+ All Categories
Home > Documents > 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed...

6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed...

Date post: 16-Oct-2019
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
152
ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS 7 Court Street, Room 210 Belmont, NY 14813-1078 Telephone: 585-268-9230 Fax: 585-268-9648 NOTICE TO BIDDERS The Allegany County Department of Public Works will receive sealed bids until 10:00 a.m. February 23, 2017. At that time, bids will be opened in Room 221, County Office Building, Belmont, New York on the following items: 1. Culvert Pipe & Bands 2. Galvanized Corrugated Steel Beam Guide Rail, Posts, Block-Outs, and Back-Up Plates 3. Steel 4. Washed Crushed Gravel- Crushed Limestone 5. Highway Signs, Blanks and Posts 6. Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete, Flowable Fill, and Concrete Blocks 11. Sand and Salt Mix 12. Rust Preventative Paint 13. Equipment Rental 14. Fiber Reinforced Bituminous Membrane Surface Treatment 15. Cold In-Place Recycled Asphalt Pavement 16. Vegetation Control Specifications for the above listed items may be obtained on the Internet: Allegany County Website at www.alleganyco.com; click on Government then Public Works Department. They are also available at the Office of the Superintendent of Public Works, Room 210, County Office Building, Belmont, New York. It shall be the responsibility of each bidder to contact this office to determine if an addendum has been issued. The Allegany County Department of Public Works reserves the right to reject any or all bids and to accept the bid it determines to be in the best interest of Allegany County. Upon mutual agreement of the parties, Allegany County reserves the right to renew our contract (s) awarded as a result of this bid for an additional one (1) year period by resolution of the Public Works Committee of the Allegany County Board of Legislators in accordance with the specifications and NYS GML 103 and 104b. Guy R James, Superintendent Allegany County Department of Public Works Page 1 of 152
Transcript
Page 1: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY DEPARTMENT OF

PUBLIC WORKS 7 Court Street, Room 210 Belmont, NY 14813-1078

Telephone: 585-268-9230 Fax: 585-268-9648

NOTICE TO BIDDERS

The Allegany County Department of Public Works will receive sealed bids until 10:00 a.m. February 23, 2017. At that time, bids will be opened in Room 221, County Office Building, Belmont, New York on the following items:

1. Culvert Pipe & Bands 2. Galvanized Corrugated Steel Beam Guide Rail, Posts, Block-Outs, and Back-Up Plates 3. Steel 4. Washed Crushed Gravel- Crushed Limestone 5. Highway Signs, Blanks and Posts 6. Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete, Flowable Fill, and Concrete Blocks 11. Sand and Salt Mix 12. Rust Preventative Paint 13. Equipment Rental 14. Fiber Reinforced Bituminous Membrane Surface Treatment 15. Cold In-Place Recycled Asphalt Pavement 16. Vegetation Control

Specifications for the above listed items may be obtained on the Internet: Allegany County Website at www.alleganyco.com; click on Government then Public Works Department. They are also available at the Office of the Superintendent of Public Works, Room 210, County Office Building, Belmont, New York. It shall be the responsibility of each bidder to contact this office to determine if an addendum has been issued. The Allegany County Department of Public Works reserves the right to reject any or all bids and to accept the bid it determines to be in the best interest of Allegany County. Upon mutual agreement of the parties, Allegany County reserves the right to renew our contract (s) awarded as a result of this bid for an additional one (1) year period by resolution of the Public Works Committee of the Allegany County Board of Legislators in accordance with the specifications and NYS GML 103 and 104b. Guy R James, Superintendent Allegany County Department of Public Works

Page 1 of 152

Page 2: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ITEM #6 BITUMINOUS MATERIALS

TABLE OF CONTENTS

SECTION A

General Terms and Conditions

GENERAL SPECIFICATIONS Specifications for liquid bituminous materials Specifications for bituminous plant mixtures: (hot mixes) Specifications for cold mixes Price adjustments

SECTION B

DETAILED SPECIFICATIONS Liquid bituminous materials - delivered and applied Bituminous concrete in-place specifications Bituminous seal coat in place Specifications for in-place crack sealing Bituminous concrete scratch or leveling course and Bituminous Seal coat-In place Paver placed surface treatment Dense Graded Cold Mix Recycled Asphalt Pavement (Cold) using High Float Emulsions

SECTION C

Allegany County 2017 Paving Program Methods of Award

SECTION D

Bid Sheets

Page 2 of 152

Page 3: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

GENERAL TERMS AND CONDITIONS:

1. Objective: This document is published in order to obtain competitive prices for Bituminous Materials.

2. Acquisition of Bid Documents: a. Bid documents are available for download at www.alleganyco.com; click

on Government then Public Works Department. They are also available at the Office of the Superintendent of Public Works, 7 Court Street, Room 210, Belmont, New York 14813. The office is open Monday – Friday, 8:00 a.m. to 4:00 p.m. Telephone number is (585) 268-9230.

b. Each contractor bears sole responsibility for acquisition of bid documents.

Requests for bid documents to be forwarded are neither a guarantee nor an incurred obligation on the part of Allegany County to ensure contractors requested receipt of bid documents, timely or otherwise.

c. Receipt of these documents, unsolicited or otherwise, shall not be

construed a predetermination of a contractor’s qualifications to receive a contract reward. Nor shall receipt of these documents be interpreted an endorsement that the contractor’s equipment, materials, products, and/or services are in compliance with the bid specifications.

3. Examination, Interpretation, Correction of Bid Documents:

Each contractor shall examine all bid documents and judge all matters relating to the adequacy of such documents. Any inquiries, suggestions or requests concerning interpretation, clarification or additional information pertaining to this bid solicitation shall be writing and submitted to the Public Works Department. The County shall not be responsible for oral interpretations given by any county employee, representative or others. The issuance of written addendum/addenda is the only official method whereby clarification or additional information can be given.

4. Preparation of Bid Documents: Bids must be submitted on the forms provided in these bid documents and prepared in the following manner:

a. All forms shall be clearly legibly completed using a permanent medium (i.e. ink, typewriter, laser printer, etc.) Illegible entries may be rejected.

i. If submittal of unit price(s) is a requirement, said unit price(s) shall prevail.

ii. All mathematical functions (extensions, additions, etc.) are subject to audit.

iii. Each price shall be expressed as a numerical dollar value; indicators such as ditto marks, arrows, etc. are not acceptable.

Page 3 of 152

Page 4: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

b. All forms requiring a contractor’s signature shall be signed by a contractor or the contractors authorized representative. Erasures and/or alterations shall be initialed by the representative whose signature appears on the forms.

c. The contractor shall submit the bid in accordance with the bid documents

and shall not make any changes in the wording or the bid forms or make any stipulations or qualify the bid in any manner.

d. Prices shall be F.O.B. any point in Allegany County, New York. Price

quoted shall include all delivery charges.

e. Prices shall be net; including transportation on delivery charges must be prepaid by the successful bidder and added to the invoice as a separate item. In any case title shall not pass until items delivered to the County and accepted by the requesting department.

f. All bids shall be firm for the period of forty-five (45) days from the bid

opening date; during which time the County shall render its decision.

5. Bid Surety: All bidders must submit a Bid Bond or Certified Check in the amount of Five Thousand Dollars ($5,000.00) payable to Allegany County Department of Public Works with their bid. Bid Bond or Certified Check will be refunded to unsuccessful bidders. The successful bidder(s) will be issued a Notice of Intent to award and will be required to submit a Performance Bond within three weeks of the date of receipt of the Notice of Intent. The amount of the Performance Bond will be determined at the time of award. Bond shall remain in effect until May 1st, 2018. Upon receipt of the Performance Bond or Certified Check the successful bidder(s) will be issued a Notice of Award. The Bid Bond will be returned with the Notice of Award. The Performance Bond will be released upon completion of work and acceptance by the Superintendent of Public Works. Performance Bonds for towns and villages should be provided directly to the respective town or village.

6. Contract Term: May 1, 2017 through April, 30, 2018

7. Quantities: a. Quantities are not guaranteed. A minimum and/or maximum quantity shall

not be established. All purchases, therefore the cumulative annual purchase quantity shall be “as required” by Allegany County.

b. If this bid specifies “estimated quantities”, said quantities are specified for

bid purpose only. These quantities are not intended, nor should they be construed to reflect the actual purchase requirements of Allegany County.

Page 4 of 152

Page 5: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

8. “In-Place” Work:

The County accepts more than one bid for In-Place Hot Mix Asphalt, In-Place Cold Mix Asphalt and In- Place Surface Treatment in order to allow an option to the County in event the low bidder is unable to perform when the County requires these materials. If the low bidder cannot perform within a reasonable time (a judgment made by the County Superintendent) the County has the option of using the next lowest bidder or bidders. ALL “IN-PLACE” WORK MUST BECOMPLETED BY SEPTEMBER 15, 2017 UNLESS APPROVED IN WRITING BY THE SUPERINTENDENT OF PUBLIC WORKS. ANY “IN-PLACE” WORK NOT COMPLETED BY SAID COMPLETION DATE MAY BE SUBJECT TO LIQUIDATED DAMAGES OF $750.00/DAY UNLESS PREVIOUSLY NEGOTIATED WITH THE SUPERINTENDENT OF PUBLIC WORKS.

Municipalities (Towns, Villages, School Districts or Fire Districts) making purchases of the above materials pursuant to General Municipal Law Section 103 are required to follow the above County procedure. The determination of whether or not the low bidder can perform within a reasonable time shall be made by the appropriate Superintendent or Official, and not by Allegany County.

9. Non-Collusive Bidding Clause and Certificate: The contractor shall submit a signed and dated Non-Collusive bidding certificate with its bid which is included in this bid document. Said certificate is mandated by Section 103-g of the General Municipal Law.

10. Hold Harmless Clause and Form: The contractor shall submit a signed and dated Hold Harmless Clause form with its bid, which is included in this bid document.

11. Iranian Energy Sector Divestment Certification: Contractor hereby represents that said contractor is in compliance with New York State General Municipal Law; Section 103-g entitled “Iranian Energy Sector Divestment.” By submission of this bid, each contractor and said person signing on behalf of any contractor certified and in case of a joint bid, each party hereto certifies as to its own organization, under penalty of perjury, that the best knowledge and belief, that each contractor is not on the list created pursuant to NYS Finance Law Section 165-A (3) (b). The contractor shall submit a signed, notarized and dated Iranian Energy Sector Divestment Certification, included in this document, with its bid. Said certificate is mandated by Section 103-g of the General Municipal Law. Reference the Iranian Energy Sector Divestment Certificate Form included in this document.

Page 5 of 152

Page 6: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

12. Required Insurance: a. This bid document includes an information sheet entitled: ALLEGANY

COUNTY STANDARD INSURANCE REQUIREMENTS. These requirements establish the minimum insurance(s) which the contractor shall have in effect prior to entering into a contract with Allegany County. Said insurance(s) are required to remain in effect through the term of the contract(s). In the event that the contractor’s insurance lapses during the term of the contract(s), the County reserves, as its right, the right to cancel the contractor’s contract(s), and to purchase the contracted product(s)/service(s) on the open market; with any increase in cost(s) to Allegany County charged to the awardee. Credit shall not be issued to the awardee where open market cost(s) to the County are less than the cost(s) contracted with the awardee.

b. Additional Insured & Certificate Holder:

i. Allegany County shall be named as an “additional insured” for the

purpose of coverage on direct, primary and non-contributory basis in the contractor’s policy for all intents and purposes of contract(s) issued as a result of an award of this bid. Additional insured shall read- Allegany County, 7 Court Street, Room 210, Belmont, New York, 14813.

ii. Certificate Holder shall read- Allegany County, 7 Court Street, Room 210, Belmont, New York 14813.

c. Each contractor shall submit an original of its Certificate of Insurance and

NYS Workers Compensation Insurance Coverage Form (which indicates the contractor’s compliance with the above sections a. and b.) to the following: Allegany County DPW, 7 Court Street, Room 210, Belmont, New York 14813.

13. Sales Tax Exemption:

The County is exempt from payment of sales and compensating use taxes of the State of New York and cities within the State of New York.

14. Protection from Claim Against or Equal: In the event of any claim concerning or relating to the issues of equal or better, the contractor agrees to hold the County of Allegany free and harmless from any and all claims, legal fees and court costs for loss or damage arising out of this transaction for any reason whatsoever.

15. Addendum/Addenda: a. If an addendum has been issued prior to the County’s receipt of bids;

Allegany County shall attempt to notify contractors know to have received the sealed bid documents and who contact information is on file with Allegany County. Allegany County does not ensure the potential

Page 6 of 152

Page 7: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

contractor’s receipt of the addendum. It shall be the responsibility of the contractor, prior to submitting its bid, to contact the Department of Public Works (585) 268-9230, to determine if an addendum has been issued.

b. Addendum shall be available online at www.alleganyco.com; click on

Government then Public Works Department. They are also available at the Office of the Superintendent of Public Works, 7 Court Street, Room 210, Belmont, New York 14813.

c. It is a requirement that the contractor sign date and include the addendum

with its bid submittal. Failure to do so may result in rejection of bid.

16. Multiple/Alternate Bid Submittal(s): For those contractor’s intending to submit multiple/alternate bids in response to this bid solicitation; the contractor is required and shall submit a complete bid document for each bid submitted. Note: If there is a bid surety requirement, one (1) surety instrument written for the highest amount, shall suffice.

17. Submittal of Bid(s): a. The bid shall be submitted in a sealed envelope with the following marked

on the outside: i. Print your company’s name in the upper left corner ii. In the lower left corner print:

Sealed Bid: February 26, 2015, 10:00 a.m. Bituminous Materials

b. The envelope shall be address to Allegany County DPW, 7 Court Street, Room 210, Belmont, New York 14813.

c. Bids will be received at the Public Works Department at the time specified.

At which times bids will be opened.

d. Facsimile transmitted bids are not acceptable and shall be rejected.

e. Security procedures are in effect at the Allegany County Office Building. Interested parties, especially contractors who intend to hand deliver bids and/or conduct business with Allegany County Department of Public Works should allow sufficient time for any delay which may arise as a result of security procedures. To be considered delivered and on time a bid submittal must be received at the Public Works Department by the appointed hour.

f. All bid proposal sheets shall remain intact and be submitted with the bid.

Page 7 of 152

Page 8: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

18. Business Hours: Contractors will maintain normal business hours during the time in which the material bid will be needed by the County. Bidders agree that normal business hours shall mean 8:00 a.m. to 4:00 p.m. Bidders acknowledge and agree that on some occasions it may be necessary to open before and remain open beyond normal business hours in order to provide the County with material bid.

19. NYSDOT Standard Specifications or Source(s) & Materials: a. All materials proposed or materials supplied by the bidder to Allegany

County shall conform to the requirements set forth in Standard Specifications (US CUSTOMARY UNITS), published by the New York State Department of Transportation, May 2, 2008, including all current amendments, or to any other standard or standard specifications. If the materials bid are subject to certification or approval by the State of New York and the bidder shall furnish with the bid proof of such approval or certification.

b. The Superintendent of Public Works may order tests for the materials

proposed by the bidder or supplies by a successful bidder, at any time, the costs of such testing shall be the responsibility of the bidder and/or successful bidder as the case may be. The bidder and/or successful bidder agree to pay the costs of such tests when presented with an invoice by the Superintendent of Public Works.

20. Compensation:

Payment shall be rendered to the contractor(s) for satisfactory compliance with the general terms and conditions of this bid. Invoice terms shall be net 30 days. The county normally processes invoices for payment bi-monthly, according to a regular established schedule.

21. Late Bids: Contractors bear the sole responsibility for the delivery of their bid in a timely manner. Reliance upon the U.S. Postal Service or other carriers is at the contractor’s risk. Late bids will not be considered and will be returned unopened.

22. Right of County to Seek Clarification, Accept or Reject Bid(s), etc.: a. Allegany County reserves as its right, the right to require clarification from

the contractor for the purpose of assuring a full understanding of the contractor’s responsiveness to the solicitation requirements.

b. Allegany County reserves as its right, the right to accept or reject any and

all bids (or separable portions thereof), the right to waive irregularities and technicalities, and the right to request resubmittal of bids (re-bid).

Page 8 of 152

Page 9: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

23. Civil Rights: The County of Allegany in accordance with the provisions of Title VI of the Civil Rights Act of 1964 and New York Labor Law; Article 8- Public Works, Section 220e hereby notifies all contractors will affirmatively ensure that any contract awarded as a result of this bid solicitation will be awarded without discrimination on the grounds of race, color, sec or natural origin.

24. Award of Bid: For the purpose of this bid and subsequent award(s), it is intended that award(s) that will be made on a line item basis:

a. Bids will be awarded to qualified and responsible contractor(s) who sufficiently meet the terms, conditions and specifications stated herein. However under all circumstances and all statements to the contrary notwithstanding, Allegany County reserves as it right, the right to determine award(s)/awardee(s) in accordance with the best interest of Allegany County.

b. Award of Bid is not made at the bid opening. All bids are subject to final

review and acceptance by the Public Works Committee of the Allegany County Legislature before any award may be made.

25. Executory Clause:

Allegany County shall have no liability under any contract or contracts or to anyone else beyond funds appropriated and available for the purpose of this document and resultant contract(s).

26. Assignability: The contractor shall not assign, transfer, convey, sub-contract, sublet or otherwise dispose of all or portions of this contract (and/or work to be performed as a result of the contract) or its right, title, or interest to any other person, company, corporation, without prior written consent of the Superintendent of Public Works.

27. Extension of Contract Usage by Political Subdivisions: Political subdivisions within Allegany County (Towns, Villages, School Districts and Fire Districts), as defined in Section #103 of the General Municipal Law may participate in any contract awarded as a result of this bid document. Additionally, per section 408-a (2) of County Law and Allegany County Resolution No. 202-15, all political subdivisions within the state of New York may piggyback off this competitive bid as long as it is mutually agreed to by both parties. Responsibility, financial or otherwise, for purchase(s) made by other parties as a result of the extension of this contract, shall not be borne by Allegany County.

Page 9 of 152

Page 10: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

28. Contractor’s Failure to Comply:The Contractor’s failure to perform in compliance with the bid award shall result in withholding of payment. The payment shall be withheld until such times as the contractor fulfills its responsibilities. Compliance shall be determined by and to satisfaction of Allegany County. Such action would not necessarily preclude further initiatives on the part of Allegany County to protect and preserve its best interest.

29. Cancellation of Contract: Allegany County reserves, as its right, to cancel the contract(s) resulting from an award of this bid solicitation at any time during the contract period, without penalty to Allegany County and without stated reason, by delivering a written ten (10) day notice of intent to the contractor(s) or its representative(s). Said notification mailed to the contractor or its representatives via the US Postal Service, First Class Mail shall be considered sufficient and delivered.

Page 10 of 152

Page 11: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SECTION A

INFORMATION FOR BIDDERS

GENERAL SPECIFICATIONS

Page 11 of 152

Page 12: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ITEM NO. 6

SPECIFICATIONS FOR LIQUID BITUMINOUS MATERIALS It is the intent of these specifications to describe the requirements for bituminous materials to be used by the Allegany County Department of Public Works for the proposed maintenance of County Highways for the 2017-2018 year.

BITUMINOUS MATERIALS REQUIREMENTS: All bituminous materials furnished shall meet the material requirements for bituminous materials as specified in Section 702 of the New York State Department of Transportation Standard Specification or by the Allegany County Department of Public Works as follows:

Asphalt Cements...............Table 702-1 (702-0200) Liquid Asphalts (MC)..........Table 702-4 (702-20, 702-21) Asphalt Emulsions, Anionic....Table 702-5 (702-3001, 702-3101, 702-3102, 702-3201, 702-3301, 702-3401) (Tack Coat 702-90)

Asphalt Emulsions, Cationic...Table 702-6 (702-4101, 702-4201, 702-4301)

Joint & Crack Filler..........Table 702-2 (702-0700), (702-05, 702-05-03)

Plastic Joint Material has added rubber compounds, either virgin polymers or recycled rubber tires. The inclusion of these rubber compounds produces a sealant, which is elastic and remains flexible over a wide temperature range. The rubber also prevents the sealant from softening and becoming tacky in hot weather, and so eliminates any tracking. These two rubberized sealants are made to two sets of specifications, ASTM D1190 or ASTM D3405, and differ in the percentage of rubber compound (3405 having a higher amount.)

Materials for use in the Manufacture of Stockpile Patching Materials shall conform to the requirements of NYSOGS Group Specification for Commodity Group 31502, No. 624 dated July 2, 1996.

Sampling, Testing, Inspection & Reporting: All liquid bituminous material intended for use on County projects shall be sampled tested, inspected, certified and shipped in accordance with New York State Department of Transportation Materials Method N.Y. 8.1, 8.2 & 8.3 and addenda. The County reserves the right to inspect liquid bituminous material supply facilities and the equipment of any successful bidder at any time for conformance with the requirements listed herein, if deficiencies are found, such deficiencies shall be corrected within 10 days or the bidder will be considered in default.

Payments: Payment shall be made at contract price per gallon for the actual quantities of liquid bituminous material furnished and verified by the receiving agency. This determination as to quantities involved in any contract shall be accepted as final and binding upon the contractor. For the purpose of measurement, a gallon shall be a volume of 231 cubic inches, and measurement shall be based on the volume of the liquid bituminous material at a temperature of 60 degrees Fahrenheit. All invoices shall show an allowance for temperature above 60 degrees Fahrenheit. The temperature-volume correction to obtain the correct volume at 60 degrees Fahrenheit shall be 0.00025 per Fahrenheit degree for all asphalt emulsions. The method to be used for volume corrections for petroleum products shall be the method and coefficients of expansion given in the “Standard Petroleum Tables, A.S.T.M. D1250.”

Page 12 of 152

Page 13: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Tack Coat (702-90) payment shall be made at the contract price per gallon plus all on job distributor time which will be paid at the contract price per hour.

Delivery Ticket: A delivery ticket shall be provided with each load of bituminous material and filler for joints stating the following:

1) Storage facility identifications 2) Ticket Number 3) Date & Time 4) Item Number & Type 5) Quantity ticket printed by machine 6) Quantity in 60 degrees Fahrenheit gallon emulsions

Approved List Criteria: The County will perform inspection of the facility of the primary source and/or supplier to determine conformance with these requirements and establish the approved lists. Copies of the approved lists status are available from New York State Department of Transportation Materials Bureau, 1220 Washington Avenue, Albany, New York 12232. Material & Equipment Requirements: 1) All materials in this bid shall be supplied from NEW YORK STATE DEPARTMENT OF TRANSPORTATION APPROVED LIST OF LIQUID BITUMINOUS MATERIAL PRIMARY SOURCES AND/OR SUPPLIERS. The bidder shall supply asphalt cement for paving only from a firm listed as a primary source. The approved liquid bituminous material primary sources and/or suppliers list is a listing of firms that meet the following requirements:

a. The liquid bituminous material at a supplier’s facility shall be obtained from an approved primary source. (In many cases a firm listed as supplier will also be an approved primary source, and therefore, automatically meets this requirement.) An approved primary source is a firm that samples, tests and certifies that the material is in conformance with the New York State Department of Transportation materials specifications. Primary sources may be refineries, terminals, emulsion manufacturing plants, lime-blend plants, intermediate storage facilities or other similar plants that sample test and certify the materials.

b. Asphalt emulsions shall be stored in an approved facility having a minimum of one permanent storage tank. The tank(s) shall have a storage capacity of at least 10,000 gallons each and have equipment capable of heating the material to the proper application temperature prior to shipment. These tanks shall be equipped with a sampling valve and thermometer. The sampling valve shall be so designed and installed as to be non-clogging and safe. The type of valve and its general location shall be according to written instructions by the New York State Department of Transportation. If tack coat, Material Designation 702- 90, is stored in a permanent tank, this tank shall have agitating equipment in addition to the other tank requirements.

c. The quantity of liquid bituminous materials except fill for joints, shall be measured with an accurate truck scale or meter (s) and the quantity shall be ticket printed by machine. The truck scale or meter (s) shall meet the requirements of National Bureau of Standard Handbook 44. If a meter is used, it shall be permanently installed to connect it with the approve storage tank, and it shall be used to measure all quantities. The meter (s) shall be equipped with automatic temperature compensation devices to

Page 13 of 152

Page 14: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

provide quantity in 60˚ Fahrenheit gallons. The quantity of filler for joints shall be measured by volume or weight using an accurate measuring device.

The ticket printer shall meet the following requirements:

1. Truck Scales: The ticket printer shall machine print in digital form a minimum of two (2) of the following:

a) tare weight b) gross weight c) net weight

The scale system shall be interlocked to allow printing only when the scale has come to a complete rest.

Material & Equipment Requirements: 1. Meters:

The ticket printer shall machine print in digital form a minimum of two (2) of the following:

a. Beginning meter reading b. Ending meter reading c. Total gallons at 60 degrees Fahrenheit

The firm shall have evidence available to show that the scale meter(s) have been tested for accuracy by a competent scale technician approved by the New York State Department of Transportation, in the calendar year that the material is being supplied. The truck scale shall be located at the storage facility unless the following conditions are met:

a. The firm owns the truck scale or has full control of the weighing operations. The scale shall be located in close proximity (approximately 1,000 feet or less) to the storage tanks.

b. The acceptability of the distance will be determined by the Allegany County Department of Public Works.

c. The firm provides written proof to the Allegany County Department of Public Works that the firm has complete access to the truck scale 24 hours a day, 7 days a week.

d. The firm is responsible for calibration and repairs of the weighing equipment.

2. The bidder shall have equipment required to complete the work of the item(s) requiring applicators as follows:

a. For item(s) requiring distributors, at least one distributor for each 100,000 total gallons of liquid bituminous material to be applied. The distributor shall meet the requirements of the New York State Department of Transportation Standard Specifications, Section 410, Bituminous Surface Treatment. The distributor minimum capacity shall be 2,000 gallons. Each distributor shall be equipped with a calibrated measuring stick to measure the actual quantity used when only a portion of the original quantity of liquid bituminous material is used at the project site. The measuring stick shall be calibrated such that the quantity can be determined within an accuracy of +/- 25 gallons when the distributor is in a level position.

b. For item(s) requiring aggregate spreaders, at least one aggregate spreader for each 100,000 total gallons of liquid bituminous material to be applied covered with

Page 14 of 152

Page 15: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

aggregate. The aggregate spreader shall be a self-propelled unit capable of uniformly spreading the aggregate at a rate specified by the engineer with an allowable variation not to exceed 0.5 pounds per square yard. The spreader hopper shall have a minimum spread width of 12 feet with gate openings graduated so that spread widths can be adjusted in 6 inch increments. The spreader shall be equipped with a self-locking hitch with a minimum of 90 degree vertical movement. For item(s) requiring pugmill mixers, at least one pugmill mixer for each 200,000 total gallons of liquid bituminous material.

c. The pugmill mixer shall be a rotating paddle shaft mixer meeting the requirements of New York State Department of Transportation Standard Specifications, Section 302 Bituminous Stabilized course or better.

Page 15 of 152

Page 16: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SPECIFICATIONS FOR BITUMINOUS PLANT MIXTURES: (HOT MIXES)

MATERIAL REQUIREMENTS: Material requirements for bituminous plant mixes shall conform with New York State Department of Transportation Standard Specifications for plant mix pavements Section 401, Sub-section 401-2. Materials requirements for the Manufacture of Stockpile Patching Materials shall conform to the requirements of NYSOGS Group Specification for Commodity Group 31502, No. 624 dated July 2, 1996. TESTING REQUIREMENTS: It shall be the responsibility of the supplier to extract one (1) box sample for every 500 tons of material supplied or delivered. The supplier shall then have the sample tested either by their own laboratory or by a independent laboratory. Testing will conform to Bituminous Concrete Testing New York State Materials Method #5 for Extraction and Gradation. The gradation of the various Bituminous Concrete items shall conform to the standards set forth in the latest New York State Standard specifications and construction materials manual. The results of the tests shall be sent to the Allegany County Department of Public Works within two (2) working days of the taking of the sample. The Allegany County Department of Public Works reserves the right to take samples for independent testing. The County will, when sampling, take two (2) samples with the second being sent to the supplier. The supplier then may test this sample if so desired. Should the test fail the supplier shall cease all operations until the situation is corrected and compensation for the rejected material is negotiated with the County Superintendent of Public Works.

PRICE ADJUSTMENTS 1. Price adjustments allowed will be based on October 1, 2016 average of the F.O.B. terminal price per ton

of AC-10 or AC-20 asphalt cement (base average F.O.B. terminal price), at the following locations:

Chevron, Perth Amboy, NY Marathan, Tonawanda, NY

Citgo, Albany, NY United Refinery, Warren PA

Citgo, Bayonne NJ United Refinery, Buffalo NY

United Refinery, Rochester NY

The October 1, 2016 base average terminal price is $386.00/U.S. Ton.

*NOTE: The same grade of asphalt cement used in establishing the base average F.O.B. terminal price shall be used in establishing the new average F.O.B. terminal price.

In the event that one or more of the above named sources discontinue posting a price for asphalt cement, the base average F.O.B. terminal price shall be recalculated upon notice by the supplier to discontinue posting a price. A revised base average F.O.B. terminal price than shall be determined by removing that location from the original base average F.O.B. terminal price. All revised and new average F.O.B. terminal prices calculated from that date shall reflect the reduction in the number of reporting locations.

Any introduction or withdrawal of a temporary voluntary allowance, terminal operator’s allowance, or other

Page 16 of 152

Page 17: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

discount offered to the trade in general from the posted price of asphalt cement at any of the above terminals will be considered, for purposes of price adjustment, as a change in the F.O.B. terminal price.

2. The new average F.O.B. terminal price will be determined based on the above F.O.B. terminal prices posted for each month, hereafter known as the “Adjustment Date”, during the contract period. However, price adjustments, in accordance with the formula below, will be effective for deliveries made on and after the first day of the month following the adjustment date.

3. The unit prices of bituminous materials purchased from any award based on this specification will be subject to adjustment based on the following formula:

Price Adjustment= New Average F.O.B. Base Average

(per gallon) Terminal Price - Terminal Price x Total Allowable Petroleum %

235

3. The unit prices for tons of bituminous concrete material purchased from any Award based on this specification will be subject to adjustment based on the following formula:

Price Adjustment = New Average FOB - Base Average FOB x Total % Asphalt plus fuel allowance

(Per Ton) Terminal Price Terminal Price

New Average F.O.B. Terminal Price: The average FOB terminal price for AC-10 or AC-20 asphalt cement at the above mentioned seven locations as determined by the Commissioner. Base Average F.O.B. Terminal Price: The average FOB terminal price of AC-10 or AC-20 asphalt cement as of October 1, 2016. Total Allowable Petroleum: Material Petroleum Total Designation Grade Asphalt_% Allowance Allowable_Petroleum_% 702-3001 RS-1 55 2 57 702-3101 RS-2 63 3 66 702-3102 HFRS-2 63 3 66 702-3201 MS-2 65 10 75 702-3401 HFMS-2h 65 3 68 702-3402 HFMS-2s 65 10 75 703-3301 HFMS-2 65 10 75 702-4201 CMS-2 65 12 77 702-90 TACK COAT 28 2 30 AEDC 40 4 44

* Polymer, wt % 2 * Material Designation identifies New York State specified Item 702-4101, CRS- 2, Cationic Rapid Set Emulsion. The “P” suffix denotes polymer modified.

Page 17 of 152

Page 18: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Price adjustments will not be allowed for materials, which do not have an asphalt cement base. Example: Item 702-3101 ($175.00 - $145.00)/235 x 0.66

Base Average Price = $145.00 New Average Price = $175.00 Total Allowable Petroleum = 66% $0.084 Gallon over original bid price.

4. Price revisions allowed by the contract shall be calculated and applied to the original bid price. There will

not be a price revision unless the change amount to more than $0.01 per gallon from the original bid price.

Total % Asphalt Plus Fuel: The percentage of total allowable asphalt and fuel for each item is as follows: Item Asphalt % Fuel Allowance Total Asphalt % & Fuel Allowance 403.11 5.0 1 6.0% 403.13 5.5 1 6.5% 403.1701 6.2 1 7.2% 403.1901 6.85 1 7.85% Example: Item 403.17

Base Average Price = $150.00 $160.00 - $150.00 x .72 = $.072 per ton New Average Price = $160.00 Total Asphalt % plus Fuel = 7.2%

Positive Price Adjustment number shall be added to original per ton Bid Price.

Negative Price Adjustment number shall be subtracted from original per ton Bid Price.

6. Price adjustments allowed by this contract shall be calculated and applied to the original bid price. There will not be a price adjustment unless the change amounts to more than $.10 per ton from the original bid price.

7. If at any time after October 1, 2016 the average posted price of asphalt cement at the aforementioned terminals increases or decreases by $4.00 per ton or more over or under the last average FOB posted price utilized by the State for adjustment purposes, the State shall publish a special price adjustment which shall be effective eight (8) days subsequent to the date on which the change in the average FOB posted price becomes effective.

8. All price adjustments will be computed by calculator to three decimal places.

All bid prices will be effective through May 1, 2018.

Page 18 of 152

Page 19: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SECTION B

DETAILED SPECIFICATIONS

Page 19 of 152

Page 20: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

LIQUID BITUMINOUS MATERIALS - DELIVERED AND APPLIED LIQUID BITUMINOUS MATERIAL: APPLIED

The liquid bituminous material for item(s) requiring distributors shall be applied in accordance with New York State Department of Transportation Standard Specification, Section 410 Bituminous Surface Treatment.

SPECIFICATIONS FOR EMULSIFIED ASPHALT

AEDC

The emulsion is a specially formulated dust palliative emulsion. It shall be homogeneous and shall conform to the following requirements:

Emulsion Properties (a)

Min Max

Viscosity, Saybolt Furol @ 25C (77F), sec ---- 50 Sieve Test, % ---- 0.30 Distillation (b) Oil Distillate, by volume of emulsion, % ---- 4 Residue from distillation, % 40 ---- Tests on Residue from Distillation: Penetration, 25C (77F) 100g, 5 sec 30 100 Solubility in Trichloroethylene, % 97.5 ----

(a) All tests shall be run in accordance with ASTM –D244 except as noted. (b) All tests shall be run in accordance with ASTM –D244 except as noted.

The emulsion shall remain homogenous and useable for a minimum of 30 days. The supplier will not be held responsible for emulsion testing of samples that have frozen before testing. Material that does not fully comply with these specifications will be rejected. The supplier shall be responsible for the cost and disposal of rejected material. SPECIFICATIONS FOR TACK COAT: Provide bituminous liquid tack coat material and distributor w/operator to apply material in accordance with the manufacturer’s and/or owner’s recommendations.

Page 20 of 152

Page 21: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

MATERIAL REQUIREMENT: Material shall meet the requirements of the New York State Department of Transportation Standard Specifications, Section 702, latest revision, for bituminous liquid tack coat. CONSTRUCTION REQUIREMENTS: The material shall be delivered to the site upon 24 hours notice and applied in accordance with NYSDOT Standard Specifications, Section 407, latest revision. The tack coat shall be applied within the confines of the paving construction work zone as directed by the County Superintendent or his Designee. BASIS OF BID: The unit price bid shall include all costs to furnish, deliver and install the material at the recommended and/or agreed upon application rates. The unit bid price shall be the cost per gallon factoring in an established price of $125.00 / hour for the rental of the bituminous distributor with operator. METHOD OF MEASUREMENT: The quantity of material to be paid for shall be measured by the number of gallons used. The number of hours charged for the distributor truck and operator will only be for the hours on the project site. No payment will be made for travel to and from the project site or for mechanical breakdown of the distributor. The time charged shall be agreed upon for the project at the end of each working period by the County Superintendent or his Designee. BASIS OF PAYMENT: Payment will be made under: Item Description Pay Unit

Bituminous Liquid Tack Coat Gallon Tack Coat Distributor rental w/operator Fixed price $125.00 / hr.

Page 21 of 152

Page 22: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

LIQUID BITUMINOUS MATERIAL: MIXING GRADES

TRAVEL MIX PAVER: The liquid bituminous material for these items shall include a Midland Mix Paver (or equal) and an operator and screed man.

PUGMILL & PAVER: The liquid bituminous material for these items shall include a rotating paddle shaft pugmill with operator, a Blaw Knox PF 200 Paver (or equal) with an operator and screed man.

PUGMILL ONLY: The liquid bituminous material for these items shall include a rotating paddle shaft pugmill with operator.

JOINT & CRACK FILLER MATERIALS - FOB FRIENDSHIP SHOP

Material shall be delivered to the Allegany County Equipment Shop on North Branch Road in Friendship NY. Asphalt fillers and sealers shall be shipped in double end steel drums 26 to 28 gauge or in cardboard containers.

For other item(s) requiring shipment in containers: Asphalt emulsions and liquid asphalts shall be shipped in clean, leak-proof containers not exceeding a capacity of 55 gallons each. All steel 55 gallon drums shall have side bungs with 1 ½” or 2” standard pipe threads.

All liquid bituminous materials furnished and/or applied, shall be in accordance with Specifications for Bituminous Materials in the book entitled, NEW YORK STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, CONSTRUCTION AND MATERIALS, January 2, 1990”, as currently amended by the New York State Department of Transportation, and as amended herein.

HYPERPATCH HIGH PERFORMANCE COLDPATCH COMPOUND

HYPERPATCH permanent asphalt patching material shall be a proprietary mixture of liquid asphalt, adhesion agents, polymers and synthetic latex that when mixed with specific graded limestone aggregate shall form a permanent patching material. This material can be used to fill potholes, utility cuts, drop-offs, and similar pavement repairs. It can be stockpiled, packaged, or used immediately from the mixer.

HYPERPATCH liquid shall be delivered and metered by the gallon at a temperature range of 180 – 240 degrees F. The material shall be free flowing, pumpable, and mixable through an approved portable pugmill mixing plant with ambient temperature aggregate. Mixing temperatures should not be below 32F. The liquid material shall provide an adequate coating of the aggregate and show no signs of stripping.

Hyperpatch material shall meet the NYS DOT specifications for high performance cold patch

Page 22 of 152

Page 23: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

material and appear on the list entitled – BITUMINOUS MATERIAL USED FOR MODIFIED STOCKPILE PATCHING MATERIALS (ITEM 15402-2030)

Price to the county will include all delivery, handling and pump-off to the pugmill. Mixing with a pugmill shall be included in the per gallon price.

Page 23 of 152

Page 24: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

BITUMINOUS CONCRETE IN-PLACE SPECIFICATIONS

At the discretion of the Allegany County Superintendent, or his designee, materials may be ordered in place. In addition to all existing specifications, the following provisions shall apply:

Labor Rates:

The successful bidder will comply with the prevailing rates, a copy of which is attached and made a part of this specification, and present to the County Superintendent a certified payroll report at the time of each billing.

Bituminous Pavers:

Bituminous pavers shall be self-powered units, provided with an activated screed or strike-off assembly. The machine shall be capable of spreading and finishing courses of bituminous plant mix material in lane widths applicable to the specified typical section and thicknesses shown on the plans. Pavers used for shoulders and similar construction shall be capable of spreading and finishing courses of bituminous plant material in widths shown on the plans. The paver shall have a receiving hopper with sufficient capacity for uniform spreading operation and with automated flow controls to place the mixture uniformly in front of the screed. The screed or strike-off assembly shall be heated as necessary to produce a finished surface of the required evenness and texture without tearing, shoving or gouging the mixture. When laying mixtures, the paver shall be capable of operating at forward speeds consistent with satisfactory placement of mixtures.

The bituminous paver shall be at the job site sufficiently ahead of the start of paving operations to be examined and approved by the County Superintendent or his designee. Any paver found worn or defective either before or during its use shall be immediately repaired to the satisfaction of the County Superintendent or his authorized representative or replaced.

Rollers:

All rollers shall be either of an approved vibratory type or static steel wheel used according to the requirement of sub-section 401-3.11 of the New York State Department of Transportation Specifications. The rollers shall be in good mechanical condition, free from excessive backlash, and capable of operating at speeds slow enough to avoid displacement of the mixture. The number and weight of rollers shall be sufficient to satisfactorily compact the mixture while it is still in a workable condition. The use of equipment which results in excess crushing of aggregate will not be permitted. Alternate types of rollers may be approved by the Allegany County Superintendent, or his designee, if field tests or other data demonstrates that satisfactory results can be achieved. The Contractor will be required to supply two (2) rollers which are to be on the job site at all times for any in place work, and both may need to be used at the same time.

Hauling Equipment:

The mixture shall be transported from mixing plants to the work site in tight vehicles having clean and smooth metal beds. Each load shall be covered with canvas or other suitable material of such

Page 24 of 152

Page 25: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

size as to protect the mixture from the weather. When necessary, so that the mixture will be delivered on the road at the specified temperatures, truck bodies shall be properly insulated.

Personnel:

The successful bidder must provide sufficient competent, trained personnel under the direction of a superintendent or foreman who has experience in all aspects of the placement of hot mix bituminous material. Personnel must be of sufficient number to accomplish the work. The number of personnel used is subject to approval by the Superintendent or his designee.

Finished Pavement:

Compacted depth of in-place pavement to be determined by the Superintendent of Public Works. Compaction and finished mat must be approved by the Superintendent or his designee.

The initial lift of hot mix asphalt shall be 6F Top that is applied to the old road surface that is lightly tack coated by others. The final lift of hot mix asphalt shall be 7F top.

Traffic Control:

The successful bidder must provide all traffic control responsible for the entire work zone and shall conform to New York State Traffic Control Standards. The Contractor shall be required to place temporary pavement markings in accordance with NYS DOT specifications 619-3.06. At a minimum a 15” strip shall be placed at 50’ intervals along the entire length of the project. The temporary pavement marking tape or paint/glass beads will be supplied to the contractor by Allegany County.

Method of Measurement:

The quantity to be paid for will be in tons of bituminous plant mixture incorporated into the project.

Basis of Payment:

The unit price bid per ton of bituminous plant mix in-place will include the transportation to the job site, all necessary equipment and labor, including traffic control, and materials necessary to satisfactorily complete the project within a normal work day.

If a project takes multiple days, the contractor shall use the average tons per day to determine the price per ton to be charged for the project.

Page 25 of 152

Page 26: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

BITUMINOUS SEAL COAT IN PLACE Section 1

Description: This work is an application of bituminous material, immediately followed by an application of coarse aggregate. The aggregate for this work will be provided by the County and a list of stockpile areas will be provided as needed. At the time of bidding, the successful bidder must own and operate a New York State approved Bituminous Manufacturing Facility located within the State of New York.

Section 2

Material: Bituminous material shall be Item 702-3101 RS-2 or Item 702-3301 HFMS- 2GH or 702-4101 CRS-2 and conform to New York State Department of Transportation Specifications. This material shall be obtained from the successful bidders bituminous manufacturing facility within New York State that is approved at the time of bidding. Application temperature shall be as specified by New York State D.O.T. specifications.

Section 3

Construction: The successful bidder shall sample the aggregate to be used and determine the approximate application rate using the design method.

a) Conditioning Existing Surface: The successful bidder shall clean the entire existing road surface of loose and foreign materials. Any temporary pavement tape shall be removed by the contractor prior to surface treatment. Any patching shall have been done by County Forces prior to this application.

b) Application of Bituminous Material: Do not apply bituminous material unless entire surface

is in condition to permit satisfactory penetration and adhesion, and unless air and surface temperatures are 60 degrees Fahrenheit. Use a distributor designed, equipped, calibrated, maintained, and operated so material may be applied uniformly, on variable width of surface up to 20 feet, at readily determined and controlled rates, as specified, capable of uniform distributing pressure, and with an allowable variation from any specified rate not exceeding 0.02 gallon per sq. yd. Provide a distributor equipped with a tachometer, pressure gauges, accurate volume-measuring devices or a calibrated tank, a thermometer for measuring temperatures of tank contents, a power operated pump, and full circulation spray bars adjustable laterally and vertically. The distributor shall be calibrated in accordance to these specifications (calibration is discussed in Distributor Calibration) prior to its use. Small areas inaccessible to the distributor may be applied with hand- spraying equipment. Apply bituminous material, at a rate to be determined by the Public Works Superintendent or his authorized agent.

Insure uniformity at the junction of applications.

c) Spreading and Rolling Coarse Aggregate: Use a self-propelled, mechanical stone spreader capable of uniformly spreading 10 to 50 pounds per square yard of coarse aggregate of at least 11 feet wide in a single layer. Calibrate the spreader using the method specified later

Page 26 of 152

Page 27: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

in these specifications. The final application rate shall be determined by the County Public Works Superintendent or his authorized agent.

Apply the aggregate within 30 seconds of the application of bituminous material.

Use a sufficient number of pneumatic-tired rollers to cover the entire width of stone spread during the contact pressure of 40-50 psi. Rolling shall follow within 30 seconds of aggregate. After one-half of the roadway has had seal coat applied and prior to starting work on the unsealed portion onto the shoulder. Also, broom all loose aggregate within the one foot area from the center lane edge of the newly applied seal coat portion to insure a uniform adhesion over the center line joint. In addition, any excess aggregate that is left loose after the proper curing time shall be swept from the entire surface. The surface shall be swept at the time determined by the County Public Works Superintendent or his authorized agent.

d) Maintenance and protection of Traffic during construction: The contractor shall provide a minimum of Two flag persons attired with ANSI approved safety vests to be stationed at each end of the work zone. The contractor shall also provide signs and at least one pilot car and driver to control traffic within work zone. Provide one lane traffic protection during daylight construction and keep traffic off the seal coat application by the use of sufficient pilot vehicles until the seal coat is adequately cured. Weather conditions or high volume traffic may dictate that the pilot vehicles remain in operation for an extended period of time after sealing has been completed.

The pilot vehicles shall keep all thru traffic off the uncured seal coat and at speed of 25 M.P.H. or less within the limits of work. The pilot vehicles shall be equipped with reflectorized signs on the rear of the vehicles stating “Pilot-car - Follow me.”

E) Hauling Equipment: The aggregate shall be transported from stockpiles to the work site in tight vehicles having clean and smooth metal beds. These vehicles shall travel no faster than 25 M.P.H. anywhere on the jobsite. THE HAULING SHALL BE DONE BY ALLEGANY COUNTY DPW OR TOWN TRUCKS. THE TRUCKS WILL BE LOADED BY THE SUCCESSFUL BIDDER’S LOADER AT THE STOCKPILES.

f) Personnel: The successful bidder must provide sufficient competent, trained personnel

under the direction of a superintendent or foremen who have experience in all aspects of applied in place bituminous seal coat. Personnel including sub-contracted haulers must be of sufficient numbers to accomplish the work. The number of personnel used and their relevant experience with in place bituminous seal coat is subject to approval by the Superintendent or his designee. The superintendent or his designee reserves the right to remove any personnel deemed incompetent to accomplish the work in a professional manner.

Page 27 of 152

Page 28: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SPECIAL NOTES: 1) The County, if this item is used, intends to complete all the routes planned. By mutual

agreement of the County and supplier, additions and subtractions may be made to do work as the County deems necessary.

2) Because of the nature of the work involved the County will make every attempt to

schedule this work to occur without interruption, however, this cannot be guaranteed and the County will be the final authority as to the schedule.

3) The successful bidder will comply with the prevailing labor rates, a copy of which is

attached and made a part of this specification, and present to the County Public Works Superintendent a certified payroll report at the time of each billing.

4) The application rates determined will be given to the County Superintendent of Public

Works at least 2 weeks prior to the start of work. These rates will be used as a guideline by the County Superintendent of Public Works or his authorized agent and may be revised by him if field conditions warrant.

Method of Measurement:

Bituminous Seal Coat In Place: Work shall be measured by the square yard and agreed to between County Public Works Superintendent or his authorized agent and contractor.

Asphalt Emulsion: The quantity paid for will be in gallons measured as defined in the section “SPECIFICATION FOR LIQUID BITUMINOUS MATERIALS”.

Basis of Payment:

Bituminous Seal Coat In Place: Payment will be made per square yard for completed work. The price per square yard bid will include labor, traffic control, equipment, and materials with the exception of aggregate and Asphalt Emulsion.

Asphalt Emulsion: Payment will be made per gallon and will include application with an approved and calibrated asphalt distributor.

Page 28 of 152

Page 29: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SPECIFICATIONS FOR IN-PLACE CRACK SEALING

Scope - This specification shall describe the Equipment, Labor, and Materials to be used for crack sealing on County Roads. Cracks which are ¼” or larger shall be filled and payment will be on a per gallon basis.

Equipment - Containerized, hot oil heated, thermostatically controlled, agitated tank, air compressor with a minimum of 125 CFM. Application equipment capable of heating seventy five percent (75%) of the tank capacity in one hour when the ambient air temperature if 70 Degrees Fahrenheit. The unit shall be equipped with insulated discharge valves, hoses and application wand. The application shall incorporate a shut off valve, preferably located near the wand tip.

Application - The contractor shall fill any cracks which are ¼” wide or larger. The cracks shall be blown clean using the described air compressor and shall be adequately filled without excessive waste. The material shall be spread evenly along the crack with a squeegee. No work shall be performed when the ambient air temperature is less than 60 Degrees Fahrenheit.

Labor - All operators and laborers must be experienced and trained to perform the required tasks to complete the work in a professional manor. The Contractor shall comply with all applicable OSHA requirements.

The successful bidder will comply with the prevailing labor rates, which are attached to these specifications. A certified payroll report shall accompany the invoice and shall be directed to the Superintendent of Public Works.

Maintenance and Protection of Traffic - The Contractor shall supply a minimum of three flag persons. The Flagpersons shall be equipped with portable radios, hard hats, reflective safety vests and stop/go paddles. The Flagpersons shall be required to keep traffic off any newly applied materials until such time that no tracking of materials occur.

Material - The material shall in accordance with Specifications for Bituminous Materials in the book entitled, “NEW YORK STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, CONSTRUCTION AND MATERIALS, January 2, 1990”, as currently amended by the New York State Department of Transportation, and as amended herein.

Material Material Material

Designation Type Grade

705-05 Plastic Joint ASTM D3405

705-05-03 Plastic Joint ASTM D1190

705-05-01 Crack & Joint Filler AC20 & Fiber

702-0700 Asphalt Filler Joint & Crack

The Contractor shall apply the material specified by the County Superintendent.

Page 29 of 152

Page 30: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Method of Measurement:

Measurement shall be based on the volume, in gallons, of crackfiller/sealer at a temperature of 15.5 degrees C.

Basis of Payment:

Payment shall be made at the contract price per gallon for the actual quantity incorporated into the project.

BITUMINOUS CONCRETE SCRATCH OR LEVELING COURSE

AND

BITUMINOUS SEAL COAT - IN PLACE Section 1

Description: This work shall consist of the placement, at any location in the County, of a scratch or leveling course of bituminous concrete and a bituminous seal coat wearing course in conformance with this specification. the payment lines, and typical sections on the plans or as specified by the Superintendent of Public Works. Section 2

Materials: Materials will conform to the Sections “Specifications for Liquid Bituminous Materials” and “Specifications for Bituminous Plant Mixtures”. The type of Bituminous Concrete to be used for the “Scratch of Leveling” course will be determined by the Superintendent of Public Works or his representative. Section 3

Construction Details: The construction details shall be the same as those in the sections “Bituminous Concrete In - Place” and “Bituminous Seal Coat In - Place”.

The thickness of the “scratch or leveling” course of bituminous concrete will be determined by the Superintendent of Public Works or his representative and the intent is to place a thin layer of material to level the roadway in preparation of placing the bituminous seal coat. The “scratch or leveling” course will be placed the full width of the roadway as to provide a uniform surface for the Seal Coat. The Bituminous Seal Coat shall be placed as directed by the Superintendent of Public Works or his representative. The “scratch or Leveling” course shall be allowed to cure for a minimum of ten (10) days before the Bituminous Seal Coat is placed unless instructed to do so by the Superintendent of Public Works or his representative.

Page 30 of 152

Page 31: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Section 4

Method of Measurement:

Bituminous Concrete Scratch or Leveling Course: The quantity of Bituminous Concrete Scratch or Leveling Course will be measured in tons of 7-F bituminous concrete incorporated into the project. Bituminous Seal Coat In Place: Work shall be measured by the square yard and agreed to between County Public Works Superintendent or his authorized agent and contractor.

Asphalt Emulsion: The quantity paid for will be in gallons measured as defined in the section “SPECIFICATION FOR LIQUID BITUMINOUS MATERIALS”. Basis of Payment:

Bituminous Concrete Scratch or Leveling Course: The unit price bid per ton of bituminous plant mix in-place will include the transportation to the job site, all necessary equipment and labor, including traffic control, and materials necessary to satisfactorily complete the project.

Bituminous Seal Coat In Place: Payment will be made per square yard for completed work. The price per square yard bid will include labor, traffic control, equipment, and materials with the exception of aggregate and Asphalt Emulsion.

Asphalt Emulsion: Payment will be made per gallon and will include application with an approved and calibrated asphalt distributor.

DETAILED SPECIFICATIONS

PAVER PLACED SURFACE TREATMENT

1.0 DESCRIPTION

The Paver Placed Surface Treatment system shall consist of a warm polymer modified asphalt emulsion sprayed immediately preceding the application of a hot mix asphalt wearing course which forms a homogeneous well-textured and durable wearing surface that can be opened to traffic immediately on cooling. The nominal thickness of the layer shall be 5/8 inch, the maximum thickness of the mat shall not exceed 1½ inches.

The wearing course system shall be placed in one pass by a single machine. This machine shall complete the operation by spraying the polymer modified asphalt emulsion and applying a hot mix asphalt overlay. The machine shall incorporate a receiving hopper, asphalt emulsion storage tank, variable width asphalt emulsion spray system and a variable width heated screed. The machine shall be capable of applying the Paver Placed Surface Treatment at 20 to 100 feet per minute, and actual application shall not be less than 30 feet per minute.

Page 31 of 152

Page 32: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

2.0 POLYMER MODIFIED ASPHALT EMULSION MATERIAL

The liquid material shall be a cationic, rapid setting, asphalt emulsion, NYS Item 702-4001 except as modified in DATA TABLE I – POLYMER MODIFIED ASPHALT EMULSION. The emulsion shall be obtained from a storage facility that has been approved by the Director, Materials Bureau, New York State Department of Transportation, within the current calendar year, prior to the start of work.

3.0 HOT MIX ASPHALT MATERIAL FOR WEARING COURSE

The wearing course shall be a plant mixed hot asphalt concrete and shall be a mixture of single size coarse aggregate, fine aggregate, mineral filler and asphalt cement. The single size course aggregate shall be nominal ¼ inch for Type A mix, nominal 3/8 inch for Type B and nominal ½ inch for Type C mix, according to the gradation specficiations in Date Table II. The hot mix asphalt concrete shall be obtained from a facility that has been approved by the Director, Materials Bureau, New York State Department of Transportation, within the current calendar year, prior to the start of work. The asphalt content of the mix shall be 4.8 – 5.3% by weight of the total mix and must be computed based on the actual job mix.

4.0 SURFACE PREPARATION

The following items will be performed by the contracting agency, unless otherwise directed:

A. Manhole covers, water valves, catch basins, and other drainage structures shall be clearly referenced for location and adjustment after the surfacing operation.

B. Thermoplastic traffic markings shall be removed. All vegetation at the edge of pavement shall be removed.

C. Pavement cracks and joints, greater than ¼ inch wide, shall be cleaned and filled with an approved material prior to the surfacing operation.

D. Before applying the Paver Placed Surface Treatment, serious surface irregularities shall be corrected. Wheel ruts greater than 1 inch in depth shall be filled prior to the re-surfacing operation.

E. The pavement surface area to be overlaid shall be cleaned and made free of any debris that may hinder bonding of the overlay.

5.0 APPLICATION

Paver Placed Surface Treatment shall be placed on a dry or damp, but not on a wet, pavement surface. The pavement temperature shall be not less than 45 degrees Farenheit and rising.

Page 32 of 152

Page 33: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

The polymer modified asphalt emulsion shall be applied by the asphalt emulsion spray system mounted on the self-priming paver. The spray system shall accurately, uniformly and continuously monitor the rate of application across the entire width to be overlaid.

The rate of spray shall be 0.2 +/- 0.05 gallons per square yard. The asphalt emulsion shall be applied at a temperature of 140 – 180 degrees Fahrenheit. No wheel or other part of the paving machine shall come into contact with the polymer modified asphalt emulsion before the hot mix asphalt-wearing course is applied.

The hot asphalt concrete wearing course shall be delivered to the self-priming paver at a temperature of 315 +/- degrees Fahrenheit. The application rate of the hot asphalt aggregate mixture shall be:

Type A (nominal ¼ inch) 50 +/- 10 pounds per square yard

Type B (nominal 3/8 inch) 55 +/- 10 pounds per square yard

Type C (nominal ½ inch) 60 +/- 10 pounds per square yard

The hot mix asphalt-wearing course shall be spread over the polymer modified asphalt emulsion within seconds of the spray application. Where shape correction is necessary or the old surface is porous, the application rate of the emulsion and hot mix asphalt wearing course may need to be increased.

Compaction of the Paver Placed Surface Treatment shall be accomplished with a minimum of a steel wheeled, double drum roller of minimum dead weight of 10 tons before the material temperature has fallen below 180 degrees Fahrenheit at mid-layer. Because of the speed of the paving machine, and if production is over 15,000 square yards per day, two steel-wheeled double drum rollers may be required.

6.0 TRAFFIC

Maintenance and protection of traffic will be provided by the contractor.

The new pavement surface may be opened to traffic when rolling is completed and proper cooling has taken place. In general, traffic can use the new surface at a distance of 300 feet behind the last roller.

7.0 VERIFICATION OF QUANTITIES AND TESTING

At the end of each working day or completed job site, a check shall be made to determine the quantities of polymer modified asphalt emulsion used. The check shall be made by means of the gauge on the self-priming paver or the unit used to transport the material. The total gallons of material sprayed shall be divided by the total square yards sprayed to determine yield per square yard.

Page 33 of 152

Page 34: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

The hot mix asphalt concrete spread rate shall be calculated by dividing the tonnage placed by the square yards covered to determine yield per square yard.

Samples of the hot mix asphalt shall be taken at a rate of 1 per 250 tons and tested for aggregate gradation and asphalt cement content. Samples of the polymer modified asphalt emulsion shall be taken once per tanker load or once per day.

At the conclusion of each day’s production, a delivery ticket or invoice shall be completed by the contractor and signed by a representative of the Contracting Agency.

Page 34 of 152

Page 35: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DATA TABLE I

POLYMER MODIFIED ASPHALT EMULSION

This material shall be cationic asphalt emulsion modified with an approved polymer, using either natural or synthetic latex. It shall be smooth and homogenous and shall conform to the following requirements and be available on site at a temperature of not less than 140 degrees Fahrenheit.

TEST

METHOD

MAX

MIN

Polymer Content (% mass of total residue)

3.0

-

Demulsibility, % by wt residue

ASTM D244

40

DATA TABLE II

SINGLE SIZE COARSE AGGREGATE COMPONENT GRADATION

AASHTO STANDARD SIEVES

TOTAL % PASSING BY WT

US

mm

TYPE A

(1/4 inch)

TYPE B

(3/8 inch)

TYPE C

(1/2 inch) ¾

19

-

-

100

½ 12.5

-

100

85-100

3/8 9.5

100

85-100

25.50

¼ 6.3

85-100

0-15

0-15

4 4.75

25-50

0-3

0-3

8 2.36

0-3

0

0

Page 35 of 152

Page 36: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DATA TABLE III

COARSE AGGREGATE PROPERTIES

TESTS

METHOD

Light Medium Traffic

(<200 heavy veh/day)

Heavy Traffic

(>200 heavy veh/day)

Los Angeles Abrasion Value, %

ASTM C131

<25

<20

Water Absorption, %

ASTM C127

<2

<2

Flatness Index, %

NFP 18-561

<20

<15

Flatness Coefficient (G/E)

NFP 18-561

<1.58

<1.58

Crushing Ratio, %

Observation

100

100

Overall Cleanliness (%pass#30)

ASTM C142

<2

<2

Resistance to Stripping

ASTM D3625

>95

>95

Note 1: Where “G” is the smallest square opening through which the particles can pass “E” is the smallest slot through which the particles can pass.

Note 2: Anti-stripping agents may be required to provide acceptable values.

Page 36 of 152

Page 37: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DATA TABLE IV

FINE AGGREGATE COMPONENT GRADATION

AASHTO STANDARD SIEVES

% PASSING BY WEIGHT

US Metric

Type A, B or C

#4 4.75

100

#8 2.36

90-100

#16 1.18

60-80

#30 0.60

45-60

#50 0.30

30-40

#100 0.15

20-30

#200 0.075

15-25

Crushing ratio, % minimum (Observation)

100 Sand Equivalency, % minimum (ASTM D2419)

60

Mineral Filler, if required, may be Hydrated Lime, Fly Ash or Bag-house Fines

100% passing #100, 80% passing #200

Page 37 of 152

Page 38: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DATA TABLE V

COMBINED AGGREGATE GRADATIONS – DESIGN TARGET ENVELOPES

AASHTO STANDARD SIEVE SIZES

TOTAL % PASSING BY WT

US mm

TYPE A

(1/4 inch)

TYPE B

(3/8 inch)

TYPE C

(1/2 inch) ¾

19

-

-

100

½ 12/5

-

100

85-100

3/8 9.5

100

85-100

60-90

¼ 6.3

85-100

30-50

30-50

4 4.75

40-60

24-40

24-40

8 2.36

16-26

21-32

21-32

#16 1.18

16-26

16-26

16-26

#30 0.60

12-20

12-20

12-20

#50 0.30

8-16

8-16

8-16

#100 0.15

5-10

5-10

5-10

#200 0.075

5-7

5-7

5-7

%PGB

4.9 – 5.3

4.8 – 5.2

4.8 – 5.2

Note: All aggregate percentages are based on the total weight of aggregate.

ASPHALT BINDER

Use the appropriate Performance Graded asphalt for the project geographical location and design traffic level.

Page 38 of 152

Page 39: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DENSE GRADED COLD MIX SPECIFICATIONS 1.0 SCOPE: This specification covers supplying a dense graded cold mix pavement for use as a base, binder

or surface course. This work shall consist of one or more courses of dense graded cold mix bituminous pavement consisting of aggregate, bituminous material, mixing, hauling, placing and compacting to a predetermined depth in accordance with these specifications. This operation is intended to provide a binder and/or top course and shall be followed by a liquid bituminous surface treatment as a finished wearing surface.

2.0 MATERIALS:

2.1 Bituminous Materials: The bituminous material for the dense graded cold mix shall be HFMS-2gh asphalt emulsion.

2.2 Aggregate: The mineral aggregate shall conform to the requirements set out in the following referenced subsections in the NYSDOT Standard Specifications:

Fine Aggregate 703.01 Coarse Aggregate 703.02

3.0 DESIGN, CERTIFICATION, AND DEMONSTRATIONS: 3.1 Prior to bidding, it shall be the responsibility of the contractor to sample all sources of

aggregates and any existing stockpiles of aggregates and determine the quantity of asphalt emulsion required in the cold bituminous mixture.

3.2 Prior to commencing any mixing work, the contractor shall submit a certified recommended job mix formula to the Superintendent of Highways. The recommended job mix should include the following as a minimum: (1) Gradation of each aggregate to be used. (2) Proposed aggregate blend. (3) Proposed aggregate gradations for types 3 and 6. (4) Proposed asphalt content based on the total weight of the mix, exclusive of water or

oil distillate. 3.3 Acceptance of the job mix formula by the Superintendent of Highways is solely for the

purpose of quality control and in no way releases the contractor from his responsibilities. 3.4 Once the project has commenced, the contractors shall sample the cold bituminous mixture

a minimum of once daily. Samples shall be taken from the auger of the bituminous finishing machine, prior to placement on the pavement. Certified test results shall be submitted to the Superintendent of Highways for each sample taken. Sampling and testing shall be done by NYSDOT Materials Method 5, except the mixture shall be heated to 250 F for a minimum of 15 minutes prior to testing. As a minimum, all test results shall state: (1) Percent asphalt residue based on total weight of mix. (2) Calculated asphalt emulsion content in gallons per ton and/or gallons per cubic

yard. (3) Aggregate gradation based on total weight of the aggregate.

Page 39 of 152

Page 40: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

3.0 DESIGN, CERTIFICATION, AND DEMONSTRATIONS (Cont.) 3.5 The Contractor shall supply the Superintendent of Highways with a certified test analysis of

the asphalt emulsion used on the project. The Superintendent of Highways may at any time have samples tested by a certified independent testing lab.

3.6 Payment for mixing grade materials - the unit price per gallon will only be paid on the quantity delivered within the range of various mixtures in Table CDM-2. The Highway Department will only be responsible to pay for the maximum quantity in gallons per ton set forth in Table CDM-2.

4.0 EQUIPMENT:

All equipment and the condition of the equipment for this work shall be subject to approval of the Superintendent of Highways at all times. 4.1 Pugmill. Mixing shall be done with a rotating twin paddle shaft pugmill providing suitable

pressure-kneading action in mixing. Mixing by blading, shoveling and/or scooping will not be permitted. The mixer shall be a central continuous or batch type pugmill designed to accurately proportion either by volume or by weight, so that when the aggregate and bituminous materials are incorporated in the mix, a thorough and uniform coating will result. The mixer shall be equipped to mechanically or electrically interlock the bituminous feed with the aggregate feed such that uniformity of the mixture is assured at all times. The pugmill mixer shall be provided with weighing, volumetric or other gauging equipment which shall be capable of providing accurate control at all times of the amount of aggregate entering the mixer per time interval. The mixer shall be equipped with a positive displacement metering system capable of totalizing the quantity of bituminous material applied to the mixing chamber. The aggregate feed system must contain a minimum of two (2) compartments or bins; each compartment or bin shall have adjustable feed gates so that the aggregates can be proportioned at the specified rate. The capacities of the cold feed bins shall be sufficient to maintain a continuous flow of material. Each bin shall have a mechanical device for uniform feeding of the aggregate. The mixer unit shall be approved by the Superintendent of Highways or his representative prior to commencing any work.

4.2 Paver. The paver shall be equipped with automatic transverse slope and longitudinal grade screed controls. The paver shall be equipped with a screed that is fully extendible from 10 feet to 19 feet 6 inches. Heat and vibration shall be provided for the full-extended width. The extenders shall have independent slope control and on the go capabilities to change width and slope.

4.3 Roller. The roller shall be a twin drum vibratory with static weight of 22,000 lbs. or more. Drum width shall be a minimum of 78 inches and capable of providing the necessary compaction of the dense graded cold mix.

Page 40 of 152

Page 41: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

5.0 METHOD OF MEASUREMENT: 5.1 The dense graded cold mix shall be measured by the number of tons of compacted mix

placed in accordance with the specifications. 5.2 When suitable platform truck scales are not available, the tonnage shall be measured and

calculated based on the number of gallons of asphalt emulsion actually used on the project divided by the gallons per ton of mix used based on the submitted job mix formula and verified by the certified extractions of the mix.

6.0 PAYMENT:

The unit price per ton shall include the cost of furnishing all aggregate, asphalt emulsion, labor, supplies and equipment including the hauling, pugmill, loader, paver, roller, as well as all labor and equipment for the Maintenance & Protection of Traffic.

7.0 PRICE EXTENSION:

Political subdivisions within Allegany County (Towns, Villages, School Districts and Fire Districts), as defined in Section #103 of the General Municipal Law may participate in any contract awarded as a result of this bid document. Additionally, per section 408-a (2) of County Law and Allegany County Resolution No. 202-15, all political subdivisions within the state of New York may piggyback off this competitive bid as long as it is mutually agreed to by both parties. Responsibility, financial or otherwise, for purchase(s) made by other parties as a result of the extension of this contract, shall not be borne by Allegany County.

Performance Bonds for all other municipalities should be provided directly to the respective municipality by the bidder.

8.0 BIDDER QUALIFICATIONS:

8.1 The bidder at the time of bidding must be listed as a supplier on the NYSDOT APPROVED LIST OF LIQUID BITUMINOUS MATERIAL PRIMARY SOURCES and/or SUPPLIERS.

8.2 The bidder at the time of bidding will own and operate an emulsion manufacturing plant. The particular plant shall have been owned and operated by the bidder for at least five (5) years. The plant shall be a permanent facility.

8.3 The bidder shall own, operate and maintain, or have access to, a working laboratory. The laboratory shall be equipped with all equipment necessary to perform all specified tests on any emulsion sample. As a minimum, this shall include the following equipment: (1) Saybolt-Furol Viscometer (2) Distillation equipment (3) Penetration apparatus (4) All necessary equipment and supplies to perform the tests required for meeting

the emulsified asphalt specifications. 8.4 The laboratory shall be operated by a full time qualified technician and shall be

available for use by any Highway personnel. The Laboratory shall also include sufficient

Page 41 of 152

Page 42: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

equipment to test aggregates and mixes required by NYSDOT Materials Method 5. In addition, the Superintendent of Highways may have samples tested by a certified independent testing lab.

8.5 The Superintendent of Highways reserves the right to make any investigations or

inquiries necessary to determine the competence and ability of the bidder to properly perform the work. If after said investigation the Superintendent of Highways is not satisfied that the bidder is properly qualified to meet all requirements contained herein and to perform all work in a satisfactory manner, he may recommend to the Highway Committee that the bidder be rejected as unsatisfactory.

9.0 GUARANTEE:

9.1 The bidder shall guarantee that all material and equipment used to fulfill this contract meets the enclosed specifications.

9.2 A two-year guarantee for defective or inferior bituminous material and/or workmanship shall apply to all bituminous materials supplied and applied under this contract.

9.3 Upon completion, the successful bidder will provide a two-year maintenance bond to the department and each political subdivision purchasing under this contract.

Page 42 of 152

Page 43: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DENSE GRADED COLD MIX SPECIFICATIONS TABLE CDM-2

TYPE 6 TYPE 3 Screen Percent Percent Sizes Passing Passing #1s & Sand #2s, #1s & Sand 1 1/2" 100 1" 100 95-100 1/2" 90-100 50-90 1/4" 30-70 30-74 1/8" 15-65 15-62 #20 5-40 5-40 #40 3-25 3-25 #80 2- 8 2- 8 #200 1- 5 1- 5 % of Residue 3.3-4.7 3.0-4.5 Gal/Ton 11-17 10-16 Approx. Asphalt Type HFMS-2 HFMS-2 HFMS-2gh HFMS-2gh Note: 1. Aggregate percentages are based on total weight of aggregate.

2. The bitumen content is based on the total weight of the mix. 3. Aggregate gradation based on total weight of the aggregate. 4. Asphalt emulsion HFMS-2, HFMS-2gh. 5. Coarse aggregates (retained on the + 1/8 inch screen) shall consist of approved

crushed stone or crushed gravel conforming to the requirements of NYSDOT section 703-02, coarse aggregates except for gradation. Fine aggregates shall consist of material conforming to the requirements of NYSDOT 703-01, Fine Aggregates. In addition, the fine aggregate, including blended fine aggregate, used in all courses shall have a FAA of not less than 40. Test procedures for determining the FAA are available from the NYSDOT Materials Bureau.

Page 43 of 152

Page 44: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SECTION C

2017 ALLEGANY COUNTY

PAVING PROGRAM

Page 44 of 152

Page 45: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

2017 PAVING PROGRAM

PAVING PROGRAM COUNTY ROAD DESCRIPTION WIDTH MILES 4 Entire Length 24’ 5.35 miles 7C Entire Length 24’ 0.45 miles 7D Entire Length 24’ 1.57 miles 15A East Section CR #15B to CR #16 22’ 5.04 miles 20 Angelica to SR #19 24’ 3.40 miles 38 Entire Length 22’ 6.03 miles 48 Entire Length 24’ 3.02 miles 24.86 miles SURFACE TREATMENT PROGRAM COUNTY ROAD DESCRIPTION WIDTH MILES 9 Entire Length 24’ 5.99 miles

16 Angelica East to Town Line Road 24’ 12.10 miles

20 SR #275 to SR #19 24’ 5.90 miles

41 Entire Length 21’ 5.04 miles

29.03 miles

Page 45 of 152

Page 46: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Allegany County 2017Paving Program

Award will be made to the lowest responsible qualified bidder whose proposal complies with all of the provisions required to make it formal based on the total cost of the work listed for:

The application rates and quantities listed on the bid sheet are to be used only to determine the lowest cost of each item and are not to be construed as the actual application rates.

Bidders must bid all items and all County Routes listed.

It is the intent of Allegany County to do all the routes listed, however, the listed projects are subject to change for reason of a budgetary nature due to funding or at the discretion of the Superintendent. ALL “IN PLACE” WORK MUST BE COMPLETED BY SEPTEMBER 15, 2017 UNLESS APPROVED IN WRITING BY THE SUPERINTENDENT OF PUBLIC WORKS. ANY “IN PLACE” WORK NOT COMPLETED BY SAID COMPLETION DATE MAY BE SUBJECT TO LIQUIDATED DAMAGES OF $750.00/DAY UNLESS PREVIOUSLY NEGOTIATED WITH THE SUPERINTENDENT OF PUBLIC WORKS. PRIOR TO ALL FINISHED IN PLACE BITUMINOUS PAVEMENT APPLICATIONS, THE AWARDED BIDDER SHALL SHIM ALL PIPE CROSSINGS, CURVES, AREAS TO BE STABILIZED, AREAS TO BE TRUE AND LEVELED, ETC. AS SPECIFIED BY THE ALLEGANY COUNTY SUPERINTENDENT OR HIS DESIGNEE.

METHODS OF AWARD Liquid Bituminous Materials - Delivered & Applied

Award of each item bid will be made to the lowest responsible qualified bidder whose proposal comply with all the provisions required to make it formal.

Bituminous Concrete - FOB Plant

Contracts will be awarded to each bidder whose prices indicate the material will be furnished at a reasonable price or to only the lowest responsible bidder when the proximity of two (2) or more bidder’s plants so warrant as being in the best interest of the County as determined by the Superintendent of Public Works.

Page 46 of 152

Page 47: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Purchase orders will be placed only against those contracts where an analysis of plant price and hauling cost for each individual requirement indicates the lowest composite cost. Allegany County reserves the right to award multiple purchase contracts for the purchase of a particular item based on the availability of the item and/or location of vendors to particular areas.

Transportation Rates:

The mileage to be allowed from plant to destination is the actual minimum mileage between the two points over properly conditioned roads, as determined by the County.

Mileage delivery cost per ton in County trucks from plant to destination will be figured on the following basis:

.30 each mile

Transportation Rates: For estimating purposes only, trucks rented by the County for hauling materials under this contract shall be considered as County-Owned-Trucks. It will be assumed that bidder’s transportation rates indicated on the bid form are to be calculated in the same manner.

Destination: Shall be defined as the midpoint of a particular job. The midpoint will be determined by dividing the distance from the start to the end of the project by two and measuring from the start or end to the midpoint, to the nearest one-tenth of a mile.

Bituminous Concrete - In Place

Contracts will be awarded to each bidder whose prices indicate the material will be furnished at a reasonable price or to only the lowest responsible bidder when the proximity of two (2) or more bidder’s plants so warrant as being in the best interest of the County as determined by the Superintendent of Public Works.

Purchase orders will be placed only against those contracts where an analysis of In Place price of the combination of Items and Quantities per project indicates the lowest composite cost.

Bituminous Seal Coat - In Place

Award will be made to the lowest responsible qualified bidder whose proposal complies with all the provisions required to make it formal based on the total of the per square yard price of Bituminous seal coat and the cost of the application of .35 gallon per square yard of the asphalt emulsion. The application rate of .35 gallon per square yard is

Page 47 of 152

Page 48: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

to be used only to determine the lowest total cost per square yard and is not to be construed as the actual application rate.

Joint & Crack Filler Material - FOB Friendship Shop

Award of each item bid will be made to the lowest responsible qualified bidder whose proposal complies with all the provisions required to make it formal.

In-Place Crack Filling

Award of each item bid will be made to the lowest responsible qualified bidder whose proposal complies with all the provisions required to make it formal.

Bituminous Concrete Scratch or Leveling Course And Bituminous Seal Coat - In Place

Award will be made to the lowest responsible qualified bidder whose proposal complies with all the provisions required to make it formal based on the cost per Square Yard of the bituminous concrete scratch or leveling course, using an application rate 55 pounds per square yard, and the per square yard price of Bituminous seal coat and the cost of the application of .35 gallon per square yard of the asphalt emulsion. The application rates of 55 pounds per square yard of bituminous concrete scratch or leveling course and of .35 gallon per square yard for the asphalt emulsion is to be used only to determine the lowest total cost per square yard and is not to be construed as the actual application rates.

Dense Graded Cold Mix- In Place

Award will be made to the lowest responsible qualified bidder whose proposal complies with all the provisions required to make it formal based on the total cost per Square Yard of the Dense Graded Cold Mix course, using an application rate of 220 pounds per square yard, and the per square yard price of Bituminous seal coat and the cost of the application of .35 gallon per square yard of the asphalt emulsion. The application rates of 220 pounds per square yard of dense graded cold mix course and of .35 gallons per square yard for the asphalt emulsion is to be used only to determine the lowest total cost per square yard and is not to be construed as the actual application rates.

Page 48 of 152

Page 49: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SECTION D

BID SHEETS

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution to the other bidders. These copies should not be attached to your bid package.

Page 49 of 152

Page 50: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS

ITEM NO. 6 LIQUID BITUMINOUS MATERIALS: DELIVERED AND APPLIED NYS GRADE BID PRICE PER GALLON DESIGNATION Applied – Anionic Emulsions 702-20 MC-30 $_________________________ 702-3001 RS-1 $_________________________ 702-3101 RS-2 $_________________________ 702-3102 HFRS-2 $_________________________ 702-3201 MS-2 $_________________________ 702-3301 HFMS-2GH $_________________________ 702-3701 HFRS-2P $_________________________ 702-3801 RS-2P $_________________________ Applied – Cationic Emulsions 702-4201 CMS-2 $_________________________ 702-4101 CRS-2 $_________________________ 702-4702 CRS-2P $_________________________ Asphalt Emulsion Dust Control (AEDC) $_________________________ Tack Coat 702-90 Dilute Tack Coat $_________________________ Distributor Rate $125.00/hr. MIXING GRADES (Anionic & Cationic Emulsions) NYS GRADE Bid Price Bid Price Bid Price DESIGNATION Per Gallon Per Gallon Per Gallon Travel Mix Paver Pugmill & Paver Pugmill Only 702-3201 MS-2 $_____________ $_____________ $_____________ 702-3301 HFMS-2GH $_____________ $_____________ $_____________ 702-4201 CMS-2 $_____________ $_____________ $_____________ COLD PATCH OIL

Page 50 of 152

Page 51: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

(Mod. CMS-2) $_____________ (HFMS-2s) $_____________ (Hyperpatch Oil) $_____________

BITUMINOUS CONCRETE: FOB PLANT LOCATION______________________

NYS ITEM DESCRIPTION BID PRICE FOB PLANT

403-11 Type 1 Base $_____________________ 403-13 Type 3 Binder $_____________________ 403-17 Type 6F Top $_____________________

403-19 Type 7F Top $_____________________ 15.402.201 Regular Mix Cold Patch $_____________________ 15-402.203 Modified Mix Cold Patch $_____________________

HOT MIX DELIVERY PRICE:

Miles for Hauling from Plant to Road, Price Per Net Ton.

0-5 miles $______ per ton mile delivered.

6-15 miles $______ per ton mile delivered.

16-50 miles $______ per ton mile delivered.

If none check here: [__]

BITUMINOUS CONCRETE - IN PLACE:

Bid Price in-place

Under 150 Ton

Bid Price in-place

151 - 500 Ton

Bid Price in-place

501 - 1000 Ton

Bid Price in-place

Over 1000 Ton NYS ITEM

DESCRIPTION

403-11

Type 1 Base

$

$

$

$

403-13

Type 3 Binder

$

$

$

$

403-17

Type 6F Top

$

$

$

$

403-19

Type 7F Top

$

$

$

$

In Place: In place blacktop prices are based on one (1) workday.

Note: Contractor must have enough labor and equipment to do the work in one day as may be required by the Superintendent of Public Works or his representative. This may involve more labor and equipment as required.

BITUMINOUS SEAL COAT - IN PLACE

Page 51 of 152

Page 52: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Bituminous Seal Coat In Place: Price per Square Yd: $______________

Item 702-4101 CRS-2

Applied for Seal Coat In Place: Price per Gallon: $______________ TOTAL COST PER SQUARE YARD (For low bid determination) Seal Coat Price Per Square Yard:

$

Item 702-4101 CRS-2

($_________Per Gallon X .35 Gal per SY)

$ TOTAL COST PER SQUARE YARD:

$

BITUMINOUS SEAL COAT - IN PLACE Bituminous Seal Coat In Place: Price per Square Yd: $______________

Item 702-3101 RS-2

Applied for Seal Coat In Place: Price per Gallon: $______________ TOTAL COST PER SQUARE YARD (For low bid determination) Seal Coat Price Per Square Yard:

$

Item 702-3101 RS-2

($_________Per Gallon X .35 Gal per SY)

$ TOTAL COST PER SQUARE YARD:

$

BITUMINOUS SEAL COAT - IN PLACE Bituminous Seal Coat In Place: Price per Square Yd: $______________

Item 702-3301 HFMS-2GH

Applied for Seal Coat In Place: Price per Gallon: $______________ TOTAL COST PER SQUARE YARD (For low bid determination) Seal Coat Price Per Square Yard:

$

Item 702-3301 HFMS-2GH

($_________Per Gallon X .35 Gal per SY)

$ TOTAL COST PER SQUARE YARD:

$

JOINT & CRACK FILLER: (ALL PRICES TO BE F.O.B. FRIENDSHIP SHOP)

Page 52 of 152

Page 53: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

705-05 ASTM D 3405 Plastic Bid Price Per Gallon $ 705-05-03 ASTM D 1190

Bid Price Per Gallon

$

705-05-01 AC20 & FIBER

Bid Price Per Gallon

$

702-0700 ASPHALT FILLER

Bid Price Per Gallon

$

IN PLACE CRACK SEALING:

705-05 ASTM D 3405 Plastic Bid Price Per Gallon $ 705-05-03 ASTM D 1190

Bid Price Per Gallon

$

705-05-01 AC20 & FIBER

Bid Price Per Gallon

$

702-0700 ASPHALT FILLER

Bid Price Per Gallon

$

TYPE 6 DENSE GRADED COLD MIX COURSE AND BITUMINOUS SEAL COAT - IN PLACE Type 6 Dense Graded Cold Mix in Place Price Per Ton: $____________ Bituminous Seal Coat in Place Price Per Sq. Yd. $____________ Item 702-3301 HFMS-2GH in Place Price Per Gallon $____________

TOTAL COST PER SQ. YD. (for low bid determination) Type 6, Dense Graded Cold Mix Price per Ton $________X 2000lb/220lb./Sq. Yd.:

$_____________

Seal Coat Price per Sq. Yd.:

$_____________

Item 702-3301 HFMS-2GH Price per Gal. $_________X .35 Gal/Sq. Yd.:

$_____________

TOTAL COST PER SQ. YD.:

$_____________

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution to the other bidders. These copies should not be attached to your bid package.

ALLEGANY COUNTY 2017 PAVING PROGRAM

Page 53 of 152

Page 54: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Bidders must bid all items and all County Roads Total Cost Sheet: 1-½” overlay (shim pipe crossings, curves, etc., as specified by the Superintendent or his designee then ¾” compacted T & L course with 6-F top, and ¾” compacted overlay with 7-F top

CR

DESCRIPTION

DESCRIPTION OF WORK

ESTIMATED QUANTITIES

UNIT

PRICE/TON

TOTAL PRICE

4

Entire Length

2” Total Compacted

Depth-

5.35 miles x 24’ wide

8474.4

Tons

$

$

7C

Entire Length

2” Total Compacted

Depth-

0.45 miles x 24’ wide

712.8

Tons

$

$

7D

Entire Length

2” Total Compacted

Depth

1.57 miles x 24’ wide

2486.88

Tons

$

$

15A

East Section CR 15B to CR 16

2” Total Compacted

Depth

5.04 miles x 22’ wide

7318.08

Tons

$

$

20

Angelica to State Route 19

2” Total Compacted

Depth

3.40 miles x 24’ wide

5385.60

Tons

$

$

38

Entire Length

2” Total Compacted

Depth

6.03 miles x 22’ wide

8755.56

Tons

$

$

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution

to the other bidders. These copies should not be attached to your bid package.

Page 54 of 152

Page 55: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY 2017 PAVING PROGRAM Continued

Bidders must bid all items and all County Roads Total Cost Sheet: 1-½” overlay (shim pipe crossings, curves, etc., as specified by the Superintendent or his designee then ¾” compacted T & L course with 6-F top, and ¾” compacted overlay with 7-F top

CR

DESCRIPTION

DESCRIPTION OF WORK

ESTIMATED QUANTITIES

UNIT

PRICE/TON

TOTAL PRICE

48

Entire Length

2” Total Compacted

Depth-

3.02 miles x 24’ wide

4786.68

Tons

$

$

OVERALL TOTAL BID PRICE

$

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution

to the other bidders. These copies should not be attached to your bid package.

Page 55 of 152

Page 56: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY 2017 SURFACE TREATING

Bidders must bid all items and all County Roads Total Cost Sheet: Bituminous Seal Coat In Place (CRS-2 and 1A Limestone) (Limestone will be supplied by Allegany County)

COUNTY ROUTE

DESCRIPTION ESTIMATED QUANTITIES

SEAL COAT PRICE/Sq. Yd.

CRS-2 PRICE PER GALLON

TOTAL PRICE/Sq. Yd.

TOTAL PRICE PER PROJECT

9

Entire Length 5.99 miles X 24 Feet Wide

84,339.20

Square Yards

$______________

$_________________ Per gallon x .35 gal. per Square yard

$_____________

$______________

16

Angelica East to Town Line Road 12.10 miles X 24 Feet Wide

170,368.0

Square Yards

$______________

$_________________ Per gallon x .35 gal. Per Square yard

$_____________

$______________

20

SR #275 to SR 19 5.90 miles X 24 Feet Wide

83,072.0

Square Yards

$______________

$_________________ Per gallon x .35 gal. per Square yard

$______________

$______________

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution to the other bidders. These copies should not be attached to your bid package.

Page 56 of 152

Page 57: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY 2017 SURFACE TREATING Cont…

Bidders must bid all items and all County Roads Total Cost Sheet: Bituminous Seal Coat In Place (CRS-2 and 1A Limestone) (Limestone will be supplied by Allegany County)

41

Entire Length 5.04 miles X 21 Feet Wide

62,092.80

Square Yards

$______________

$_________________ Per gallon x .35 gal per Square yard

$______________

$______________

TOTAL PROGRAM $__________________________

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution to the other bidders. These copies should not be attached to your bid package.

Page 57 of 152

Page 58: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

PAVER PLACED SURFACE TREATMENT

BID PRICE/SQUARE YARD

Type A Type B Type C

Square Yard Range ¼ inch 3/8 inch ½ inch Up to 5,000 S.Y. $__________ $__________ $ __________ 5,000 to 15,000 S.Y. $__________ $__________ $__________

15,001 to 30,000 S.Y. $__________ $__________ $__________

30,001 S.Y. plus $__________ $__________ $__________

Allowable DEDUCTIONS per square yard if Contracting Agency elects to supplement operation with their equipment and labor. DEDUCT $__________ per square yard if Contracting Agency furnishes and operates compaction equipment. DEDUCT $__________ per square yard if Contracting Agency furnishes hauling of hot mix asphalt from plant to paving machine. DEDUCT $__________per square yard if contracting agency furnishes traffic control.

To expedite the bid process, please submit ten (10) extra copies of your bid pages for distribution to the other bidders. These copies should not be attached to your bid package.

Page 58 of 152

Page 59: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS

ITEM #6

Name of Bidder: ________________________________________

Address: ________________________________________

________________________________________

Plant Location: ________________________________________

Telephone Number: ________________________________________

Fax Number: ________________________________________

Date: _________________________________________

Signature of Bidder _________________________________________ Title _________________________________________

Page 59 of 152

Page 60: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

NON-COLLUSIVE BIDDING CERTIFICATION

By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:

1. The prices is this bid have been arrived at independently without collusion, consultation, communication or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor;

2. Unless otherwise required by law, the prices which have been quoted in

this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly, to any other bidder or to any competitor; and

3. No attempt has been made or will be made by the bidder to induce any other person, partnership or corporation to submit, a bid for the purpose of restricting competition.

_______________________________ Name of Bidder _______________________________ Signature of Bidder _______________________________ Date

Subscribed and sworn to before me This_____day of _________, 20___ ____________________________ Notary Public Note: If bidder is a corporation, the corporate name and title of officer signing must be stated.

Page 60 of 152

Page 61: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

HOLD HARMLESS CLAUSE

The agent shall at all times defend, indemnify and hold harmless the County of Allegany and its employees from any and all claims, damages or judgments or for the defense or payment thereof, based on any claim, action or cause of action whatsoever, including any action for libel, slander or personal injury, or any affiliated claims, by reason of any act or failure to properly act on the part of Agent and in particular as may arise from the performance under this contract. Such obligation to the County shall not be construed to negate, abridge or reduce other rights of indemnity which would otherwise exist. This provision shall supersede any other provision in this Agreement deemed to be in conflict, unless specifically stated otherwise. In the event of an injury by the subcontractor or its employees, they shall cause notice to be served upon the County within twenty-four (24) hours of any such injury.

PLEASE PRINT OR TYPE:

Company Name: _____________________________________________________

Company Address: ___________________________________________________

Name: ____________________________________ Title: ____________________

Signature: _________________________________ Date: ____________________

Telephone No: ______________________ Fax No: _________________________

Federal Employee ID#_________________________________________

Bid Name:____________________________________________________________

Page 61 of 152

Page 62: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

IRANIAN ENERGY SECTOR DIVESTMENT

1. Contractor/proposer hereby represents that said contractor/proposer is in compliance with New York State General Municipal Law Section 103-g entitled “Iranian Energy Sector Divestment”, in that said contractor/proposer has not

a. Provided goods or services of $20 million or more in the energy sector of Iran

including but not limited to the provision of oil or liquefied natural gas tankers or products used to construct or maintain pipelines used to transport oil or liquefied natural gas for the energy sector of Iran; or

b. Acted as a financial institution and extended $20 million or more in credit to another person for forty-five (45) days or more, if that person’s intent was to use the credit to provide goods or services in the energy sector in Iran.

2. Any contractor/proposer who has undertaken any of the above and it identified on a list

created pursuant to Section 165-a (3) (b) of the New York State Finance Law as a person engaging in investment activities in Iran, shall not be deemed a responsible bidder pursuant to Section 103 of the New York State General Municipal Law.

3. Except as otherwise specifically provided herein, every contractor/proposer submitting a

bid/proposal in response to this request for bids/request for proposals must certify and affirm the following under penalties of perjury:

a. “By submission of this bid, each bidder and each person signing on behalf of any bidder certifies and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief, that each bidder is not on the list created pursuant to NYS Finance Law Section 165-a (3) (b).”

Allegany County will accept this statement electronically in accordance with the provisions of Section 103 of the General Municipal Law.

4. Except as otherwise specifically provided herein, any bid/proposal that is submitted without having complied with subdivision (a) above, shall not be considered for award. In any case where the bidder/proposer shall so state and shall furnish with the bid a signed statement setting forth in detail the reasons therefore. The County reserves its rights in accordance with General Municipal Law Section 103-g to award the bid/proposal to any bidder/proposer who cannot make the certification, on a case-by-case basis under the following circumstances:

a. The investment activities in Iran were made before April 12, 2012, the investment

activities in Iran have not been expanded or renewed after April 12, 2012 and the bidder/proposer has adopted, publicized and is implementing a formal plan to cease the investment activities in Iran and to refrain from engaging in any new investments in Iran; or

b. The County of Allegany has made a determination that the goods or services are necessary for the County to perform its functions and that, absent such an exemption, the County of Allegany would be unable to obtain the goods or

Page 62 of 152

Page 63: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

services for which the bid/proposal is offered. Such determination shall be made by the County in writing and shall be a public document.

______________________________ ________________________________ Signature Title ______________________________ ________________________________ Company Name Date State of New York) County of Allegany) ss: On the _________day of ____________________in the year ____________before me, the undersigned, personally appeared_______________________________________, personally known to me or proved to me on the basis on satisfactory evidence to be the individual(s) whose name(s) is (are) subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his /her/their capacity (ies) and that by his/her/their signature(s) on the instrument, the individual(s) or the person upon behalf of which the individual (s) acted, executed as instrument. ___________________________________ Notary Public

Page 63 of 152

Page 64: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ALLEGANY COUNTY STANDARD INSURANCE REQUIREMENTS

Insurance shall be procured and certificates of Insurance delivered to the County Attorney’s Office, the County department responsiblefor the agreement, and the Clerk of the County Board of Legislators prior to commencement of work or delivery of merchandise or equipment. The Certificates of Insurance shall be made to the County of Allegany, County Office Building, Belmont, New York 14813 must comply with all coverage specifications of the contract; and must be executed by an insurance company and/or agency or broker licensed by the Insurance Department of the State of New York. The “ACCORD” form certificate may be used, provided the following two additions are added to the form verbatim:

A. ACKNOWLEDGMENT: The insurance companies providing these coverages acknowledge that the named insured is entering into a contract with Allegany County in which the named insured agrees to defend, hold harmless, and indemnify the County, its officials, employees and agents against all claims resulting from work performed, material handled and services rendered. The contractualliability coverage evidenced above covers the liability assumed under the County-Contractor agreement.

B. Prior to non-renewal or cancellation of these policies, at least thirty (30) days advance written notice shall be given to AlleganyCounty Attorney’s Office and the County Department requesting this certificate before such change shall be effective, except that five (5) days advance written notice shall be sufficient for Certificates from the State Worker’s Compensation Fund.

MINIMUM COVERAGE LIMITS ARE AS FOLLOWS: Policy Construction and

Maintenance Professional Services

Property Leased to Others or Use of Facilities or Grounds

ConcessionairesServices

Livery Services All Purposes Public Entity Contracts

Comp. Gen. Liab* $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL Prem. & Ops. INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Prods/Compl Ops INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Independent Cont INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Contractual INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Broad Form P.D. INCLUDE X.C.U INCLUDE Personal Injury INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Liquor Law INCLUDE Host Liquor INCLUDE

Auto Liability $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL $1,000,000 CSL Owned INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Hired INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE Non-owned INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE INCLUDE

Excess Umbrella Liability *

$1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000

Worker’s Compensation & Employers Liability

STATUTORY STATUTORY STATUTORY STATUTORY STATUTORY

Disability Benefits STATUTORY STATUTORY STATUTORY STATUTORY STATUTORY

Professional Liab. $1,000,000 Allegany County shall be named as additional named insured on all policies for purposes of coverage but not the payment of premium. *The comprehensive general liability can be met by one or more policies or in combination with an excess umbrella liability policy. No umbrella policy is required if underlying coverage is at least $1,000,000. Bid specifications or particular contracts, leases or agreements may require alternative coverage and limits, which must be evidenced on the certificate in lieu of the coverages specified above. The expiration date for any claims made policy must be at least ninety (90) days after the expiration of the contract for services or final delivery of any products.

Page 64 of 152

Page 65: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

PREVAILING WAGE SCHEDULE FOR ARTICLE 8 PUBLIC WORK PROJECT

Attached is the current schedule(s) of the prevailing wage rates and prevailing hourlysupplements for the project referenced above. A unique Prevailing Wage Case Number(PRC#) has been assigned to the schedule(s) for your project.

The schedule is effective from July 2016 through June 2017. All updates, corrections, postedon the 1st business day of each month, and future copies of the annual determination areavailable on the Department's website www.labor.state.ny.us. Updated PDF copies ofyour schedule can be accessed by entering your assigned PRC# at the proper location onthe website.

It is the responsibility of the contracting agency or its agent to annex and make part, theattached schedule, to the specifications for this project, when it is advertised for bids and /orto forward said schedules to the successful bidder(s), immediately upon receipt, in order toinsure the proper payment of wages.

Please refer to the "General Provisions of Laws Covering Workers on Public WorkContracts" provided with this schedule, for the specific details relating to otherresponsibilities of the Department of Jurisdiction.

Upon completion or cancellation of this project, enter the required information and mail ORfax this form to the office shown at the bottom of this notice, OR fill out the electronicversion via the NYSDOL website.

NOTICE OF COMPLETION / CANCELLATION OF PROJECT

Date Completed: Date Cancelled:

Name & Title of Representative:

Phone: (518) 457-5589 Fax: (518) 485-1870 W. Averell Harriman State Office Campus, Bldg. 12, Room 130, Albany, NY 12240

www.labor.state.ny.us. PW 200 [email protected]

Andrew M. Cuomo, Governor Roberta Reardon, Commissioner

Allegany County Yvonne Marks, DPW Fiscal Manager7 Court StRoom 210Belmont NY 14813

Schedule Year 2016 through 2017Date Requested 01/13/2017PRC# 2017000429

Location Various County RoadsProject ID#Project Type Paving and Surface Treatment of various county roads

Page 65 of 152

Page 66: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 66 of 152

Page 67: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

General Provisions of Laws Covering Workers on Article 8 Public Work Contracts

Introduction

The Labor Law requires public work contractors and subcontractors to pay laborers, workers, or mechanics employed inthe performance of a public work contract not less than the prevailing rate of wage and supplements (fringe benefits) in thelocality where the work is performed.

Responsibilities of the Department of Jurisdiction

A Department of Jurisdiction (Contracting Agency) includes a state department, agency, board or commission: a county,city, town or village; a school district, board of education or board of cooperative educational services; a sewer, water, fire,improvement and other district corporation; a public benefit corporation; and a public authority awarding a public workcontract.

The Department of Jurisdiction (Contracting Agency) awarding a public work contract MUST obtain a Prevailing RateSchedule listing the hourly rates of wages and supplements due the workers to be employed on a public work project.This schedule may be obtained by completing and forwarding a "Request for wage and Supplement Information" form (PW39) to the Bureau of Public Work. The Prevailing Rate Schedule MUST be included in the specifications for the contract tobe awarded and is deemed part of the public work contract.

Upon the awarding of the contract, the law requires that the Department of Jurisdiction (Contracting Agency) furnish thefollowing information to the Bureau: the name and address of the contractor, the date the contract was let and theapproximate dollar value of the contract. To facilitate compliance with this provision of the Labor Law, a copy of theDepartment's "Notice of Contract Award" form (PW 16) is provided with the original Prevailing Rate Schedule.

The Department of Jurisdiction (Contracting Agency) is required to notify the Bureau of the completion or cancellation ofany public work project. The Department's PW 200 form is provided for that purpose.

Both the PW 16 and PW 200 forms are available for completion online.

Hours

No laborer, worker, or mechanic in the employ of a contractor or subcontractor engaged in the performance of any publicwork project shall be permitted to work more than eight hours in any day or more than five days in any week, except incases of extraordinary emergency. The contractor and the Department of Jurisdiction (Contracting Agency) may apply tothe Bureau of Public Work for a dispensation permitting workers to work additional hours or days per week on a particularpublic work project.

There are very few exceptions to this rule. Complete information regarding these exceptions is available on the "4 Day /10 Hour Work Schedule" form (PW 30R).

Wages and Supplements

The wages and supplements to be paid and/or provided to laborers, workers, and mechanics employed on a public workproject shall be not less than those listed in the current Prevailing Rate Schedule for the locality where the work isperformed. If a prime contractor on a public work project has not been provided with a Prevailing Rate Schedule, thecontractor must notify the Department of Jurisdiction (Contracting Agency) who in turn must request an original PrevailingRate Schedule form the Bureau of Public Work. Requests may be submitted by: mail to NYSDOL, Bureau of Public Work,State Office Bldg. Campus, Bldg. 12, Rm. 130, Albany, NY 12240; Fax to Bureau of Public Work (518) 485-1870; orelectronically at the NYSDOL website www.labor.state.ny.us.

Upon receiving the original schedule, the Department of Jurisdiction (Contracting Agency) is REQUIRED to providecomplete copies to all prime contractors who in turn MUST, by law, provide copies of all applicable county schedules toeach subcontractor and obtain from each subcontractor, an affidavit certifying such schedules were received. If the originalschedule expired, the contractor may obtain a copy of the new annual determination from the NYSDOL websitewww.labor.state.ny.us.

The Commissioner of Labor makes an annual determination of the prevailing rates. This determination is in effect fromJuly 1st through June 30th of the following year. The annual determination is available on the NYSDOL websitewww.labor.state.ny.us.

Payrolls and Payroll Records

Every contractor and subcontractor MUST keep original payrolls or transcripts subscribed and affirmed as true underpenalty of perjury. Payrolls must be maintained for at least three (3) years from the project's date of completion. At aminimum, payrolls must show the following information for each person employed on a public work project: Name,Address, Last 4 Digits of Social Security Number, Classification(s) in which the worker was employed, Hourly wage rate(s)paid, Supplements paid or provided, and Daily and weekly number of hours worked in each classification.

Page 67 of 152

Page 68: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Every contractor and subcontractor shall submit to the Department of Jurisdiction (Contracting Agency), within thirty (30)days after issuance of its first payroll and every thirty (30) days thereafter, a transcript of the original payrolls, subscribedand affirmed as true under penalty of perjury. The Department of Jurisdiction (Contracting Agency) shall collect, reviewfor facial validity, and maintain such payrolls.

In addition, the Commissioner of Labor may require contractors to furnish, with ten (10) days of a request, payroll recordssworn to as their validity and accuracy for public work and private work. Payroll records include, by are not limited to timecards, work description sheets, proof that supplements were provided, cancelled payroll checks and payrolls. Failure toprovide the requested information within the allotted ten (10) days will result in the withholding of up to 25% of thecontract, not to exceed $100,000.00. If the contractor or subcontractor does not maintain a place of business in New YorkState and the amount of the contract exceeds $25,000.00, payroll records and certifications must be kept on the projectworksite.

The prime contractor is responsible for any underpayments of prevailing wages or supplements by any subcontractor.

All contractors or their subcontractors shall provide to their subcontractors a copy of the Prevailing Rate Schedulespecified in the public work contract as well as any subsequently issued schedules. A failure to provide these schedulesby a contractor or subcontractor is a violation of Article 8, Section 220-a of the Labor Law.

All subcontractors engaged by a public work project contractor or its subcontractor, upon receipt of the original scheduleand any subsequently issued schedules, shall provide to such contractor a verified statement attesting that thesubcontractor has received the Prevailing Rate Schedule and will pay or provide the applicable rates of wages andsupplements specified therein. (See NYS Labor Laws, Article 8 . Section 220-a).

Determination of Prevailing Wage and Supplement Rate Updates Applicable to All Counties

The wages and supplements contained in the annual determination become effective July 1st whether or not the newdetermination has been received by a given contractor. Care should be taken to review the rates for obvious errors. Anycorrections should be brought to the Department's attention immediately. It is the responsibility of the public workcontractor to use the proper rates. If there is a question on the proper classification to be used, please call the districtoffice located nearest the project. Any errors in the annual determination will be corrected and posted to the NYSDOLwebsite on the first business day of each month. Contractors are responsible for paying these updated rates as well,retroactive to July 1st.

When you review the schedule for a particular occupation, your attention should be directed to the dates above thecolumn of rates. These are the dates for which a given set of rates is effective. To the extent possible, the Departmentposts rates in its possession that cover periods of time beyond the July 1st to June 30th time frame covered by aparticular annual determination. Rates that extend beyond that instant time period are informational ONLY and may beupdated in future annual determinations that actually cover the then appropriate July 1st to June 30th time period.

Withholding of Payments

When a complaint is filed with the Commissioner of Labor alleging the failure of a contractor or subcontractor to pay orprovide the prevailing wages or supplements, or when the Commissioner of Labor believes that unpaid wages orsupplements may be due, payments on the public work contract shall be withheld from the prime contractor in a sufficientamount to satisfy the alleged unpaid wages and supplements, including interest and civil penalty, pending a finaldetermination.

When the Bureau of Public Work finds that a contractor or subcontractor on a public work project failed to pay or providethe requisite prevailing wages or supplements, the Bureau is authorized by Sections 220-b and 235.2 of the Labor Law toso notify the financial officer of the Department of Jurisdiction (Contracting Agency) that awarded the public work contract.Such officer MUST then withhold or cause to be withheld from any payment due the prime contractor on account of suchcontract the amount indicated by the Bureau as sufficient to satisfy the unpaid wages and supplements, including interestand any civil penalty that may be assessed by the Commissioner of Labor. The withholding continues until there is a finaldetermination of the underpayment by the Commissioner of Labor or by the court in the event a legal proceeding isinstituted for review of the determination of the Commissioner of Labor.

The Department of Jurisdiction (Contracting Agency) shall comply with this order of the Commissioner of Labor or of thecourt with respect to the release of the funds so withheld.

Summary of Notice Posting Requirements

The current Prevailing Rate Schedule must be posted in a prominent and accessible place on the site of the public workproject. The prevailing wage schedule must be encased in, or constructed of, materials capable of withstanding adverseweather conditions and be titled "PREVAILING RATE OF WAGES" in letters no smaller than two (2) inches by two (2)inches.

The "Public Work Project" notice must be posted at the beginning of the performance of every public work contract, oneach job site.

Page 68 of 152

Page 69: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Every employer providing workers. compensation insurance and disability benefits must post notices of such coverage inthe format prescribed by the Workers. Compensation Board in a conspicuous place on the jobsite.

Every employer subject to the NYS Human Rights Law must conspicuously post at its offices, places of employment, oremployment training centers, notices furnished by the State Division of Human Rights.

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite noticesfurnished by the NYS Department of Labor.

Apprentices

Employees cannot be paid apprentice rates unless they are individually registered in a program registered with the NYSCommissioner of Labor. The allowable ratio of apprentices to journeyworkers in any craft classification can be no greaterthan the statewide building trade ratios promulgated by the Department of Labor and included with the Prevailing RateSchedule. An employee listed on a payroll as an apprentice who is not registered as above or is performing work outsidethe classification of work for which the apprentice is indentured, must be paid the prevailing journeyworker's wage rate forthe classification of work the employee is actually performing.

NYSDOL Labor Law, Article 8, Section 220-3, require that only apprentices individually registered with the NYSDepartment of Labor may be paid apprenticeship rates on a public work project. No other Federal or State Agency ofoffice registers apprentices in New York State.

Persons wishing to verify the apprentice registration of any person must do so in writing by mail, to the NYSDOL Office ofEmployability Development / Apprenticeship Training, State Office Bldg. Campus, Bldg. 12, Albany, NY 12240 or by Faxto NYSDOL Apprenticeship Training (518) 457-7154. All requests for verification must include the name and socialsecurity number of the person for whom the information is requested.

The only conclusive proof of individual apprentice registration is written verification from the NYSDOL ApprenticeshipTraining Albany Central office. Neither Federal nor State Apprenticeship Training offices outside of Albany can provideconclusive registration information.

It should be noted that the existence of a registered apprenticeship program is not conclusive proof that any person isregistered in that program. Furthermore, the existence or possession of wallet cards, identification cards, or copies ofstate forms is not conclusive proof of the registration of any person as an apprentice.

Interest and Penalties

In the event that an underpayment of wages and/or supplements is found:

- Interest shall be assessed at the rate then in effect as prescribed by the Superintendent of Banks pursuant tosection 14-a of the Banking Law, per annum from the date of underpayment to the date restitution is made.

- A Civil Penalty may also be assessed, not to exceed 25% of the total of wages, supplements, and interest due.

Debarment

Any contractor or subcontractor and/or its successor shall be ineligible to submit a bid on or be awarded any public workcontract or subcontract with any state, municipal corporation or public body for a period of five (5) years when:

- Two (2) willful determinations have been rendered against that contractor or subcontractor and/or its successorwithin any consecutive six (6) year period.

- There is any willful determination that involves the falsification of payroll records or the kickback of wages orsupplements.

Criminal Sanctions

Willful violations of the Prevailing Wage Law (Article 8 of the Labor Law) may be a felony punishable by fine orimprisonment of up to 15 years, or both.

Discrimination

No employee or applicant for employment may be discriminated against on account of age, race, creed, color, nationalorigin, sex, disability or marital status.

No contractor, subcontractor nor any person acting on its behalf, shall by reason of race, creed, color, disability, sex ornational origin discriminate against any citizen of the State of New York who is qualified and available to perform the workto which the employment relates (NYS Labor Law, Article 8, Section 220-e(a)).

No contractor, subcontractor, nor any person acting on its behalf, shall in any manner, discriminate against or intimidateany employee on account of race, creed, color, disability, sex, or national origin (NYS Labor Law, Article 8, Section 220-e(b) ).

Page 69 of 152

Page 70: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

The Human Rights Law also prohibits discrimination in employment because of age, marital status, or religion.

There may be deducted from the amount payable to the contractor under the contract a penalty of $50.00 for eachcalendar day during which such person was discriminated against or intimidated in violation of the provision of the contract (NYS Labor Law, Article 8, Section 220-e(c) ).

The contract may be cancelled or terminated by the State or municipality. All monies due or to become due thereundermay be forfeited for a second or any subsequent violation of the terms or conditions of the anti-discrimination sections ofthe contract (NYS Labor Law, Article 8, Section 220-e(d) ).

Every employer subject to the New York State Human Rights Law must conspicuously post at its offices, places ofemployment, or employment training centers notices furnished by the State Division of Human Rights.

Workers' Compensation

In accordance with Section 142 of the State Finance Law, the contractor shall maintain coverage during the life of thecontract for the benefit of such employees as required by the provisions of the New York State Workers' CompensationLaw.

A contractor who is awarded a public work contract must provide proof of workers' compensation coverage prior to beingallowed to begin work.

The insurance policy must be issued by a company authorized to provide workers' compensation coverage in New YorkState. Proof of coverage must be on form C-105.2 (Certificate of Workers' Compensation Insurance) and must name thisagency as a certificate holder.

If New York State coverage is added to an existing out-of-state policy, it can only be added to a policy from a companyauthorized to write workers' compensation coverage in this state. The coverage must be listed under item 3A of theinformation page.

The contractor must maintain proof that subcontractors doing work covered under this contract secured and maintained aworkers' compensation policy for all employees working in New York State.

Every employer providing worker's compensation insurance and disability benefits must post notices of such coverage inthe format prescribed by the Workers' Compensation Board in a conspicuous place on the jobsite.

Unemployment Insurance

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite noticesfurnished by the New York State Department of Labor.

Page 70 of 152

Page 71: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Notice of Contract Award

New York State Labor Law, Article 8, Section 220.3a requires that certain informationregarding the awarding of public work contracts, be furnished to the Commissioner of Labor.One "Notice of Contract Award" (PW 16, which may be photocopied), MUST be completedfor EACH prime contractor on the above referenced project.

Upon notifying the successful bidder(s) of this contract, enter the required information andmail OR fax this form to the office shown at the bottom of this notice, OR fill out theelectronic version via the NYSDOL website.

Contractor InformationAll information must be supplied

Federal Employer Identification Number:

Name:

Address:

aaa

City: State: Zip:

Contract Type:[ ] (01) General Construction[ ] (02) Heating/Ventilation[ ] (03) Electrical[ ] (04) Plumbing[ ] (05) Other :

Amount of Contract: $

Approximate Starting Date: - - - - /- - - - /

Approximate Completion Date: - - - - /- - - - /

Phone: (518) 457-5589 Fax: (518) 485-1870 W. Averell Harriman State Office Campus, Bldg. 12, Room 130, Albany, NY 12240

www.labor.state.ny.us. PW 16 [email protected]

Andrew M. Cuomo, Governor Roberta Reardon, Commissioner

Allegany County Yvonne Marks, DPW Fiscal Manager7 Court StRoom 210Belmont NY 14813

Schedule Year 2016 through 2017Date Requested 01/13/2017PRC# 2017000429

Location Various County RoadsProject ID#Project Type Paving and Surface Treatment of various county roads

Page 71 of 152

Page 72: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 72 of 152

Page 73: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

IMPORTANT NOTICE

FOR

CONTRACTORS & CONTRACTING AGENCIES

Social Security Numbers on Certified Payrolls

The Department of Labor is cognizant of the concerns of the potential for misuse or inadvertent disclosure of social security numbers. Identity theft is a growing problem and we are sympathetic to contractors’ concerns with regard to inclusion of this information on payrolls if another identifier will suffice. For these reasons, the substitution of the use of the last four digits of the social security number on certified payrolls submitted to contracting agencies on public work projects is now acceptable to the Department of Labor.

NOTE: This change does not affect the Department’s ability to request and receive the entire social security number from employers during the course of its public work / prevailing wage investigations.

Page 73 of 152

Page 74: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

To all State Departments, Agency Heads and Public Benefit Corporations IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

Budget Policy & Reporting Manual

B-610Public Work Enforcement Fund

effective date December 7, 2005

1. Purpose and Scope:

This Item describes the Public Work Enforcement Fund (the Fund, PWEF) and itsrelevance to State agencies and public benefit corporations engaged in construction orreconstruction contracts, maintenance and repair, and announces the recently-enactedincrease to the percentage of the dollar value of such contracts that must be deposited intothe Fund. This item also describes the roles of the following entities with respect to theFund:

- New York State Department of Labor (DOL),- The Office of the State of Comptroller (OSC), and- State agencies and public benefit corporations.

2. Background and Statutory References:

DOL uses the Fund to enforce the State's Labor Law as it relates to contracts forconstruction or reconstruction, maintenance and repair, as defined in subdivision two ofSection 220 of the Labor Law. State agencies and public benefit corporations participatingin such contracts are required to make payments to the Fund.

Chapter 511 of the Laws of 1995 (as amended by Chapter 513 of the Laws of 1997,Chapter 655 of the Laws of 1999, Chapter 376 of the Laws of 2003 and Chapter 407 of theLaws of 2005) established the Fund.

3. Procedures and Agency Responsibilities:

The Fund is supported by transfers and deposits based on the value of contracts forconstruction and reconstruction, maintenance and repair, as defined in subdivision two ofSection 220 of the Labor Law, into which all State agencies and public benefit corporationsenter.

Chapter 407 of the Laws of 2005 increased the amount required to be provided to this fundto .10 of one-percent of the total cost of each such contract, to be calculated at the timeagencies or public benefit corporations enter into a new contract or if a contract is amended.The provisions of this bill became effective August 2, 2005.

Page 74 of 152

Page 75: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

To all State Departments, Agency Heads and Public Benefit Corporations IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

OSC will report to DOL on all construction-related ("D") contracts approved during themonth, including contract amendments, and then DOL will bill agencies the appropriateassessment monthly. An agency may then make a determination if any of the billedcontracts are exempt and so note on the bill submitted back to DOL. For any instancewhere an agency is unsure if a contract is or is not exempt, they can call the Bureau ofPublic Work at the number noted below for a determination. Payment by check or journalvoucher is due to DOL within thirty days from the date of the billing. DOL will verify theamounts and forward them to OSC for processing.

For those contracts which are not approved or administered by the Comptroller, monthlyreports and payments for deposit into the Public Work Enforcement Fund must be providedto the Administrative Finance Bureau at the DOL within 30 days of the end of each monthor on a payment schedule mutually agreed upon with DOL.

Reports should contain the following information:

- Name and billing address of State agency or publicbenefit corporation;

- State agency or public benefit corporation contact andphone number;

- Name and address of contractor receiving the award;- Contract number and effective dates;- Contract amount and PWEF assessment charge (if

contract amount has been amended, reflect increase ordecrease to original contract and the adjustment in thePWEF charge); and

- Brief description of the work to be performed under eachcontract.

Checks and Journal Vouchers, payable to the "New York State Department of Labor"should be sent to:

Department of LaborAdministrative Finance Bureau-PWEF Unit

Building 12, Room 464State Office CampusAlbany, NY 12240

Any questions regarding billing should be directed to NYSDOL's Administrative FinanceBureau-PWEF Unit at (518) 457-3624 and any questions regarding Public Work Contractsshould be directed to the Bureau of Public Work at (518) 457-5589.

Page 75 of 152

Page 76: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Construction Industry Fair Play Act

Required Posting For Labor Law Article 25-B § 861-d

Construction industry employers must post the "Construction Industry Fair Play Act" notice in a prominent and accessible place on the job site. Failure to post the notice can result in penalties of up to $1,500 for a first offense and up to $5,000 for a second offense. The posting is included as part of this wage schedule. Additional copies may be obtained from the NYS DOL website, www.labor.ny.gov. If you have any questions concerning the Fair Play Act, please call the State Labor Department toll-free at 1-866-435-1499 or email us at: [email protected] .

Page 76 of 152

Page 77: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

New York State Department of LaborRequired Notice under Article 25-B of the Labor Law

ATTENTION ALL EMPLOYEES, CONTRACTORS AND SUBCONTRACTORS:YOU ARE COVERED BY THE

CONSTRUCTION INDUSTRY FAIR PLAY ACT The law says that you are an employee unless:

You are free from direction and control in performing your job ANDYou perform work that is not part of the usual work done by the business that hired you ANDYou have an independently established business

Your employer cannot consider you to be an independent contractor unless all three of these facts apply to your work.

IT IS AGAINST THE LAW FOR AN EMPLOYER TO MISCLASSIFY EMPLOYEES AS INDEPENDENT CONTRACTORS OR PAY EMPLOYEES OFF-THE-BOOKS.

Employee rights. If you are an employee: You are entitled to state and federal worker protections such as

o unemployment benefits, if unemployed through no fault of your own, able to work, and otherwise qualified

o workers’ compensation benefits for on-the-job injuries o payment for wages earned, minimum wage, and overtime (under certain conditions) o prevailing wages on public work projects o the provisions of the National Labor Relations Act ando a safe work environment

It is a violation of this law for employers to retaliate against anyone who asserts their rights under the law. Retaliation subjects an employer to civil penalties, a private lawsuit or both.

Independent Contractors: If you are an independent contractor: You must pay all taxes required by New York State and Federal Law.

Penalties for paying off-the-books or improperly treating employees as independent contractors:

Civil Penalty First Offense: up to $2,500 per employee.Subsequent Offense(s): up to $5,000 per employee.

Criminal Penalty First Offense: Misdemeanor - up to 30 days in jail, up to a $25,000 fine and debarment from performing Public Work for up to one year.Subsequent Offense(s): Misdemeanor - up to 60 days in jail, up to a $50,000 fine and debarment from performing Public Work for up to 5 years.

If you have questions about your employment status or believe that your employer may have violated your rights and you want to file a complaint, call the Department of Labor at 1(866)435-1499 or send an email to [email protected]. All complaints of fraud and violations are taken seriously and you can remain anonymous.

Employer Name:

IA 999 (09/10)

Page 77 of 152

Page 78: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

(11.11)

WORKER NOTIFICATION (Labor Law §220, paragraph a of subdivision 3-a)

Effective February 24, 2008

This provision is an addition to the existing prevailing wage rate

law, Labor Law §220, paragraph a of subdivision 3-a. It requires

contractors and subcontractors to provide written notice to all

laborers, workers or mechanics of the prevailing wage rate for

their particular job classification on each pay stub*. It also requires

contractors and subcontractors to post a notice at the beginning of

the performance of every public work contract on each job site that

includes the telephone number and address for the Department of

Labor and a statement informing laborers, workers or mechanics of

their right to contact the Department of Labor if he/she is not

receiving the proper prevailing rate of wages and/or supplements

for his/her particular job classification. The required notification

will be provided with each wage schedule, may be downloaded

from our website www.labor.state.ny.us or made available upon

request by contacting the Bureau of Public Work at 518-457-5589.

* In the event that the required information will not fit on the pay stub, an accompanying sheet or attachment of the information will suffice.

Page 78 of 152

Page 79: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

New York State Department of Labor Bureau of Public Work

Attention Employees THIS IS A: PUBLIC WORK

PROJECTIf you are employed on this project as a worker, laborer, or mechanic you are entitled to receive the prevailing wage and supplements rate for the classification at which you are working.

Chapter 629 of the Labor Laws of 2007:

These wages are set by law and must be posted at the work site. They can also be found at:www.labor.ny.gov

If you feel that you have not received proper wages or benefits, please call our nearest office.*

Albany Binghamton Buffalo Garden City New York City Newburgh

(518) 457-2744(607) 721-8005 (716) 847-7159 (516) 228-3915 (212) 932-2419 (845) 568-5156

PatchogueRochester Syracuse Utica White Plains

(631) 687-4882(585) 258-4505 (315) 428-4056 (315) 793-2314 (914) 997-9507

* For New York City government agency construction projects, please contact the Office of the NYC Comptroller at (212) 669-4443, or

www.comptroller.nyc.gov – click on Bureau of Labor Law.

Contractor Name:

Project Location:

PW 101 (4.15) Page 79 of 152

Page 80: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 80 of 152

Page 81: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

(03.12) Page 1 of 2

OSHA 10-hour ConstructionSafety and Health Course – S1537-A

Effective July 18, 2008

This provision is an addition to the existing prevailing wage rate

law, Labor Law §220, section 220-h. It requires that on all public

work projects of at least $250,000.00, all laborers, workers and

mechanics working on the site, be certified as having successfully

completed the OSHA 10-hour construction safety and health course.

It further requires that the advertised bids and contracts for every

public work contract of at least $250,000.00, contain a provision of

this requirement.

The OSHA 10 Legislation only applies to workers

on a public work project that are required, under

Article 8, to receive the prevailing wage.

NOTE:

Page 81 of 152

Page 82: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

(03.12) Page 2 of 2

Where to find OSHA 10-hour Construction Course

1. NYS Department of Labor website for scheduled outreach training at:

www.labor.state.ny.us/workerprotection/safetyhealth/DOSH_ONSITE_CONSULTATION.shtm

2. OSHA Training Institute Education Centers:

Rochester Institute of Technology OSHA Education Center Rochester, NYDonna Winter Fax (585) 475-6292 e-mail: [email protected](866) 385-7470 Ext. 2919 www.rit.edu/~outreach/course.php3?CourseID=54

Atlantic OSHA Training CenterUMDNJ – School of Public Health Piscataway, NJJanet Crooks Fax (732) 235-9460 e-mail: [email protected](732) 235-9455 https://ophp.umdnj.edu/wconnect/ShowSchedule.awp?~~GROUP~AOTCON~10~

Atlantic OSHA Training CenterUniversity at BuffaloBuffalo, New York Joe SyracuseFax (716) 829-2806 e-mail:mailto:[email protected](716) 829-2125 http://www.smbs.buffalo.edu/CENTERS/trc/schedule_OSHA.php

Keene State CollegeManchester, NHLeslie Singletone-mail: [email protected](800) 449-6742 www.keene.edu/courses/print/courses_osha.cfm

3. List of trainers and training schedules for OSHA outreach training at:

www.OutreachTrainers.org

Page 82 of 152

Page 83: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 1 of 1

RRequirements for OSHA 10 Compliance

Chapter 282 of the Laws of 2007, codified as Labor Law 220-h took effect on July 18, 2008. The statute provides as follows:

The advertised specifications for every contract for public work of $250,000.00 or more must contain a provision requiring that every worker employed in the performance of a public work contract shall be certified as having completed an OSHA 10 safety training course. The clear intent of this provision is to require that all employees of public work contractors, required to be paid prevailing rates, receive such training “prior to the performing any work on the project.”

The Bureau will enforce the statute as follows:

All contractors and sub contractors must attach a copy of proof of completion of the OSHA 10 course to the first certified payroll submitted to the contracting agency and on each succeeding payroll where any new or additional employee is first listed.

Proof of completion may include but is not limited to:

Copies of bona fide course completion card (Note: Completion cards do not have an expiration date.)

Training roster, attendance record of other documentation from the certified trainer pending the issuance of the card.

Other valid proof

**A certification by the employer attesting that all employees have completed such a course is not sufficient proof that the course has been completed.

Any questions regarding this statute may be directed to the New York State Department of Labor, Bureau of Public Work at 518-485-5696.

Page 83 of 152

Page 84: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 84 of 152

Page 85: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

PW30R-Notice (03.11) NYSDOL Bureau of Public Work 1 of 1

IMPORTANT INFORMATION

Regarding Use of Form PW30R

“Employer Registration for Use of 4 Day / 10 Hour Work Schedule”

To use the ‘4 Day / 10 Hour Work Schedule’:

There MUST be a Dispensation of Hours (PW30) in place on the project

AND

You MUST register your intent to work 4 / 10 hour days, by

completing the PW30R Form.

REMEMBER…

The ‘4 Day / 10 Hour Work Schedule’ applies ONLY to Job Classifications and Counties listed on the PW30R Form.

Do not write in any additional Classifications or Counties.

(Please note : For each Job Classification check the individual wage

schedule for specific details regarding their 4/10 hour day posting.)

Page 85 of 152

Page 86: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

PW30R-Instructions (03.11) NYSDOL Bureau of Public Work 1 of 1

Instructions (Type or Print legibly):

Contractor Information: Enter the Legal Name of the business, FEIN, Street Address, City, State, Zip Code; the Company’s

Phone and Fax numbers; and the Company’s email address (if applicable)

Enter the Name of a Contact Person for the Company along with their Phone and Fax numbers, and the personal email address (if applicable)

Project Information:

Enter the Prevailing Rate Case number (PRC#) assigned to this project

Enter the Project Name / Type (i.e. Smithtown CSD – Replacement of HS Roof)

Enter the Exact Location of Project (i.e. Smithtown HS, 143 County Route #2, Smithtown,NY; Bldgs. 1 & 2)

If you are a Subcontractor, enter the name of the Prime Contractor for which you work

On the Checklist of Job Classifications -

o Go to pages 2 and 3 of the form o Place a checkmark in the box to the right of the Job Classification you are choosing o Mark all Job Classifications that apply

***Do not write in any additional Classifications or Counties.***

Requestor Information: Enter the name of the person submitting the registration, their title with the company , and the

date the registration is filled out

Return Completed Form:

Mail the completed PW30R form (3 pages) to: NYSDOL Bureau of Public Work, SOBC – Bldg.12 – Rm.130, Albany, NY 12240 -OR -

Fax the completed PW30R form (3 pages) to: NYSDOL Bureau of Public Work at (518)485-1870

Instructions for Completing Form PW30R

“Employer Registration for Use of 4 Day / 10 Hour Work Schedule”

Before completing Form PW30R check to be sure …

There is a Dispensation of Hours in place on the project.

The 4 Day / 10 Hour Work Schedule applies to the Job Classifications you will be using.

The 4 Day / 10 Hour Work Schedule applies to the County / Counties where the work will take place.

Page 86 of 152

Page 87: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

PW-30R (07.16)

Bureau of Public Work Harriman State Office Campus

Building 12 - Room 130 Albany, New York 12240

Phone - (518) 457-5589 Fax - (518) 485-1870

Date :

Name:

Title:

Company Name:

City: State:

Fax Number: Email Address:

Contractor Information

Address:

Zip Code:

Project PRC#:

Exact Location of Project:

Project Information

Requestor Information

Project Name/Type:

(If you are Subcontractor) Prime Contractor Name:

Contact Person:

FEIN:

Phone Number

Phone No: Fax No: Email:

1 of 8

County:

Job Classification(s) to Work 4/10 Schedule: (Choose all that apply on Job Classification Checklist - Pages 3 -7) *** Do not write in any additional Classifications or Counties***

Before completing Form PW30R check to be sure … There is a Dispensation of Hours in place on the project. The 4 Day / 10 Hour Work Schedule applies to the Job Classifications you will be using. The 4 Day / 10 Hour Work Schedule applies to the County / Counties where the work will take place.

Please Type or Print the Requested Information

When completed … Mail to NYSDOL Bureau of Public Work, SOBC, Bldg. 12, Rm.130, Albany, NY 12240 -or- Fax to NYSDOL Bureau of Public Work at (518) 485-1870

Employer Registration for Use of 4 Day / 10 Hour Work Schedule

Page 87 of 152

Page 88: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Please use the list below with the number assigned to each county as a reference to the corresponding numbers listed in the following pages under "Entire Counties" & "Partial Counties".

1. Albany County

2. Allegany County

3. Bronx County

4. Broome County

5. Cattaraugus County

6. Cayuga County

7. Chautauqua County

8. Chemung County

9. Chenango County

10. Clinton County

11. Columbia County

12. Cortland County

13. Delaware County

14. Dutchess County

15. Erie County

16. Essex County

17. Franklin County

18. Fulton county

19. Genesee County

20. Greene County

21. Hamilton County

22. Herkimer County

23. Jefferson County

24. Kings County (Brooklyn)

25. Lewis County

26. Livingston County

27. Madison County

28. Monroe County

29. Montgomery County

30. Nassau County

31. New York County (Manhattan)

32. Niagara County

33. Oneida County 34. Onondaga County 35. Ontario County 36. Orange County 37. Orleans County 38. Oswego County 39. Otsego County 40. Putnam County 41. Queens County 42. Rensselaer County 43. Richmond County (Staten Island) 44. Rockland County 45. Saint Lawrence County 46. Saratoga County 47. Schenectady County 48. Schoharie County 49. Schuyler County 50. Seneca County 51. Steuben County 52. Suffolk County 53. Sullivan County 54. Tioga County 55. Tompkins County 56. Ulster County 57. Warren county 58. Washington County 59. Wayne County 60. Westchester County 61. Wyoming County 62. Yates County

2 of 8NYSDOL Bureau of Public WorkPW-30R (07.16) Page 88 of 152

Page 89: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial CountiesCheck Box

Carpenter-Building 276B-All 7 2 ,5

Carpenter-Building 276B-Cat 15 5

Carpenter - Building 276-B--LIV 26, 28, 35, 59 61

Carpenter-Building 276B-Gen 19, 32, 37 61

Carpenter-Floor Layers 276B-FL-Liv 26, 28, 35, 59 61

Carpenter-Heavy&Highway 276HH-All 2, 5, 7

Carpenter-Heavy&Highway 276HH-Erie 15

Carpenter-Heavy&Highway 276HH- Gen 19, 32, 37, 61

Carpenter-Heavy&Highway 276HH-Liv 26, 28, 35, 59

Carpenter-Residential 276R-All 7 2, 5

Carpenter - Building 277B-Bro 4, 54

Carpenter - Building 277B-CAY 6, 50, 62

Carpenter - Building 277B-CS 8, 12, 49, 51, 55 2

Carpenter - Building 277 JLS 23, 25, 45

Carpenter - Building 277 omh 22, 27, 33

Carpenter - Building 277 On 34

Carpenter - Building 277 Os 38

Carpenter - Building 277CDO Bldg 9, 13, 39

Carpenter - Heavy&Highway 277CDO HH 9, 13, 39

Carpenter - Heavy&Highway 277HH-BRO4, 6, 8, 12, ,22, 23, 25, 27, 33, 34, 38, 45, 49, 50, 51, 54, 55, 62

Carpenter - Building 291B-Alb 1, 18, 20, 29, 42, 47, 48

Carpenter - Building 291B-Cli 10, 16, 17

Carpenter - Building 291B-Ham 21, 57, 58

Carpenter - Building 291B-Sar 46

Carpenter - Heavy&Highway 291HH-Alb1, 10, 16, 17,18, 20, 21, 29, 42, 46, 47, 48, 57, 58

Electrician 25m 30, 52

Electrician-Teledata Cable Splicer 43 12, 22, 27, 33, 38 6, 9, 34, 39, 55, 59

PW-30R (07.16) 3 of 8NYSDOL Bureau of Public WorkPage 89 of 152

Page 90: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial Counties CheckBox

Electrician 86 26, 28 19, 35, 37, 59, 61

Electrician840Teledata and 840 Z1 62 6, 34, 35, 50, 59

Electrician 910 10, 16, 17, 23, 25, 45

Electrician Lineman 1049Line/Gas 30, 41, 52

Electrician Lineman

1249a

1, 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 25, 26, 27, 28, 29, 32, 33, 34, 35, 36, 37, 38, 39, 40, 42, 44, 46, 47, 48, 49, 50, 45, 51, 53, 54, 55, 56, 57, 58, 59, 61, 62

Electrical Lineman 1249a West 60

Electrical Lineman 1249a-LT1, 2, 4, 5, 6, 7, 8, 9, 10, 12, 13, 15, 16, 17, 18, 19, 20, 21, 22, 23, 25, 26, 27, 28, 29, 32, 33, 34, 35, 37, 38, 39, 42, 46, 47, 48, 49, 50, 45, 51, 53, 54, 55, 57, 58, 59, 61, 62

Electrical Lineman 1249aREG8LT 11, 14, 36, 40, 44, 56

Electrical Lineman 1249aWestLT 60

Elevator Constructor 138 11, 14, 20, 36, 40, 53, 56 13, 44, 60

Elevator Constructor 14 2, 5, 7, 15, 19, 32, 37, 61

Elevator Constructor 27 8, 26, 28, 35, 49, 50, 51, 59, 62

Elevator Constructor 351, 10, 16, 18, 21, 22, 29, 39, 42, 46, 47, 48, 57, 58

Elevator Constructor 62.1 4, 6, 9, 12, 23, 25, 27, 33, 34, 38, 45, 54, 55 13

Glazier 201 1, 10, 11, 16, 17, 18, 20, 21, 29, 42, 46, 47, 48, 57, 58

Glazier 660r 2, 5, 7, 15, 19, 32, 37, 61

Glazier 660 2, 5, 7, 15, 19, 32, 37, 61

Glazier 677.1 23, 25, 26, 28, 35, 45, 50, 59, 62

Glazier 677Z-2 6, 12, 22, 27, 33, 34, 38

Glazier 677z3 4, 8, 9, 13, 39, 49, 51, 54, 55

Glazier 677r.2 6, 12, 22, 27, 33, 34, 38

Insulator - Heat & Frost 30-Syracuse4, 6, 8, 9, 12, 22, 23, 25, 27, 33, 34, 38, 39, 49, 50, 45, 54, 55

Laborers- Tunnel 157 47 18, 29, 46

Laborers- Heavy & Highway 157h/h 47 18, 29, 46

PW-30R (07.16) 4 of 8NYSDOL Bureau of Public WorkPage 90 of 152

Page 91: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial Counties Check Box

Laborers- Heavy & Highway 1822/2h 10,16,57

Laborers- Heavy & Highway 1822/2h(2) 17, 23, 25, 45

Laborers- Tunnel 1822T 10, 16 57

Laborers- Tunnel 1822T(2) 17, 23, 25, 45

Laborers- Tunnel 35T 21, 22, 27, 33 18, 29

Laborers- Tunnel 190 1, 42, 58 11, 20, 46

Laborers- Heavy & Highway 190 h/h 1, 42, 58 11, 20, 46

Laborers- Heavy & Highway 35/2h 21, 22, 27, 33 18, 29

Laborers- Tunnel 35T 21, 22, 27, 33 18, 29

Laborers- Heavy & Highway 633hON 34

Laborers- Heavy & Highway 633hOS 38

Laborers- Heavy & Highway 633h Cay 6

Laborers- building 633 bON 34

Laborers- building 633b Cay 6

Laborers- building 633bOS 38

Laborers- Tunnel 633T (Cay) 6

Laborers- Tunnel 633T (ON) 34

Laborers- Tunnel 633T (OS) 38

Laborers- Heavy & Highway 785h 12, 55 49, 54

Laborers-Tunnel 785T 12, 55

Laborers - Building 785(7) 4 9, 13, 54

Laborers - Building 785B-CS 8, 51 49

Laborers- Heavy & Highway 7-785b 12, 55 49, 54

Laborers Heavy & Highway 785(7) 4 9, 13, 54

Laborer - Heavy & Highway 785HH-CS 8, 51 49

Laborer - Building 621b 2, 7 5

Laborer - Residential 621r 2, 7 5

PW-30R (07.16) 5 of 8NYSDOL Bureau of Public Work Page 91 of 152

Page 92: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial Counties Check Box

Mason-Building2TS.1 1, 10,11, 16, 17, 18, 20, 21, 29, 42, 46, 47,

48, 57, 58

Mason-Building 2TS.2 22, 23, 25, 33, 45 27

Mason-Building 2TS.3 6, 34, 38 27

Mason-Building2b-on 34

Mason-Building2b.1 1, 11, 18, 20, 21, 29, 42, 46, 47, 48, 58 57

Mason-Building2b.2 22, 33 25

Mason-Building 2b.3 6, 34 27

Mason-Building 2b.4 38

Mason-Building2b.5 23 25

Mason-Building2b.6 45

Mason-Building2b.8 10, 16, 17 57

Mason-Building2b.5 23 25

Mason-Building2b.6 45

Mason-Building2b.8 10, 16, 17 57

Mason-Building 3b-Co-Z2 8, 49, 51 2

Mason-Building 3B-Z1 19, 26, 28, 35, 50, 59, 61, 62

Mason-Building-Residential 3B-Z1R 19, 26, 28, 35, 50, 59, 61, 62

Mason-Building 3B-Bing-Z2 4, 9, 13, 39, 54

Mason-Building 3B-Ith-Z2 12, 55

PW-30R (07.16) 6 of 8NYSDOL Bureau of Public WorkPage 92 of 152

Page 93: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial Counties Check Box

Mason-Building 3B-Jam-Z2 7 2, 5

Mason-Building-Residential 3B-Jam-Z2R 2, 4, 8, 7, 9, 12, 39, 13, 49, 51, 54, 55 5

Mason-Building 3B-Z3 15, 32 5

Mason-Building 3B-Z3.Orleans 37

Mason-Residential 3B-Z3R 15, 32 5

Mason-Residential 3B-Z3R.Orleans 37

Mason-Heavy Highway 3h2, 4, 8, 7, 9, 12, 13, 19, 26, 28, 35, 37, 39, 49, 50, 51, 54, 55, 59, 61, 62 5, 15, 32

Mason-Tile Finisher 3TF-Z1 19, 26, 28, 35, 50, 59, 61, 62

Mason-Tile Finisher 3TF-Z2 2, 4, 8, 7, 9, 12, 13, 39, 49, 51, 54, 55 5

Mason-Tile Finisher 3TF-Z3 15, 32, 37 5

Mason-Tile Finisher 3TF-Z1R 19, 26, 28, 35, 50, 59, 61, 62

Mason-Tile Finisher 3TF-Z2R 2, 4, 7, 9, 12, 13, 39, 49, 51, 54, 55 5

Mason-Tile Finisher 3TF-Z3R 15, 32, 37 5

Mason-Tile Setter 3TS-Z1 19, 26, 28, 35, 50, 59, 61, 62

Mason-Tile Setter Residential 3TS-Z1R 19, 26, 28, 35, 50, 59, 61, 62

Mason-Tile Setter 3TS-Z2 2, 4, 7, 8, 9, 12, 13, 39, 49, 51, 54, 55 5

Mason-Tile Setter Residential 3TS-Z2R 2, 4, 7, 8, 9, 12, 13, 39, 49, 51, 54, 55 5

Mason-Tile Setter Residential 3TS-Z3R 15, 32, 37 5

Mason - Building/Heavy&Highway 780 3, 24, 30, 31, 41, 43, 52

Operating Engineer - Heavy/Highway 137H/H 40, 60 14

Operating Engineer - Heavy& Highway 158-832H 2, 8, 26, 28, 35, 49, 51, 59, 62 19

Operating Engineer - Heavy& Highway 158-H/H

1, 4, 9, 10, 11, 14, 16, 17, 18, 20, 21, 22, 29, 39, 42, 46, 47, 48, 54, 57, 58

Operating Engineer - Heavy& Highway 158-545h 6, 12, 23, 25, 27, 33, 38, 45, 50, 55

Painter 1456-LS1, 3, 10, 11, 14, 16, 17, 18, 20, 21, 24, 29, 30, 31, 36, 40, 41, 42, 43, 44, 46, 47, 48, 52, 53, 56, 57, 58, 60

Painter 150 28, 59, 62 26, 35

PW-30R (07.16) 7 of 8NYSDOL Bureau of Public Work Page 93 of 152

Page 94: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Job Classification Checklist (Place a checkmark by all classifications that will be using the 4/10 schedule)

*** Do not write in any additional Classifications or Counties***

Job Classification Tag # Entire Counties Partial Counties Check Box

Painter 178 B 4, 9, 54

Painter 178 E 8, 49 51

Painter 178 I 12, 55

Painter 178 O 13, 39

Painter 31 6, 22, 27, 33, 34, 50 25, 35, 38

Painter 38.O 38

Painter 38.W 23, 45 25

Painter 4-Buf,Nia,Olean 2, 15, 19, 32, 37, 615, 7, 26, 51

Painter 4-Jamestown5, 7

Painter 38.O 38

Painter 38.W 23, 45 25

Painter 4-Buf,Nia,Olean 2, 15, 19, 32, 37, 615, 7, 26, 51

Painter 4-Jamestown5, 7

Sheetmetal Worker 46 26, 28, 35, 50, 59, 62

Sheetmetal Worker 46r 26, 28, 35, 50, 59, 62

Teamsters-Heavy&Highway 294h/h 1, 11, 18, 20, 29, 42, 46, 47, 48, 58 57

Teamsters-Heavy&Highway 317bhh 6, 12, 50, 51, 55, 62 2

Teamsters-Building/Heavy&Highway 456 40, 60

PW-30R (07.16) NYSDOL Bureau of Public Work 8 of 8Page 94 of 152

Page 95: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Introduction to the Prevailing Rate Schedule

Information About Prevailing Rate Schedule

This information is provided to assist you in the interpretation of particular requirements for each classification of worker contained in theattached Schedule of Prevailing Rates.

Classification

It is the duty of the Commissioner of Labor to make the proper classification of workers taking into account whether the work is heavy andhighway, building, sewer and water, tunnel work, or residential, and to make a determination of wages and supplements to be paid orprovided. It is the responsibility of the public work contractor to use the proper rate. If there is a question on the proper classification to beused, please call the district office located nearest the project. District office locations and phone numbers are listed below. Prevailing Wage Schedules are issued separately for "General Construction Projects" and "Residential Construction Projects" on a county-by-county basis. General Construction Rates apply to projects such as: Buildings, Heavy & Highway, and Tunnel and Water & Sewer rates. Residential Construction Rates generally apply to construction, reconstruction, repair, alteration, or demolition of one family, two family, rowhousing, or rental type units intended for residential use. Some rates listed in the Residential Construction Rate Schedule have a very limited applicability listed along with the rate. Rates foroccupations or locations not shown on the residential schedule must be obtained from the General Construction Rate Schedule. Pleasecontact the local Bureau of Public Work office before using Residential Rate Schedules, to ensure that the project meets the required criteria.

Paid Holidays

Paid Holidays are days for which an eligible employee receives a regular day's pay, but is not required to perform work. If an employeeworks on a day listed as a paid holiday, this remuneration is in addition to payment of the required prevailing rate for the work actuallyperformed.

Overtime

At a minimum, all work performed on a public work project in excess of eight hours in any one day or more than five days in any workweek isovertime. However, the specific overtime requirements for each trade or occupation on a public work project may differ. Specific overtimerequirements for each trade or occupation are contained in the prevailing rate schedules. Overtime holiday pay is the premium pay that is required for work performed on specified holidays. It is only required where the employeeactually performs work on such holidays. The applicable holidays are listed under HOLIDAYS: OVERTIME. The required rate of pay for these covered holidays can be found in theOVERTIME PAY section listings for each classification.

Supplemental Benefits

Particular attention should be given to the supplemental benefit requirements. In most cases the payment or provision of supplements is foreach hour worked (noted in the schedule as 'Per hour worked'). Some classifications require the payment or provision of supplements foreach hour paid (noted in the schedule as 'Per hour paid'), which require supplements to be paid or provided at a premium rate for premiumhours worked. Some classifications may also require the payment or provision of supplements for paid holidays on which no work isperformed.

Effective Dates

When you review the schedule for a particular occupation, your attention should be directed to the dates above the column of rates. Theseare the dates for which a given set of rates is effective. The rate listed is valid until the next effective rate change or until the new annualdetermination which takes effect on July 1 of each year. All contractors and subcontractors are required to pay the current prevailing ratesof wages and supplements. If you have any questions please contact the Bureau of Public Work or visit the New York State Department ofLabor website (www.labor.state.ny.us) for current wage rate information.

Apprentice Training Ratios

The following are the allowable ratios of registered Apprentices to Journey-workers.

For example, the ratio 1:1,1:3 indicates the allowable initial ratio is one Apprentice to one Journeyworker. The Journeyworker must be inplace on the project before an Apprentice is allowed. Then three additional Journeyworkers are needed before a second Apprentice isallowed. The last ratio repeats indefinitely. Therefore, three more Journeyworkers must be present before a third Apprentice can be hired,and so on.

Please call Apprentice Training Central Office at (518) 457-6820 if you have any questions.

Title (Trade) Ratio

Boilermaker (Construction) 1:1,1:4

Boilermaker (Shop) 1:1,1:3

Carpenter (Bldg.,H&H, Pile Driver/Dockbuilder) 1:1,1:4

Carpenter (Residential) 1:1,1:3

Page 31

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429

Page 95 of 152

Page 96: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Electrical (Outside) Lineman 1:1,1:2

Electrician (Inside) 1:1,1:3

Elevator/Escalator Construction & Modernizer 1:1,1:2

Glazier 1:1,1:3

Insulation & Asbestos Worker 1:1,1:3

Iron Worker 1:1,1:4

Laborer 1:1,1:3

Mason 1:1,1:4

Millwright 1:1,1:4

Op Engineer 1:1,1:5

Painter 1:1,1:3

Plumber & Steamfitter 1:1,1:3

Roofer 1:1,1:2

Sheet Metal Worker 1:1,1:3

Sprinkler Fitter 1:1,1:2

If you have any questions concerning the attached schedule or would like additional information, please contact the nearest BUREAU ofPUBLIC WORK District Office or write to:

New York State Department of Labor Bureau of Public Work State Office Campus, Bldg. 12 Albany, NY 12240

District Office Locations: Telephone # FAX #

Bureau of Public Work - Albany 518-457-2744 518-485-0240

Bureau of Public Work - Binghamton 607-721-8005 607-721-8004

Bureau of Public Work - Buffalo 716-847-7159 716-847-7650

Bureau of Public Work - Garden City 516-228-3915 516-794-3518

Bureau of Public Work - Newburgh 845-568-5287 845-568-5332

Bureau of Public Work - New York City 212-932-2419 212-775-3579

Bureau of Public Work - Patchogue 631-687-4882 631-687-4902

Bureau of Public Work - Rochester 585-258-4505 585-258-4708

Bureau of Public Work - Syracuse 315-428-4056 315-428-4671

Bureau of Public Work - Utica 315-793-2314 315-793-2514

Bureau of Public Work - White Plains 914-997-9507 914-997-9523

Bureau of Public Work - Central Office 518-457-5589 518-485-1870

Page 32

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429

Page 96 of 152

Page 97: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Allegany County General Construction

Boilermaker 01/01/2017

JOB DESCRIPTION Boilermaker DISTRICT 12

ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua, Chemung, Erie, Genesee, Livingston, Monroe, Niagara, Ontario, Orleans, Schuyler, Steuben, Wayne,Wyoming, Yates

WAGESPer hours: 07/01/2016 01/01/2017

Boilermaker $ 32.25 $ 33.50

The wage rate will be 90% of the above for Maintenance work on boilers less than 100,000 pph.

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday; Friday may be used as a make up day.

NOTE- In order to use the '4 Day/10 Hour Work Schedule, YOU MUST submit an Employer Registration for Use of 4 Day/10 Hour WorkSchedule, Form PW30R; additionally, there must be a dispensation of hours in place on project.

SUPPLEMENTAL BENEFITSPer hour: $ 27.99* $ 27.99*

*NOTE: $26.00 of this amount is for every Hour "Paid"

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICES1st Term 12 Months, Terms 3-8 at 6 Months

Per Hour:

1st $ 21.96 $ 22.773rd $ 23.57 $ 24.454th $ 25.93 $ 26.125th $ 26.80 $ 27.806th $ 28.41 $ 28.477th $ 29.03 $ 30.158th $ 30.64 $ 31.83

Supplemental Benefits per hour:

1st to 6th $ 26.99**7th to 8th $27.99***

**NOTE: $25.00 of this amount is for every Hour "Paid"

***NOTE: $26.00 of this amount is for every Hour "Paid"12-7

Carpenter - Building 01/01/2017

JOB DESCRIPTION Carpenter - Building DISTRICT 12

ENTIRE COUNTIESChautauqua

PARTIAL COUNTIESAllegany: Entire county except the Township of Alfred.Cattaraugus: Entire county except the Township of Perrysburg and the Village of Gowanda.

WAGESPer hour: 07/01/2016

Carpenter $ 25.61Floorlayer 25.61

Page 33

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 97 of 152

Page 98: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Certified Welder 26.61Hazardous Waste Worker 27.11Diver-Dry Day 26.61Dive Tender 26.61Diver-Wet Day** 61.25

Hazardous Waste Worker: Hazardous sites requiring personal protective equipment.

** Diver rate applies to all hours worked on the day of dive.Depth pay for divers: 0' to 80' no additional fee

81' to 100' additional $0.50 per foot101' to 150' additional $0.75 per foot151' and deeper additional $1.25 per foot

Penetration pay: 0' to 50' no additional fee51' to 100' additional $0.75 per foot101' and deeper additional $1.00 per foot

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work Schedule,' as your normal schedule, you must submit an 'Employer Registration for Use of4 Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is notsubmitted you may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Carpenter(s) $ 17.74Diver Wet 17.74Diver Dry & Tender 17.74

OVERTIME PAYSee (B, E, E2, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's base wage:

1st 2nd 3rd 4th50% 60% 70% 80%

Supplemental benefits per hour worked:

1st 2nd 3rd 4th$10.79 $10.79 $13.39 $13.39

12-276B-All

Carpenter - Building 01/01/2017

JOB DESCRIPTION Carpenter - Building DISTRICT 2ENTIRE COUNTIESChemung, Cortland, Schuyler, Steuben, Tompkins

PARTIAL COUNTIESAllegany: Only the Township of Alfred.

WAGESPer hour: 07/01/2016 07/01/2017 07/01/2018 07/01/2019

Additional Additional AdditionalCarpenter $ 27.32 $ 0.60 $ 0.70 $ 0.80Floor Coverer 27.32 0.60 0.70 0.80Carpet Layer 27.32 0.60 0.70 0.80Dry-Wall 27.32 0.60 0.70 0.80Lather 27.32 0.60 0.70 0.80Piledriver 27.57 0.60 0.70 0.80Diver-Wet Day 61.25 0.00 0.00 0.00Diver -Dry Day 28.32 0.60 0.70 0.80

Page 34

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 98 of 152

Page 99: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Diver Tender 28.32 0.60 0.70 0.80

NOTE ADDITIONAL PREMIUMS PAID FOR THE FOLLOWING WORK LISTED BELOW:- Certified welders shall receive $1.00 per hour over the journeyman's rate of pay when the employee is required to be certified andperforms DOT or ABS specified welding work- When an employee performs work within a contaminated area on a State and/or Federally designated hazardous waste site, and whererelevant State and/or Federal regulations require employees to be furnished and use or wear required forms of personal protection, then theemployee shall receive his regular hourly rate plus $1.50 per hour.- Depth pay for Divers based upon deepest depth on the day of the dive:

0' to 80' no additional fee81'to 100' additional $.50 per foot101'to 150' additional $0.75 per foot151'and deeper additional $1.25 per foot

- Penetration pay for Divers based upon deepest penetration on the day of the dive:0' to 50' no additional fee51' to 100' additional $.75 per foot101' and deeper additional $1.00 per foot

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeymen $ 19.61

OVERTIME PAYSee (B, E, *E2, Q) on OVERTIME PAGE* Note - Saturday is payable at straight time if the employee misses work, except where a doctor's or hospital verification of illness isproduced Monday through Friday when work was available to the employee.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGENote: Any holiday which occurs on Sunday shall be observed the following Monday. If Christmas falls on a Saturday, it shall be observed onthe prior Friday.

REGISTERED APPRENTICESWages per hour

FOR APPRENTICES INDENTURED PRIOR TO JANUARY 1, 2016One year terms at the following percentage of Journeyman's base wage1st 2nd 3rd 4th50% 60% 70% 80%Supplemental Benefits per hour worked plus paid holidays:1st year term $ 10.652nd year term 10.653rd year term 13.254th year term 13.25

FOR APPRENTICES INDENTURED AFTER TO JANUARY 1, 20161,300 hour terms at the following percentage of Journeyman's base wage1st 2nd 3rd 4th 5th50% 60% 65% 70% 80%Supplemental Benefits per hour worked plus paid holidays:1st year term $ 10.652nd year term 10.653rd year term 13.254th year term 13.255th year term 13.25

2-277B-CS

Carpenter - Building / Heavy&Highway 01/01/2017

JOB DESCRIPTION Carpenter - Building / Heavy&Highway DISTRICT 2ENTIRE COUNTIES

Page 35

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 99 of 152

Page 100: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Albany, Allegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware, Erie, Essex,Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara, Oneida,Onondaga, Ontario, Orleans, Oswego, Otsego, Rensselaer, Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben,Sullivan, Tioga, Tompkins, Ulster, Warren, Washington, Wayne, Wyoming, Yates

PARTIAL COUNTIESOrange: The area lying on Northern side of Orange County demarcated by a line drawn from the Bear Mountain Bridge continuing east tothe Bear Mountain Circle, continue North on 9W to the town of Cornwall where County Road 107 (also known as Quaker Rd) crosses under9W, then east on County Road 107 to Route 32, then north on Route 32 to Orrs Mills Rd, then west on Orrs Mills Rd to Route 94, continuewest and south on Route 94 to the Town of Chester, to the intersection of Kings Highway, continue south on Kings Highway to Bellvale Rd,west on Bellvale Rd to Bellvale Lakes Rd, then south on Bellvale Lakes Rd to Kain Rd, southeast on Kain Rd to Route 17A, then north andsoutheast along Route 17A to Route 210, then follow Route 210 to NJ Border.

WAGESWages per hour:

07/01/2016 07/01/2017 07/01/2018Carpenter - ONLY for Additional AdditionalArtificial Turf/SyntheticSport Surface $ 29.10 $ 1.50 $ 1.50

Note - Does not include the operation of equipment. Please see Operating Engineers rates.

SUPPLEMENTAL BENEFITSPer hour worked plus paid holidays:

Journeyman $ 20.73

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (2, 17) on HOLIDAY PAGEOvertime: See (5, 6, 16) on HOLIDAY PAGENotes:When a holiday falls upon a Saturday, it shall be observed on the preceding Friday. Whan a holiday falls upon a Sunday, it shall beobserved on the following Monday.An employee taking an unexcused day off the regularly scheduled day before or after a paid Holiday shall not receive Holiday pay.

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:1st 2nd 3rd 4th50% 60% 70% 80%

Supplemental Benefits per hour paid:1st year term $ 10.702nd year term 10.703rd year term 13.304th year term 13.30

2-42AtSS

Carpenter - Heavy&Highway 01/01/2017

JOB DESCRIPTION Carpenter - Heavy&Highway DISTRICT 12

ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua

WAGESPer hour: 07/01/2016

Carpenter $ 29.10Certified Welder 30.60Diver-Dry Day 30.10Diver-Wet Day** 54.10Dive Tender 30.10Hazardous Waste Worker 31.10Pile Driver 33.11Millwright 30.60Effluent & Slurry Diver-Wet Day 81.15

Hazardous Waste Worker: Hazardous sites requiring personal protective equipment.

** Diver rate applies to all hours worked on the day of the dive.Page 36

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 100 of 152

Page 101: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Depth pay for divers: 0' to 50' no additional fee51' to 100' additional $0.50 per foot101' to 150' additional $0.75 per foot151' to 200' additional $1.25 per foot

Penetration pay: 0' to 50' no additional fee51' to 100' additional $0.75 per foot101' to deeper additional $1.00 per foot

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Carpenter(s) $ 20.73Diver Wet 22.55Diver Dry & Tender 22.55Pile Driver 20.73

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (2, 17) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th50% 60% 70% 80%

Supplemental benefits per hour worked:

1st 2nd 3rd 4th$10.70 $10.70 $13.30 $13.10

12-276HH-All

Electrician 01/01/2017

JOB DESCRIPTION Electrician DISTRICT 2ENTIRE COUNTIESChemung, Steuben

PARTIAL COUNTIESAllegany: Only the townships of Allen, Almond, Alfred, Andover, Birdsall, Burns, Granger, Grove, Hume, Independence, Ward, Wellsville,West Almond, Willing, and that portion of Amity, Angelica, Belfast, Caneadea, and Scio that lie east of the Genesee River.Schuyler: Only the Townships of Dix, Montour, Orange, Reading and Tyrone.Tioga: Only the Townships of Barton and Nichols.

WAGESPer hour: 07/01/2016Electrician $34.50Audio,Sound,Teledata 34.50

Additional $1.00 per hour for high work defined as work being done more than 35' above the floor where electricians are working on ToothPicks, Structural Steel, Temporary Platforms, Swinging Scaffolds and Boatswain Chairs.Additional $2.00 per hour for work inside or on Towers, Smoke Stacks and Wind Turbine Generators over 100' high.Additional $1.00 per hour for work in shafts 25' deep and in tunnels 50' long under construction.Additional $3.00 per hour for work in hazardous locations requiring Class A supplied air as defined in OSHA Standards.Additional $2.00 per hour for work in hazardous locations requiring supplied air (other than Class A) and any other type of respiratoryequipment required for Class B or Class C as defined in OSHA Standards.

SHIFT WORK:When multiple shifts lasting of at least five (5) days duration that are mandated by the contracting agency, the following hourly rates apply:

Page 37

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 101 of 152

Page 102: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Between the hoursof 8:00AM and 4:30PM No premium

Between the hoursof 4:30PM and 1:00AM 12.5% premium

Between the hoursof 12:30AM and 9:00AM 25% premium

Following NOTES apply to shift work only:The starting hours of the shift may be adjusted up to two (2) hours. All overtime work required before the established start time and after thecompletion of eight (8) hours of any shift shall be paid at one-half times the "shift" hourly rate. Double the straight time rate shall be themaximum compensation for any hour worked.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 17.65plus 5.70*plus 3% ofhourly wage

*Subject to SAME PREMIUM as overtime work

OVERTIME PAYSee (B, *E, Q) on OVERTIME PAGE*NOTE: Work performed on Saturday shall be paid at one and one-half of the hourly rate for the first ten hours, then two times the hourlyrate therafter.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6, 23) on HOLIDAY PAGEWhen the holiday falls on Saturday, it shall be recognized and celebrated as such on the Friday before and when the holiday falls onSunday, it shall be recognized and celebrated as such on the following Monday (December 24th excluded).

REGISTERED APPRENTICESWAGES: One year terms at the following percent of Journeyman's wage.

1st 2nd 3rd 4th 5th40% 50% 60% 70% 80%

SUPPLEMENTAL BENEFITS per hour worked:

1st term $10.65 plus 3% of hourly wage2nd term $14.15 plus $2.85* plus 3% of hourly wage3rd term $14.85 plus $3.42* plus 3% of hourly wage4th term $15.55 plus $3.99* plus 3% of hourly wage5th term $16.25 plus $4.56* plus 3% of hourly wage

*Subject to SAME PREMIUM as overtime work2-139

Electrician 01/01/2017

JOB DESCRIPTION Electrician DISTRICT 3ENTIRE COUNTIESChautauqua

PARTIAL COUNTIESAllegany: Only the Townships of Alma, Bolivar, Centerville, Clarksville, Cuba, Friendship, Genesee, New Hudson, Rushford, Wirt and thatportion of the Townships of Amity, Angelica, Belfast, Caneadea and Scio that are west of the Genesee River.Cattaraugus: Only the Townships of Allegany, Carrollton, Cold Spring, Conewango, Dayton, Great Valley, Hinsdale, Humphrey, Ischua,Leon, Little Valley, Napoli, Olean, Portville, Red House, Randolph, Salamanca and South Valley.

WAGESPer hour: 07/01/2016 01/01/2017 01/01/2018

Additional AdditionalElectrician* $ 34.50 $ 1.25 $ 1.30

* Includes teledata work.When shift work is mandated either in the job specification or by the contracting agency the following premiums apply:17.3% for work from 4:30PM - 1:00AM31.4% for work from 12:30AM - 9:00AM

Page 38

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 102 of 152

Page 103: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Additional 15% above wage for work 40' above floor, or in underground mines or tunnels or from suspension-type personnel lift equipment.

SUPPLEMENTAL BENEFITSPer hour paid:

$ 20.37** NOTE - add 3% of the posted straight time or applicable premium wage rate.* NOTE - $9.90 of this amount is paid at the same premium as the wages

OVERTIME PAYSee (B, *E, Q, V) on OVERTIME PAGE* Double-time for all work on Saturday in excess of 10 hours.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

Hour terms at the following percentage of Journeyman's wage:

0 to 1000 to 2000 to 2750 to 3500 to 4250 to 5000 to 5750 to 6600 to 7350 to 8200 40% 45% 55% 60% 65% 70% 75% 80% 85% 90%

Supplemental benefits per hour paid:

0 to 1000 to 2000 to 2750 to 3500 to 4250 to 5000 to 5750 to 6600 to 7350 to 8200 $ 8.08* $ 8.08* $ 13.72* $ 14.01* $ 16.91* $ 17.40* $ 17.90* $ 18.39* $ 18.89* $ 19.38** NOTE - add 3% of the posted straight time or applicable premium wage rate.

3-106

Elevator Constructor 01/01/2017

JOB DESCRIPTION Elevator Constructor DISTRICT 3ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua, Erie, Genesee, Niagara, Orleans, Wyoming

WAGESPer hour: 07/01/2016 01/01/2017Elevator Constructor $ 45.78 $ 46.80Helper 32.05 32.76

** IMPORTANT NOTICE - EFFECTIVE 04/01/2009 **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 29.99* $ 31.59** Note - add 6% of regular hourly rate for all hours worked.

OVERTIME PAYSee (D, O) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6, 15, 16) on HOLIDAY PAGEOvertime: See (5, 6, 15, 16) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:

1st* 2nd 3rd 4th55% 65% 70% 80%

Supplemental benefits per hour worked:$ 29.99** $ 31.59**

* Note - 0-6 months of the 1st year term is paid at 50% of Journeyman's wage with no Supplemental benefits.

Page 39

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 103 of 152

Page 104: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

** Note - add 6% of regular hourly rate for all hours worked.3-14

Glazier 01/01/2017

JOB DESCRIPTION Glazier DISTRICT 3ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua, Erie, Genesee, Niagara, Orleans, Wyoming

WAGESPer hour: 07/01/2016 05/01/17

AdditionalGlazier $ 26.25 $ 1.35Working off SuspendedScaffold (Swing Stage) 27.25 1.35Maintenance 12.80* 1.00* Note - This rate to be used only for all repair and replacement work such as glass breakage, glass replacement, door repair and board ups.

** IMPORTANT NOTICE **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:Journeymen Glazier $ 19.77Maintenance 12.54

OVERTIME PAYSee (B, E2, F, R) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGE for Glazier and Glazier Apprentices.Paid: See (5, 6) on HOLIDAY PAGE for MaintenanceOvertime: See (5, 6) on HOLIDAY PAGE.

REGISTERED APPRENTICESWages per hour:

Glazier: 1000 hour terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th 5th 6th 7th 8th40% 45% 50% 55% 60% 70% 80% 90%

Supplemental benefits per hour worked:

1st & 2nd terms $ 7.503rd & 4th terms 8.35All other terms 9.25

3-660

Insulator - Heat & Frost 01/01/2017

JOB DESCRIPTION Insulator - Heat & Frost DISTRICT 3ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua, Erie, Niagara, Wyoming

PARTIAL COUNTIESGenesee: Only the Townships of Alabama, Alexander, Darien, Oakfield and Pembroke.

WAGESPer Hour: 07/01/2016 05/01/2017 05/01/2018

Additional AdditionalHeat & Frost Insulator $ 32.15 $ 1.40 $ 1.40

SUPPLEMENTAL BENEFITSPer hour worked:

$ 21.39

OVERTIME PAYSee (B, *E, **Q) on OVERTIME PAGE

Page 40

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 104 of 152

Page 105: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

* Note - Double time after 10 hours on Saturday.** Note - Triple time on Labor Day if WORKED.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th50% 60% 70% 80%

Supplemental Benefits per hour worked:

1st and 2nd $ 16.99All other terms 21.39

3-4

Ironworker 01/01/2017

JOB DESCRIPTION Ironworker DISTRICT 5ENTIRE COUNTIESChemung, Livingston, Monroe, Ontario, Yates

PARTIAL COUNTIESAllegany: Only the Townships of Birdsall, Burns and Grove.Genesee: Only the Townships of Batavia, Bergen, Bethany, Byron, Elba, LeRoy, Oakfield, Pavillion, Stafford.Orleans: Only the Townships of Albion, Barre, Carlton, Clarendon, Gaines, Kendall, Murray, and Village of Holley.Schuyler: Only the Townships of Dix, Orange, Reading and Tyron.Steuben: Only the Townships of Addison, Avoca, Bath , Bradford, Cameron, Campbell, Caton, Cohocton, Corning, Dansville, Erwin, Hornby,Lindley, Prattsburg, Pulteney, Rathbone, Thurston, Tuscarora, Urbana, Wayland, Wayne, Wheeler, Woodhull.Wayne: Only the Townships of Arcadia, Lyons, Macedon, Marion, Ontario, Palmyra, Sodus, Walworth, Willamson and Village of Newark.Wyoming: Only the Townships of Castile, Covington, Middlebury, Perry.

WAGESPer hour: 07/01/2016 05/01/2017

AdditionalStructural $ 26.45 $ 1.25Reinforcing 26.45 1.25Ornamental 26.45 1.25Fence Erector 26.45 1.25Welder 26.45 1.25Sheeter 26.70 1.25Stone Derrick Man 26.45 1.25Mach. Mov./Rigger 26.45 1.25Precast Concrete Erector 26.45 1.25Window/Curtainwall Erector 26.45 1.25Pre-Engineered Building 26.45 1.25

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 26.24

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESOne year terms at the following rates.

1st. 2nd. 3rd. 4th.16.50 18.50 20.50 22.50

Supplemental Benefits per hour worked:

Appr. 1st year $ 10.70Appr. 2nd year 17.10

Page 41

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 105 of 152

Page 106: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Appr. 3rd year 18.02Appr. 4th year 18.93

5-33.1

Ironworker 01/01/2017

JOB DESCRIPTION Ironworker DISTRICT 3ENTIRE COUNTIESCattaraugus, Chautauqua

PARTIAL COUNTIESAllegany: Entire county except the Towns of Birdsall, Burns and Grove.Erie: All except the Town of Grand Island north of Whitehaven Road.Genesee: Only the Townships of Alabama, Alexander, Darien and PembrokeSteuben: Only the Townships of Canisteo, Freemont, Greenwood,Hartsville, Hornell, Hornellsville, Howard, Jasper, Troupsburg and WestUnionWyoming: Only the Townships of Arcade, Attica, Bennington, Eagle,Gainsville, Java, Orangeville, Pike, Sheldon, Warsaw and Wethersfield.

WAGESPer hour: 07/01/2016 05/01/2017

AdditionalStructural $ 30.00 $ 1.25Ornamental 30.00 1.25Layout 30.00 1.25Rodmen 30.00 1.25Reinforcing 30.00 1.25Welders 30.00 1.25Riggers & Mach. Movers 30.00 1.25Curtain Wall Erector 30.00 1.25Window Erector 27.65 1.25Fence Erector 28.57 1.25

SUPPLEMENTAL BENEFITSPer hour worked:

Fence erectors $ 24.50All others 26.00

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following wage:1st 2nd 3rd 4th

$ 16.50 $ 18.50 $ 20.50 $ 22.50

Supplemental benefits per hour worked:

1st 2nd 3rd 4th$ 11.06 $ 19.92 $ 21.18 $ 22.45

3-6

Laborer - Building 01/01/2017

JOB DESCRIPTION Laborer - Building DISTRICT 3ENTIRE COUNTIESAllegany, Chautauqua

PARTIAL COUNTIESCattaraugus: Entire county except the Town of Perrysburg and the Village of Gowanda.

WAGESPer hour: 07/01/2016

Basic and Flagman $ 23.30Blaster, Nozzelman, Curb 24.30 and Flatwork Formsetter not 24.30 on structures, Pipelayer 24.30

Page 42

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 106 of 152

Page 107: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Work 40 ft. and up 23.45Hazardous Waste 24.80Deleader & Asbestos Removal 25.30OSHA Level C or 25.30 greater protective suit or 25.30 any anti-contamination 25.30 clothing is required 25.30With supplied air respirator 26.30

** IMPORTANT NOTICE **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.Saturday may be used as a make-up day at time and one half of the hourly rate.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 15.25

OVERTIME PAYSee (B, E, E2, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

1000 hour terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th70% 80% 85% 90%

Supplemental benefits per hour worked:

$ 15.253-621b

Laborer - Heavy&Highway 01/01/2017

JOB DESCRIPTION Laborer - Heavy&Highway DISTRICT 3ENTIRE COUNTIESAllegany, Cattaraugus

PARTIAL COUNTIESChautauqua: Only the Townships of Busti, Carroll, Chautauqua, Clymer, Ellery, Ellicott, Ellington, French Creek, Gerry, Harmony, Kiantone,Mina, North Harmony, Poland, Sherman, Stockton and the City of Jamestown.

WAGESGROUP A: Basic, Drill Helper, Flagman, Outboard and Hand Boats. Chain Saw, Concrete Aggregate Bin, Concrete Bootmen, Gin Buggy,Hand or Machine Vibrator, Jack Hammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of Steel Mesh, Small Generators forLaborers' Tools, Pipe Layers, Vibrator Type Rollers, Tamper, Drill Doctor, Water Pump Operator (2" and Single Diaphragm), Nozzle(Asphalt, Gunite, Seeding, and Sand Blasting), Laborers on Chain Link Fence Erection, Rock Splitter and Power Unit, Pusher Type ConcreteSaw and all other Gas, Electric, Oil and Air Tool Operators, Wrecking Laborer, Grade Checker.

GROUP B: All Rock or Drilling Machine Operators (Except Quarry Master and Similar Type), Acetylene Torch Operators and Powderman.Blasters, Curb and Flatwork Formsetters not on structures, Stone or Granite Curb Setters, Designated Asphalt Rakers (not on cold patch),Tail or Screw Operator on Asphalt Paver.

Per hour: 07/01/2016 07/01/2017 07/01/2018Additional Additional

GROUP A $ 26.54 $ 1.30 $ 1.30GROUP B 26.94 1.30 1.30Hazardous Waste 28.04 1.30 1.30

SUPPLEMENTAL BENEFITSPer hour worked:

$ 19.35

OVERTIME PAYPage 43

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 107 of 152

Page 108: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

See (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

1000 hour terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th70% 80% 85% 90%

Supplemental benefits per hour worked:

$ 19.353-621h Zone 1

Lineman Electrician 01/01/2017

JOB DESCRIPTION Lineman Electrician DISTRICT 6ENTIRE COUNTIESAlbany, Allegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware, Dutchess,Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara,Oneida, Onondaga, Ontario, Orange, Orleans, Oswego, Otsego, Putnam, Rensselaer, Rockland, Saratoga, Schenectady, Schoharie,Schuyler, Seneca, St. Lawrence, Steuben, Sullivan, Tioga, Tompkins, Ulster, Warren, Washington, Wayne, Wyoming, Yates

WAGESPer hour:

NOTE: Includes Teledata Work within ten (10) feet of High Voltage Transmission Lines

Below rates applicable on all overhead and underground distribution and maintenance work, and all overhead and underground transmissionline work and the installation of fiber optic cable where no other construction trades are or have been involved. (Ref #14.01.01)

07/01/2016

Lineman, Technician $ 47.95Crane, Crawler Backhoe 47.95Welder, Cable Splicer 47.95Digging Machine Operator 43.16Tractor Trailer Driver 40.76Groundman, Truck Driver 38.36Equipment Mechanic 38.36Flagman 28.77

Additional $1.00 per hour for entire crew when a helicopter is used.

Below rates applicable on all electrical sub-stations, switching structures, fiber optic cable and all other work not defined as "Utility outsideelectrical work". (Ref #14.02.01-A)

Lineman, Technician $ 47.95Crane, Crawler Backhoe 47.95Cable Splicer 52.75Cert. Welder-Pipe Type Cable 50.35Digging Machine Operator 43.16Tractor Trailer Driver 40.76Groundman, Truck Driver 38.36Equipment Mechanic 38.36Flagman 28.77

Additional $1.00 per hour for entire crew when a helicopter is used.

Below rates apply on switching structures, maintenance projects, railroad catenary install/maintenance third rail installation, bonding of railsand pipe type cable and installation of fiber optic cable. (Ref #14.02.01-B)

Lineman, Technician, Welder $ 49.27Crane, Crawler Backhoe 49.27Cable Splicer 54.20

Page 44

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 108 of 152

Page 109: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Cert. Welder-Pipe Type Cable 51.73Digging Machine Operator 44.34Tractor Trailer Driver 41.88Groundman, Truck Driver 39.42Equipment Mechanic 39.42Flagman 29.56

Additional $1.00 per hour for entire crew when a helicopter is used.

Below rates applicable on all overhead and underground transmission line work & fiber optic cable where other construction trades are orhave been involved. This applies to transmission line work only, not other construction. (Ref #14.03.01)

Lineman, Technician, Welder $ 50.46Crane, Crawler Backhoe 50.46Cable Splicer 50.46Digging Machine Operator 45.41Tractor Trailer Driver 42.89Groundman, Truck Driver 40.37Equipment Mechanic 40.37Flagman 30.28

Additional $1.00 per hour for entire crew when a helicopter is used.

NOTE: THE FOLLOWING RATES WILL APPLY ON ALL CONTRACTING AGENCY MANDATED MULTIPLE SHIFTS OF AT LEAST FIVE(5) DAYS DURATION WORKED BETWEEN THE HOURS LISTED BELOW:

1ST SHIFT 8:00 AM to 4:30 PM REGULAR RATE2ND SHIFT 4:30 PM to 1:00 AM REGULAR RATE PLUS 17.3 %3RD SHIFT 12:30 AM to 9:00 AM REGULAR RATE PLUS 31.4 %

** IMPORTANT NOTICE **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.*Effective 05/06/2013, Tuesday thru Friday may be worked with no make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked (but also required on non-worked holidays):

The following SUPPLEMENTAL BENEFITS apply to all classification categories of CONSTRUCTION, TRANSMISSION andDISTRIBUTION.

Journeyman $ 21.75*plus 7.25% ofhourly wage

*The 7.25% is based on the hourly wage paid, straight time rate or premium rate.

OVERTIME PAYSee (B, E, Q,) on OVERTIME PAGE. *Note* Double time for all emergency work designated by the Dept. of Jurisdiction.

HOLIDAYPaid See ( 5, 6, 8, 13, 25 ) on HOLIDAY PAGE plus Governor of NYS Election Day.Overtime See ( 5, 6, 8, 13, 25 ) on HOLIDAY PAGE plus Governor of NYS Election Day.

NOTE: All paid holidays falling on Saturday shall be observed on the preceding Friday. All paid holidays falling on Sunday shall be observedon the following Monday. Supplements for holidays paid at straight time.

REGISTERED APPRENTICESWAGES: 1000 hour terms at the following percentage of the Journeyman Lineman wage.

1st 2nd 3rd 4th 5th 6th 7th60% 65% 70% 75% 80% 85% 90%

SUPPLEMENTAL BENEFITS: Same as Journeyman

Page 45

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 109 of 152

Page 110: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

6-1249a

Lineman Electrician - Teledata 01/01/2017

JOB DESCRIPTION Lineman Electrician - Teledata DISTRICT 6ENTIRE COUNTIESAlbany, Allegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware, Dutchess,Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara,Oneida, Onondaga, Ontario, Orange, Orleans, Oswego, Otsego, Putnam, Rensselaer, Rockland, Saratoga, Schenectady, Schoharie,Schuyler, Seneca, St. Lawrence, Steuben, Sullivan, Tioga, Tompkins, Ulster, Warren, Washington, Wayne, Westchester, Wyoming, Yates

WAGESPer hour:

FOR OUTSIDE WORK.

07/01/2016 01/01/2017

Cable Splicer $ 30.29 $ 30.90Installer, Repairman 28.75 29.33Teledata Lineman 28.75 29.33Technician, Equipment Operator 28.75 29.33Groundman 15.25 15.56

NOTE: EXCLUDES Teledata work within ten (10) feet of High Voltage (600 volts and over) transmission lines. For this work please seeLINEMAN.

SUPPLEMENTAL BENEFITSPer hour worked:Journeyman $ 4.43 $ 4.43

*plus 3% of *plus 3% ofwage paid wage paid

*The 3% is based on the hourly wage paid, straight time rate or premium rate.

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6, 16) on HOLIDAY PAGE

6-1249LT - Teledata

Lineman Electrician - Traffic Signal Lighting 01/01/2017

JOB DESCRIPTION Lineman Electrician - Traffic Signal Lighting DISTRICT 6ENTIRE COUNTIESAlbany, Allegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Cortland, Delaware, Erie, Essex, Franklin,Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara, Oneida, Onondaga,Ontario, Orleans, Oswego, Otsego, Rensselaer, Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Sullivan,Tioga, Tompkins, Warren, Washington, Wayne, Wyoming, Yates

WAGESLineman/Technician shall perform all overhead aerial work. A Lineman/Technician on the ground will install all electrical panels, connect allgrounds, install and connect all electrical conductors which includes, but is not limited to road loop wires; conduit and plastic or other typepipes that carry conductors, flex cables and connectors, and to oversee the encasement or burial of such conduits or pipes.

A Groundman/Groundman Truck Driver shall: Build and set concrete forms, handle steel mesh, set footer cages, transport concrete in awheelbarrow, hand or machine concrete vibrator, finish concrete footers, mix mortar, grout pole bases, cover and maintain footers whilecuring in cold weather, operate jack hammer, operate hand pavement breaker, tamper, concrete and other motorized saws, as a drill helper,operate and maintain generators, water pumps, chain saws, sand blasting, operate mulching and seeding machine, air tools, electric tools,gas tools, load and unload materials, hand shovel and/or broom, prepare and pour mastic and other fillers, assist digger operator equipmentoperator in ground excavation and restoration, landscape work and painting. Only when assisting a lineman technician, agroundman/groundman truck driver may assist in installing conduit, pipe, cables and equipment.

A flagger's duties shall consist of traffic control only.

(Ref #14.01.01)

Per hour:07/01/2016

Page 46

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 110 of 152

Page 111: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Lineman, Technician $ 41.65Crane, Crawler Backhoe 41.65Certified Welder 43.73Digging Machine 37.49Tractor Trailer Driver 35.40Groundman, Truck Driver 33.32Equipment Mechanic 33.32Flagman 24.99

Above rates applicable on all Lighting and Traffic Signal Systems with the installation, testing, operation, maintenance and repair of all trafficcontrol and illumination projects, traffic monitoring systems, road weather information systems and the installation of Fiber Optic Cable.

NOTE: THE FOLLOWING RATES WILL APPLY ON ALL CONTRACTING AGENCY MANDATED MULTIPLE SHIFTS OF AT LEAST FIVE(5) DAYS DURATION WORKED BETWEEN THE HOURS LISTED BELOW:

1ST SHIFT 8:00 AM TO 4:30 PM REGULAR RATE2ND SHIFT 4:30 PM TO 1:00 AM REGULAR RATE PLUS 17.3%3RD SHIFT 12:30 AM TO 9:00 AM REGULAR RATE PLUS 31.4%

** IMPORTANT NOTICE **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.*Effective 05/06/2013, Tuesday thru Friday may be worked with no make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked (but also required on non-worked holidays):

Journeyman $ 21.75*plus 7.25% ofhourly wage

*The 7.25% is based on the hourly wage paid, straight time rate or premium rate.Supplements paid at STRAIGHT TIME rate for holidays.

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE. *Note* Double time for all emergency work designated by the Dept. of Jurisdiction

HOLIDAYPaid: See ( 5, 6, 8, 13, 25 ) on HOLIDAY PAGE plus Governor of NYS Election Day.Overtime: See ( 5, 6, 8, 13, 25 ) on HOLIDAY PAGE plus Governor of NYS Election Day.

NOTE: All paid holidays falling on Saturday shall be observed on the preceding Friday. All paid holidays falling on Sunday shall be observedon the following Monday. Supplements for holidays paid at straight time.

REGISTERED APPRENTICESWAGES: Per hour. 1000 hour terms.

1st 2nd 3rd 4th 5th 6th 7th$ 24.99 $ 27.07 $ 29.16 $ 31.24 $ 33.32 $ 35.40 $ 37.49

SUPPLEMENTAL BENEFITS: Same as Journeyman

6-1249a-LT

Lineman Electrician - Tree Trimmer 01/01/2017

JOB DESCRIPTION Lineman Electrician - Tree Trimmer DISTRICT 6ENTIRE COUNTIESAlbany, Allegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware, Dutchess,Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara,Oneida, Onondaga, Ontario, Orange, Orleans, Oswego, Otsego, Putnam, Rensselaer, Rockland, Saratoga, Schenectady, Schoharie,Schuyler, Seneca, St. Lawrence, Steuben, Sullivan, Tioga, Tompkins, Ulster, Warren, Washington, Wayne, Wyoming, Yates

WAGESPer hour:

Page 47

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 111 of 152

Page 112: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Applies to line clearance, tree work and right-of-way preparation on all new or existing energized overhead or underground electrical,telephone and CATV lines. This also would include stump removal near underground energized electrical lines, including telephone andCATV lines.

07/01/2016 01/01/2017

Tree Trimmer $ 23.37 $ 23.95Equipment Operator 20.61 21.13Equipment Mechanic 20.61 21.13Truck Driver 17.26 17.52Groundman 14.15 14.36Flag person 10.08 10.23

SUPPLEMENTAL BENEFITSPer hour worked (but also required on non-worked holidays):

Journeyman $ 9.56 $ 9.98*plus 3% of *plus 3% ofhourly wage hourly wage

* The 3% is based on the hourly wage paid, straight time rate or premium rate.

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6, 8, 15, 16, 25) on HOLIDAY PAGEOvertime: See (5, 6, 8, 15, 16, 25) on HOLIDAY PAGENOTE: All paid holidays falling on a Saturday shall be observed on the preceding Friday.All paid holidays falling on a Sunday shall be observed on the following Monday.

6-1249TT

Mason - Building 01/01/2017

JOB DESCRIPTION Mason - Building DISTRICT 5ENTIRE COUNTIESChautauqua

PARTIAL COUNTIESAllegany: Entire county except the Townships of Alfred, Almond, Andover and Burns.Cattaraugus: Entire county except the Township of Perrysburg and the Village of Gowanda.

WAGESPer hour: 07/01/2016Building:Bricklayer $ 31.30Cement Mason 31.30Plasterer 31.30Stone Mason 31.30Tuck Pointer 31.30

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work Schedule,' as your normal schedule, you must submit an 'Employer Registration for Use of4 Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is notsubmitted you may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 18.65

OVERTIME PAYSee (B,E,E2*,Q) on OVERTIME PAGE*Note - Or other conditions beyond the employer's control such as fire or natural disaster.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

Page 48

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 112 of 152

Page 113: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

One year terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th55% 70% 80% 90%

Supplemental benefits per hour worked:

All terms $ 18.65

5-3B - Jam - Z2

Mason - Building 01/01/2017

JOB DESCRIPTION Mason - Building DISTRICT 5ENTIRE COUNTIESChemung, Schuyler, Steuben

PARTIAL COUNTIESAllegany: Only the Townships of Alfred, Almond, Andover and Burns.

WAGESPer Hour: 07/01/2016Building:Bricklayer $ 28.60Cement Mason 28.60Plasterer 28.60Stone Mason 28.60Tuck Pointer 28.60

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITS

Journeyman $ 22.12

OVERTIME PAYSee (B,E,E2*,Q) on OVERTIME PAGE*Note - Or other conditions beyond the employer's control such as fire or natural disaster.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following wage:

1st 2nd 3rd 4th$ 15.67 $ 16.84 $ 20.25 $ 23.47

Supplemental benefits per hour worked:

1st 2nd 3rd 4th$ 9.55 $ 13.48 $ 15.17 $ 17.02

5-3b - Co - Z2

Mason - Heavy&Highway 01/01/2017

JOB DESCRIPTION Mason - Heavy&Highway DISTRICT 5ENTIRE COUNTIESAllegany, Broome, Chautauqua, Chemung, Chenango, Cortland, Delaware, Genesee, Livingston, Monroe, Ontario, Orleans, Otsego,Schuyler, Seneca, Steuben, Tioga, Tompkins, Wayne, Wyoming, Yates

PARTIAL COUNTIESCattaraugus: Enitre county except in the Township of Perrysburg and the Village of Gowanda only the Bricklayer classification applies.Erie: Only the Bricklayer classification applies.Niagara: Only the Bricklayer classification applies.

Page 49

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 113 of 152

Page 114: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

WAGESPer hour: 07/01/2016Heavy & Highway:Cement Mason $30.39Bricklayer 30.39

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 20.37

OVERTIME PAYSee (B, E, E2, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

1500 hour terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th50% 60% 70% 80%

Supplemental benefits per hour worked:

1st term $ 13.422nd - 4th term 20.37

5-3h

Mason - Tile Finisher 01/01/2017

JOB DESCRIPTION Mason - Tile Finisher DISTRICT 5ENTIRE COUNTIESAllegany, Broome, Chautauqua, Chemung, Chenango, Cortland, Delaware, Otsego, Schuyler, Steuben, Tioga, Tompkins

PARTIAL COUNTIESCattaraugus: With the exception of the Township of Perrysburg and the Village of Gowanda.

WAGESPer hour: 07/01/2016Building:Marble, Slate, Terrazzo $ 26.20and Tile Finisher 26.20

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked: $ 16.15

OVERTIME PAYSee (B,E,E2*,Q) on OVERTIME PAGE*Note - Or other conditions beyond the employer's control such as fire or natural disaster.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

Page 50

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 114 of 152

Page 115: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

1st and 2nd term 1200 hours and 3rd term 1300 hours at the following percentage of Journeyman's rate:

1st 2nd 3rd55% 60% 80%

Supplemental benefits per hour worked:

1st 2nd 3rd$ 10.68 $ 10.75 $ 14.27

5-3TF - Z2

Mason - Tile Setter 01/01/2017

JOB DESCRIPTION Mason - Tile Setter DISTRICT 5ENTIRE COUNTIESAllegany, Broome, Chautauqua, Chemung, Chenango, Cortland, Delaware, Otsego, Schuyler, Steuben, Tioga, Tompkins

PARTIAL COUNTIESCattaraugus: With the exception of the Township of Perrysburg and the Village of Gowanda.

WAGESPer hour: 07/01/2016Building:Marble, Slate, Terrazzo $ 28.91and Tile Setter 28.91

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 18.69

OVERTIME PAYSee (B,E,E2*,Q) on OVERTIME PAGE*Note - Or other conditions beyond the employer's control such as fire or natural disaster.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Joureyman's wage:

1st 2nd 3rd 4th55% 70% 80% 90%

Supplemental benefits per hour worked:

1st 2nd 3rd 4th$ 11.19 $ 11.32 $ 18.51 $ 18.60

5-3TS - Z2

Millwright 01/01/2017

JOB DESCRIPTION Millwright DISTRICT 7ENTIRE COUNTIESAllegany, Broome, Cattaraugus, Cayuga, Chautauqua, Herkimer, Madison, Oneida, Seneca, Tioga, Yates

WAGESPer Hour 07/01/2016 07/01/2017Building: AdditionalMillwright $ 26.60 $ 1.40Certified welder 27.85 1.40Hazardous 27.85 1.40Machinist 27.85 1.40

Page 51

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 115 of 152

Page 116: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 19.03

OVERTIME PAYSee (B, E, *E2, Q) on OVERTIME PAGE*Note - Saturday may be used as a make-up day and worked at the straight time rate of pay during a work week when conditions such asweather, power failure, fire, or natural disaster prevent the performance of work on a regular scheduled work day.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES: (1) year terms at the following percentage of Journeyman's wage.

1st 2nd 3rd 4th60% 70% 80% 90%

SUPPLEMENTAL BENEFITS per hour worked:

Appr. 1st year $ 9.40Appr. 2nd year 16.15Appr. 3rd year 17.10Appr. 4th year 18.07

7-1163 Zone 2

Operating Engineer - Building 01/01/2017

JOB DESCRIPTION Operating Engineer - Building DISTRICT 7ENTIRE COUNTIESAllegany, Chemung, Livingston, Monroe, Ontario, Schuyler, Steuben, Wayne, Yates

PARTIAL COUNTIESGenesee: Only that portion of the county that lies east of a line drawn down the center of Route 98, and the entirety of the City of Batavia.

WAGESCranes 1 - Up to & including 250 ton capacity hydraulic & lattice boom cranes, all boom trucksCranes 2 - 251 ton capacity and over hydraulic and lattice boom cranes.Cranes 3 - All tower cranes (when need to climb up) including mobile self-erecting (Potain and similar type).

CLASS 1: Air Tugger; All terrain telescoping material handler; Barber Green and similar type machines; Clamshell, Dragline, Shovel andsimilar machines over three-eighths cu.yd. capacity (Fact.rating); Carrier mounted backhoes that swing 360 degrees; Big Generator PlantHoist (on steel erection); Bridge Crane (all types); Cableway; Caisson auger and similar type machine; Crane; Derrick; Dredge; Excavator allpurpose hydraulically operated; Forklift (with Factory rating of Fifteen ft. or more of lift); Hoist (on steel erection); Hydraulic/Krupp Drill Type;Mucking Machines; Remote Controlled excavator with attachments (Brokk type or similar); Ross Carrier (and similar type); Three-Drum Hoist(when all three drums are in use).

CLASS 2: A-Frame Truck; Backfilling Machine; Backhoe - tractor mounted; Belt Crete and similar type machines; Bituminous spreadingmachine 3/8 yd. capacity or less (Factory Rating); Bulldozer; Carry-all type scraper; Compressors: Four (4) not to exceed 2000 CFMcombined capacity; or three (3) or less with more than 1200 CFM but not to exceed 2000 CFM; Concrete Mixer; Concrete Placer; ConcretePump; Dinky Locomotives (all types); Elevating Grader; Elevator; Fine Grade and Finish Rollers; Fine Grade Machines (all kinds); Forkliftwith Factory rating of less than fifteen (15) feet of lift; Front End Loader; Gunite Pumping Machine; High Pressure Boiler; Hoist (1 or 2drums); Maintenance Engineer (Mechanic); Mechanical Slurry Machine (all kinds); Mega Mixers and similar type machines; Motor Grader;Post Hole Digger; Pumps (regardless of motive power) no more than four (4) in number not to exceed twenty (20) inches in total capacity;Shot Crete Pumping Machine; Side Boom Tractor; Skid Steer Loader with attachments; Stoner Crusher; Tournadozer and similar types;Tournapull and similar types; Trenching Machines; Welder; Well Drill; Well Point System;EXCEPTION: Single electric pumps up to and including four(4) inches need not be manned.

CLASS 3: Any combination (Not to exceed three (3) pieces of equipment); Compressors - three (3) or less, or not to exceed 1200 CFMcombined capacity; Fireman; Longitudinal Float; Mechanical Heater; Pumps (regardless of motive power) No more than three (3) in number,not to exceed twelve (12) inches total capacity; Roller (Fill and Grade); Rubber Tired Tractor; Welding Machine or Mechanical Conveyor(over 12 ft. in length);EXCEPTION: Single gasoline driven welding machine to 300 amps need not be manned.

CLASS 4: Junior Engineers / Oilers

Operating Engineer Building

Per hour: 07/01/2016 07/01/2017 07/01/2018Page 52

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 116 of 152

Page 117: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Building:Crane 1 $ 34.78 $ 36.11 $ 37.35Crane 2 36.65 37.78 38.82Crane 3 37.46 38.62 39.69

Master Mechanic 33.89 34.88 35.77CLASS # 1 31.89** 32.88** 33.77**CLASS # 2 31.13** 32.10** 32.97**CLASS # 3 28.59** 29.48** 30.27**CLASS # 4 24.29 25.05 25.71

** Hazardous Waste Site Premium: When an employee is required by Federal, State, Owner or Employer rules or regulations to wear anytype of respiratory protection (excluding paper dust masks) in the Class #1, #2, or #3 classification add $2.50 per hour over the appropriateclassification.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 25.99 $ 26.74 $ 27.64

OVERTIME PAY See (B,E,E2,Q) on OVERTIME PAGE.

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES:(1) year terms at the following percentage of Journeyman's wage.

1st term 60% of class 3 rate2nd term 65% of class 3 rate3rd term 75% of class 2 rate4th term 80% of class 1 rate

SUPPLEMENTAL BENEFITS per hour worked:

$ 25.39 $ 26.75 $ 27.647-158-832B

Operating Engineer - Building - Excavating & Paving 01/01/2017

JOB DESCRIPTION Operating Engineer - Building - Excavating & Paving DISTRICT 7ENTIRE COUNTIESAllegany, Chemung, Livingston, Monroe, Ontario, Schuyler, Steuben, Wayne, Yates

PARTIAL COUNTIESGenesee: Only that portion of the county that lies east of a line drawn down the center of Route 98, and the entirety of the City of Batavia.

WAGESThe following rates apply to "Site Work" which may include site preparation and grading, underground work or paving, athleticfields,skateboard parks and all other work outside the footprint of any building.

CLASS A: All terrain telescoping material handler; Asphalt Paver; Automatic Fine Grader; Backhoe (Except Tractor Mounted, Rubber Tired);Blacktop Plant (Automated); Cableway; Caisson Auger; Central Mix Concrete Plant (Automated); Cherry Picker - over 5 ton capacity; Crane;Cranes and Derricks (steel erection); Dragline; Dual Drum Paver; Excavator-all purpose-Hydraulically operated; Front End Loader (4 c.y. andover); Hoist, Two or Three Drum; Hydro-Axe; Hydraulic/Krupp Drill Type; Pile Driver; Power Grader with elevating loader attachment; QuarryMaster (or equivalent); Remote controlled excavator with attachments; Shovel; Slip Form Paver (if a second man is needed, he shall be anoiler); Tractor Drawn Belt-Type Loader; Truck Crane; Tunnel Shovel;

CLASS B: Articulated off road material Hauler; Backhoe (tractor mounted, Rubber Tired); Bituminous Spreader and Mixer; Blacktop Plant(non-automated); Boring Machine; Cage Hoist; Central Mix Plant (non-automated) and all concrete batching plants; Cherry Picker (5 tonsand under); Compressor (4 or less) exceeding 2,000 c.f.m. combined capacity; Concrete Paver over 16S; Concrete Pump; Crusher; DrillRigs (tractor mounted); Front-end Loader (under 4 c.y.); Hi-pressure Boiler (15 lbs. and over); Hoist, One Drum; Kolman Plant Loader andsimilar type loaders (if Employer requires another man to clean the screen or to maintain the equipment, he shall be an oiler); MaintenanceEngineer; Maintenance Grease Man; Mechanical Slurry Machine; Mixer for stabilized base self-propelled; Monorail Machine; Plant Engineer;Power Broom; Power Grader; Pump Crete, Ready Mix Concrete Plant; Road Widener; Roller (all above sub-grade); Side Boom; Skid SteerLoader with Attachments; Tractor Scraper; Tractor with Dozer and/or Pusher; Trencher; Vacuum Truck; Winch.

Page 53

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 117 of 152

Page 118: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

CLASS C: Compressors: 4 not to exceed 2,000 c.f.m. combined capacity; or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000c.f.m.; Compressors (any size but subject to other provisions for compressors), Dust Collectors, Generators, Welding Machines (four of anytype or combination); Concrete Pavement Spreaders and Finishers; Conveyor; Drill, Core; Drill, Well; Electric Pump used in conjunction withWell Point Systems; Farm Tractor with accessories; Fine Grade Machine; Fork Lift; Gunite Machine; Hammers-Hydraulic self-propelled;Locomotive; Post Hole Digger and Post Driver; Pumps, regardless of motive power, not more than 4 in number not to exceed 20" in totalcapacity; Submersible Electric Pumps when used in lieu of well Points; Tractor with towed accessories; Vibrator Compactor; Vibro Tamp;Well Point.

CLASS D: Compressor (any size, but subject to other provisions for compressors), Dust Collectors, Generator, Welding machines (three orless of any type or combination); Concrete Mixer (16S and under); Concrete Saw self propelled; Form Tamper; Mulching Machine; PowerHeaterman; Pumps regardless of motive power no more than 3 in number not to exceed 12" in total capacity; Revinius Widener; SteamCleaner; Tractor.

CLASS E: Junior Engineer

Per hour: 07/01/2016 07/01/2017 07/01/2018

Building Excavatingand Paving:Master Mechanic $ 32.19 $ 33.12 $ 33.95Class A 30.19 31.12 31.95Class B 29.74 30.66 31.48Class C 29.09 29.99 30.79Class D 25.81 26.61 27.30Class E 24.65 25.41 26.07

The above rates do not cover hazardous waste removal work, See Heavy/Highway.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 25.64 $ 26.39 $ 27.29

OVERTIME PAY See ( B, E, E2, Q ) on OVERTIME PAGE.

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES:(1) year terms at the following percentage of Journeyman's wage.

1st term 60% of Class C rate2nd term 65% of Class C rate3rd term 75% of Class B rate4th term 80% of Class A rate

SUPPLEMENTAL BENEFITS per hour worked:

$ 25.64 $ 26.39 $ 27.297-158-832BEX

Operating Engineer - Heavy&Highway 01/01/2017

JOB DESCRIPTION Operating Engineer - Heavy&Highway DISTRICT 7ENTIRE COUNTIESAllegany, Chemung, Livingston, Monroe, Ontario, Schuyler, Steuben, Wayne, Yates

PARTIAL COUNTIESGenesee: Only that portion of the county that lies east of a line drawn down the center of Route 98, and the entirety of the City of Batavia.

WAGES Crane 1: All tower cranes, including self erecting to be paid $4.00 per hour over Class A rate. Crane 2: All Lattice Boom Cranes: All other cranes with a manufacturer's rating of fifty (50) ton and over, to be paid $3.00 per hour overClass A rate. Crane 3: All hydraulic cranes and derricks with a manufacturer's rating of forty nine (49) ton and below, including boom trucks, to be paid$2.00 per hour over Class A rate.

Crane rates apply when a Certificate of Completence is required by the New York State Department of Labor.

Page 54

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 118 of 152

Page 119: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

CLASS A: Asphalt Paver; Automated Concrete Spreader (CMI Type); Automatic Fine Grader; Backhoe (except tractor-mounted, rubbertired); Belt Placer (CMI Type); Blacktop Plant (Auto); Cableway; Caisson Auger; Central Mix Concrete Plant (Automated); Concrete CurbMachine (Self-Propelled, Slipform); Concrete Pump; Dragline; Dredge; Dual Drum Paver; Excavator (All Purpose-Hydraulically Operated)(Gradall or Similar); Fork Lift (Factory Rated 15 feet and Over); Front End Loader (4 cu. yd. and Over); Head Tower (Sauerman or Equal);Hoist (Two or Three Drum); Holland Loader; Horizontal Directional Drill and Power Ram type equipment; Maintenance Engineer; Mine Hoist;Mucking Machine or Mole; Overhead Crane (Gentry or Straddle Type); Pavement Breaker (self-propelled) Wertgen: PB-4 and similar type;Pavement Profiler over 105 horsepower; Pavement Rubbleizer; Pile Driver; Power Grader; Quad 9; Scraper; Shovel; Side Boom; Slip FormPaver (If a second man is needed, he shall be an Oiler); Tractor Drawn Belt-Type Loader; Truck or Trailer Mounted Log Chipper (Self Feederwith Loader); Tug Boat moving equipment or materials; Tunnel Shovel.

CLASS B: Backhoe (Tractor-Mounted, Rubber Tired); Bituminous Spreader & Mixer; Blacktop Plant (Non-automated); Blast or Rotary Drill(Truck or Tractor Mounted); Boring Machine; Cage Hoist; Central Mix Plant (Non Automated) and All Concrete Batching Plants;Compressors (4 or less) exceeding 2,000 c.f.m. combined capacity; Core Drill; Crusher; Diesel Power Unit; Drill Rigs hydraulic Krupp type);Drill Rigs (Tractor Mounted); Fork Lift (Factory rated under 15 feet); Front End Loader (Under 4 cu. yd.); Hoist (One Drum); HorizontalDirectional Drill Locator; Hydro-Axe; Hydro-Blaster (self-propelled, non-manually operated); Kolman Plant Loader and Similar Type Loaders(If Employer requires another man to clean the screen or to maintain the equipment, he shall be an Oiler); L.C.M. Work Boat Operator;Locomotive; Log Skidder; Lubrication Engineer/Greaseman; Material Handling Knuckle Boom; Mixer (for stabilized base self-propelled);Monorail Machine; Pavement Profiler 105 horsepower and under; Plant Engineer; Pump Crete; Ready Mix Concrete Plant; RefrigerationEquipment (for soil stabilization); Road Widener; Roller (all above sub-grade); Sea Mule; Skid Steer Loader with attachments; Tractor withDozer and/or Pusher; Trencher; Tugger Hoist; Vacuum Blasting Machine (self-propelled, non-manually operated); Vacuum Truck; VermeerType Saw; Welder; Winch; Winch Cat.

CLASS C: A Frame Truck; Articulated Off Road Material Hauler; Aggregate Plant; Ballast Regulator (ride on); Cement and Bin Operator;Compressors (4 not to exceed 2,000 c.f.m. combined capacity: or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000 c.f.m.);Compressors (any size but subject to other provisions for compressors), Dust Collectors, Generators, Pumps, Welding Machines, LightPlants (4 of any type or combination); Concrete Pavement Spreaders and Finishers; Concrete Saw, (self-propelled); Conveyor; DeckEquipment Operator (Marine); Electric Pump Used in Conjunction with well-point system; Farm Tractor with Accessories; Fine GradeMachine; Form Tamper; Grout Pump; Gunite Machine; Hammers (hydraulic-self propelled); Hydro-Spiker (ride-on); Hydraulic Pump (jackingsystem); Hydroblaster (low pressure cleaning); Light Plants; Mulching Machine; Oiler; Parapet Concrete or Pavement Grinder; Post HoleDigger & Post Driver; Power Broom (towed); Power Heaterman; Power Sweeper; Revinius Widener; Roller (grade & fill); Scarifier (ride-on);Shell Winder; Span-Saw (ride-on); Steam Cleaner; Submersible Electric Pump (when used in lieu of well point system); Tamper (ride-on);Tie Extractor (ride-on); Tie Handler (ride-on); Tie Inserter (ride-on); Tie Spacer (ride-on); Track Liner (ride-on); Tractor (with or Without towedaccessories); Vibratory Compactor; Vibro Tamp; Well Drill; Well Point.

Per hour: 07/01/2016 07/01/2017 07/01/2018

Crane 1 $ 43.38 $ 44.51 $ 46.01Crane 2 42.38 43.51 45.01Crane 3 41.38 42.51 44.01

Master Mechanic 40.71 41.89 43.44

CLASS A 39.38 40.51 42.01CLASS B 38.67 39.80 41.30CLASS C 35.81 36.94 38.44

Additional 2.50 per hr. for E.P.A. or D.E.C. certified toxic or hazardous waste work.

A single irregular work shift can start any time from 5:00 pm to 1:00 am.All employees who work a single irregular work shift on Governmental mandated night work shall be paid and additional $2.00 per hr.effective for work bid on or after September 01,2000.

** IMPORTANT NOTICE - EFFECTIVE 04/01/2009 **Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Friday.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 26.23 $ 27.23 $ 27.93

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

Page 55

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 119 of 152

Page 120: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

REGISTERED APPRENTICESWAGES: (1000) hour terms at the following percentage of Journeyman's wage.

1st term 60% of Class B2nd term 70% of Class B3rd term 80% of Class B4th Term 90% of Class B

SUPPLEMENTAL BENEFITS per hour worked:$ 26.23 $ 27.23 $ 27.93

7-158-832H

Operating Engineer - Survey Crew 01/01/2017

JOB DESCRIPTION Operating Engineer - Survey Crew DISTRICT 12

ENTIRE COUNTIESAlbany, Allegany, Broome, Cayuga, Chemung, Chenango, Clinton, Columbia, Cortland, Essex, Franklin, Fulton, Greene, Hamilton,Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara, Oneida, Onondaga, Ontario, Oswego, Otsego, Rensselaer,Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Tioga, Tompkins, Warren, Washington, Wayne, Yates

PARTIAL COUNTIESDutchess: The northern portion of the county from the northern boundary line of the City of Poughkeepsie, north.Genesee: Only the portion of the county that lies east of a line down the center of Route 98 to include all area that lies within the City ofBatavia.

WAGESThese rates apply to Building and Heavy Highway.

Per hour:SURVEY CLASSIFICATIONS:

Party Chief - One who directs a survey party.Instrument Person - One who operates the surveying instruments.Rod Person - One who holds the rods and assists the Instrument Person.

07/01/2016

Party Chief $ 38.49Instrument Person 35.32Rod Person 26.03

Additional $3.00 per hr. for work in a Tunnel.Additional $2.50 per hr. for EPA or DEC certified toxic or hazardous waste work.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 23.70

OVERTIME PAYSee (B, E, P, T) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES: 1000 hour terms based on the Percentage of Rod Persons Wage:

07/01/2016

0-1000 60%1001-2000 70%2001-3000 80%

SUPPLEMENTAL BENIFIT per hour worked:

0-1000 $ 15.571001-2000 $ 18.172001-3000 $ 20.77

12-158-545 D.H.H.

Page 56

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 120 of 152

Page 121: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Operating Engineer - Survey Crew - Consulting Engineer 01/01/2017

JOB DESCRIPTION Operating Engineer - Survey Crew - Consulting Engineer DISTRICT 12

ENTIRE COUNTIESAlbany, Allegany, Broome, Cayuga, Chemung, Chenango, Clinton, Columbia, Cortland, Essex, Franklin, Fulton, Greene, Hamilton,Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara, Oneida, Onondaga, Ontario, Oswego, Otsego, Rensselaer,Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Tioga, Tompkins, Warren, Washington, Wayne, Yates

PARTIAL COUNTIESDutchess: The northern portion of the county from the northern boundary line of the City of Poughkeepsie, north.Genesee: Only the portion of the county that lies east of a line down the center of Route 98 to include all area that lies within the City ofBatavia.

WAGESThese rates apply to feasibility and preliminary design surveying, line and grade surveying for inspection or supervision of constructionwhen performed under a Consulting Engineer Agreement.

Per hour:SURVEY CLASSIFICATIONS:

Party Chief - One who directs a survey party.Instrument Person - One who operates the surveying instruments.Rod Person - One who holds the rods and assists the Instrument Person.

07/01/2016

Party Chief $ 38.49Instrument Person 35.32Rod Person 26.03

Additional $3.00 per hr. for work in a Tunnel.Additional $2.50 per hr. for EPA or DEC certified toxic or hazardous waste work.

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 23.70

OVERTIME PAYSee (B, E, P, T) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES: 1000 hour terms based on percentage of Rod Persons Wage:

07/01/2016

0-1000 60%1001-2000 70%2001-3000 80%

SUPPLEMENTAL BENIFIT per hour worked:

0-1000 $ 15.571001-2000 $ 18.172001-3000 $ 20.77

12-158-545 DCE

Operating Engineer - Tunnel 01/01/2017

JOB DESCRIPTION Operating Engineer - Tunnel DISTRICT 7ENTIRE COUNTIESAlbany, Allegany, Broome, Cayuga, Chemung, Chenango, Clinton, Columbia, Cortland, Essex, Franklin, Fulton, Greene, Hamilton,Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Oneida, Onondaga, Ontario, Oswego, Otsego, Rensselaer,Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Tioga, Tompkins, Warren, Washington, Wayne, Yates

PARTIAL COUNTIES

Page 57

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 121 of 152

Page 122: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Dutchess: Northern part of Dutchess to the northern boundary line of the City of Poughkeepie then due east to Route 115 to Bedelt Roadthen east along Bedelt Road to VanWagner Road then north along VanWagner Road to Bower Road then east along Bower Road to Rte. 44east to Rte. 343 then along Rte. 343 east to the northern boundary of the Town of Dover Plains and east along the northern boundary of theTown of Dover Plains to Connecticut.Genesee: Only that portion of the county that lies east of a linedrawn down the center of Route 98 and the entirety of the City of Batavia.

WAGES Crane 1: All cranes, including self erecting to be paid $4.00 per hour over the Class A rate. Crane 2: All Lattice Boom Cranes and all other cranes with a manufacturer's rating of fifty (50) ton and over to be paid $3.00 per hour overClass A rate. Crane 3: All hydraulic cranes and derricks with a manufacturer's rating of forty nine (49) ton nad below, including boom trucks, to be paid$2.00 per hour over Class A rate.

CLASS A: Automatic Concrete Spreader (CMI Type); Automatic Fine Grader; Backhoe (except tractor-mounted,rubber tired); Belt Placer(CMI Type); Blacktop Plant (Automated); Cableway; Caisson Auger; Central Mix Concrete Plant (Automated); Concrete Curb Machine (Self-propelled slipform) Concrete Pump (8" or over); Dredge; Dual Drum Paver; Any Mechanical Shaft Drill; Excavator (all purpose-hydraulic-Gradall or Similar); Fork Lift (factory rated 15 ft and over); Front End Loader (4 c.y & over); Gradall; Head Tower (Sauerman or Equal), HoistShaft; Hoist (two or three Drum); Mine Hoist; Maintenance Engineer (Shaft and Tunnel) ; Mine Hoist; Mucking Machine or Mole, OverheadCrane (Gantry or Straddle Type); Pile Driver; Power Grader; Remote Controlled Mole or Tunnel Mach.; Scraper; Shovel; Side Boom; SlipForm Paver (If a second man is needed, he shall be an Oiler); Tractor Drawn Belt Type Loader; Tripper/Maintenance Eng.(Shaft & Tunnel);Truck or Trailer Mounted Log Chipper (self-feeding); Tug Operator (Manned rented equip. excluded); Tunnel Shovel; Mining Machine(Moleand Similar Types).

CLASS B: Automated Central Mix Concrete Plant; Backhoe Trac-Mtd, Rubber Tired); Backhoe (topside); Bitum. Spred. & Mixer, BlacktopPlant non-automated); Blast or Rotary Drill (Truck or Tractor Mounted); Boring Machine; Cage Hoist; Central Mix Plant(NonAutomated) andAll Concrete Batching Plants; Compressors (4 or less exceeding 2,000 c.f.m. combined capacity); Concrete Pump; Crusher; Diesel PowerUnit; Drill Rigs (Tractor Mounted); Front End Loader (under 4 c.y.); Grayco Epoxy Machine; Hoist (One Drum); Hoist 2 or 3 Drum (Topside);Kolman Plant Loader & Similar Type Loaders (if Employer requires another person to clean the screen or to maintain the equipment, he shallbe an Oiler); L.C.M. Work Boat Operator; Locomotive; Maint. Eng. (Topside ); Grease Man; Welder; Mixer (for stabilized base-self propelled);Monorail Machine; Plant Eng.; Personnel Hoist; Pump Crete; Ready Mix Concrete Plant; Refrigeration Equipment (for soil stabilization);Road Widener; Roller (all above sub-grade); Sea Mule; Shotcrete Mach.; Shovel (Topside); Tractor with Dozer and/or Pusher; Trencher;Tugger Hoist; Tunnel Locomotive; Winch and Winch Cat.

CLASS C: A Frame Truck; Ballast Regulator (ride-on); Compressors (4 under 2,000 cfm combined capacity; or 3 or less with more than1200 cfm. but not to exceed 2,000 cfm); Compressors (any size but subject to other provisions for compressors-Dust Collectors, Generators,Pumps, Welding Machines, Light Plants-4 of any type or combination); Concrete Pavement Spreaders and Finishers; Conveyor; Drill (core);Drill well; Elec Pump Used in Conjunction with Well Point System; Farm Tractor with Accessories; Fine Grade Machine; ForkLift (under 15ft); Grout Pump (over (5) cu. ft.; Gunite Machine; Hammers (hydraulic- self propel.); Hydra-Spiker-Ride on; Hydra-Blaster; Hydra Blaster(water); Motorized Form Carrier; Post Hole Digger & Post Driver; Power Sweep; Roller grade & fill); Scarifer (Ride on); Span-Saw (Ride-on);Submersible Electric Pump (when used in lieu of well point system); Tamper (Ride-on); Tie-Extractor, Tie Handler, Tie Inserter, Tie Spacerand Track Liner (Ride-on); Tractor (with towed accessories); Vibratory Compactor; Vibro Tamp, Well Point.

CLASS D: Aggregate Plant; Cement & Bin Operator; Compressors( 3 or less not to exceed 1,200 c.f.m. combined capacity); Compressors(any size, but subject to other provisions for compressors-Dust Collectors, Generators, Pumps, Welding Machines, Light Plants-3 or less-anytype or combination); Concrete Saw (self propelled); Fireman; Form Tamper; Hydraulic Pump (jacking system); Light Plants; MulchingMachine; Oiler; Parapet Concrete or Pavement Grinder; Power Broome towed; Power Heaterman; Revinius Widener; Shell Winder; SteamCleaner and Tractor; Greaseman; Junior Engineer.

Per hour: 07/01/2016 07/01/2017 07/01/2018

Crane 1 $ 45.94 $ 47.15 $ 48.74Crane 2 44.94 46.15 47.74Crane 3 43.94 45.15 46.74

Master Mechanic 44.20 45.49 47.15

CLASS A 41.94 43.15 44.74CLASS B 40.72 41.93 43.52CLASS C 37.93 39.14 40.73CLASS D 34.92 36.13 37.72

On hazardous waste work bid, on a state or federally designated hazardous waste site, where the Operating Engineer is in direct contactwith hazardous material and when personal protective equipment is required for respiratory, skin and eye protection, the Operating Engineershall receive the hourly wage plus $5.00 per hour. Fringe benefits will be paid at the contractual hourly wage.

SUPPLEMENTAL BENEFITSPer hour paid:

$ 26.20 $ 27.20 $ 27.90

OVERTIME PAYPage 58

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 122 of 152

Page 123: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

See (B, B2, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWAGES:(1000) hours terms at the following percentage of Journeyman's wage.

1st term 60% of Class B2nd term 65% of Class B3rd term 70% of Class B4th term 75% of Class B

SUPPLEMENTAL BENEFITS per hour paid:

$ 26.20 $ 26.20 $ 27.907-158-832TL.

Painter 01/01/2017

JOB DESCRIPTION Painter DISTRICT 3ENTIRE COUNTIESAllegany, Erie, Genesee, Niagara, Orleans, Wyoming

PARTIAL COUNTIESCattaraugus: Entire County except the Townships of Conewango, Leon, Napoli, New Albion, Randolph and South Valley.Chautauqua: Only the Townships of Awkright, Dunkirk, Hanover, Pomfret, Portland, Sheridan and Villenova.Livingston: Only the Townships of North Dansville, Nunda, Ossian,Portage, Sparta, Spring Water and West Sparta.Steuben: Only the Townships of Avoca, Canisteo, Cohocton, Dansville,Fremont, Greenwood, Hartsville, Hornellsville, Howard, Jasper,Prattsburg, Pulteney, Troupsburg, Tuscarora, Urbana, Wayland, Wayne, Woodhull, West Union, Wheeler, and the City of Hornell.

WAGESPer hour: 07/01/2016Basic Rate (Brush & Roll) $ 25.95Spray painting, wallcovering 26.20Abrasive and hydroblasting 26.20Taping/DryWall Finisher 26.45Skeleton Steel* 26.70

* Skeleton Steel: No floors, walls or ceiling are constructed, including radio and television towers, flagpoles, smokestacks, cranes and theabatement of coatings with lead, asbestos and/or arsenic, etc. All work within the confines of a plant shall be paid the skeleton steel rate(except in-plant tank work (see Tank Rate)).

Four (4), ten (10) hour days may be worked at straight time during a week, Monday thru Thursday. Friday may be used as a make-up day.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 22.84

OVERTIME PAYExterior work only See ( B, E4, F*, R ) on OVERTIME PAGE.All other work See ( B, F*, R ) on OVERTIME PAGE.* Note - Saturday is payable at straight time if the employee misses work, except where a doctor's or hospital verification of illness isproduced Monday through Friday when work was available to the employee.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

Painter/Decorator: 750 hour terms at the following percentage of Journeyman's Basic wage rate:1st 2nd 3rd 4th 5th 6th 7th 8th50% 55% 60% 65% 70% 75% 80% 90%Taper/Drywall Finisher: 750 hour terms at the following percentage of Journeyman's Taper wage:1st 2nd 3rd 4th 5th 6th50% 55% 60% 65% 75% 85%

Page 59

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 123 of 152

Page 124: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Supplemental benefits per hour worked:

Painter/Decorator and Taper/Drywall Finisher:1st & 2nd terms $ 2.273rd & 4th terms 5.27All other terms 6.27

3-4-Buf, Nia, Olean

Painter 01/01/2017

JOB DESCRIPTION Painter DISTRICT 3ENTIRE COUNTIESAllegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Cortland, Delaware, Erie, Genesee, Herkimer, Jefferson,Lewis, Livingston, Madison, Monroe, Niagara, Oneida, Onondaga, Ontario, Orleans, Oswego, Otsego, Schuyler, Seneca, St. Lawrence,Steuben, Tioga, Tompkins, Wayne, Wyoming, Yates

WAGESPer hour: 07/01/2016 05/01/2017 05/01/2018

Additional AdditionalBridge* $ 38.00 $ 1.25 $ 1.25Tunnel* 38.00 1.25 1.25Tank* 36.00 1.25 1.25

For Bridge Painting Contracts, ALL WORKERS on and off the bridge (including Flagmen) are to be paid Painter's Rate; the contract must beONLY for Bridge Painting.

Tank rate applies to indoor and outdoor tanks, tank towers, standpipes, digesters, waste water treatment tanks, chlorinator tanks, etc.Covers all types of tanks including but not limited to steel tanks, concrete tanks, fiberglass tanks, etc.

* Note an additional $1.00 per hour is required when the contracting agency or project specification requires any shift to start prior to 6:00amor after 12:00 noon.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 25.65

OVERTIME PAYExterior work only See ( B, E4, F*, R ) on OVERTIME PAGE.All other work See ( B, F*, R ) on OVERTIME PAGE.*Note - Saturday is payable at straight time if the employee misses work, except where a doctor's or hospital verification of illness isproduced Monday through Friday when work was available to the employee.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

750 hour terms at the following percentage of Journeyman's wage rate:1st 2nd 3rd 4th 5th 6th50% 55% 60% 65% 75% 85%

Supplemental benefits per hour worked:

1st & 2nd terms $ 5.303rd & 4th terms 5.305th & 6th terms 6.30

3-4-Bridge, Tunnel, Tank

Painter - Metal Polisher 01/01/2017

JOB DESCRIPTION Painter - Metal Polisher DISTRICT 8ENTIRE COUNTIESAlbany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware,Dutchess, Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Kings, Lewis, Livingston, Madison, Monroe,Montgomery, Nassau, New York, Niagara, Oneida, Onondaga, Ontario, Orange, Orleans, Oswego, Otsego, Putnam, Queens, Rensselaer,Richmond, Rockland, Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Suffolk, Sullivan, Tioga, Tompkins,Ulster, Warren, Washington, Wayne, Westchester, Wyoming, Yates

WAGESPage 60

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 124 of 152

Page 125: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

07/01/2016 06/01/2017Metal Polisher $ 28.88 $ 29.73Metal Polisher** 29.83 30.68Metal Poilsher*** 32.38 33.23

**Note: Applies on New Construction & complete renovation*** Note: Applies when working on scaffolds over 34 feet.

SUPPLEMENTAL BENEFITSPer Hour: 07/01/2016 06/01/2017

Journeyworker:All classification $ 9.26 $ 9.41

OVERTIME PAYSee (B, E, E2, P, T) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6, 11, 15, 16, 25, 26) on HOLIDAY PAGEOvertime: See (5, 6, 9, 11, 15, 16, 25, 26) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:One (1) year term at the following wage rates:

07/01/2016

1st year $ 11.752nd year 13.003rd year 15.75

Supplentals benefits:Per hour paid:

1st year $ 6.262nd year 6.37

3rd year 6.51

8-8A/28A-MP

Plumber 01/01/2017

JOB DESCRIPTION Plumber DISTRICT 5ENTIRE COUNTIESLivingston, Monroe, Ontario, Yates

PARTIAL COUNTIESAllegany: Only the Townships of Alfred, Almond, Andover, Birdsall, Burns, Grove, Independence, that portion of Scio which lies east of RT.19, Ward, Wellsville, W. Almond and WillingGenesee: Only the Townships of Bergen, Bethany, Byron, Leroy, Pavillion and Stafford.Orleans: Only the Townships of Albion, Barre, Carlton, Clarendon, Gaines, Kendall and Murray.Seneca: Only the Townships of Fayette, Junius, Ovid, Romulus, Seneca Falls, Tyre, Varick and Waterloo.Steuben: Only the Townships of Avoca, Cameron, Canisteo, Cohocton, Dansville, Freemont, Greenwood, Harsville, City of Hornell,Hornelsville, Howard, Jasper, Pulteney, Prattsburg, Rathbone, Troopsburg, Tuscarora, W. Union, Wayland, Wheeler and Woodhull.Wayne: Only the Townships of Arcadia (Newark), Galen (Clyde), Huron, Macedon, Marion, Lyons, Ontario, Palmyra, Rose, Sodus,Walworth and Williamson.

WAGESPer hour 07/01/2016

Plumber $ 32.18Steamfitter 32.18

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman $ 20.63*

*NOTE-$ 2.55 of this amount must be paid at the same premium as the wage for overtime hours.

OVERTIME PAYSite work & New const. See (B*, E,E2,Q)on OVERTIME PAGE.

Page 61

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 125 of 152

Page 126: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

All other work See ( B*, E, Q )on OVERTIME PAGE.

*Time and one half for work on the day after Thanksgiving.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESOne year terms at the following percentage of Journeyman's wage.

1st. 2nd. 3rd. 4th. 5th.40% 50% 59% 66% 75%

Supplemental Benefits per hour worked:

1st year $7.702nd year 8.623rd year 9.454th year 10.105th year 12.21*

*NOTE-$ 1.20 of this amount must be paid at the same premium as the wage for overtime hours.5-13-SF

Plumber 01/01/2017

JOB DESCRIPTION Plumber DISTRICT 3ENTIRE COUNTIESPARTIAL COUNTIESAllegany: Only the Townships of Alma, Amity, Bolivar, Clarksville, Cuba, Friendship, Genesee, Wirt and that portion of Scio which lies westof Rt. 19.Cattaraugus: Only the Townships of Allegany, Carrollton, Conewango, Cold Spring, Great Valley, Hinsdale, Humphrey, Ischua, Little Valley,Napoli, Olean, Portville, Randolph, Red House, Salamanca, South Valley, the City of Dunkirk, the City of Olean, the City of Salamanca, theVillage of Fredonia, and the Allegany Indian Reservation.Chautauqua: Only the Townships of Busti, Carroll, Chautauqua, Clymer, Ellery, Ellicott, Ellington, French Creek, Gerry, Harmony, Kiantone,Mina, North Harmony, Poland, Sherman, and the City of Jamestown.

WAGESPer hour: 07/01/2016 05/01/2017 04/30/2018

Additional AdditionalPlumber $ 31.46* $ 1.45 $ 1.45Steamfitter 31.46* 1.45 1.45

*Note - Add 10% (ten-percent) to wage when HAZMAT training is required or when OSHA compliant respirator protection is required.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 23.51** Note - $2.76 of this amount must be paid at the same premium as the wage.

OVERTIME PAYSee (*B, **E, Q) on OVERTIME PAGE* Double time after 11 hours per day on Weekdays.** Double time after 10 hours per day on Saturday.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6, 16) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th 5th45%* 55%* 65%* 75%* 90%*

*Note - Add 10% (ten-percent) to wage when HAZMAT training is required or when OSHA compliant respirator protection is required.

Supplemental benefits per hour worked:

Page 62

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 126 of 152

Page 127: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

$ 19.32** Note - $2.76 of this amount must be paid at the same premium as the wage.

3-22-Southern

Plumber 01/01/2017

JOB DESCRIPTION Plumber DISTRICT 3ENTIRE COUNTIESErie, Niagara, Wyoming

PARTIAL COUNTIESAllegany: Only the Townships of Allen, Angelica, Belfast, Caneadea, Centerville, Granger, Hume, New Hudson and RushfordCattaraugus: Only the Townships of Ashford, Dayton, East Otto, Ellicottville, Farmersville, Franklinville, Freedom, Leon, Lyndon, Machias,Mansfield, New Albion, Otto, Perrysburg, Persia and Yorkshire.Chautauqua: Only the Townships of Arkwright, Charlotte, Cherry Creek, Hanover, Pomfret, Portland, Ripley, Sheridan, Stockton, Villenova,Westfield, City of Dunkirk and Village of Fredonia.Genesee: Only the Townships of Alabama, Alexander, Batavia, Darien, Elba, Oakfield, Pembroke and the City of Batavia.Orleans: Only the Townships of Ridgeway, Shelby and Yates.

WAGESPer hour: 07/01/2016 05/01/2017 04/30/2018

Additional AdditionalPlumber $ 33.55* $ 1.45 $ 1.45Steamfitter 33.55* 1.45 1.45

*Note - Add 10% (ten-percent) to wage when HAZMAT training is required or when OSHA compliant respirator protection is required.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 23.51** Note - $2.76 of this amount must be paid at the same premium as the wage.

OVERTIME PAYSee (*B, **E, Q) on OVERTIME PAGE* Double time after 11 hours per day on Weekdays.** Double time after 10 hours per day on Saturday.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6, 16) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

One year terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th 5th45%* 55%* 65%* 75%* 90%**Note - Add 10% (ten-percent) to wage when HAZMAT training is required or when OSHA compliant respirator protection is required.

Supplemental benefits per hour worked:

$ 19.32** Note - $2.76 of this amount must be paid at the same premium as the wage.

3-22-Buffalo, Niagara

Roofer 01/01/2017

JOB DESCRIPTION Roofer DISTRICT 3ENTIRE COUNTIESAllegany, Cattaraugus, Chautauqua

WAGESPer hour: 07/01/2016Roofer $ 29.02Waterproofer 29.02Asbestos Removal with respirator or protective suit add $1.00 per hour.

SUPPLEMENTAL BENEFITSPer hour worked:

$ 12.68

OVERTIME PAYSee (B, E, E2, Q) on OVERTIME PAGE

Page 63

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 127 of 152

Page 128: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

REGISTERED APPRENTICESWages per hour:

750 hour terms at the following percentage of Journeyman's wage:

1st 2nd 3rd 4th 5th 6th50% 50% 60% 70% 80% 90%

Supplemental benefits per hour paid:

1st & 2nd terms $ 0.42All other terms 12.68

3-210

Sheetmetal Worker 01/01/2017

JOB DESCRIPTION Sheetmetal Worker DISTRICT 2ENTIRE COUNTIESAllegany, Broome, Chemung, Delaware, Otsego, Schuyler, Steuben, Tioga, Tompkins

WAGESPer hour:

07/01/2016Sheetmetal Worker $ 27.72Polyresin Fiberglass 27.82

SUPPLEMENTAL BENEFITSPer hour worked:

Journeyman: $ 18.93

OVERTIME PAYSee (*B1, Q) on OVERTIME PAGE *On Saturday, time and one half of the hourly rate for the first ten (10) hours, then two (2) times the hourly wage rate for all hours after ten(10) hours worked.

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGENote: Holidays are observed on the Holiday, not on the day that it is locally observed.

REGISTERED APPRENTICESWAGES per hour:Half Year Terms

1st 2nd 3rd 4th 5th 6th 7th 8th07/01/2016 13.91 13.11 14.53 15.94 17.32 18.76 20.17 22.97

SUPPLEMENTAL BENEFITS per hour worked:1st 2nd 3rd 4th 5th 6th 7th 8th

07/01/2016 1.38 10.73 16.35 16.43 16.50 16.57 16.64 16.792-112

Sprinkler Fitter 01/01/2017

JOB DESCRIPTION Sprinkler Fitter DISTRICT 1ENTIRE COUNTIESAllegany, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware, Erie, Essex, Franklin,Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Lewis, Livingston, Madison, Monroe, Montgomery, Niagara, Oneida, Onondaga,Ontario, Orleans, Oswego, Otsego, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Tioga, Tompkins, Washington, Wayne, Wyoming,Yates

WAGESPer hour 07/01/2016Sprinkler $ 31.66Fitter

SUPPLEMENTAL BENEFITSPer hour worked

Page 64

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 128 of 152

Page 129: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Journeyman $ 21.02

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (1) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGENote: When a holiday falls on Sunday, the following Monday shall be considered a holiday and all work performed on either day shall be atthe double time rate. When a holiday falls on Saturday, the preceding Friday shall be considered a holiday and all work performed on eitherday shall be at the double time rate.

REGISTERED APPRENTICESWages per hour

For Apprentices HIRED PRIOR TO 04/01/2010:

One Half Year terms at the following percentage of journeyman's wage.

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th50% 50% 55% 60% 65% 70% 75% 80% 85% 90%

Supplemental Benefits per hour worked

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th$ 8.15 $ 8.15 $ 15.12 $ 15.12 $21.02 $21.02 $21.02 $21.02 $21.02 $21.02

For Apprentices HIRED ON OR AFTER 04/01/2010:

One Half Year terms at the following percentage of journeyman's wage.

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th45% 50% 55% 60% 65% 70% 75% 80% 85% 90%

Supplemental Benefits per hour worked

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th$ 8.56 $ 8.60 $ 15.37 $ 15.41 $ 15.96 $ 16.00 $ 16.05 $ 16.09 $ 16.14 $ 16.18

For Apprentices HIRED ON OR AFTER 04/01/2013:

One Half Year terms at the following percentage of journeyman's wage.

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th45% 50% 55% 60% 65% 70% 75% 80% 85% 90%

Supplemental Benefits per hour worked

1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th$ 7.90 $ 7.90 $ 15.12 $ 15.12 $ 15.37 $ 15.37 $ 15.37 $ 15.37 $ 15.37 $ 15.37

1-669

Teamster - Building / Heavy&Highway 01/01/2017

JOB DESCRIPTION Teamster - Building / Heavy&Highway DISTRICT 3ENTIRE COUNTIESCattaraugus, Chautauqua

PARTIAL COUNTIESAllegany: Entire county except the Townships of Alfred, Almond, Burns and West Almond.

WAGESGROUP 1: Warehousemen, Yardmen, Truck Helpers, Panel Trucks, Flatboy Material Trucks (straight jobs), Single Axle Dump Trucks,Dumpsters, Material Checkers and Receivers, Greasers, Truck Tiremen, Mechanics Helpers and Parts Chasers, Tandems and BatchTrucks, Mechanics, Dispatcher, Semi-Trailers, Low-boy Trucks, Asphalt Distributor Trucks, and Agitator, Mixer Trucks and Dumpcrete typevehicles, Truck Mechanic, Fuel Trucks.

Page 65

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 129 of 152

Page 130: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

GROUP 2: Specialized Earth Moving Equipment, Euclid type, or similar off-highway where not self-loading and self-contained concretemobile unit, Off-highway Tandem Back-Dump, Twin Engine Equipment and Double-Hitched Equipment where not self-loading, Water Tanks,Sprinkler Trucks and Winch Trucks.

Per hour: 07/01/2016 04/01/2017GROUP 1 $ 35.13 $ 36.38GROUP 2 35.13 36.38

SUPPLEMENTAL BENEFITSPer hour paid:

$ 13.21 $ 13.66

OVERTIME PAYSee (B, E, Q) on OVERTIME PAGE

HOLIDAYPaid: See (5, 20) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

3-264

Teamster - Building / Heavy&Highway 01/01/2017

JOB DESCRIPTION Teamster - Building / Heavy&Highway DISTRICT 6ENTIRE COUNTIESCayuga, Cortland, Seneca, Tompkins, Yates

PARTIAL COUNTIESAllegany: Only the Townships of Almond, Alfred, Burns and West Almond.Steuben: Only the Townships of Avoca, Canisteo, Cohocton, Dansville, Freemont, Greenwood, Hartsville, Hornell, Howard, Jasper,Prattsburg, Pulteney, Troupsburg, West Union and Wheeler.

WAGESPer hour:

GROUP 1: Warehousemen, Yardmen, Truck Helpers, Pickups, Panel Trucks, Flatboy Material Trucks (straight jobs), Single Axle DumpTrucks, Dumpsters, Material Checkers & Receivers, Greasers, Truck Tiremen, Mechanics Helpers and Parts Chasers, Tandems & BatchTrucks, Mechanics, Semi-Trailers, Low-boy Trucks, Asphalt Distributor Trucks, and Agitator, Mixer Trucks and Dumpcrete type vehicles,Truck Mechanic, Fuel Trucks.

GROUP 2: Specialized Earth Moving Equipment-Euclid type, or similar off-highway equipment, where not self-loading, Straddle (Ross)Carrier, and self-contained concrete mobile truck, Off-highway Tandem Back-Dump, Twin Engine Equipment and Double-Hitched Equipmentwhere not self-loading.

07/01/2016 07/01/2017

GROUP #1 $ 23.94 $ 24.46GROUP #2 24.14 24.66

NOTE: For all work bid, there shall be a twelve month carryover of the rates in effect at the time of the bid.

** IMPORTANT NOTICE - EFFECTIVE 04/01/2009 **Four (4), ten (10) hour days may be worked at straight time during a week.

NOTE - In order to use the '4 Day/10 Hour Work schedule', as your normal schedule, you must submit an 'Employer Registration for Use of 4Day/10 Hour Work Schedule,' form PW30R; and there must be a dispensation of hours in place on the project. If the PW30R is not submittedyou may be liable for overtime payments for work over 8 hours per day.

SUPPLEMENTAL BENEFITSPer hour paid:

Journeyman $ 22.87 $ 24.10

OVERTIME PAYSee (B, E2, J) on OVERTIME PAGE

HOLIDAYPaid: See (5, 6) on HOLIDAY PAGEOvertime: See (5, 6) on HOLIDAY PAGE

6-317bhh

Welder 01/01/2017

JOB DESCRIPTION Welder DISTRICT 1

Page 66

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 130 of 152

Page 131: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

ENTIRE COUNTIESAlbany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton, Columbia, Cortland, Delaware,Dutchess, Erie, Essex, Franklin, Fulton, Genesee, Greene, Hamilton, Herkimer, Jefferson, Kings, Lewis, Livingston, Madison, Monroe,Montgomery, Nassau, New York, Niagara, Oneida, Onondaga, Ontario, Orange, Orleans, Oswego, Otsego, Putnam, Queens, Rensselaer,Richmond, Rockland, Saratoga, Schenectady, Schoharie, Schuyler, Seneca, St. Lawrence, Steuben, Suffolk, Sullivan, Tioga, Tompkins,Ulster, Warren, Washington, Wayne, Westchester, Wyoming, Yates

WAGESPer hour 07/01/2016

Welder: To be paid the same rate of the mechanic performing the work.*

*EXCEPTION: If a specific welder certification is required, then the 'Certified Welder' rate in that trade tag will be paid.

OVERTIME PAYHOLIDAY

1-As Per Trade

Page 67

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429 Allegany County

Page 131 of 152

Page 132: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Overtime CodesFollowing is an explanation of the code(s) listed in the OVERTIME section of each classification contained in the attached schedule.Additional requirements may also be listed in the HOLIDAY section.

NOTE: Supplemental Benefits are 'Per hour worked' (for each hour worked) unless otherwise noted

( AA ) Time and one half of the hourly rate after 7 and one half hours per day

( A ) Time and one half of the hourly rate after 7 hours per day

( B ) Time and one half of the hourly rate after 8 hours per day

( B1 ) Time and one half of the hourly rate for the 9th & 10th hours week days and the 1st 8 hours on Saturday.Double the hourly rate for all additional hours

( B2 ) Time and one half of the hourly rate after 40 hours per week

( C ) Double the hourly rate after 7 hours per day

( C1 ) Double the hourly rate after 7 and one half hours per day

( D ) Double the hourly rate after 8 hours per day

( D1 ) Double the hourly rate after 9 hours per day

( E ) Time and one half of the hourly rate on Saturday

( E1 ) Time and one half 1st 4 hours on Saturday; Double the hourly rate all additional Saturday hours

( E2 ) Saturday may be used as a make-up day at straight time when a day is lost during that week due to inclementweather

( E3 ) Between November 1st and March 3rd Saturday may be used as a make-up day at straight time when a day islost during that week due to inclement weather, provided a given employee has worked between 16 and 32hours that week

( E4 ) Saturday and Sunday may be used as a make-up day at straight time when a day is lost during that week dueto inclement weather

( E5 ) Double time after 8 hours on Saturdays

( F ) Time and one half of the hourly rate on Saturday and Sunday

( G ) Time and one half of the hourly rate on Saturday and Holidays

( H ) Time and one half of the hourly rate on Saturday, Sunday, and Holidays

( I ) Time and one half of the hourly rate on Sunday

( J ) Time and one half of the hourly rate on Sunday and Holidays

( K ) Time and one half of the hourly rate on Holidays

( L ) Double the hourly rate on Saturday

( M ) Double the hourly rate on Saturday and Sunday

( N ) Double the hourly rate on Saturday and Holidays

( O ) Double the hourly rate on Saturday, Sunday, and Holidays

( P ) Double the hourly rate on Sunday

( Q ) Double the hourly rate on Sunday and Holidays

( R ) Double the hourly rate on Holidays

( S ) Two and one half times the hourly rate for Holidays, if worked

Page 68

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429

Page 132 of 152

Page 133: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

( S1 ) Two and one half times the hourly rate the first 8 hours on Sunday or Holidays One and one half times thehourly rate all additional hours.

( T ) Triple the hourly rate for Holidays, if worked

( U ) Four times the hourly rate for Holidays, if worked

( V ) Including benefits at SAME PREMIUM as shown for overtime

( W ) Time and one half for benefits on all overtime hours.

Page 69

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429

Page 133 of 152

Page 134: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Holiday CodesPAID Holidays:

Paid Holidays are days for which an eligible employee receives a regular day's pay, but is not required to perform work. If an employeeworks on a day listed as a paid holiday, this remuneration is in addition to payment of the required prevailing rate for the work actuallyperformed.

OVERTIME Holiday Pay:

Overtime holiday pay is the premium pay that is required for work performed on specified holidays. It is only required where the employeeactually performs work on such holidays. The applicable holidays are listed under HOLIDAYS: OVERTIME. The required rate of pay forthese covered holidays can be found in the OVERTIME PAY section listings for each classification.

Following is an explanation of the code(s) listed in the HOLIDAY section of each classification contained in the attached schedule. TheHolidays as listed below are to be paid at the wage rates at which the employee is normally classified.

( 1 ) None

( 2 ) Labor Day

( 3 ) Memorial Day and Labor Day

( 4 ) Memorial Day and July 4th

( 5 ) Memorial Day, July 4th, and Labor Day

( 6 ) New Year's, Thanksgiving, and Christmas

( 7 ) Lincoln's Birthday, Washington's Birthday, and Veterans Day

( 8 ) Good Friday

( 9 ) Lincoln's Birthday

( 10 ) Washington's Birthday

( 11 ) Columbus Day

( 12 ) Election Day

( 13 ) Presidential Election Day

( 14 ) 1/2 Day on Presidential Election Day

( 15 ) Veterans Day

( 16 ) Day after Thanksgiving

( 17 ) July 4th

( 18 ) 1/2 Day before Christmas

( 19 ) 1/2 Day before New Years

( 20 ) Thanksgiving

( 21 ) New Year's Day

( 22 ) Christmas

( 23 ) Day before Christmas

( 24 ) Day before New Year's

( 25 ) Presidents' Day

( 26 ) Martin Luther King, Jr. Day

( 27 ) Memorial Day

Page 70

Prevailing Wage Rates for 07/01/2016 - 06/30/2017 Published by the New York State Department of LaborLast Published on Jan 01 2017 PRC Number 2017000429

Page 134 of 152

Page 135: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

New York State Department of Labor - Bureau of Public Work State Office Building Campus

Building 12 - Room 130 Albany, New York 12240

REQUEST FOR WAGE AND SUPPLEMENT INFORMATION

Fax (518) 485-1870 or mail this form for new schedules or for determination for additional occupations. This Form Must Be Typed

Submitted By:(Check Only One)

A. Public Work Contract to be let by: (Enter Data Pertaining to Contracting/Public Agency)

1. Name and complete address 2. 07 City01 DOT 08 Local School District02 OGS 09 Special Local District, i.e.,03 Dormitory Authority Fire, Sewer, Water District

1O Village04 State University11 TownConstruction Fund12 County05 Mental Hygiene

Facilities Corp. 13 Other Non-N.Y. StateFax:Telephone:

06 OTHER N.Y. STATE UNIT (Describe)E-Mail:

check if new or change) 4. SERVICE REQUIRED. Check appropriate box and provide projectinformation.

3. SEND REPLY TO (Name and complete address:

New Schedule of Wages and Supplements.

APPROXIMATE BID DATE :

Additional Occupation and/or Redetermination

PRC NUMBER ISSUED PREVIOUSLY FORTHIS PROJECT :

OFFICE USE ONLYTelephone: Fax:

E-Mail:

B. PROJECT PARTICULARS

6. Location of Project:5.Location on Site

Route No/Street Address

Village or City

Town

County

7. Nature of Project - Check One: 8. OCCUPATION FOR PROJECT :1. New Building Guards, WatchmenConstruction (Building, Heavy2. Addition to Existing Structure Highway/Sewer/Water) Janitors, Porters, Cleaners,

Elevator Operators3. Heavy and Highway Construction (New and Repair) TunnelMoving furniture and4. New Sewer or Waterlineequipment

Residential5. Other New Construction (Explain)

Trash and refuse removalLandscape Maintenance

6. Other Reconstruction, Maintenance, Repair or Alteration Elevator maintenanceWindow cleaners7. Demolition Exterminators, FumigatorsOther (Describe)8. Building Service Contract

SignatureName and Title of Requester10.

SEE PAGE TWO FOR LAWS RELATING TO PUBLIC WORK CONTRACTSPW-39 (04.11)

( ) ( )

Project Title

Description of Work

Contract Identification Number

Note: For NYS units, the OSC Contract No.

NY State Units (see Item 5)

9. Has this project been reviewed for compliance with the Wicks Law involving separate bidding? YES

( ) ( )

As Required by Articles 8 and 9 of the NYS Labor Law

Contracting Agency Architect or Engineering Firm Public Work District Office Date:

(Check if new or change)

Fire Safety Director, NYC Only

NO

Page 135 of 152

Page 136: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 136 of 152

Page 137: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Under Article 8 and Article 9 of the NYS Labor Law, a contractor, sub-contractor and/or

its successor shall be debarred and ineligible to submit a bid on or be awarded any

public work or public building service contract/sub-contract with the state, any municipal

corporation or public body for a period of five (5) years from the date of debarment

when:

• Two (2) final determinations have been rendered within any consecutive six-year

(6) period determining that such contractor, sub-contractor and/or its successor has

WILLFULLY failed to pay the prevailing wage and/or supplements

• One (1) final determination involves falsification of payroll records or the kickback of

wages and/or supplements

NOTE: The agency issuing the determination and providing the information, is denoted

under the heading ‘Fiscal Officer’. DOL = NYS Dept. of Labor; NYC = New York City

Comptroller's Office; AG = NYS Attorney General’s Office; DA = County District

Attorney’s Office.

A list of those barred from bidding, or being awarded, any public work contract or

subcontract with the State, under section 141-b of the Workers' Compensation Law,

may be obtained at the following link, on the NYS DOL Website:

https://dbr.labor.state.ny.us/EDList/searchPage.do

NEW YORK STATE DEPARTMENT OF LABOR Bureau of Public Work - Debarment List

LIST OF EMPLOYERS INELIGIBLE TO BID ON OR BE AWARDED ANY PUBLIC WORK CONTRACT

Page 137 of 152

Page 138: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

Page 138 of 152

Page 139: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

AGENCY Fiscal Officer FEIN EMPLOYER NAME EMPLOYERDBA NAME

ADDRESS DEBARMENTSTART DATE

DEBARMENTEND DATE

DOL DOL 4618 FOSTER AVE LLC C/O KAHAN & KAHAN225 BROADWAY-SUITE

715NEW YORK NY 10007

02/05/2013 02/05/2018

DOL DOL *****0996 A-1 CONSTRUCTION &RENOVATION INC

1973 81ST ST - SUITE A-5BROOKLYN NY 11214

01/08/2015 01/08/2020

DOL NYC *****4486 ABBEY PAINTING CORP 21107 28TH AVENUEBAYSIDE NY 11360

07/02/2012 07/02/2017

DOL DOL *****9095 ABDO TILE CO 6179 EAST MOLLOY ROADEAST SYRACUSE NY 13057

06/25/2010 07/02/2017

DOL DOL *****9095 ABDO TILE COMPANY 6179 EAST MOLLOY ROADEAST SYRACUSE NY 13057

06/25/2010 07/02/2017

DOL NYC ABDUL KARIM C/O NORTH AMERICAN IRONW

1560 DECATURSTREETRIDGEWOOD NY

11385

05/15/2015 05/15/2020

DOL DOL *****8488 ABELCRAFT OF NEW YORKCORP

640 ASHFORD AVENUEARDSLEY NY 10502

08/27/2013 08/27/2018

DOL DOL *****1219 ABSOLUTE GENERALCONTRACTING INC

1229 AVENUE UBROOKLYN NY 11229

01/28/2013 01/28/2018

DOL DOL *****4539 ACCOMPLISHED WALLSYSTEMS INC

112 OSCAWANA HEIGHTSROAD

PUTNAM VALLEY NY 10542

08/27/2013 08/27/2018

DOL DOL *****8018 ACCURATE MECHANICAL LLC 9547 BUSTLETON AVENUEPHILADELPHIA PA 19115

02/05/2014 02/05/2019

DOL DOL ACCURATE MECHANICAL OFPHILADELPHIA LLC

9547 BUSTLETON AVENUEPHILADELPHIA PA 19115

02/05/2014 02/05/2019

DOL DOL *****3344 ACT INC 6409 LAND O LAKES BLVDLAND O LAKES FL 34638

11/10/2015 11/10/2020

DOL DOL *****7584 ADAM'S FLOOR COVERINGLLC

2718 CURRY ROADSCHENECTADY NY 12303

07/08/2010 02/15/2017

DOL DOL ADESUWA UWUIGBE P O BOX 21-1022BROOKLYN NY 11221

05/16/2012 05/16/2017

DOL NYC ADRIANA SELA C/O COLONIALROOFING

COMPANY INC

247 48TH STREETBROOKLYN NY 11220

02/05/2014 02/05/2019

DOL DOL *****6367 ADVANCED METALS 387 RIVERSIDE DRIVEJOHNSON CITY NY 13790

10/01/2012 10/01/2017

DOL DOL *****1687 ADVANCED SAFETYSPRINKLER INC

261 MILL ROADP O BOX 296EAST AURORA

NY 14052

07/29/2015 07/29/2020

DOL DOL *****2538 AGG MASONRY INC 160 72ND ST - SUITE 721BROOKLYN NY 11209

03/19/2013 03/19/2018

DOL DOL AJ TORCHIA 10153 ROBERTS RDSAUQUOIT NY 13456

08/09/2016 08/09/2021

DOL DOL ALISHER KARIMOV C/O AGG MASONRY INC7105 3RD AVENUEBROOKLYN

NY 11209

03/19/2013 03/19/2018

DOL DOL *****3344 ALL CATASTROPHECONSTRUCTION TEAM INC

ACT INC 6409 LAND O LAKES BLVDLAND O LAKES FL 34638

11/10/2015 11/10/2020

DOL DOL *****8740 ALLSTATE ENVIRONMENTALCORP

C/O JOSE MONTAS27 BUTLER PLACEYONKERS

NY 10710

03/18/2011 03/19/2020

DOL DOL AMADEO J TORCHIA TORCHIA'SHOME

IMPROVEMENT

10153 ROBERTS RDSAUQUOIT NY 13456

08/09/2016 08/09/2021

DOL DOL *****4274 AMERICAN STEELMECHANICAL INC

693 PAINTER STREETMEDIA PA 19063

02/20/2013 02/20/2018

DOL DOL ANDREW DIPAUL C/O CONSOLIDATEDINDUSTRI

2051 ROUTE 44/55MODENA NY12548

12/11/2012 12/11/2017

DOL NYC ANDRZEJ WROBEL 24 CONGRESS LANESOUTH RIVER NJ 08882

05/01/2013 05/01/2018

DOL NYC ANISUL ISLAM C/O RELIANCE GENERALCONS

644 OCEANPARKWAYBROOKLYN NY

11230

09/02/2015 09/02/2020

DOL DOL *****7004 ANNEX CONTRACTING LTD 3005 WYNSUM AVENUEMERRICK NY 11566

08/18/2014 08/18/2019

DOL DOL *****7004 ANNEX GENERALCONTRACTING INC

3005 WYNSUM AVENUEMERRICK NY 11566

08/18/2014 08/18/2019

DOL DA ANTHONY CARDINALE 58-48 59TH STREETMASPETH NY 11378

05/16/2012 05/08/2020

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 1 of 14

Article 8

Page 139 of 152

Page 140: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL ANTHONY J MINGARELLI JR C/O T & T CONCRETE INC2560 HAMBURG

TURNPIKELACKAWANNA NY14218

07/08/2015 07/08/2020

DOL DOL *****3020 APCO CONTRACTING CORP 24 SOUTH MARYLANDAVENUE

PORT WASHINGTON NY11050

09/24/2012 09/02/2020

DOL DOL *****3219 APOLLO CONSTRUCTIONSERVICES CORP

APOLLOPAINTING CO

157 TIBBETTS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL APOLLO PAINTING CO 157 TIBBETTS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL *****3295 APOLLO PAINTING CORP 3 ALAN B SHEPART PLACEYONKERS NY 10705

03/12/2014 03/12/2019

DOL AG *****0194 APPLIED CONSTRUCTION INC 46 RUGBY ROADWESTBURY NY 11590

11/20/2013 11/20/2018

DOL NYC *****8403 AQUA JET PAINTING CORP 10 VIKING DRIVEWEST ISLIP NY 11795

04/16/2014 04/16/2019

DOL NYC *****9232 ARKAY CONSTRUCTION INC 102-104 GREYLOCK AVENUEBELLEVILLE NJ 07109

07/15/2015 07/15/2020

DOL DOL *****3953 ASCAPE LANDSCAPE &CONSTRUCTION CORP

634 ROUTE 303BLAUVELT NY 10913

07/26/2012 11/19/2018

DOL NYC *****4779 ASTORIA GENERALCONTRACTING CORP

35-34 31ST STREETLONG ISLAND CITY NY 11106

09/02/2015 09/02/2020

DOL NYC *****7217 ASTRO COMMUNICATIONS OFNY CORP

79 ALEXANDER AVE- STE 36ABRONX NY 10454

10/30/2015 10/30/2020

DOL NYC *****6046 ATLANTIC SUNCONTRUCTION CORP

58-46 59TH AVENUEMASPETH NY 11378

05/08/2015 05/08/2020

DOL NYC AUDLEY O'BRIEN 1273 NORTH AVENUE/#1 CPNEW ROCHELLE NY 10804

04/07/2015 04/07/2020

DOL DOL AVIS R HILL 3510 HICKORY WALK LANEELLENWOOD GA 32094

01/22/2015 01/22/2020

DOL AG AVTAR SINGH 116-24 127TH STREETSOUTH OZONE PARK NY

11420

12/22/2015 12/22/2020

DOL AG BALDEV SINGH 116-24 127TH STREETSOUTH OZONE PARK NY

11420

12/22/2015 12/22/2020

DOL DOL BARBARA CASSIDY 7 BLENIS PLACEVALHALLA NY 10595

04/02/2015 04/02/2020

DOL DOL BARRY KINNEY 6409 LAND O LAKES BLVDLAND O LAKES FL 34638

11/10/2015 11/10/2020

DOL NYC *****3915 BEACON RESTORATION INC SUITE B-8782 PELHAM PARKWAY

SOUTHBRONX NY 10462

04/21/2016 04/21/2021

DOL DOL *****2294 BEDELL CONTRACTING CORP 2 TINA LANEHOPEWELL JUNCTION NY

12533

01/06/2012 01/06/2017

DOL DOL BEVERLY F WILLIAMS 1238 PRESIDENT STREETBROOKLYN NY 11225

11/18/2013 11/18/2018

DOL DOL BIAGIO CANTISANI 200 FERRIS AVENUEWHITE PLAINS NY 10603

12/04/2009 05/04/2017

DOL DOL *****8551 BRANDY'S MASONRY 216 WESTBROOK STREETP O BOX 304SAYRE PA 18840

08/09/2016 08/09/2021

DOL NYC *****6555 BROOKLYN WELDING CORP 1273 NORTH AVENUE/ #1 CPNEW ROCHELLE NY 10804

04/07/2015 04/07/2020

DOL DOL *****1449 BRRESTORATION NY INC 140 ARCADIA AVENUEOSWEGO NY 13126

09/12/2016 09/12/2021

DOL DOL BRUCE MORSEY C/O KENT HOLLOW SIDING LL29A BRIDGE STREETNEW

MILFORD CT 06776

01/15/2016 01/15/2021

DOL DOL *****6156 C & J LANDSCAPING &MAINTENANCE INC

520 PINE HILL ROADCHESTER NY 10940

06/23/2014 06/23/2019

DOL DOL CANTISANI & ASSOCIATESLTD

442 FERRIS AVENUEWHITE PLAINS NY 10603

12/04/2009 05/04/2017

DOL DOL CANTISANI HOLDING LLC 220 FERRIS AVENUEWHITE PLAINS NY 10603

05/04/2012 05/04/2017

DOL DOL CARIBBEAN POOLS C/O DOUGLAS L MALARKEY64 VICTORIA

DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL *****1143 CARMODY BUILDING CORP 442 ARMONK ROADMOUNT KISCO NY 10549

05/04/2012 05/04/2017

DOL DOL *****3368 CARMODY CONCRETE CORP 442 ARMONK ROADMOUNT KISCO NY 10549

12/04/2009 05/04/2017

DOL DOL CARMODY CONTRACTINGCORP

220 FERRIS AVENUEWHITE PLAINS NY 10603

05/04/2012 05/04/2017

DOL DOL *****6215 CARMODY CONTRACTING INC 220 FERRIS AVENUEWHITE PLAINS NY 10603

05/04/2012 05/04/2017

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 2 of 14

Article 8

Page 140 of 152

Page 141: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL CARMODY ENTERPRISES LTD 220 FERRIS AVENUEWHITE PLAINS NY 10603

12/04/2009 05/04/2017

DOL DOL *****3812 CARMODY INC 442 ARMONK ROADMOUNT KISCO NY 10549

12/04/2009 05/04/2017

DOL DOL *****3812 CARMODY INDUSTRIES INC 442 FERRIS AVENUEWHITE PLAINS NY 10603

05/04/2012 05/04/2017

DOL DOL CARMODY MAINTENANCECORP

105 KISCO AVENUEMOUNT KISCO NY 10549

05/04/2012 05/04/2017

DOL DOL *****0324 CARMODY MASONRY CORP 442 ARMONK ROADMOUNT KISKO NY 10549

12/04/2009 05/04/2017

DOL DOL *****3812 CARMODY"2" INC 220 FERRIS AVENUEWHITE PLAINS NY 10603

12/04/2009 05/04/2017

DOL NYC *****9172 CASSIDY EXCAVATING INC 14 RAILROAD AVENUEVALHALLA NY 10595

05/15/2014 04/02/2020

DOL DOL *****1683 CATONE CONSTRUCTIONCOMPANY INC

294 ALPINE ROADROCHESTER NY 14423

03/09/2012 03/09/2017

DOL DOL CATONE ENTERPRISES INC 225 DAKOTA STREETROCHESTER NY 14423

03/09/2012 03/09/2017

DOL DOL *****6745 CATSKILL FENCEINSTALLATIONS INC

5445 ROUTE 32CATSKILL NY 12414

08/22/2014 08/22/2019

DOL DOL *****8530 CAZ CONTRACTING CORP 37-11 35TH AVENUELONG ISLAND CITY NY 11101

08/26/2013 08/26/2018

DOL DOL *****5556 CERTIFIED INSTALLERS INC 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL *****7655 CHAMPION CONSTRUCTIONSERVICES CORP

2131 SCHENECTADY AVENUEBROOKLYN NY 11234

11/18/2015 11/18/2020

DOL NYC CHARLES CASSIDY JR 14 RAILROAD AVENUEVALHALLA NY 10595

05/15/2014 04/02/2020

DOL DOL CHARLES ZIMMER JR 216 WESTBROOK STREETP O BOX 304SAYRE PA 18840

08/09/2016 08/09/2021

DOL DOL *****1416 CHEROMINO CONTROLGROUP LLC

61 WILLET ST - SUITE 14PASSAIC NJ 07055

12/03/2009 02/23/2017

DOL DOL CHRISTINE J HEARNE C/O CJ-HEARNECONSTRUCTIO

131 PONCE DE LEON AVENEATLANTA GA 30308

12/01/2015 12/01/2020

DOL DOL CHRISTOF PREZBYL 2 TINA LANEHOPEWELL JUNCTION NY

12533

01/06/2012 01/06/2017

DOL DOL *****3360 CITY LIMITS GROUP INC 2279 HOLLERS AVENUEBRONX NY 10475

01/07/2014 06/23/2019

DOL DOL *****0671 CJ-HEARNE CONSTRUCTIONCO

SUITE 204131 PONCE DE LEON

AVENUEATLANTA GA 30308

12/01/2015 12/01/2020

DOL NYC *****2905 COLONIAL ROOFINGCOMPANY INC

247 48TH STREETBROOKLYN NY 11220

02/05/2014 02/05/2019

DOL NYC *****3182 COLORTECH INC 5990 58TH AVENUEMASPETH NY 11378

11/18/2013 11/18/2018

DOL DOL *****2703 CONKLIN'S TECH-MECHANICAL INC

5 PARKER AVENUEPOUGHKEEPSIE NY 12601

03/25/2014 03/25/2019

DOL DOL *****4175 CONSOLIDATED INDUSTRIALSERVICES INC

2051 ROUTE 44/55MODENA NY 12548

12/11/2012 01/28/2018

DOL DOL CONSTANTINOS ZERVAS 37-11 35TH AVENUELONG ISLAND CITY NY 11101

08/26/2013 08/26/2018

DOL NYC *****4468 CRAFT CONTRACTINGGROUP INC

3256 BRUNER AVENUEBRONX NY 10469

07/29/2014 07/29/2019

DOL NYC *****8507 CRAFT FENCE INC 3256 BRUNER AVENUEBRONX NY 10469

07/29/2014 07/29/2019

DOL NYC *****2164 CREATIVE TRUCKING INC 58-83 54TH STREETMASPETH NY 11378

02/26/2016 02/26/2021

DOL DOL *****0810 D & G PAINTING &DECORATING INC

53 LITTLE COLLABAR ROADMONTGOMERY NY 12549

04/19/2012 04/19/2017

DOL DOL *****7761 D L MALARKEYCONSTRUCTION

64 VICTORIA DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL *****7888 D L MALARKEYCONSTRUCTION INC

64 VICTORIA DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL *****5629 DAKA PLUMBING ANDHEATING LLC

2561 ROUTE 55POUGHQUAG NY 12570

02/19/2016 02/19/2021

DOL DOL DARYL T RIEKS C/O RIEKS CONTRACTING LLC4804 GAHWILER

ROADAUBURN NY 13021

05/01/2015 05/01/2020

DOL NYC *****7707 DASSLE CONTRACTING INC 213-37 39TH AVE/SUITE 120BAYSIDE NY 11360

05/08/2015 05/08/2020

DOL DOL DAVID MARTINEZ C/O EMPIRE TILE INC6 TREMONT

COURTHUNTINGTON STATIONNY 11746

03/08/2016 03/08/2021

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 3 of 14

Article 8

Page 141 of 152

Page 142: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL NYC DAWN AVILA AKA DAWNBECHTOLD

1ST FLOOR STORE FRONT88-10 LITTLE NECK

PARKWAYFLORAL PARK NY11001

06/24/2014 06/24/2019

DOL NYC DAWN BECHTOLD AKA DAWNAVILA

1ST FLOOR STORE FRONT88-10 LITTLE NECK

PARKWAYFLORAL PARK NY11001

06/24/2014 06/24/2019

DOL DOL DEAN ROBBINS III 212 OXFORD WAYSCHENECTADY NY 12309

12/11/2012 09/16/2018

DOL NYC *****3865 DECOMA BUILDINGCORPORATION

134 EVERGREEN PL/STE 101EAST ORANGE NJ 07018

12/30/2013 12/30/2018

DOL DOL DEDA GAZIVODAN C/O DAKA PLUMBING AND H2561 ROUTE 55POUGHQUAG

NY 12570

02/19/2016 02/19/2021

DOL DOL *****1446 DELTA CONTRACTINGPAINTING AND DECORATING

INC

437 SUNRISE HIGHWAYWEST BABYLON NY 11707

08/12/2013 08/12/2018

DOL DOL *****3538 DELTA CONTRACTINGPAINTING AND DESIGN INC

75 MCCULLOCH DRIVEDIX HILLS NY 11746

10/19/2010 08/12/2018

DOL DOL DEMETRIOS KOUTSOURAS 530 BEECH STREETNEW HYDE PARK NY 11040

07/02/2012 07/02/2017

DOL DOL DENNIS SCHWANDTNER C/O YES SERVICE AND REPAI325 RABRO DRIVE - SUITE1HAUPPAUGE NY 11788

08/09/2016 08/09/2021

DOL DOL *****9868 DESANTIS ENTERPRISES 161 OSWEGO RIVER ROADPHOENIX NY 13135

09/24/2013 11/18/2018

DOL NYC *****8234 DEWATERS PLUMBING ANDHEATING LLC

30 COLUMBUS CIRCLEEASTCHESTER NY 10709

08/21/2012 08/21/2017

DOL DOL *****9252 DI BERNARDO TILE ANDMARBLE CO INC

15 WALKER WAYALBANY NY 12205

03/21/2014 03/21/2019

DOL DOL DIANE DEAVER 731 WARWICK TURNPIKEHEWITT NJ 07421

06/25/2012 12/11/2017

DOL NYC DIMITRIOS KOUTSOUKOS C/O ASTORIA GENERALCONTR

35-34 31ST STREETLONGISLAND CITY NY 11106

09/02/2015 09/02/2020

DOL DA *****6789 DOL DBA NAMEQMC

BUILDING 12ALBANY NY 12240

12/01/2017 12/01/2018

DOL DOL DORIS SKODA C/O APCO CONTRACTINGCORP

24 SOUTH MARYLANDAVENUEPORT WASHINGTON

NY 11050

09/24/2012 09/02/2020

DOL NYC *****7404 DOSANJH CONSTRUCTIONCORP

9439 212TH STREETQUEENS VILLAGE NY 11428

02/25/2016 02/25/2021

DOL DOL DOUGLAS L MALARKEY MALARKEYCONSTRUCTI

ON

64 VICTORIA DRIVEB INGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL *****6982 DUFOUR GROUP INC DUFOURMASONRY

353 WEST 56TH STREET #7MNEW YORK NY 10019

06/10/2014 06/10/2019

DOL DOL DUFOUR MASONRY 353 WEST 56TH ST #7MNEW YORK NY 10019

06/10/2014 06/10/2019

DOL DOL DUFOUR MASONRY &RESTORATION INC

353 WEST 56TH STREET #7MNEW YORK NY 10019

06/10/2014 06/10/2019

DOL DOL *****5840 DYNA CONTRACTING INC 363 88TH STREETBROOKLYN NY 11209

11/18/2013 11/18/2018

DOL DOL E C WEBB 6409 LAND O LAKES BLVDLAND O LAKES FL 34638

11/10/2015 11/10/2020

DOL DOL EARL GALBREATH 640 ASHFORD AVENUEARDSLEY NY 10502

08/27/2013 08/27/2018

DOL DOL EARL L WILSON WILSONBROTHERDRYWALL

CONTRACTORS

36 ABERSOLD STREETROCHESTER NY 14621

08/31/2015 08/31/2020

DOL DOL *****1496 EAST COAST DRYWALL INC 1238 PRESIDENT STREETBROOKLYN NY 11225

11/18/2013 11/18/2018

DOL DOL *****8011 ECOA CLEANINGCONTRACTORS INC

P O BOX 21-1022BROOKLYN NY 11221

05/16/2012 05/16/2017

DOL DOL EDWARD L GAUTHIER C/O IMPERIAL MASONRYREST

141 ARGONNEDRIVEKENMORE NY 14217

10/03/2012 10/03/2017

DOL NYC EDWARD MENKEN C/O AQUA JET PAINTING10 VIKING DRIVEWEST ISLIP

NY 11795

04/16/2014 04/16/2019

DOL NYC *****0900 EF PRO CONTRACTING INC 147 BROOME AVENUEATLANTIC BEACH NY 11509

03/03/2014 03/03/2019

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 4 of 14

Article 8

Page 142 of 152

Page 143: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL NYC EFSTRATIOS BERNARDIS 23-73 48TH STREETLONG ISLAND CITY NY 11103

04/24/2014 04/24/2019

DOL DOL ELIZABETH RAMADANI C/O RAMADA CONSTRUCTION80 SAVO LOOPSTATEN

ISLAND NY 10309

01/07/2014 01/07/2019

DOL DOL ELLEN DESANTIS DESANTISENTERPRISES

161 OSWEGO RIVER ROADPHOENIX NY 13135

09/24/2013 11/18/2018

DOL DOL *****0780 EMES HEATING & PLUMBINGCONTR

5 EMES LANEMONSEY NY 10952

01/20/2002 01/20/3002

DOL AG EMILIO FRANZA 90 JUNIUS STREETBROOKLYN NY 11212

01/23/2014 01/23/2019

DOL DOL EMPIRE CONCRETESERVICES LLC

101 SULLYS TRAIL/SUITE 20PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DOL *****0511 EMPIRE CONCRETE SYSTEMSLLC

101 SULLYS TRAIL/ SUITE 2PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DOL *****2353 EMPIRE CONSTRUCTORS LLC 101 SULLYS TRAIL/SUITE 20PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DOL EMPIRE PRECAST LLC 101 SULLYS TRAIL/SUITE 20PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DOL *****3270 EMPIRE TILE INC 6 TREMONT COURTHUNTINGTON STATION NY

11746

03/08/2016 03/08/2021

DOL DOL ERIKA BARNETT 253 BEACH BREEZE LANEUNIT BARVERNE NY 11692

02/05/2013 02/05/2018

DOL DOL ESTEVES & FRAGACONSTRUCTION CO INC

986 MADISON AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL DOL ESTEVES & FRAGA INC 986 MADISON AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL DOL EVELIO ELLEDIAS 114 PEARL STREETPORT CHESTER NY 10573

08/15/2012 08/15/2017

DOL NYC EVERTON CARLESS 134 EVERGREEN PL/STE 101EAST ORANGE NJ 07018

12/30/2013 12/30/2018

DOL DOL *****7403 F & B PAINTINGCONTRACTING INC

2 PARKVIEW AVENUEHARRISON NY 10604

09/26/2016 09/26/2021

DOL DOL F KALAFATIS 2279 HOLLERS AVENUEBRONX NY 10475

01/07/2014 06/23/2019

DOL DOL FANTASTIC PAINTING 493 LANSING ROADFULTONVILLE NY 12072

11/18/2013 11/18/2018

DOL DOL FAY MATTHEW C/O CHAMPIONCONSTRUCTION

2131 SCHENECTADYAVENUEBROOKLYN NY 11234

11/18/2015 11/18/2020

DOL DOL FAZIA GINA ALI-MOHAMMED C/OCHAMPION

CONSTRUCTION

2131 SCHENECTADY AVENUEBROOKLYN NY 11234

11/18/2015 11/18/2020

DOL DOL *****1311 FLOZ-ON PAINTING &DECORATING INC

12 DUNDERBERG ROADTOMKINS NY 10986

10/16/2013 10/16/2018

DOL DOL *****8961 FLOZ-ON PAINTING INC 12 DUNDERBERG ROADTOMKINS NY 10986

10/16/2013 10/16/2018

DOL DOL FMS 4 LEGHORN COURTNEW YORK NY 11746

11/28/2012 11/28/2017

DOL DOL *****8067 FORTH SPORT FLOORS INC P O BOX 74EAST GREENBUSH NY 12061

02/28/2012 10/01/2017

DOL DOL FRAN MICELI 2279 HOLLERS AVENUEBRONX NY 10475

01/07/2014 06/23/2019

DOL DOL FRANCES KALAFATIS 2279 HOLLERS AVENUEBRONX NY 10475

01/07/2014 06/23/2019

DOL DOL FRANCES KALAFATIS-MICELI 2279 HOLLERS AVENUEBRONX NY 10475

01/07/2014 06/23/2019

DOL DOL FRANK BENEDETTO C/O F & B PAINTING CONTRA2 PARKVIEW

AVENUEHARRISON NY 10604

09/26/2016 09/26/2021

DOL DOL FRANK J MERCANDO 134 MURRAY AVENUEYONKERS NY 10704

12/11/2009 02/03/2019

DOL DOL FRANK MICELI JR C/O FRANKMICELI JR

CONTRACTING INC

19 CLIFF STREETNEW ROCHELLE NY 10801

10/16/2013 10/16/2018

DOL DOL *****1321 FRANK MICELI JRCONTRACTING INC

19 CLIFF STREETNEW ROCHELLE NY 10801

10/16/2013 10/16/2018

DOL DOL FRED ABDO ABDO TILECOMPANYAKA ABDO

TILE CO

6179 EAST MOLLOY ROADEAST SYRACUSE NY 13057

06/25/2010 07/02/2017

DOL DOL *****2724 FRESH START PAINTINGCORP

157 TIBBETS ROADYONKERS NY 10705

03/12/2014 03/12/2019

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 5 of 14

Article 8

Page 143 of 152

Page 144: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL G FUCCI CONSTRUCTIONSERVICES

3 ALAN B SHEPARD PLACEYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL *****6767 G FUCCI PAINTING INC C/O SPIEGEL & UTRERA1 MAIDEN LANE - 5TH FLNEW

YORK NY 10038

03/12/2014 03/12/2019

DOL DOL *****4546 GAF PAINTING LLC 157 TIBBETS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL GALINDA ROTENBERG C/O GMDV TRANS INC67-48 182ND STREETFRESH

MEADOWS NY 11365

06/24/2016 06/24/2021

DOL DOL GARDEN STATE PAINTING 157 TIBBETTS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL GARY MCDOWELL GMCONSTRUCTION & LAWN

CARESERVICE

76 PLEASANT STREETWELLSVILLE NY 14895

06/11/2013 06/11/2018

DOL DOL GEORGE DI BERNARDO C/O DI BERNARDO TILE15 WALKER WAYALBANY NY

12205

03/21/2014 03/21/2019

DOL DA GEORGE LUCEY 150 KINGS STREETBROOKLYN NY 11231

01/19/1998 01/19/2998

DOL DOL *****1075 GLOBAL TANKCONSTRUCTION LLC

P O BOX 1238SALINA OK 74365

11/28/2012 11/28/2017

DOL DOL *****0878 GM CONSTRUCTION & LAWNCARE SERVICE

76 PLEASANT STREETWELLSVILLE NY 14895

06/11/2013 06/11/2018

DOL DOL *****5674 GMDV TRANS INC 67-48 182ND STREETFRESH MEADOWS NY 11365

06/24/2016 06/24/2021

DOL DOL *****0090 GOLDS FLOORINGINSTALLATIONS INC

25 HAMILTON ROADMONTICELLO NY 12701

10/16/2013 10/16/2018

DOL DOL GREGORY A FUCCI C/O PAF PAINTING SERVICES157 TIBBETTS ROADYONKERS

NY 10705

03/12/2014 03/12/2019

DOL DOL GREGORY FUCCI JR C/O APOLLO CONSTRUCTION157 TIBBETTS ROADYONKERS

NY 10705

03/12/2014 03/12/2019

DOL DOL *****9456 GUILLO CONTRACTING CORP P O BOX 229CALVERTON NY 11933

07/08/2013 07/08/2018

DOL DOL GUS PAPASTEFANOU C/O D & G PAINTING & DECO53 LITTLE COLLABAR

ROADMONTGOMERY NY12549

04/19/2012 04/19/2017

DOL NYC *****0346 H N H CONTRACTORS CORP 4558 BROADWAY # 6NEW YORK NY 10040

08/04/2014 08/04/2019

DOL DOL HALSSAM FOSTOK 5 HANSEN PLACEWAYNE NJ 07470

09/18/2013 09/18/2018

DOL NYC HAMEEDUL HASAN 240 HOME STREETTEANECK NJ 07666

08/04/2014 08/04/2019

DOL AG *****9918 HARA ELECTRIC CORP 2461 47TH STREETASTORIA NY 11103

09/26/2013 09/26/2018

DOL NYC HARMEL SINGH 15 CLINTON LANEHICKSVILLE NY 11801

02/25/2016 02/25/2021

DOL NYC HAROLD KUEMMEL 58-83 54TH STREETMASPETH NY 11378

02/26/2016 02/26/2021

DOL AG HARVINDER SINGH PAUL 90 JUNIUS STREETBROOKLYN NY 11212

01/23/2014 01/23/2019

DOL DOL HENRY VAN DALRYMPLE 2663 LANTERN LANEATLANTA GA 30349

12/01/2015 12/01/2020

DOL DOL HI-TECH CONTRACTING CORP 114 PEARL STREETPORT CHESTER NY 10573

08/15/2012 08/15/2017

DOL DOL *****6370 HILLIANO CONSTRUCTION &ELECTRICAL INC

354 MAGNOLIA STREETROCHESTER NY 14611

01/22/2015 01/22/2020

DOL DOL *****8282 IDEMA DEVELOPMENT INC 91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL DOL *****8282 IDEMA GENERALCONTRACTORS INC

91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL DOL *****8426 IMPERIAL MASONRYRESTORATION INC

141 ARGONNE DRIVEKENMORE NY 14217

10/03/2012 10/03/2017

DOL DOL *****7001 INTEGRATED CONSTRUCTION& POWER SYSTEMS INC

SUITE 1002105 W GENESEE

STREETSYRACUSE NY 13219

01/06/2016 01/06/2021

DOL DOL ISABEL FRAGA C/O THREE FRIENDS CONSTR986 MADISON

AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL AG *****0000 J A M CONSTRUCTION CORP SUITE 125265 SUNRISE

HIGHWAYROCKVILLE CENTRENY 10457

04/07/2016 04/07/2021

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 6 of 14

Article 8

Page 144 of 152

Page 145: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL *****7598 J M RICH LLC P O BOX 268STILLWATER NY 12170

09/16/2013 03/21/2019

DOL DOL *****3478 J N P CONSTRUCTION CORP 50 LOUIS COURTP O BOX 1907SOUTH

HACKENSACK NY 07606

03/21/2014 03/21/2019

DOL DOL J N RICH LLC P O BOX 268STILLWATER NY 12170

09/16/2013 03/21/2019

DOL DOL *****9368 J TECH CONSTRUCTION PO BOX 64782ROCHESTER NY 14624

09/24/2012 09/24/2017

DOL DOL J THE HANDYMAN 09/24/2012 09/24/2017

DOL DOL *****4910 J V MAGIC TOUCHCORPORATION

94-25 57TH AVENUE, APT 5GELMHURST NY 11373

01/12/2015 01/12/2020

DOL DOL JACQUELINE HOWE C/O FLOZ-ON PAINTING INC12 DUNDERBERG

ROADTOMKINS NY 10986

10/16/2013 10/16/2018

DOL DOL *****8627 JAG I LLC 635 LUZERNE ROADQUEENSBURY NY 12804

09/16/2013 09/16/2018

DOL DOL *****2868 JAG INDUSTRIES INC 175 BROAD ST - SUITE 320GLENS FALLS NY 12801

09/16/2013 09/16/2018

DOL DOL JAMES B RHYNDERS 91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL DOL JAMES BOYCE C/O EMPIRE CONCRETE SYST101 SULLYS TRAIL/SUITE20PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DOL JAMES E RHYNDERS 91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL AG JAMES FALCONE SUITE 125265 SUNRISE

HIGHWAYROCKVILLE CENTRENY 10457

04/07/2016 04/07/2021

DOL DOL JAMES RHYNDERS SR 91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL DOL JAMES SICKAU 3090 SHIRLEY ROADNORTH COLLINS NY 14111

04/19/2011 07/08/2020

DOL DOL JASON M RICH P O BOX 268STILLWATER NY 12170

09/16/2013 03/21/2019

DOL DOL JASON W MILLIMAN C/O ROCHESTERACOUSTICAL

P O BOX 799HILTON NY 14468

02/19/2016 02/19/2021

DOL DOL JAY PRESUTTI C/O CONSOLIDATEDINDUSTRI

2051 ROUTE 44/55MODENA NY12548

01/28/2013 01/28/2018

DOL DOL JEFF P BRADLEY 520 PINE HILL ROADCHESTER NY 10940

06/23/2014 06/23/2019

DOL NYC JEFFREY CASSIDY 14 RAILROAD AVENUEVALHALLA NY 10595

05/15/2014 04/02/2020

DOL DOL JERALD HOWE C/O FLOZ-ON PAINTING INC12 DUNDERBERG

ROADTOMKINS NY 10986

10/16/2013 10/16/2018

DOL DOL JEROME LACITIGNOLA C/O CATSKILL FENCE INSTAL5445 ROUTE 32 CATSKILL NY

12414

08/22/2014 08/22/2019

DOL NYC JERRY DEWATERS 30 COLUMBUS CIRCLEEASTCHESTER NY 10709

08/21/2012 08/21/2017

DOL DOL JESSICA WHITESIDE C/O BRRESTORATION NY INC140 ARCADIA

AVENUEOSWEGO NY 13126

09/12/2016 09/12/2021

DOL DOL JOHN CATONE C/O CATONE CONSTRUCTION294 ALPINE

ROADROCHESTER NY 14612

03/09/2012 03/09/2017

DOL DOL JOHN DESCUL 437 SUNRISE HIGHWAYAWEST BABYLON NY 11704

08/12/2013 08/12/2018

DOL DOL JOHN H LEE JOHN LEEQUALITYPAVING

67 WILER ROADHILTON NY 14468

01/28/2013 01/28/2018

DOL DOL *****1749 JOHN LEE QUALITY PAVING 67 WILER ROADHILTON NY 14468

01/28/2013 01/28/2018

DOL DOL JON E DEYOUNG 261 MILL ROADP O BOX 296EAST AURORA

NY 14052

07/29/2015 07/29/2020

DOL DOL *****9368 JORGE I DELEON J TECHCONSTRUCTI

ON

PO BOX 64782ROCHESTER NY 14624

09/24/2012 09/24/2017

DOL DOL JORGE VILLALOBOS 94-25 57TH AVENUE - APT 5ELMHURST NY 11373

01/12/2015 01/12/2020

DOL DOL JOSE MONTAS 27 BUTLER PLACEYONKERS NY 10710

03/18/2011 03/19/2020

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 7 of 14

Article 8

Page 145 of 152

Page 146: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL AG JOSEPH FALCONE SUITE 125265 SUNRISE

HIGHWAYROCKVILLE CENTRENY 10457

04/07/2016 04/07/2021

DOL DOL JOSEPH MARTONE 112 OSCAWANA HEIGHTSROAD

PUTNAM VALLEY NY 10542

08/27/2013 08/27/2018

DOL DOL JOSHUA DEBOWSKY 9547 BUSTLETON AVENUEPHILADELPHIA PA 19115

02/05/2014 02/05/2019

DOL DOL JOYA MUSCOLINO 10 ST CHARLES STREETTHORNWOOD NY 10594

09/03/2013 09/03/2018

DOL DOL JUANA MARTINEZ C/O LEAD CONSTRUCTION27 BUTLER PLACEYONKERS

NY 10710

03/19/2015 03/19/2020

DOL DOL *****4340 JUBCO SITE DEVELOPMENTLLC

462 LAKEVIEW AVENUEVALHALLA NY 10595

12/16/2013 12/16/2018

DOL DOL JULIUS AND GITA BEHREND 5 EMES LANEMONSEY NY 10952

11/20/2002 11/20/3002

DOL DOL KAREN HARTMAN C/O GUILLO CONTRACTINGP O BOX 229CALVERTON NY

11933

07/08/2013 07/08/2018

DOL NYC KATHLEEN SELA C/O COLONIALROOFING

COMPANY INC

247 48TH STREETBROOKLYN NY 11220

02/05/2014 02/05/2019

DOL DOL KEITH SCHEPIS C/O KJS HAULING AND HOME95 MAPLE AVENUENEW CITY

NY 10956

04/15/2013 04/15/2018

DOL DOL KEN DEAVER 731 WARWICK TURNPIKEHEWITT NJ 07421

06/25/2012 12/11/2017

DOL DOL *****9732 KENT HOLLOW SIDING LLC 29A BRIDGE STREETNEW MILFORD CT 06776

01/15/2016 01/15/2021

DOL DOL KEVIN BABCOCK JR P O BOX 46THOMPSON RIDGE NY 10985

08/22/2014 08/22/2019

DOL DOL KEVIN M BABCOCK P O BOX 46THOMPSON RIDGE NY 10985

08/22/2014 08/22/2019

DOL DOL KIM SOROCENSKI C/O SOLUTION MATTERS INC198 NORWOOD ROADPORT

JEFFERSON NY 11776

11/19/2015 11/19/2020

DOL DOL *****2463 KJS HAULING AND HOMEIMPROVEMENT INC

95 MAPLE AVENUENEW CITY NY 10956

04/15/2013 04/15/2018

DOL AG KOSTAS "GUS"ANDRIKOPOULOS

2461 47TH STREETASTORIA NY 11103

09/26/2013 09/26/2018

DOL DOL KRZYSZTOF PRXYBYL 2 TINA LANEHOPEWELL JUNCTION NY

12533

01/06/2012 01/06/2017

DOL DOL *****6033 KUSNIR CONSTRUCTION 2677 ANAWALK ROADKATONAH NY 10536

08/03/2012 08/03/2017

DOL DA *****8816 LAKE CONSTRUCTION ANDDEVELOPMENTCORPORATION

150 KINGS STREETBROOKLYN NY 11231

08/19/1998 08/19/2998

DOL DOL *****6224 LAKESIDE FIRE SPRINKLERSLLC

125 CHAUTAUQUA AVENUELAKEWOOD NY 14750

06/24/2015 06/24/2020

DOL DOL LARRY DOMINGUEZ 114 PEARL STREETPORT CHESTER NY 10573

08/15/2012 08/15/2017

DOL DOL LAURA A. GAUTHIER C/O IMPERIAL MASONRYREST

141 ARGONNEDRIVEKENMORE NY 14217

10/03/2012 10/03/2017

DOL DOL LAURI MARTONE 112 OSCAWANA HEIGHTSROAD

PUTNAM VALLEY NY 10542

08/27/2013 08/27/2018

DOL DOL LAVERN GLAVE C/O RAW POWER ELECTRIC3 PARK CIRCLEMIDDLETOWN

NY 10940

09/15/2014 09/15/2019

DOL DOL LAWRENCE J RUGGLES P O BOX 371ROUND LAKE NY 12151

05/12/2014 05/12/2019

DOL DOL *****1364 LEAD CONSTRUCTIONSERVICES INC

3 ALAN B SHEPARD PLACEYONKERS NY 10705

03/19/2015 03/19/2020

DOL DOL *****0597 LEED INDUSTRIES CORP HI-TECHCONTRACTIN

G CORP

114 PEART STREETPORT CHESTER NY 10573

08/15/2012 08/15/2017

DOL DOL *****4388 LEN J CONSTRUCTION LLC P O BOX 10007ALBANY NY 12201

06/24/2016 06/24/2021

DOL AG LEONID FRIDMAN APT 5200 BRIGHTON, 15TH

STBROOKLYN NY 11235

01/23/2014 01/23/2019

DOL DOL LEROY NELSON JR C/O LEN J CONSTRUCTION LLP O BOX 10007ALBANY NY

12201

06/24/2016 06/24/2021

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 8 of 14

Article 8

Page 146 of 152

Page 147: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL LINDSEY R CRILL 143 FILLMORE AVENUEBUFFALO NY 14210

01/08/2015 01/08/2020

DOL DOL *****8453 LINPHILL ELECTRICALCONTRACTORS INC

523 SOUTH 10TH AVENUEMOUNT VERNON NY 10553

01/07/2011 04/15/2018

DOL DOL LINVAL BROWN 523 SOUTH 10TH AVENUEMOUNT VERNON NY 10553

01/07/2011 04/15/2018

DOL NYC *****2850 M A 2 FLAGS CONTRACTINGCORP

25-18 100TH STREETEAST ELMHURST NY 11369

08/21/2013 08/21/2018

DOL AG *****6957 M B DIN CONSTRUCTION INC 8831 20TH AVENUE/SUITE 6EBROOKLYN NY 11214

11/17/2015 11/17/2020

DOL NYC *****6317 M S QUALITY CONSTRUCTIONLLC

27 MAPLEWOOD AVENUECOLONIA NJ 07067

02/04/2015 02/04/2020

DOL NYC MACIEJ SONTOWSKI 27 MAPLEWOOD AVENUECOLONIA NJ 07067

02/04/2015 02/04/2020

DOL NYC *****9590 MACK GLASSNAUTH IRONWORKS INC

137 LIBERTY AVENUEBROOKLYN NY 11212

12/21/2015 12/21/2020

DOL NYC *****3141 MACKEY REED ELECTRIC INC 1ST FLOOR STORE FRONT88-10 LITTLE NECK

PARKWAYFLORAL PARK NY11001

06/24/2014 06/24/2019

DOL DOL *****1784 MADISON AVECONSTRUCTION CORP

39 PENNY STREETWEST ISLIP NY 11795

11/02/2016 11/02/2021

DOL DOL MALARKEY'S BAR & GRILLLLC

64 VICTORIA DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL *****0705 MALARKEY'S PUB & GRUBLLC

64 VICTORIA DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DA MANUEL P TOBIO 150 KINGS STREETBROOKLYN NY 14444

08/19/1998 08/19/2998

DOL DA MANUEL TOBIO 150 KINGS STREETBROOKLYN NY 11231

08/19/1998 08/19/2998

DOL DOL MAR CONTRACTING CORP 620 COMMERCE STREETTHORNWOOD NY 10594

09/24/2012 09/24/2017

DOL DOL MARGARET FORTH P O BOX 74EAST GREENBUSH NY 12061

02/28/2012 10/01/2017

DOL DOL MARIA ESTEVES AKA MARIAMARTINS

C/O THREE FRIENDS CONSTR986 MADISON

AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL DOL MARIA MARTINS AKA MARIAESTEVES

C/O THREE FRIENDS CONSTR986 MADISON

AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL DOL MARIACHI'S PIZZERIA C/O DOUGLAS L MALARKEY64 VICTORIA

DRIVEBINGHAMTON NY 13904

02/04/2016 02/04/2021

DOL DOL MARIO LUIS 31 DURANT AVENUEBETHEL CT 06801

07/02/2012 07/02/2017

DOL DOL MARK MIONIS 6409 LAND O LAKES BLVDLAND O LAKES FL 34638

11/10/2015 11/10/2020

DOL DOL *****5533 MARQUISE CONSTRUCTION &DEVELOPMENT CORP

10 ST CHARLES STREETTHORNWOOD NY 10594

09/03/2013 09/03/2018

DOL DOL *****8810 MARQUISE CONSTRUCTIONASSOCIATES INC

20 BOSWELL ROADPUTNAM VALLEY NY 10579

09/03/2013 09/03/2018

DOL DOL *****1134 MARQUISE CONSTRUCTIONCORP

10 ST CHARLES STREETTHORNWOOD NY 10594

09/03/2013 09/03/2018

DOL NYC *****4314 MASCON RESTORATION INC 129-06 18TH AVENUECOLLEGE POINT NY 11356

02/09/2012 02/09/2017

DOL NYC *****4314 MASCON RESTORATION LLC 129-06 18TH AVENUECOLLEGE POINT NY 11356

02/09/2012 02/09/2017

DOL DOL *****0845 MASONRY CONSTRUCTIONINC

442 ARMONK ROADMOUNT KISCO NY 10549

12/04/2009 05/04/2017

DOL DOL *****3333 MASONRY INDUSTRIES INC 442 ARMONK ROADMOUNT KISKO NY 10549

12/04/2009 05/04/2017

DOL DOL MATTHEW IDEMA GENERALCONTRACTORS INC

91 COLLEGE AVENUEPOUGHKEEPSIE NY 12603

12/04/2015 12/04/2020

DOL DOL *****6416 MCCALL MASONRY P O BOX 304SAYRE PA 18840

08/09/2016 08/09/2021

DOL DOL *****9028 MCINTOSH INTERIORS LLC 8531 AVENUE BBROOKLYN NY 11236

02/05/2013 02/05/2018

DOL DOL *****4259 MERCANDO CONTRACTINGCO INC

134 MURRAY AVENUEYONKERS NY 10704

12/11/2009 02/03/2019

DOL DOL *****0327 MERCANDO INDUSTRIES LLC 134 MURRAY AVENUEYONKERS NY 10704

12/11/2009 02/03/2019

DOL NYC *****5330 METRO DUCT SYSTEMS INC 1219 ASTORIA BOULEVARDLONG ISLAND CITY NY 11102

04/16/2014 11/19/2020

DOL DOL *****3368 MICEK CONSTRUCTION COINC

20 CROSS STREETFALCONER NY 14733

12/02/2014 12/02/2019

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 9 of 14

Article 8

Page 147 of 152

Page 148: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL MICHAEL A PASCARELLA SUITE 1002105 WEST GENESEE STREET

SYRACUSE NY 13219

01/06/2016 01/06/2021

DOL DOL *****9198 MICHAEL CZECHOWICZ OCTAGON CO 37-11 35TH AVENUE-2ND FLLONG ISLAND CITY NY 11101

01/08/2013 01/08/2018

DOL DOL MICHAEL F LEARY JR3813 SNOWDEN HILL

ROADNEW HARTFORD NY13413

06/19/2013 06/19/2018

DOL DOL MICHAEL F LEARY JR METALSTUD & DRYWALL

3813 SNOWDEN HILL ROADNEW HARTFORD NY 13413

06/19/2013 06/19/2018

DOL NYC MICHAEL HIRSCH C/O MZM CORP163 S MAIN STREETNEW CITY

NY 10956

01/28/2016 01/28/2021

DOL DOL MICHAEL KTISTAKIS 363 88TH STREETBROOKLYN NY 11209

11/18/2013 11/18/2018

DOL DOL *****6033 MICHAEL KUSNIR KUSNIRCONSTRUCTI

ON

2677 ANAWALK ROADKATONAH NY 10536

08/03/2012 08/03/2017

DOL DOL MICHAEL MARGOLIN 4 LEGHORN COURTNEW YORK NY 11746

11/28/2012 11/28/2017

DOL DOL MICHAEL WILSON WILSONBROTHERDRYWALL

CONTRACTORS

36 ABERSOLD STREETROCHESTER NY 14621

08/31/2015 08/31/2020

DOL DOL MICHELLE L BARBER 635 LUZERNE ROADQUEENSBURY NY 12804

09/16/2013 09/16/2018

DOL NYC MIGUEL ACOSTA 25-18 100TH STREETEAST ELMHURST NY 11369

08/21/2013 08/21/2018

DOL NYC MILANCE HADZIC 22 CALIFORNIA AVE - STE 1PATERSON NJ 07503

03/11/2015 03/11/2020

DOL AG MOHAMMAD RIAZ 46 RUGBY ROADWESTBURY NY 11590

11/20/2013 11/20/2018

DOL AG MOHAMMED N CHATHA 8831 20TH AVENUE/SUITE 6EBROOKLYN NY 11214

11/17/2015 11/17/2020

DOL DOL *****2737 MOUNTAIN'S AIR INC 2471 OCEAN AVENUE- STE 7ABROOKLYN NY 11229

09/24/2012 09/18/2020

DOL DOL MUHAMMAD PERVAIZ C/O CHAMPIONCONSTRUCTION

2131 SCHENECTADYAVENUEBROOKLYN NY 11234

11/18/2015 11/18/2020

DOL NYC MUHAMMAD ZULFIQAR 129-06 18TH AVENUECOLLEGE POINT NY 11356

02/09/2012 02/09/2017

DOL DOL MURRAY FORTH P O BOX 74EAST GREENBUSH NY 12061

02/28/2012 10/01/2017

DOL DOL MUZAFFAR HUSSAIN C/O ABSOLUTE GENERALCONT

1129 AVENUE UBROOKLYN NY11229

01/28/2013 01/28/2018

DOL NYC *****3613 MZM CORP 163 S MAIN STREETNEW CITY NY 10956

01/28/2016 01/28/2021

DOL NYC *****1284 NEW AMERICANRESTORATION INC

22 CALIFORNIA AVE - STE 1PATERSON NJ 07503

03/11/2015 03/11/2020

DOL DA *****6988 NEW YORK INSULATION INC 58-48 59TH STREETMASPETH NY 11378

05/16/2012 05/08/2020

DOL NYC *****4839 NEW YORK RIGGING CORP 58-83 54TH STREETMASPETH NY 11378

02/26/2016 02/26/2021

DOL DOL NICHOLAS DEGREGORY JR NJDEGREGORY& COMPANY

1698 ROUTE 9GLENS FALLS NY 12801

05/23/2013 05/23/2018

DOL NYC NICHOLAS PROVENZANO 147 BROOME AVENUEATLANTIC BEACH NY 11509

03/03/2014 03/03/2019

DOL NYC NICHOLAS PROVENZANO 147 BROOME AVENUEATLANTIC BEACH NY 11509

03/03/2014 03/03/2019

DOL DOL *****5279 NJ DEGREGORY & COMPANY 1698 ROUTE 9GLENS FALLS NY 12801

05/23/2013 05/23/2018

DOL DOL NJ DEGREGORY & SONSCONSTRUCTION

1698 ROUTE 9GLENS FALLS NY 12801

05/23/2013 05/23/2018

DOL NYC *****1968 NORTH AMERICAN IRONWORKS INC

1560 DECATUR STREETRIDGEWOOD NY 11385

05/15/2015 05/15/2020

DOL DOL *****6966 NORTH COUNTRY DRYWALLAND PAINT

23167 COUNTY ROUTE 59DEXTER NY 13634

10/24/2016 10/24/2021

DOL DOL *****9198 OCTAGON CO 37-11 35TH AVENUE-2ND FLLONG ISLAND CITY NY 11101

01/08/2013 01/08/2018

DOL DOL OKBY ELSAYED 1541 EAST 56TH STREETBROOKLYN NY 11234

05/04/2012 05/04/2017

DOL NYC *****8337 OPTIMUM CONSTRUCTIONINC

23-73 48TH STREETLONG ISLAND CITY NY 11103

04/24/2014 04/24/2019

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 10 of 14

Article 8

Page 148 of 152

Page 149: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL NYC ORSON ARROYO C/O METRO DUCT SYSTEMS12-19 ASTORIA

BOULEVARDLONG ISLANDCITY NY 11102

04/16/2014 11/19/2020

DOL DOL *****4546 PAF PAINTING CORP 161 TIBBETTS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL *****5242 PAF PAINTING SERVICES INC GARDENSTATE

PAINTING

157 TIBBETTS ROADYONKERS NY 10103

03/12/2014 03/12/2019

DOL DOL PAF PAINTING SERVICES OFWESTCHESTER INC

C/O SPIEGEL & UTRERA1 MAIDEN LANE - 5TH FLNEW

YORK NY 10038

03/12/2014 03/12/2019

DOL DOL *****8802 PAT'S HEATING AND AIRCONDITIONING LTD

P O BOX 371ROUND LAKE NY 12151

05/12/2014 05/12/2019

DOL DOL PATRICIA M RUGGLES P O BOX 371ROUND LAKE NY 12151

05/12/2014 05/12/2019

DOL DOL PAUL VERNA C/O AMERICAN STEELMECHA

693 PAINTER STREETMEDIAPA 19063

02/20/2013 02/20/2018

DOL DOL *****9569 PERFORM CONCRETE INC 31 DURANT AVENUEBETHEL CT 06801

07/02/2012 07/02/2017

DOL NYC PETER LUSTIG 30 COLUMBUS CIRCLEEASTCHESTER NY 10709

08/21/2012 08/21/2017

DOL NYC PETER TRITARIS 5990 58TH AVENUEMASPETH NY 11378

11/18/2013 11/18/2018

DOL DOL *****2989 PROFESSIONAL ESTIMATING& BUSINESS CORP

157 TIBBETS ROADYONKERS NY 10705

03/12/2014 03/12/2019

DOL DOL *****6895 PROLINE CONCRETE OF WNYINC

3090 SHIRLEY ROADNORTH COLLINS NY 14111

04/19/2011 07/08/2020

DOL DA *****6817 QUADRANT METALBUILDINGS LLC

2740 SW MARTIN DOWNSBLVD

PALM CITY FL 34990

08/25/2016 08/25/2021

DOL DOL *****0015 RAMADA CONSTRUCTIONCORP

80 SAVO LOOPSTATEN ISLAND NY 10309

01/07/2014 01/07/2019

DOL NYC RAMESHWAR ASU 137 LIBERTY AVENUEBROOKLYN NY 11212

12/21/2015 12/21/2020

DOL DOL RANA A KAHN 1973 81ST ST - SUITE A-5BROOKLYN NY 11214

01/08/2015 01/08/2020

DOL NYC RANTIK PARIKH 13 LORIANN ROADWARREN NJ 07059

07/15/2015 07/15/2020

DOL DOL *****2633 RAW POWER ELECTRIC CORP 3 PARK PLACEMIDDLETOWN NY 10940

09/16/2013 09/15/2019

DOL NYC RAYMOND PEARSON P O BOX 957PORT JEFFERSON STA NY

11776

03/12/2014 03/12/2019

DOL DOL REBECCA THORNE 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL REGINALD WARREN C/O RAW POWER ELECTRIC3 PARK CIRCLEMIDDLETOWN

NY 10940

09/15/2014 09/15/2019

DOL NYC *****3461 RELIANCE GENERALCONSTRUCTION INC

644 OCEAN PARKWAYBROOKLYN NY 11230

09/02/2015 09/02/2020

DOL DOL REVOLUTIONARY FLOORSLLC

P O BOX 268STILLWATER NY 12170

09/16/2013 03/21/2019

DOL DOL RHINO CONCRETE LLC 101 SULLYS TRAIL/SUITE 20PITTSFORD NY 14534

11/18/2013 01/07/2019

DOL DA RIANN MULLER 2740 SW MARTIN DOWNSBLVD

PALM CITY FL 34990

08/25/2016 08/25/2021

DOL DOL RICHARD WILSON C/O DUFOUR GROUP INC353 WEST 56TH STREET#7MNEW YORK NY 10019

06/10/2014 06/10/2019

DOL DOL *****8618 RIEKS CONTRACTING LLC 4804 GAHWILER ROADAUBURN NY 13021

05/01/2015 05/01/2020

DOL DOL ROBBYE BISSESAR 89-51 SPRINGFIELD BLVDQUEENS VILLAGE NY 11427

01/11/2003 01/11/3003

DOL DOL *****1855 ROBERT D BISHOP JR ROBERT DBISHOP JR

P O BOX 112MORRISSONVILLE NY 12962

07/15/2014 07/15/2019

DOL DOL ROBERT D BISHOP JR P O BOX 112MORRISONVILLE NY 12962

07/15/2014 07/15/2019

DOL NYC ROBERT GUIDO 3256 BRUNER AVENUEBRONX NY 10469

07/29/2014 07/29/2019

DOL DOL ROBERT L EVANS 128A NORTH STAMFORDROAD

STAMFORD CT 06903

05/23/2013 05/23/2018

DOL DOL ROBERT TORDELLA 125 CHAUTAUQUA AVENUELAKEWOOD NY 14750

06/24/2015 06/24/2020

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 11 of 14

Article 8

Page 149 of 152

Page 150: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL ROCCO ESPOSITO C/O ROCMAR CONTRACTINGCO

620 COMMERCESTREETTHORNWOOD NY

10594

09/24/2012 09/24/2017

DOL DOL *****3859 ROCHESTER ACOUSTICALCORP

P O BOX 799HILTON NY 14468

02/19/2016 02/19/2021

DOL DOL ROCMAR CONSTRUCTIONCORP

620 COMMERCE STREETTHORNWOOD NY 10594

09/24/2012 09/24/2017

DOL DOL *****7083 ROCMAR CONTRACTINGCORP

620 COMMERCE STREETTHORNWOOD NY 10594

09/24/2012 09/24/2017

DOL NYC RODNEY SCOTT 201 HEMPSTEAD AVENUEWEST HEMPSTEAD NY 11552

10/30/2015 10/30/2020

DOL DOL ROMEO WARREN C/O RAW POWER ELECTRCORP

3 PARK PLACEMIDDLETOWNNY 10940

09/16/2013 09/15/2019

DOL DOL ROSEANNE CANTISANI 11 TATAMUCK ROADPOUND RIDGE NY 10576

05/04/2012 05/04/2017

DOL DOL ROSS J MUSCOLINO 10 ST CHARLES STREETTHORNWOOD NY 10594

09/03/2013 09/03/2018

DOL DOL S & S ELECTRIC 235 BROADWAYSCHENECTADY NY 12306

06/19/2013 06/19/2018

DOL NYC SABIR MUHAMMED SUITE B-8782 PELHAM PARKWAYSOUTHBRONX NY 10462

04/21/2016 04/21/2021

DOL NYC SAEED HASAN 4558 BROADWAY #6NEW YORK NY 10040

08/04/2014 08/04/2019

DOL DOL *****4923 SCHENLEY CONSTRUCTIONINC

731 WARWICK TURNPIKEHEWITT NJ 07421

06/25/2012 12/11/2017

DOL NYC *****2117 SCOTT ELECTRICAL LLC 201 HEMPSTEAD AVENUEWEST HEMPSTEAD NY 11552

10/30/2015 10/30/2020

DOL DOL SCOTT LEONARD GLOBAL TANKCONSTRUCTI

ON LLC

P O BOX 1238SALINA OK 74365

11/28/2012 11/28/2017

DOL DOL SEAKCO CONSTRUCTIONCOMPANY LLC

128A NORTH STAMFORDROAD

STAMFORD CT 06903

05/23/2013 05/23/2018

DOL DOL *****9030 SEAKCO NEW YORK LLC SEAKCOCONSTRUCTION COMPANY

128A NORTH STAMFORDROAD

STAMFORD CT 06903

05/23/2013 05/23/2018

DOL DOL SEAN BURBAGE C/O SEANBURBAGE

CORP

445 ROOSA GAP ROADBLOOMINGBURG NY 12721

04/14/2014 04/14/2019

DOL DOL *****6586 SEAN BURBAGE CORP 445 ROOSA GAP ROADBLOOMINGBURG NY 12721

04/14/2014 04/14/2019

DOL NYC SHAHZAD ALAM 21107 28TH AVEBAYSIDE NY 11360

07/02/2012 07/02/2017

DOL DOL *****6904 SIGNING STAR LIMITEDLIABILITY COMPANY

5 HANSEN PLACEWAYNE NJ 07470

09/18/2013 09/18/2018

DOL DOL *****4025 SOLUTION MATTERS INC 198 NORWOOD ROADPORT JEFFERSON NY 11776

11/19/2015 11/19/2020

DOL DOL SPASOJE DOBRIC 61 WILLET STREET - SUITEPASSAIC NJ 07055

07/09/2010 02/23/2017

DOL NYC *****4934 SPHINX CONTRACTING CORP 240 HOME STREETTEANECK NJ 07666

08/04/2014 08/04/2019

DOL DOL SPORTSCRAFTERS INC 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL *****3496 STAR INTERNATIONAL INC 89-51 SPRINGFIELD BLVDQUEENS VILLAGE NY 11427

08/11/2003 08/11/3003

DOL DOL STEPHEN BIANCHI 462 LAKEVIEW AVENUEVALHALLA NY 10595

12/16/2013 12/16/2018

DOL DOL STEPHEON SHELDON FANTASTICPAINTING

493 LANSING ROADFULTONVILLE NY 12072

11/18/2013 11/18/2018

DOL DOL STEVEN P SUCATO 15-68 208TH STREETBAYSIDE NY 11360

06/23/2016 06/23/2021

DOL DOL STEVEN SAGGESE 3005 WYNSUM AVENUEMERRICK NY 11566

08/18/2014 08/18/2019

DOL DOL STUART CHAITIN 634 ROUTE 303BLAUVET NY 10913

07/26/2012 11/19/2018

DOL NYC *****9432 SUBLINK LTD 346 THIRD AVENUEPELHAM NY 10803

11/19/2015 11/19/2020

DOL DOL *****3210 SUPER SWEEP FMS 4 LEGHORN COURTNEW YORK NY 11746

11/28/2012 11/28/2017

DOL DOL SUZANNE G GOLD C/O GOLDSFLOORING

INSTALLATIONS INC

25 HAMILTON ROADMONTICELLO NY 12701

10/16/2013 10/16/2018

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 12 of 14

Article 8

Page 150 of 152

Page 151: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL *****7441 T & T CONCRETE INC 2560 HAMBURG TURNPIKEP O BOX 367LACKAWANNA NY

14218

07/08/2015 07/08/2020

DOL DOL *****9676 T D CONTRACTORS CORP T DCONTRACTOR

S INC

113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL T D CONTRACTORS INC 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL TAMMY LACITIGNOLA C/O CATSKILL FENCE INSTAL5445 ROUTE 32CATSKILL NY

12414

08/22/2014 08/22/2019

DOL DOL *****9852 TAP STEEL INC ROUTE 26 3101P O BOX 457CONSTABLEVILLE

NY 13325

01/28/2016 01/28/2021

DOL DOL TECH-MECHANICAL FAB DCINC

5 PARKER AVENUEPOUGHKEEPSIE NY 12601

03/25/2014 03/25/2019

DOL DOL *****0887 THE BRINSON PAINTINGCORPORATION

72 TAUNTON PLACEBUFFALO NY 14216

04/14/2015 04/14/2020

DOL DOL *****8174 THE DALRYMPLECORPORATION

UNIT 278541 10TH STREET

NWATLANTA GA 30318

12/01/2015 12/01/2020

DOL DOL *****8174 THE DALRYMPLE GROUP LLC 289 JONESBORO RD/ STE 216MCDONOUGH GA 30253

12/01/2015 12/01/2020

DOL DOL THE THORNE GROUP INC 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL *****2070 THE UNIVERSAL GROUP OFNEW YORK INC

212 OXFORD WAYSCHENECTADY NY 12309

12/11/2012 09/16/2018

DOL DOL *****9243 THE WELCOME MATPROPERTY MANAGEMENT

LLC

P O BOX 268STILLWATER NY 12170

09/16/2013 03/21/2019

DOL DOL THOMAS DESANTIS DESANTISENTERPRISES

161 OSWEGO RIVER ROADPHOENIX NY 13135

09/24/2013 11/18/2018

DOL NYC THOMAS SCARINCI 130-43 92ND AVENUERICHMOND HILLS NY 11418

11/27/2013 11/27/2018

DOL DOL *****2734 THREE FRIENDSCONSTRUCTION CORP

986 MADISON AVENUEPATERSON NJ 07501

01/03/2013 01/03/2018

DOL NYC *****6253 THUNDER BROTHERS CORP 24 CONGRESS LANESOUTH RIVER NJ 08882

05/01/2013 05/01/2018

DOL DOL TIMOTHY A PALUCK C/O TAP STEEL INCRTE 26 3101/ P O BOX

457CONSTABLEVILLE NY13325

01/28/2016 01/28/2021

DOL DOL TIMOTHY F BARBER 635 LUZERNE ROADQUEENSBURY NY 12804

09/16/2013 09/16/2018

DOL NYC *****1523 TM MECHANICAL CORP 130-43 92ND AVENUERICHMOND HILLS NY 11418

11/27/2013 11/27/2018

DOL DOL *****0600 TOMSON ALLOYS RECYCLINGINC

143 FILLMORE AVENUEBUFFALO NY 14210

01/08/2015 01/08/2020

DOL DOL *****3453 TORCHIA'S HOMEIMPROVEMENT

10153 ROBERTS RDSAUQUOIT NY 13456

08/09/2016 08/09/2021

DOL DOL *****8176 TOURO CONTRACTING CORP 1541 EAST 56TH STREETBROOKLYN NY 11234

05/04/2012 05/04/2017

DOL DOL *****6914 TRI-COUNTY RESTORATIONS& CONSTRUCTION INC

13 SUMMERSET DRIVEWALLKILL NY 12589

08/22/2014 08/22/2019

DOL DOL TRI-COUNTY RESTORATIONSINC

392 ROCK CUT ROADWALDEN NY 12586

08/22/2014 08/22/2019

DOL DOL TROY D CLARKE ADVANCEDMETALS

387 RIVERSIDE DRIVEJOHNSON CITY NY 13790

10/01/2012 10/01/2017

DOL DOL *****9407 TURBO GROUP INC 15-68 208TH STREETBAYSIDE NY 11360

06/23/2016 06/23/2021

DOL AG *****6490 UNIVERSAL STEELFABRICATORS INC

90 JUNIUS STREETBROOKLYN NY 11212

01/23/2014 01/23/2019

DOL NYC *****7174 V&R CONTRACTING P O BOX 957PORT JEFFERSON STA NY

11776

03/12/2014 03/12/2019

DOL NYC VALERIE VISCONTI 346 THIRD AVENUEPELHAM NY 10803

11/19/2015 11/19/2020

DOL NYC VEAP SELA C/O COLONIALROOFING

COMPANY INC

247 48TH STREETBROOKLYN NY 11220

02/05/2014 02/05/2019

DOL DOL *****3270 VEZANDIO CONTRACTINGCORP

530 BEECH STREETNEW HYDE PARK NY 11040

07/02/2012 07/02/2017

DOL NYC VICK CONSTRUCTION 21 DAREWOOD LANEVALLEY STREAM NY 11581

12/31/2013 12/31/2018

DOL NYC VICKRAM MANGRU VICKCONSTRUCTI

ON

21 DAREWOOD LANEVALLEY STREAM NY 11581

12/31/2013 12/31/2018

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 13 of 14

Article 8

Page 151 of 152

Page 152: 6 Bituminous Materials - alleganyco.com · Bituminous Materials 7. 1311 Calcium Chloride 8. Crushed Gravel, Screened & Bank Run Gravel 9. Stone Fill (Rip Rap) 10. Ready Mix Concrete,

DOL DOL VICTOR ROTENBERG C/O GMDV TRANS INC67048 182ND STREETFRESH

MEADOWS NY 11365

06/24/2016 06/24/2021

DOL NYC VINCENT PIZZITOLA P O BOX 957PORT JEFFERSON STA NY

11776

03/12/2014 03/12/2019

DOL DOL WAYNE LIVINGSTON JR NORTHCOUNTRYDRYWALLAND PAINT

23167 COUNTY ROUTE 59DEXTER NY 13634

10/24/2016 10/24/2021

DOL DOL WESLEY J STAROBA 206 TALLY HO COURTSCHENECTADY NY 12303

06/19/2013 06/19/2018

DOL DOL *****0078 WESLEY J STAROBA INC S & SELECTRIC

235 BROADWAYSCHENECTADY NY 12306

06/19/2013 06/19/2018

DOL DOL *****7617 WHITE PLAINS CARPENTRYCORP

P O BOX 309WHITE PLAINS NY 10603

12/04/2009 05/04/2017

DOL DOL WILLIAM CONKLIN 5 PARKER AVENUEPOUGHKEEPSIE NY 12601

03/25/2014 03/25/2019

DOL DOL WILLIAM DEAK C/O MADISON AVE CONSTRCO

39 PENNY STREETWEST ISLIPNY 11795

11/02/2016 11/02/2021

DOL DOL WILLIAM MAZZELLA 134 MURRAY AVENUEYONKERS NY 10704

02/03/2014 02/03/2019

DOL DOL WILLIAM THORNE 113 N MAPLE AVENUEGREENSBURG PA 15601

02/21/2013 02/21/2018

DOL DOL WILLIE BRINSON 72 TAUNTON PLACEBUFFALO NY 14216

04/14/2015 04/14/2020

DOL DOL *****6195 WILSON BROTHER DRYWALLCONTRACTORS

36 ABERSOLD STREETROCHESTER NY 14621

08/31/2015 08/31/2020

DOL DOL *****7345 YES SERVICE AND REPAIRSCORPORATION

325 RABRO DRIVE - SUITE 1HAUPPAUGE NY 11788

08/09/2016 08/09/2021

DOL DOL YURIY IVANIN C/O MOUNTAIN'S AIR INC2471 OCEAN AVENUE-STE

7ABROOKLYN NY 11229

09/24/2012 09/18/2020

NYSDOL Bureau of Public Work Debarment List 01/04/2017

Page 14 of 14

Article 8

Page 152 of 152


Recommended