of projects continued from 2011/2012:

1. Package Project SCADA/EMS and Telecom: LOT-1:SCADA/EMS;2. Package Project SCADA/EMS and Telecom: LOT-2: Telecom;3. Replacement of the conductor, isolators and connection equipment in OHL 125/2

and 125/3;4. Connections in SS Lipjan, in OHL LP 212 ( Kosova A - Ferizaj 2);5. Reallocation of the 110kV line, no. 1806 SS Gjakova 1 - Gjakova 2, and Reha-

bilitation of HV Equipment in SS Gjakova 1; 6. Rehabilitation of high voltage 110kV equipment in SS Gjilani 1 and SS Ferizaji 1; 7. Installation of two new fields in lines 110kV in SS Prizreni 2;

Implementation of projects is always accompanied by various hazards mostly related to theinability to access relevant equipment, as it was the case with the line OHL 125/3 - line toVallaç. Due to the political situation in the north of Kosovo, this project could not be imple-mented. Delays in project implementation, especially those related to the construction of lines,are also caused by land expropriation procedures.

1600

1500

1400

1300

1200

1100

1000

900

800

700

6002011Q1 2011Q2 2011Q3 2011Q4 2012Q1 2012Q2 2012Q3 2012Q4 2013Q1 2013Q2 2013Q3 2013Q4

MW

peak load (MW)

capacity/N (MW)

capacity/N-1 (MW)

1112

875

740

1175

1105

886

749

1168

1133

909

768

1101

850 870

930

1050

1270 12701300

14501500 1500

1050 1050 10501080 1080 1080 1080 1080

1450 1450 14501480 1480 1500

Fig 19 Development of capacities through the years

The commencement of new projects in 2013 is characterized by projects which mainly com-prise rehabilitations, substation safety and enhancement of transformation capacities. Beloware projects the implementation of which commenced in 2013 and will continue in 2014:

1. Rehabilitation of HV facilities in SS Gjakova 2 and Prizreni 3; 2. Rehabilitation of towers of OHL 2298 220kV, No. 24 and 25, and OHL 1806

110kV, No. 31 and 32; 3. Construction of the new fence in SS 400/220 kV Kosova B, and installation of

lighting throughout its perimeter4. Installation of observation cameras (CCTV) in SS Kosova B and Storage; 5. Supply and installation of numerical relay protection in automatic transformer fields

of SS Kosova B; 6. Supply with transformers

Implementation contracts are also signed for significant projects, for which co-funding agreements wereexecuted between KOSTT and KfW in end-2013:

1. Advisory services and construction of the line 400 kV RKS - AL - LOT 1;2. Advisory services and construction of the line 400 kV HV field and LFC - LOT 2;

In 2013, the value of KOSTT assets increased for an additional three new substations 110/10/20 KV,which upon elapse of the warranted term, were transferred from KEK (KEDS) to KOSTT: SS Gjilani 5, SSPalaj, SS Prishtina 7, for which the official documentation handover was already executed.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

38

40

chAPTER iiikosovo Electricity marketOperation

According to the Law on Electricity and Market Operator License (MO), KOSTT is mandatedto develop Market Rules (MR). Upon approval of the Kosovo Electricity Market Design inMarch 2013, the Market Operator modified Market Rules, in order to provide transparentand non-discriminatory conditions for electricity trading between stakeholders, and in De-cember 2013 the said rules were approved by ERO. They stipulate the manner of wholesaleelectricity trading between parties. According to Market Rules, electricity market shall be abilateral market, based on long-term bilateral contracts between generators, suppliers andcross-boundary traders, and day-ahead electricity market nomination contracts. Parties willbe responsible for any electricity imbalances caused. Rules also cover trading of cross-bound-ary transmission capacities and allocation of physical transmission rights of parties.

Electricity generation, consumption and cross-boundary flows in 2013, as metered in theboundaries of Kosovo's trading zone are presented in Figure 20..

WWW.kOsTT.cOm

41

6 1

h

MWh

in tran

9

hi

46

umbardh

4

,

MWh

L

722,70

5 51,4555

MontenegroTSO - EPCG

88 MWh

9 M

338 993

1,1 9881

449 1,334

441

losses in trans.:

hWMMW5 51455supplyKEK

Ujmani

3

aibreSEMS

2,014,046MWh

1 MWh441 3,84483

3,863,439MWh

h

MWhMWh783,99

osovaK

3

1,374,583 MWh

” AA” 2,014,046MWhos “ “AK” os “BK

8

h1

,

8

AlbaniaOST

43 MWh

9 MWh

h 9339

8,3

443 11,2442224

110,337MWh

27 M112

,

36

,

Wh

11

MWh

56MWh

115,0770777,1

utputO

nputI

ainodecaMMEPSO

Fig 20 Cross-boundary flows, generation and consumption in 2013.

From the energy flowing in the Kosovo transmission system, 71.44% comprised domesticgeneration, 22.6% transit, 5.96% imports for Kosovo consumption needs, 65.59% was ded-icated to Kosovo consumption, 10.50% Kosovo generated exports, and around 1.30%KOSTT transmission grid losses.

In comparison to 2012, when the number registered market parties decreased, in 2013there was a light increase trend:

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

42

direct consumerKEK consumptionlossesNEFtransitKEDS distribution

5.79%

54.69%

5.11%1.31%

10.5%

22.6%

thermo power plantstransitNIFhydro power plant

69.89%22.6%

5.96%

1.55%

Fig 21 Energy traded within Kosovo's trading area during 2013

2009 2010 2011 2012 2013

21 2122

19

24

Fig 22 Number of registered market parties in 5 years.

The chart below presents imports and exports in the period 2009-2013.

The chart reveals that exports have increased during the period 2009-2013. Whereas, suchincrease between 2011 and 2010 was merely 5.3%, the increase between 2013 and 2012exceeded 81.2%. Imports in the period 2009-2011 increased, whereas between 2011 and 2013 imports de-creased.

imPLEmENTATiON OF A mARkET OPERATiON (iT) iNFORmA-TiON TEchNOLOGy PLATFORm In May 2013, the Market Operator tested and commissioned a market operation IT platform(dry-run). Similarly in May 2013, the training for internal market parties was organized, inorder to explain the new manner of physical and day-ahead contract nomination programs.The new daily nomination program is in full conformity with ENTSO-E recommendations,which use XML data exchange formats.

sysTEm imBALANcEs The chart below presents system imbalances, by hour, for 2013. Values express annual cu-mulative amounts of system imbalances:

WWW.kOsTT.cOm

43

import (MWh)export (MWh)

900,000

800,000

700,000

600,000

500,000

400,000

300,000

200,000

100,000

0

2009 2010 2011 2012 2013

767,

542

818,

387

816,

199

625,

058

521,

712

274,

015

352,

471

371,

164

472,

794

856,

869

Fig 23 2009-2013 imports and exports

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

44

kOsTT cOOPERATiON ANd iNTEGRATiON iN REGiONAL AssO-ciATiONs ANd mEchANisms One of KOSTT's most important objectives of the recent years was regional integration. De-spite continuous engagements in this regard, KOSTT continues to face numerous obstaclesin relation to integration in regional mechanisms. Upon execution of the Agreement on Energybetween Kosovo and Serbia in September 2013, KOSTT and EMS have commenced nego-tiations on an operational agreement, as two regulatory zones, which will open the path toKOSTT's integration in all regional mechanisms. It is expected for said agreement to besigned during 2014.

In 2013, KOSTT continues to remain:

1. An observer in RG SEE1

a. An observer in SG CMMI22. A founding member of the Project Company for establishment of CAO3

CAO Project Team Company has successfully concluded its work and established all prereq-uisites for the establishment of the Interconnection Transmission Capacity Allocation Office(SEE CAO), which will start its work January 2014. Regarding the KOSTT-EMS dispute,KOSTT's complaint against Serbia, as a signatory party of the treaty, was submitted in theEnergy Community Secretariat (registered as Case 3/8), in relation to the Serbia's failure(breach) to fulfill obligations deriving from the Energy Community Treaty, respectively articles3 and 6 of Regulation No. 1228/2003 pertaining to compensation of electricity transitsand allocations of transmission interconnection capacities, despite the ECS conclusion issuedon the case, remains as of yet unresolved.

30,000

20,000

10,000

0

-10,000

-20,000

-30,000

system surplussystem deficit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Fig 24 Presentation in MWh of system imbalances in 2013

1. RG SEE - is a regional group functioning under the auspices of ENTSO-E Market Committee, which deals with SEE market-relatedmatters.

2.SG CMMI - Subgroup for congestion management and market integration3.CAO - Coordinated Allocation Office of SEE interconnection capacities, with its headquarters in Podgorica, which shall be estab-

lished by Region 8 TSOs and is expected to be operational in 2013.

chAPTER iVmanagement ofhuman Resources

46

WWW.kOsTT.cOm

47

Human resources play a substantial role in KOSTT's efforts to meet its objectives and increaseits performance. KOSTT concluded 2013 with 368 employees, i.e. 1.6% less than the pre-ceding year.

From the overall number of staff members, 31.5% have superior professional qualifications(university degree); 26.08% are engineers, serving KOSTT's functions as electricity System,Transmission and Market Operator. The nature of KOSTT's activities also affected the com-pany's gender structure, being that 86.69% of the staff is male and only 13.04 female. Av-erage age of KOSTT staff is 48.49 years old. There were no work-related injuries.

B

Chief Executive

Audit

Board of Directors

Committee

Environment Office

Communications Office

Safety and

PR and

r

r

erm

SeCo S

ong T Term Planning OfficeLDevel

Executive OfficeDeputy Chief

Officer

m Planning Office

ecretaryompany p y

ndopment a

OfficeInternal Audit

Environment Office erm Planning Officeong T Term Planning OfficeL

Ope

ratio

nnra

nsm

issi

oT O

pera

tion

Syst

em

Ope

ratio

nM

arke

t

Regu

lato

ryA

ffairs

egal

and

L Reso

urce

s H

uman

Man

agem

ent

roje

ctan

d P

Engi

neer

ing

reas

ure

and

Tinan

ceFrocu

rem

ent

P

Fig 25 KOSTT Organizational Structure

Staff engagement and energy largely depend on the health they enjoy; therefore KOSTT un-dertook a number of measures that benefit the health of its staff.

In 2013, KOSTT continued the implementation of the health – insurance project for all itsstaff members, continuing to cover it by the company's own budget. In addition, KOSTT con-tinues to conduct systematic periodic health check – ups, as preventive measures, includingan overall examination of the general health state of its staff members and their operability.

KOSTT also contributes to the health of its staff by providing them access to sport gyms,where staff members are able to engage in various sport activities.

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

48

1. Number of KOSTT staff members

2. Staff structure by gender

Male

Female

4. SPQ structure

Engineer

Economist

Lawyer

Philology Faculty/Albanian Language

5. Average age

6. Work-related injuries

2012 2013 % (decrease)

374 368 1.60%

2012 2013

326 87.17% 320 86.96%

48 12.83% 48 13.04%

2012 2013

M 83 22.19% M 82 22.28%

F 33 8.82% F 34 9.23%

M 7 1.87% M 7 1.90%

F F

M 20 5.34% M 18 4.89%

F F

M 215 57.48% M 205 55.70%

F 11 2.94% F 9 2.44%

M 1 0.26% M 1 0.27%

F 4 1.07% F 5 1.36%

2012 2013

94 25.13% 96 26.08%

18 4.81% 21 5.70%

6 1.60% 6 1.63%

1 0.26%

47.78 years old 48.49 years old

Tab 10 Structure of KOSTT staff

WWW.kOsTT.cOm

49

sTAFF dEVELOPmENT ANd TRAiNiNG During 2013, KOSTT has undertaken certain activities related to staff development and ca-pacity building, which will support the implementation of its corporate mission, vision andstrategy. The value of expenditure for courses, trainings, participation in Southeast Europeworking groups, publications and professional literature for 2013 is 127,469.70 €

Similar to last year, KOSTT also provided for the training of its staff on occupational safety,training on industrial safety, testing equipment use, relay protection use, regulatory matters,etc.

In order to acquaint its staff with new knowledge, KOSTT provided them with study tours,such as the “Wind Integration Project Study Tour 2013”. During this visit, new knowledgerelated to transmission system operation and application of operation and managementmethodologies in Balancing Groups was attained. Experiences obtained also related to theintegration of renewable energy sources in transmission and distribution systems.

KOSTT enabled its staff's participation in working groups, such as SECI and CMMI.

Similar to previous years, KOSTT continued with ongoing education and training of opera-tors, as a requirement deriving from ENTSO-E rules, and other obligations deriving from Pol-icy No. 5 and Policy No. 8. Upon conclusion of such training, the company managed toimprove its adherence with requirements deriving from ENTSO-E rules, having developedwell-prepared, professional and certified staff members.

imPLEmENTATiON OF ThE QUALiTy mANAGEmENT sysTEmANd PLANs FOR AN iNTEGRATEd sysTEm Practical implementation of the ISO 9001:2008 Quality Management System represents acomplex task which required the engagement of the company management and a widerteam led by the Quality Manager, with the aim of constantly improving and developing theQuality Management System.

In the first year of development of the Quality Management System (QMS), KOSTT was sub-jected to recertification. The system is harmonized with all requirements of the ISO9001:2008 standard, subsequently the company was recertified with the ISO 9001:2008standard, thus expanding the quality management system in all KOSTT facilities and units.The internal audit unit also showed full compliance with requirements of the ISO 9001:2008standard.

In total, 127 staff members par-ticipated in trainings for specificfields and working groups , whobenefited 438 training or work-ing group participation days.

50

chAPTER VAudited Financial statementsand Audit Report

WWW.kOsTT.cOm

51

Indicators I-XII 2012 I-XII 2013 Indicator set in the business plan

0.13 0.15 above zero

T2. Liquidity indicator 3.71 4.21 above zero

T3. Demand turnover indicator 153 days 31 days T

T4. Return on Capital Employed (ROCE)

2.02% Target: > 0

Tab 11 Targets set in the Business Plan

Overall company income in 2013 amounted to24.01 million, exceeding 2012 income by14.83%. income from charges in 2013 amounted to17.68 million, exceeding respective 2012 in-come by 13.10%. Pre-tax profit in 2013 was 4.27 million. Net profit, after taxes, for the period was 3.56million.

The income was used to:• cover company's operational expenses • Finance investment costs• Pay dividends.

KOSTT J.S.C. business continues to show a constant improvement trend, from both technicaland financial aspect. Financial trends are depicted through key financial indicators, whichare stipulated in the Business Plan, and are presented in the following table along with com-parisons from the previous year:

Investment costs are focused on infrastructural improvements and investment maintenance,aiming to enhance company's technical and financial performance.

Net value of the assets increased from 114.7 million in 2012 to 126.9 million in 2013.

Overall assets increased from 146.9 million in 2012 to 156.9 million in 2013.

The report submitted by the audit company assesses that "Financial Statements present in afair manner all material aspects, financial position and performance of the Company, in com-pliance with International Financial Reporting Standards".

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

52 Fig 26 Independent Auditor Report

WWW.kOsTT.cOm

53Tab 12. Statmenet of Financial Position, as of 31.12.2013

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

54 Tab 13 Statement of Comprehensive income, as of 31.12.2013

WWW.kOsTT.cOm

55Tab 14 Statement of Changes in Equity

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

56

WWW.kOsTT.cOm

57

Tab 15 Statement of Cash Flows

WWW.kOsTT.cOm

59

significant Eventsduring 2013 jANUARy• The Energy Regulatory Office (ERO) in its

Board meeting held on 23 January 2013,upon an application submitted by KOSTT,rendered a decision approving the Trans-mission Development Plan 2013-2022.(V_501_2013)

FEBRUARy• In the beginning of the month of February,

KOSTT was visited by delegations of theWorld Bank and the European Bank for Re-construction and Development, thereby dis-cussing the opportunities for cooperation indeveloping the transmission infrastructureand support to the KOSTT development.

mARch • In a meeting of the ERO Board held on 01

March 2013, upon an application of theKOSTT, the Board approved the KosovoElectricity Market Design. (V_505_2013)

• On 30 March 2013, the reconstructedhigh voltage line 110 kV no. 125/2 wascommissioned into operation, connectingsub-stations SS 110/35 kV Vushtrri 1 andSS 110/35/6.5 kV Trepça.

• On 23 March 2013, a Working Table wasorganized for the presentation of theKosovo Electricity Security of Supply(KESS). An objective of the Study was theanalysis of several scenarios of forecastingthe electricity demand development in thecountry, the electricity generation ade-

quacy, the operation of the electricity mar-ket and the utilization of renewablesources, all elements influencing the secu-rity of electricity supply until 2030. Thesaid study also contains a component ofjoint operations with the Republic of Alba-nia, as a possibility of securing electricitysupply, which showed tendencies of impacton the decline of electricity prices.

APRiL• On 23 April 2013, the CEO of KOSTT and

his team received in a meeting at Sub-Sta-tion Kosovo B the Principal Deputy Presi-dent of the KfW for the South-EasternEurope and Turkey, Mr. Tiskens. During themeeting, there was a discussion on theprogress of projects funded by the GermanGovernment.

mAy

• In May, a change was made in the man-agement structure of the KOSTT, upon ap-pointment of Mr. Fadil Ismajli as Minister ofEconomic Development of the Governmentof Kosovo. As of May, KOSTT is managedby Mr. Naim Bejtullahu, Electrical Engi-

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

60

neer. Mr. Bejtullahu has over 35 years ofexperience in transmission and distributionsystems, and in the energy sector regula-tion as a commissioner. Before appoint-ment as CEO of KOSTT, Mr. Bejtullahuexercised the function of Deputy CEO forDevelopment.

jUNE • On 6 June 2013, a senior delegation from

the German Development, led by Mr. Ste-fan Mironjuk, Director for Kosovo in theMinistry for Economic Collaboration, theGerman Embassy in Kosovo and the KfW,visited the Sub-Station Kosovo B, the mainSub-Station of the Kosovo Transmission Sys-tem. The meeting presented in a summa-rized manner all the benefits deriving fromprojects funded by the German Govern-ment.

jULy

• In July, the project for the rehabilitation ofthe façade of the KOSTT commercial prem-ises begun.

AUGUsT • As part of permanent commitment of the

KOSTT JSC in developing the electricitytransmission system of the Republic ofKosovo, along other projects, the KOSTTimplemented the project for Rehabilitationof High Voltage Facilities at Sub-Stations SS110/35/10 kV Ferizaj 1 and SS 110/35kV Gjilani 1.

sEPTEmBER• On 8 September 2013, an Energy Agree-

ment was signed by the Prime Minister ofKosovo, Mr. Hashim Thaçi and Prime Min-ister of Serbia, Mr. Ivica Dacic, under thefacilitation of the European Union, respec-tively the Baroness Catherine Ashton. TheEnergy Agreement consists of two key com-ponents, establishing the foundations of en-ergy matters between the two countries in:Matters related to the Transmission Sys-tems, and matters related to the normaliza-tion of electricity supply to the northernarea of Kosovo.

• On 23 September 2013, in the premisesof the Ministry of Finance in Prishtina, aLoan Agreement was signed with the KfW,to finance several projects in the electricitytransmission infrastructure development.This is the second commercial loan that theGerman Government, through the GermanBank for Development (KfW), has allocatedto the Republic of Kosovo, for the fundingof six projects of KOSTT. The Agreementprovides on the allocation of a long-termcommercial loan from the KfW, in soft loanconditions at the value of € 23,5 Million,of which € 15,5 Million at a return periodof 15 years, and €8 Million at a return pe-riod of 40 years, and additional finance inthe form of a grant from the European Com-mission, at the value of € 7.3 Million,through the IPA Program.

WWW.kOsTT.cOm

61

OcTOBER• KOSTT was represented in the 6th Balkan

Energy Finance Forum-Powering FutureGrowth in SEE. At the Forum, the Chief Ex-ecutive Officer of KOSTT, Mr. Naim Bejtul-lahu held a presentation before theattendees titled “Security of Electricity Sup-ply in Kosovo and the Joint Market Kosovo-Albania”. The presentation of Mr.Bejtullahu attracted the interest of the pres-ent. Also, the KOSTT was represented inthe expert panel for the “Electricity Marketin Balkan”, thereby presenting for the atten-dees numerous matters related to the oper-ations of the energy market in Kosovo.

NOVEmBER• On 24 November, a delegation of the Al-

banian Transmission System Operator(OST), led by Deputy Economic Administra-tor Mr. Dritan Cepa visited KOSTT. The pur-pose of the visit was to further strengthenthe climate of cooperation between the twocompanies.

dEcEmBER• On 21 December 2013, in the premises of

the Albanian League of Prizren, a contracton development of the 400 kV interconnec-tion Line Kosovo-Albania was signed. TheCEO of KOSTT, Mr. Naim Bejtullahusigned the contract with the representativesof the Croatian company Dalekovod, theworks contractor for the construction of theKosovo part of the line, and Mr. EngjëllZeqo, General Administrator of OST Alba-nia, signed the contract with the represen-tatives of the company Energoinvest fromBosna and Herzegovina, to build the linein the part of the Republic of Albania.

• On 27 December 2013, the Energy Reg-ulatory Office, upon an application by theKOSTT, rendered a decision approving the“Market Rules” (V_601_2013)

List of TablesTab 1 Decisions of the Board of Directors in 2013 17Tab 2 Data according to the realized balance 21Tab 3 Performance indicators 23Tab 4 Length of transmission lines and their transmission capacity 26Tab 5 Age of KOSTT network lines in 2013 27Tab 6 Number of substations based on auto-transformers of KOSTT for 2013 28Tab 7 Transformation capacities of auto transformers of KOSTT in 2013 28Tab 8 Installed transformation capacities of KOSTT transformers in 2013 28Tab 9 Interconnection capacities in 2013 29Tab 10 Structure of KOSTT staff 48Tab 11 Targets set in the Business Plan 51Tab 12 Statmenet of Financial Position, as of 31.12.2013 53Tab 13 Statement of Comprehensive income, as of 31.12.2013 54Tab 14 Statement of Changes in Equity 55Tab 15 Statement of Cash Flows 57

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

62

List of Figures Fig 1. Map of the Kosovo Transmission System, 31.12.2013 14Fig 2. Undeveloped energy and availability of the transmission network 23Fig 3. Losses in Transmission 2006-2013 24Fig 4 Consumption and peak 2000-2013 25Fig 5 Gross consumption of Kosovo for 2011-2013 25Fig 6 Load duration curve 2013 26Fig 7 Age of lines in percentage 27Fig 8 Number of assets according to the voltage level for 2013 29Fig 9 Comparison of the number of assets of KOSTT network for 2012 and 2013 30Fig 10 Comparison between planning and implementation of line maintenance in 2013 30Fig 11 Comparison between planning and implementation of maintenance for substations in 2013 31Fig 12 Comparison of emergency interventions in substations in 2009-2013 31Fig 13 Comparison of interventions in lines in the period 2009-2013 32Fig 14 Comparison of interruptions in OHL in 2011-2013 32Fig 15 Comparison of interruptions of ATR and TR in 2011-2013 33Fig 16 Availability of OHL for 2013 33Fig 17 Availability of OHL for 2013 34Fig 18 Development of internal transmission system capacities 2009-2013 36Fig 19 Development of capacities through the years 37Fig 20 Cross-boundary flows, generation and consumption in 2013 41Fig 21 Energy traded within Kosovo's trading area during 2013 42Fig 22 Number of registered market parties in 5 years. 42Fig 23 2009-2013 imports and exports 43Fig 24 Presentation in MWh of system imbalances in 2013 44Fig 25 KOSTT Organizational Structure 47Fig 26 Independent Auditor Report 52

WWW.kOsTT.cOm

63

ANNU

AL RE

PORT

2013

/TR

ANsm

issiO

N, sy

sTEm

ANd

mARk

ET O

PERA

TOR j

.s.c

64

cOmPiLATiON OF ThE 2013 ANNUAL REPORT WAs cOORdiNATEd By:PR and Communications Office, KOSTT

With contributions from KOSTT staff members:Besim Gërxhaliu, Bukurije Dauti, Edita Bytyqi, Elvane Devexhi-Osmani,Gazmend Kabashi, Gonxhe Haziri, Ilir Shala, Jusuf Imeri, Kadri Kadriu,Kimete Fazliu, Milazim Zeka, Naim Bejtullahu, Nasip Bresilla, Nebih Haziri,Nergize Rezniqi, Resmije Ahma, Sabri Musiqi, Sadudin Havolli, SafeteOrana, Sherif Dedaqi, Skender Gjonbalaj, Visar Hoxha, Vjosa Rezniqi, ZanaBajrami-Rama.

Pictures by: KOSTT J.S.C

Design, illustration and layoutASHA www.ashagraphics.com

Transmission, System and Market Operator - KOSTT J.S.C.Iljaz Kodra St. n.n10000 PrishtinaRepublic of Kosovo Tel: +381 (0) 38 501 601 5Fax: +381 (0) 38 500 201E-mail: [email protected]: www.kostt.com

This publication is not for sale

Translation of the Annual Report 2013 into English is intended solely as a convenience tothe non-Albanian-reading public. Translation accuracy is not guaranteed nor implied. If anyquestions arise related to the accuracy of the information contained in the translation, pleaserefer to the Albanian version of the document which is the official version of the document.Any discrepancies or differences created in the translation are not binding and have no legaleffect for compliance or enforcement purposes.


Recommended